Student Internship Report Student Name: Diana Enab Student ID: 1057895 Internship Company Name: AEC Internship Semester: Summer 2021-2022 Internship Total Hours: 240 hrs (6 weeks) Faculty Supervisor: Mohamed Elkaftangui



Content 1- Introduction 2- Internship Sheets 3- Internship Tasks 4- Conclusion


Introduction


About Company

01

I. Company Birth

III. Company Supervision

AEC is one of The Leading Architectural and Engineering Consultancy Offices in UAE and has been in the Local Market since 1982.

Eng. Maher Lamie Founder of the company.

II. Vision A.E.C.’s philosophy of providing innovative architectural solutions with consistently high levels of service and competence results in the clear communication of alternatives and recommendations so that sound decisions are made with confidence to the best interest of the client. - AEC maintains and commits to an integrated management system to facilitate the reduction of the impact/risk and hazards associated with its operations, activities, products, and services. We continuously strive to Identify materials, processes or products that may cause harm to humans and the environment.

Eng. Ahmed KamelDesign Operations Manager in AEC & my Internship Company Supervisor. IV. Branches and Projects scope Currently having 2 branches in Al Ain and Cairo besides the head office in Abu Dhabi. Projects completed by A.E.C. in the U.A.E., Egypt, France, UK, Oman, Qatar, Saudi Arabia, Seychelles, Tanzania, China, Pakistan and Libya reflect contemporary architectural theory and encompass modern conveniences while maintaining classic functionality.


01

About Company

About Company

01

V. Area of Expertise:

III. Area of Expertise Architecture Design

Landscape architecture

Structural Engineering

Master planning

Interior Design

Feasibility studies

Urban Planning

Value engineering

Quantity Surveying

Tendering & Construction

Project Supervision

Project management

Road related engineering

Civil work & transportation


02

Company Projects

Company Projects

02

1. Company Project Categories

I. Categories

Commercial

Recreation

Cultural

Religious

Educational

Office Buildings

Governmental

Multistory Bldg

Health

Local Consultant

Hotels

Interior Design

Industrial

Master Planning


Company Project

02

II. Company Project Examples



Internship sheets





Internship Tasks


Internship Timeline Week 1

Architectural Drawings: Project Title: [C46]: Residential & Commercial Building

Week 2 Week 3

Toilets & Bathroom Details: Project Title: [C44]: Residential & Commercial Building [C47]: Hotel Apartment Building

Week 4

Flats & Retails Area:

Week 5

Project Title: [C10]: Residential & Commercial Tower Fire & Life Safety Strategy Drawings: [C46]: Residential & Commercial Building [C1]: Coptic Church

Week 6 Architectural Modifications: Project Title: [C11]: Residential & Commercial Tower [C15]: Residential & Commercial Tower


01

Architectural Drawings: Project Title: [C46]: Residential & Commercial Building Understanding Architectural Drawings * Entrances * Circulation * Divisions * Levels * Annotation * Hatches * Openings

Assigning Print Layout Settings according to Company Code: * Paper Size * Scale and Units * Plot Style (Pen Assignments)

Assigning Proper Documents Settings for Submission: * Proper Drawings Titles * Revision name and code * Plot Number * Authorities logo & sign


List

Internal Finishes

Typical Plans

Roof Plan

Elevations

Sections

Stairs

Preparation of Compiled Architectural Drawings for Submission (to get approval from bank):

Site Plan

01

Architectural Drawings: Project Title: [C46]: Residential & Commercial Building

*Proper sheet Order & format *Proper scale, updates, etc.


02

Architectural Drawings: Project Title: [C46]: Residential & Commercial Building Checked Format of Project Submission to Tanasok, Abu Dhabi Municipality: *Project Description *Selected Criteria *Street view Perspectives (both daytime and night time), *Roof view Perspectives *Elevations *Site Location at Google maps *Photographs of current site *Environmental Studies *Sun & Shade Studies Checked Format of Feasibility Study Report submitted to ADCE (Abu Dhabi Commercial Engineering Services): *Conceptual Area Breakdown *Conceptual Cost Estimate *Projected Returns on Investments *Conceptual Design Drawings Checked Municipality regulations & building codes


03 04

Toilets & Bathroom Details: [C44]: Residential & Commercial Building & [C47]: Hotel Apartment Building Producing Toilets & Bathroom Detailed Drawings * Sections * Plans * List * Materials * Annotation * Hatches *Light *Furniture

Key plan to link toilets & bathrooms location & title

Material: Fixation, Dimensions, Thickness, Type

Application of Lights considers centering the light fixture at room area, surrounded by ceiling tiles at same dimensions, and filling the rest with gypsum board.

-Including details of drawing according to scale for all building floors (Ground, Mezzanine, Typical and Roof): Plans: Brickwork, Finishes, Floor Tiles, Wall Tiles, Hatches, Centering Furniture according to Dimensions, Door, Skirting, Covers, and Drainage. Section: Brickwork, Finished, Floor Tiles, Wall Tiles, Hatches, Centering Furniture according to Dimensions, Door, Skirting, Covers, False Ceiling and Lighting Fixtures


05

Flats & Retails Area: [C10]: Residential & Commercial Tower

* AREAS ARE BASED ON CARPET AREA ONLY.

Unit

Flats

Living Room / Foyer / Dining

Living Room Balcony

Corridor

Maid room

Corridor FR Lobby

Maid Toilet

Powder Room

Kitchen Balcony

Kitchen

M. Bedroom

M Bedroom Toilet

Master Bedroom Balcony M. Bedroom 2

M Bedroom Toilet Master Bedroom 2 M. Bedroom 3 2 Balcony

M Bedroom Toilet Master Bedroom Bed Room 3 3 Balcony

Bed Room Balcony

4 GR-BR 01

6.1 (shared with living room) GR-BR 01

4.1 FR-BR 02

6.2 FR-BR 03

3 FR-BR 01

6.1 FR-BR 03

7.2 FR-BR 03

Bed Room Balcony 2

Bed Room 2

Bathroom

Iron/Dryer

Jan.

Store

Laundry

Total; Area -

G01 Duplix

29.7

-

-

5.2

14.1

10.2

G02 Duplix

29.7

-

-

7.9

11.5

G03 Duplix

22.2

-

-

6.3

G04 Duplix

22.2

-

-

G05 Duplix

22.2

-

-

G06 Duplix

23.2

-

-

101 2 BR

6.7 (shared 19 with Bedroom2)

102 2 BR

20

103 2 BR

23.7

104 1 BR

22.4

105 1 BR

22.4

106 1 BR

26.6

107 1 BR

21.9

11.1 7.1 (shared with Master Bedroom) 7.1 (shared with Master Bedroom) 7.1 (shared with Master Bedroom) 8.8

2.8

2.6

11.1

- 18.6 GR-BR 01

-

-

2.4

6.1 (shared 14.6 with living room)

13

-

-

2.2

10.1

- 15.5 GR-BR 01

4.4 GR-BR

6.3

13

-

-

2.2

10.1

- 15.5 GR-BR 01

4.4 GR-BR

6.3

13

-

-

2.2

10.1

- 15.5 GR-BR 01

4.4 GR-BR

5.8

12.5

6.7

3.6

2.2

10.7

- 15.5 GR-BR 01

4.4 GR-BR

20 FR-BR 03

8.7 (shared with living room) GR-BR 01 8.7 (shared with living room) GR-BR 01 8.7 (shared with living room) GR-BR 01 8.7 (shared with living room) GR-BR 01

9.4

3.5

-

-

2.5

11

-

23.3

4.7

9.7

3.7

-

-

2.8

10.6

-

23.1

4.8

13.2

2.4

-

-

2.8

10.4

-

20.1

5.6

-

5.8

-

-

2.6

11

-

22.8

4.5

-

5.8

-

-

2.6

11

-

17.9 FR-BR 02

-

-

21 FR-BR 03 -

7.3 FR-BR 03 -

22.4 FR-BR 01 -

16.1 FR-BR 01

-

6.3

3.1

1.9

2.1

79.5

23.6 FR-BR 02

6.6 FR-BR 02

14.3 FR-BR 02

-

-

-

-

-

6.9

3.2

-

1.9

65.8

19.3 FR-BR 02

3.9 FR-BR 02

-

23.6 FR-BR 01

6.6 FR-BR 01

14.3 FR-BR 01

-

-

-

-

-

6.9

3.2

-

1.9

65.8

19.3 FR-BR 01

3.9 FR-BR 01

-

23.6 FR-BR 02

6.6 FR-BR 02

14.3 FR-BR 02

-

-

-

-

-

6.9

3.2

-

1.9

65.8

19 FR-BR 02

3.9 FR-BR 02

-

27.8 FR-BR 01

6.0 FR-BR 01

14.3 FR-BR 01

-

-

-

-

-

-

-

-

1.9

66.6

3.3

-

-

6.8

-

4

-

-

5.8

0.8

102.6

4

-

-

6.1

-

121.5

6.7 (shared with 19.3 living room)

-

-

-

-

-

-

-

6.2 (shared with Living Room)

-

-

-

-

-

-

-

-

-

0.8

69.9

22.8

6.2 (shared with Living 4.5 Room)

-

-

-

-

-

-

-

-

-

0.8

69.9

-

-

-

-

-

-

-

-

-

-

68

-

-

-

-

-

-

-

-

-

-

85.6

-

-

-

-

-

-

-

-

-

0.8

64.6

-

-

-

-

-

-

-

-

-

0.7

64.5

-

-

-

-

-

-

-

-

-

0.8

66.5

20

4.8

6.9

-

-

-

-

-

-

1.9

109

-

-

-

-

-

0.7

80.1

4.3

-

-

6.8

-

6.5

-

6.3

-

-

2.1

9.1

-

19.1

-

6.4

-

-

2.3

7.2

-

25.6

6.6

6.8 11.4 (shared with Living 6.2 Room) 9.6 (shared with Living 6 Room) 6.9 (shared with Living 6.1 Room)

6.7 (shared with 17.3 Master Bedroom) 15.6 -

-

6.7

-

-

2.4

8.5

-

19.5

7

-

-

2.3

7.9

-

19.6

110 1 BR

21.7

-

-

7

-

-

2.3

7.9

-

20.7

-

12.2

6.8

-

2.5

8.1

-

18.9

5

-

6.2

-

-

2.6

12.4

-

22.4

4.5

-

-

-

-

-

9.4

3.5

-

-

2.5

11

-

23.3

4.7

-

-

-

-

19.3

20

204 1 BR

21.7

205 1 BR

22.4

206 1 BR

26.6

207 1 BR

21.9

9.7 (shared with Kitchen) 11.1 7.2 (shared with Master Bedroom) 7.1 (shared with Master Bedroom) 7.1 (shared with Master Bedroom) 8.7

9.6

3.7

-

-

2.8

-

13.6

-

-

2.8

-

6.4

-

-

2.6

-

5.8

-

-

2.6

11

11

-

-

23

4.8

19.9

5.6

22.8

4.5

-

6.2 (shared with Living Room)

-

-

-

-

-

22.8

6.3 (shared with Living 4.5 Room)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

68

-

-

-

-

-

-

-

-

-

-

86

-

-

-

-

-

-

-

-

-

0.8

64.7

-

-

-

-

-

-

-

-

-

0.7

64.6

-

-

-

-

-

-

-

-

-

0.8

66.4

20

4.8

6.5

-

-

-

-

-

-

1.9

108.6

-

-

-

-

0.7

4.3

-

-

6.8

-

-

6.3

-

-

2.1

9.1

-

19.1

-

6.4

-

-

2.3

7.2

-

25.6

6.6

7.3 11.3 (shared with Living 6.2 Room) 9.5 (shared with Living 6 Room) 7.4 (shared with Living 6.1 Room)

-

-

6.7

-

-

2.4

8.5

-

19.5

-

7

-

-

2.3

7.9

-

19.6

210 1 BR

21.6

-

-

7

-

-

2.3

7.9

-

20.7

-

12.2

6.8

-

2.5

8.1

-

18.9

5

20

303 2 BR

23.7

304 1 BR

21.7

305 1 BR

22.4

306 1 BR

26.6

307 1 BR

21.9

10 (shared with Kitchen) 10.5 7.2 (shared with Master Bedroom) 7.2 (shared with Master Bedroom) 7.1 (shared with Master Bedroom) 8.7

6.5

6.2 (shared with Living 4.8 Room)

-

302 2 BR

5.7 (shared with Living Room)

0.8

102.5

6.1

-

119.2

-

-

-

-

0.8

69.8

-

-

-

-

0.8

69.9

-

-

2.6

12.4

-

22.4

4.5

-

-

-

-

-

-

-

2.5

11

-

23.3

4.7

-

-

-

-

19.3

9.6

3.7

-

-

2.8

23

4.8

-

-

-

-

13.6

-

-

2.8

19.9

5.6

-

-

-

-

6.4

-

-

2.6

22.8

4.5

6.2 (shared with Living Room)

