DANIELE BETTIN
PORTFOLIO
Daniele Bettin Architect (ARB)
+ 44 771.9969.136 daniele4bettin@gmail.com https://issuu.com/danielebettin
Location: Pieve di Soligo, Treviso
city landscape Reload_
Aim of the intervention is to re-create in the industrial new urban reality, connected with the nearby attractions, activities to try to reactivate the industrial area; today completely disconnected from the surrounding environment.
ity landscape Reload_
Matteo Bolgan matteobolgan@gmail.com Matteo Bolgan matteobolgan@gmail.com
Location: Rosolina mare, Rovigo
Rosolina 2030
COSTI
COSTI
DEMOLIZIONE
SUPERFICIE
DEMOLIZIONE VOLUME
mq
SUPERFICIE VALORE
mc
Fase 1
VOLUME VALORE
VALORE COSTI AGGIUNTIVI
mc €
€/mq €/mc
€€
€ 18.986,25 759,45
15 25
€ €3.797,25 18.986,25
15 25
€ €6.600,00 33.000,00
30
€ 391.500,00
€/mc mq
VALORE VALORE
TOTALE COSTI AGGIUNTIVI
Blocco 759,45 1
253,15 25
440
Blocco 13202
25 440
€ 33.000,00 1320
Parco acquatico
4350
Parco 13050 acquatico
30 4350
€ 391.500,00 13050
Fase 2
Blocco 3
455
Blocco 4
2340 510
TOTALE
€
€
€ 401.897,25
253,15
Blocco 2
Fase 2
VALORE
€€/mq
Fase 1
Blocco 1
€ 3.797,25
€ 6.600,00 15
€ 6.600,00
€ 3.797,25 € 6.600,00 € 391.500,00
€ 54.540,00
€ 54.540,00
25 455
€ 34.125,00 1365
15 25
€ €6.825,00 34.125,00
Blocco 70204
25 2340
€ 175.500,00 7020
15 25
€ €35.100,00 175.500,00
Blocco 15305
25 510
€ 38.250,00 1530
15 25
331
Blocco 9936
25 331
€ 24.825,00 993
15 25
€ €4.965,00 24.825,00
Blocco 7
3285
Blocco 98557
25 3285
€ 246.375,00 9855
15 25
€ €49.275,00 246.375,00
€ 49.275,00 15
€ 49.275,00
€ 49.275,00
Blocco 8
1475
Blocco 44258
25 1475
€ 110.625,00 4425
15 25
€ €22.125,00 110.625,00
€ 22.125,00 15
€ 22.125,00
€ 22.125,00
Case
1148
Case 3444
28 1148
€ 96.432,00 3444
28
€ 96.432,00
€ 96.432,00
€ 96.432,00
€ 624.269,25
€ 624.269,25
Blocco 5 Blocco 6
Blocco 13653
€ 401.897,25
€ 3.797,25 15 € 391.500,00
Fase 3
€ €7.650,00 38.250,00
Totale demolizioni edifici
€ 6.825,00 € 35.100,00
Asfalto
€ 305.760,00
€ 305.760,00
fase6934 1
4854
6934 21
€ 101.920,00 4854
21
fase6934 2
4854
6934 21
€ 101.920,00 4854
21
€ 101.920,00
fase6934 3
4854
6934 21
€ 101.920,00 4854
21
€ 101.920,00
TOTALE DEMOLIZIONI
TOTALE DEMOLIZIONI
COSTRUZIONE
€ 101.920,00
€ 930.029,25
SUPERFICIE COSTRUZIONE PERIMETRO
SUPERFICIE VOLUME
mq Destinazione d'uso m
mq mc
4411 Albergo piano 1358
4411 13233
PERIMETRO SUPERFICIE NETTA
SUPERFICIE VALORE NETTA
COSTO COSTRUZIONE
mc €/mq
mc
€/mq
13233
4411 Albergo piano 2358
4411 13233
358
13233
1336 Albergo piano 3244
1336 4008
244
4008
Totale albergo
10158Totale albergo
10158 26466
8126
Commerciale 1
1330 Commerciale 1160
1330 3990
160
Totale commerciale 1
1330 Totale commerciale 1
1330 3990
Parco acquatico
2230 Parco acquatico474
2230 6690
Totale parco acquatico
2230 Totale parco acquatico
2230 6690
Commerciale 2
1315 Commerciale 2162
1315 3945
Totale commerciale 2
1315 Totale commerciale 2
1315 3945
Ristorante
1150 Ristorante
1150 3450
Totale Ristorante
1150 Totale Ristorante
226
€ 930.029,25
VOLUME COSTO COSTRUZIONE
m mc 358
Albergo piano 2 Albergo piano 3
€26466 1.300,00
€ 10.564.320,00 8126
€ 1.300,00
€ 10.564.320,00
€ 1.463.000,00
€ 1.100,00
€ 1.463.000,00
€ 3.345.000,00
€ 1.500,00
€ 3.345.000,00
€ 1.446.500,00
€ 1.100,00
€ 1.446.500,00
€ 1.380.000,00
€ 1.200,00
€ 1.380.000,00
€ 771.100,00
€ 1.100,00
6690 €6690 1.500,00
162
3945 €3945 1.100,00
226
3450
1150 3450
€3450 1.200,00
Commerciale 3
701 Commerciale 3111
701 2103
701 Totale commerciale 3
701 2103
Ristorante torre 1
95 Ristorante torre 35 1
95 285
35
€ 285 1.800,00
€ 171.000,00
€ 1.800,00
Ristorante torre 2
95 Ristorante torre 35 2
95 285
35
€ 285 1.800,00
€ 171.000,00
€ 1.800,00
Sistemazioni esterne
Sistemazioni esterne
TOTALE COSTI DI COSTRUZIONE
TOTALE COSTI DI COSTRUZIONE
VALORE
3990 €3990 1.100,00
474
Totale commerciale 3
RICAVI
€ 4.965,00 € 167.832,00
fase 2
Albergo piano 1
€ 7.650,00
€ 4.965,00
fase 3
Destinazione d'uso
€ 6.825,00 € 35.100,00
€ 7.650,00
€ 4.965,00 15 € 167.832,00
Totale demolizioni edifici
Asfalto fase 1
€ 6.825,00 15 € 35.100,00 15 € 7.650,00 15
Fase 3
111
2103 €2103 1.100,00
€ 771.100,00 € 171.000,00 € 171.000,00
€ 1.000.000,00
€ 1.000.000,00
€ 20.311.920,00
€ 20.311.920,00
RICAVI
RICAVO HOTEL
RICAVO HOTEL
€
RICAVO ACQUA €PARK
hotel Milan***
hotel Milan***
75 €
€ entrate
75 €
Hotel sole***
Hotel sole***
55 €
persone
55 €
Hotel Fiorella***
Hotel Fiorella***
60 €
totale giorno 60 €
Hotel Umberto ***
Hotel Umberto ***
63 €
totale anno
63 €
Hotel Olympia***
Hotel Olympia***
65 €
spese
65 €
Hotel Alexander*** media n° stanze
Hotel Alexander***
58 €
media
63 €
n° stanze
ricavi hotel
guadagni
€ 10,00 100
totale€ giorno 1.000,00
€ 1.000,00
totale € 120.000,00 anno
€ 120.000,00
spese € 36.000,00
30%
€ 36.000,00
guadagni € 84.000,00
58 €
€ 84.000,00
350
€ 8.048.250,00
63€/giorno
percentuale 50% occupazione € 4.024.125,00
50%
spese
spese 40%
€ 1.609.650,00
40%
guadagno
guadagno
€ 2.414.475,00
FLUSSI DI CASSA
€
€ entrate € 10,00 persone100
63 €
350
63€/giorno ricavi hotel
percentuale occupazione
RICAVO ACQUA € PARK
30%
€ 8.048.250,00 € 4.024.125,00 € 1.609.650,00 € 2.414.475,00
FLUSSI DI CASSA
