Daria Gavrilova
Portfolio 2017
Residential
House rebuild
70% of house extention - Planning approval - Design proposal/Tender documents - Construction package/Site survey - To be finished by December 2016
London, 2016 On site
Restaurant Fucina
Featured curved ceiling of 10’000 bricks - Carcass substructure - Plywood substrate - Brick cladding
London, 2015 - 2016 Complete
Restaurant Barrafina
London, 2016 Complete
Refurbishment of listed buildings and new restaurant on Ground Floor. - Plannings/licensing/fire strategy - Design/Consept presentation - Tender/Construction drawings - Site supervision
Office move
London, 2015 Complete
- Design/Construction drawings - Table fabrication - Site supervision
Office AMA
2800 600
200
1200
200
A
1400
A
White laminate on plywood
1200
2800
200
1200
200
1200
200
600
1500
Removable panels with Ă˜ 80 hole for cable access
Power outlet
1
Desk - Plan View 1:20
50x25x3 RHS support bar 150
60
150
1400
1400
Cables
357
Plywood painted 20% Gloss RAL 7016
73
725
150
1400
Power outlet
Wild steel fabricated leg to bath ends powder coat finish RAL 7016 20% gloss
635
150
1400
203
25
1400
2
364
Base ring with nylon glides under
18
Desk - Front View 1:20
18
MDF mobile unit all in 2-pak finish 20% Gloss RAL 7016
600 200
576
12
Plywood MDF with paint finish RAL 7016 20% Gloss
12
12
12
18
524
18
18 mm plywood cable management tray runs full length of table Note tapered ends
18 164
24
12
25
12
100
RAL 7016
203
191 140 339 300
Solid oak for fixed legs on the floor
357
Cables from below
18
5
60
560 548
560
2 No layer 12 mm MDF for drawer fronts
Hettich Swivel castor steel KTL black, wheel polypropylene dark grey # 003336
73
Hettich Swivel castor with total brake steel black, wheel polypropylene dark grey # 003337
3
51 Calthorpe Street London WC1X 0HH
Desk - Short view 1:10 andy martin associates architects and designers tel: +44 20 3397 1999 info@andymartinstudio.com
4 Revision
Revision
15/12/2015
A
Date
Issue
Drawers in MDF/ Plywood with full extension runners
Desk - Section Section 1:10 Project
Scale
@ A3 Office 2016
Office 51 Calthorpe street London WC1XOHH
Notes
Date
Issue
Date
December 2015 Drawing name
Desk
Drawing number
Revision
A
The House On The Terrace The House is obstructing directly with its walls onto the terrace, insolated by the sky lights with a narrow roof terrace. To be rebuilt with plywood sheets placed on existing terrace as a part of educational facility.
The House on the Terrace 2014
plywood panel
18
sheet isolation
240
timber beam
250
vapor barrier
10
plywood panel
18
Prefabricated sandwich floor panels are sloted into the I-beams and fixed with a timber log. As well deliverd by crane. Scaffolding is moved up on the floor are
Terrace floor paneling, spanning between the two trusses, interlocking with the CLT trusses
4.9
Buiding sequence, Terrace top a - Entrance door b - Sliding stairwell door c - Thermoclick windows d - Glass window
c
3
6
18 2
2
c
3
5
10
c
4
2
plywood panel vapor barrier
240
sheet isolation
18
plywood panel
L-shaped Mounting Plates / Metal Brackets FSMAS
125
85
4
105
b
3
2 3
3 6
2
1
er
c d
3 3
r 2
a
Floor panels flashing with the steel beams, connected with the Metal Brackets at the ends 3.1
3,48m
4.3
Materials and Element, Structural diagram
Section B-B scale 1:20
Buiding sequence, Floor panels
6042
430
760
2,06m
0,0m
Paraphet I-beam 178x102x19
Cross I-beam 305x102x25
Paraphet I-beam 127x76x13
-0,78m
4
3
2
1
2.5
Thie House on the Terrace Construction Drawings 2014
Construction drawing, Section B-B, 1:20
The Game of Follies The main element of the design process - the grid developed into a Game. It is a system of random urban interventions that brings unpredictability to the organization of additions, symplifying it to Add Hoc - for the specific reasoning
FINISH X DELEDE CARD
RIVER BRIDGE
X2 ROLL
COMMUNITY CENTRE
+1 CARD
21
JUMP
X DELEDE CARD
38
28
37
JUMP
BACK TO START
GOLDEN SQUARE pick any square
SWAP CARD
JUMP
GO TO â„–13
CORNERS
1/2 ROLL
Community Centre Development
34
31
18
15
35
30
19
JUMP
2
36
29
TOWER 14
3
27
+1 CARD 20
13
4
GO BACK
JUMP
POOL 12
5
SWAP CARD
22
11
6
39
26
+1 CARD
PARK JUMP
JUMP
23
10
7
40
25
24
9
8
TRELLICK TOWER
GATES JUMP
1
START
16
17
32
33
Introducing the 5 moments of addendum as a combination of existing site elements, derived through the Game of random urban interventions, that activate the fabric of the site locally at the points of intersections with a new Diagonal Walkway forming a procession through the site, to create an environment which can be as visually rich and varied as an actual urban life itselfmerged with the stairs for people to come down from bridges.
Folly Game 2015
Fish eye addendum momentums The idea of my addendum is to provide an environment which can be as visually rich and varied as an actual urban life, by using the game system as tool to detect and solve problems quickly and efficiently, relying particularly on resources available on the site
Folly Game 2015
Bedford Square Strawberry Table Collective work by 10 students, annual graduation Strawberry table. Constructed within 5 days, structure made out of seven 18mm plywood compartments with a total length of 16 meters, covered with over 1200 tiles.
Strawberry Table 2015