Agenda infrastructure, works & development 5 december 2016

Page 1

NOTICE OF MEETING Notice is hereby given that a Infrastructure Works and Development Committee meeting of the Devonport City Council will be held in the Council Chambers, 17 Fenton Way, on Monday 5 December 2016, commencing at 5:30pm. The meeting will be open to the public at 5:30pm. QUALIFIED PERSONS In accordance with Section 65 of the Local Government Act 1993, I confirm that the reports in this agenda contain advice, information and recommendations given by a person who has the qualifications or experience necessary to give such advice, information or recommendation.

Paul West GENERAL MANAGER 30 November 2016


AGENDA FOR A MEETING OF THE INFRASTRUCTURE WORKS AND DEVELOPMENT COMMITTEE OF DEVONPORT CITY COUNCIL HELD ON MONDAY 5 DECEMBER 2016 AT THE COUNCIL CHAMBERS AT 5:30PM Item

Page No.

APPOINTMENT OF CHAIRMAN ................................................................................... 1 1.0

APOLOGIES ............................................................................................... 1 Ald LM Perry

2.0

DECLARATIONS OF INTEREST ........................................................................ 1

3.0

PROCEDURAL............................................................................................. 2

3.1

PUBLIC QUESTION TIME ...................................................................................................................... 2

3.1.1

Questions on notice from the public ........................................................................................... 3

3.1.2

Question without notice from the public .................................................................................... 3

3.2

QUESTIONS ON NOTICE FROM ALDERMEN .............................................................................................. 3

4.0

TENDERS ................................................................................................... 4

4.1

Tender Report Contract CS0051 William Street Stormwater Catchment Upgrade Stage 6 (D449046) ........................................................................................................................... 5

5.0

INFRASTRUCTURE AND WORKS REPORTS ......................................................... 8

5.1

Signage Strategy 2017 - 2022 (D387141) ..................................................................................... 8

5.2

Pedestrian Strategy 2016-2021 (D447171) ................................................................................. 43

5.3

Mersey Bluff Precinct - Future Needs (D449608) ...................................................................... 77

5.4

Cradle Coast Waste Management - Annual Report 2015-2016 (D450524) ........................ 81

6.0

INFRASTRUCTURE WORKS AND DEVELOPMENT BI-MONTHLY UPDATES ............. 109

6.1

Development and Health Services Report (D448187) .......................................................... 109

6.2

Infrastructure and Works Report (D448020) ............................................................................ 118

7.0

CLOSURE .............................................................................................. 137


PAGE 1 Infrastructure Works and Development Committee meeting Agenda 5 December 2016

Agenda of a meeting of the Devonport City Council’s Infrastructure Works and Development Committee to be held at the Council Chambers, 17 Fenton Way, Devonport on Monday 5, December 2016 commencing at 5:30pm. PRESENT Present Chairman

Apology

Ald L M Perry Ald C D Emmerton Ald G F Goodwin Ald A J Jarman Ald L M Laycock Ald J F Matthews

IN ATTENDANCE All persons in attendance are advised that it is Council policy to record Council Meetings, in accordance with Council’s Audio Recording Policy. The audio recording of this meeting will be made available to the public on Council’s website for a minimum period of six months. Members of the public in attendance at the meeting who do not wish for their words to be recorded and/or published on the website, should contact a relevant Council Officer and advise of their wishes prior to the start of the meeting.

APPOINTMENT OF CHAIRMAN

In the absence of the Chairman it will be necessary for the Committee to elect an Alderman to chair the meeting.

1.0

APOLOGIES The following apology was received for the meeting. Ald Perry

2.0

Apology

DECLARATIONS OF INTEREST


PAGE 2 Infrastructure Works and Development Committee meeting Agenda 5 December 2016

3.0

PROCEDURAL

3.1

PUBLIC QUESTION TIME

Members of the public are invited to ask questions in accordance with the following resolution of Council (Min Ref 54/16): 1.

Public participation shall take place at Council meetings in accordance with Regulation 31 of the Local Government (meeting Procedures) Regulations 2015.

2.

Public participation will be the first agenda item following the formal motions; Apologies, Minutes and Declarations of Interest.

3.

A maximum period of time of 30 minutes in total will be allowed for public participation.

4.

A maximum period of time of 3 minutes will be allowed for each individual.

5.

A member of the public may give written notice to the General Manager 7 days before an ordinary meeting of Council of a question to be asked at that meeting.

6.

A member of the public will be entitled to ask questions relating to the activities of Council, giving an explanation that is necessary to give background to the question and ask supplementary or follow up questions relating to that specific matter that may come to light as a result of the answer.

7.

Questions do not have to be lodged prior to the meeting, however they would be preferably provided in writing.

8.

A question by any member of the public and an answer to that question are not to be debated.

9.

The Chairperson may refuse to accept a question. If the Chairperson refuses to accept a question, the Chairperson is to give reason for doing so.


PAGE 3 Infrastructure Works and Development Committee meeting Agenda 5 December 2016

3.1.1

Questions on notice from the public At the time of compilation of the agenda no questions on notice from the public were received.

3.1.2

Question without notice from the public

3.2

QUESTIONS ON NOTICE FROM ALDERMEN At the time of compilation of the agenda no questions on notice from Aldermen were received.


PAGE 4 Infrastructure Works and Development Committee meeting Agenda 5 December 2016

4.0

TENDERS

In accordance with Section 22(1) of the Local Government Act 1993 Council has delegated powers to the Infrastructure and Works Committee to accept tenders for activities related to the functions of the Committee to the extent of the estimates for the current financial year (Min 198/15 refers). The following item is to be dealt with by the Infrastructure and Works Committee in accordance with delegated authority. 4.1

Tender Report Contract CS0051 William Street Stormwater Catchment Upgrade Stage 6

The following table details all tenders and contracts which have been entered into by Council above $100,000 for the 2016/2017 financial year. Contract Contract - 1311 King Street Carpark Contract - CT0167-01 Supply, Delivery and Placement of Hotmix Asphalt Contract - CT0167-02 Supply, Delivery and Placement of Bituminous Surfacing Contract - CT0165 William Street Reconstruction Best to Stewart Street Contract - CT0164 Fenton & Steele Street Intersection Upgrade Contract - CT0166 Formby Road and Westport Road Intersection Reconstruction Contract - CT0186 Elizabeth Street Renewal Forbes to Hiller Street Contract - CT0190 Soccer Club Carpark

$ Value

Min Ref/ Meeting Date Council 150/16 22/08/2016

Contract Period

Extension Options

September to December 2016 September to January 2017

Not Applicable Not Applicable

$302,359

Roadways Pty Ltd

IWC 25/16 08/08/2016

September to January 2017

Not Applicable

$230,931

Venarchie Pty Ltd

IWC 26/16 08/08/2016

Not Applicable

$491,671

IWC 32/16 10/10/2016

Not Applicable

$396,451

Kentish Construction & Engineering Co Pty Ltd Civilscape Contracting

Not Applicable

$706,090

Kentish Construction & Engineering Co. Pty Ltd

Council 188/16 24/10/2016

January to March 2017

Not Applicable

$196,440

Civilscape Contracting

December to February 2017

Not Applicable

$173,433

ATM Investments Pty Ltd

Council 208/16 28/11/2016 Council 209/16 28/11/2017

November to February 2017 November to February 2017 November to March 2024

(Excluding GST)

Contractor

$532,973

Oliver Kelly Construction

IWC 33/16 10/10/2016


PAGE 5 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

4.1 TENDER REPORT CONTRACT CS0051 WILLIAM STREET STORMWATER CATCHMENT UPGRADE - STAGE 6 File: 32677 D449046

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 2.3.2

Provide and maintain stormwater infrastructure to appropriate standards

SUMMARY This report seeks Council’s approval to award CS0051 William Street Stormwater Catchment Upgrade - Stage 6, to Civilscape Contracting Tasmania Pty Ltd.

BACKGROUND This report considers tenders received for “William Street Stormwater Catchment Upgrade - Stage 6” listed within the 2016/17 capital expenditure budget. This project involves the duplication of the stormwater main on William Street between North Street and James Street. This is a continuation of work in the catchment to increase the capacity of the piped system to meet the Stormwater Strategy requirements and reduce the risk of stormwater flooding. This catchment has been assessed as a high risk based on the current capacity, the possibility of damage to private and public property and the safety risk during a major rain event. Major rain events have caused damage to private property in this catchment on three occasions in 2016.

STATUTORY REQUIREMENTS Council is required to comply with Section 333 of the Local Government Act 1993 and its adopted Code for Tenders and Contracts when considering awarding tenders.

DISCUSSION In accordance with Council’s Code of Tenders and Contracts, a Tender Planning and Evaluation Committee was formed to evaluate the tenders received. Tenders were received from four companies. tenders and are summarised in table 1.

All tenders received were conforming

TABLE 1

1

Civilscape Contracting Tasmania Pty Ltd

Conforming

Tender Price (ex GST) $217,867

2

Conforming

$234,902

3

Kentish Construction and Engineering Company Pty Ltd (trading as Treloar Transport) Hardings Hotmix Pty Ltd

Conforming

$255,425

4

Oliver/Kelly Constructions Pty Ltd

Conforming

$282,825

No.

