Appropriateness of using a Kanban System - Webinar

Page 1

July 2018

1

Appropriateness of using a Kanban System

06-06-2018

Hangout Agile Network Supported by DIAAME

“Success is no accident. It is hard work, perseverance, learning, studying, sacrifice, and most of all, love of what you are doing” – Pele, The foot ball legend © 2018 DIAAME Consulting Services, All Rights Reserved.

@ Your Project Environment


July 2018

2

AGENDA Deferred Commitment is Desirable

Overburdening

TKPÂŽ Program Benefits

01

Appropriateness of Using a Kanban System

03

Unevenness in the Flow of Work

05

Bulletin Board, Q & A

02

04

06 Š 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

3 Appropriateness of using a Kanban System

When should we use a kanban pull system?  Realize that we apply kanban systems to a service delivery workflow.  Assuming we have identified workflow  Assuming we can describe the types of work it processes  Assuming we have identified the service interface and service levels it offers  IT system software maintenance and sustained (or business as usual) engineering. This is the classic example of an IT service within most large corporates. © 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

4

Appropriateness of using a Kanban System

Reasons for choosing a Kanban system?  Deferred commitment is desirable – because early commitment is causing excessive re-work and wasted effort  There is unevenness in the flow of work – and we want smooth, even flow  The workflow system (and its workers) are overburdened – and we wish to relieve this © 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

5 Appropriateness of using a Kanban System

Deferred commitment is desirable – because early commitment is causing excessive re-work and wasted effort       

The future is uncertain Things might change Priorities are often changing Re-planning is common and frequent There is a high abandonment rate for incoming requests There is a high discard rate for incoming requests There is a high abort rate for committed requests where work already started  There is a high level of delivered work which is ignored, never used or never commissioned for use in the field © 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

6 Appropriateness of using a Kanban System

Unevenness in the Flow of Work  This is caused by  Large batch transfers  Unplanned, Speculative, Disruptive Work Requests  Blocking issues © 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

7 Appropriateness of using a Kanban System

Overburdening  This can be observed by:      

long queues of requests waiting to be serviced too much work-in-progress too much multi-tasking and task switching stressed workers poor quality long and unpredictable lead times © 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

8

TKP® Program Benefits

© 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

9

BULLETIN BOARD

© 2018 DIAAME Consulting Services, All Rights Reserved.


July 2018

10 Address: Regus Business Centre, 1st Floor, Pine Valley, Embassy Golf Links Business Park (EGL) Domlur, Bangalore 560071

Thanks For Watching

Contact Numbers: +91 914 802 6666 +91 914 842 6666 +91 702 538 6666 +91 702 538 1111

Visit us: https://www.diaame.com https://www.hangoutagile.com

Email Address: info@diaame.com services@diaame.com

Š 2018 DIAAME Consulting Services, All Rights Reserved.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.