Architecture Portfolio

Page 1

DARIA GAVRILOVA

Portfolio 2015

1


Assembly

In the anteroom, behind the door Through the window, is a House With the ground two stories away

The First House On The Terrace The House with a triangulated piched glass roof sits on top of the 3-floored building, resting only on the lateral walls. The House searves as a working space with two studios on both floors. To enter the House, one have to come on the terrace from the building next to it, walk around the House. After getting in, take the stairs to the next level; at the back of second studio a metal staircase will lead you down to the street

First House on the Terrace

2013

2

3


Along the wall, Underneath and twice right The door is hidden At the darker side of the House As legs hold the body, lateral walls Lift the House to float Above the ground and rest on borders. The roof overhead Brings light and casts shadows onto the chairs Passing inside, inviting upstairs

First House on the Terrace

2013

4

5


The Second and Third Houses On The Terrace The two houses are similar in their position and occupation of the terrace. The Second House rests on pillars and is built around the main stairwell leading to the roof top of the House. The inner space forms an open plan studio with a window facing a quite street The Third House is obstructing directly with its walls onto the terrace, insolated by the sky lights with a narrow roof terrace Second House on the Terrace

Third House on the Terrace

6

7


4

Prefabricated elements Structural diagram

3

6

2

1. Prefabricated floor sandwich panels x11

2

c

c

3

5

4

2

2. Prefabricated lateral wall sandwich panels x6

b

3. Â In situ constructed cross walls sandwich panels x6

3

2 3

3 6

2

1

4. prefabricated cross laminated timber roof x2

c d

5 .Prefabricated sandwich terrace top sandwich panel x1 ( with tongue for trusses to slot in)

3 3

6. Prefabricated cross laminated timber trusses x2 (with grooves for terrace top to slot in)

2

a - Entrance door b - Sliding stairwell door c - Thermoclick windows d - Glass window

c

a

4 3.1 3

6

2

2

c

c

3

5

Materials and Element, Structural diagram

4

2 b

3

2 3

3 6

2

1 c

d

3 3

2

a

Third House on the Terrace Technical Studies

2015

8

9


10

Section A-A scale 1:20

plywood panel vapor barrier

240

sheet isolation

18

plywood panel

125

85

18

L-shaped Mounting Plates / Metal Brackets FSMAS

105

At last arrives the prefabricated terrace top sandwich panel, sloted into the trusses spanning between the short lateral walls

3,51m Hand Railing h=1.05m Thermalclick windows

CLT roof panels

2,25m

Thermalclick windows

CLT roof truss

R10/ 11A Gutters Sandwich floor panels

Sandwich prefab wall panels

Floor panels flashing with the steel beams, connected with the Metal Brackets at the ends

Glass windows

4.3

Left Wing

Existing railings

Right Wing

Middle Aisle

0,0m

Buiding sequence, Floor panels

Sandwich floor panels

Cross I-beam 127x76x13

Paraphet I-beam 305x102x25

A

B

plywood panel

18

sheet isolation

240

timber beam

250

vapor barrier 10 After all walls erected, come the prefabricated CLT roof panels sloted on top. plywood panel 18

2.4 D

C

Construction drawing, Section A-A, 1:20

Section B-B scale 1:20

3,48m

Terrace floor paneling, spanning between the two trusses, interlocking with the CLT trusses

6042

760

430

4.9

Buiding sequence, Terrace top

2,06m

plywood panel

18

crosslam timber panel

90

wood fiber insulation board 150

0,0m

Paraphet I-beam 178x102x19

Cross I-beam 305x102x25

3

2

Third House on the Terrace Technical Studies

10

10

plywood structural panel

18

Paraphet I-beam 127x76x13

-0,78m

4

vapor control

Roof rests mainly on the secondary walls. Composed out of Cross Laminated Timber, the isolation is provided by sevral levels of plywood, with Thermal Click semi-transparent windows

1

2.5

Construction drawing, Section B-B, 1:20

2015

11

4.7

Buiding sequence, Roof panel


On a back street Somewhere in a city Behind a barrage Is a gateway On a back Blocked by street a box Somewhere a city The passage in is hidden Behind barrage From a astranger, Is a gateway Blocked by a box The passage is hidden From a stranger,

The Portal The Portal at the backstreet of St Paul’s acts as a boundary to separate private areas from unwelcome intrusions Working as an open gateway, the view through the door is obstructed by the block in front, giving a fake impression of a closed path

Portal Gatehouse

2013

12

13


The Dock The system of locks at both sides of the dock for the boats to enter from the river are merged with the

The Dock forms a new 34th Borough of London on the junction of the four existings ones, becoming a cargo port in the centre of London City, juxtaposed between the Blackfriars and Waterloo Bridges.

stairs for people to come down from bridges.

London Dock Borough

2014

14

15


London Dock Borough

16

By equating the levels of water The lock serves a boat Lifting a gate for vessels to float.

2014

17


The result of the game - 5 intervetions Model Wood, plaster, 3d printing, cnc

The Game of Follies The main element of the design process - the grid developed into a Game. It is a system of random urban interventions that brings unpredictability to the organization of additions, symplifying it to Add Hoc - for the specific reasoning

FINISH X DELEDE CARD

RIVER BRIDGE

X2 ROLL

COMMUNITY CENTRE

JUMP

+1 CARD

21

JUMP

X DELEDE CARD

28

37

JUMP

BACK TO START

GOLDEN SQUARE pick any square

SWAP CARD

JUMP

GO TO â„–13

CORNERS

34

31

18

15

35

30

19

JUMP

2

36

29

TOWER 14

3

38

+1 CARD 20

13

4

27

JUMP

POOL 12

5

SWAP CARD

22

11

6

GO BACK

+1 CARD

PARK JUMP

39

26

23

10

7

40

25

24

9

8

TRELLICK TOWER

1/2 ROLL

GATES JUMP

1

16

32

17

33

START

Folly Game

2015

18

19


Folly Game

2015

20

21


Introducing the 5 moments of addendum as a combination of existing site elements, derived through the Game of random urban interventions, that activate the fabric of the site locally at the points of intersections with a new Diagonal Walkway forming a procession through the site, to create an environment which can be as visually rich and varied as an actual urban life itselfmerged with the stairs for people to come down from bridges.

Twin Gate Towers

Community Centre Development

Folly Game

2015

22

23


Fish eye addendum momentums The idea of my addendum is to provide an environment which can be as visually rich and varied as an actual urban life, by using the game system as tool to detect and solve problems quickly and efficiently, relying Folly Game

2015

24

25


Bedford Square Strawberry Table Collective work by unit 10, annual graduation Strawberry table. Constructed within 5 days, structure made out of seven 18mm plywood compartments with a total length of 16meters, covered with over 1200 tiles. Strawberry Table

26

27


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.