! Daniel Diez Ausias Architecture portfolio selected works 2010-2016
Daniel Diez Ausias 30/01/1980 Born in Valladolid. Spain. Currently living in Rotterdam since 2010. Master in Architecture. April 2009 ETSAV. Escuela TĂŠcnica Superior de Arquitectura de Valencia Valencia Polytechnic University (U.P.V.) Spain. a: Leopoldstraat 21A , 3031SV Rotterdam e: danieldiezausias@gmail.com t: +31 640824244 / 0640824244 in: https://nl.linkedin.com/in/dadiez
About me
communicative
competitive
designer
friendly
architecture lover
team player
energetic
organized
creative sturdy
hard worker
volleyball player
studious
flexible fun positive
honest
masterchef
international experience
enthousiast
languages
Spanish ( native )
English ( fluent )
Dutch ( intermediate, B1)
Catalan ( fluent )
Architect specialist in sustainable architectural envelopes !
Specialized skills - Revit ( BIM modeling, 4 years experience, member of EHA expert group) - Dynamo ( parametric design for Revit, member of Dutch Dynamo user group ) - Sefaira ( daylight analysis and energy optimization ) - Rhinoceros / 3DMax + Vray ( 3D modeling of complex geometries ) - Adobe
suite
Work experiences
EHA Ector Hoogstad Architecten 04/2011 - Present Company: Ector Hoogstad Architecten. Rotterdam, The Netherlands. Position: architect Work: Designer / 3D visualizer/animator / BIM manager/modeler - projects in The Netherlands and in China.
SPA Salvador PĂŠrez Arroyo 07/2010 - 04/2011 Company: SPA Salvador PĂŠrez Arroyo, Madrid, Spain. Position: architect Work description: Designer / 3D visualizer - projects in Doha, Qatar.
STAR Strategies + Architecture 01/2010 - 07/2010 Company: STAR strategies + architecture, Beatriz Ramo. Rotterdam, The Netherlands. Position : architect internship Work description: Designer / mockup maker - international competitions.
Highlighted competitions -Competition for the Koninklijke Auris Groep audiology centrum and headquarters Rotterdam, The Netherlands 2014. AURIS ( winner ) working for Ector Hoogstad Architecten. Team: Oscar Backus, Markus Clarijs, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the center court campus building in Geleen, The Netherlands 2014. CHEMELOT CAMPUS ( winner ) working for Ector Hoogstad Architecten. Team: Koert Hougee, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Guggenheim Helsinki museum. Helsinki, Finland 2014. Team: Samuel Delgado, Elia Salcedo, Iñaki Llorens, Daniel Diez. -Competition for the Walltopia headquarters, Sofia, Bulgaria 2013. SHOWROOM ( mention ) Team: Ivan Carbajosa, Elia Salcedo, Carlos Moreira, Daniel Diez. -Competition for the central station square,canopy and bycicle parking. Utrecht, The Netherlands 2011. STATIONALLE ( winner ) working for Ector Hoogstad Architecten. Team: Elia Salcedo, Markus Clarijs, Lennaert Capelleveen, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Alibaba headquarters. Senzhen, China 2011. THE ROCK ( Finalists ) working for Ector Hoogstad Architecten. Team: Tao Yang, Lennaert van Capelleveen, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Elche Auditorium, Alicante, Spain 2010. MÉZCLATE CONMIGO. working for STAR Strategies+Architecture. Team: Elia Salcedo, Beatriz Ramo, Xiana Méndez, Guadalupe Hernández, Daniel Diez. -Competition for the Contemporary Architecture Foundation in Cordoba, Spain 2010. USE YOUR ILLUSION ( Finalists ).working for STAR Strategies+Architecture. Team: Elia Salcedo, Beatriz Ramo, Xiana Méndez, Guadalupe Hernández, Daniel Diez. -Competition for the Polish History Museum in Warsaw, Poland 2009. MEELTING POINT Team: Elia Salcedo, Jordi Lopez, Daniel Diez. -Competition for building 50 housing units in Cuevas de Almanzora, Spain 2006. BIOFLEX (Finalists) Team: Elia Salcedo, Marian Torres, Pablo Sanchis, Daniel Diez. -Competition for the 2G Park in Venice lagoon, Italy 2007. THE GAME Team: Elia Salcedo, Daniel Diez -Competition for the tram station at the Alicante university, Spain 2008. EN MOVIMIENTO ( Finalists ) in collaboration with AMC Architecture. Team: Ana Lozano, Elia Salcedo, Carlos Jiménez , Daniel Diez.
