The Perfect Outdoor Living Solution on the Isle of Alderney

Page 1




CASE STUDY

Project Alderney: Decking, Balcony, and Spa Solution


JB Architecture based in Chichester approached us to discuss their client’s outdoor living requirements. This was for a 2 metre wide balcony running the full 23 metre length of the property on both sides, with a staircase to the lower deck. This was to include a large decking area with an integrated hot tub built over existing natural ground, tiles, and concrete. The following week, we arranged to meet with the architects to discuss the project requirements further and to view their drawings and designs. From this, we were able to propose our Complete Outdoor Living Solution comprising of an integrated QwickBuild deck frame, ResortDeck composite decking, and a Mini-Post frameless glass balustrade system. Given the versatility and durability of all our products both in the short and long term, the architects agreed this was to be the perfect solution for the demands of the project, especially due to its coastal location. QwickBuild is manufactured from marine grade anodised structural aluminium and offers 100 per cent moisture resistance and dimensional stability. Furthermore, the Mini-Posts used for frameless glass balustrade are manufactured from marine grade 2205 duplex stainless steel offering the most superior corrosion resistance amongst alternatives. Our design team flew over to Alderney two weeks later to carry out a full site survey. As per the architects briefing, the job had some complex build requirements, however we were pleased to confirm our systems could make these relatively straight forward. The QwickBuild deck frame offered the perfect solution for building the lower deck over uneven natural ground and existing pavers. This was through the use of adjustable height deck jacks which can range from just 3mm to 600mm. Therefore, no resurfacing was required prior to installation speeding up the process. Another factor which enabled faster installation than traditional methods was the QwickBuild substructure for the balcony could be prefabricated into made-to-measure frames at our UK based workshop prior to delivery.


Although the membrane did not need disrupting to install the QwickBuild frame, one challenge we faced was to ensure there would be no lateral movement once the balcony was complete. Therefore, threaded bar and resin were used to put anchor points into the property wall which we then anchored the frame back to. The logistics for transporting over 6,000kg of materials to Alderney and getting our installation team to the tiny island of just 7 miles by 3 miles, proved to be one of the biggest challenges we faced. Three ferry cancellations and a flight cancellation due to weather conditions resulted in some delays occurring. However, thanks to the hard work and commitment of our installers, the impact of this on the project was kept to a minimum and overall completion took five weeks. Special mention to our Nathan who genuinely took one for the team in facing his fear of flying on several occasions! During this project, we have demonstrated the versatility of our integrated systems in creating a spectacular outdoor living area that can be enjoyed whilst looking its best for many years to come. Our complete solution is setting new standards in the construction industry and we are looking forward to turning more ideas into design and reality.


ST 60 PO 139 INI O: DM M: R N YSTE NTE E D U OR E OF S E MO ASS L I L TYP EDG M G NDRA 15MAL HA : ME V O NA Y : AN AN ME MP BOH CO A J RS NA AN H 7 ME BO 01 SO ONY 7/01/2 U C T 2 1 R TE: ON: ME A D ISI STO CU REV IDE : OV ING R P AW : DR KIT ING T: EN AN CLI CLE ION T LLA A T INS K: U SM ER: : H ETE OT S ER: ONCR C ING TIMB FIX D/ O WO L: E ION STE AT RIC D: FAB UIRE REQ

S IAL

ER

AT FM

DP N D I AN AD KED PIC

N

DO

KE

AC

LO BIL

50

56

55

51 52

Location:

Alderney Products:

QwickBuild Deck Frame ResortDeck Composite Decking Mini-Post Frameless Glass Balustrades

Y.

58

54

QT

1 4 ers orn rs 5 d C orne 6 s Ra r C e mm Rad Corn rs N 7 5 IO ith mm ad rne s IPT w o R 2 5 R r r C a h SC rne s P r wit 5mm Rad DE o s 1 Gla ss Pa with mm ad C ers d 1 R la ar h5 orn rners ne m P it C G e s h w d 3 5m Rad Co ners las Par ug ene h it o G d m r T s h w m d 2 Ra ar Co ners las ar ug h5 ne Cle ar To ghe ed G ss P r wit 5mm Rad or s r a C m la u e h n P m Cle ar To ghe ed G lass wit 5mm Rad Corn 15 r m G u le Pa with mm ad m To ghen ened m R 5 C s r s E 1 5 R m r a 0 MB mm Cle r Tou ough d Gla ss Pa with mm 06 m 15 T NU a la 0x1 60m ar h5 ne RT mm Cle aque 07 0 m he d G lass P r wit 15 PA 5.1 09x1 60m m a Op Toug ene 1 R.1 m 5m mm h 10 d G lass P ar 5 ug LEA R.15.1 125x 060m m 1 ne 1 Cle ar To ghe ed G M SS.C LEA .15.1 33x1 060m m m E u A n IT O. m Cle ar To ghe GL SS.C EAR 5.12 1.5x1 60m 15 N L A 7 .1 10 mm Cle r Tou GL SS.C EAR 5.12 50 15 .5x mm a L A 69 .1 mm Cle 60 GL SS.C EAR 5.15 51 15 m x10 L A mm 5 GL SS.C EAR.1 5.220 060m m 52 m m 1 1 L A x 0 .1 L 0 6 3 R .C G 5 S 5.8 3x10 60m LEA AS GL SS.C EAR.1 5.86 54 x10 L A 2.5 .1 GL SS.C EAR 5.95 55 L A .1 GL SS.C EAR 56 L A GL SS.C 57 A GL 58 59 53

59

F1 1O ET 0 SHE E:1:20 L

: SCA 3 ain art PG A id M EET Dav SH ALE: IZE: SC EET S BY: N H S AW RK ITED PA LIM DE DR NS TRA O LL E LUTI A SO TERF REET SHIR UK WA ST CA m SM IT 1 CLIFFE , LAN e.co om UN AN RN trad de.c - STACKBUR 5594 alus stra BL 2 2Q 254 82 liteb balu BB l: 01 ww.e elite Te eb: w sales@ W ail: rtain Emvid Ma Da

Elite Balustrade Systems Elite Outdoor Living Part of SMUK Solutions Limited Unit 1 Waterfall Trade Park Stancliffe Street Blackburn Lancashire 01254 825594 sales@elitebalustrade.com elitebalustrade.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.