ATTUALIZZAZIONE DEI FLUSSI DI CASSA ATTUALIZZAZIONE DEI FLUSSI DI CASSA r
0,05
q= 1 +r
1,05
ANNO
r
1
0,05
q= 1 +r
COSTI
1,05
RICAVI ANNO
FLUSSI COSTIDI CASSA
€0
1€ 0
2
€ 503.817,25
2€ 0
€ 503.817,25 -€ 503.817,25
3
€ 10.564.320,00
3€ 0
€ 10.564.320,00 -€ 10.564.320,00
4
€ 3.345.000,00
4€ 0
€ 3.345.000,00 -€ 3.345.000,00
5
€0
€ 2.414.475,00 5
€ 2.414.475,00 €0
6
€0
€ 2.498.475,00 6
€ 2.498.475,00 €0
€0
€ 2.498.475,00 7
7 8
€0
9
€ 2.498.475,00 8
€0
10
€ 2.498.475,00 9
€0
11
€ 2.498.475,00 10
€0
€ 2.498.475,00 11
2€ 0
FLUSSO TASSO SCONTATO ATTUALIZZAZIONE
0,952380952 1
1,05 € 0,00
1,1025 -€ 503.817,25 0,907029478 2
FLUSSO SCONTATO
0,952380952
€ 0,00
1,1025 -€ 456.977,10
0,907029478
-€ 456.977,10
1,157625 -€ 10.564.320,00 0,863837599 3
1,157625 -€ 9.125.856,82
0,863837599
-€ 9.125.856,82
4€ 0
1,21550625 -€ 3.345.000,000,822702475 4
1,21550625 -€ 2.751.939,78
0,822702475
-€ 2.751.939,78
1,276281563 € 1.891.804,34
0,783526166
€ 1.891.804,34
€ 2.498.475,00 6 1,340095641 € 2.498.475,000,746215397 6
1,340095641 € 1.864.400,51
0,746215397
€ 1.864.400,51
€ 2.498.475,00 €0
€ 2.498.475,00 7 1,407100423 € 2.498.475,00 0,71068133 7
1,407100423 € 1.775.619,54
€ 2.498.475,00 €0
€ 2.498.475,00 8 1,477455444 € 2.498.475,000,676839362 8
€ 2.498.475,00 €0
€ 2.498.475,00 9 1,551328216 € 2.498.475,000,644608916 9
€ 2.498.475,00 €0
€ 2.498.475,00 10 1,628894627 € 2.498.475,000,613913254 10
1,477455444 € 1.691.066,23 1,551328216 € 1.610.539,26 1,628894627 € 1.533.846,92
0,71068133
€ 1.775.619,54 € 1.691.066,23
0,644608916
€ 1.610.539,26
0,613913254
€ 1.533.846,92
€ 2.498.475,00 11 1,710339358 € 2.498.475,000,584679289 11 € 2.498.475,00 12 1,795856326 € 2.342.015,000,556837418 12
1,795856326 € 1.304.121,59
0,556837418
€ 2.498.475,00 13 1,885649142 € 608.643,00 0,530321351 13
1,885649142 € 322.776,38
0,530321351
€ 322.776,38
€ 4.782.520,00 -€ 2.284.045,00
€ 2.498.475,00 14 1,979931599 -€ 2.284.045,000,505067953 14
1,979931599 -€ 1.153.597,93
0,505067953
-€ 1.153.597,93
€ 2.498.475,00 €0
€ 2.498.475,00 15 2,078928179 € 2.498.475,000,481017098 15
2,078928179 € 1.201.809,19
0,481017098
€ 1.201.809,19
€ 2.498.475,00 12 € 2.498.475,00 13
€ 1.889.832,00 € 608.643,00
14
€ 4.782.520,00
€ 2.498.475,00 14
15
€0
€ 2.498.475,00 15
1,710339358 € 1.460.806,59
0,676839362
€ 2.498.475,00 €0 € 156.460,00 € 2.342.015,00
€ 156.460,00 € 1.889.832,00
0,584679289
€ 1.460.806,59 € 1.304.121,59
€ 15.000.000,00
€ 10.000.000,00
€ 10.000.000,00
€ 5.000.000,00
€ 5.000.000,00
€-
€1
2
3
4
5
38
49
€ 1.120.207,65 somma flussi 2
POSITIVO € 1.120.207,65 IN 13 ANNI
5 € 1.168.418,91 16somma 27 flussi 338
49POSITIVO 10 5 € 1.168.418,91 11 6 ANNI 12 7 IN 15
13 8
-€ 5.000.000,00
-€ 5.000.000,00
-€ 10.000.000,00
-€ 10.000.000,00
-€ 15.000.000,00
-€ 15.000.000,00
16
27
10 5
11 6
12 7
13 8
14 9
10 15
11
COSTI
COSTI
RICAVI 12 13 14 15 FLUSSO SCONTATO
RICAVI
€ 15.000.000,00
€ 10.000.000,00
€ 10.000.000,00
€ 5.000.000,00
€ 5.000.000,00 somma flussi 1
€-
1,05 € 0,00
3€ 0
13
€ 15.000.000,00
FLUSSI DI CASSA TASSO ANNI ATTUALIZZAZIONE
1€ 0
€ 2.414.475,00 5 1,276281563 € 2.414.475,000,783526166 5
12
€ 15.000.000,00
ANNI RICAVI
€ €0 0,00
€ 797.431,27 somma flussi 1
€-
somma flussi 2
1 somma 2 flussi 33
4
-€ 5.000.000,00
-€ 5.000.000,00
-€ 10.000.000,00
-€ 10.000.000,00
-€ 15.000.000,00
COSTI POSITIVO IN 12 ANNI
POSITIVO € 797.431,27 IN 12 ANNI
COSTI
POSITIVO IN 13 ANNI RICAVI 14 9POSITIVO 10 15 IN 15 11ANNI 12 13 14 15 FLUSSO SCONTATO
RICAVI FLUSSO SCONTATO
-€ 15.000.000,00 ANNI PRIMA FASE
1
2
3 ANNI 4
5
PRIMA FASE
SECONDA FASE
SECONDA FASE
TERZA FASE
TERZA FASE
1
6
2
7
3
8
4
9
5
10 6
11 7
12 8
13 9
14 10 15 11
12
13
14
15
FLUSSO SCONTATO
For the design of the new town center of Rosolina Mare new buildings have been shaped, inspired by the shape and the direction of the sand dunes present in area . Much of the area has been devoted to an urban public park and the water tower has been redesigned, covering the top with perforated panels that evoke the movement of waves.
Location: Padova, ex military zone.
Cohousing
The project aims at the rehabilitation of the former military zone located in Padova which lies between the medieval city walls and the Porta Savonarola . The systematic conversion of the state property is through the construction of three areas; exhibition / commercial, university and cohousing.
Studenti:
Gruppo n°2 S
Location: Lido, Venezia.
Inside the existing military area, near the Mose it has been decided to place a center of attraction considering the territorial structure / architectural elements that make up the Lido North.
An aquarium for Lido
QUANTIFICAZIONE DELL’ENERGIA RICHIESTA E SUO PROFILO TEMPORALE
DISPOSIZIONE DELL’U.T.A. E PASSAGGIO DEI CANALI DI AERAZIONE (DISPOSIZIONE A)
AMBIENTI Vediamo dal grafico come l’andatura dei consumi energetici (Qd, Qv e Qtot) col cambiare delle temperature mensili, varia da una richiesta massima di 271 KW (richiesta di calore), scende a una richiesta minima di -43 KW (richiesta di raffrescamento), per poi risalire. I ricambi d’aria rimangono costanti lungo tutto il periodo dato che non dipendono dalla temperatura dentro e fuori dall’edificio.
