PORTFOLIO | DENYS KOZAK

Page 1

KOZAK DENYS ARCHITECTURE PORTFOLIO 1


2


PROJECTS LIST

CONCEPT OF EMBANKMENTS | 6-13

RESORT ON THE BANKS OF THE VOLGA RIVER | 14-23

WINE CULTURE CENTER | 24-31

CEBADA COMMUNITY CENTER | 32-39

COLLIDER ACTIVITY CENTER | 40-47

QUIET CENTER | 48-55

3


CONCEPT OF EMBANKMENTS Kharkiv, Ukraine | Spesialist graduation project | 2015

Developed site is located in the central part of the city, bounded by streets and Kharkiv waterfront, has direct access to the river. On the opposite bank are located residential apartment buildings. The close proximity of the river provides excellent specific points. Within the area of​​ design are located monuments, places of worship and educational facilities. Today, there are a number of issues addresse d by the present project. Among them: Lack of urban framework, the lack of improvement, low availability, a large number of dilapidated buildings, no point of attraction for citizens In close proximity tramway, metro station "Sovetskaya"- important transport artery. Despite the favorable location in terms of accessibility, as well as the presence of a large number of valuable buildings and monuments, Kharkov hem, a part of which is the portion of the design is not attractive for residents and visitors alike. The project is proposed the concept of development of Kharkiv Podol quay and adjacent districts for the purpose of this place is to saturate the city activity and introduce a new feature in this part of the city. The structure of the embankment is divided into two parts: the transit area and the area formed by 4-6 storey buildings, which serve to ensure all functions for the promenade and shore division of space on public and private space. The nature of the waterfront changes from urbanized in the west to the east , which has a wide beach and scenic spots. Offering a multitude of connections between the upper and the lower level of the embankment, communication is enshrined in the squares and ramps.

4


graduation project

5


embankment section 1

embankment section 2

6


graduation project

master plan

section

section

7


squares

pedestrian routes

bike routes

parking

public | private spaces

function

housing parking offices culture education school retail

concept

8


graduation project

courtyard space

embankment space

9


site plan

10


graduation project

floor plan

11


RESORT ON THE BANKS OF THE VOLGA RIVER Kokshaysk, Russia | Professional work | 2015 Drozdov & Partners bureau | KHARKIV team | kozak denys, oleg drozdov, sergey kostyanoy, aleksandr kuznetsov, oksana chebina, vitaliy pravik, vyacheslav zhemir, yekaterina yerchenko activities | architectural design, models, plans, schemes

The plot is located on the bank of the volga river. the peculiar feature of the place is the necessity to protect it from spring floods. this fact called for a platform secured from the high water. The border between the “platform� and the beach outlines the embankment which is the main pedestrian alley connecting all the functions of the complex that are evenly distributed around the territory. the access to the plot is performed from its longitudinal rear side. at the entrance of the complex there is a parking lot with utility facilities, followed by the yacht club which has immediate access to the pier. finally, there is a restaurant with a terrace overlooking the volga. The major public space of the complex is a swimming pool with deck chairs, a playground and sports facilities. the common lobby unites the spa complex with the hotel with rooms exposed to the river. We preserve a fragment of the natural terrain and carve a landscape park out of the platform, with lounge-zones and observation points

12


professional work

13


site plan

14

1. parking 2. underground reservoir 3. amphitheater 4. wedding place 5. swimpool 6. volleyball 7. workout 8. playground 9. children's swimming pool 10. parking 11. park 12. lounge

13. pergola 14. summer cinema 15. parking 16. bar 17. cafe terrace 18. volleyball 19. terrace 20. yacht club 21. spa 22. hotel 23. quest houses 24. household block 25. watch ships


professional work

15


project area

program

flooded area

slab

program on the area

connections

technical area parking restaurant + yacht club swimpool hotel+spa

park

individual houses

16

ay

ew

iv

dr

t

en

km

em

n ba


professional work

site area

landscaping area

design area

stylobate area

building area

parking

elevation

17


front elevation

back elevation

hotel+spa plan

18


professional work

hotel entrance

spa

19


promenade

view from beach

20


professional work

back elevation

restaurant plan

21


WINE CULTURE CENTER Verona, Italy | Competition project | 2014 team | kozak denys, darya kuznetsova, artem tiutiunnik, dasha shataliuk activities | architectural design, 3d model, schemes, renders

