What will be 5D BIM mean for cost manager?

Page 1

What will 5D BIM Mean for Cost Manager?

Traditionally followed Quantity Take-off and bill generation is a very time-consuming process that is prone to error. It can require 50% to 80% of a cost estimator’s time on a project.

Avoid Manual Extraction Errors /Measurement of Quantities, Instead Validate the Quantities from Building Information Model

5D BIM offers the capability to generate take-offs, counts, and measurements directly from a model throughout the project lifecycle.

5D BIM allows Cost Manager to give instantaneous inputs whenever there is a change in the design, it will give cost estimates based on the change.

Manual Methods are too Slow, Say no to Reactive value Engineering

5D BIM = 3D Model + Cost Information

Join us for the upcoming webinar
www.desapex.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.