1 minute read
COLORADO GENERAL HOSPITAL
ADEPTUS HEALTH | E4H ARCHITECTURE
DBR provided mechanical, electrical, and plumbing design services for the 60,000-square-foot, 2 level hospital in Colorado Springs. The hospital consists of 24 beds, 3 operating rooms, 8 PACU stations, 6 emergency exam rooms, 2 treatment rooms, CT scan, and x-ray. The MEP systems included two 150-ton air cooled chillers and 6 custom air handling units. A 20-ton glycol chiller was provided to maintain low temperatures in the Operating Rooms while also maintaining the room relative humidity. The heating system consists of three 2000-MBH high efficiency condensing type gas fired heating water boilers and the associated pumps and distribution piping. The essential power system included a 1000-KW diesel engine emergency generator and the normal power service included a 2500-amp main service.