Cantina Valpolicella in Negrar is located in the north of Italy in a picturesque mountain valley of Valpocella region, which is famous for its winemaking traditions. The winery is represented by complicated conglomeration of different spaces, that today has led to an important issue - the complex lost semantic and emotional conection with the culture of winemaking. Easier speaking,the factory has lost spirit of the place. And we believe that the main goal is to recreate the atmosphere of winemaking complex. The project aim is to reconstruct existing spaces with the dismantling of structures that have been installed in the recent time and managed to change the face of the winery seriously. The idea of ​​the project is to identify algorithm of winemaking and to use it as a foundation for d evising a pass scenario making an analogy tocinematograph. Lots of spaces diff e rent by atmosphere are designed to c r eate the sense of presence for everyvisitor and to provide all conditions for understanding the culture of this place. The s pace of wine culture center cons i sts of a set of different premises, intended to impress visitors on asociative leve l . The path starts with grape patio, whic h associated with the ingathering of g r apes and therefore the first stage of w i nemaking. After that people walk into the obscured space where he gets acqu a inted with the next step-wine spin n ing, with the help of dashboards and media screens. All the production step s , which can not be demonstrated are d isplayed in the media room. The visi t ors have the opportunity to look at t h e bottling of wine while going down the stairs from the media room.

22


competition project

23


greenhouse

media room

museum

bottling

testing

space relationships

site

new structure

demolishing

insolation

integrating

add functions

facade system

finally

concept

24


competition project

site plan

25


0-1/multifunctional space 350 m 2

0-1/lobby 550 m 2

1/greenhouse 300 m 2

0/space boutique 300 m 2

1/museum, multimedia library 1000 m 2

0-2/office 1000 m 2

0/fruit storehouse 1000 m 2

0/research labs 200 m 2

1/tasting rooms 400 m 2

-1/storehouse 1600 m 2

function diagram

26


competition project

metal decking

harvest extraction

metal beams

filtering

sludge sun protection storage natural ventilation botteling wooden sticks rotated by 45 degrees

facade structure

tasting

scenario

27


interior space

interior space

28


competition project

TOP

LEVEL 2

degustation

LEVEL 1 media room

wine patio

LEVEL 0 shop entrance

fruit storehouse

wine cellar storehouse

LEVEL -1

scenario diagram

29


CEBADA COMMUNITY CENTER Madrid, Spain | Bachelor graduation project | Competition project, winning proposal | 2014

The site is located in the histocal part of the city, which today is represented as complicated market and public space. The last one is given for use of citizens. In this supersaturated, tight context the priority is given to transportation and economics mostly. The human needsdon’t get enough attention and in this case we can speak about total reorganization of space, in order to remedy the situation. Current market conditions, the needs of the public space in the city, rich flow of traffic in this place led to the formation of the idea of the whole structure, consolidating a communicative environment and trade, as important elements in the economy and the history of the area. The idea is the movement towards film viewings. The main objective of the project is the creation of open space, active communication with the influx of people and as a result development of the region in general. The idea is the movement towards communication between all ages and interests and is represented in 2 ramps, passing through the market, connecting out of the subway and the surrounding neighborhoods. This is a two-level structure with trading floor shifted to the level of the road, toensure the availability of market space and open upper space, having a relatively simple organization just to show platform where people can spend their leisure time, organizeconcerts, make cycling, relax in a cafe or just have a walk. Cupola space is filled with audiences, enabling to organize lectures or film viewings. The main objective of the project is the creation of open space, active communication with the influx of people and as a result development of the region in general.

30


competition project

31


axonometry

32


competition project

situation

ramps

residential areas

major transport links

market space is closed

difficulty in movement

natural ventilation significantly reduces the cost of maintaining

problem

creating public street between ramps

street view

33


ramps plan

ground plan

34


competition project

public space?

how?

market is not convenient

removing the enclosing structure

lack of visual communications

creation one available level

saving construction market as a symbol and a shelter from rain and sun

but how to tie it together

street view

35


36


competition project

37


COLLIDER ACTIVITY CENTER Sofia, Bulgary | Competition project | 2013 team | kozak denys, aleksandr kolesnikov, igor lyalyuk activities | architectural design, 3dmodel, plans, schemes, sections

