1 minute read
EXHIBIT 70: MINERALS MUSEUM TRAILHEAD
C.2.2 Minerals Museum
A formal OVNHT trailhead at the Minerals Museum on NC 226 would provide access to an existing section of the trail that begins just north of Little Switzerland’s eastern border. The trail travels east towards the Orchard at Altapass and west towards Big Lynn Lodge.
ACTION ITEMS: • Work with partners in the planning, development, and construction of the proposed trailhead facilities.
MINERALS MUSEUM TRAILHEAD EXH 70
Existing Conditions
The Minerals Museum trailhead will provide access to an existing section of the OVNHT. Key elements include a trailhead kiosk and entry with OVNHT branding.
The Orchard at Altapass Master Plan will guide the use of limited funding and resources on needed improvements. The master plan provides recommendations for improvements to facilities, parking, and vehicular circulation. Since the Orchard is located next to the Blue Ridge Parkway and due to deed and easement restrictions, master plan implementation may require approval by the National Park Service.
C.3.1 Master Plan Implementation
Implementation of the Orchard at Altapass Master Plan will help the Orchard successfully grow its programs and continue to achieve its mission by enhancing the visitor experience and attracting more visitors.
C.3.2 Trail System Redevelopment
The existing trail system isn’t well defined and redevelopment will provide visitors with trail options of varying lengths and experiences. The trail system will become an asset for the Orchard and provide another amenity for visitors.
ACTION ITEMS: • Develop and implement site-specific construction plans for the Orchard at Altapass master plan implementation. ACTION ITEMS: • Develop and implement site-specific plans to design and construct a sustainable trail system.