JOURNAL DOCUMENTATION
Tristan Da Roza | 388 045 Studio: Bannarama
TOWER ONE:
The Exquisite Corpse
TASK 1:
Precedant Tower Study
http://www.archdaily.com/23431/in-progress-capital-gate-by-rmjm-most-leaning-building-in-
STRUCTURE: Capitol Gate, Abu Dhabi / RMJM (2011)
https://www.ctbuh.org/Publications/Journal/Reviews/Book_Marina/tabid/1730/language/en-
GROUND FLOOR: MARINA CITY, CHICAGO / Bertrand Goldberg (1964)
http://www.archdaily.com/169173/1-bligh-office-tower-ingenhoven-architects/
TYPICAL FLOOR PLATE:1 BLIGH ST, SYDNEY Ingenhoven Architects & Architectus (2011)
http://www.ctbuh.org/TallBuildings/FeaturedTallBuildings/ArchiveJournal/O14/tabid/1818/lan-
FACADE: O-14, DUBAI / Reiser + Umemoto (2010)
http://www.evolo.us/competition/monument-to-civilization-vertical-landfill-for-metropolises/
SYMBOLISIM [OTHER]: Monument to Civilization: Vertical Landfill for Metropolises / Lin Yu-Ta, Anne Schmidt (2012), Competition Finalist
TASK 2:
Structure
PRECEDANT: Hong Kong Bank / Foster Associates
47 FLOORS / 178M / 99 000 m² / Cnstrc. 1983-85
9
Pin Connections
Circular Steel Sections-Load Bearing Internal Bracing/ Node Connection
Outer Rectiliner Bracing
SERVICE CORES
6 7 $ , 5 6
( / ( 9
( / ( 9
30m
15m
TRUSSES [SPANNING]
TRUSSES [OUT RIGGING]
HANGER BAY 1
HANGER BAY 2 CROSS BRACES
CROSS BRACES
PLAN
1:500 @ A3
HANGER BAY 3
0
5
25
50M
HANGER [TRUSS] SYSTEM
DBL. HEIGHT FLR.
5 FLOORS
DBL. HEIGHT FLR.
7 FLOORS
DBL. HEIGHT FLR.
7 FLOORS
OUT RIGGING TRUSS
DBL. HEIGHT FLR.
SPANNING TRUSS
OUT RIGGING HANGER 8 FLOORS
VERTICAL HANGER
MAST DBL. HEIGHT FLR.
EXTERNAL CORE
LOAD TRANSFER 8 FLOORS + ATRIUM
ELEVATION
1:500 @ A3
0
5
25
50 m
ASSEMEBLY
AXO 1:500 @ A3
STREET VIEW
TASK 3:
Ground Floor
GROUND FLOOR LEVEL: Structure Precedant/Willis Tower, Chiago
AXO
1:500 @ A3
0
5
25
50M
ENTE RANC E
CAFE
ENTERANCE
BIK E
SEATING
ENTERANCE
RECEPTION
RETAIL
FOH
STAIRS
SERVICES
TOILETS
RECEPTION
CAR PARK
GROUND LEVEL PLAN
1:500 @ A3
0
5
25
50M
ELEVATION
1:500 @ A3
0
5
25
50m
SECTION 1:400
0
4
40m
TASK 4:
Typical Floor
1.4
1.4 FIREWALL BUILDING Building type courtyard building along firewall facing S Date of construction
Number of units
Size of units
Area per user
Building depth
Access quadruple- and double-loaded stairwells Open spaces balconies garden in inner court Parking in basement story with garden above Architect Inken und Hinrich Baller Berlin Location Fraenkelufer Berlin-Kreuzberg
Referring to
Brought to you by | University of Melbourne Authenticated | 128.250.144.144 Download Date | 7/30/13 12:39 AM
ڕۏۋۀھۉۊڞٻۀھڼۋێڈۄۏۇېڨ ڑڋڋڍ ۃھۄۍېڵ ڼۉۀۂۉۊڞ ۆۉڼڝ ڼ ۍۊہ ۏۋۀھۉۊڞ ڑڋڋڍٻڇۃھۄۍېڵٻڇڼۉۀۂۉۊڞٻڇۆۉڼڝٻڼٻۍۊہٻۏۋۀھۉۊڞ
TYPICAL FLOOR- PRECEDANTS
111
L.31
L.20
L.9
L.1 A = SELF SUFFICIANT TYPICAL FLOOR B = DEPENDEANT ON A
AXONAMETIC
1:1000 @ A3 0
10
100M
TYPICAL FLOOR PLAN
1:200 @ A3
0
2
20M
WORKSTATION TYPES 1:100 @ A3
TYPICAL FLOOR PLAN 0
2
1:200 @ A3 20M
SECTION
1:200 @ A3
0
2
20 M
INTERNAL RENDER
TASK 5:
Facade
Roche Tower, Herzog and de Meuron, Basel
Swiss Re Headquarters, Foster and Mates, London
FACADE- PRECEDANTS
1.