! t c roje
p c i etr
BIM
m a r pa
A 3.600 m² roof made only with 4 different pieces !
01
Project name: Bubble cloud Location: Utrecht, The Netherlands. Size: 3.600 m². Date: Final design May 2013. Status: Under construction, expected completion April 2017. Type: Canopy design on top of the square in the East side of the central station. Role in the project: Designer, BIM modeler, 3D visualizer, 3D animator, construction detailing, construction supervision on site. Experience:Parametric design in BIM projects, long 3D animations, video edition, complex interdisciplinary team, fluid dynamics studies, construction site visits, materials research, maintenance research.
bovenaan 34 34pieces stuks
28 28pieces stuks
262
68 68pieces stuks
49 49pieces stuks
pieces distribution
Stationsallee, Utrecht
1
2
3
4 geometry design steps
Ector Hoogstad Architecten
n het dat het Op de
et te worpen. gonale n ĂŠĂŠn van mgeving. te het zich ven de
em e UVgrote 4 ak wordt aarbij de
259
van de
bruik. s ten udig
oudig te
orden in
15-05-2013 complete shape
3D print experience !
constructive section
The project is fully modeled in Revit and made of 4 parametric families. The bubbles are made of Inflated ETFE plastic cushions. Ector Hoogstad Architecten
The shape is totally optimized through studies of fluid dynamics to allow a dry pathway between the central station and the shopping mall. Steel structure is designed in a monocoque way to optimize it’s own weight and performing equally in all directions.
263
15-05-2013
Ector Hoogstad Architecten
the 4 different pieces assembled
B
r p IM
! t c oje
12.500 bicycles... World’s largest bicycle parking !
02
Project name: SPO Stationsplein Oost Location: Utrecht, The Netherlands. Size: 19.000 m². Date: Final design May 2013 Status:Under construction expected completion 2018 Type: Competition for the bicycle parking facility in the East side of the central station. Role in the project: Designer, BIM modeler, 3D visualizer, 3D animator, construction detailing, construction supervision on site. Experience: Bicycle traffic and storage research, long 3D animations, video edition, large scale BIM projects, materials research, complex interdisciplinary team, visits to the building site.
In this last years, the city of Utrecht is constantly changing, SPO is part of the new urbanistic plan CU2030 along the main train station in Holland. Utrecht is building in the station area to the future of the city: a meeting place for everyone who wants to travel, shop, live, work and relax in the dynamics of the heart of the Netherlands. This bicyle parking facility project starts in 2011 and will be completed in 2018. The project is coordinating a complex adjoining network of structures and infrastructures.
transversal section
Ector Hoogstad Architecten
construction photos
5200
Tr2
longitudinal section 35
5200
34
5200
33
5200
32
5200
31
5200
30
4900
29
5400
28
6900
27
5200
26
5200
25
5200
24
5200
23
5200
22
4900
21
5400
20
4900
19
179600
18
Ector Hoogstad Architecten
5200 5200
5200 5200
17 17
5200 5200
16 16
5200 5200
15 15
5200 5200
14 14
5200 5200
13 13
5200 5200
12 12
5200 5200
11 11
6900 6900
10 10
5400 5400
99
4900 4900
88
5200 5200
77
5200 5200
66
5200 5200
55
5200 5200
44
5200 5200
33
5200 5200
22
11
Great animation made by me with more than 69.000 visualizations !
PEDESTRIAN ENTRANCES
level +1
+1
InIN UIT
out
level 0
0
level -1
-1
out
UIT
In IN
MIDDENTUNNEL MIDDENTUNNEL
unidirectional bicycle zone
éénrichting
pedestrian zone
voetganger
parking zone
stallingszon
vertical circulation
stijgpunten
bike point shop/maintenance
fietspoint
NOORDERSTALLING NOORDERSTALLING
For the digital version, please click on the image and scroll down in the site to see the animation movie or go to:
https://www.youtube.com/watch?v=ynIRAhoqoBc
Complexity
Interdisciplinary collaboration
BIM integration
Projects structure in the station area Utrecht ! structuur projecten stationsgebied in relation with the station square East and West utrecht in relatie tot Stationsplein Oost en Stationsplein West
Projecten CU2030 met relatie tot Stationsplein Oost en Stationsplein West Ector Hoogstad Architecten Overlegpartner EHA in eigen project of buurprojecten
c i r t e m a r a p ! t M I c B je o r p
03
Name: Pulse Location: TU Delft, The Netherlands. Date: Final design August 2015 Status:Under construction, expected completion September 2017 Type: University campus building, development of one of the facades to optimize solar shading, illuminance performance and volume material use.
