Architecture

Page 1


TABLE OF CONTENTS PROJECT 0

- URBAN ANALYSIS

PROJECT 1

- SITE STUDY AT THE HIGHLINE WITH MODEULES [TECTONIC MODULE]

PROJECT 2

- THE HIGHLINE INTERVENTION

PROJECT 3

- INDIVIDUAL SPACE

PROJECT 4a

- SITE ANALYSIS

PROJECT 4b

- THE FINAL; YOUTH HOSTEL, RETAIL & CONDOS BUILDING

PRECIDENC STUDY


PROJECT 0


THIS WAS A GROUP RESEARCH OF A SITE OR PUBLIC SPACE ON HISTORICAL PRECIDENCE AND ANALYSE YOUR EXPERIENCE


PROJECT 1 SITE STUDY AT THE HIGHLINE WITH MODEULES THIS PROJECT INVOLVED, VISITING THE SITE, LOCATED AT THE HIGHLINE ON THE WEST SIDE OF 10TH AVE STARTING FROM 17TH STREET AND IDENTIFYING ISSUES THAT RELATE TO CONNECTION. THEN COME UP WITH CONCEPTS FOR DEVELOPMENT THROUGH STUDY MODELS AND DRAWINGS. CONCEPT WORDS THAT I CHOSE 1. Adaptive Re-Use of Materials 2. Spontaneous Program Addition 3. Entry as Visible Marker


CONCEPT DEVELOPMENT THRU STUDY MODEL AND DRAWINGS -ADAPTIVE REUSE MODULE GOALS A. PERSONALIZED & HIGHLY ARCHITECTURAL MODEL BASED ON PRINCIPAL IDEAS B. A REPETITIVE SYSTEM THAT IS SPATIAL, STRUCTURAL & ARCHITECTONIC C. UNDERSTANDABLE RULES THAT CAN BE EASILY DISCUSSED D. STRONG DRAWINGS & MODELS


PROJECT 2 HIGHLINE INTERVENTION

17th ST

PLOT PLAN 0

10'

20' 30'


T.O.ROOF

T.O. H/LINE CUT

PLAN CUT

GRADE

SECTION

NORTHERN ELVATION

T.O.ROOF

T.O. H/LINE CUT

PLAN CUT

GRADE

SECTION

EASTERN ELEVATION


GROUND FLOOR PLAN

HIGHLINE LEVEL


ROOF PLAN

SECTION


FINAL MODEL FOR PROJECT 2


PROJECT 3 - INDIVIDUAL SPACE FROM PROJECT 2 THIS IS A SECTION OF THE MODEL FROM PFOJRCT 2 THAT WAS BLOWN UP TO BE ABLE TO UNDERSTAND INHABITING THE SPACE AS YOU MOVE THROUGH.


PROJECT 4a SITE ANALYSIS THE SITE IS LOCATED ON THE WEST SIDE OF 10TH AVE BET 20TH & 21 STREET NEXT TO THE HIGHLINE THE SITE ANALYSIS WAS DONE TO ESTABOLISH CONNECTION POINTS, 3/D QUALITY, PUBLIC TO PRIVATE, DATUM POINT AND MATERIAL. ALSO BY USING DIAGRAMS TO SHOW VARIOUS POINTS OF INTEREST TO CONNECT WITH SITE AND THE CITY.

VISUAL CONNECTION


AXIAL CONNECTIONS


PUBLIC TO PRIVATE PUBLIC PRIVATE


PROJECT 4b SITE ANALYSIS GROUP BOARDS





FINAL YOUTH HOSTEL, RETAIL & CONDOS


5 SPACES:-

i. Entry Space the transition the public to the Hostel. The entry needs to be public (5-10 persons) ii. Service Area: Utilities, etc iii. Kitchen, Dining, Recreation: A commercial area (15-20 people), bath, lounge, outdoor/indoor. Iv. Rooms: 30+ people with 2 people / room and 250 sf / room V. Outdoor Recreation area







3/D RENDER FROM HIGHLINE LVL

PICTURES OF THE MODEL


PICTURES OF THE MODEL


FROM HIGHLINE LVL


BIRD’S EYE VIEW



PRECIDENCE STUDY Talca Hotel & Casino / Rodrigo Duque Motta + Rafael Hevia GarcĂ­a-Huidobro


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.