2.
3.
AXO
1:500 @ A3
0
5
25
50 m
FACADE: [clockwise] Street View, External Close Up, Internal
SECTION DETAIL 1:100 @A3
AXO DETAIL 1:200 @A3
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION
NORTH ELEVATION
1:1500 @ A3
TASK 6:
Site Analysis
Film Stills from ‘Film-o-rama’
SITE ANALYSIS: Film-o-rama
Tower 2
A Residential Tower Melbourne CBD
CONCEPT MODELS Tristan Da Roza | 12/09
DIARY DOCUMENTATION Tristan Da Roza | 12/9 - 1/10
IN-BETWEEN TOWER
CONCEPT DEVELOPMENT
Morning LA TROBE ST
LA TROBE ST PEDESTRAIN TRAFFIC
SPENCER ST
SPENCER ST
Afternoon SUMMER SHADE
WINTER SUN
PUBLIC
NORTH ELEVATION 1:1500
CORE AXIS
ENTRY
VIEW
CONDENSED FLOOR PLAN 1:1000 SHARE HOUSE
FAMILY
SINGLE
ATTRIU M
COMMUNAL
COMUNAL GARDEN
POOL
PUBLIC VIEWING VEGETATION
TYPICAL FLOOR PLAN 1:1000
STORAGE
VEGETATION
228M
STORAGE APPARTMENT TYPE I ___________________
APPARTMENT TYPE III ___________________
SINGLE - 1 BED
SHARE HOUSE 5 BED
VEGETATION
VEGETATION
CIRCUT EXCERISE
APPARTMENT TYPE II ___________________ FAMILY 3 BED
GROUP CONFIG. I 0m
AXONAMETRIC 1:1000
SECTION 1:500
GROUP CONFIG. II
8 4
AXO 1:200
16
GROUP CONFIG. III
GROUP CONFIG. IV
AERIAL VIEW
STREET VIEW
EAST ELEVATION 1:1000
NORTH ELEVATION 1:1000
Tristan Da Roza 388 045
SECTION 1:1000
SYNTHETIC NETTING
BELT TRUSS
GLASS PANELS
FACADE DETAIL 1:50
PERFORATED ALLUMINIUM SHEET
LIBRARY LIB IBRARY AFE/RESTAURANT CAFE/RESTAURANT
CHILD CARE
M MA MARKE E ET MARKET
RE ETA E RETAIL
OILLET L TOILETS
B E BIKE
RE E CLE ECYCLE/ E RECYCLE/ WAS AS AST S WASTE
APARTMENT TYPES 1.200 P NT NT ROOM OM OM PLANT
LOADING
GROUND FLOOR 1:500
APPARTMENT TYPE I ___________________
APPARTMENT TYPE III ___________________
SINGLE - 1 BED
SHARE HOUSE 5 BED
APPARTMENT TYPE II ___________________ FAMILY 3 BED
Tristan Da Roza 388 045
TYPICAL FLOOR 1:500
GROUP CONFIG. I 0m
8
GROUP CONFIG. II
GROUP CONFIG. III
GROUP CONFIG. IV
DIARY DOCUMENTATION Tristan Da Roza | 1/10-13/10
INITIAL TEST
Facade Strategy
Continuous Pattern
Ceramic Fritted Glass
9am December 21st
12pm December 21st
6pm December 21st
Sun Diagrams
W
Unrolled Envelope
Unrolled Envelope
S
E
N
W
Developed Facade
Tristan Da Roza 388045 STUDIO BANANARAMA ABPL90285 SEMESTER 2 2013
Vignettes
Concept Diagrams
STUDIO LEADERS: PETER RAISBECK
IN BETWEEN TOWER
KIRILLY BARNETT
MADELEINE BEECH
BEN DE NARDI
Tristan Da Roza
CHILD CARE
BIKE