Role in the project: Designer, BIM modeler, 3D visualizer, construction detailing, coordinator between EHA and TUDelft. Experience: 3D printing, material research, parametric optimization, cable construction, international team, TUDelft collaboration.
The first 3D printed facade in the world!
Relation between the building and the square in TU Delft
affordable
pure matrial
printing time
INPASSING IN DE OMGEVING
ECTOR HOOGSTAD ARCHITECTEN
situation in TUDelft 1449 Pulse TU Delft
3D optimization
Impressie Pulse, Learning Environment As en plein
production process
9
augustus-2015
square relation
Ector Hoogstad Architecten
CONSTRUCTION
PULSE TU DELFT
B4_05_04
15
17850+P
dakrand dakverd 03
3978
B4_05_03
7956
0 73 10
2 45 16
28.92°
47.8 55°
3978
B4_05_02
6950+P
dakrand dakverd 01 B4_05_01
I
H
G
F
E
D
C
B
A
augustus-2015 BIM section of the different illuminance requierments for a new way to share knowledge and teach Doorsnede
ulse TU Delft
ging 3D-zonwering optie 3
200
optie 3
1449 Pulse TU Delft
schaal
noord
1 : 200
Construction
Optie 3
11/23/15
December-2015
one of the possible geomety solutions generated by 3D parametric optimization process
On behalf of TU Delft, EHA Architects design ‘PULSE’; an inter-educational center with space for new forms of education where students and teachers meet and share knowledge and experiences. I join the design team to develop this extraordinary facade, based in the optimization of daylight illuminance in different areas of the building by an avant-garde facade made of unique reusable plastic 3D printed pieces.
construction site
an
aly
sis
1
t gh
in g
de
sign
li da y
d ha s su n
2
Figuur 2 Schematisch bovenaanzicht van het tui verloop ge誰ntegreerd in de 3D geprinte elementen
CHITECTEN TECTEN
COMPUTA
How How
de sig n
computational design
3D printed facade in 7 steps !
op t
Figuur 4 Schaalmodel voor constructie
pt im iza tion
im izati on
Figuur 3 Schaalmodel voor constructie
c an pa r n i ametric illum 4
e
3
re tu c stru
computational design
6
pa r ametric
o y r t e 5 ge o m
ns
ha din
g facade
7
u s rt a sm
In the development process of the facade we have integrated the most innovative and avant-garde construction techniques.
6
3
t in r Dp
Advanced computer software was been used to study the sun shading in line with the lighting requirements of the interior space. Use of parametric computing is used to obtain an optimization of the illuminance of daylight and optimum use of material used. The pieces are designed to be printed on reusable plastic with long life durability, able to performance perfectly in external conditions. The structure is integrated into the design of the pieces, so the pieces are working together with the supporting structure becoming part of the structure system.
A climbable building !
04
Name: Showroom Date: March 2013 Size: 5.000 m² Location: Sofia, Bulgaria Status: Non builded Type: Open competition for the Walltopia headquarters ( climbing company )
Role in the project: Designer, 3D modeler / visualizer, schemes, photo edition, research. Experience: Sports facility program, strategy, 3D complex curves modeling.
The showroom is a strong concept project for a climbing representative building whitch combines a very high level of flexibility in the program.
strategy schemes
Click here to see the animation presentation ! or go to : https://prezi.com/5ml5rlqh_ynv/the-showroom/
05
Project name: ¨Le ballon rouge¨ Location: Madrid, Spain Status: Non builded Date: February 2014 Type: Open ideas competition for the renovation of the Sol square and Km.0 ( national roads network starting point ) Role in the project: Designer, 3D modeler / visualizer, schemes, photo edition, research. Experience: urban scale strategy, milestone research, furniture systems, pavilion scale.
Madrid balloon !
balloon
longitudinal section of the square
relation between square - pavilion - balloon
! t c oje
B
r p IM
Rotterdam!