-

-

-

-

-

22.8

6.3 (shared with Living 4.5 Room)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

68

-

-

-

-

-

-

-

-

-

-

85.5

-

-

-

-

-

-

-

-

-

0.8

64.7

-

-

-

-

-

-

-

-

-

0.7

64.5

-

-

-

-

-

-

-

-

-

0.8

66.5

20

4.8

6.9

-

-

-

-

-

-

1.9

109

-

-

-

-

-

0.7

80.2

4.3

-

-

6.8

-

-

5.8

-

-

2.6

11

11

-

-

6.7 (shared with Bedroom2 ) 6.6

-

6.3

-

-

2.1

9.1

-

19.1

6.2 (shared with Living 4.8 Room)

-

6.4

-

-

2.3

7.2

-

25.6

6.6

6.8 11.4 (shared with Living 6.2 Room) 9.6 (shared with Living 6 Room) 6.9 (shared with Living 6.1 Room)

-

-

6.7

-

-

2.4

8.5

-

19.5

-

-

7

-

-

2.3

7.9

-

19.6

310 1 BR

21.7

-

-

7

-

-

2.3

7.9

-

20.7

-

12.2

6.8

-

2.5

8.1

-

18.9

5

-

6.2

-

-

2.6

12.4

-

22.4

4.5

-

-

-

-

-

9.4

3.5

-

-

2.5

11

-

23.3

4.7

-

-

-

-

19.3

5.7 (shared with Living Room)

6.5 (shared with living room)

6.5 (shared with 17.3 Master Bedroom) 15.5 -

21

401 2 BR

5.9

-

6.2

20.6

312 1 BR

-

-

3.5

308 1 BR

13.4 (shared 21.9 with Master Bedroom) 22.6 8.8 6.7 (shared 19 with Bedroom2)

-

4

-

6.8 (shared 10.6 with Living Room) 10.4 -

-

4

9.4

309 1 BR

311 2 BR

103.8

-

20.6

301 2 BR

6.6 (shared with 17.3 Master Bedroom) 15.5 -

-

21.1

212 1 BR

6.7 (shared with Bedroom2 )

6.6 (shared with living room)

-

208 1 BR

13.4 (shared 21.9 with Master Bedroom) 22.6 8.8 6.7 (shared 19 with Bedroom2)

5.7 (shared with Living Room)

-

209 1 BR

211 2 BR

102.8

-

-

23.7

77.2

-

-

203 2 BR

1.5

-

-

202 2 BR

-

-

6.7 (shared with Bedroom2)

6.2 (shared with Living 4.8 Room)

6.8 (shared 10.6 with Living Room) 10.4 -

4 FR

-

3.9 FR-BR 04

21

201 2 BR

-

16.2 FR-BR 02

-

3.9 FR-BR 01

20.5

112 1 BR

4.2 FR

19.2 FR-BR 04

108 1 BR

13.3 (shared 21.9 with Master Bedroom) 22.6 8.7 6.7 (shared 19 with Bedroom2)

-

19.3 FR-BR 01

109 1 BR

111 2 BR

-

6.5 (shared with living room)

80.2 103.8

4

-

-

5.9

0.8

102.5

4

-

-

6.1

-

118.7

-

-

-

-

0.8

69.8

-

-

-

-

0.8

69.9

103.8


05

Flats & Retails Area: [C10]: Residential & Commercial Tower *Filling in Areas for Ground+ 13 Floors building, each with 12 apartments. Process: AutoCad for polyline creation of spaces, Excel for filling in Figures and comparing flat areas and room usage. Reviewing previous Excel Area Sheets from other projects to match the layout & work flow.

Notes on Excel Table: *Classifying flats through color in table. *Annotation with Rooms tag *Adding meaningful notes where needed for Area Estimation Table sheet. *Dividing Area according to rooms, to verify a meaningful division of usage.


Preparation of Document Submission for Civil Defense 3

2

5

4

6

7 8

NO RT H

9

24

.3

4m 15.2

1

8m

C4

6

OFFICE - 3 GFA = 81 M2

1200

N 2709867.8343 E 233604.1800

2500

3800

NO LPG

Fire Reserve Water Tank shall be calculated according to the building type and Civil Defense requirement and shall be submitted in shop drawing submittal.

5.

4.

8. 9.

SMOKE EXTRACTION SHAFT WITH 6 TO 10 AIR CHANGES PER HOUR

X E

C D

FD90

3.

N 2709882.3713 E 233623.7556

7.

IT

P+++

Fire Pump capacity shall be calculated according to the building type and civil defense requirement and shall be submitted in shop drawing submittal.

PLOT LIMIT

P++

-2

2500 1250

STAIRCASE-1

All items in these documents are guidance only: detailed of Fire Alarm, Fire Fighting and all ventilation system in all items shall be submitted in shop drawing submittal.

2.

6.

P+++

1200

1.

FD90

90

3280 5680

1250

1200

3080

+4.55

1765

B

STAIRCASE-2

1200 100 1200

FD

PLOT LIMIT

A

There are no installations for LPG central system in these building. All gas piping (LPG central system) shall be exposed on the outside elevations filling line and risers if the system is provided. Determine the total area of the opening between adjacent façade of two different buildings as percentage as per UAE fire and life safety code and international codes. All Stairways shall be provided with marking signs. All Smoke Management System and Elevators shall be interlocking with the alarm system. All horizontal and vertical opening on external façade, on internal, shafts or voids shall be fire rated according to the rating degree of the compartment within the building or on elevation.

00

ISSUED FOR APPROVAL

July 2021

10. All portable fire extinguishers shall be provided as per UAE fore and life safety code and NFPA 10 11. Emergency light and exit signs shall be provided according to UAE fire and life safety code and NFPA 101 12. All structure elements shall have the fire resistance rating according to NFPA 5000 and other international standards. 13. All stairways shall be provided with two ways fire telephone communication. 14. All portions of these buildings and common and services areas shall be fully cover by smoke detections and fully covered by voice announcement system according to NFPA 72.

FHC

P++

+4.37

15. All portions of these building shall be fully protected by automatic sprinklers system according to NFPA 13.

FH C

05

Fire & Life Safety Strategy Drawings: [C46]: Residential & Commercial Building

16. Standpipe system shall be provided in these building according to NFPA 14. 17. All Fire Door and Windows shall be according to NFPA 80.

NO LPG

NO LPG

18. All types of smoke management systems (include pressure difference between adjacent zones) shall be following NFPA 90A, NFPA 92A, NFPA 92B and other international codes and standards and shall be submitted in shop drawing submittal.

E

19. All interiors finishing material shall be provided as UAE fire and life safety code and NFPA 101. 20. Fire command center room shall be provided according to UAE fore and life safety code and NFPA requirement. 21. Carbon monoxide detector shall be provided to detect the CO concentration.

SMOKE EXTRACTION SHAFT WITH 6 TO 10 AIR CHANGES PER HOUR

22. Central battery system for emergency lighting systems and other system shall be provided. 23. Internal roads indicating how fire-men emergency tracks will maneuver on the site and occupants assemblies areas. 24. Total duration time of full evacuation of the building at discharging level, up to assemblies' areas assemblies' areas shall be sized according total number of occupants. 25. All curtain walls and cladding insulations, exterior wall cladding and roofing system shall be provide as UAE fire and life safety code annexure A.1.21 and international codes and standards, after tender is approved bring shop drawing and support information for civil defense approval.

F

26. Fire pump and fire water tank shall be listed and tested according to civil defense requirement and international standards.

PLOT LIMIT

PLOT LIMIT

N 2709855.5968 E 233613.2669

N 2709870.1338 E 233632.8425

28. Fire or smoke damper shall be provided in these building on all duct shaft according to UAE fire and life safety code and NFPA 90A, NFPA90B and shall be submitted in shop drawing submittal. 29. All penetrations through fire resistance rated walls shall be protected by approved fire stop system and materials, installed and tested in accordance with ASTM E 814 or UL 1479. 30. All means of egress components details and dimensions shall be provided and constructed according to UAE fire and life safety code and NFPA 101 and 5000.

MEZZANINE FLOOR PLAN

31. Consultant and contractor shall comply with UAE fire and life safety code chapter 12 in terms of requirements of building under construction.

SCALE 1:100

OFFICE - 2 GFA = 71.51 M2

27. All open space floors shall be used as a single tenant floor only, if it used as a multiple tenancy, then fire rated corridor not less than one hour shall be connected to the bath staircase.

32. Emergency action plan shall be implementing in these buildings according to UAE annexure B2 in the UAE Fire and Life Safety Code.

OFFICE - 1 GFA = 71.79 M2

33. Consultant and contractors shall comply with UAE fire and life safety annexure B.1 in terms of the requirement of balcony, terrace and windows. 34. Private Fire Hydrants shall provide around these building as per UAE Fire and Life Safety Code. 35. Consultant and contractors must comply with the general notes and applicable codes and standards even if the code requirement was missed during plan review.

TABLE : 1 OCCUPANCY LOAD AS PER UAE FIRE CODE 2018 ,TABLE No.3.14 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

AREA

OCCUPANT FACTOR

COMMERCIAL APARTMENT

MEZZANINE FLOOR

OFFICE-1

BUSINESS

71.79 m²

9.3m² / PERSON

8 PERSON

1 EXIT

COMMERCIAL APARTMENT

MEZZANINE FLOOR

OFFICE-2

BUSINESS

71.51 m²

9.3m² / PERSON

8 PERSON

1 EXIT

COMMERCIAL APARTMENT

MEZZANINE FLOOR

OFFICE-3

BUSINESS

81.00 m²

9.3m² / PERSON

9 PERSON

1 EXIT

TOTAL:- 25 PERSON

1 EXIT

TYPE OF OCCUPANCY

NAME OF ROOM

NUMBER OF PEOPLE NO. OF EXIT

FIRE FIGHTING LEGEND: SYMBOL

FHC

TABLE : 2A STAIRCASE SCHEDULE AS PER UAE LIFE SAFETY CODE 2018 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

NUMBER OF STAIR

WIDTH OF EACH STAIR IN (mm)

FACTOR OF STAIR IN (mm)

COMMERCIAL APARTMENT

MEZZANINE FLOOR

EXIT STAIR-1

1200mm

7.6mm

158 PERSONS

COMMERCIAL APARTMENT

MEZZANINE FLOOR

EXIT STAIR-2

1200mm

7.6mm

158 PERSONS

MEZZANINE FLOOR FIRE & LIFE SAFETY STRATEGY LAYOUT

F104

5 KG Co2 FIRE EXTINGUISHER

TOTAL PERSON FOR TOTAL NUMBER OF COMPLY PEOPLE IN THIS FLOOR EACH STAIR 25 PERSONS

DESCRIPTION FIRE HOSE REEL CABINET. 1 No. Ø25x30 MTR. LONG HOSE REEL. 1 No. Ø25mm GATE VALVE & PRV. 1 No. 4.5KG. DCP FIRE EXTINGUISHER 1 No. 5KG. CO2 FIRE EXTINGUISHER. 1 No. Ø65mm LANDING VALVE.

