Daniel diez architecture portfolio!

Page 1

! Daniel Diez Ausias Architecture portfolio selected works 2010-2016


Daniel Diez Ausias 30/01/1980 Born in Valladolid. Spain. Currently living in Rotterdam since 2010. Master in Architecture. April 2009 ETSAV. Escuela TĂŠcnica Superior de Arquitectura de Valencia Valencia Polytechnic University (U.P.V.) Spain. a: Leopoldstraat 21A , 3031SV Rotterdam e: danieldiezausias@gmail.com t: +31 640824244 / 0640824244 in: https://nl.linkedin.com/in/dadiez

About me

communicative

competitive

designer

friendly

architecture lover

team player

energetic

organized

creative sturdy

hard worker

volleyball player

studious

flexible fun positive

honest

masterchef

international experience

enthousiast


languages

Spanish ( native )

English ( fluent )

Dutch ( intermediate, B1)

Catalan ( fluent )

Architect specialist in sustainable architectural envelopes !

Specialized skills - Revit ( BIM modeling, 4 years experience, member of EHA expert group) - Dynamo ( parametric design for Revit, member of Dutch Dynamo user group ) - Sefaira ( daylight analysis and energy optimization ) - Rhinoceros / 3DMax + Vray ( 3D modeling of complex geometries ) - Adobe

suite


Work experiences

EHA Ector Hoogstad Architecten 04/2011 - Present Company: Ector Hoogstad Architecten. Rotterdam, The Netherlands. Position: architect Work: Designer / 3D visualizer/animator / BIM manager/modeler - projects in The Netherlands and in China.

SPA Salvador PĂŠrez Arroyo 07/2010 - 04/2011 Company: SPA Salvador PĂŠrez Arroyo, Madrid, Spain. Position: architect Work description: Designer / 3D visualizer - projects in Doha, Qatar.

STAR Strategies + Architecture 01/2010 - 07/2010 Company: STAR strategies + architecture, Beatriz Ramo. Rotterdam, The Netherlands. Position : architect internship Work description: Designer / mockup maker - international competitions.


Highlighted competitions -Competition for the Koninklijke Auris Groep audiology centrum and headquarters Rotterdam, The Netherlands 2014. AURIS ( winner ) working for Ector Hoogstad Architecten. Team: Oscar Backus, Markus Clarijs, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the center court campus building in Geleen, The Netherlands 2014. CHEMELOT CAMPUS ( winner ) working for Ector Hoogstad Architecten. Team: Koert Hougee, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Guggenheim Helsinki museum. Helsinki, Finland 2014. Team: Samuel Delgado, Elia Salcedo, Iñaki Llorens, Daniel Diez. -Competition for the Walltopia headquarters, Sofia, Bulgaria 2013. SHOWROOM ( mention ) Team: Ivan Carbajosa, Elia Salcedo, Carlos Moreira, Daniel Diez. -Competition for the central station square,canopy and bycicle parking. Utrecht, The Netherlands 2011. STATIONALLE ( winner ) working for Ector Hoogstad Architecten. Team: Elia Salcedo, Markus Clarijs, Lennaert Capelleveen, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Alibaba headquarters. Senzhen, China 2011. THE ROCK ( Finalists ) working for Ector Hoogstad Architecten. Team: Tao Yang, Lennaert van Capelleveen, Stijn Rademakers, Joost Ector, Daniel Diez. -Competition for the Elche Auditorium, Alicante, Spain 2010. MÉZCLATE CONMIGO. working for STAR Strategies+Architecture. Team: Elia Salcedo, Beatriz Ramo, Xiana Méndez, Guadalupe Hernández, Daniel Diez. -Competition for the Contemporary Architecture Foundation in Cordoba, Spain 2010. USE YOUR ILLUSION ( Finalists ).working for STAR Strategies+Architecture. Team: Elia Salcedo, Beatriz Ramo, Xiana Méndez, Guadalupe Hernández, Daniel Diez. -Competition for the Polish History Museum in Warsaw, Poland 2009. MEELTING POINT Team: Elia Salcedo, Jordi Lopez, Daniel Diez. -Competition for building 50 housing units in Cuevas de Almanzora, Spain 2006. BIOFLEX (Finalists) Team: Elia Salcedo, Marian Torres, Pablo Sanchis, Daniel Diez. -Competition for the 2G Park in Venice lagoon, Italy 2007. THE GAME Team: Elia Salcedo, Daniel Diez -Competition for the tram station at the Alicante university, Spain 2008. EN MOVIMIENTO ( Finalists ) in collaboration with AMC Architecture. Team: Ana Lozano, Elia Salcedo, Carlos Jiménez , Daniel Diez.