Project name: Auris Location: Rotterdam, The Netherlands. Size: 3.000 m². Date: Final design April 2015 Status:Under construction, expected completion September 2016 Type: Building for the Royal Auris Group audiology centrum and national headquarters. Role in the project: Designer, BIM manager/modeler, 3D visualizer, construction detailing, construction supervision on site. Experience: First time as BIM manager, special construction for audiological test rooms, budget control, daylight analysis, team leadership, visits to the building site.
06
1
1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.
2. Raamope Rondom de cm.
Ector Hoogstad Architecten 1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.
Ector Hoogstad Architecten
de
2. Raamopening Rondom de opening een halfsteens rollaag. Diepte negge is ca. 15 cm.
2
4. Overstek 2.Het Raamopening metselwerk eindigt onder met een rollaag (staande driekleRondom de metselwerk opening eenloopt halfsteens rollaag. Dieptevan negge ca. 15 zoor). Het door in het plafond het isoverstek. cm. Onder het overstek begint direct het betonnen kader.
3
5. Rooster parkeergarage 3. Onderhoek metselwerk 1. metselwerk DeBovenhoek lamellen van het rooster hebben dezelfde lagenmaat als het Het metselwerk eindigt onder met een rollaag (staande drieklHet metselwerk eindigt met rollaag drieklmetselwerk en zijn ook boven in de kleur van het(staande metselwerk. ezoor) en gaat in verstek de hoek om. Het metselwerk loopt door ezoor). Rondom het betonnen kader een rollaag van dezelfde in het plafond van het overstek. hoogte.
3. On Het m ezoor) in het
3. Onderhoek metselwerk Het metselwerk eindigt onder met een rollaag (staande drieklezoor) en gaat in verstek de hoek om. Het metselwerk loopt door in het plafond van het overstek.
Ector Hoogstad Architecten 4. Overstek 2. Raamopening metselwerk eindigt onder metDiepte een rollaag Rondom deHet opening een halfsteens rollaag. negge(staande is ca. 15drieklezoor). Het metselwerk loopt door in het plafond van het overstek. cm. Onder het overstek begint direct het betonnen kader.
1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.
2. Raamope Rondom de cm.
Building under construction in Ammanplein
2
kleerstek.
1 1442 Koninklijke Auris Groep Ammanplein Rotterdam 5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het 4. Overstek metselwerk en zijn ook in de kleur van het metselwerk. Het metselwerk eindigt onder met een rollaag (staande driekle-
4. Overstek Het metselwerk eindigt onder met een rollaag (staande drieklezoor). Het metselwerk loopt door in het plafond van het overstek. Onder het overstek begint direct het betonnen kader.
4
2
zoor). Het metselwerk loopt door in het plafond van het overstek. Onder het 1 overstek begint direct het betonnen kader.
4
5
2
3 4
het
lling
ep Ammanplein Rotterdam
3
1442 Koninklijke Auris Groep Ammanplein Rotterdam
4
5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het metselwerk en zijn ook in de kleur van het metselwerk.
5
5
5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het metselwerk en zijn ook in de kleur van het metselwerk.
5
Special attention points in the brick rig 1442 Koninklijke Auris Groep Ammanplein Rotterdam
1442 Koninklijke Auris Groep Ammanplein Rotterdam
25-02-2015
level -1
begane grond 1442 Koninklijke Auris Groep Ammanplein Rotterdam
level 0
25-02-2015
oep Ammanplein Rotterdam
level +1