Tender

Status

As highlighted in the above table, the Civilscape Contracting Tasmania Pty Ltd tender of $217,867 is the lowest price. The Tender Planning and Evaluation Committee have considered the tenders against each of the selection criteria, these being:  

Relevant Experience Quality, Safety and Environmental Management ITEM 4.1


PAGE 6 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

 

Methodology Price

The evaluation by the committee indicates that Civilscape Contracting Tasmania Pty Ltd scored highest overall against the selection criteria and therefore offers Council the best value for money. The Tender Planning and Evaluation Committee minutes were prepared and confidential copies can be made available upon request by Aldermen.

COMMUNITY ENGAGEMENT A public advertisement calling for tenders was placed in the Advocate Newspaper on 5 November 2016 and tenders were also advertised on Council’s website.

FINANCIAL IMPLICATIONS The 2016/17 capital expenditure budget includes an allocation for the “William Stormwater Catchment Upgrade - Stage 6” project of $275,000. The tender received from Civilscape Contracting Tasmania Pty Ltd is $217,867. The breakdown of the budget for this project is summarised below in table 2. TABLE 2 No.

Price (ex GST)

Tender

1

Contract CS0051

$217,867

2

Project management/administration

$14,000

3

Construction contingency

$21,790 TOTAL

The contingency allowance for this project is 10% of the contract price. unforeseen variations is low.

$253,657 The risk of

RISK IMPLICATIONS To minimise risk, the tender administration processes related to this contract comply with Council’s Code for Tenders and Contracts which was developed in compliance with Section 333 of the Local Government Act 1993.

CONCLUSION Taking into account the selection criteria assessment, the Tender Planning and Evaluation Committee has determined that Civilscape Contracting Tasmania Pty Ltd meet Council’s requirements and is therefore most likely to offer “best value” in relation to Contract CS0051 William Street Stormwater Catchment Upgrade - Stage 6.

ATTACHMENTS Nil

ITEM 4.1


PAGE 7 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

RECOMMENDATION That the Infrastructure, Works and Development Committee in relation to Contract CS0051 William Street Stormwater Catchment Upgrade - Stage 6 and in accordance with the delegated authority provided to it by Council under Minute 198/15: a)

award the contract to Civilscape Contracting Tasmania Pty Ltd for the revised tendered sum of $217,867 (ex GST);

b)

note that design, project management and administration for the project are estimated to cost $14,000 (ex GST); and

c)

note that a construction contingency of $21,790 (ex GST) is included in the budget.

Author: Position:

Michael Williams City Engineer

Endorsed By: Position:

ITEM 4.1

Matthew Atkins Deputy General Manager


PAGE 8 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

5.0

INFRASTRUCTURE AND WORKS REPORTS

5.1

SIGNAGE STRATEGY 2017 - 2022 File: 25428 D387141

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 3.3.1

Improve the City's physical access and connectivity

SUMMARY This report seeks Council endorsement of the Signage Strategy 2017-2022 (the Strategy) for public consultation.

BACKGROUND Council first adopted a Signage Strategy in 2013 and has already undertaken several projects in accordance with the Strategy. The updated Signage Strategy 2017-2022 has been prepared to continue to assist with the objectives and goals outlined in the Council’s Strategic Plan 2009-2030.

STATUTORY REQUIREMENTS There are no specific statutory requirements relating to this report.

DISCUSSION The goal of the Strategy is to ensure that there is a consistent approach to the look, feel and placement of non-regulatory signage for Devonport City Council owned or supported attractions and facilities by: 

providing clear guidelines for design and type,



providing clear approach to positioning,



defining a Signage Hierarchy, and



providing a clear process for assessment and prioritisation of signage replacements and new signage requests.

The Strategy has been prepared to build on the achievements of the original Signage Strategy adopted in 2013 by detailing: 

An action plan containing 22 actions. The action plan includes the time frames and resources required for delivery of the actions,



Signage Hierarchy – eight sign types have been identified to improve way finding and the visitor experience across the City, and



Assessment criteria for prioritising requests for signage.

The Strategy does not include advertising signage, signage for non-Council facilities and businesses or regulatory signage. It is intended that once the Strategy is adopted an itemised list of signage requirements will be added to Council’s Forward Works Program for adoption as part of the annual budget deliberations.

ITEM 5.1


PAGE 9 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

COMMUNITY ENGAGEMENT It is recommended that Council endorse the draft Strategy for a period of public comment prior to formal adoption.

FINANCIAL IMPLICATIONS A significant allocation of staff time is required to implement the action plan but this can be achieved within existing resource allocations. Several capital projects will be proposed as part of the action plan implementation.

RISK IMPLICATIONS ď€

Asset & Property Infrastructure The Strategy aims to provide a decision-making framework and supporting design principles to enhance signage across the Devonport municipal area ensuring consistent and compliant signage.

CONCLUSION Adoption of the Strategy and the implementation of the action plan will assist Council to deliver its long term strategic objectives and goals.

ATTACHMENTS 1.

DRAFT Signage Strategy 2017-2022

RECOMMENDATION That it be recommended to Council that the report of the Infrastructure and Works Manager relating to the Draft Signage Strategy 2017-2022 be received and noted and Council endorse the release of the Strategy for a minimum 30-day public consultation period.

Author: Position:

Kylie Lunson Infrastructure & Works Manager

Endorsed By: Position:

ITEM 5.1

Matthew Atkins Deputy General Manager


PAGE 10 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 11 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 12 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 13 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 14 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 15 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 16 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 17 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 18 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 19 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 20 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 21 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 22 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 23 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 24 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 25 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 26 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 27 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 28 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 29 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 30 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 31 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


PAGE 32 DRAFT Signage Strategy 2017-2022

ATTACHMENT [1]

ITEM 5.1


DRAFT Signage Strategy 2017-2022

PAGE 33

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 34

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 35

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 36

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 37

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 38

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 39

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 40

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 41

ITEM 5.1

ATTACHMENT [1]


DRAFT Signage Strategy 2017-2022

PAGE 42

ITEM 5.1

ATTACHMENT [1]


PAGE 43 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

5.2

PEDESTRIAN STRATEGY 2016-2021 File: 26157 D447171

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 2.3.1

Provide and maintain roads, bridges, footpaths, bike paths and car parks to appropriate standards

SUMMARY This report outlines the outcome of the public consultation process for the Pedestrian Strategy 2016-2021 (Strategy) and presents the final document for Council adoption.

BACKGROUND Council first adopted a Pedestrian Strategy in 2012 and has already undertaken 30 projects worth over $1.5M in accordance with the Strategy. The updated Pedestrian Strategy 2016-2021 has been prepared to continue to assist with the objectives and goals outlined in Council’s Strategic Plan 2009-2030. The draft Strategy was endorsed for public consultation by Council at its August 2016 meeting (Min IWC 28/16 refers). The draft Strategy was subsequently made available for viewing and comment at Council’s Customer Service Centre and online at www.speakupdevonport.com.au. The objective of the draft Strategy is: To make walking in Devonport safe and convenient and to enable and encourage walking as a mode of transport. It is proposed to meet this objective through the provision of infrastructure, helping to make walking safer and convenient and through the provision of information that enables and encourages walking. The draft Strategy gives priority to projects in the high ‘walkability’ areas including Devonport CBD and surrounds, the North West Coastal Pathway, and the East Devonport retail precinct. These projects will provide a benefit in the areas that experience high pedestrian volumes.

STATUTORY REQUIREMENTS There are no specific statutory requirements relating to this report.

DISCUSSION During the consultation period, two responses were received via “Speak Up Devonport”, raising the following four points: 

Tugrah Road is shown on map to have a footpath through residential area. This is incorrect, but should have with the increased traffic flow with growth in this area and no footpath to safely walk for parents, school children and runners. many near misses have been witnessed and still no safe footpath.



Continue shared cycle/pedestrian footpath on Stony Rise Road between Leary Avenue to Don/Stony Rise Road intersection. Provides safe, visible, direct, continuous access to schools, Harvey Norman Complex, Devonfield, businesses, Don village area.



Continue shared cycle/pedestrian footpath on Stony Rise Road between Leary Avenue to Don/Stony Rise Road intersection. Provides safe, visible, direct, continuous ITEM 5.2


PAGE 44 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

access to schools, Harvey Norman Complex, Devonfield, businesses, Don village area. Continue shared cycle/pedestrian footpath on Stony Rise Road between Leary Avenue to Don/Stony Rise Road intersection. Provides safe, visible, direct, continuous access to schools, Harvey Norman Complex, Devonfield, businesses, Don village area. Continue shared cycle/pedestrian footpath on Stony Rise Road between Leary Avenue to Don/Stony Rise Road intersection. Provides safe, visible, direct, continuous access to schools, Harvey Norman Complex, Devonfield, businesses, Don village area. 

Pending Don River Railway expansion to Eugenana, a shared cycle/pedestrian pathway to coexist with new train line as does presently for the Don-Coles Beach walking track.

These responses were requesting footpath and pedestrian facility improvements in Tugrah Road/Stony Rise area. A project to provide these facilities aligns with the objective of the draft Strategy. In accordance with the Strategy, construction is likely to be a low priority given the low ‘walkability’ of the area and is therefore unlikely to be delivered in the short to medium term. The low number of responses and the nature of the responses mean that no changes to the draft Strategy are recommended.

COMMUNITY ENGAGEMENT The draft Strategy was made available for viewing and comment at Council’s Customer Service Centre or online at www.speakupdevonport.com.au. The Strategy proposes ongoing community consultation on pedestrian issues to help Council stay informed of the community priorities.