300000
Qd (W) Qv (W) Ricambi aria (mc/h) Qtot (W) 225000
150000
75000
0
PIANO TERRA
PIANO PRIMO -75000 Gennaio
Febbraio
Marzo
MESE Gennaio Febbraio Marzo Aprile Maggio Giugno Luglio Agosto Settembre Ottobre Novembre Dicembre
Aprile
Maggio
Qd (W) 82.856 52.847 37.843 46.669 42.918 24.163 12.910 1.656 -10.921 15.337 34.092 64.100
Giugno
Luglio
Agosto
Settembre
Qv (W) Ricambi aria (mc/h) 188.054 21996 127.877 21996 97.788 21996 45.133 21996 37.611 21996 0 21996 -22.567 21996 -45.133 21996 0 21996 52.655 21996 90.266 21996 150.443 21996
Ottobre
Novembre Dicembre
Qtot (W) 270.910 180.724 135.631 91.802 80.529 24.163 -9.657 -43.477 -10.921 67.992 124.358 214.544
DISPOSIZIONE DELL’U.T.A. E PASSAGGIO DEI CANALI DI AERAZIONE (DISPOSIZIONE B)
VASCHE Sulla base dei calcoli effettuati, vediamo in forma schematica come, nel caso invernale dove la T media all’interno degli alloggi è 20°C, la richiesta di acqua fredda da parte delle vasche costitisce il 61% della richiesta totale.
Inverno (20°C)
H2o Fredda (W) H2o Calda (W) 23.736 -15.225
39%
61%
Nel caso estivo dove la T media all’interno degli alloggi è 26°C, la richiesta di acqua fredda da parte delle vasche costitisce il 95% della richiesta totale.
Estate (26°C)
5%
H2o Fredda (W) H2o Calda (W) 1.380 -27.211
PIANO TERRA
PIANO PRIMO
95%
LEGENDA
FONTE DI ENERGIA UTILIZZATA
Canale principale U.T.A. mod. 45-30 (1,45 x 1, 5 m) Canale principale U.T.A. mod. 40-25 (1,00 x 1,5 m)
DIMENSIONAMENTO U.T.A.
U.T.A. mod. 45-30
U.T.A. mod. 40-25
Diramazione canale U.T.A. mod. 45-30 Diramazione canale U.T.A. mod. 40-25
Per dimensionare l’ UTA che servirà per riscaldare, raffreddare e far circolare l’aria all’interno dei nostri ambienti, calcoliamo la portata che questa deve avere con la formula m= (Qtot / Densità dell’aria * differenza di DIMENSIONAMENTO U.T.A. temperatura * T aria) e trasformiamo il tutto in mc/h moltiplicando per 3600. Sulla base del risultato decidiamo di utilizzare due tipi di U.T.A. modello Vulcan 45-30 e modello Vulcan 40-25. Considerando quindi che la loro portata massima garantisce il raffrescamento o riscaldamento degli ambienti
Portata richiesta U.T.A.1 U.T.A.2
DIMENSIONAMENTO DIMENSIONAMENTO U.T.A. U.T.A. Potenza U.T.A. (mc/h) Canale (mq) m (mc/h) v (m/s) Grandezza U.T.A. 80.869 47000 2,18 6 45-30 mod. Sab. 1,57 34000 6 40-25 mod. Sab.
DISPOSIZIONE DEGLI IMPIANTI DI FILTRAGGIO, MANDATA E RITORNO DELL’ACQUA CALDA E FREDDA NELLE VASCHE
TABELLA TEMPERATURA CONFORT TERMICO DIMENSIONAMENTO FILTRAGGIO VASCHE Per dimensionare il diamentro dei condotti che serviranno per portare e asportare acqua calda o fredda dalle vasche posizionate nell’edificio, consideriamo la somma dei valori positivi e di quelli negativi calcolati in precedenza. Sulla base di questi, con la formula m= (Qtot / Densità dell’acqua * differenza di temperatura * T acqua) e trasformiamo il tutto in l/h moltiplicando per 3600. Il canale che trasporterà acqua calda avrà un diametro di 42 cm dato che la velocità al suo interno dell’acqua sarà di 1 l/s, mentre quello che trasporta acqua fredda sarà di diametro 45 cm.
PIANO TERRA
PIANO PRIMO
LEGENDA
DIMENSIONAMENTO CANALI RICAMBIO ACQUA m (l/h) v (l/s) Canale (mq) Diametro (m) -2.340 1 0,65 0,45 2.041 1 0,57 0,42
Condotto mandata e ritorno acqua fredda Condotto mandata e ritorno acqua calda
Attacchi al miscelatore della vasca
Risalida condotto principale acqua calda Risalida condotto principale acqua fredda
Portata richiesta (-) Portata richiesta (+)
SCALA METRICA
10 m
SOLEGGIAMENTI STAGIONALI
2
Equinozio Primavera - 20 Marzo
TABELLA TEMPERATURA MEDIA GIORNALIERA PER MESE
Solstizio Estate - 21 Giugno
2
Equinozio Autunno - 22 Settembre
1
Solstizio Inverno - 21 Dicembre
1
Pianta Copertura - scala 1:500
Sezione C-C’ - scala 1:200
Sezione C-C’ - scala 1:200
C’
D’ Sezione D-D’ - scala 1:200
4
C
D 4
Pianta Piano Terra - scala 1:200
Sezione C-C’ - scala 1:200
Sezione C-C’ - scala 1:200
Vista 4 - scala 1:200
C’
D’
Sezione D-D’ - scala 1:200 Sezione D-D’ - scala 1:200
C
Sezione C-C’ - scala 1:200
4
Location: Silandro, Trentino Alto Adige Year: 2014 - 2015
S2020
Architectur competition SCHLANDERS 2020 townscape design. _1*price
The basic idea for the redevelopment of public spaces of the town of Silandro is redefining the decking in public spaces. This new common foundation is subtracted from a mainly technical use and becomes the ‘ common ground, hosting and enhancing the diversity of individuals in communion with the historical context and landscape.
Location: 56th International Art Exhibition, Venezia, Arsenale Year: 2015 Slovenian pavilion
UTTER /
The Violent Necessity For The Embodied Presence Of Hope
Jaša
Development of the external facades MDF making up the wrapper. (Open doors)
The project “Utter / The Violent Necessity for the Embodied Presence of Hope” focuses on three major themes − resistance, collaboration, and hope that are accomplished by a longterm coexistence of a group of artists within an architectural shell, the co-creation of repetitive performative actions, and the production of harmonic moments. The project involves a spatial installation in a given space, an architectural drawing as a reflection of thoughts, the integral experience of an artwork, a long-lasting performance as a reflection of the necessity of believing in change here and now.
Location: London, UK
The project focuses on a existing house extension and renovation. A new roof has been done as well as all the fixtures. The house is a private property located in South-West London.
Front Elevation
Private house
Fiberglass
Velux
Velux
Velux
Fiberglass
Velux
Existing roof
Master Bedroom CH=2,40
Corridor CH=2,60
Eaves / storage
Junior Bedroom CH=2,60
Studio CH=2,74
Kitchen CH=2,60
Corridor CH=2,61
Front Elevation
Not surveyed
SECTION A-A' Scale 1:50 (meters)
N 1ST Paolo Sabbadin | Architecture Office
2m
3m
4m
CH=2,00
Section CC CH=2,40
162 Tranmere Road 158 Tranmere Road
RVP
158 Tranmere Road
Eaves / storage
80 120
King 150x200
RAD
Master Ensuite
74 204
Front Garden
74 204
RAD
RAD
Bathroom CH=2,60
Master Bedroom CH=2,40 Section B-B'
100 100
7.62
Section B-B'
Rear Garden
Eaves / storage WM / TD
67 204
Junior Bedroom CH=2,60
67 204
Section A-A'
Section A-A'
RAD
158 Tranmere Road
158 Tranmere Road 154 Tranmere Road
Chimney breast
Section CC
154 Tranmere Road
SECOND FLOOR Scale 1:50 (meters)
N 1ST
PS AO
Paolo Sabbadin | Architecture Office 29 C Eastlake Road SE5 9QJ London
1. This drawing remains copyright of PSAO Ltd and may not be reproduced or copied without consent in writing. 2. Do not scale drawing use figured dimensions only. Drawing errors and omissions to be reported to the architect. 3. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. 4. Read in conjunction with all relevant structural and mechanical & electrical engineers drawings.