! t c roje

p c i etr

BIM

m a r pa

A 3.600 m² roof made only with 4 different pieces !


01

Project name: Bubble cloud Location: Utrecht, The Netherlands. Size: 3.600 m². Date: Final design May 2013. Status: Under construction, expected completion April 2017. Type: Canopy design on top of the square in the East side of the central station. Role in the project: Designer, BIM modeler, 3D visualizer, 3D animator, construction detailing, construction supervision on site. Experience:Parametric design in BIM projects, long 3D animations, video edition, complex interdisciplinary team, fluid dynamics studies, construction site visits, materials research, maintenance research.


bovenaan 34 34pieces stuks

28 28pieces stuks

262

68 68pieces stuks

49 49pieces stuks

pieces distribution

Stationsallee, Utrecht


1

2

3

4 geometry design steps

Ector Hoogstad Architecten

n het dat het Op de

et te worpen. gonale n ĂŠĂŠn van mgeving. te het zich ven de

em e UVgrote 4 ak wordt aarbij de

259

van de

bruik. s ten udig

oudig te

orden in

15-05-2013 complete shape



3D print experience !


constructive section



The project is fully modeled in Revit and made of 4 parametric families. The bubbles are made of Inflated ETFE plastic cushions. Ector Hoogstad Architecten

The shape is totally optimized through studies of fluid dynamics to allow a dry pathway between the central station and the shopping mall. Steel structure is designed in a monocoque way to optimize it’s own weight and performing equally in all directions.

263

15-05-2013


Ector Hoogstad Architecten

the 4 different pieces assembled


B

r p IM

! t c oje


12.500 bicycles... World’s largest bicycle parking !

02

Project name: SPO Stationsplein Oost Location: Utrecht, The Netherlands. Size: 19.000 m². Date: Final design May 2013 Status:Under construction expected completion 2018 Type: Competition for the bicycle parking facility in the East side of the central station. Role in the project: Designer, BIM modeler, 3D visualizer, 3D animator, construction detailing, construction supervision on site. Experience: Bicycle traffic and storage research, long 3D animations, video edition, large scale BIM projects, materials research, complex interdisciplinary team, visits to the building site.


In this last years, the city of Utrecht is constantly changing, SPO is part of the new urbanistic plan CU2030 along the main train station in Holland. Utrecht is building in the station area to the future of the city: a meeting place for everyone who wants to travel, shop, live, work and relax in the dynamics of the heart of the Netherlands. This bicyle parking facility project starts in 2011 and will be completed in 2018. The project is coordinating a complex adjoining network of structures and infrastructures.

transversal section


Ector Hoogstad Architecten


construction photos

5200

Tr2

longitudinal section 35

5200

34

5200

33

5200

32

5200

31

5200

30

4900

29

5400

28

6900

27

5200

26

5200

25

5200

24

5200

23

5200

22

4900

21

5400

20

4900

19

179600

18


Ector Hoogstad Architecten

5200 5200

5200 5200

17 17

5200 5200

16 16

5200 5200

15 15

5200 5200

14 14

5200 5200

13 13

5200 5200

12 12

5200 5200

11 11

6900 6900

10 10

5400 5400

99

4900 4900

88

5200 5200

77

5200 5200

66

5200 5200

55

5200 5200

44

5200 5200

33

5200 5200

22

11



Great animation made by me with more than 69.000 visualizations !

PEDESTRIAN ENTRANCES

level +1

+1

InIN UIT

out

level 0

0

level -1

-1

out

UIT

In IN

MIDDENTUNNEL MIDDENTUNNEL

unidirectional bicycle zone

éénrichting

pedestrian zone

voetganger

parking zone

stallingszon

vertical circulation

stijgpunten

bike point shop/maintenance

fietspoint

NOORDERSTALLING NOORDERSTALLING

For the digital version, please click on the image and scroll down in the site to see the animation movie or go to:

https://www.youtube.com/watch?v=ynIRAhoqoBc


Complexity

Interdisciplinary collaboration

BIM integration


Projects structure in the station area Utrecht ! structuur projecten stationsgebied in relation with the station square East and West utrecht in relatie tot Stationsplein Oost en Stationsplein West

Projecten CU2030 met relatie tot Stationsplein Oost en Stationsplein West Ector Hoogstad Architecten Overlegpartner EHA in eigen project of buurprojecten


c i r t e m a r a p ! t M I c B je o r p


03

Name: Pulse Location: TU Delft, The Netherlands. Date: Final design August 2015 Status:Under construction, expected completion September 2017 Type: University campus building, development of one of the facades to optimize solar shading, illuminance performance and volume material use.