FINANCIAL IMPLICATIONS Adoption of the Strategy has no immediate financial implications. A significant allocation of staff time is required to implement the action plan but this can be achieved within existing resource allocations. It is likely that a number of capital projects will be proposed from 2017-18 onwards as part of the action plan implementation. Construction of new paths will result in additional operational expenditure, including maintenance and depreciation costs.

RISK IMPLICATIONS Adoption of the Strategy ensures that all pedestrian related projects undertaken by Council help to achieve the strategic objectives which support Council’s Strategic Plan 2009-2030.

CONCLUSION Adoption of the Strategy and the implementation of the action plan will assist Council to meet its Legislative requirements and long term strategic objectives and goals.

ATTACHMENTS 1.

Pedestrian Strategy 2016-2021

ITEM 5.2


PAGE 45 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

RECOMMENDATION That it be recommended to Council that the report of the City Engineer be noted and that the Pedestrian Strategy 2016-2021 be adopted with immediate effect.

Author: Position:

Michael Williams City Engineer

Endorsed By: Position:

ITEM 5.2

Matthew Atkins Deputy General Manager


PAGE 46 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 47 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 48 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 49 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 50 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 51 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 52 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 53 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 54 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 55 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 56 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 57 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 58 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 59 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 60 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 61 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 62 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 63 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


Pedestrian Strategy 2016-2021

PAGE 64

ITEM 5.2

ATTACHMENT [1]


PAGE 65 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 66 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 67 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 68 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 69 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 70 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


Pedestrian Strategy 2016-2021

PAGE 71

ITEM 5.2

ATTACHMENT [1]


Pedestrian Strategy 2016-2021

PAGE 72

ITEM 5.2

ATTACHMENT [1]


Pedestrian Strategy 2016-2021

PAGE 73

ITEM 5.2

ATTACHMENT [1]


PAGE 74 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 75 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 76 Pedestrian Strategy 2016-2021

ATTACHMENT [1]

ITEM 5.2


PAGE 77 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

5.3

MERSEY BLUFF PRECINCT - FUTURE NEEDS File: 25062 D449608

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 3.5.2

Identify future infrastructure needs of business and industry and pursue implementation options

SUMMARY To consider undertaking a precinct planning study for the Mersey Bluff area.

BACKGROUND Development at the Mersey Bluff precinct has been a focus for Council since the finalisation of the Surf Club building, which encompasses two tenanted restaurants. The Caravan Park site has also been the subject of concept plans in the past which have not to date progressed. Parking, or a lack of, has been raised as a concern with Council on several occasions, particularly during the summer months when both the restaurants, surf club and caravan park have increased activity and visitation. The car park at the immediate rear of the building has been signed to indicate that it is for use of patrons of both restaurants only (Drift Café and Mrs Jones Restaurant). The Surf Club executive are aware that the car park is for this use and they are encouraged to park in the other car parks surrounding the precinct. Despite the signage, it is difficult to determine whether it is just being used by restaurant patrons or other visitors to the bluff precinct. The area around the Bluff precinct also incorporates a lot of sporting activity with Meercroft Park in the immediate vicinity with the playground and skate park also experiencing a high level of utilisation in the summer months.

STATUTORY REQUIREMENTS There are no statutory requirements which relate to this report. In February 2016, Council adopted its 2016 Parking Strategy. Any consideration relating to parking requirements and managing demand for parking should be in accordance with the strategy.

DISCUSSION With the number of activities being undertaken in the Bluff precinct, it may be prudent to conduct investigations into an overall precinct plan to ensure it meets the future needs and potential growth in this area. The plan could consider future development and/or parking options for the Bluff precinct. Currently, there are approximately 330 car parking spaces in the vicinity of the Bluff precinct as outlined on the plan marked “A”. The spaces in the immediate vicinity of the surf club building are those marked ‘a’, ‘b’, ‘e’, ‘f’ and ‘h’, which total approximately 284 car parking spaces. Plan “B” shows the parking available within a 100 metre and 200 metre radius of the building. There are clear guidelines for parking requirements at restaurants but no guidelines on the other facilities within the precinct like the surf club, the playground and the sporting facilities. The potential to use car parking areas further away from the Surf Club building could be an option through creating improved pedestrian links. ITEM 5.3


PAGE 78 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

PLAN “A”

ITEM 5.3


PAGE 79 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

PLAN “B�

Council in the last few months increased parking availability in the area by expanding the car park adjacent to Meercroft Park on Bluff Road. This car park provides a further option for patrons of the Bluff restaurants on occasions when the closer car park is full. It is a short walk across Bluff Road through the promenade area to the surf club building.

COMMUNITY ENGAGEMENT A deputation was received by Council at its October workshop from the tenants of both restaurants, the Surf Club and the caravan park. No further community engagement has been undertaken at this stage. Wider consultation would be required once a draft precinct plan was formulated. ITEM 5.3


PAGE 80 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

The development of a precinct plan would include a public consultation process.

FINANCIAL IMPLICATIONS The costs of undertaking the development of a precinct plan is unknown and it would need to be determined whether consultants are required or whether Council has the resources to undertake the planning in-house. The project would need to be scoped in the first instance to clarify the extent of the planning and what resources may be required to formulate a precinct plan. If the precinct plan were to identify capital works, these would need to be factored into Council’s forward works program as part of its annual budget deliberations. As further investigation, will be required, it is unknown as to what the potential costs and implications may be on future capital budgets.

RISK IMPLICATIONS Any recommendations contained within a precinct plan for the Mersey Bluff area could create expectations of tenants, users and the public that may not be able to be undertaken for many years due to Council’s financial constraints and/or other projects.

CONCLUSION There are potentially many options which could be considered when undertaking precinct planning for the Mersey Bluff area. It is therefore recommended that Council commence investigations into an overall precinct plan to ensure any decisions will meet the future needs and potential growth in this area.

ATTACHMENTS Nil

RECOMMENDATION That it be recommended to Council that: (a)

options relating to the development of a precinct plan for the Mersey Bluff area be investigated; and

(b)

funding the preparation of a precinct plan be considered as part of the 2017/18 budget deliberations.

Author: Position:

Karen Hampton Governance Coordinator

Endorsed By: Position:

ITEM 5.3

Paul West General Manager


PAGE 81 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

5.4

CRADLE COAST WASTE MANAGEMENT - ANNUAL REPORT 20152016 File: 29119 D450524

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 1.4.2

Facilitate, and where appropriate, undertake improvements in waste and recycling collection, processing services and facilities

SUMMARY The purpose of this report is to present to Council the Cradle Coast Waste Management Group (CCWMG) Annual Report for the 2015/16 Financial Year.

BACKGROUND The CCWMG is responsible for implementing the Cradle Coast Regional Waste Management Strategy 2012-2017. The CCWMG, comprises a General Manager, an elected member, Cradle Coast Authority (CCA) & Dulverton Waste Management (DWM) representatives and four technical staff from the member Councils. Council’s Deputy General Manager, Matthew Atkins is one of the technical staff on the group. The Group is chaired by Central Coast General Manager, Ms Sandra Ayton. Each year the CCWMG set an annual plan and budget for the upcoming twelve months aimed at achieving the outcomes of the Regional Strategy. The Annual Plan and Budget is funded from a voluntary levy of $5.00 per tonne of waste delivered to landfills in the North West region. This report tables the CCWMG’s Annual Report for 2015/16 which outlines the progress during the year against the Annual Plan and Budget.

STATUTORY REQUIREMENTS The CCWMG is a working group of the Cradle Coast Authority (CCA). The CCA is established as a Joint Authority under Section 30 of the Local Government Act 1993.

DISCUSSION The CCWMG 2015/16 Annual Report summarises progress against planned projects with 46 of an identified 52 actions being completed or ongoing as of 30 June 2016. Total income generated from the waste levy totalled $368,393 for the 12-month period with expenditure of $300,351, the Group ended the year with a $68,042 surplus. The attached report is marked draft with a final version to be released on 2 December. Whilst no further changes are expected, any revisions will be advised to Aldermen at the meeting.

COMMUNITY ENGAGEMENT The CCWMG maintain a web site Rethinkwaste.com.au in conjunction with other Tasmanian waste bodies as a means of engaging with the community. A number of media initiatives were also implemented during the year.

ITEM 5.4


PAGE 82 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

FINANCIAL IMPLICATIONS There are no financial implications for Council as a result of this report.

RISK IMPLICATIONS There are no notable risks to Council associated with the recommendation of this report.

CONCLUSION The CCWMG’s 2015/16 Annual Report is tabled for Council’s information and noting.

ATTACHMENTS 1.

CCWMG - Annual Report for 2015/16 DRAFT

RECOMMENDATION That it be recommended to Council that the 2015/16 Cradle Coast Waste Management Group Annual Report be received and noted.

Author: Position:

Matthew Atkins Deputy General Manager

Endorsed By: Position:

ITEM 5.4

Paul West General Manager


PAGE 83 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 84 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 85 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 86 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 87 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 88 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 89 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 90 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 91 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 92 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 93 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 94 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 95 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 96 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 97 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 98 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 99 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 100

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 101

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 102

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 103

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 104

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 105

ITEM 5.4

ATTACHMENT [1]


CCWMG - Annual Report for 2015/16 DRAFT

PAGE 106

ITEM 5.4

ATTACHMENT [1]


PAGE 107 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 108 CCWMG - Annual Report for 2015/16 DRAFT

ATTACHMENT [1]

ITEM 5.4


PAGE 109 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

6.0

INFRASTRUCTURE AND WORKS MONTHLY UPDATE

6.1

DEVELOPMENT AND HEALTH SERVICES REPORT File: 29543 D448187

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 5.4.1

Provide timely, efficient, consistent and quality services which are aligned with and meet our customers needs

SUMMARY This report provides a summary of the activities undertaken by the Development and Health Services Department for the months of October and November 2016.