Tender Drawings
0m
1m
- 09.11.18 Issued for comments
5m
TD_03 PROPOSED SECTION A-A' PS
Chimney breast
CH=2,40
CH=1,40
162 Tranmere Road
1m
- 09.11.18 Issued for comments
Tender Drawings
1. This drawing remains copyright of PSAO Ltd and may not be reproduced or copied without consent in writing. 2. Do not scale drawing use figured dimensions only. Drawing errors and omissions to be reported to the architect. 3. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. 4. Read in conjunction with all relevant structural and mechanical & electrical engineers drawings. 5. All work must comply with relevant British Standards and Building Regulations requirements.
29 C Eastlake Road SE5 9QJ London info@psao.co.uk
Timber fence
PS AO
0m
2m
3m
4m
5m
TD_02 PROPOSED FLOOR PLAN
scale 1:50@A3
D_2
Specification:
20
21
12. 13. 14. 15.
7 6 5
16.
4 3
17.
2 1
NOTES: Insulation: All insulation to be closely butted together. Gaps to be filled and joints sealed in accordance with manufacturers recommentation. Continuity of insulation to be ensured at all junctions. Vapour control layer: All junctions, joists and penetrations sealed with proprietary air tightness products from the Pro Clima range. Rooflight: Setting out of rooflight to be agreed on site.
1
19 18
17
16 15 13
14
D_4
Plasterboard Timber joist to Engineer's detail Timber firings to create 1% fall Plywood sheeting Vapour control layer 40mm Kingspan adhered to ply in accordance with manufacturer's recommentations. Note: no fixing to penetrate 25mm Kingspan Rubber roof fully adhered to insulation Existing clay ridge tile retained and refitted in mortar bed New clay tiles to match existing New reconstituted slates to match existing 25x50mm battens 38x38mm counter battens Breather membrane stapled to rafters Joists to Engineer's detail 150mm Kingspan fitted below rafters Steelwork to Engineer's detail. With 60 min fire proofing
7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.
8 14 13
15
9 6
NOTES: Insulation: All insulation to be closely butted together. Gaps to be filled and joints sealed in accordance with manufacturers recommentation. Continuity of insulation to be ensured at all junctions. Vapour control layer: All junctions, joists and penetrations sealed with proprietary air tightness products from the Pro Clima range. Rooflight: Setting out of rooflight to be agreed on site. -
1
12
2
10
9 10
5
11 12 13
14
8 7
7 17
D_7
9
10
11
14
13 12
NOTES: Insulation: All insulation to be closely butted together. Gaps to be filled and joints sealed in accordance with manufacturers recommentation. Continuity of insulation to be ensured at all junctions. Vapour control layer: All junctions, joists and penetrations sealed with proprietary air tightness products from the Pro Clima range. Rooflight: Setting out of rooflight to be agreed on site.
3 4
8
16
15
7 6
5
4 3
2
1
17
7 5
11
11
1ST
PS
Section CC
CH=2,00
162 Tranmere Road
- 09.11.18 Issued for comments
DD_01 TYPICAL DETAILS
Tender Drawings
1. This drawing remains copyright of PSAO Ltd and may not be reproduced or copied without consent in writing. 2. Do not scale drawing use figured dimensions only. Drawing errors and omissions to be reported to the architect. 3. All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. 4. Read in conjunction with all relevant structural and mechanical & electrical engineers drawings. 5. All work must comply with relevant British Standards and Building Regulations requirements.
CH=1,40
29 C Eastlake Road SE5 9QJ London info@psao.co.uk
CH=2,40
Paolo Sabbadin | Architecture Office
PS AO
CH=2,40
scale 1:20@A3
162 Tranmere Road
158 Tranmere Road
158 Tranmere Road SVP
1 2
13
DM
Eaves / storage
RVP
1 2
SVP
13
King 150x200
80 120
Master Ensuite
UFH
74 204
Front Garden
1
13
1
1
T
1
T
2
DM
100 100
7.62
Section B-B'
ML
SD 13
13
Rear Garden
UFH 67 204
Junior Bedroom CH=2,60
DM
1 1
Section A-A'
T
158 Tranmere Road
2
2 67 204
13
WM / TD
2
1
P
2
INT
Eaves / storage
2
Bathroom CH=2,60
Master Bedroom CH=2,40
Section B-B'
RAD
T
SD
Section A-A'
RAD
158 Tranmere Road 154 Tranmere Road
Timber fence
Section CC
154 Tranmere Road
Exit flue boiler Stub-stack with air admittance valve SVP RWP SVP RWP Cold feed
UFH
Chimney breast
13. 14.
14
74 204
10. 11. 12.
3
Specification: 1. 2. 3. 4. 5. 6.
13
Chimney breast
9.
6
Reconstituted slate to match the existing main roof 25x50mm battens and 38x38mm counter battens Breather membrane 70mm Kingspan over joists and 70mm between joists Joists to Engineer's detail Lead flashing Steelwork to Engineer's detail Double glazed fixed flat skylight with extruded aluminium profile, thermally broken factory glazed with a argon filled and soft coat low E insulating glass unit. Supplied and installed by main contractor on isulated upstand to 3 sides and directly to wall on 1 side. 60mm foam with 9mm ply either side to form upstand Existing wall Plasterboard Insulated plasterboard (12.5mm plasterboard + 50mm insulation). Boards butted tightly together and all gaps/junctions filled with expanding foam. Packer Fill void with expanding foam
RAD
3. 4. 5. 6. 7. 8.
16
6
NOTES: Insulation: All insulation to be closely butted together. Gaps to be filled and joints sealed in accordance with manufacturers recommentation. Continuity of insulation to be ensured at all junctions. Vapour control layer: All junctions, joists and penetrations sealed with proprietary air tightness products from the Pro Clima range. Rooflight: Setting out of rooflight to be agreed on site.
13
2.
1 2
-
Specification: 1.
4
13
12. 13. 14. 15. 16. 17. 18. 19. 20. 21.
6. 7. 8. 9. 10. 11.
11
21 9 8 10
100mm Concrete block London buff stock brickwork Cavity full filled with insulation Pre cast Concrete capping 50mm Kingspan insulation between joist/firings Stepped DPC Steel/lintel to Engineer's detail Cavity closer Plasterboard Timber joist to Engineer's detail Timber firings cut to fall with ply screwed over Vapour control layer 120mm Kingspan fixed to ply rubber roof fully adhered to insulation box gutter to falls formed with ply and firings, with 50mm kingspan over. Additional kingspan insulation below 25mm Kingspan insulation to inside of parapet with membrane turned up and over Aluminium framed double glazed unit with argon fill and warm sdge spacers. Laminated glazing to comply with part N. RAL colour outside inside. Supplied and installed by main contractor.
RAD
9. 10. 11.
D_5
Specification: 1. 2. 3. 4. 5.
13
3. 4. 5. 6. 7. 8.