tweede verdieping 1442 Koninklijke Auris Groep Ammanplein Rotterdam
level +2
3D longitudinal BIM section
10%
20%
1.700-P
10%
plateau lift
nooduitgang
bellentableau+ brievenbus
V
nooduitgang
V
entree (Schuifdeur)
00.02.35 spreek/onderzoekskamer #08 kantoorfunctie 3 personen 14 m²
5400
00.02.36 flexruimte kantoorfunctie 4 personen 11 m²
elektra kast 02.02.21 0.86 m²
trap(beton) type 2: - aantrede: 260mm; - optrede = 180mm; - leuning (1-zijdig) h=850mm
1500
00.02.34 spreek/onderzoekskamer #07 kantoorfunctie 3 personen 14 m²
00.02.38 Administratie kantoorfunctie 4 personen 21 m²
00.02.37 spreek/onderzoekskamer #21 kantoorfunctie 4 personen 11 m²
BMC
1
00.03.01 wachtruimte bijeenkomstfunctie 8 personen 21 m²
Entreesluis 01.02.08 13.50 m²
00.02.02 administratie met archief kantoorfunctie 4 personen 44 m²
gang 01.02.09 8.48 m²
2
00.04.02 Miva toilet 4 m²
00.02.33 spreek/onderzoekskamer #06 kantoorfunctie 3 personen 14 m²
5400
00.02.32 spreek/onderzoekskamer #05 kantoorfunctie 3 personen 14 m²
00.05.04 Schacht 3 m²
00.01.01a lifthal/wachtruimte verkeersruimte 34 m²
00.02.31 spreek/onderzoekskamer #04 kantoorfunctie 3 personen 14 m²
5400
3352
00.01.06 gang verkeersruimte 63 m² ANV
ANV
125
00.02.06 spreek/onderzoekskamer #17 kantoorfunctie 3 personen 14 m²
00.02.07 spreek/onderzoekskamer #16 kantoorfunctie 3 personen 13 m²
125
2575
00.02.16 spreek/onderzoekskamer #15 kantoorfunctie 2 personen 14 m²
00.02.19 medewerkers / pantry bijeenkomstfunctie 35 personen 109 m²
00.02.15 spreek/onderzoekskamer #14 kantoorfunctie 2 personen 14 m²
125
atrium
V
00.02.14 spreek/onderzoekkamer #13 kantoorfunctie 2 personen 14 m²
125 1448
V ANV
ANV
00.01.04 "stille"gang verkeersruimte 16 m²
00.05.02 TR 9 m²
00.02.18 flexwerkplek AC #44 kantoorfunctie 8 personen 46 m²
00.02.20 OAE #42 12 m²
00.02.13 AP 2 personen 13 m²
00.02.12 Bera ruimte 2 personen 14 m²
00.02.09 gehooronderzoek #05 kantoorfunctie 3 personen 11 m²
00.02.11 flexruimte kantoorfunctie 3 personen 19 m²
container ruimte nooduitgang
V
00.02.08 gehooronderzoek #06 kantoorfunctie 3 personen 11 m²
00.02.10 gehooronderzoek #04 kantoorfunctie 3 personen 11 m²
00.06.02 werkkast 3 m²
V
00.02.04 spreek/onderzoekskamer #19 kantoorfunctie 3 personen 14 m²
00.02.05 spreek/onderzoekskamer #18 kantoorfunctie 3 personen 14 m²
00.06.01 Opslag/test. overige gebruiksfunctie 0 personen 14 m²
2575
00.02.21 spreek/onderzoekskamer #09 kantoorfunctie 2 personen 14 m²
00.01.05 "stille"gang verkeersruimte 18 m²
00.02.03 spreek/onderzoekskamer #20 kantoorfunctie 3 personen 14 m²
125
5400
V
6
5400
brandwerend rolscherm aangesloten op BMI
2575
00.02.22 spreek/onderzoekskamer #10 kantoorfunctie 2 personen 14 m²
5
00.02.25 gehooronderzoek #01 kantoorfunctie 3 personen 11 m²
00.01.07 wachtruimte overige gebruiksfunctie 48 m²
2575
32400 5400
00.02.23 spreek/onderzoekskamer #11 kantoorfunctie 2 personen 14 m²
00.02.28 spreek/onderzoekskamer #01 kantoorfunctie 3 personen 13 m²
00.02.26 gehooronderzoek #02 kantoorfunctie 3 personen 11 m²
440 +P
brandslanghaspel (inbouw)
00.02.24 spreek/onderzoekskamer #12 kantoorfunctie 2 personen 14 m²
00.02.29 spreek/onderzoekskamer #02 kantoorfunctie 3 personen 14 m²
00.02.27 gehooronderzoek #03 kantoorfunctie 3 personen 11 m²
00.01.03 gang verkeersruimte 40 m²
ANV
125
00.02.30 spreek/onderzoekskamer #03 kantoorfunctie 3 personen 14 m²
00.02.01 receptie kantoorfunctie 2 personen 29 m²
00.01.02a trap verkeersruimte 10 m²
00.04.03 toiletten D 11 m²