BACKGROUND This report is provided to the bi-monthly Infrastructure, Works and Development Committee meeting to summarise the activities of the Development and Health Services Department in the preceding two months. The Council functions undertaken by the Department are:     

Planning; Building and Plumbing Services; Environmental Health; Animal Control; and Risk and Regulatory Compliance Services.

STATUTORY REQUIREMENTS In carrying out its activities the Development and Health Services Department is required to ensure compliance with a substantial amount of legislation and regulation. The principal legislation administered by the Department includes the:         

Local Government Act 1993 Land Use Planning and Approvals Act 1993 Building Act 2000 Public Health Act 1997 Food Act 2003 Environmental Management and Pollution Control Act 1994 Dog Control Act 2000 Devonport Interim Planning Scheme 2013 Work Health and Safety Act 2012

DISCUSSION 1.

Devonport Interim Planning Scheme The Tasmanian Planning Commission (TPC) has previously confirmed that its consideration of representations to the draft scheme has been finalised. In fact, some representations made to the Devonport (and other Council) Interim Schemes remain unresolved. Two examples would be the awkward mix of residential zoning, existing industrial use rights and a statutory dispensation (potato packing plant) on the carpet factory ITEM 6.1


PAGE 110 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

precinct at East Devonport, and the potential residential subdivision abutting the Fonterra site at Spreyton. Another matter that requires resolution is the rezoning of Council owned land in Murray Street to the west of the old Post Office. The Tasmanian Planning Commissioner suggested to Cradle Coast planning staff at a recent meeting that such matters should be addressed either in framing the Local Provisions Schedules (LPS’s) for the new Tasmanian Planning Scheme (TPS) or by way of an application for amendment of a planning scheme under the provisions of the Land Use Planning and Approvals Act 1993 (LUPAA). Council is about to embark on the preparation of the LPS’s and while it is unclear what form and content will be acceptable to the State it is intended to explore opportunities to remedy any IPS anomalies. 2.

Tasmanian Planning Scheme The TPC has advised that it is required to present a report about the final draft of the State Planning Provisions (SPP’s) of the Tasmanian Planning Scheme to the Minister by 9 December 2016. Further advice is that the TPC anticipated there would be more clarity about the content of the SPP’s in January or February 2017. Regardless of when the finalised State Provisions are declared and released by the Minister they cannot be applied by Council until its Local Provisions are endorsed by the TPC and Minister. The nine Cradle Coast Councils collaborated on the preparation of their Interim Schemes to provide as much consistency as possible across municipal boundaries. This model is favoured by the TPC for the preparation of the Local Provisions and to that end another Cradle Coast working group has been established. It will include a range of representatives from across the region. At a meeting of planners on 8 November 2016, which included the TPC, some initial requirements were identified. They included: 

state-wide briefings by the TPC on the final form of the SPP’s;



workshops on the zone application guidelines of the new State Scheme;



clear guidelines on how the new “agricultural zone” will be mapped and applied;



how local variations around such matters as special area and particular purpose zones will be managed.

The TPC indicated that the State was reviewing all “layer maps” to recognise current science and recent natural disaster experience. It was suggested there would be no change to current landslip maps, but there will be a revision of coastal inundation and coastal erosion layers. Planners requested that the State consider more clarity and uniformity around bushfire mapping. The convenor of the working party will now prepare a draft Work Plan to advance the preparation of the Local Provisions. 3.

Amendments to the Tasmanian Building Regulatory Framework As advised in the Development and Health Services report to the committee meeting in October 2016, new Building and Plumbing Regulations will come into effect on 1 January 2017. The new Regulations have now been published, but unfortunately Permit Authority staff were given very little time to review and respond to them. The focus therefore ITEM 6.1


PAGE 111 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

has turned to how the new provisions are to be interpreted and applied in a consistent fashion. The Department of Justice conducted a series of training sessions across the State for Permit Authority staff and building surveyors. Devonport officers attended such a session at Burnie on 26 October 2016. The training session, although helpful, created some confusion for the attendees as a series of exercises to determine which new categories examples of building and plumbing work fell into, produced a raft of conflicting answers. There were concerns that although the new Building Act is supposed to concentrate on the “built environment” only, by excluding any reference to licensing or contractual disputes, certain discretionary planning requirements will trigger a requirement for a building permit where the intention was to simplify the process. There was also concern that with the January implementation drawing near the Department has not yet finalised and released the new forms that will be required and neither had the necessary amendments to section 337 certificates been considered. Following the meeting it was decided that the Cradle Coast Permit Authorities should meet to explore how consistent advice and procedures could be delivered to consumers and the building and plumbing industries. Representatives of the nine councils attended a meeting hosted by Devonport on 16 November 2016 where there was a strong focus on communication and consistency to assist the introduction of the new Regulations. If there are applications which cause problems or “drop through the cracks” they will be discussed and documented and may form the basis of a future submission to the Government for necessary amendments. Councils across Tasmania have contacted LGAT to express concerns about some aspects of the new Regulations and it will now host regional seminars in December. One aspect of the new Regulations is that licensing of “building practitioners” and “building services providers” will now be regulated through an amended Occupational Licensing Act. A Permit Authority will now become a “building services provider” and will be required to be licensed. Section 37C of the amended Act provides that a “municipal council” may apply to be a licensed “entity” but to do so must nominate a “person” to be the licensed person of the licensed entity. Obviously to cover absences through leave or illness Council will need to nominate more than one “licensed person” at an annual fee (currently) of $367.20. Application forms have not yet been made available but it is intended that a report recommending that Council take the necessary action to comply with the new licensing requirements will be presented to the December Council meeting. 4.

TPC Hearing – Service Station Redevelopment at William and Stewart Streets. Council first considered this matter at its meeting on 25 July 2016. At that meeting it resolved (Min 132/16 refers) to approve the development application and to advertise the enabling planning scheme amendment in accordance with the provisions of LUPAA. Following the statutory advertising period the matter again came before Council at its meeting on 26 September 2016. On this occasion Council considered the merit of ITEM 6.1


PAGE 112 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

the 3 representations received and resolved (Min 173/16 refers) to provide a report to the TPC that it supported the development in general terms but noting that it accepted the merit of representations by two neighbouring residents about the proposed laneway on the eastern side of the development. This laneway would potentially increase vehicle movements adjoining the home units at 81 Stewart Street. In accordance with the requirements of LUPAA the TPC convened a hearing in Devonport on 9 November 2016. The 3 representors were in attendance and the applicant’s acoustic engineer gave evidence by conference phone. The TPC Commissioner led a discussion about the proposed laneway and the applicant conceded that it would not adversely affect the development if it were deleted. This led to a further discussion about the proposed acoustic wall and the expert witness explained that if the laneway were deleted there were ways of restricting noise from new plant on site to at or below existing levels without an acoustic wall. The two residents of 81 Stewart Street then asked if some form of low maintenance landscaping could replace part of the laneway on the eastern boundary and the applicant agreed to this. Council and the applicant’s consultant will now supply amended permit condition wording to the TPC which is likely to then approve the scheme amendment and the development in line with the agreements reached at the hearing. 5.

DHS Statistical Report for October and November 2016 Building and Plumbing 112 building applications had been received to the end of November an increase over the 102 received in the same period last year. The value of those building works, as nominated in the applications, was $34,167,423. This is significantly higher than the $13.28 million recorded in the same period last year. This is mainly attributable to some large commercial projects such as the LIVING CITY redevelopment, Hill Street grocers and the TasWater relocation to Steele Street. There have been 131 plumbing applications received in the year to date a 27% increase over the 103 received in the same period last year. Taken together these figures confirm healthy building activity in Devonport.

ITEM 6.1


PAGE 113 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

Planning 92 development applications have been received in the year to date. This is similar to the 98 received during the same period last year. Of those received 32 were for a permitted use while 60 applications triggered a discretionary assessment. The breakdown of uses attached to the applications is set out below. �Other� includes such things as developments to school and church premises, and boundary re-alignments.

ITEM 6.1


PAGE 114 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

Environmental Health In the year to date the Health team carried out 55 food premises inspections. These inspections resulted in the issuing of 2 improvement notices under the provisions of the Food Act 2003. Both of those notices have been complied with. The team has also been involved in the health and safety assessment components of 13 Devonport Events such as the Devonport Show. There have been 14 special plumbing permit assessments for on-site waste water treatment plants. This is a big increase on the 7 for the same period last year and reflects increased building activity in non-sewered areas. A total of 256 complaints relating to a range of issues including noise, litter, environmental and fire hazards have been responded to. “Other� matters include unsightly premises, unsafe premises, overhanging branches, illegal camping and abandoned vehicles.

ITEM 6.1


PAGE 115 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

The majority of the complaints have been resolved although officers continue to work with owners and complainants to satisfactorily resolve some of these issues.

Animal Control Council records indicate that at the end of November 3,497 dogs were registered in Devonport.

ITEM 6.1


PAGE 116 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

In the same period Council responded to 71 complaints which were almost exclusively related to dogs at large. This is a pleasing reduction from the 163 complaints received during the same period last year. Council maintained its record of prompt complaint response times with an average of 1 day. 69 complaints were investigated and closed during the period. Although Council subscribes to a policy of owner education when dealing with dog owners it has issued 30 infringement notices for the period, primarily for ‘dog at large’. There were 86 infringement notices referred to MPES. This large number of referrals were a result of a comprehensive review of outstanding long term unpaid fines for such matters as unregistered dogs detected during a city-wide house check in the middle of last year.