Plasterboard 50x50mm battens to form service cavity filled 50mm insulation Vapour control layer Timber studs to form frame 140mm insulation between 18mm sarking board 38mm cavity formed with 38x38mm timber battens 18mm ply Zinc profile on separation membrane Timber framed double glazed unit with argon fill and warm edge spacers Insect mesh New reconstituted slates to match existing 25x50mm battens 38x38mm counter battens Breather membrane stapled to rafters Joists to Engineer's detail 150mm Kingspan fitted between rafters 37.5 Kingspan fitted below rafters Softwood timber cill Zinc flashing/cill
13
1. 2.
DRAINAGE: ALL NEW BATHROOM & KITCHEN DRAINAGE PIPEWORK TO BE CONNECTED TO THE EXISTING MANHOLE ROUTE OF DRAINAGE PIPES ON THIS DRAWING IS SCHEMATIC
SECOND FLOOR
Location: London, UK
The project focuses on a house extension and renovation, The house is a private property located in South-East London.
Private house
NOTES
1_This drawing remains copyright of PSAO L may not be reproduced or copied without con writing. 2_Do not scale drawing use figured dimension Drawing errors and omissions to be reported architect. 3_All dimensions to be checked on site contractor and such dimensions to be responsibility. 4_Read in conjunction with all relevant structu mechanical & electrical engineers drawings. 5_All work must comply with relevant British Sta and Building Regulations requirements.
0
B Entrance mat fitted flush, metal trim all around.
Victorian door
Square tiles, 20x20
Mini dynamic canal
C
CC
98_LR_320
A Steel beam on PW, Padstone 540x100x215 mm DEEP
0.5 m
1m
N
New Radiator
Washing Machine
TV 55'
Shoes +Jackets
Mirror
Megaflow
Fuse Board
Fridge Freezer 910x670 mm
Over Microware
Over Lamona Arroscia Water Tap, Microware Howdens
Water Softener Tall Unit
Lamona Easton 1.5 Bowl Inset Stainless Steel Kitchen Sink, Howdens
1
100 Lilford Rd 98 Lilford Rd
G.T. Hallway CH=2.62
DG.02
90 205
Storage
80 205
Bike hook
UC 203x203x46 box frame column under
90 210
70 210
1
DG.0
Entrace to 98 Lilford Road
DG.04
DG.03 70 210
AA
98_LR_300
AA
98_LR_300
BB
98_LR_310
d Ro Lilfor
Tall Unit
Dishwasher
ad
50 160
Sink Boiling Tap Front Room CH=2.62
Windows TBC Shutters to be kept
2
Wine Fridge
Bi-fold doors + entrance door
Hob (Induction) Future Gas Extractor
UC 203X203X60 Steel beam on padstones (left) and portal frame (right)
Tall Unit
+17.70 +17.70
Middle Room CH=2.62
DG.07
Kitchen CH=2.45 Polished Concrete UFH
85 160
New Georgian Radiator
+17.70
225 325
Backyard
DG.05
BB
110 200
50 160
98_LR_310
PET FLAP
NOTES
3
98 Lilford Rd 96 Lilford Rd
Gas Burner
Fire Place 39 Iron Grey Steel Corner Model
Media/AV
UC 203X203X52 Steel beam on padstones
Antique Chest
Vinyls shelves
Padstone 540x100x215 mm DEEP
Crittal doors FD30
SVP to future LOFT
Internal insultation
0
0.5 m / Partition
Bi-fold doors 3 panels UC 203x203x46 box frame column under
A TENDER -
Paolo Sabbadin Architecture Office
Brick tiles + Pointing
Fence H: 1.75
1m
Brixton,London info@psao.co.uk www.psao.co.uk/
CC
98 LILFORD ROAD LONDON SE5 9HR Title
GROUND FLOOR PLAN
98 Lilford Rd
1
2
3
GA
100 Lilford Rd
ALL TEMPORARY WORKS TO BE CONTRACTORS DESIGN PORTION
98 Lilford Rd
96 Lilford Rd
ALL MECHANICAL AND ELECTRICAL INSTALLATIONS TO BE CONTRACTORS DESIGN PORTIONS
ALL FLOORS, WALLS AND CEILINGS TO BE LEVELED.
23.08.2019
Scale
1.25 @ A1
Drawn
SM
Status
TENDER
Authorised
PS
Proj No
Drg No
98_LR
98_LR_100
FFL
FFL Windows to be removed
Windows to be removed
Internal insultation
Partition to be removed
Partition to be removed
FFL FFL
Bedroom 2
Internal insultation / Partition
UC 203X203X60 Steel beam on padstones (left) and portal frame (right)
Fixed Glazing
New carpert
Internal insultation Coping stone
GFGT-03
GFGT-03
REAR ELEVATION
FFL
PFC 125x65 supported on engineering brick at both ends
75
37,5
NOTES
Tall Unit
Sink Boiling Tap
Lamona SNK1420 Round Single Bowl Inset Stainless Steel Kitchen Sink, Howdens
Hob (Induction) Future Gas Extractor
6 Drawers
1_This drawing remains copyright of PSAO Ltd and may not be reproduced or copied without consent in writing. 2_Do not scale drawing use figured dimensions only. Drawing errors and omissions to be reported to the architect. 3_All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. 4_Read in conjunction with all relevant structural and mechanical & electrical engineers drawings. 5_All work must comply with relevant British Standards and Building Regulations requirements.
Dishwasher
GFGT-02
GFGT-02
0
0.5 m
1m
Internal insultation / Partition
Brick tiles + Pointing
N
Crittal doors
GFGT-01
85
GFGT-01
FRONT
FFL
SECTION Fridge Freezer 910x670 mm
Over Microware
Over Microware
Lamona Arroscia Water Tap, Howdens
Water Softener Tall Unit
Lamona Easton 1.5 Bowl Inset Stainless Steel Kitchen Sink, Howdens
Tall Unit
Vario wine climate cabinet 400 series fully integrated, with glass door Niche width 45.7 cm, Niche height 213.4 cm
Open Shelving LED
6 Drawers
Flat Channel Open Shelving LED
31,1
Water Cylinder
100
100
85
FFL
GFGT-02 Lamona Arroscia Water Tap, Howdens
Dishwasher
Sink Boiling Tap
6 Drawers
2 Drawers
DG.03
70 210
70 210
Lamona Easton 1.5 Bowl Inset Stainless Steel Kitchen Sink, Howdens 85
85
190
213,9
60
60
GFGT-01
DG.03
SECTION
A TENDER
Concrete Fuse Board
Water Cylinder
Fridge Freezer 910x670 mm
Over Microware
Fuse Board
Over Microware
60
60
90
42,3
Fridge Freezer 910x670 mm
Over Microware
97,6
Over Microware
60
Lamona Arroscia Water Tap, Howdens
60
Water Softener Tall Unit
Lamona Easton 1.5 Bowl Inset Stainless Steel Kitchen Sink, Howdens 120
60
-
124,3
GFGT-02: Wall Hung Small Cloakroom Basin
FOR INFORMATION
23/08/2019
Revision
Date
Paolo Sabbadin Architecture Office
GFGT-03: Wall mirror with light. (60x90)
Paolo Sabbadin Architecture Office
63,5
Wall Tiles: 3.5 sq mt
60
120
64
Brixton,London info@psao.co.uk www.psao.co.uk/ 67,5
45,7 45,6
Lamona SNK1420 Round Single Bowl Inset Stainless Steel Kitchen Sink, Howdens
Sink Boiling Tap
BATHROOM
Vario wine climate cabinet 400 series fully integrated, with glass door Niche width 45.7 cm, Niche height 213.4 cm
Title
158,8
63,5
Tall Unit
Hob (Induction) Future Gas Extractor
Dishwasher
98 LILFORD ROAD LONDON SE5 9HR
85
Tall Unit
Tall Unit
Vario wine climate cabinet 400 series fully integrated, with glass door Niche width 45.7 cm, Niche height 213.4 cm
Sink Boiling Tap
6 Drawers
Open Shelving LED
23/08/2019
Revision
A TENDER
65
GFGT-01: Water Closet + External Cistern
FOR INFORMATION
41,5
32,1
60
Water Cylinder
Dishwasher
Tall Unit
F
KITCHEN
Date
23.08.2019
Scale
1.20 @ A1
Drawn
SM
Status
TENDER
Authorised
PS
Proj No
Drg No
SECTION CC Rev
Date
GROUN
FLOOR
Date
Windows to be removed Partition to be removed
Fuse Board
23/0
FOR INFORMATION
Revision
98_LR_320
Steel beam on PW/Padstone 540x100x215 mm DEEP
Boiler Manifold UFH
-25cm (FFL to be flush with rear patio BC)
1_This drawing remains copyright of PSAO Ltd and may not be reproduced or copied without consent in writing. 2_Do not scale drawing use figured dimensions only. Drawing errors and omissions to be reported to the architect. 3_All dimensions to be checked on site by the contractor and such dimensions to be their responsibility. Oper 4_Read Shelving in conjunction with all relevant structural and mechanical & electrical engineers drawings. 5_All work must comply with relevant British Standards and Building Regulations requirements.