Role in the project: Designer, BIM modeler, 3D visualizer, construction detailing, coordinator between EHA and TUDelft. Experience: 3D printing, material research, parametric optimization, cable construction, international team, TUDelft collaboration.

The first 3D printed facade in the world!


Relation between the building and the square in TU Delft

affordable

pure matrial

printing time

INPASSING IN DE OMGEVING

ECTOR HOOGSTAD ARCHITECTEN

situation in TUDelft 1449 Pulse TU Delft

3D optimization

Impressie Pulse, Learning Environment As en plein

production process

9

augustus-2015

square relation


Ector Hoogstad Architecten

CONSTRUCTION

PULSE TU DELFT

B4_05_04

15

17850+P

dakrand dakverd 03

3978

B4_05_03

7956

0 73 10

2 45 16

28.92°

47.8 55°

3978

B4_05_02

6950+P

dakrand dakverd 01 B4_05_01

I

H

G

F

E

D

C

B

A

augustus-2015 BIM section of the different illuminance requierments for a new way to share knowledge and teach Doorsnede

ulse TU Delft

ging 3D-zonwering optie 3

200

optie 3

1449 Pulse TU Delft

schaal

noord

1 : 200

Construction

Optie 3

11/23/15

December-2015

one of the possible geomety solutions generated by 3D parametric optimization process

On behalf of TU Delft, EHA Architects design ‘PULSE’; an inter-educational center with space for new forms of education where students and teachers meet and share knowledge and experiences. I join the design team to develop this extraordinary facade, based in the optimization of daylight illuminance in different areas of the building by an avant-garde facade made of unique reusable plastic 3D printed pieces.

construction site


an

aly

sis

1

t gh

in g

de

sign

li da y

d ha s su n

2

Figuur 2 Schematisch bovenaanzicht van het tui verloop ge誰ntegreerd in de 3D geprinte elementen

CHITECTEN TECTEN

COMPUTA

How How

de sig n

computational design

3D printed facade in 7 steps !

op t

Figuur 4 Schaalmodel voor constructie

pt im iza tion

im izati on

Figuur 3 Schaalmodel voor constructie

c an pa r n i ametric illum 4

e

3

re tu c stru

computational design

6

pa r ametric

o y r t e 5 ge o m


ns

ha din

g facade

7

u s rt a sm

In the development process of the facade we have integrated the most innovative and avant-garde construction techniques.

6

3

t in r Dp

Advanced computer software was been used to study the sun shading in line with the lighting requirements of the interior space. Use of parametric computing is used to obtain an optimization of the illuminance of daylight and optimum use of material used. The pieces are designed to be printed on reusable plastic with long life durability, able to performance perfectly in external conditions. The structure is integrated into the design of the pieces, so the pieces are working together with the supporting structure becoming part of the structure system.


A climbable building !

04

Name: Showroom Date: March 2013 Size: 5.000 m² Location: Sofia, Bulgaria Status: Non builded Type: Open competition for the Walltopia headquarters ( climbing company )

Role in the project: Designer, 3D modeler / visualizer, schemes, photo edition, research. Experience: Sports facility program, strategy, 3D complex curves modeling.



The showroom is a strong concept project for a climbing representative building whitch combines a very high level of flexibility in the program.

strategy schemes


Click here to see the animation presentation ! or go to : https://prezi.com/5ml5rlqh_ynv/the-showroom/



05

Project name: ¨Le ballon rouge¨ Location: Madrid, Spain Status: Non builded Date: February 2014 Type: Open ideas competition for the renovation of the Sol square and Km.0 ( national roads network starting point ) Role in the project: Designer, 3D modeler / visualizer, schemes, photo edition, research. Experience: urban scale strategy, milestone research, furniture systems, pavilion scale.

Madrid balloon !


balloon

longitudinal section of the square


relation between square - pavilion - balloon


! t c oje

B

r p IM

Rotterdam!


Project name: Auris Location: Rotterdam, The Netherlands. Size: 3.000 m². Date: Final design April 2015 Status:Under construction, expected completion September 2016 Type: Building for the Royal Auris Group audiology centrum and national headquarters. Role in the project: Designer, BIM manager/modeler, 3D visualizer, construction detailing, construction supervision on site. Experience: First time as BIM manager, special construction for audiological test rooms, budget control, daylight analysis, team leadership, visits to the building site.