Risk and Statutory Compliance For the year to date there have been 43 internal and 24 external incidents reported. They included incident reports about a wide range of issues such as:         

Motor vehicle/plant & equipment damage Vandalism – graffiti and destruction of Council property Personal injury – strains and sprains Stolen property – due to break ins Damage to property – parking meters damaged in an attempt to steal money Traffic islands damaged due to motor vehicle accident Verbal abuse from public to staff Hazards/reports eg potential trip hazards on Council property (footpaths and roads) Road hazards e.g. pot holes and road reconstruction causing damage to vehicles

To ensure compliance with notification requirements to our insurer Council has also created a separate category for incidents related to the Living City project. To date the following incidents have been reported:  

Contractor truck became bogged on construction site. Following heavy rains, water from construction site flowed into the DECC no serious damage caused.

ITEM 6.1


PAGE 117 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

All incident reports are investigated by Council’s Safety Officer and where necessary either handled through insurance arrangements or revised safety procedures are developed and implemented.

COMMUNITY ENGAGEMENT The information provided above details any issues relating to community engagement.

FINANCIAL IMPLICATIONS Any financial implications arising out of this report will be reported separately to Council.

RISK IMPLICATIONS There are no specific risk implications as a result of this report.

CONCLUSION This report is provided for information purposes only about the activities of the Development and Health Services Department in October and November 2016.

ATTACHMENTS Nil

RECOMMENDATION That it be recommended to Council that the Development and Health Services report be received and noted.

Author: Position:

Brian May Development Manager

Endorsed By: Position:

ITEM 6.1

Matthew Atkins Deputy General Manager


PAGE 118 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

6.2

INFRASTRUCTURE AND WORKS REPORT File: 29528 D448020

RELEVANCE TO COUNCIL’S PLANS & POLICIES Council’s Strategic Plan 2009-2030: Strategy 5.4.1

Provide timely, efficient, consistent and quality services which are aligned with and meet our customers needs

SUMMARY This report provides a summary of the activities undertaken by the Infrastructure and Works Department during the months of October and November 2016.

BACKGROUND The report is provided to the Infrastructure and Works Committee and aims to update Aldermen and the community on matters of interest. The functional areas of Council covered by this report are:             

Asset Management Program (forward planning and maintenance) Capital Works Roads, Footpaths and Cycleways Streetscape Design (incl. lighting, signs, furniture, vegetation) Stormwater Management Traffic Management Waste Management Recreation Reserves (incl. playgrounds, parks and gardens) Sporting Grounds and Facilities Tracks and Trails Public Buildings (incl. public halls, toilets) Marine Structures (incl. jetties, boat ramps) Recreation and open space planning

STATUTORY REQUIREMENTS Council is required to comply with the provisions of the Local Government Act 1993 and other relevant legislation.

DISCUSSION 1.

2016/2017 Capital Works Program 1.1

Work is progressing well on the 2016/17 Capital Works Program. The monthly capital works report which combines both the physical progress and the financial status has been attached to this report. Overall the program is progressing as planned with no significant issues to report at this point in time. Items of note are outlined in detail below.

ITEM 6.2


PAGE 119 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

1.2

Buster Road Bridge – the approach barriers have been replaced.

1.3

Melrose Road – new culvert has been installed at No. 772.

1.4

Stephen Street and Caroline Street – new footpath link to the East Devonport Recreation Centre has been constructed.

ITEM 6.2


PAGE 120 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

1.5

Aquatic Centre Pool Heating Systems – a new 1,500 litre insulated tank and larger heat exchangers have been installed to improve the efficiency of heating the indoor pools.

1.6

Aquatic Centre Rainwater Tanks – the capacity of the rainwater tanks has been increased to prevent the overflow flooding the building.

1.7

Mersey Vale Cemetery Niche Wall Fence – a fence has been installed around the niche wall at the cemetery to protect flowers from the wildlife.

ITEM 6.2


PAGE 121 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

1.8

Pioneer Park New Toilets and Parenting Facility – the new facility has been completed and the original toilet block has been demolished.

1.9

Fourways Car Park Toilet and Parenting Facilities Upgrade – the existing toilet block has been upgraded and extended to included parenting facilities.

1.10 Steele Street Car Park – construction is progressing on the new car park in Steele Street. Unfortunately, wet weather early in the project and delays whilst waiting for contractors on the adjoining property have resulted in the project being approximately three weeks behind schedule. Council’s contractor, Oliver Kelly Pty Ltd is currently working six days a week to ensure the project is completed as soon as possible.

ITEM 6.2


PAGE 122 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

1.11 Bluff Fitness Equipment Renewal – Sturdybilt Agencies have been awarded the contract to replace the fitness equipment near the Bluff. The two existing sets of equipment will be removed and a new larger fitness area will be constructed closer to the Clements Street car park.

1.12 The following table details works relating to the Capital Works Program managed within the Infrastructure and Works Department under $100,000 that have been awarded to a contractor this financial year:

2.

Description of Works:

$ Value: (Exc. GST)

Contractor:

Newton Street Renewal Contract - CT0185 William Street Safety Improvements – North St to Bluff Road

$77,615

Hardings Hotmix Pty Ltd

$41,764

Kentish Construction and Engineering Company Pty LTD

Wright St Intersection Renewal

$67,955

Hardings Hotmix Pty Ltd

Bluff Fitness Equipment Renewal

$63,410

Sturdybilt Agencies Pty Ltd

Management 2.1. The following table is a summary of the action requests for the Infrastructure and Works Department: Balance of Action Requests as at 28/9/2016 Number of Action Requests created in Oct & Nov Number of Action Requests completed in Oct & Nov Balance of Action Requests as at 21/11/2016

ITEM 6.2

492 179 338 333


PAGE 123 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

2.2. The following graph details the breakdown of the action requests completed during October:

Completed Action Requests Bi‐monthly Breakdown

10%

Buildings Cemeteries

6%

28%

Footpaths Parking

9%

Parks Roads Service Assistance

5%

Signage 4%

Stormwater

5%

Trees & Weeds

5%

Waste

1% 8%

19%

Other

2.3. The following graph details the total number of action requests completed this financial year by the Infrastructure and Works Department compared to the previous year: Completed Action Requests 400

350

300

250

200

150

100

50

0

3.

16/17 Monthly Total

Jul‐16 233

Aug‐16 254

Sep‐16 157

Oct‐16 222

Nov‐16 0

Dec‐16 0

Jan‐17 0

Feb‐17 0

Mar‐17 0

Apr‐17 0

May‐17 0

15/16 Monthly Total

271

221

151

183

160

288

142

324

305

263

350

Technical and Engineering 3.1. Pavement Testing – A program of road pavement testing has been completed and a report has been received from Pitt and Sherry. The report includes analysis of deflection testing undertaken on several roads including Formby Road, Nicholls Street and James Street where the pavement and wearing ITEM 6.2


PAGE 124 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

surface are in poor condition. The report determines the strength of the pavement and advises whether a full road reconstruction is required or if a reseal is sufficient. The recommendations will be used to guide the forward works program. 3.2. East Devonport Stormwater Survey – Work has started on surveying stormwater catchments in East Devonport. The work, which will continue until February 2017, involves collecting information on all pits, manholes, pipes, drains and kerbs in the urban area of East Devonport (excluding Ambleside). This is part of an ongoing works program to survey the complete urban area of Devonport by 2019. The survey will enable Council to determine the capacity of the stormwater system and help to prioritise upgrade projects. The work is also required to ensure Council complies with the requirements of the Urban Drainage Act 2013. 3.3. Chinamans Creek Report – A report on the capacity of the Chinamans Creek stormwater catchment has been received from SEMF. This report has resulted from a long running project collecting and verifying data collected by Council staff and external surveyors. The report concluded that the capacity of the stormwater system is less than what is required by Council’s Stormwater Strategy. Work is currently being undertaken to determine the most effective way of increasing the capacity of the system. 3.4. NBN – The construction phase of the NBN in Devonport is almost complete. Final inspections are underway with minor work and reinstatement to be completed in the next month. Vision Stream will then progress the commissioning phase. 3.5. Parking – 16 new on-street spaces have been identified in the CBD on Best Street, Rooke Street and Oldaker Street (refer attachment). These locations have been identified to partially offset the temporary loss of parking during the LIVING CITY construction phase. Local businesses were consulted and are supportive of the changes which will also improve access to businesses in Rooke Street between Best Street and Oldaker Street. 3.6. The following is a summary of the projects capitalised in October and November: Number of projects capitalised in Oct & Nov (to 21/11/2016) Total value of capitalisations in Oct & Nov Total value of Works in Progress (WIP) as at 21/11/2016 Number of projects awaiting capitalisation next month

1 $0.77M $15.16M* 9

* includes $8.9M LIVING CITY costs yet to be capitalised

3.7. Heavy Vehicles – In conjunction with the Department of State Growth and other Councils, approval has been given to continue to provide access to agricultural vehicles and specific types of laden and unladen heavy vehicles. These vehicles were operating under a permit system that expired on 30 November 2016, but have now been granted approval in accordance with the National Heavy Vehicle Law. This approval was critical to ensure that transport operators and their customers are able to continue to operate lawfully. As part of this process, Council’s Higher Mass Limit (HML) network was able to be expanded to include key industrial and agricultural locations. This will enable semi-trailers with suitable suspension systems to carry an additional three tonnes per load on these routes. ITEM 6.2