2_Do not s Drawing er architect. 3_All dime contractor responsibilit 4_Read in mechanical 5_All work m and Building
0
A
B
C Chimney stack
100 Lilford Road
Internal insultation Bedroom 1
Corridor/Staircase
New carpert
Juliet balcony
Bedroom 2
Bathroom CH=2.40
FFL
Flemish Brick Bond
UC 203X203X52 Steel beam on padstones FFL Bike hook
Internal insultation UC 203x203x46 box frame higher level beam
Shoes +Jackets
New floor
Boundary brick wall
Boundary brick wall Living Room 1 CH=2.62 Kitchen CH=2.45 Washing Machine
A TENDER -
FFL
GL
FOR IN
Revision
FFL
P Ar
FFL
UC 203x203x46 box frame ground beam embedded in Mass concrete footing denotes new mass concrete strip footing (W) 500 x (D) 600 mm with encased steel beam
9 L Title
G
Date Scale Drawn Status
SECTION BB
Authorised Proj No
98_LR Windows to be removed Carpet to be removed
Partition to be removed
FFL
NOTES
FFL Partition to be removed
FFL
Partition to be removed
FFL Windows to be removed
Windows to be removed
Partition to be removed
Partition to be removed
Partition to be removed
GL
FFL
FFL
FFL
FFL
FFL
SECTION AA
A
1_This drawing re may not be repro writing. 2_Do not scale d Drawing errors an architect. 3_All dimensions contractor and responsibility. 4_Read in conjun mechanical & elec 5_All work must c and Building Regu
0
REAR ELEVATION
B
C
Chimney stack
100 Lilford Road Re-Tiling TBC
Carpet to be removed Windows to be removed Carpet to be removed
FFL
Partition to be removed
FFL
Partition to be removed
Bedroom 1
Partition to be removed
Floor to be removed
GL
Bedroom 3
Floor to be lowered
FFL
FFL FFL
New carpert Skylight
Fixed Glazing
SECTION BB
FFL
Coping stone UC 203X203X52 Steel beam on padstones Double rafters (typical)
Vinyls shelves Bike hook
UC 203x203x46 box frame higher level beam
TV 55' New floor Living Room 1 CH=2.62
Boundary brick wall
Boundary brick wall
A TENDER
Kitchen CH=2.45
-
FOR INFORM
Revision
GL
Pao Archit
FFL
FFL
FFL
UC 203x203x46 box frame ground beam embedded in Mass concrete footing denotes new mass concrete strip footing (W) 500 x (D) 600 mm with encased steel beam
SECTION AA
98 L LON Title
GA
Date
23.
Scale
1.25
Drawn
SM
Status
TEN
Authorised
PS
Proj No
Dr
98_LR
9
Location: Merchant Square, London. Year: 2016 - 2017
London Floating Pocket Park.
The 730 sqm park provide a green “oasis� of public space on the canal. Is divided into three areas: an events and installations venue with a pergola, an common main area and a floating reserve for wildfowl. The main area has lawns, multi-stemmed Tibetan cherry trees, borders for flowers such as irises and alliums in spring and summer and scented flowering shrubs in winter as well as seating and walkways over the water.
Photo
Visual
Location: John Lewis, 300 Oxford Street, London.
The 200 real living pine trees covered at the base by material present in the undergrowth such as bark and branches, have been arranged in various irregular groups to allow for a different view from every angle, but a continuousness of similar elements. The strongest contrasting element is the view from the roof (we are on the 6th floor) with, by choice, must not result the key determinant of the project.
Year: 2016
Pop-up winter garden.
Visual
Winter garden Layout
Location: Regents Place, London.
“Using Origami shapes and Pop Colour we devised a series of seating, planters and combi planter seating throughout the space. Working carefully to avoid causing congestion we looked at the impact the scheme would have from all view pointsr. Low maintenance plants were chosen for bold leaf colour and we clad the planter units in hard wearing, colourful artificial turf to encourage people to look, touch and feel the installation.�
Year: 2017
Origami Planters
D Assembly Plan - plywood cladding
D9
D Dp1
D9
Then bent to form the right angle with 12 mm plywood pieces to be attached together with small flexible joints. themm adjacent pieces. 12 plywood pieces to be attached Then bent to form the right angle with 3D Then 45x45mm frame will be the adjacent timber pieces. together with small flexible joints. Then 45x45mm frame timber will be attached. attached. Then bentD2 to form the right angle with The framework for the benches and for the adjacent pieces. D1 the planters will be built separately and The framework thetotimber benches then fixed the base. Then 45x45mm for frame willand be for the planters will BLUE be artificial builtgrass separately and will be fixed attached. the plywood with staples. then fixed to thetobase. 95x20 mm cedar will be fixed on The framework for benches and for top ofthe the grass to clad the bench seats. BLUE artificial grass will be fixed the planters will be built separately and to thefixed plywood staples. then to thewith base. Dp1
D6 D7
2 D
3D
Db1
D1
Db1
D7
D8
2 D
D10
D1 Db1
Dp1
D7
D
D5
3
Dp2
95x20artificial mm cedar willwill bebe fixed on BLUE grass fixed topthe of plywood the grasswith to clad the bench seats. to staples.
D4
D6
D6
D10 D1
Db1
95x20 mm cedar will be fixed on Studio 3.09 Vox Studios top of the grass to clad the 1-45 bench seats. E7 Durham Street
D10
D9
Dp1
D0 BASE
D7
Vauxhall London SE11 5AP Garden Club London Ltd www.gardenclublondon.co.uk
D6
Db
1
9
D10
1
Db1
Project Title
Origami Regent's Place
Dp2 D7
Dp2
D5
D4
D
D5
3
Client
D6
D4
British Land Sheet Title
Development example.
D6
D6
3D
D10
8D
D
D3
Dp2
D5 D4
D6
D1
D4
Dp1
D7
D5
D9
3
D2
Dp2
Dp
D
Dp2
Cladding assembly - D
Drawn By
3F
1
Db
Assembly Plan - plywood cladding D1
D2
p
D9
D
D
D0 BASE
1
3Dpieces to be attached 12 mm plywood E D
9
7 together with small flexible joints. Assembly Plan - plywood cladding
1
Dp1
Dp2
D10
D
p
1
D
D9
Dp1
Db
9
2 D
D1
Db
Client
Origami Regent's Place British Land
Cladding assembly - D British Land DrawnTitle By Sheet
0
1
D5
D4
Checked By
Date Rev
1:25 @ A3 FD Scale Rev
Date
1:25 @ A3
D5
D10 Dp2
D6 Dp2
Dp D3 1
D2
D3
Rev
D4
D10
1
D
D2
1
Db1 Db1
TW Sheet No.By Checked
11/05/2017 Date
Date
RPG_D02 TW
Sheet No. Description
11/05/2017
NL
RPG_D02
Description
NL
D1
D6
D4
Rev
FD Cladding assembly - D Scale By Drawn
D1
Db
D5
3
D6
D
D5
D4
D
Dp2
D1
Dp D9 1
1
D6
Db
Dp1
D7
D9
3
3F 95x20 mm cedar will be fixed on top of the grass to clad the bench seats. 0
Dp1
D9
D
Dp2
D9
Dp1 D7
RPG_D02
Description
Sheet Title Client
3F
D9
Date
Project Title
95x20 artificial mm cedar willwill be be fixed on BLUE grass fixed topthe of plywood the grass with to clad the bench seats. to staples.
