1 minute read
Figure 20. Concept Source: Archdaily.com
Case Studies
Case studies were selected considering how the building interacts with their users considering all the parameters of an effective and productive workspace, keeping in mind the collaboration between multi-disciplinary users.
Advertisement
1. Campus for Agilent Technologies, Manesar.
LOCATION: Sector-B, Manesar, Gurgaon Site Area: 10 Acres Built-up Area: 46,453 m² Occupancy: 1800 workstations Architects: Ar. Sanjay Prakash (SHiFT Architects
Completion: 2009 Client: Agilent Technologies, USA
Fig 4. Collaboration between people Source: blog.bonus.ly
Architectural Approach :
Figure 4
The campus has been crafted for the ultimate office experience, this building imparts distinctive character to enhance productivity while maintaining the sanctity of a quite work environment.
The building utilizes only 25% of the permissible FAR, while allowing the future expansion to full FAR. this not only serves to create valuable outdoor spaces for recreation
PARKING :
8total- 600 cars Basement parking- 2 floors Surface paring- Soft paved (100 Cars)