Plot of land, reserved for ColliderActivityCenter, for the moment is a typical indeterminate territory, situated in-between strong urban elements: subway station, large residential district, plant area. To place a new, unfamiliar to this area, function of ColliderActivityCenter, we need to create a mystery island of isolation. In presented project this is achieved by placing the main part of the building underground, at level-6.00, and the excavated soil to be used for creating elevated plateau at +6.00 level. Arrangement of traffic ‘throughunder’ the object creates multiplicity of dimensional experiences and allows to create different footpaths for ColliderActivityCenter visitors, depending on mood, weather, company. AllColliderActivityCenter basic functions are located on the same plane at level -6.00 and are integrated into one space. At level -3.00 and at level 0.00 there are separate sites with additional secondary functions / bars, cafes, checkrooms, bathrooms, parking garage / and link ways between them. A stand-alone threestorey administration unit is connected to the main building by a covered walkway. A walkable roof of Collider Activity Center is an integral part of plateau, elevated at +6.00. The landscape layers are passing through them: garden, city amphitheater, dunes, water, meadow. There is a possibility to move along one layer, in borders of one landscape or across them. In the holistic geometrical scheme one item is differentiated from general system - the 10-meter "gorge-corridors" that are located upon underground utilities, existing on site, are used for bicycling / skating, roller skating / and walking. forycling / skating, roller skating / and walking.

38


competition project

39


meadow

swimming pool sand dunes

green amphitheater

tree park

40


competition project

kitchen

41


earth removal

collider center structure

42

the use of land to create a slope

lines of activities

engineering constraints

pavilions


competition project

spa

A administration

fitness

B

coffee shop

C

greenhouse

communicating space

bar

D

low climbing hall

multifunctional hall

kitchen

E

funtopia

F

high climbing hall

technical communication 0

5

plan at -6.000

administration

boulders

greenhouse

communicating space

parking

bar

multifunctional hall low climbing hall

funtopia

high climbing hall

kitchen

funtopia

technical communication 0

5

plan at -3.000

43


tree park

green amphitheater

boulder park

sand dunes rooftop bar

summer restaurant ropetopia

swimming pool voleyball

situation plan

high climbing hall

low climbing hall | restaurant

lobby | greenhouse

44

meadow


competition project

longitudinal section

transverse section

45


QUIET CENTER

Belgorod, Russia | Competition project | 2013 team | kozak denys, igor lyalyuk, andrew soloviov, ivan shevchenko activities | architectural design, schemes, 3dmodel, model

The purpose of the project - the formation of a multi dimensional, multi-functional, sustainable urban environment, sustainable balance between the different types of urban spaces - Evrostreet and housing premiumm buildings - quiet quarter of urban villas. Evrostreet - the type of public space characteristic of European cities. The functional framework is presented with catering - cafes, restaurants, bars, pubs, pastry shops, etc., and their derivatives - cafe-Hairdressers, cafĂŠ-shops, etc. This space filled with people, works as a "social reactor" in the space of the city. The project provided an apparatus two "evroulits." One is solved as an offshoot from the Boulevard, overlooking the square with a church-chapel. The other connects the boulevard to the prospectus. The site is offered to the temple issue as an area, put on her layout Belgorod fortress, as well as other structures destroyed by the war. New pedestrian streets divide land into four parts, which makes it a traditional quarter somasshabnym European cities. The stretch of luxury housing typology between single-family villa and apartment house, in relation to urban areas, the most attractive is the type of urban villa. In typological development town house has not lost its significant positive kachestvindividual arhiektury and measured, quiet lifestyle in the countryside. In addition to building houses proposed a private intra landscaping with a barbecue and playing sports, jogging trails. Garden furniture, outdoor pool, and so on.

46


competition project

47


Kindergard

Public space

City park

Public street

48


competition project

den

Green zones

Activity zones

49


division

projection frid of the traditional European city for a quarter

zoning

city villas urban neighborhoods public space

space-planning structure

public space

diffusion of space

organization of urban spacesareas of social activity

site plan

50


competition project

-

parking offices retail perimeter buildings

total area of apartments - 65000 m2 total area of infrastructure - 12000 m2 total number of apartments - 520

- housing - public services

- buffer buildings

blocks imply different - new public buildings - kindergarden

desigh decisions

bird view

51


public street

52


competition project

public street

courtyard

street elevation

53


thanks for your attention

54


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.