06


1

1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.

2. Raamope Rondom de cm.

Ector Hoogstad Architecten 1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.

Ector Hoogstad Architecten

de

2. Raamopening Rondom de opening een halfsteens rollaag. Diepte negge is ca. 15 cm.

2

4. Overstek 2.Het Raamopening metselwerk eindigt onder met een rollaag (staande driekleRondom de metselwerk opening eenloopt halfsteens rollaag. Dieptevan negge ca. 15 zoor). Het door in het plafond het isoverstek. cm. Onder het overstek begint direct het betonnen kader.

3

5. Rooster parkeergarage 3. Onderhoek metselwerk 1. metselwerk DeBovenhoek lamellen van het rooster hebben dezelfde lagenmaat als het Het metselwerk eindigt onder met een rollaag (staande drieklHet metselwerk eindigt met rollaag drieklmetselwerk en zijn ook boven in de kleur van het(staande metselwerk. ezoor) en gaat in verstek de hoek om. Het metselwerk loopt door ezoor). Rondom het betonnen kader een rollaag van dezelfde in het plafond van het overstek. hoogte.

3. On Het m ezoor) in het

3. Onderhoek metselwerk Het metselwerk eindigt onder met een rollaag (staande drieklezoor) en gaat in verstek de hoek om. Het metselwerk loopt door in het plafond van het overstek.

Ector Hoogstad Architecten 4. Overstek 2. Raamopening metselwerk eindigt onder metDiepte een rollaag Rondom deHet opening een halfsteens rollaag. negge(staande is ca. 15drieklezoor). Het metselwerk loopt door in het plafond van het overstek. cm. Onder het overstek begint direct het betonnen kader.

1. Bovenhoek metselwerk Het metselwerk eindigt boven met rollaag (staande drieklezoor). Rondom het betonnen kader een rollaag van dezelfde hoogte.

2. Raamope Rondom de cm.

Building under construction in Ammanplein

2

kleerstek.

1 1442 Koninklijke Auris Groep Ammanplein Rotterdam 5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het 4. Overstek metselwerk en zijn ook in de kleur van het metselwerk. Het metselwerk eindigt onder met een rollaag (staande driekle-

4. Overstek Het metselwerk eindigt onder met een rollaag (staande drieklezoor). Het metselwerk loopt door in het plafond van het overstek. Onder het overstek begint direct het betonnen kader.

4

2

zoor). Het metselwerk loopt door in het plafond van het overstek. Onder het 1 overstek begint direct het betonnen kader.

4

5

2

3 4

het

lling

ep Ammanplein Rotterdam

3

1442 Koninklijke Auris Groep Ammanplein Rotterdam

4

5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het metselwerk en zijn ook in de kleur van het metselwerk.

5

5

5. Rooster parkeergarage De lamellen van het rooster hebben dezelfde lagenmaat als het metselwerk en zijn ook in de kleur van het metselwerk.

5

Special attention points in the brick rig 1442 Koninklijke Auris Groep Ammanplein Rotterdam

1442 Koninklijke Auris Groep Ammanplein Rotterdam

25-02-2015

level -1

begane grond 1442 Koninklijke Auris Groep Ammanplein Rotterdam

level 0

25-02-2015


oep Ammanplein Rotterdam

level +1

tweede verdieping 1442 Koninklijke Auris Groep Ammanplein Rotterdam

level +2


3D longitudinal BIM section

10%

20%

1.700-P

10%

plateau lift

nooduitgang

bellentableau+ brievenbus

V

nooduitgang

V

entree (Schuifdeur)

00.02.35 spreek/onderzoekskamer #08 kantoorfunctie 3 personen 14 m²

5400

00.02.36 flexruimte kantoorfunctie 4 personen 11 m²

elektra kast 02.02.21 0.86 m²

trap(beton) type 2: - aantrede: 260mm; - optrede = 180mm; - leuning (1-zijdig) h=850mm