5 KG DRY POWDER FIRE EXTINGUISHER

YES

1:100

2.5 KG DRY POWDER FIRE EXTINGUISHER

TOTAL NUMBER OF PEOPLE WHO CAN USE THESE STAIR : 316 PERSONS

4 WAY BREECHING INLET FIRE BLANKET

TABLE :3 MEANS OF EGRESS AS PER UAE FIRE CODE 2018 TABLE No.3.16 CHAPTER 3 PAGE No.321 NAME OF BUILDING

NAME OF FLOOR

COMMERCIAL APARTMENT

MEZZANINE FLOOR MEZZANINE FLOOR

COMMERCIAL APARTMENT

MEZZANINE FLOOR

COMMERCIAL APARTMENT

NAME OF ROOM

TYPE OF OCCUPANCY

ALLOWED DEAD END

ALLOWED COMMON PATH

ALLOWED TRAVEL DISTANCE

APPLIED DEAD END

APPLIED COMMON PATH

OFFICE-1

BUSINESS

15.00m

30.00m

8.36 m

-

10.40m

14.80m

YES

OFFICE-2

BUSINESS

15.00m

30.00m

8.36 m

-

12.50m

15.65m

YES

OFFICE-3

BUSINESS

15.00m

30.00m

8.36 m

-

12.00m

19.25m

YES

2 HOUR (120min.) FIRE RATED WALL

APPLIED COMPLY TRAVEL DISTANCE

1 HOUR (60min.) FIRE RATED WALL EXIT STAIRWAY FD60 FD90

TABLE : 5 FIRE PROTECTION SYSTEM AS PER UAE FIRE CODE 2018 ,CHAPTER 9 NO. OF BUILDING 1

NAME OF BUILDING

TYPE OF OCCUPANCY

COMMERCIAL APARTMENT

RESIDENTIAL (GROUP A)

AREA OF BUILDING (SQ.M)

BASEMENT BASEMENT BASEMENT GROUND MEZZINE -3 -2 -1 FLOOR FLOOR 550.00m²

550.00m²

550.00m²

371.61m²

371.61 m²

60 mins FIRE RATED DOOR 90 mins FIRE RATED DOOR DEAD END TRAVEL DISTANCE

FIRST to 15th TYPICAL FLOOR

ROOF FLOOR

TOTAL

TYPE OF FIRE PROTECTION SYSTEM

436.17x15 = 6542.55 m²

177.23 m²

9113.00 m²

SPRINKLER SYSTEM + WET RISER SYSTEM + EXTINGUISHER

TYPE OF FIRE ALARM SYSTEM DETECTOR

COMMON PATH EGRESS PATH FIRE ESCAPE ROUTE

P P++

P+++

NOMINAL LEVEL (AT FLAT / OFFICES) PRESSURE LEVEL (AT CORRIDOR LOBBIES) PRESSURE LEVEL (AT MAIN STAIRCASE'S & FIRE LIFT SHAFT)


P17

05

45 8

MIT

P16

P15

P14

P12

P11

Fire & Life Safety Strategy Drawings: [C46]: Residential & Commercial Building N 2709884.4182 E 233624.4154

BUILDING ENTRANCE

+0.20

BASEMENT LIMIT

R.C.C WALLS PLOT LIMIT

2500

1200

PROTECTED WITH FOAM WATER SPRAY SYSTEM

1800

1200 100 1200

C D

3000

P++

1540

2500

1515

P+++

FD90

+0.35

FHC +0.35

FD90

+0.35

PROTECTED WITH CLEAN AGENT SYSTEM

PROTECTED WITH CLEAN AGENT SYSTEM

E

FIRE FIGHTING W. TANK (1st,2nd&3rd. BASEMENT) R.C.C. TANK V=170.5m3 CAPACITY - 37500 IG.

EP

PROTECTED WITH CLEAN AGENT SYSTEM

MOKE EXTRACTION AFT WITH 6 TO 10 AIR HANGES PER HOUR

+0.35

JP

PROTECTED WITH CLEAN AGENT SYSTEM

+0.35

FIRE FIGHTING PUMP SET 750 GPM

DP

+0.35

+0.35

F

968 69

SHOP GFA = 48 M2

IMIT

P1

P2

P3

P4

P5

PLOT LIMIT

4WAY EACH 2 NO OF BREECHING INLET BOX ONE FOR FIRE TANK FILLING ONE FOR SPRINKLER SYSTEM FEEDING

24380

P6

P7

GROUND FLOOR PLAN

SCALE 1:100

P8

-Preparing a proper Fire & Life Safety Strategy Drawing Layout: *Travel Distance, *Common Path Distance *Exit Separation Distance *2hr FireC47 Rated Wall vs 1hr Fire Rated Wall *60 mins fire rated door vs 90 mins fire rated door stais *Exit Stairway *Fire Blanket *Fire Hose Reel Cabinet *Dry Powder Fire Extinguisher *Co2 Extinguisher *Dead End *Fire Escape Route *Egress Path.

SMOKE EXTRACTION SHAFT WITH 6 TO 10 AIR CHANGES PER HOUR

FD90

2100

15240

1050

STAIRCASE-1 1200

1200

1400 6300

1200

3360

+0.35

5230

R.C.C WALLS

2520

P+++

B

N 2709882.3713 E 233623.7556

EXIT-2

STAIRCASE-2

A

343 00

68 2

P13

P9

N 2709870.1338 E 233632.8425

P10

BASEMENT LIMIT N 2709863.7105 E 233639.7918

Link of study to UAE Fire and Life Safety Code of Practic


SCALE

DATE

REVISION

REMARKS

Fire Pump capacity shall be calculated according to the building type and civil defense requirement and shall be submitted in shop drawing submittal. Fire Reserve Water Tank shall be calculated according to the building type and Civil Defense requirement and shall be submitted in shop drawing submittal.

LIST OF DRAWINGS

F000

N.T.S

4. 5.

28-04-2021

00

F001

FIRE CODE STUDY

N.T.S

28-04-2021

00

03

F002

PERSPECTIVE

N.T.S

28-04-2021

00

04

F003

SETTING LAYOUT PLAN

N.T.S

28-04-2021

00

05

F100

THIRD BASEMENT FLOOR PLAN

1:100

28-04-2021

00

All gas piping (LPG central system) shall be exposed on the outside elevations filling line and risers if the system is provided.

All Stairways shall be provided with marking signs.

8.

All Smoke Management System and Elevators shall be interlocking with the alarm system.

9.

02

There are no installations for LPG central system in these building.

Determine the total area of the opening between adjacent façade of two different buildings as percentage as per UAE fire and life safety code and international codes.

7.

All horizontal and vertical opening on external façade, on internal, shafts or voids shall be fire rated according to the rating degree of the compartment within the building or on elevation.

10. All portable fire extinguishers shall be provided as per UAE fore and life safety code and NFPA 10 11. Emergency light and exit signs shall be provided according to UAE fire and life safety code and NFPA 101 12. All structure elements shall have the fire resistance rating according to NFPA 5000 and other international standards. 13. All stairways shall be provided with two ways fire telephone communication. 14. All portions of these buildings and common and services areas shall be fully cover by smoke detections and fully covered by voice announcement system according to NFPA 72. 15. All portions of these building shall be fully protected by automatic sprinklers system according to NFPA 13. 16. Standpipe system shall be provided in these building according to NFPA 14. 17. All Fire Door and Windows shall be according to NFPA 80. 18. All types of smoke management systems (include pressure difference between adjacent zones) shall be following NFPA 90A, NFPA 92A, NFPA 92B and other international codes and standards and shall be submitted in shop drawing submittal. 19. All interiors finishing material shall be provided as UAE fire and life safety code and NFPA 101.

0.20

06

F101

07

F102

08

F103

09

F104

10

F105

SECOND BASEMENT FLOOR PLAN

1:100

28-04-2021

00

FIRST BASEMENT FLOOR PLAN

1:100

28-04-2021

00

GROUND FLOOR PLAN

1:100

28-04-2021

00

BUILDING ENTRANCE

20. Fire command center room shall be provided according to UAE fore and life safety code and NFPA requirement. 21. Carbon monoxide detector shall be provided to detect the CO concentration. 22. Central battery system for emergency lighting systems and other system shall be provided. 23. Internal roads indicating how fire-men emergency tracks will maneuver on the site and occupants assemblies areas. 24. Total duration time of full evacuation of the building at discharging level, up to assemblies' areas assemblies' areas shall be sized according total number of occupants. 25. All curtain walls and cladding insulations, exterior wall cladding and roofing system shall be provide as UAE fire and life safety code annexure A.1.21 and international codes and standards, after tender is approved bring shop drawing and support information for civil defense approval. 26. Fire pump and fire water tank shall be listed and tested according to civil defense requirement and international standards.

MEZZANINE FLOOR PLAN

1:100

28-04-2021

00

1st to 4th FLOOR PLAN

1:100

28-04-2021

00

11

F106

5th to 8th FLOOR PLAN

1:100

28-04-2021

00

12

F107

9th to 12th FLOOR PLAN

1:100

28-04-2021

00

13

F108

13th & 14th FLOOR PLAN

1:100

28-04-2021

00

14

F109

15th FLOOR PLAN

1:100

28-04-2021

00

15

F110

ROOF FLOOR PLAN

1:100

28-04-2021

00

16

F111

TOP ROOF PLAN

1:100

28-04-2021

00

27. All open space floors shall be used as a single tenant floor only, if it used as a multiple tenancy, then fire rated corridor not less than one hour shall be connected to the bath staircase. 28. Fire or smoke damper shall be provided in these building on all duct shaft according to UAE fire and life safety code and NFPA 90A, NFPA90B and shall be submitted in shop drawing submittal. 29. All penetrations through fire resistance rated walls shall be protected by approved fire stop system and materials, installed and tested in accordance with ASTM E 814 or UL 1479. 30. All means of egress components details and dimensions shall be provided and constructed according to UAE fire and life safety code and NFPA 101 and 5000. 31. Consultant and contractor shall comply with UAE fire and life safety code chapter 12 in terms of requirements of building under construction. 32. Emergency action plan shall be implementing in these buildings according to UAE annexure B2 in the UAE Fire and Life Safety Code. 33. Consultant and contractors shall comply with UAE fire and life safety annexure B.1 in terms of the requirement of balcony, terrace and windows. 34. Private Fire Hydrants shall provide around these building as per UAE Fire and Life Safety Code. 35. Consultant and contractors must comply with the general notes and applicable codes and standards even if the code requirement was missed during plan review.

EMEREGENCY COMMAND CENTER

CHAPTER 1, Clause 2.9.3 of the UAE Fire and Life Safety Code of Practice -2017 The emergency command centre shall be fire separated from the remainder of the building with construction achvieing a fire rating of no less than 1 hour and be proided with an automatic sprinkler system in accordance with NFPA13 The clear space to be provided shall be no less than 8.9 s.q.m in narea with internal dimention less than 2440mm The emergency command centre shall contain the following controls -

.C WALLS

17

A01-A200

ELEVATION - 1 (FRONT)

1:100

28-04-2021

00

18

A01-A201

ELEVATION - 2 (RIGHT)

1:100

28-04-2021

00

19

A01-A202

ELEVATION - 3 (REAR)

1:100

28-04-2021

00

20

A01-A203

ELEVATION - 4 (LEFT)

1:100

28-04-2021

00

SECTION A-A

1:125

28-04-2021

00

22

A01-A301

SECTION B-B

1:125

28-04-2021

00

A01-A302

SECTION C-C

1:125

28-04-2021

00

24

A01-A303

SECTION D-D

1:125

28-04-2021

00

1200 100 1200

25

STAIRCASE-2

23

2500

1:50

28-04-2021

00

A01-A401

SECTION 1-1 PART-1 ( STAIRCASE-1 )

1:50

28-04-2021

00

27

A01-A402

SECTION 1-1 PART-2 & HANDRAIL DETAIL ( STAIRCASE-1 )

1:50

28-04-2021

00

EXIT-2 STAIRCASE - 2 DETAILED PLAN

the fire pump is accessible directly from the outside and shall be protected with an automatic sprinkler system in accordance with NFPA 13-2011

N 2709884.4182 E 233624.4154

28

A01-A403

1:50

28-04-2021

00

29

A01-A404

SECTION 2-2 PART-1 ( STAIRCASE-2 )

1:50

28-04-2021

00

30

A01-A405

SECTION 2-2 PART-2 & HANDRAIL DETAIL ( STAIRCASE-2 )

1:50

28-04-2021

00

ETISALAT & DU ROOM ( TELEPHONE ROOMS )

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the Etisalat and Du Room shall be provided with fire extinguisher system

HV & LV ROOM

ACCESS AND EGRESS VIA PLANTROOMS

Pursuate to Clause 40.2.5.2 of NFPA 101 - 2011, walkways that serve as a component in the means of egress shall be no less than 560mm in width and be provided with a minimum headrooms clearance of no less than 2030mm

EMERGENCY POWER SUPPLY SYSTEM

GENERATOR ROOM

BASEMENT LIMIT TABLE - 3 CONSTRUCTION RATING AS PER NFPA 5000 TABLE No. 7.2.1.1 & CONSTRUCTION ELEMENTS

FIRE RATING FOR TYPE II (222) CONSTRUCTION

FIRE RATING FOR FIRE RATING FOR TYPE II (111) TYPE II (000) CONSTRUCTION CONSTRUCTION

FIRE RATING FOR TYPE I (442) CONSTRUCTION

4 hours

0 hours

4 hours

0 hours

4 hours

0 hours

4 hours

2

INTERIOR BEARING WALLS

3

COLUMNS

proided with secondary power and include independent ductwork serving other parts of the building The following shall be provided within the emergency command centre -

(b) Emergency oice / alarm communication system unit (c) Fire detection and alarm system unit (d) Annuniciator isually indicating the location of elevator and their operation

4

The emergency command centre shall be provided with emergency lighting

TWO WAY EMERGENCY COMMUNICATION SYSTEM CHAPTER 7, Table 7.2 Page no:489 of the UAE Fire and Life Safety Code of Practice -2017 Two way, Clause emergency communication system shall be provided between the emergency command centre and the following areas-

(b) All fire fighting related mechanical equipment rooms inclusive of the sprikler pump room , switch rooms and generator rooms (c) All rooms housing smoke control equipment (d) All lift machine rooms (e) Fire lifts (g) Air handling control rooms

EMERGENCY VOICE EVACUATION AND COMMUNICATION SYSTEM One way emergency voice evacuation and communication system as well as emergency centre shall be provided for high rise building as per CHAPTER 7, Table 7.3 Page no:491 of the UAE Fire and Life Safety Code of Practice -2017