D9
Rev
Garden Club London Ltd Origami Regent's Place www.gardenclublondon.co.uk
1
D1
8D
2 3D D Db1
D5
D10 Dp1
D5 D4
D6
D10D3 D4
Db
D8
D7 D5
D4
8D
Dp2
D3
Db1
TW
Sheet No.
11/05/2017
Studio 3.09 Vox Studios NL 1-45 Durham Street Vauxhall D3 London SE11 5AP Studio 3.09 Vox Studios Garden Club London Ltd 1-45 FOR MANIFACTURE Durham Street www.gardenclublondon.co.uk Vauxhall Project Title London SE11 5AP Dp1
This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Then bent to form D10 the right angle with themm adjacent pieces. 12 plywood 3Dpieces to be attached Then 45x45mm frame timber will be together with small flexible joints. Dp2 attached. Then bent to form theDright angle with 7 D10 the adjacent pieces. The framework for the timber benches Then 45x45mm frame willand be for D6 Dp2 will be built separately and the planters attached. 7 then fixed to the base.D The framework for the benches and for D6 BLUE artificial grass will be fixed the planters will be built separately and to thefixed plywood staples. then to thewith base.
3D
D10
D2 D8 D8
D7
D5 D4
D6
D8
Checked By
Date
1:25 @ A3
D5
D9
E7
D2
Rev
FD
Scale
0
D0 BASE
1
D9
D
D4
Dp1
D
D1
Db
D10
D9
Db
Dp2
Dp2
D8
D6
D8
Db
D10
Db1
D10
Dp2
D10
Db
3D
D9
D6 D7
D8
D8
12 mm plywoodDpieces to be attached
together with small flexible joints. Assembly Plan - plywood cladding Assembly Plan - plywood cladding
Dp1
Dp2
D10 D8
FOR MANIFACTURE
D1
This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
D0 BASE
Studio 3.09 Vox Studios 1-45 Durham Street Vauxhall London SE11 5AP Studio 3.09 Vox Studios Garden Club London Ltd 1-45 Durham Street Vauxhall www.gardenclublondon.co.uk Project Title London SE11 5AP
E7 D
D0 BASE
p
3D
1
D
9
D
p
3D
1
D
9
D5 D4
D3 D4 D3 D4
1 Db
D10
8D
Dp2
Project Title
D7
Client
Origami Regent's Place British Land
D6 Dp2
D5
D7
Client Title Sheet
D6
D5
British Land Cladding assembly - D Sheet Title Drawn By 3F
Db
1
Db
D9 Dp 1
Dp1
D5
D4
0
1
D
D9
3F
D5
0
1
D9
D1 D2
1
D3
D2
D3
Planting area design specification.
Rev
Checked By
Cladding assembly - D FD Drawn By Scale
D
Dp1
D9
D4
Dp1
This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Garden Club London Ltd Origami Regent's Place www.gardenclublondon.co.uk
1 Db
D10
8D
D5 D4
D2 D2
E7
FOR MANIFACTURE
Rev Date
FD @ A3 1:25 Scale Rev
Date Date
1:25 @ A3 Rev
Date
TW Checked Sheet No.By
11/05/2017
TW RPG_D02
Sheet No. Description
11/05/2017
NL
RPG_D02
Description
NL
D1
FOR MANIFACTURE This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
FOR MANIFACTURE This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Sitting area design specification.
Step and brick patio area detail Scale 1:8
Concrete slab detail Scale 1:8
10mm Tile adhesive
150mm concrete base 215
10
215
Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH)
70 10 70 10
Location: Islington, London
This garden comes as an expansion of the house. The kitchen & living room area are “connected� to the garden through brick paving which lies right behind a big window screen. On customer request, a trampoline fits in this small area. If not required in the future, this can then be designed to become a decking platform. The floating bench is also designed as a feature, enlightened from below it gives you the idea of continuity above the brick step. Reinforcement mesh
10 mm gaps - Kiln dried paving sand
Year: 2019
30mm layer - Sharp sand
Islington Private Garden
Geotextile membrane layer
100mm sub-base layer - MOT tipe 1
Compacted ground
Geotextile membrane layer
20mm layer -Mortar bed composed by cement and sand
Compacted ground
Strip light - bench detail Scale 1:1
Brick paving garden area detail Scale 1:4 10 mm gaps - Kiln dried paving sand 215
Bench clad, Iroko boards (140x20mm) Bench frame (19x25mm)
10
Bench frame (4'x2') Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH) 23
LED strip light.
30mm layer - Sharp sand 15
Linear steel profile
100mm sub-base layer - MOT tipe 1
'Ebony' bricks step Geotextile membrane layer
Compacted ground Steel rigid profile - 65mm edging Spiral steel securing spike (at regular interval) Garden Club London Ltd Studio WG06 Vox Studios 1-45 Durham Street Vauxhall London SE11 5AP www.gardenclublondon.co.uk FOR INFORMATION:
Sheet No.
Portfolio 3
Sheet Title
Portfolio detail
Project Title
Client
32 Devonia Road, N18JH
Scale
Heather Briant & Jeffrey Veen
1:10/20@ A3
Drawn By
Date
DB
Rev
Checked By
08-04-19
NL
this document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Bench profile & construction detail. Visual - night scene
Rodgersia aesculifolia
5
Hakonechloa macra
5
Dicksonia antarctica
1
Asarum europaeum
7
Soleirolia soleirolii
7
Planting plan
Hakonechloa macra 1
5
Fatsia japonica 3
Epimedium niveum 9
9
Soleirolia soleirolii 3
Blechnum Spicant 1
Dicksonia antarctica
Dryopteris erythrosora
1
Actaea simplex 'Brunette'
3
Hakonechloa macra
4
Quercus ilex - pleached
4
Polystichum setiferum
Dicksonia antarctica
1
3
Epimedium niveum
Soleirolia soleirolii
14
28
Soleirolia soleirolii
Fatsia japonica
1
3
Actaea simplex 'Brunette'
Hakonechloa macra
3
3
Asarum europaeum
Dicksonia antarctica
1
3
Dryopteris erythrosora
Dryopteris erythrosora
3
1
Trachelospermum jasminoides
Polygonatum hybridum
3
1
Dicksonia antarctica
Pittosporum 'Tom Thumb'
1
3
Astrantia major 'Star of Billion'
Epimedium niveum
4
2
Asarum europaeum
Actaea simplex 'Brunette'
3
5
Rodgersia aesculifolia
Dicksonia antarctica
1
3
Ceratophyllum Demersum
3
9
Epimedium niveum
1
Dicksonia antarctica
3
Actaea simplex 'Brunette'
4
Trachelospermum jasminoides
Asarum europaeum
11
Rodgersia aesculifolia
9
Step and brick patio area detail Scale 1:8
Astrantia major 'Star of Billion'
1
5
Polygonatum x hybridum
1
2
Asplenium scolopendrium
1
Pittosporum 'Tom Thumb'
Asarum europaeum
11
Hakonechloa macra
3
Asarum europaeum Epimedium niveum
215
Conc Scale
10mm Tile adhesive
Dicksonia antarctica Pittosporum 'Tom Thumb'
10
215
Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH) Astrantia major 'Star of Billion'
2
Hakonechloa 10 mm gapsmacra - Kiln dried paving sand
2
5
Dryopteris erythrosora
4
1
Asplenium scolopendrium
3
Astrantia major 'Star of Billion'
70 10 70 10
3
Soleirolia soleirolii 117 Asarum europaeum
30mm layer - Sharp sand 100mm sub-base layer - MOT tipe 1
Geotextile membrane layer
3
1
Dicksonia antarctica
20mm2layerHakonechloa -Mortar bed macra composed by cement and sand
During work
Compacted ground Garden Club London Ltd Studio WG06 Vox Studios 1-45 Durham Street Vauxhall London SE11 5AP www.gardenclublondon.co.uk FOR INFORMATION:
Sheet No.