3
4
00.04.01 toiletten H 6 m²
00.06.03 werkkast 3 m²
ANV
7
12000
9000
12000
33000
Ground floor
A
B
C
D
The project contains an audiological center in ground floor and the national headquarters of the company in the upper levels. The project is built around a compact core communications and a double height that allows cross visuals between floors. Central atrium is bringing daylight into the building. The construction of the test rooms requires a Faraday cage to isolate magnetic fields, external vibrations and unsuitable sounds. entrance and atrium area
construction detail
PV_oostgevel schaal 1 : 100
6
5
4
3
2
1
13970+P
400
7
o.k dak installatieruimte
2800
G
11170+P
3600
3600
03_dak
02_2e verdieping
3600
3600
14370
7570+P
3970+P
5620
3970
01_1e verdieping
begane grond P = 0 1650
NAP
1650
650+NAP
NAP
-1650+P
1260
1260
Gw
1260
b.k. plein tpv helling
-2910+P
00_1 kelder
Gw
west elevation
5400
5400
5400
5400
5400
5400
PV_westgevel schaal 1 : 100 1
2
3
4
5
6
7
14370 +P
400
13970+P
o.k dak installatieruimte
2800
2800
Installaties 03.05.01 53.32 m²
11170+P
Algemeen bureauwerk met vertrouwelijk karakter C 02.02.01 18.38 m²
3600
850
03_dak
gang 02.01.01 verkeersruimte 32.69 m²
Vide 02.03.07 17.00 m²
7570+P
6685
02_2e verdieping
gang 01.02.11 11.14 m²
Vide 01.03.07 16.54 m²
dakterras 01.03.08 152.04 m²
3600
vergaderruimte 01.03.04 57.44 m²
lichtstraat voorzien van 30 minuten brandwerend doorvalveilige beglazing - doorvalveiligheid minimaal volgens NEN3569
3970+P
NAP
wachtruimte 00.01.07 48.26 m²
medewerkers / pantry 00.02.19 108.62 m²
medewerkers / pantry 00.02.19 108.62 m²
flexwerkplek AC #44 00.02.18 46.22 m²
1000
3120 -75 +P
lifthal/wachtruimte 00.01.01a 33.74 m²
Entreesluis 01.02.08 13.50 m²
3970
850
01_1e verdieping
begane grond P = 0 650+NAP
NAP 2910
-1055 +P
Parkeerkelder -01.06.01 699.32 m²
-1650+P
b.k. plein tpv helling
Gw
-2910+P
00_1 kelder
Gw 5400
5400
5400
5400
5400
5400
longitudinal section 1
3
2
4
6
5
7
doorsnede A-A' schaal 1 : 100 14370 +P
13970+P
o.k dak installatieruimte
Installaties 03.05.01 53.32 m²
11170+P
flex + mediatheek 01.02.05 33.04 m²
vluchttrap/ gang 01.01.05 13.71 m²
toilet D 01.04.04 H. 1.32 m²
gang 02.01.01 verkeersruimte 32.69 m²
trap 02.01.02 verkeersruimte 11.42 m²
samenwerken algemeen bureauwerk 02.02.04 86.07 m²
Vide 02.03.07 17.00 m²
3600
trap 02.01.02 verkeersruimte 12.00 m²
toilet H 02.04.04 H. 1.33 m²
7570+P
02_2e verdieping
lunch/werk 01.03.01 103.00 m²
Vide 01.03.07 16.54 m²
3600
vluchttrap 02.01.04 1.46 m²
3970+P
01_1e verdieping
gang 00.01.06 62.75 m²
receptie 00.02.01 29.32 m²
toiletten 00.04.03 10.88 m²
3200
brandwerend rolscherm aangesloten op BMI spreek/onderzoekskamer #05 00.02.32 14.09 m²
spreek/onderzoekskamer #20 00.02.03 14.04 m²
3970
770
Kantoor vzv berging 01.02.06 19.06 m²
overleggen 02.02.14 36.44 m²
3600
Algemeen bureauwerk met vertrouwelijk karakter A 02.02.11 33.42 m²
3600
03_dak
begane grond P = 0 125 410
650+NAP
Fietsenstalling -01.06.02 33.18 m²
2910
2375
trap naar parkeren -01.01.01 verkeersruimte 4.81 m²
Parkeerkelder -01.06.01 699.32 m²
-1650+P
b.k. plein tpv helling
-2910+P
00_1 kelder
1442 Nieuwbo Ammanp 700
12000
9000
12000
700
34400
A
B
Auris Gr
17.04.20 C
D
gewijzigd
doorsnede B-B' schaal 1 : 100
P
construction photos
Lunch area in the first floor
Thank you !
a: Leopoldstraat 21A , 3031SV Rotterdam e: danieldiezausias@gmail.com t: 0640824244 in: https://nl.linkedin.com/in/dadiez