FIRE SERVICE OPERATION REQUIREMENTS CHAPTER 1, Clause 2.6 Page no:224 of the UAE Fire and Life Safety Code of Practice -2017 The maximum parking distance of a Civil Defense vehicle from not less than one building is less than 15mm The maximum road grade of the Civil Defense ehicle access shall no exceed 10% A suitable access pathway shall be provided to enablefire fighters to inspect all elevations of the building being paved or gravel type no less than 1 m in width As per Table 2.6 Clause 13 of Chapter 2. of the UAE Fire & Life Safety Code of Practice -2011 the largest floor area of the development is the ground floor with an area between 4,000ms.q.m and 8000m2 only 1/4 of the perimeter of the building is required to be provided with perimeter accesways The perimeter of the building has an approximate dimension of 368m and requires no less than 92m of an accessible perimeter The development is provided with a fire perimeter access way that exceeds 200m

Supporting more than one floor, columns or other bearing walls

2 hours

1 hours

Supporting one floor only

2 hours

Supporting a roof only

1 hours

0 hours

3 hours

1 hours

1 hours

0 hours

3 hours

Supporting more than one floor , columns or other bearing walls

2 hours

1 hours

0 hours

4 hours

Supporting one floor only

2 hours

1 hours

0 hours

3 hours

Supporting a roof only

1 hours

1 hours

0 hours

3 hours

Supporting more than one floor, columns or other bearing walls

2 hours

1 hours

0 hours

4 hours

Supporting one floor only

2 hours

1 hours

0 hours

2 hours

Supporting a roof only

1 hours

1 hours

0 hours

2 hours

FLOOR / CEILING ASSEMBLIES

2 hours

1 hours

0 hours

2 hours

6

ROOF / CEILING ASSEMBLIES

1 hours

1 hours

0 hours

2 hours

7

INTERIOR NONBEARING WALLS

0 hours

0 hours

0 hours

0 hours

0 hours

0 hours

0 hours

0 hours

PLOT LIMIT 8

EXTERIOR NONBEARING WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

CODES/STANDARDS

UAE FIRE AND LIFE SAFETY CODE OF PRACTISE - 2017 NFPA 101 LIFE SAFETY CODE 2012 EDITION NFPA 10 STANDARD FOR PORTABLE EXTINGUISHERS,2013 EDITION NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS,2013 EDITION NFPA 14 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS , 2013 EDITION NFPA 15 STANDARD FOR WATER SPARY FIXED SYSTEMS FOR FIRE PROTECTION ,2012 NFPA 16 STANDARD FOR THE INSTALLATION OF FOAM -SPRINKLER AND FOAM -WATER SPARY SYSTEM ,2011 EDITION NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION ,2013 EDITION NFPA 22 STANDARD FOR WATER TANKS FOR PRIVATE PROTECTION NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE ,2013 EDITION NFPA 92 STANDARD FOR SMOKE CONTROL SYSYTEMS,2013 EDITION NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEM,2010 EDITION NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHING SYSTEM,2012 EDITION NFPA 500 BUILDING CONSTRUCTION AND SAFETY CODE , 2012 EDITOR NFPA 664 STANDARD FOR THE PREVETION OF FIRES AND EXPLOSION IN WOOD PROCESSING AND WOOD WORK FACILITIES, 2012 EDITION NFPA 654 STANDARD FOR THE FIRE PREVENTION OF FIRE AND DUST EXPLOSION FROM COMBUSTIBLE PARTICULATE SOLIDS,2013 EDITION NFPA 24 - STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICESMAINS AND APPURTENANCE , 2011 EDITION NFPA 30 FLAMMABLE AND COMBUSTABLE LIQUIDS CODE , 2011 EDITION NFPA 33 - STANDARD FOR SPARY APPLICATION USING FLAMMABLE OR COMBUSABLE MATERIALS , 2011 EDITION NFPA 34- STANDARD FOR DIPPING , COATING AND PRINTING PROCESS USING FLAMMABLE OR COMBUSTIBLE LIQUIDS , 2011 EDITION NFPA 51B - STANDARD FOR FIRE PREVENTION DURING WELDING , CUTTING AND OTHER HOT WORK , 2011 EDITION NFPA68- STANDARD ON EXPLOTION PROTECTION BY DEFLAGRATIONENTING , 2013 EDITION NFPA 69- STANDARD ON EXPLOSION PREVENTION SYSTEM , 2008 EDTION NFPA 80 - STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVE , 2013 EDITION NFPA91 - STANDARD FOR EXAUST SYSTEM FOR AIR CONVEYING OF VAPOURS , GASES , MISTS AND NON COMBUSTIBLE PARTICULAR SOLID, 2013 EDITION NFPA 90A- STANDARDFOR THE INSTALLATION OF AIR- CORDITIONING AND VENTILATING SYSTEM , 2012 EDITION NFPA 204- STANDARD FOR SMOKE AND HEAT VENTING , 2012 EDITION NFPA 220 - STANDARD ON TYPE OF BUILDING CONSTRUCTION , 2012 EDITION NFPA 221- STANDARD FOR HIGH CHALLANGE FIRE WALLS , FIRE WALLS AND FIRE BARRIER WALLS NFPA 2113 -STANDARD FOR LIGHTING PROTECTION SYSTEM 2011 EDITION NFPA 2113 - STANDARD IN SECTION , CARE USE AND MAINTENANCE OF FLAME RESISTANT GARMENTS FOR PROTECTION OF INDUSTRIAL PERSONNEL AGAINST FLASH FIRE , 2012 EDITION

N 2709882.3713 E 233623.7556 25 26 27 28 29 30 31

ENCLOSED EQUIPMENT/AUH PLANT ROOM

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the Enclosed Equipment /AUH Plant Room shall be provided with Automatic Sprinkler System

LIFT MACHINE ROOM As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the Lift Machine Room shall be provided with Pre-action Sprinkler System Automatic Sprinkler System

Table 3.2 Chapter 3 of the UAE Fire & Safety Code of Practise-2017 Doors providing access to and are in the path of travel to an exit from rooms that have an area not exceeding 6.5 m2 and are not required to be occupied by disabled persons shall be provided with a door leaf dimension of at least 610mm The clear and unobstructed width of doorways that provide access to the fire escape stairways shall not less than 915mm At least one leaf of a double leaf doorway set shall be no less than 810mm in clear width

EXTERNAL CLADDING

External cladding and roofing system shall comply with Chapter 1 ,Section 4, Cladding and facade system

FIRE CODE STUDY

The system shall be approved during the shop drawing submission stage

Shop Drawings to be submitted to Abu Dhabi Civil defense for approval shall be based on the following Codes/Standards ITEM

ELECTRICAL ROOM

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017,the Electrical Room shall be provided with fire extinguisher System

DOOR WIDTHS

BEAMS, GIRDERS, TRUSSES & ARCHES

5

(h)Emergency and standby power status indicators (i)Fire pump status indicators

SERVER ROOM As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the Server Room shall be provided with Clean Agent System

EXTERIOR BEARING WALLS 0 hours

(a) Building plans indicating the typical floor plans and details the location of the building exit stairways,

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the central battery room shall be provided with Clean Agent System with Automatic Sprinkler System

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017,the IT Room shall be provided with Clean Agent System

WASTE/RECYCLE ROOM (GARBAGE ROOM )

CHAPTER 1 OF THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE - 2017,TABLE 1.6

1 hours

GENERAL

with Automatic Sprinkler System

IT ROOM ( SERVER ROOM )

Table 3.2 , chapter 3 , Page no 217 of the UAE FIRE & LIFE SAFETY CODE OF PRACTICE _2017 Thresholds at doorways shall not exceed 13mm and where a threshold is between 6.3mm and 13mmit shall be bevelled with a slope not sleeper than 1:2

1 hours

(k)Puplic address system

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the closet having heaters or furnaces shall be provided with

THRESHOLDS

1 hours

(l)Control for smoke management system

ETS ROOM ( ELECTRIC THERMAL STORAGE )

CENTRAL BATTERY ROOM

1 hours

(j)Generator superision devices and manual star and transfer features

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017,the Generator Room shall be provided with Foam Sprinkler System

ELEVATOR HOISTWAY PROTECTION

Sidewall spray sprinklers shall be installed at the bottom of each elevator hoist way , nor more than 6100mm above the floor of the pit as per clause 8.15.5.1 of NFPA 13 standard for the Installation of Sprinkler System

2 hours

fire fighting equipments and fire department access

TRANSFORMER ROOM As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017,the Transformer Room shall be provided with fire extinguisher system

Type 60, class 1, Leel 1 Standby power system in accordance witg Article 701 of NFPA 70, National Electric Code and NFPA 110, Standard for Emergency and Standby power system shall be provided in this building,(page 47 General Directorate of Civil Defense Safety and Prevention Department Plan Reiew Manual ) Further , the standby power shall have a capacity to provide power for the following essentials functions: (a) Life safety illumination (b) Fire detection and alarm system (c) Elevators (d) Fire Pumps (e) Puplic safety communications system (f) Industrial processes wher current interruption would production serious life safety or health hazards. (g) Essential ventilation and smoke removal system

CONSTRUCTION OF EXIT STAIRWAYS

Chapter 3 of the UAE FIRE & LIFE SAFETY CODE OF PRACTISE -2017 Exit stairways shall be no less than 2 hours fire rated and Constructed of Reinforced Concrete (RCC) AND PROVIDED WITH 90 minute self -closing fire rated door sets

F001

RISERS, SHAFTS & PASSAGEWAYS

Chapter 1, Table 1.9 ,Page no 113 of the UAE Fire & Life Safety Code of Practice - 2017 Vertical shafts -

2 hour with 90 minute access openings

Elevators Exit Access Corridors -

2 hour with 90 minute lift landing doors 1 hour with 1 hour self- closing fire rated door sets

Exit passageways -

2 hour with 90 minutes self - closing fire rated door sets

LIST OF DRAWINGS FIRE & LIFE SAFETY STRATEGY LAYOUT

1:100

TABLE-2 TYPE OF CONSTRUCTION AS PER NFPA 5000 TABLE NO:- 7.4.1,PAGE NO:-101UAE FIRE CODE 2018, CHAPTER 1, TABLE 1.7 SL. NO

NAME OF BUILDING

1

COMMERCIAL

TYPE OF OCCUPANCY

RESIDENTIAL

AREA OF BUILDING (PER STOREY)

TYPE OF CONSTRUCTION

436.00m²

TYPE I(332)

APPLIED MAXIMUM ALLOWABLE ALLOWABLE HEIGHT (m) HEIGHT (m) UNLIMITED

67.70

MAXIMUM ALLOWABLE NO. OF STOREY UNLIMITED

APPLIED ALLOWABLE NO.OF STOREY

MAXIMUM ALLOWABLE AREA PER STOREY(sq.m)

APPLIED ALLOWABLE AREA PER STOREY(sq.m)

COMPLY

15

UNLIMITED

436.00m²

YES

F-000

SPRINKLER SYSTEM + WET RISER SYSTEM + EXTINGUISHER

DETECTOR

N-T.S

Fire Hose Reel Cabinet

Preparation for Drawings Submission

1515

P++

+0.35

FD90

SMOKE EXTRACTION SHAFT WITH 6 TO 10 AIR CHANGES PER HOUR

FD90

FHC +0.35

15240

FD90

ISSUED FOR APPROVAL

As per Table 9.3 Chapter 9 page no 826 of the UAE Fire & Life safety Code of Practise -2017, the HV & LV Room shall be provided with Clean Agenty System

The egress paths indicated are indicative only. The contractor shall ensure compliance with the prescriptiv requirements of this clausesuch that access from any part of the roof ( both internal and external ) is maintained at all times

2 hours

(f) Fire fighting stairways

26

Chapter 3 of the UAE FIRE & LIFE SAFETY CODE OF PRACTISE -2017 Doors in the means of egress shall be side hinged or pivoted swinging type and shall be capable of swinging to the full required width of the opening

Doors accommodating more than 50 persons , doors in exit enclosures and doors serving high hazard areas shall swing in the direction of egress The forces required to fully open any door manually in a means of egress shall not exceed 67N to release the latch, 133N to set the door to the minimum required width

CHAPTER 9.3, TABLE 9.18 PAGE NO:773 OF THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE -2017

Supporting a roof only

(a) Every fire fighting lift lobby including the ground floor

STAIRCASE - 1 DETAILED PLAN

SWING & FORSE

and pressure according to the hydraulic calculation to supply fire demand of the system

FIRE PUMP ROOM

Supporting one floor only

exit routes, protected corridors,fire protection systems,fire compartments,fire fighting equipments,

July 2021

Emergency Evacuation Diagrams and Actions plan shall be provided prior to occupation of the building in accordance with ANNEXURE_B2. EMERGENCY ACTION PLANS of the UAE Fire & Life Safety Code of Practise - 2017

5230

P+++

1800

ISSUED FOR APPROVAL

FIRE PUMP

(g) Sprinkler valve and waterflow detector display panels

A01-A300

in ASCE ( American society of civil engineers) and any other structure requirements for a top rail

Supporting more than one floor , columns or other bearing walls

(d) All terminals and superisory / control equipment of the building fireprotection /detection system

C46

Chapter 3 of the UAE FIRE & LIFE SAFETY CODE OF PRACTISE -2017

AS PER CHAPTER 9.3, TABLE 9.18 PAGE NO:773 OF THE UAE FIRE AND LIFE SAFETY CODE OF PRACTICE -2017 , The fire pump set shall consist of one main electrical driven pump , one standby diesel driven pump and electric jocky pump having minimum flow

1

8m

Enclosed stairways shall be rovided with markings that indicate the floor level, the terminus of the top and bottom of the stair enclosure, the identification of the stair enclosure and the floor level of , and the direction to , the exit discharge The signage shall be located inside the enclosure approximately 1525mm aove the floor landing in a position that is visible when the door is in the open or closed position and in lettering no less than 25mm high The stairway identification letters shall be located at the top of the sign in minimum 25mm high lettering

As per , CHAPTER 9, Table 9.3 Page no:637of the UAE Fire and Life Safety Code of Practice -2017 the fire water shall be stored in a water tank having two compartments or in two tanks with total effective fire water reserve to cater the pumping demand of the system which shall be no less than 60 minutes

S.No.