RECYCLE/ WASTE
TOILETS
RETAIL
CAFE/RESTAURANT
Ground Floor Plan 1:500
Section 1:1000
LOADING
PLANT ROOM
MARKET
LIBRARY
Typical Floor Plan 1:500
Facade Section Detail 1:25
North Elevation 1:1000
Explanatory Diagrams
East Elevation 1:1000
Apartment Plans 1:200
0m 4
8
GROUP CONFIG. I
16
GROUP CONFIG. II
GROUP CONFIG. III
FAMILY 3 BED
GROUP CONFIG. IV
SINGLE - 1 BED
APPARTMENT TYPE II ___________________
APPARTMENT TYPE III ___________________ SHARE HOUSE 5 BED
APPARTMENT TYPE I ___________________
STUDENT NAME: STUDENT NUMBER: STUDIO BANANARAMA ABPL90285 SEMESTER 2 2013
STREET VIEW
STUDIO LEADERS: PETER RAISBECK
KIRILLY BARNETT
MADELEINE BEECH
BEN DE NARDI
EXPAND TO DOUBLE HEIGHT FLOORS
INSERT MODULAR SYSTEM
STUDIO LEADERS:
EXPAND TO CREATE IN-BETWEEN LEVELS
Tristan Da Roza 388045 STUDIO BANANARAMA ABPL90285 SEMESTER 2 2013
Vignettes
1.
2.
Concept Diagrams
PETER RAISBECK
KIRILLY BARNETT
OFFSET LEVELS FOR DIRECT SUNLIGHT
IN-BETWEEN TOWER
MADELEINE BEECH
BEN DE NARDI
RAMP TO PROVIDE USER ACCESS TO ALL LEVELS
Tristan Da Roza
Section 1:250
Section 1:500
2. EXERCISE PLATFROM
1. VIEWING PLATFROM
Typical In-Between Floor Plan 1:500
4.
4.
4.
2.
3.
Typical Apartment Floor Plan 1:500
4. COMMUNAL GARDEN
2.
3.
7. STORAGE
1.
4.
2.
3. ATRIUM
7.
5.
6.
1.
4.
North Elevation 1:1000
6. ATRIUM
5.EXERCISE PLATFORM
4. VIEWING PLATFORM
3. SPORTS COURT
2. AMENITY BLOCK
1. TRANSITORY LIVING
3.
Ground Floor 1:500
1.
4.
4.
4.
4.
4.
STUDENT NAME: STUDENT NUMBER: STUDIO BANANARAMA ABPL90285 SEMESTER 2 2013
Apartment Floor Nollie
6m
3m
GROUND
PAVILLION
In-Between Floor Nollie
STREET VIEW
STUDIO LEADERS:
MOVEMENT
20. PARKING & LOADING
19. SECURITY
18. PLANT ROOM
17. BIKE CAGE
16. RECYCLE CENTRE
15. PLAYGROUND
14. CHILD CARE
13. BIKE CO-OP
12. MARKET
11. LOBBY
10. MEETING
9. OPEN-AIR CINEMA
8. LAWN
7. TENT & OP-SHOP
6. KITCHEN
5. LIBRARY
4. LOBBY
3. CAFE / RESTAURANT
2. LAWN
1. STAGE
PETER RAISBECK
19.
14.
6.
16.
13.
19.
18.
11.
4.
KIRILLY BARNETT
3.
LA TROBE ST
12.
MADELEINE BEECH
7.
5.
BEN DE NARDI
SPENCER ST
Apartment Plans 1:200
SIte Analysis & Canopy Diagram
Sun Diagrams
DECEMBER 21st 9am
Unrolled Facade Diagram
DECEMBER 21st 12pm
Exploded Facade
DECEMBER 21st 6pm
STUDENT NAME: STUDENT NUMBER: STUDIO BANANARAMA ABPL90285 SEMESTER 2 2013
STUDIO LEADERS:
PETER RAISBECK
KIRILLY BARNETT
MADELEINE BEECH
BEN DE NARDI