What will 5D BIM Mean for Cost Manager?
Traditionally followed Quantity Take-off and bill generation is a very time-consuming process that is prone to error. It can require 50% to 80% of a cost estimator’s time on a project.
Avoid Manual Extraction Errors /Measurement of Quantities, Instead Validate the Quantities from Building Information Model
5D BIM offers the capability to generate take-offs, counts, and measurements directly from a model throughout the project lifecycle.
5D BIM allows Cost Manager to give instantaneous inputs whenever there is a change in the design, it will give cost estimates based on the change.
Manual Methods are too Slow, Say no to Reactive value Engineering
5D BIM = 3D Model + Cost Information