.3

STAIRWAY IDENTIFICATION

(c) Engineered smoke control system (e) Air conditioning and mechnical ventilation required for the emergency command centre shall be

24

and a safety factors of 4 shall be used Enclosed stairways shall be rovided with markings that indicate the floor level, the terminus of the top and bottom of the stair enclosure, the Each handrail or guard section shall be supported by a minimum of three glass balusters, or shall be otherwise supported to remain in place if one baluster panel fails, and either an attached handrail or guard shall be provided or the glass balusters shall laminated glass with two or more glass piles of equal thickness and the same glass type , and the panels shall be designed to withstand the loads specified

(b) Emergency voice communication

(f) Controls for unlocking electromagnetic or access control stairway doors

21

A01-A400

FIRE WATER TANK

BALUSTRADE PANELS Chapter 1 , Section 2.17, UAE FIRE & LIFE SAFETY CODE OF PRACTISE -2017 The panels and their support system shall be designed to withstand the loads specified in ASCE(American Society of civil Engineers)

A minimum of two breeching inlets per wet riser at remote locations shall be provided (a) Shall be visible from the fire engine access road (b) The distance of the breeching inlet to the fire engine access road shall not exceed 18m (c) The connectionsshall be located and arranged so that the hose lines can be readiily and conveniently attached to the the inlets without interferrence from any nearby object , including building , fences or posts (d) Each breeching inlet connection shall be prvided with signage in raised or engraved letters at least 25.4mm in height on a plate or fitting (e) The sign shall indicate the service for which the connection is intended (f) A sign at inlets shall be provided indicating the pressure required to deliver the greatest system demand a valve shall (g) Breeching inlet shall be adequately illuminated be installed in the hydrant connection

(a) Fire Lifts

(e) Status indicator and control of air handling system

28-04-2021

BREECHING INLET

As per CHAPTER 1, Table 2.2 Page no:256 of the UAE Fire and Life Safety Code of Practice -2017 benching inlet shall be a 4 way connection having 150mm diameter flanged outlet with 4 nos of 65mm diameter instantaneous male coupling inlets

00

DRAWING NAME

2. 3.

6.

01

P11

External fire hydrant locations are indicative only and shall be subjected to ADCD approval during the shop drawing submission

All items in these documents are guidance only: detailed of Fire Alarm, Fire Fighting and all ventilation system in all items shall be submitted in shop drawing submittal.

00

SERIAL

DRAWING NUMBER

P12 1.

15.24m

P14

P13

LIST OF FIRE & LIFE SAFETY STRATEGY DRAWINGS

C47

July 2021


Preparation of Document Submission for Civil Defense LAND KEY :

FIRST FLOOR PLAN

1.

All items in these documents are guidance only: detailed of Fire Alarm, Fire Fighting and all ventilation system in all items shall be submitted in shop drawing submittal.

2.

Fire Pump capacity shall be calculated according to the building type and civil defense requirement and shall be submitted in shop drawing submittal.

3.

Fire Reserve Water Tank shall be calculated according to the building type and Civil Defense requirement and shall be submitted in shop drawing submittal.

4. 5.

A

B

C

D

F

E

G

6.

H

7. 31000 100

6200

2600

4600

8.

4000

4600

2600

6200

100

9.

NO LPG SYSTEM IN THIS BUILDING

There are no installations for LPG central system in these building. All gas piping (LPG central system) shall be exposed on the outside elevations filling line and risers if the system is provided. Determine the total area of the opening between adjacent façade of two different buildings as percentage as per UAE fire and life safety code and international codes. All Stairways shall be provided with marking signs. All Smoke Management System and Elevators shall be interlocking with the alarm system. All horizontal and vertical opening on external façade, on internal, shafts or voids shall be fire rated according to the rating degree of the compartment within the building or on elevation.

10. All portable fire extinguishers shall be provided as per UAE fore and life safety code and NFPA 10 11. Emergency light and exit signs shall be provided according to UAE fire and life safety code and NFPA 101

GENERAL NOTES :

12. All structure elements shall have the fire resistance rating according to NFPA 5000 and other international standards. W05

13. All stairways shall be provided with two ways fire telephone communication.

W05

W02

W02

W02

W02

A

4200 W02

FD90

D01



S01

D01

F.H.C

CORRIDOR

D02

1800

STORE

1

STAN

5M 12.3 CE=

2180

OFFICE-1 W02

VE TRA

L DI

D01

D01 S01 FD90

ELEC.

D02

LIFT-1

FD90 S01

W02

D01

CORRIDOR

D01

W02

F.H.C

OFFICE-8 W02

20. Fire command center room shall be provided according to UAE fore and life safety code and NFPA requirement.

9 Ltr. WET CHEMICAL EXTINGUISHER

21. Carbon monoxide detector shall be provided to detect the CO concentration.

2.5 KG CO2 FIRE EXTINGUISHER

W. TOILET

W04

1

W04

W04

W04

CUBICLES PARTITION

M 4.38 0M TH= =10.8 N PA NCE MO DISTA COM VEL TRA

A800

W03

D01

D01

D03

STORE

TRA VE

L DI

STAN

W02

CE= 12.3 5M

OFFICE-9

W02

5. FOR SIZES OF COLUMNS AND SHEAR WALLS AND ANY OTHER STRUCTURAL ELEMENTS, REFER TO STRUCTURAL DRAWINGS. 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRODUCING A COMPLETE SET OF COORDINATED SHOP DRAWINGS FOR ALL ELEMENTS OF THE WORK FOR APPROVAL PRIOR TO COMMENCEMENT OF WORKS. APPROVAL OF SHOP DRAWINGS BY THE CONSULTANT DOES NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY FOR COMPLYING WITH ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS.

5KG CO2 EXTINGUISHER

7. DRAWINGS ARE IN PART DIAGRAMMATIC AND DO NOT NECESSARY SHOW COMPLETE DETAILS OF CONSTRUCTION, WORK, OR MATERIALS, PERFORMANCE OR INSTALLATION.

FIRE BLANKET

25. All curtain walls and cladding insulations, exterior wall cladding and roofing system shall be provide as UAE fire and life safety code annexure A.1.21 and international codes and standards, after tender is approved bring shop drawing and support information for civil defense approval.

8. CONTRACTOR SHALL STRICTLY ADHERE TO APPLICABLE CODES, RULES, AND REGULATIONS GOVERNING BUILDING CONSTRUCTION AS SET BY THE AUTHORITY HAVING JURISDICTIONS.

2 HOUR (120min.) FIRE RATED WALL

9. CONTRACTOR TO CHECK ALL DIMENSION AND LEVELS ON SITE AND DISCREPANCIES ARE TO BE REFERRED TO THE ARCHITECTS / ENGINEERS FOR DECISION.

1 HOUR (60min.) FIRE RATED WALL

27. All open space floors shall be used as a single tenant floor only, if it used as a multiple tenancy, then fire rated corridor not less than one hour shall be connected to the bath staircase.

OFFICE-10

W03

4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH WITH RELEVANT (ARCHITECTURAL, STRUCTURAL, MEP, AND, SPECIFICATION THE CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND NOTIFY ANY DISCREPANCY FOR CLARIFICATION BEFORE COMMENCEMENT OF WORKS.

2.5 KG DCP FIRE EXTINGUISHER

24. Total duration time of full evacuation of the building at discharging level, up to assemblies' areas assemblies' areas shall be sized according total number of occupants.

26. Fire pump and fire water tank shall be listed and tested according to civil defense requirement and international standards. M. TOILET

O.T.S

2

19. All interiors finishing material shall be provided as UAE fire and life safety code and NFPA 101.

22. Central battery system for emergency lighting systems and other system shall be provided.

OFFICE-11

CUBICLES PARTITION

COM MON OFFICE-13 PATH TRAV =4. EL DI 38M STAN CE= 10.8 0M

OPEN DUCT @ F.F SLAB D

FHR

18. All types of smoke management systems (include pressure difference between adjacent zones) shall be following NFPA 90A, NFPA 92A, NFPA 92B and other international codes and standards and shall be submitted in shop drawing submittal.

23. Internal roads indicating how fire-men emergency tracks will maneuver on the site and occupants assemblies areas.

D01

B

4420 W02

STAIR-2

+4.20

CORRIDOR

D01

W02

D01

W02

EXIT-2

C

a

D01

+4.20 OFFICE-2

16. Standpipe system shall be provided in these building according to NFPA 14.

M .81 5M =5 9.1 ATH NCE= NP MO ISTA OFFICE-7 COM AVEL D TR

OFFICE-6

OFFICE-5

STAIR-1

D01 W02

12800



OFFICE-4

3. ALL LEVELS INDICTED ARE FINISHED FLOOR LEVEL (FFL) UNLESS OTHERWISE INDICATED.

FIRE HOSE REEL CABINET. 1 No. Ø25x30 MTR. LONG HOSE REEL. 1 No. Ø25mm GATE VALVE & PRV. 1 No. 5KG. DCP FIRE EXTINGUISHER 1 No. 2.5KG. CO2 FIRE EXTINGUISHER.

17. All Fire Door and Windows shall be according to NFPA 80.

A

TRA COMM O VEL DIS N PATH TAN =5 CE .81 OFFICE-3 = M 9.1 5M

M .63 =4 .88M TH 12 PA CE= ON MM ISTAN CO D VEL TRA

W02

2. THE DRAWING SHOLUD NOT BE SCALED, USE WRITTEN DIMENSIONS AS SHOWN.

DESCRIPTION

SYMBOL

15. All portions of these building shall be fully protected by automatic sprinklers system according to NFPA 13.

A400

W02

1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METER.

FIRE FIGHTING LEGEND:

14. All portions of these buildings and common and services areas shall be fully cover by smoke detections and fully covered by voice announcement system according to NFPA 72. ( if applicable)

1 W02

100

NORMAL WALL

28. Fire or smoke damper shall be provided in these building on all duct shaft according to UAE fire and life safety code and NFPA 90A, NFPA90B and shall be submitted in shop drawing submittal.

10. FEATURES NOT FULLY SHOWN ON PLANS OR DETAILS ARE TO BE PROVIDED AS INDICATED FOR SIMILAR CONDITIONS. CONSTRUCTION METHODS AND MATERIALS NOT EXPLICITLY INDICATED OR IMPLIED ARE INCIDENTAL TO THE WORK AND ARE VARIATION FROM THE DIMENSIONS AND / OR CONDITIONS SHOWN ON THESE DOCUMENTS. ANY SUCH VARIATIONS SHALL BE APPROVED PRIOR TO PROCEEDING WITH THE WORK, OR THE CONTRACTOR SHALL ACCEPT FULL RESPONSIBILITY FOR COST TO RECTIFY THE SAME.

EXIT STAIRWAY

29. All penetrations through fire resistance rated walls shall be protected by approved fire stop system and materials, installed and tested in accordance with ASTM E 814 or UL 1479.

FD60

60 mins FIRE RATED DOOR

30. All means of egress components details and dimensions shall be provided and constructed according to UAE fire and life safety code and NFPA 101 and 5000.

FD90

90 mins FIRE RATED DOOR DEAD END

31. Consultant and contractor shall comply with UAE fire and life safety code chapter 12 in terms of requirements of building under construction.

TRAVEL DISTANCE

32. Emergency action plan shall be implementing in these buildings according to UAE annexure B2 in the UAE Fire and Life Safety Code.