DEV_09
Sheet Title
Planting Plan
Project Title
Client
32 Devonia Road, N18JH
Scale
this document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Drawn By
N/A
Heather Briant & Jeffrey Veen Brick paving garden area detail Scale 1:4
@ A3
Date
DB
Rev
26-02-19
B
Checked B
NL
Strip Scale
10 mm gaps - Kiln dried paving sand 215
10
Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH)
30mm layer - Sharp sand
100mm sub-base layer - MOT tipe 1
Geotextile membrane layer
Compacted ground Steel rigid profile - 65mm edging Spiral steel securing spike (at regular interval) Garden Club London Ltd Studio WG06 Vox Studios 1-45 Durham Street Vauxhall
FOR INFORMATION:
Sheet Title
Sheet No.
London SE11 5AP www.gardenclublondon.co.uk Step and brick patio area detail Portfolio 3 Scale 1:8
Project Title
Portfolio detail
32 Devonia Road, N18JH
10mm Tile adhesive
this document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
215
10
Client
Heather B
Conc Scale
215
70 10 70 10
Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH)
10 mm gaps - Kiln dried paving sand
30mm layer - Sharp sand 100mm sub-base layer - MOT tipe 1 Geotextile membrane layer 20mm layer -Mortar bed composed by cement and sand Compacted ground
ELEVATION "A"
Strip Scale
Brick paving garden area detail Scale 1:4 10 mm gaps - Kiln dried paving sand 215
10
Vande Moortel 'Ebony' bricks 215x52x70mm (LxWxH)
Location: Bermondsay, London
With panoramic views taking in some of London’s most significant landmarks, the owner of this roof terrace asked for a stylish garden that did not detract from its backdrop. The client wanted feature planting with subtle accent lighting, a barbecue area and social spaces. A report on the suitability of construction materials had to be approved by the surveyor before work could commence.
Year: 2016-2017
Jam Factory, Panoramic Roof Garden
Bench Frame exploded view
Bench Cladding exploded view Kitchen unit construction 730 90
10
Use 50mm 16G Stainless steel Nails to fix the battens.
50 45 45
45
526
5 122
5
122 5
Use 6x 120mm & 5x 80mm goldscrew to fix the frame together.
90
10 5
5
100
50 30
30
800 5
Granite worktop 30 mm thickness. Glue it on the top subframe.
Section "02" - Scale 1:10
Front view - Scale 1:10
Main kitchen unit structure
693
885
20
845
855
885
Kitchen unit door
SX 01
20
12
Timber frame - 90 x 45 mm
50
12
45 45
Plywood panel
50
45
5
5
5
5
45
Handle in timber battons painted in HAGUE BLU
780
12 90
90 12 646
Battens 45 x 20 mm painted in HAGUE BLUE
710
SX 02
Section "01" - Scale 1:10 Timber frame 90 x 45 mm 20 45
45
12
20
780
90
Studio 1.06 Vox Studios 1-45 Durham Street Vauxhall London SE11 5AP
Hinge detail - Scale 1:5
90
Garden Club London Ltd
Plywood panel 12 mm thickness 20
Plywood panel 12 mm thickness
20
12
Timber frame 90 x 45 mm
www.gardenclublondon.co.uk
Project Title
The Jam Factory Terrace
Plywood panel 12 mm thickness
Simon Russell & Mary-Anne Anderson Flat 615 A, The Jam Factory 27, SE1 4TT 50
426
50
90
Timber frame 50x 50mm
20
45
12
20 122
50
5
526
122
45
50 5
Plywood panel 12 mm thickness
90
12
90
5
20 12
670
12
670
Client
45
Visual - night scene
20
Visual - day light
15
Sheet Title
Kitchen unit construction Drawn By
Timber supports 90 x 90 x 45 mm
Rev
Checked By
DaB
TW
Scale
Date
Sheet No.
105
Parliament Hinge satin stainless steel 102x 102mm. Fixed between the 90x 45mm & the 50x 50mm frame (one hinge on the top and one hinge on the bottom of the dor).
1:10 @A3 Timber frame 90 x 45 mm
Rev
Date
01/02/2018 Description
JFT-13 NL
Timber frame 50 x 50 mm 0 scale 1:10
10
20
30
40
50 cm
Battens 45 x 20 mm painted in HAUGE BLUE Parliament Hinges satin stainless steel 102x 102mm
FOR INFORMATION This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Garden Club London was comissioned. Garden Club London accepts no responsibility for this document to any party other than the person by who it was comissioned.
Location: Chelsea Flower Show, London. Year: 2018
The garden is designed with water conservation and environmentally considerate landscaping in mind, as well as a planting scheme that deflects and processes pollution. Chipped bricks have been used under the seating area, the colour beneath the glaze intentionally weathered to tie in with the copper accents of the garden Cast iron grates in the floor allow rainwater to cascade through into a trough below – filtering the water through to the flower beds.
Oriented by: Garden Club London LTD & Thames Water
The Urban Flow Show Garden Chelsea Flower Show
Main water feature, photo & details
A
B A
C A L A
A
D - Framework timber
C A
B A
C - Plywood - 12 mm
C A
B - Adhesive AI
A - Design Clad - 5 mm H - Waterfall pipe ∅ 150 mm G - Tubing H A
C A
E - Water reservoir
I - Support frame B A L - Hardware cloth G A F - Fountain pump F A
A
D A
E A
C A
B A
A
Location: RHS Hampton Court Palace Garden Festival, London. Year: 2019 Oriented by: Garden Club London LTD & Thames Water
The Thames Water Flourishing Future Garden
Visual & photo from the same point of view
The central rainfall pavilion shows the essential cycle of water that we all rely on to live and grow. A blooming flower meadow is a miniature version of Thames Water’s sprawling urban wetlands. The garden contains three main planting areas: drought-tolerant with Eryngium giganteum and Agave americana; moisture-loving featuring Caltha palustris and Lythrum salicaria; and nectar rich wildflowers with bug and bird boxes set among woodland trees to encourage wildlife.
RENDER & VISUAL Modeling: Rhinoceros Rendering: Cinema4D + VRAY Post-production: Photoshop
SAME PLACE, DIFFERENT STYLE
WATCHMAN
ARCHITECTURAL MODEL MAKING New City District. Milan City, Wenstern Area @ via Novara 75 • mare culturale urbano • Milan
Model of experimental unit of residence in China @ 14th International Architecture Exhibition, Venice.
New Unipol HQ, Cmr design, Milan @ De Castillia, Milan
ROMA (Aurelian Walls) in the territory Thesis Model 1 : 100.000 / Dimension 600x700mm
Base dimensions 600x600 mm, full 630x630 mm
Dimensions 500x160 mm
Daniele Bettin Architect (ARB)
+ 44 771.9969.136 daniele4bettin@gmail.com https://issuu.com/danielebettin