PAGE 125 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

3.8. 6 National Heavy Vehicle Regulator Assessments were completed in October. The following graph details the National Heavy Vehicle Regulator Assessments that have been issued so far this calendar year compared to previous years: National Heavy Vehicle Regulator Assessments 60

50

40

30

20

10

0

Jan

2014

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

3

3

4

9

11

10

11

48

11

8

7

10

4

2015

5

7

1

4

3

9

8

7

8

2

2016

8

7

5

2

1

5

6

11

6

6

Dec

3.9. The following graph details the engineering development assessments that have been completed to date this year: Development Application Engineering Assessments 45 40 35 30 25 20 15 10 5 0

Jan‐16

Feb‐16 Mar‐16

Building Assessments

11

Subdivision Assessments

0

Planning Assessments

9

Pre Assessments

0

2

29

Apr‐16 May‐16

Jun‐16

Jul‐16

Aug‐16

Sep‐16

Oct‐16

17

13

12

23

16

22

2

0

1

0

0

1

1

9

10

7

13

6

5

23

8

0

0

3

0

3

4

2

1

12

42

1

1

15

21 3

ITEM 6.2

Nov‐16 Dec‐16 0


PAGE 126 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

3.10. The following graph details the Road Occupational Permits that have been issued so far this year: Road Occupation Permits 2016 12

10

8

6

4

2

0

Jan‐16

Feb‐16

Mar‐16

Apr‐16

May‐16

Jun‐16

Jul‐16

Aug‐16

Sep‐16

Oct‐16

Public

3

5

2

7

4

2

6

6

10

11

Tas Gas

7

7

3

0

1

7

0

4

5

9

Aurora/Telstra

0

0

2

0

0

0

0

0

1

3

NBN Co

2

2

2

0

0

0

0

1

2

0

Taswater

0

0

2

1

0

0

0

0

3

3

Nov‐16

Dec‐16

3.11. The following graph details the Dial Before You Dig requests that have been processed this calendar year compared to previous years:

DBYD - Dial Before You Dig Requests 250 200 150

2016 2015

100

2014

50 0 Jan Feb Mar Apr May Jun

ITEM 6.2

Jul

Aug Sep Oct Nov Dec


PAGE 127 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

3.12. The following graph details the 337 Certificates that have been assessed by the Infrastructure and Works Department this calendar year compared to previous years:

337 Certificate Requests 100 90 80 70 60

2016

50

2015

40

2014

30 20 10 0 Jan Feb Mar Apr May Jun

4.

Jul Aug Sep Oct Nov Dec

Operational Contracts 4.1

The following table details the contracts managed within the Infrastructure and Works Department under $100,000 that have been extended this financial year: Contract

Contract Period

Extension Options

$ Value (Exc. GST)

Contractor

Contract 1265 - 30/06/2015 Supply & option 1+1 Delivery of Premixed Concrete

The original contract signed in June $75,000 per 2015 was for a 12 month period and annum had an option for two 12 month extensions. Further to a review the option for the additional 12 months was accepted.

Boral Construction Materials

Contract 1286 Roadside Mowing

30/06/2015 option 1+1

The original contract signed in June $48,600 per 2015 was for a 12 month period and annum had an option for two 12 month extensions. Further to a review the option for the additional 12 months was accepted.

Mareeba Trust

Contract 1287 Weed Control

30/06/2015 option 1+1

The original contract signed in June $90,700 per 2015 was for a 12 month period and annum had an option for two 12 month extensions. Further to a review the option for the additional 12 months was accepted.

Steeds Weeds Solution

The contract signed in November 2016 is for a two year period and has an option for two 12 month extensions.

Electrical Testing & Compliance Service

Contract 1312 - 22/11/2018 Thermos Imaging option 1+1

ITEM 6.2

$3,040 per annum


PAGE 128 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

Contract 1312 Security Monitoring

22/11/2018 option 1+1

Contract 1312 - 22/11/2018 Electrical, Fire & option 1+1 Test Tagging

5.

$14,640 per annum

MJ Miller Electrical Pty Ltd

$19,571 per annum

Safe Workplace Solutions Pty Ltd

Civil Works and Stormwater Maintenance 5.1

5.2

6.

The contract signed in November 2016 is for a two year period and has an option for two 12 month extensions. The contract signed in November 2016 is for a two year period and has an option for two 12 month extensions.

Maintenance in accordance with the Service Level Document, undertaken in October and November included: 

Replacement of failed sections of footpath at various locations based on a prioritised list of locations from the annual footpath inspections



Replacement of failed sections of kerb and channel



Shouldering and opening drain cleaning on Waverley Road

In December it is anticipated that civil works and stormwater maintenance works will include: 

Shoulder maintenance on Forthside Road



Footpath maintenance



Road patching at various locations

Parks and Reserves Maintenance 6.1

Maintenance in accordance with the Service Level Document, undertaken in October and November included: 

Changeover of sports grounds from winter sports to summer sports



Cleaning of the stainless steel handrails along the foreshore

ITEM 6.2


PAGE 129 Report to Infrastructure Works and Development Committee meeting on 5 December 2016



6.2

6.3

Cleaning and staining of park furniture in the Bluff Plaza

In December it is anticipated that parks and reserves maintenance works will include: 

Ground preparations for the Christmas Carnival at the Devonport Oval



Fertilising and irrigation of sports grounds

Mersey Vale Memorial Cemetery interment figures to date this financial year compared to previous years are as follows:

Mersey Vale Cemetery Interment Figures 18 16 14 12 10 8 6 4 2 0 Burial

Jul‐16 7

Aug‐16 9

Sep‐16 9

Oct‐16 7 0

Nov‐16

Dec‐16

Jan‐17

Feb‐17

Mar‐17

Apr‐17

May‐17

Jun‐17

Ash Interment

2

0

2

16/17 Monthly Total

9

9

11

7

15/16 Monthly Total

15

10

16

17

12

13

14

16

10

14

16

9

14/15 Monthly Total

11

13

10

5

6

17

9

8

16

12

10

16

ITEM 6.2


PAGE 130 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

7.

Building and Facilities Maintenance 7.1

7.2

8.

Maintenance in accordance with the Service Level Document, undertaken in October and November included: 

Installation of Christmas decorations and banners



Installation of racking and a workbench in the new shed at Mersey Vale Memorial Cemetery. The racking came from the old store area at 17 Fenton Way.

In December and January it is anticipated that building and facilities maintenance works will include: 

Removal of Christmas decorations and banners



Annual pest control in Council facilities

Waste Management Operations 8.1

Waste Management Services were conducted in accordance with the Service Level Document during October and November. Items of note include: 

8.2

611 drums were checked as part of the DrumMuster program

The following graph details the volumes of waste and recycling from the domestic collection services and the total volume of waste to landfill from the Spreyton Waste Transfer Station: Waste & Recycling Monthly Figures 1600

1400

1200

1000

800

600

400

200

0 Domestic Waste (tonnes)

Jul‐16 542

Aug‐16 623

Sep‐16 588

Oct‐16 648

Domestic Recycling (tonnes)

125

122

181

130

Total Waste to Landfill (tonnes)

1215

1338

963

1377

Nov‐16

ITEM 6.2

Dec‐16

Jan‐17

Feb‐17

Mar‐17

Apr‐17

May‐17

Jun‐17


PAGE 131 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

8.3

The following table details the monthly figures for the Spreyton Waste Transfer Station: Item

Sept 2016

Oct 2016

16/17 Total

15/16 Total

14/15 Total

Asbestos – large loads

1.86 tonnes

0.54 tonnes

3.8 tonnes

12.8 tonnes

5.52 tonnes

Asbestos – small loads

16m³

14m³

75m³

218m³

181m³

Mattresses

72

57

255

500

431

Vehicle Loads – up to 0.5m³

422

396

1,802

7,958

6,555

1,069

1122

4,337

12,492

10,237

388

504

1,592

6,548

6,883

Truck Loads – landfill waste

38 tonnes

45 tonnes

160 tonnes

541 tonnes

427 tonnes

Truck Loads – non-landfill waste

69 tonnes

98 tonnes

305 tonnes

958 tonnes

831 tonnes

DCC Garbage Trucks (Domestic & Commercial Collection Services)

734 tonnes

811 tonnes

3,044 tonnes

9,376 tonnes

7,656 tonnes

Steel Recycling

120 tonnes

80 tonnes

364 tonnes

843 tonnes

687 tonnes

0 tonnes

0 tonnes

0 tonnes

9.9 tonnes

93.48 tonnes

32

14

68

359

307

Vehicle Loads – 0.5m³ to 1.5m³ Vehicle Loads – 1.5m³ to 2m³

e-Waste Tyres

COMMUNITY ENGAGEMENT The information provided above details any issues relating to community engagement.

FINANCIAL IMPLICATIONS Any financial or budgetary implications relating to matters discussed in this report will be separately reported to Council.

RISK IMPLICATIONS Any specific risk implications have been outlined in the discussion above. Any specific issue that may result in any form of risk to Council is likely to be the subject of a separate report to Council.

CONCLUSION This report is provided for information purposes only and to allow Council to be updated on activities undertaken by the Infrastructure and Works Department.

ATTACHMENTS 1.

Additional CBD Parking Spaces Plan for Chamber of Commerce

2.