COMMON PATH

33. Consultant and contractors shall comply with UAE fire and life safety annexure B.1 in terms of the requirement of balcony, terrace and windows.

EGRESS PATH

34. Private Fire Hydrants shall provide around these building as per UAE Fire and Life Safety Code.

FIRE ESCAPE ROUTE

35. Consultant and contractors must comply with the general notes and applicable codes and standards even if the code requirement was missed during plan review.

INTERNAL ACCESS

EXISTING CHAPEL TABLE : 1 OCCUPANCY LOAD AS PER UAE FIRE CODE 2018 ,TABLE No.3.13 PAGE No.285 to 287

3

NAME OF FLOOR

NAME OF ROOM

AREA

OCCUPANT FACTOR

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 01, 02

BUSINESS

43.63m²

9.3m² / PERSON

5 PERSON

2 EXIT

Rev

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 03

BUSINESS

23.04m²

9.3m² / PERSON

3 PERSON

2 EXIT

OWNER :

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 04 ,05 ,06

BUSINESS

50.53m²

9.3m² / PERSON

6 PERSON

2 EXIT

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 07

BUSINESS

23.04m²

9.3m² / PERSON

3 PERSON

2 EXIT

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 08 , 09

BUSINESS

43.63m²

9.3m² / PERSON

5 PERSON

2 EXIT

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 10 , 11

BUSINESS

33.00m²

9.3m² / PERSON

4 PERSON

CHAPEL EXTENSION

1st & 2nd FLOOR

OFFICE- 12 , 13

BUSINESS

32.00m²

9.3m² / PERSON

NAME OF BUILDING

4

5

TYPE OF OCCUPANCY

NUMBER OF PEOPLE

NO. OF EXIT

2 EXIT

4 PERSON

2 EXIT

TOTAL:- 30 PERSON

2EXIT

00

ISSUED FOR APPROVAL

July. 2021

Description

Date

COPTIC CHURCH

LEAD CONSULTANT :

STRUCTURAL :

TABLE : 2A STAIRCASE SCHEDULE AS PER UAE LIFE SAFETY CODE 2018 PAGE No.285 to 287

6

NAME OF FLOOR

NUMBER OF STAIR

WIDTH OF EACH STAIR IN (mm)

FACTOR OF STAIR IN (mm)

TOTAL PERSON FOR EACH STAIR

CHAPEL EXTENSION

1st & 2nd FLOOR

EXIT STAIR-1

1200mm

7.6mm

157 PERSONS

CHAPEL EXTENSION

1st & 2nd FLOOR

NAME OF BUILDING

7

EXIT STAIR-2

1200mm

7.6mm

TOTAL NUMBER OF PEOPLE IN THIS FLOOR 30 PERSONS

157 PERSONS

COMPLY

PROJECT NAME :

COPTIC CHURCH

YES ZONE :

AL KHAREER - WADI AL AIN - AL AIN SECTOR NO. :

NAME OF BUILDING

9

10

FD90

STAIR-3

NAME OF ROOM

TYPE OF OCCUPANCY

ALLOWED DEAD END

ALLOWED COMMON PATH

ALLOWED TRAVEL DISTANCE

APPLIED DEAD END

APPLIED COMMON PATH

APPLIED TRAVEL DISTANCE

COMPLY

1st & 2nd

OFFICE- 01, 02

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

11.97m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 03

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

8.34m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 04 ,05 ,06

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

13.08m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 07

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

8.73m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 08 , 09

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

12.43m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 10 , 11

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

12.03m

YES

CHAPEL EXTENSION

1st & 2nd

OFFICE- 12 , 13

BUSINESS

15.00m

15.00m

60.00m

-

0.00m

12.01m

YES

PROPOSED MODIFICATIONS - TO EXISTING PUBLIC BUILDING (CHURCH) - (G+2+R) CONSISTING OF CHURCH EXTENSION AND ACCOMMODATION BUILDING & 1 MECH. ROOMS, ON (SECTOR WADI AL AIN -1 , PLOTS (22-01-085-1) AL KHAREER - WADI AL AIN - AL AIN DRAWING TITLE :

( CHAPEL EXTENSION ) FIRST FLOOR PLAN

DRAWING NO. :

FD90

STAIR-4

1

CHAPEL EXTENSION

TYPE OF OCCUPANCY BUSINESS (GROUP B) OFFICE

SUBMISSION DATE :

AREA OF BUILDING (SQ.M)

GROUND FLOOR

1st Floor

405.00m²

405.00m²

00

2nd Floor

ROOF FLOOR

TOTAL

TYPE OF FIRE PROTECTION SYSTEM

405.00m²

13.90 m²

1228.90 m²

SPRINKLER SYSTEM +FHR, WET RISER SYSTEM + EXTINGUISHER

TYPE OF FIRE ALARM SYSTEM

FIRE ALARM SMOKE DETECTION SYSTEM

SCALE :

1/150

07/07/2021 PROJECT ID:

DRAWING SIZE :

B2S-2018-000739 FOR OFFICIAL USE ONLY:

12

REVISION NO. :

F6-101

TABLE : 5 FIRE PROTECTION SYSTEM AS PER UAE FIRE CODE 2018 ,CHAPTER 9 NAME OF BUILDING

(22-01-085-1)

PROJECT DESCRIPTION :

CHAPEL EXTENSION

NO. OF BUILDING

11

NAME OF FLOOR

PLOT NO. :

WADI AL AIN -1

TABLE : 3 MEANS OF EGRESS AS PER UAE FIRE CODE 2018 TABLE No.3.16 CHAPTER 3 PAGE No.293 to 295

8

335.3

06

Fire & Life Safety Strategy Drawings: [C1]: Coptic Church

A1


Preparation of Document Submission for Municipality LAND KEY :

LANDSCAPING SHOWN BEYOND THE PLOT LIMIT IS FOR GUIDANCE ONLY, WHICH SHALL BE DONE BY MAIN DEVELOPER.

X1

N QI

X2

X3

+7.77

N 2705396.229 E 254604.988 X4

1

LINE OF CANOPY

A303

+8.17

1

2

3

4500

N 2705394.530 E 254596.319

4200

7 4200

53356

4200

+8.36 +8.46

+8.46 FHC-R

5075

ONT

SMDB

8100

1

L.V ROOM +8.46

A310

+8.41

SMDB

SMDB

FOR GROUND FLOOR MAIN ENTRANCE DETAILS REFER TO DRAWING NUMBER A713-A714 (MAIN ENTRANCE FLOORING LAYOUT, RCP, SECTIONS AND DETAILS)

F.F PUMP ROOM

SHAFT

MECH.

4000

+8.46

1 A301

A491

+8.46

CORRIDOR

DB

FIREMEN LIFT

4

DB

DB

A491

ED OU TDOOR AREA

+8.46

+8.36

REINFORCED CONCRETE WALL/COLUMN

+8.46

+8.41

PERFORATED FIBER CEMENT CLADDING

AWCS ROOM (GARBAGE) 01.h

GENERATOR

SERVICE ENTRANCE

ELEC.

A312

SER. LO BBY-3

EXTERNAL INSULATED BLOCKWALL

STORE

STORE

SHAFT

+8.46

SHAFT2 ELE VATION -1 4

DEPRESSED SLAB

BICYCLE PARKING SER. LOBBY-2

+8.46

5

4

6

A310

A801

A310

+8.41

DD FHC-R

6 A405

PLOT LIMIT ACK LIN E

LOAD

+8.36

+8.36

ING ARE A

SETB

UP

J

AREA

4

SHAFT 4

STAIR-1

4200

7 A491

EMPLOYER : 2401 2000

LIFT-4

K

300

LIFT LOBBY (T.HOUSE)

A205

A491

3 4 1 ELEVATION-1 A311 MECH. SHAFT-

+8.46

150

+8.41

A311

1900

ELE C.

+8.46 01.i

SMDB

01.i

JAN.

FHC-R

SMDB

STAIR

LAUNDRY LOBBY

LOBBY

G. WC

M. BATHROOM

M. BATHROOM

JAN.

G. WC

O.T.S.

KITCHEN DB

KITCHEN

AL DANA NORTH

STAIR

LAUNDRY

LOBBY

AV-6 AV-5

+2.64

TERRACE

ARCHITECTURAL MODIFICATIONS WITHOUT ADDITION & WITHOUT STRUCTURAL MODIFICATIONS

KITCHEN

G. WC SHAFT M. BATHROOM

AV-4

LIVING / DINING

KITCHEN

BEDROOM

TERRACE

TERRACE

LIVING / DINING

LIVING/DINING

TERRACE

BUILDING LIMIT

C11

STAIR

LAUNDRY

LIVING/DINING LIVING/DINING

2 A313

PLOT NO. :

RBW8 PROJECT DESCRIPTION :

72 00

LIVING/DIN ING TERRACE

SECTOR :

‫ﺗﻌﺩﻳﻼﺕ ﻣﻌﻣﺎﺭﻳﺔ ﻓﻘﻁ ﺑﺩﻭﻥ ﺇﺿﺎﻓﺔ ﻭﺑﺩﻭﻥ ﺗﻌﺩﻳﻼﺕ ﺇﻧﺷﺎﺋﻳﺔ‬

ONT

KITCHEN

BEDROOM

ONT

LOBBY

SETBACK LINE

+8.46

BEDROOM

DB

G. WC

JAN.

ONT

BEDROOM

SMDB

01.i

IRON./DRYER RM.

ONT

BEDROOM

DB

EXTRACT AIR

O.T.S.

01.i

IRON./DRYER RM. SMDB

JAN.

LIVING/DIN ING

AV-1

+8.46

STAIR

DB

LOBBY

ZONE :

01.e

IRON./DRYER RM.

LAUNDRY

G. WC

COMMERCIAL / RESIDENTIAL TOWER AV-7

LINE SETBACK

TERRAC E

IRON./DRYER RM.

LAUNDRY

SMDB

STAIR

M. BATHROOM

KITCHEN DB

LOUVER

DB

KITCHEN

G. WC

ONT

BEDROO M

LOBBY

MAID'S BR

DB

JAN.

ONT

SHAFT3 ELE VATION -1

O.T.S.

PROJECT NAME :

200MM BLOCK WALL (BOUNDERY WALLC) WITH INTERMEDIATE CONCRETE POSTS AT EVERY 4000MM

WC 01.i

SMDB

STAIR

LOBBY JAN.

A311

ENT.

01.i

ONT

G. WC

HOUSE

+8.46

SMDB

GARB.

CONSULTANT :

1 A304

5 A311

00 40

M. BATHROOM 2

+8.41

TOWN

W/M

+5.77

A310

2

CORRDO R (T.HOUSE)

FHC-R

01.i

IRON./DRY ER RM.IRON ./DRYER RM.

LAUNDR Y

SHAFT

+8.41 200

CORRDO R (T.HOUSE)

1 ELEVATION-2 MECH. SHAFT-

AV-7

+8.41

7

+8.46

STAIR

ALDAR OWNER :

0 00

00 60

A310

+7.34

67932

A310

BARRIER

ED OU TDOOR

09 JUN 2021 17 MAY 2021 01 OCT 2018 DATE

BARRIER

+7.62

A315

7500

SHAD

ISSUED FOR APPROVAL ISSUED FOR APPROVAL ISSUED FOR APPROVAL DESCRIPTION

MASTER DEVELOPER : 1

4

AV-6

2 1 0 REV. NO.

SETBACK LINE PG-15

2500

58181

LINE SETBACK

7

01.e

H

MECH.

SET BACK LINE PLOT LIMIT

LINE OF CANOPY

3

00

DD

A304

A313

60

BULK STO RE

G

+4.21

INTERNAL BLOCKWALL (100/150/200)

+8.41

+8.46

CCTV ROOM

E.C.C ROOM A-312 A312

WALL LEGEND :

CC

SER. LOBBY-1

2

LIFT 1, 2 & 3

SHAD

BB

STAIR-2

7 A402

FHC-R

FOYER

2800

+8.46

TEL.

ONT

LIFT LOBBY

SHAFT

E

SHAFT

+8.46

AS WET ARE

MECH. MECH. SHAFT-2 ELEVAT *ADM SHA FT-(SIZ ION 2 ELE E A0) VATION -2 -2

ME CH.

SMDB

DB

FUTURE

4200

2

SETBACK LINE

AV-2

4. CONTRACTOR MUST VERIFY ALL DIMENSIONS & MEASUREMENTS ON SITE & UNDERTAKE ANY ADDITIONAL OR NEW SURVEY AS NECESSARY TO CONFIRM SITE CONDITIONS. 5. ALL DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL OTHER PROJECT DOCUMENTS (I.E. ARCHITECTURAL, STRUCTURAL, MEP DRAWINGS, SPECIFICATION & BOQ SHOULD BE ALL READ TOGETHER FOR CONSISTENCY). 6. IF ANY DISCREPANCIES ARE FOUND BETWEEN DRAWINGS OR DOCUMENTS, THE CONTRACTOR MUST BRING THE SAME TO THE ATTENTION OF THE ENGINEER & SUBMIT PROPOSED SOLUTIONS DURING SHOP DRAWINGS STAGE, SUBJECT TO ENGINEER'S CONSENT & APPROVAL.