1500

00.02.34 spreek/onderzoekskamer #07 kantoorfunctie 3 personen 14 m²

00.02.38 Administratie kantoorfunctie 4 personen 21 m²

00.02.37 spreek/onderzoekskamer #21 kantoorfunctie 4 personen 11 m²

BMC

1

00.03.01 wachtruimte bijeenkomstfunctie 8 personen 21 m²

Entreesluis 01.02.08 13.50 m²

00.02.02 administratie met archief kantoorfunctie 4 personen 44 m²

gang 01.02.09 8.48 m²

2

00.04.02 Miva toilet 4 m²

00.02.33 spreek/onderzoekskamer #06 kantoorfunctie 3 personen 14 m²

5400

00.02.32 spreek/onderzoekskamer #05 kantoorfunctie 3 personen 14 m²

00.05.04 Schacht 3 m²

00.01.01a lifthal/wachtruimte verkeersruimte 34 m²

00.02.31 spreek/onderzoekskamer #04 kantoorfunctie 3 personen 14 m²

5400

3352

00.01.06 gang verkeersruimte 63 m² ANV

ANV

125

00.02.06 spreek/onderzoekskamer #17 kantoorfunctie 3 personen 14 m²

00.02.07 spreek/onderzoekskamer #16 kantoorfunctie 3 personen 13 m²

125

2575

00.02.16 spreek/onderzoekskamer #15 kantoorfunctie 2 personen 14 m²

00.02.19 medewerkers / pantry bijeenkomstfunctie 35 personen 109 m²

00.02.15 spreek/onderzoekskamer #14 kantoorfunctie 2 personen 14 m²

125

atrium

V

00.02.14 spreek/onderzoekkamer #13 kantoorfunctie 2 personen 14 m²

125 1448

V ANV

ANV

00.01.04 "stille"gang verkeersruimte 16 m²

00.05.02 TR 9 m²

00.02.18 flexwerkplek AC #44 kantoorfunctie 8 personen 46 m²

00.02.20 OAE #42 12 m²

00.02.13 AP 2 personen 13 m²

00.02.12 Bera ruimte 2 personen 14 m²

00.02.09 gehooronderzoek #05 kantoorfunctie 3 personen 11 m²

00.02.11 flexruimte kantoorfunctie 3 personen 19 m²

container ruimte nooduitgang

V

00.02.08 gehooronderzoek #06 kantoorfunctie 3 personen 11 m²

00.02.10 gehooronderzoek #04 kantoorfunctie 3 personen 11 m²

00.06.02 werkkast 3 m²

V

00.02.04 spreek/onderzoekskamer #19 kantoorfunctie 3 personen 14 m²

00.02.05 spreek/onderzoekskamer #18 kantoorfunctie 3 personen 14 m²

00.06.01 Opslag/test. overige gebruiksfunctie 0 personen 14 m²

2575

00.02.21 spreek/onderzoekskamer #09 kantoorfunctie 2 personen 14 m²

00.01.05 "stille"gang verkeersruimte 18 m²

00.02.03 spreek/onderzoekskamer #20 kantoorfunctie 3 personen 14 m²

125

5400

V

6

5400

brandwerend rolscherm aangesloten op BMI

2575

00.02.22 spreek/onderzoekskamer #10 kantoorfunctie 2 personen 14 m²

5

00.02.25 gehooronderzoek #01 kantoorfunctie 3 personen 11 m²

00.01.07 wachtruimte overige gebruiksfunctie 48 m²

2575

32400 5400

00.02.23 spreek/onderzoekskamer #11 kantoorfunctie 2 personen 14 m²

00.02.28 spreek/onderzoekskamer #01 kantoorfunctie 3 personen 13 m²

00.02.26 gehooronderzoek #02 kantoorfunctie 3 personen 11 m²

440 +P

brandslanghaspel (inbouw)

00.02.24 spreek/onderzoekskamer #12 kantoorfunctie 2 personen 14 m²

00.02.29 spreek/onderzoekskamer #02 kantoorfunctie 3 personen 14 m²

00.02.27 gehooronderzoek #03 kantoorfunctie 3 personen 11 m²

00.01.03 gang verkeersruimte 40 m²

ANV

125

00.02.30 spreek/onderzoekskamer #03 kantoorfunctie 3 personen 14 m²

00.02.01 receptie kantoorfunctie 2 personen 29 m²

00.01.02a trap verkeersruimte 10 m²

00.04.03 toiletten D 11 m²

3

4

00.04.01 toiletten H 6 m²

00.06.03 werkkast 3 m²

ANV

7

12000

9000

12000

33000

Ground floor

A

B

C

D


The project contains an audiological center in ground floor and the national headquarters of the company in the upper levels. The project is built around a compact core communications and a double height that allows cross visuals between floors. Central atrium is bringing daylight into the building. The construction of the test rooms requires a Faraday cage to isolate magnetic fields, external vibrations and unsuitable sounds. entrance and atrium area

