Page 1 of 2 MINUTES OF A PLANNING AUTHORITY COMMITTEE MEETING OF THE DEVONPORT CITY COUNCIL HELD IN THE COUNCIL CHAMBERS ON MONDAY, 11 JANUARY 2016 COMMENCING AT 11:00AM PRESENT:
Ald S L Martin (Mayor) in the Chair Ald C D Emmerton Ald G F Goodwin Ald L M Perry
Council Officers: General Manager, P West Manager Development and Health Services, B May Planning and Environmental Health Coordinator, S Warren Cadet Planner, A Mountney Audio Recording: All persons in attendance were advised that it is Council policy to record Council meetings, in accordance with Council’s Audio Recording Policy. The audio recording of this meeting will be made available to the public on Council’s website for a period of six months. 1.0
APOLOGIES The following apology was received for the meeting. Ald Matthews
2.0
Apology
DECLARATIONS OF INTEREST There were no Declarations of Interest.
3.0 DELEGATED APPROVALS Nil
4.0 DEVELOPMENT REPORTS 4.1
PA2015.0152 - RESIDENTIAL (POOL ENCLOSURE) - ASSESSMENT AGAINST PERFORMANCE CRITERIA UNDER CLAUSE 13.4.1, 13.4.2 AND 13.4.3 - 195 TUGRAH ROAD TUGRAH (D399716) PAC 01/16 RESOLUTION MOVED: SECONDED:
Ald Goodwin Ald Perry
That Council, pursuant to the provisions of the Devonport Interim Planning Scheme 2013 and Section 57 of the Land Use Planning and Approvals Act 1993, approve application PA2015.0152 and grant a Permit to use and develop land identified as 195 Tugrah Road, Tugrah for the following purposes:
Residential (pool enclosure) – assessment against performance criteria under Clause 13.4.1, 13.4.2 and 13.4.3
Subject to the following conditions: 1.
The Use and Development is to proceed generally in accordance with the submitted plans referenced as ‘Proposed Pool Enclosure’ – Project
Minutes of Planning Authority Committee meeting held 11 January 2016
Page 2 of 2 No. 15-251 (DWG. 101-105) by Lachlan Walsh Design, copies of which are attached and endorsed as documents forming part of this Planning Permit. 2.
The developer is to have the existing on-site waste water management system re-assessed and a new on-site waste water report undertaken by a suitably qualified person if the pool enclosure results in the generation of additional waste water loadings. This report is to be submitted with the Building Application.
3.
The developer is to ensure that the emptying of the pool and any backwash water when required is not directed to the existing on-site waste water management area.
4.
The developer is to ensure that backwash from the proposed pool is not to be connected to the AWTS or the irrigation area unless approved by a suitably qualified on-site waste water designer.
Note: The following is provided for information purposes. In regard to condition 3 any alternative arrangement is to be submitted by a suitability qualified consultant. During the construction or use of these facilities all measures are be taken to prevent nuisance. Air, noise and water pollution matters are subject to provisions of the Building Regulations or the Environmental Management and Pollution Control Act 1994. All electrical equipment, including pumps and filters installed in association with the pool/spa are to be housed so as not to create a noise nuisance to neighbouring properties. Pool treatment chemicals are to be stored in a location that will ensure that they are kept dry.
THIS IS NOT A BUILDING PERMIT. You need to provide a copy of this planning permit to a registered Tasmanian Building Surveyor. WORK CANNOT COMMENCE UNTIL BUILDING AND PLUMBING PERMITS ARE ISSUED. Enquiries regarding conditions and notes can be directed to Council’s Development and Health Services Department – Ph 6424 0511.
Ald Martin Ald Emmerton
For
Against Ald Goodwin Ald Perry
For
Against
CARRIED UNANIMOUSLY With no further business on the agenda the Chairman declared the meeting closed at 11:01am. Confirmed
Chairman Minutes of Planning Authority Committee meeting held 11 January 2016