bcdh
N25 Maintenance Facility BCDH Architects were appointed as part of the design team for ancillary structures required as part of the proposed new Waterford City Bypass bridge and Toll road. The maintenance facility serves staff requirements, storage, equipment and maintenance facilities for the 30 year operational contract and comprises a total of 800 sqm of building in a 6000 sqm operational yard adjacent to the bridge abutments.
Client National Toll Roads Year 2007 - ongoing Size TBC