construction detail


PV_oostgevel schaal 1 : 100

6

5

4

3

2

1

13970+P

400

7

o.k dak installatieruimte

2800

G

11170+P

3600

3600

03_dak

02_2e verdieping

3600

3600

14370

7570+P

3970+P

5620

3970

01_1e verdieping

begane grond P = 0 1650

NAP

1650

650+NAP

NAP

-1650+P

1260

1260

Gw

1260

b.k. plein tpv helling

-2910+P

00_1 kelder

Gw

west elevation

5400

5400

5400

5400

5400

5400

PV_westgevel schaal 1 : 100 1

2

3

4

5

6

7

14370 +P

400

13970+P

o.k dak installatieruimte

2800

2800

Installaties 03.05.01 53.32 m²

11170+P

Algemeen bureauwerk met vertrouwelijk karakter C 02.02.01 18.38 m²

3600

850

03_dak

gang 02.01.01 verkeersruimte 32.69 m²

Vide 02.03.07 17.00 m²

7570+P

6685

02_2e verdieping

gang 01.02.11 11.14 m²

Vide 01.03.07 16.54 m²

dakterras 01.03.08 152.04 m²

3600

vergaderruimte 01.03.04 57.44 m²

lichtstraat voorzien van 30 minuten brandwerend doorvalveilige beglazing - doorvalveiligheid minimaal volgens NEN3569

3970+P

NAP

wachtruimte 00.01.07 48.26 m²

medewerkers / pantry 00.02.19 108.62 m²

medewerkers / pantry 00.02.19 108.62 m²

flexwerkplek AC #44 00.02.18 46.22 m²

1000

3120 -75 +P

lifthal/wachtruimte 00.01.01a 33.74 m²

Entreesluis 01.02.08 13.50 m²

3970

850

01_1e verdieping

begane grond P = 0 650+NAP

NAP 2910

-1055 +P

Parkeerkelder -01.06.01 699.32 m²

-1650+P

b.k. plein tpv helling

Gw

-2910+P

00_1 kelder

Gw 5400

5400

5400

5400

5400

5400

longitudinal section 1

3

2

4

6

5

7

doorsnede A-A' schaal 1 : 100 14370 +P

13970+P

o.k dak installatieruimte

Installaties 03.05.01 53.32 m²

11170+P

flex + mediatheek 01.02.05 33.04 m²

vluchttrap/ gang 01.01.05 13.71 m²

toilet D 01.04.04 H. 1.32 m²

gang 02.01.01 verkeersruimte 32.69 m²

trap 02.01.02 verkeersruimte 11.42 m²

samenwerken algemeen bureauwerk 02.02.04 86.07 m²

Vide 02.03.07 17.00 m²

3600

trap 02.01.02 verkeersruimte 12.00 m²

toilet H 02.04.04 H. 1.33 m²

7570+P

02_2e verdieping

lunch/werk 01.03.01 103.00 m²

Vide 01.03.07 16.54 m²

3600

vluchttrap 02.01.04 1.46 m²

3970+P

01_1e verdieping

gang 00.01.06 62.75 m²

receptie 00.02.01 29.32 m²

toiletten 00.04.03 10.88 m²

3200

brandwerend rolscherm aangesloten op BMI spreek/onderzoekskamer #05 00.02.32 14.09 m²

spreek/onderzoekskamer #20 00.02.03 14.04 m²

3970

770

Kantoor vzv berging 01.02.06 19.06 m²

overleggen 02.02.14 36.44 m²

3600

Algemeen bureauwerk met vertrouwelijk karakter A 02.02.11 33.42 m²

3600

03_dak

begane grond P = 0 125 410

650+NAP

Fietsenstalling -01.06.02 33.18 m²

2910

2375

trap naar parkeren -01.01.01 verkeersruimte 4.81 m²

Parkeerkelder -01.06.01 699.32 m²

-1650+P

b.k. plein tpv helling

-2910+P

00_1 kelder

1442 Nieuwbo Ammanp 700

12000

9000

12000

700

34400

A

B

Auris Gr

17.04.20 C

D

gewijzigd

doorsnede B-B' schaal 1 : 100

P

construction photos


Lunch area in the first floor


Thank you !

a: Leopoldstraat 21A , 3031SV Rotterdam e: danieldiezausias@gmail.com t: 0640824244 in: https://nl.linkedin.com/in/dadiez


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.