Capital Works Program - October 2016

ITEM 6.2


PAGE 132 Report to Infrastructure Works and Development Committee meeting on 5 December 2016

RECOMMENDATION That it be recommended to Council that the Infrastructure and Works report be received and noted.

Author: Position:

Kylie Lunson Infrastructure & Works Manager

Endorsed By: Position:

ITEM 6.2

Matthew Atkins Deputy General Manager


PAGE 133 Additional CBD Parking Spaces Plan for Chamber of Commerce

ITEM 6.2

ATTACHMENT [1]


PAGE 134 Capital Works Program - October 2016

ATTACHMENT [2]

Devonport City Council Capital Works Income & Expenditure Report for November 2016 (as at 22/11/2016) Income 2016/17

Annual Budget

Additional Funds Carried forward & adjustments

$

$

Expenditure 2016/17

Performance Measures

Balance

Total Budget Available

External Funding Included in Total

Forecast

Actual

Commitments

Total Expenditure

Remaining Funds

Works Start

$

$

$

$

$

$

$

Month

Month

CF

Jan 2017

Works % Completion Budget

Comments

Spent

Summary Open Space & Recreation

Facilities Stormwater Transport Living City Plant & Fleet Other Equipment

Total Capital Works

414,000

343,995

757,995

29,000

721,552

104,590

65,569

170,159

587,836

2,224,000 742,000 5,517,000 30,000,000 809,300 152,000

122,418 55,273 519,722 704,915 189,499 206,643

2,346,418 797,273 6,036,722 30,704,915 998,799 358,643

1,399,434 15,500,000 -

2,327,741 811,444 6,321,810 30,704,915 998,799 358,643

173,271 133,396 1,100,166 4,120,453 158,468 68,085

163,216 11,847 1,986,456 429,003 40,624 11,015

336,487 145,243 3,086,622 4,549,456 199,092 79,100

2,009,931 652,030 2,950,100 26,155,459 799,707 279,543

39,858,300

2,142,465

42,000,765

16,928,434

42,244,904

5,858,430

2,707,730

8,566,160

33,434,605

100,907

100,907

100,907

44,985

27,489

72,474

28,433

Open Space & Recreation CP0099

Mersey Vale - MBS stage 1

CP0106

Mersey Vale - Memorial Garden

38,584

CP0111 CP0116

Pioneer Park - New Toilets & Parenting Facilities Dev onport Ov al Practice Wicket Upgrade

18,762

18,762

19,200

19,200

5,000

5,000

CP0120 CP0121 CP0124 CP0125 CP0126 CP0127

71.8% Const ruct ion nearing complet ion, lid lift ing equipment due t o arrive one sit e shed is const ruct ed

38,584

38,584

-

3,425

3,425

35,159

CF

Jan 2017

8.9% Final not ice has been given t o cont ract or advising default of final payment - arranging quot at ions for final defect s t o be resolved

Sister Cities - 20 year Anniv ersary , Cherry Blossom Julie Burgess - interpretiv e and information signage Mariners Park - Seawall mowing strip Victoria Parade boat ramp shared path alterations Victoria Parade shared path rail crossing Bluff Road - Fitness equipment renewal

CP0128 CP0129

Signage Strategy Actions Don Riv er Rail Trail - Don to Tugrah grav el track

CP0130 CP0131

Home Hill - Facility signage Path lighting - Victoria Parade, 250m from Cenotaph north

CP0132 CP0133

Pioneer Park - road safety bike park Mersey Vale Cemetery - Niche wall fence

Total Open Space & Recreation

10,266

10,266 -

-

10,266 -

8,496

CF

completed

19,200

CF

TBA

(1,253)

CF

completed

54.7% 0.0% Financial cont ribut ion only once works are complet ed by Club

10,000 30,000 90,000

35,000

6,253

6,253

-

6,253

10,000

CF

completed

30,000

30,000

2,241

-

2,241

27,759

Nov 2016

Dec 2016

10,000

125.1% Addit ional cost s due t o underground rock 0.0% 7.5% Design progressing

125,000

125,000

180

-

180

124,820

Mar 2017

Apr 2017

0.1%

15,000

15,000

15,000

30

-

30

14,970

Mar 2017

Apr 2017

0.2%

70,000

70,000

70,000

32,595

65,050

4,950

Nov 2016

Dec 2016

66,542

66,542

-

-

-

66,542

Nov 2016

June 2017

86,000

86,000

86,000

172

-

172

85,828

TBA

TBA

5,000

5,000

5,000

-

-

-

5,000

Mar 2017

Apr 2017

0.0%

52,000

52,000

52,000

104

-

104

51,896

Mar 2017

Apr 2017

0.2% Light ing opt ions being invest igat ed

109,000

2,520

7,000

5,244

721,552

104,590

32,455

92.9% Quot at ion accept ed - equipment being const ruct ed off sit e

30,000

36,542

0.0% 0.2% Await ing approval from land owners t o progress land acquisit ions

29,000

80,000

7,000 414,000

Facilities

109,000

29,000

7,000 343,995

757,995

29,000

65,569

104,280 1,756

170,159

587,836

Dec 2016 completed

4.3% Design progressing 74.9% 22.4%

Public Art

23,418

23,418

23,418

23,418

CF

TBA

Mersey Vale Cemetery - Depot Shed & Staff Amenities Improv ements

84,000

84,000

81,599

81,599

-

81,599

2,401

CF

completed

97.1%

CB0072

15,000

15,000

7,197

7,197

-

7,197

7,803

CF

completed

48.0%

CB0074

Fourways Car Park Toilet & Parenting Facilities Upgrade Aquatic Centre Pool Heating System

45,000

45,000

36,527

29,734

8,383

81.4%

CB0075

DECC - Accessible seating

20,000

20,000

20,000

CB0076

Aquatic Centre - Rainwater Tanks

14,000

14,000

14,000

CB0077

Aquatic Centre - HVAC works

CB0078

Works Depot – Vehicle wash bay

CB0079

Waste Transfer Station - Push pit roof

CB0080

Art Gallery and DECC Integration

CB0081

BSMC - Facility signage

5,400

6,883 800

-

CF completed

CB0069

-

-

4,720 5,244

CB0059

36,617 6,200

completed

completed

20,000

Dec 2016

Jan 2107

7,800

Mar 2017

Mar 2017

90,000

90,000

90,000

180

-

180

89,820

Nov 2016

Dec 2016

100,000

100,000

100,000

200

-

200

99,800

TBA

TBA

150,000

150,000

150,000

688

6,750

7,438

142,562

1,800,000

1,800,000

1,800,000

48,272

146,884

195,156

1,604,844

5,000

Total Facilities

-

2,200

2,224,000

5,000 122,418

2,346,418

5,000 -

2,327,741

173,271

ITEM 6.2

1,899

1,899

3,101

163,216

336,487

2,009,931

0.0%

0.0% Design progressing 44.3% 0.2% 0.2% Design opt ions being invest igat ed

TBA

TBA

5.0% Design progressing

Apr 2017

Dec 2017

10.8% Design progressing

TBA

Nov 2016

38.0% Quot at ions request ed 14.3%


PAGE 135 Capital Works Program - October 2016

ATTACHMENT [2]

Income 2016/17

Annual Budget $

Transport

Additional Funds Carried forward & adjustments $

Total Budget Available $

Expenditure 2016/17 External Funding Included in Total $

Forecast $

Actual $

Commitments $

Total Expenditure $

Remaining Funds $

Works Start Month

Works % Completion Budget Month Spent

Winspears Road Footpath Renewal

27,238

27,238

23,500

23,125

CT0151

Mersey Road Footpath Renewal

30,902

30,902

15,000

1,423

CT0152

Mersey Bluff Carav an Park -Internal Road

89,820

89,820

86,000

80,503

CT0156

Stony Rise Road New Footpath - Middle Road to

22,066

22,066

15,000

14,847

CT0159

Kelcey Tier - Mersey Main Road Junction

193,225

193,225

193,000

189,712

CT0160

Dev onport Road - McLeod Av enue to Horsehead

131,661

144,000

131,690

CT0164

Steele St Fenton St Intersection Upgrade

550,000

550,000

550,000

41,345

CT0165

William St Renewal Best St- Stewart St

500,000

500,000

500,000

45,258

476,035

CT0166

800,000

800,000

886,000

46,782

706,090

752,872

47,128

Nov 2016

Mar 2017

94.1% Const ruct ion progressing - increased project

CT0167

Dev onport Rd Formby Rd Westport Rd Intersection Renewal Reseal Program 2016-17

700,000

700,000

650,000

316,074

230,932

547,006

152,994

Oct 2016

Dec 2016

78.1% Asphalt work complet e, spray seal programmed in

CT0168

Buster Rd (Don Riv er) approach barriers

25,000

25,000

18,000

18,224

18,224

6,776

Sept 2016

completed

CT0169

Formby Road & Best Street intersection safety

275,000

275,000

275,000

6,161

-

6,161

268,839

Feb 2017

Apr 2017

CT0170

Stephen & Caroline Sts new footpath - northern link to EDRC

60,000

60,000

62,000

60,881

455

61,335

(1,335)

completed

completed

CT0171

Woodrising Av e new footpath - Leila Av to Walter St

55,000

55,000

45,000

43,570

43,570

11,430

completed

completed

CT0172

William St safety improv ements - North St to Bluff

50,000

50,000

59,000

10,215

41,764

51,979

(1,979)