SLAB

SED DEPRES

HATCH INDICATE SLAB AT 3.20 METER HIGH

A490 3 A312

1

2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED. 3. DO NOT SCALE OFF ANY DIMENSIONS FROM THE DRAWINGS.

+8.36

+8.46

TRENCH

+8.46

F

4300

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

TRENCH

5

AV-3

GENERAL NOTES :

TRANSFORMER

TRENCH

MAIN ENTRANCE LOBBY

RETAIL

+8.46

A312

A313 4

6680

SETBACK LINE

TRENCH

+8.61

+8.42

AA0

CC

4400

GAS

TRENCH

4

AV-4

C11

A801

+8.37

+8.41

BB

AV-5

N 2705374.480 E 254653.585

+8.01

AA0

D

4100

CE VEHICULAR ENTRAN

9 5474

H.V ROOM

5 A801

ON STREET SHOPPING /

1

8

PLOT LIMIT

FOYER

E LIN

K AC TB SE

01.g

A301

A801

A405

+8.17

4.81%

SETBACK LINE

C

6 A310

6

4200

34

+7.77

3393

5

4200

4 A801

A

+8.17 88

A

B

4

3875

5 A310

BL

+8.17

+8.01 5

PLOT LIMIT

5408

06

Architectural Modifications: [C11]: Residential & Commercial Tower

DRAWING TITLE : +8.41

GROUND FLOOR PLAN

AV-3

TERRACE

AV-2

DRAWING NO. :

REVISION NO. :

3

A104 3 A310

AV-1

2

1276

A302

11 JULY 2021

1

PLOT LIMIT

A303

16747

ML-2

PROJECT ID :

5423

ML-1

N 2705347.649 E 254561.863

SUBMISSION DATE :

B1N-2018-000258-P02-M03

ML-3 ML-4

OFFICIAL USE ONLY : ML-5 ML-6

ML-7

80785

ML-8 ML-9

OFFICIAL USE ONLY : ML-10 YYYY

ML-11

ML-12

ML-13

ML-15

ML-16

PLOT LIMIT

N 2705309.721 E 254633.066

SCALE :

1 : 100 DRAWING SIZE :

A0


06

Architectural Modifications: [C11]: Residential & Commercial Tower Basement Floors

LANDSCAPING SHOWN BEYOND THE PLOT LIMIT IS FOR GUIDANCE ONLY, WHICH SHALL BE DONE BY MAIN DEVELOPER. X3

2

4500

3

3875

5

A310

A310

4

4200

5

4200

6

4200

7

4200

8

4200

9

5474

53356

N 2705394.530 E 254596.319

88

A

C11

34

5075

MECH.SHAFT-1

6680

+3.56

FAN ROOM

23

3393

01.b

B

22

21

20

19

18

17

16

GENERAL NOTES :

+3.56

15

STORE

AA0

CONTROL ROOM

PARKING

5213 8100

00

14

11

54

55

A405

PARKING

WALL LEGEND :

TYPICAL ROAD HUMPS AS SPECIFIED AND AS PER TYPICAL DETAIL

+3.31 +3.56

G SYSTEM SHORIN

2000

OWNER :

WHEEL STOPPER (TYPICAL)

57

EMPLOYER :

300

+3.66

STAIR-1

SMDB

50

58

40

00

3

01.d

SMDB

+3.56

+3.56

ELEC.

SMDB

36

DB

DB

400

41

42

0

2000

00

2

40

FHC-R

+3.56

0

TION-1

10 40 0

-3 ELEVA

TYPICAL ROAD HUMPS AS SPECIFIED AND AS PER TYPICAL DETAIL

44

UP TO GROUND FLOOR

45

GARB.

PROVISION OF MEP SERVICES

A313

AV-5 76

PARKING

43

3

AV-2

+4.15

+4.15

+4.15

5408

+4.15

PROVISION OF MEP SERVICES

AV-3 01.g

HIGH END RESTAURANT / SHOP 03

AV-2 01.f

+4.15

+4.15

+4.15

DRAWING NO. :

DB

1.17° 1276

DB

ML-1

+4.00

1.17°

ML-2

2

ML-3

1.10°

UP

A302

7.43°

1.10°

1

ML-6

UP

A303

ML-8

ML-7

N 2705309.721 E 254633.066

80785

ML-10 YYYY

ML-11

ML-12

ML-13

ML-15

+2.80

SHAFT

+56.91

MECHANICAL

+56.91

01.r

JACUZZI KIT +57.86

ø

1

STAIR-2

A301

DN

A

+56.76

+57.86

6. IF ANY DISCREPANCIES ARE FOUND BETWEEN DRAWINGS OR DOCUMENTS, THE CONTRACTOR MUST BRING THE SAME TO THE ATTENTION OF THE ENGINEER & SUBMIT PROPOSED SOLUTIONS DURING SHOP DRAWINGS STAGE, SUBJECT TO ENGINEER'S CONSENT & APPROVAL.

CC

ACCESS CONTROL DOOR

STORE

20 50

JACUZZI

WALL LEGEND :

DN

SHAFT SHAFT

01.s

+56.91

A310

+56.91

+56.91 01.p

01.s

01.p

01.p

01.s

DD

DD

01.j

+55.56

DISABLE LIFT

7

GLASS PARTITION

4300

8

ACK LINE

ROOF

A310

UP

2 1 0 REV. NO.

SMDB

SHAFT

+8.46

ISSUED FOR APPROVAL ISSUED FOR APPROVAL ISSUED FOR APPROVAL DESCRIPTION

4

DB

DB

AREA

GENERATOR

+8.36

REINFORCED CONCRETE WALL/COLUMN

+8.46

+8.41

PERFORATED FIBER CEMENT CLADDING

AWCS ROOM (GARBAGE) 01.h

EXTERNAL INSULATED BLOCKWALL

STORE +8.46

SERVICE ENTRANCE

ELEC.

A491

5 A310

+8.46

+8.41

4

6

A801

A310

DD

7

6 A405

PLOT LIMIT LOAD

+8.36

+8.36

ING AREA

SETB

AREA

SHAFT

40

OWNER :

00

60 00

STAIR

4200

7 A491

-1

EMPLOYER :

2000

LIFT-4

K

300

LIFT LOBBY (T.HOUSE) +8.41

7

+8.46

A205

A491

A311 3 4 ELEVATION-1 A311 MECH. SHAFT-1

+8.46

150

+8.41

ELEC.

1900

AV-1

2 A302

PROJECT ID :

N 2705309.721 E 254633.066

ML-8 ML-9

ML-10 YYYY

ML-11

ML-12

ML-13

ML-15

ML-16

OFFICIAL USE ONLY :

200

JAN.

STAIR

IRON./DRYER RM.

LAUNDRY LOBBY

LOBBY

G. WC

M. BATHROOM

M. BATHROOM

O.T.S.

DB

KITCHEN

LIVING/DI NING

STAIR

LAUNDRY

LOBBY

AV-4

TERRACE

LIVING/DININ G

LAUNDRY

5408

LIVING / DINING

LIVING/DINING

KITCHEN

BEDROOM

TERRACE

TERRACE

LIVING / DINING

LIVING/DINING

TERRACE

‫ﺗﻌﺩﻳﻼﺕ ﻣﻌﻣﺎﺭﻳﺔ ﻓﻘﻁ ﺑﺩﻭﻥ ﺇﺿﺎﻓﺔ ﻭﺑﺩﻭﻥ ﺗﻌﺩﻳﻼﺕ ﺇﻧﺷﺎﺋﻳﺔ‬

ONT

TERRACE

BUILDING LIMIT

DRAWING TITLE : +8.41

GROUND FLOOR PLAN

AV-3

TERRACE

3

AV-2

DRAWING NO. :

REVISION NO. :

3

A104

SCALE : 3

1 : 100 DRAWING SIZE :

A0

A310

AV-1

2

1276

A302

11 JULY 2021

1

PLOT LIMIT

A303

ML-1

N 2705347.649 E 254561.863

SUBMISSION DATE :

16747

ML-2

PROJECT ID :

B1N-2018-000258-P02-M03

ML-3 ML-4

OFFICIAL USE ONLY : ML-5

OFFICIAL USE ONLY :

C11

ARCHITECTURAL MODIFICATIONS WITHOUT ADDITION & WITHOUT STRUCTURAL MODIFICATIONS

KITCHEN

LIVING/DI NING

2 A313

PLOT NO. :

RBW8 PROJECT DESCRIPTION :

72 00

M. BATHROOM

KITCHEN

BEDROOM

AV-5

SECTOR :

STAIR

G. WC SHAFT

+8.46

BEDROOM

AV-6

SETBACK LINE

JAN.

ONT

KITCHEN

ZONE :

AL DANA NORTH

ONT

LOBBY

G. WC

DB

BEDROOM

DB

IRON./DRYER RM. JAN.

G. WC

SMDB

01.i

SMDB

O.T.S.

01.i

DB

JAN.

FHC-R

SMDB

STAIR

LOBBY

ONT

BEDROOM

MAID'S BR +8.46

IRON./DRYER RM.

LAUNDRY

G. WC

COMMERCIAL / RESIDENTIAL TOWER AV-7

01.e

SMDB

SMDB

M. BATHROOM

KITCHEN

PROJECT NAME :

200MM BLOCK WALL (BOUNDERY WALLC) WITH INTERMEDIATE CONCRETE POSTS AT EVERY 4000MM

WC 01.i

IRON./DRYER RM.

LAUNDRY

ONT

DB

STAIR

ONT

ONT

TION-1

-3 ELEVA

G. WC

CONSULTANT :

1 A304

5 A311

E ENT.

5423

B1N-2018-000258-P02-M03

1

LOBBY

+2.64

REVISION NO. :

A117 11 JULY 2021

ML-4

KITCHEN

AV-1

DRAWING NO. :

SUBMISSION DATE : ML-1

JAN.

BEDROO M

TERRAC E

ROOF PLAN

AV-2

A303

3 A313

DRAWING TITLE : AV-3

A203

+4.21

AV-2

O.T.S.

DB

‫ﺗﻌﺩﻳﻼﺕ ﻣﻌﻣﺎﺭﻳﺔ ﻓﻘﻁ ﺑﺩﻭﻥ ﺇﺿﺎﻓﺔ ﻭﺑﺩﻭﻥ ﺗﻌﺩﻳﻼﺕ ﺇﻧﺷﺎﺋﻳﺔ‬

JAN.

HOUS

+8.46

LINE SETBACK

LINE SETBACK

AV-1

AV-3

MECH . SHAFT

A313 4

AV-4 ARCHITECTURAL MODIFICATIONS WITHOUT ADDITION & WITHOUT STRUCTURAL MODIFICATIONS

01.i

A311

01.i

STAIR

LOBBY

LOUVER

PROJECT DESCRIPTION :

AV-2

G. WC

A310

EXTRAC T AIR

AV-3

M. BATHROOM 2

C11

RBW8

W/M GARB.

YER RM.

+5.77

AV-4 PLOT NO. :

SECTOR :

TOWN

01.i

YER RM.IRON./DR

+8.41

00

AV-5

SETBACK LINE

IRON./DR

LAUNDR Y

2

R (T.HOUSE )

40

AL DANA NORTH

AV-6

X4

FHC-R

01.i

STAIR

ZONE :

CORRDO

SMDB

COMMERCIAL / RESIDENTIAL TOWER

+8.46

DB

AV-7

AV-4

SHAFT

+8.41

R (T.HOUSE )

SMDB

K

CORRDO

+7.34

ELEVATION-2

AV-6 AV-5

MECH. SHAFT-1

AV-7

CONSULTANT :

ML-7

ALDAR

BARRIER

ED OUTD OOR

2401

PROJECT NAME :

ML-6

67932

UP

4

09 JUN 2021 17 MAY 2021 01 OCT 2018 DATE

BARRIER

+7.62

A315

0 250

SHAD

4 A310

ISSUED FOR APPROVAL ISSUED FOR APPROVAL ISSUED FOR APPROVAL DESCRIPTION

MASTER DEVELOPER : 1

1

ML-5

2 1 0 REV. NO.

