02
Sports Centre
03
Brighton
Site plan
Key to areas
Ground floor plan
1. Staff Ancillery 2. Reception area and atrium space 3. Staff changing rooms 4. Toilet facilities 5. Cafeteria 6. Storage 7. Kitchen 8. Play area 9. Creche 10. Fire escape 1
3 2
Section showing the main Sports Hall 4
6 5
7
8
9
10
First floor plan
1 2
3
4
6
7
Longitudinal Section
5
Key to areas 1. Storage 2. Changing rooms 3. Main Sports hall 4. Ancillery Hall 5. Meeting room 1 6. Meeting room 2 7. Fire escape
Interior render showing the Cafeteria and Atrium Space
Materials
Interior Render showing the Reception area
Glue laminated wooden cladding for the entrance lobby
1:5 Wall Detail @A0
Floor construction: Hollow core oors
Environmental response
04