City Link Road

Project Bulletin: September 2016 ou know Griffiths has been appointed by Herefordshire Council he new City Link Road.

Welcome Project Manager’s from the Report Project Manager e to welcome you to our first project bulletin.

Construction of the Hereford City Link Road oducing these on a regular basis to keep you up to date with commenced at the end of August following the of the City Link Road, as well as sharing with you stories from contract award by Herefordshire Council earlier h the local community, schools and colleges. this year. A project base has been established

like to receive future bulletins by email or in another format, behind the well-known Hereford Football Club to r Public Liaison Officer, Neil Evans know via email:

serve the entire project.

lungriffiths.co.uk

Want to get in touch? Want to get

Yourin dedicated Public touch? Liaison Officer for the Your City dedicated Hereford Link Road Public Liaison is Neil Evans. He can be Officer for the contacted Mon-Sat es the Old Market, Widemarsh Street, Merton Meadow car park Hereford City between 8am and 6pm y areas within the city. It will provide hundreds of new homes and Linkthese Roadhours is Neil We have initially concentrated on site clearance and some outside or if pre-investigation archaeological excavations. These have Evans. He can be hundreds of new jobs. Neil is unable to answer, shown signs of buried artefacts which we are in the process of contacted Mon-Sat please leave a message uncovering for recording by the local archaeologist. of 800 new homes, 35 per cent of which will be affordable, are and andbetween he will get8am back to e built across the site. The new road will open up access to areas 6pm outside these Road formation and you as soon as possible. ent and regeneration which are currently inaccessible or difficult drainage excavations hours or if Neil is have also commenced it will also alleviate some of the volume of heavy traffic from unable to answer, T: 0330 0414 635* at the west end of the E: neil.evans @alungriffiths.co.uk ner ring road. please leave a project, with traffic message and he management soon community.alungriffiths.co.uk art of a package of measures which will enable Commercial Road, to be in place at the will get back to you and Blue School Streets to be upgraded for easier pedestrian A49 on Edgar Street. as soon as possible. Two-way traffic will nd also reduce 'through traffic' which will be transferred to the * Calls to this number are charged at national be maintained on the call rates and included in inclusive minute provements will also include the provision of a new transport hub A49 during the works plans s from landlines and mobiles 0330 y station. and most work will be

We have held public ‘drop in’ meetings at the football club and our Public Liaison Officer has and will continue to liaise d with local residents and businesses in close proximity to the site, to keep them informed of our progress, and to ensure we consider any issues raised by the public and incorporate Road (CLR) is part of a large scale inner city regeneration project solutions into our working methods wherever possible.

done during daytime nager’s Report hours with minimum disruption.

0414 635*

neil.evans@ alungriffiths.co.uk of the Hereford City Link Road commenced at the end of August following the contract award by Arcaeological photo Further to this we have showing ancient well e Council earlier this year. A project base has been established behind the well-known Hereford also commenced at the east end of the scheme to serve the entire project. community. at the Railway Station alungriffiths.co.uk car park. Road formation and drainage will be on-going with d public ‘drop in’ meetings at the football club and our Public Liaison Officer has and will continue to the majority of work within the old car park. Throughout cal residents and businesses in close proximity to the site, to keep them informed of our progress, construction pedestrian routes will be maintained even if they e we consider any issues raised by the public and incorporate solutions into our working methods are adjusted to accommodate the working areas.

ssible.

* Calls to this number are charged at national call rates and included in inclusive minute plans from landlines and mobiles


Background As many of you know Griffiths has been appointed by Herefordshire Council to construct the new City Link Road. We would like to welcome you to our first project bulletin. We will be producing these on a regular basis to keep you up to date with the progress of the City Link Road, as well as sharing with you stories from our work with the local community, schools and colleges. If you would like to receive future bulletins by email or in another format, please let our Public Liaison Officer, Neil Evans know via email: neil.evans@alungriffiths.co.uk The City Link Road (CLR) is part of a large scale inner city regeneration project which includes the Old Market, Widemarsh Street, Merton Meadow car park and other key areas within the city. It will provide hundreds of new homes and help provide hundreds of new jobs. In the region of 800 new homes, 35 per cent of which will be affordable, are planned to be built across the site. The new road will open up access to areas for development and regeneration which are currently inaccessible or difficult to access and it will also alleviate some of the volume of heavy traffic from Hereford’s inner ring road. The road is part of a package of measures which will enable Commercial Road, Newmarket and Blue School Streets to be upgraded for easier pedestrian movement and also reduce ‘through traffic’ which will be transferred to the link road. Improvements will also include the provision of a new transport hub at the railway station.

Upcoming Project Manager’s Works Report We will be implementing a temporary one-way system at Widemarsh Street, which will commence on the 10th October 2016. This system will run in a southerly direction from the Newtown roundabout (adjacent to signature Interiors to Blackfriars Street). This is to allow construction of the new road and Widemarsh Street Junction. Also, a traffic management system will be installed on Edgar Street, from the 10th October 2016 in the area adjacent to the Football ground. This traffic management is required to maintain the existing two-way traffic flow with slightly narrower running lanes whilst also giving the added benefit of protecting the workforce during the new highway alignment construction. All traffic routes will remain accessible.

Railway Station Car Park looking west

We would be pleased to hear your comments. You can get in touch via our web site community.alungriffiths.co.uk or by contacting your Public Liaison Officer Neil Evans on 0330 0414 635 Calls to this number are charged at national call rates and included in inclusive minute plans from landlines and mobiles Follow us on Twitter l @AlunGriffiths_


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.