Oct 2016

Dec 2016

104.0% Const ruct ion pending

CT0173

Madden St and Ronald St safety improv ements blackspot

200,000

200,000

200,000

200,000

4,938

3,125

8,063

191,937

Jan 2017

Apr 2017

4.0% Design progressing

CT0174

Tarleton St and Thomas St safety improv ements blackspot

95,000

95,000

95,000

95,000

1,863

1,863

93,137

TBA

TBA

2.0% Design progressing

CT0175

Victoria Parade boat ramp - pedestrian priority

15,000

15,000

15,000

30

-

30

14,970

May 2017

May 2017

CT0176

Tarleton St Wright St safety improv ements - blackspot

125,000

125,000

95,000

125,000

3,557

-

3,557

121,443

Feb 2017

March 2017

CT0177

Don Reserv e - Sawdust bridge renewal

262,000

262,000

262,000

2,426

-

2,426

259,574

Mar 2017

Apr 2017

CT0178

Middle Road interchange off ramp improv ements

75,000

75,000

CT0179

Road traffic dev ice renewal

25,000

25,000

CT0180

Street light prov ision

20,000

CT0181

Transport minor works

25,000

CT0182

Parking infrastructure renewal

25,000

CT0183

Steele-Rooke-MacFie intersection renewal

CT0184

Wright St and Norton Way intersection renewal

80,000

80,000

CT0185

Newton Street renewal

125,000

125,000

125,000

CT0186

Elizabeth St renewal - Forbes to Hiller

225,000

225,000

200,000

CT0187

Ronald St renewal - Madden to Parker

165,000

165,000

165,000

CT0188

North Caroline St car park renewal

50,000

50,000

50,000

2,449

-

CT0189

Buster Road renewal - west of Don Riv er (stage 1)

450,000

450,000

300,000

8,052

-

CT0190

Soccer Club Seal car park

190,000

190,000

204,000

9,733

-

9,733

CT0193

Durkins Road reconstruction

4,113

CF

completed

84.9%

5,174

25,728

CF

completed

16.7%

-

80,503

9,317

CF

completed

89.6%

-

14,847

7,219

CF

completed

67.3%

195,076

(1,851)

CF

completed

101.0%

12,273

143,963

(12,302)

CF

completed

109.3%

430,969

472,313

77,687

Nov 2016

Feb 2017

521,294

(21,294)

Nov 2016

Mar 2017

3,750

5,364

85.9% Const ruct ion progressing - increased project budget approved IMC 32/16

374,434

104.3% Const ruct ion progressing, delayed due t o hold-up from St at e Growt h regarding t he school crossing increased project budget approved IMC 32/16 budget approved IMC 32/16 December

24,810

350,000

70,000

75,000

-

-

-

5,517,000

519,722

72.9% 2.2% Design progressing 102.2% 79.2%

0.2% 2.8% Design progressing 0.9% Tender report t o December Council Meet ing

75,000

150

-

150

74,850

TBA

TBA

0.2%

25,000

50

-

50

24,950

Jan 2017

Feb 2017

0.2%

20,000

20,000

6,832

13,812

6,188

TBA

TBA

69.1%

25,000

25,000

815

-

815

24,185

Nov 2016

Dec 2016

3.3%

49,810

49,810

50

-

50

49,760

Feb 2017

Mar 2017

0.1%

350,000

350,000

737

710

1,447

348,553

Feb 2017

Apr 2017

0.4%

83,500

6,456

68,009

74,464

5,536

Jan 2017

Mar 2017

93.1% Const ruct ion pending

100,000

6,812

-

6,812

118,188

Jan 2017

Mar 2017

5.4% Const ruct ion pending

234,000

11,856

-

11,856

213,144

Nov 2016

Jan 2017

5.3% Tender report t o November Council Meet ing

165,000

3,549

-

3,549

161,451

Feb 2017

Apr 2017

2.2% Design progressing

2,449

47,551

Nov 2016

Jan 2017

4.9% Design progressing

8,052

441,948

Apr 2017

Jun 2017

1.8% Budget reduced t o $300,000 (res 189/16)

180,267

Dec 2016

Jan 2017

5.1% Tender report t o November Council Meet ing

Nov 2016

Feb 2017

6,980

422,000

Total Transport

23,125

Comments

CT0138

131,661

-

Performance Measures

Balance

6,036,722

1,399,434

6,321,810

1,100,166

ITEM 6.2

1,986,456

3,086,622

2,950,100

Proejct added at Oct ober Council (res 189/16)

51.1%


PAGE 136 Capital Works Program - October 2016

ATTACHMENT [2]

Income 2016/17

Annual Budget $

Additional Funds Carried forward & adjustments $

Total Budget Available $

Expenditure 2016/17 External Funding Included in Total $

Forecast $

Actual $

Performance Measures

Balance

Commitments $

Total Expenditure $

Remaining Funds $

Works Start Month

Works % Completion Budget Month Spent

Comments

Stormwater CS0042

William SW Catchment Upgrade - Stage 5

25,607

25,607

20,044

20,044

-

20,044

5,563

CF

completed

CS0045

Melrose Road - new culv ert near No.772

29,666

29,666

49,400

38,026

53

38,078

(8,412)

CF

completed

CS0050

Minor Stormwater Works 2016-17

CS0051

William SW Catchment Upgrade - Stage 6

78.3% 128.4% scope of work increased t o eliminat e drainage issue - ext ra cost s t o be offeset from savings on ot her project s

30,000

30,000

30,000

24,940

-

24,940

5,060

Aug-16

Nov -16

275,000

275,000

275,000

10,898

1,687

12,585

262,415

Jan-17

Mar-17

30,000

30,000

6,799

8,614

15,413

14,587

Nov -16

Dec-16

53

83.1% 4.6% Tender report t o Dec IW&D Commit t ee Meet ing

CS0052

Stormwater outfall risk management -Mersey Bluff

30,000

CS0053

Tugrah Road Duplication of pipe crossing

45,000

45,000

45,000

315

368

44,632

Dec-16

Mar-17

0.8% Design progressing

CS0054

Elanora car park - drainage improv ements

12,000

12,000

12,000

24

-

24

11,976

Mar-17

Apr-17

0.2%

CS0055

Squibbs Road drainage improv ements

90,000

90,000

90,000

9,403

-

9,403

80,597

TBA

TBA

CS0056

Tugrah Road Roberton Close Stormwater

50,000

50,000

50,000

4,317

-

4,317

45,683

Dec-16

Mar-17

CS0057

Waste Transfer Station - litter capture

30,000

30,000

30,000

60

CS0058

Pit replacements

50,000

50,000

50,000

17,629

CS0059

49 Sorell st stormwater renewal

75,000

75,000

75,000

646

CS0060

Sorell Laneway drainage

55,000

55,000

55,000

296

1,200

811,444

133,396

11,847

145,243

652,030

Total Stormwater

51.4% Const ruct ion progressing

10.4% Design on hold - pending out come of ident ified t hreat ened species

742,000

55,273

797,273

-

240 -

8.6% Const ruct ion pending

60

29,940

Mar-17

Mar-17

17,869

32,131

Nov -16

Feb-17

0.2%

646

74,354

Mar-17

Apr-17

0.9%

1,496

53,504

Jan-17

Feb-17

2.7% Design progressing

35.7% Const ruct ion progressing

18.2%

Plant & Fleet CF0017

Hire Plant Replacement Plan (including disposal

CF0018

Minor Plant Replacement Plan (including disposal

CF0016

Fleet Replacement Plan (including disposal

Total Plant & Fleet

603,800

603,800

603,800

44,641

-

44,641

559,159

NA

NA

7.4% List of ident ified it ems t o be progressively

32,000

48,316

80,316

80,316

14,106

-

14,106

66,210

NA

NA

d ified it ems t o be progressively 17.6% List ofhident

173,500

141,183

314,683

314,683

99,722

140,346

174,337

NA

NA

d ified it ems t o be progressively 44.6% List ofhident

40,624

h

809,300

189,499

998,799

-

998,799

d

158,468

40,624

199,092

799,707

19.9%

11,015

29,464

110,034

NA

NA

21.1% List of ident ified it ems t o be progressively

49,636

169,509

NA

NA

h d program of IT infrast ruct ure upgrades 22.6% Ongoing

Other Equipment CE0007

Office Equipment

78,000

61,498

139,498

139,498

18,449

CC0007

Information Technology - Renewal & Upgrades

74,000

145,145

219,145

219,145

49,636

152,000

206,643

358,643

358,643

68,085

11,015

79,100

279,543

22.1%

9,858,300

1,437,550

11,295,850

11,539,989

1,737,977

2,278,727

4,016,704

7,279,146

35.6%

Total Other Equipment TOTAL CAPITAL EXPENDITURE - EXCLUDING LIVING CITY

1,428,434

-

Living City CB0068

Liv ing City - Strategic Initiativ es

Total Living City TOTAL CAPITAL EXPENDITURE - INCLUDING LIVING CITY

30,000,000

704,915

30,704,915

15,500,000

30,704,915

4,120,453

429,003

4,549,456

26,155,459

30,000,000

704,915

30,704,915

15,500,000

30,704,915

4,120,453

429,003

4,549,456

26,155,459

14.8%

39,858,300

2,142,465

42,000,765

16,928,434

42,244,904

5,858,430

2,707,730

8,566,160

33,434,605

20.4%

ITEM 6.2

July 2016

June 2017

14.8% Project to continue through duration of

Â


PAGE 137 Infrastructure Works and Development Committee meeting Agenda 5 December 2016

7.0

CLOSURE

There being no further business the Chairman declared the meeting closed at

pm.