TRAVERSING STIMULI Evoking the Senses Through Nature and the Built Environment. A design based on the experiential journey at the 1000 Steps, Dandenong, VIC. Introduction to Site.
Fight or Flight Responses activated in the human body. Reaction to either understimulation or overstimulation.
Private vs. Public Social Interaction
Creation of Lane Ways.
Auditory Connection to Nature
Memories are stored in the same part of the brain as navigation. The built environment evokes certain emotions and feelings due to this inherent connection.
Visual/Physical Connection to Nature
COMMUNITY BUILDING BBQ
PAST - 1897
PRESENT PHYSIO
COMMUNITY EVENTS
Allocation of Buildable Plots. PLAYGROUND
CAFE ENTRY
PRIMARY CARE
Footprint of Buildings Created.
Incorporating Public Transport.
- Improved / Easier Access to Facilities.
Integrating Greenery from Neighbouring Sites.
- Catalyst for future redevelopment to the west.
BEYOND BIOPHILIA - STUDIO 13
Improved Circulation Through the Site. - Creating an unrestricted flow.
Accommodating proposed Storm Water Collection. - Improved user experience due to presence of water.
Integration into site. -Variation in levels following the natural topography.
Scale: 1:500 @ A1
5m
10m
50m
DAVID GERBER - 774234 - STUDIO E
HORIZONTAL LOUVERS - PROTECTION FROM NORTHERN SUN. - COMMUNITY VERTICAL GARDEN. - GREEN FACADE.
GREEN ROOF - RESISTANCE TO WEATHER. - FLEXIBILITY IN VEGETATION. - RECYCLABLE.
VERTICAL LOUVERS - PROTECTION FROM WESTERN SUN. - OVERHANG - PASSIVE DESIGN. - BLOCKS SUMMER HIGH SUN. - ALLOWS WINTER LOW SUN.
SUMMER SOLSTICE 12PM VS. WINTER SOLSTICE 12PM
INTERPLAY OF NATURAL AND BUILT ENVIRONMENTS CREATE DIFFERENT ATMOSPHERES AND FEELINGS THROUGHOUT THE SITE AND BUILDING.
ENTRANCE
RECEPTION
CORRIDOR TO PRIMARY CARE PRIMARY CARE MAIN AREA BEYOND BIOPHILIA - STUDIO 13
PRIMARY CARE INNER COURTYARD DAVID GERBER - 774234 - STUDIO E
C -
A.1
C
_
-
FFL - S
ER
AD TEAM LE
ER
AD TEAM LE
FICE
OPEN OF
UNGE
LO STAFF
OOM
BOARDR
W ROOM
INTERVIE
UTILITY
e m a N t c oje SECTION A - 1:250 - DOUBLE HEIGHT CORRIDORPr
A -
ING E - MEET
IVE OFFIC
EXECUT
MEETING ROOM
MEETING ROOM ICE IVE SERV EXECUT IVE EXECUT
FINANCE
N E + ADMI
- SHARED
or o l F t s r i F
FINANCE IVE EXECUT
PA OFFIC
IVE EXECUT CEO OFFICE ENETTE + KITCH
ER
AD TEAM LE
CLIENT
FF EE TEA + CO S + UTILITIE
IVE
UT - EXEC
ICE IVE SERV EXECUT SHARED
OM QUIE T RO
A
ADER TEAM LE
ER
AD TEAM LE
ER
AD TEAM LE
Section - Double Height 1 : 250
ADER TEAM LE
ER
AD TEAM LE
ER
AD TEAM LE
FIRST FLOOR - 1:250
SECTION B - 1:250 - COURTYARDS
C
mber u N t c .c k e s j tode Pro www.au nu mbe r Project ate Issue D Date t Author onsultan
-
om /revit
ant Consult s s e Addr Address Phone Fax e-mail
C -
FFL - G
ant Consult s Addres Addres s Phone Fax e-mail
C Adydress Drawn Abddress Phone Fadxby Checke -mail e
r Checke
A102
A
FFL - S
B
-
ant Consult s s e Addr Address Phone le a c S Fax e-mail
FFL
4 AM
VOID
-
ACE F TERR
ID VO
FFL
Owner
STAF
FEMALE TOILET
A
ID VO
DN
O P
EN
-
B
F
6:52:0 6/6/2018
MALE TOILET
B
B
TO EL CO O UR W T YA
R D
OM QUIE T RO
-
1 : 250
FFL - G
AINING
G AND TR TEACHIN EN + KITCH
SP STUDIO
Level 1
1
B
L PHYS ICA ES ACTIVITI
ACE
Section - Courtyards 1 : 250
C -
1 : 250
C
TION
Y/EXHIBI
GALL ER SPACE
Section - N/S - WEST No.
STADIUM
URPOSE
MULTI-P ROOM
A.1
1 : 250
C
Dat_e
ion Descript
-
FFL - S SE
URPO MULTI-P ROOM
ITY HALL
COMMUN
FFL
ER
AD TEAM LE
PHYSIO
PHYSIO ENT TREATM ROOM
FFL - G
CONSUL ROOM
T
T CONSUL ROOM
CONSUL ROOM
MALE TOILET
CONSUL ROOM
CONSUL ROOM
B
ION
RECEPT
UP
A.1 _
T
T CONSUL ROOM
CONSUL ROOM
T
T CONSUL ROOM
N TO OPE
EN ITY GARD
COMMUN
ROOM TMENT
TREA
LIFT
NSP
T CONSUL ROOM
-
CONSUL ROOM
UP
T FAMILY ROOM T CONSUL
A
T CONSUL ROOM
T
T CONSUL ROOM
-
T
ENT TREATM
ROOM
B
ID VO
A
1 : 250
-
AR D COURTY
ION RECEPT STORE
PLAY ROOM
VE ABO
EN OP
TO
S ROOM
MOTHER
OM
T RO EATMEN
TR
OM
ENT RO
TREATM
A
VE AB O
ILET
TOILET
DDA TO
EQ
TOILET
ROOM CLEAN
FAMILY TOILET
OM
DIRTY RO
AGE
CONSUL ROOM
RESOUR
T CONSUL ROOM
e m a N t Projec r o o l F d n Grou
-
WAITING AREA
E T STOR UIPMEN
Owner
Section - Double Height
OR RY + ST CE LIBRA
A
B
-
-
T T CONSUL ROOM
CONSUL ROOM
Project
T ENT TREATM ROOM
ENT TREATM ROOM TREATM ROOM
Date
ENT TREATM ROOM
nu mbe r
ENT TREATM ROOM
ENT TREATM ROOM
y
Draw n b
ENT
N
SECTION A.1 - 1:50 - KEY FEATURE ELEMENT
TIO SUBSTA
r
Checke
d by
Checke
A
C -
1 : 250
Scale
GROUND FLOOR - 1:250 BEYOND BIOPHILIA - STUDIO 13
mber u N t c e Proj ate Issue D Author 8 AM
OM
CONSUL ROOM
6:52:3 6/6/2018
FEMALE TOILET ENCE RO
T CONSUL ROOM
FAMILY T CONSUL ROOM
CAFE
CONF ER
T
5m Section - N/S -10m WEST
Scale: 1:250 @ A1
C
1 : 250
DAVID GERBER - 774234 - STUDIO E