SETBACK LINE PG-15

750 0

A304

ML-3

SET BACK LINE PLOT LIMIT

BULK STORE

01.e

OWNER :

01.p

ML-2

00

FHC-R

A310

X3

60

DEPRESSED SLAB

BICYCLE PARKING SER. LOBBY-2

DD

X1

X2

INTERNAL BLOCKWALL (100/150/200)

+8.41

+8.46

CCTV ROOM

STORE DB

FIREMEN LIFT

WALL LEGEND :

CC CORRIDOR

LINE OF CANOPY

09 JUN 2021 17 MAY 2021 01 OCT 2018 DATE

EMPLOYER :

AV-7

1 A301

SER. LOBBY-1

+8.46

SHAFT

+8.46

ED OUTD OOR

BB

STAIR-2

7 A402

E.C.C ROOM A-312 A312

SER. LOBB Y-3

J

4200

. SHAFT

-2 ELEVA TION-1 4

SHAD

PAVING TILES AND SWIMMING POOL FURNITURE LAYOUT REFER TO LANDSCAPE

AV-6

N 2705347.649 E 254561.863

SHAFT

TEL.

01.p

+55.56

F.F PUMP ROOM

SHAFT

SMDB

DB

+8.46

FHC-R

FOYER

A304

ALDAR 8 A310

+55.96

A310

+8.41

2 A491

A312

SETBACK LINE

01.p

J

K

AV-5

+8.46

+8.46

LIFT LOBBY

LIFT 1, 2 & 3

5

MECH.

58181

4100

MECH

E

H

ING POOL

4. CONTRACTOR MUST VERIFY ALL DIMENSIONS & MEASUREMENTS ON SITE & UNDERTAKE ANY ADDITIONAL OR NEW SURVEY AS NECESSARY TO CONFIRM SITE CONDITIONS. 5. ALL DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL OTHER PROJECT DOCUMENTS (I.E. ARCHITECTURAL, STRUCTURAL, MEP DRAWINGS, SPECIFICATION & BOQ SHOULD BE ALL READ TOGETHER FOR CONSISTENCY). 6. IF ANY DISCREPANCIES ARE FOUND BETWEEN DRAWINGS OR DOCUMENTS, THE CONTRACTOR MUST BRING THE SAME TO THE ATTENTION OF THE ENGINEER & SUBMIT PROPOSED SOLUTIONS DURING SHOP DRAWINGS STAGE, SUBJECT TO ENGINEER'S CONSENT & APPROVAL.

SED SLAB 1

L.V ROOM

A490 3 A312

MASTER DEVELOPER :

SWIMM

UP

DEPRES

TRENCH

2

1

2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED. 3. DO NOT SCALE OFF ANY DIMENSIONS FROM THE DRAWINGS.

+8.36

+8.46

A202

01.p

POOL LADDER POOL DECK

+56.66

+54.54

TRANSFORMER

TRENCH

+8.41

G

SETB

H

C11

GENERAL NOTES :

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

TRENCH

HATCH INDICATE SLAB AT 3.20 METER HIGH

4

SET BACK LINE

SETBACK LINE

TRENCH

+8.61

+8.42

+8.46

FOR GROUND FLOOR MAIN ENTRANCE DETAILS REFER TO DRAWING NUMBER A713-A714 (MAIN ENTRANCE FLOORING LAYOUT, RCP, SECTIONS AND DETAILS)

+8.46

A312

PLOT LIMIT

+8.01

A801

LINE SETBACK

+55.56

N 2705374.480 E 254653.585

PLOT LIMIT

VEHICULAR ENTRANCE

9 5474

+8.37

GAS

AA0

PERFORATED FIBER CEMENT CLADDING

LINE SETBACK

SHAFT

A201

A801

MAIN ENTRANCE LOBBY

RETAIL

CC

1

8

H.V ROOM

5

F

OPEN SHOWER

UP G

LINE

BB

A301

A801

TRENCH

AA0

D

REINFORCED CONCRETE WALL/COLUMN

+56.91

4400

A304

01.p

01.p

SHAFT 1

4200

A405

+8.17

A310

7 4200

53356

FOYER

ACK LINE

F

C

6

4 A801

6 4200

+8.36 +8.46

ON STREET SHOPPING /

EXTERNAL INSULATED BLOCKWALL

ROOF OF TOWER

5 A310

5 4200

+8.17

01.g

INTERNAL BLOCKWALL (100/150/200)

4000

7

LINE OF CANOPY

4 4200

+8.46

K AC TB SE

4000

ROOF OF TOWER

OPENING IN SLAB

E

3 3875

FHC-R

SETBACK LINE

B

4300

OPENING IN SLAB CC 4200

BB

2 4500

4100

D

1 A301

5. ALL DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL OTHER PROJECT DOCUMENTS (I.E. ARCHITECTURAL, STRUCTURAL, MEP DRAWINGS, SPECIFICATION & BOQ SHOULD BE ALL READ TOGETHER FOR CONSISTENCY).

01.r

SHAFT

X4

1 A303

1

34

2800

+56.91

BB

PLOT LIMIT

88

A +7.77

4400

8100

4. CONTRACTOR MUST VERIFY ALL DIMENSIONS & MEASUREMENTS ON SITE & UNDERTAKE ANY ADDITIONAL OR NEW SURVEY AS NECESSARY TO CONFIRM SITE CONDITIONS.

+8.01

+8.17

N 2705394.530 E 254596.319

+8.17

5

SMDB

3. DO NOT SCALE OFF ANY DIMENSIONS FROM THE DRAWINGS.

+53.31

OPEN BELOW

N 2705396.229 E 254604.988

SMDB

2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED. +53.31

+56.91

+7.77

ONT

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

AA0

+56.66

C

X3

ONT

GENERAL NOTES :

N QIB LA

X2

FUTURE WET AREAS

8100

+56.66

ø 300 0

5075

B

200

LAND KEY :

LANDSCAPING SHOWN BEYOND THE PLOT LIMIT IS FOR GUIDANCE ONLY, WHICH SHALL BE DONE BY MAIN DEVELOPER.

X1

6680

OPENINGININSLAB SLAB OPENING

12600

OFFICIAL USE ONLY :

16747

4.81%

AA0

K AC TB SE

A0

OFFICIAL USE ONLY :

ML-16

+2.80

MECH . MECH SHAFT-2 ELEVA . SHAFT *ADM (SIZE -2 ELEVA TION-2 A0) TION-2

C11

SETBACK LINE

1 : 100 DRAWING SIZE :

B1N-2018-000258-P02-M03

ML-5

3393

9 5474

3 SCALE :

11 JULY 2021 PROJECT ID :

ML-4

5075

8 4200

REVISION NO. :

A103 SUBMISSION DATE :

+4.00

1.17°

8100

7 4200

LINE

AV-1

ONT

1.17°

UP

BASEMENT-1 PLAN

STORE

LOBBY ONT

3

N 2705394.530 E 254596.319

C11

DRAWING TITLE :

PROVISION OF MEP SERVICES

01.f

01.g

HIGH END RESTAURANT / SHOP 02

DB

A310

A

PLOT NO. :

ARCHITECTURAL MODIFICATIONS WITHOUT ADDITION & WITHOUT STRUCTURAL MODIFICATIONS

AV-4

DN

01.g

HIGH END RESTAURANT / SHOP 01

ONT

+4.00

4200

6 4200

PE

5423

5

SLO

RBW8 PROJECT DESCRIPTION :

CONVEX MIRROR

6% = 16.

‫ﺗﻌﺩﻳﻼﺕ ﻣﻌﻣﺎﺭﻳﺔ ﻓﻘﻁ ﺑﺩﻭﻥ ﺇﺿﺎﻓﺔ ﻭﺑﺩﻭﻥ ﺗﻌﺩﻳﻼﺕ ﺇﻧﺷﺎﺋﻳﺔ‬

1.17°

N 2705374.480 E 254653.585

4200

+3.81

SLOPE= 8.33 %

2

QIB LA

4 4200

+3.56

+3.56

PROVISION OF MEP SERVICES

A313

Typical Plans

Roof Plans

3

AL DANA NORTH SECTOR :

79

STORE AV-1

N

3875

COMMERCIAL / RESIDENTIAL TOWER ZONE :

AV-6 +3.56

MECH . SHAFT

AV-3

CONSULTANT :

PROJECT NAME :

AV-7

00

+3.56

00

2 A310

A313 4

A204

2

40

1

10

AV-4

1 A304

1 TO

0 800

X3

4500

5

4

BASEMENT RAMP FROM FLOOR GROUND

SMDB

LAND KEY :

1

400 0

200

200 150

4200

+3.56

AV-7

AV-6 AV-5

ML-9

SETBACK LINE

09 JUN 2021 17 MAY 2021 01 OCT 2018 DATE

ALDAR

LIFT LOBBY-2

+1.50

X4

ISSUED FOR APPROVAL ISSUED FOR APPROVAL ISSUED FOR APPROVAL DESCRIPTION

6 51

LIFT-4

UP

1

2 1 0 REV. NO.

56

32

FHC-R

8

38

+3.56

34

01.a

9

MASTER DEVELOPER :

BICYCLE PARKING

7

33

35

10

STORE

TYPICALCORNER GUARD IN ALL COLUMNS AS PER SPECIFIED AND AS PER DETAILS

+3.56

29

+3.56

PARKING

67932

EXISITN

0 400

34 TYPICALCORNER GUARD IN ALL COLUMNS AS PER SPECIFIED AND AS PER DETAILS

A405

+3.56

PARKING

32

33

+2.80

A303

SET BACK LINE PLOT LIMIT

+3.56

+1.50

X2

PERFORATED FIBER CEMENT CLADDING

6 REGULATORY ARROW

35

J

UP

X1

EXTERNAL INSULATED BLOCKWALL REINFORCED CONCRETE WALL/COLUMN

DD

MECHANICAL MECH.SHAFT-3 MECH.SHAFT-4

7

BASEMENT 1 PARKING: 58 CARS +3.56

28

K

INTERNAL BLOCKWALL (100/150/200)

1 A315

20

TOP LEVEL

3

31

BY DEVELO PER

4300

36

2

CONVEX MIRROR

11199

+3.56

27

85

58181

RAMP FROM BASEMENT-2

SLOPE= 16.6 % 41

G RAMP/S TAIRS WITH EXISTIN

4000

COORD

30

20

4100

TYPICAL ROAD HUMPS AS SPECIFIED AND AS PER TYPICAL DETAIL

+3.56

G RAMP

H

53

PARKING

TO BE

4400

A304

G

52

00 40

DD

+3.66

01.d

SLOPE= 8.33 %

ROAD MARKING (TYPICAL)

STORE FHC-R

29

INATED

F

CC

72

4200

12

13

LIFT 1, 2 & 3

6. IF ANY DISCREPANCIES ARE FOUND BETWEEN DRAWINGS OR DOCUMENTS, THE CONTRACTOR MUST BRING THE SAME TO THE ATTENTION OF THE ENGINEER & SUBMIT PROPOSED SOLUTIONS DURING SHOP DRAWINGS STAGE, SUBJECT TO ENGINEER'S CONSENT & APPROVAL.

BB 1 A301

5

00 40

FIREMEN LIFT

1

FHC-R

STAIR-2 LIFT LOBBY-1

27

28

5. ALL DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL OTHER PROJECT DOCUMENTS (I.E. ARCHITECTURAL, STRUCTURAL, MEP DRAWINGS, SPECIFICATION & BOQ SHOULD BE ALL READ TOGETHER FOR CONSISTENCY).

2800

2775

26 CC

E

4. CONTRACTOR MUST VERIFY ALL DIMENSIONS & MEASUREMENTS ON SITE & UNDERTAKE ANY ADDITIONAL OR NEW SURVEY AS NECESSARY TO CONFIRM SITE CONDITIONS.

+3.56 612

TYPICALCORNER GUARD IN ALL COLUMNS AS PER SPECIFIED AND AS PER DETAILS

BB

1

3. DO NOT SCALE OFF ANY DIMENSIONS FROM THE DRAWINGS.

A310

STORE

25

A301

2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED.

1

ETS ROOM +3.56

F.F WATER TANK

D

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.

AA0

+3.56

24 C

N 2705347.649 E 254561.863

N 2705396.229 E 254604.988

N 2705374.480 E 254653.585

1

X4

1 A303

1

N QIB LA

X2

20

*Gaining an understanding on the importance of setting a proper Travel Distance to the nearest exits in case of fire. *Coordinating Revision Clouds with proper legend description, and setting proper hatching for its print layout. *Editing submission sheets layout when needed.

LAND KEY : X1

N 2705396.229 E 254604.988

ML-6

ML-7

80785

ML-8 ML-9

OFFICIAL USE ONLY : ML-10 YYYY

ML-11

ML-12

ML-13

ML-15

ML-16

PLOT LIMIT

N 2705309.721 E 254633.066

SCALE :

1 : 100 DRAWING SIZE :

A0


Preparation of Document Submission for Municipality TABLE : 1 OCCUPANCY LOAD AS PER UAE FIRE CODE 2017 ,TABLE No.3.14 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

NAME OF ROOM

COMMERCIAL APARTMENT

BASEMENT-3

PARKING AREA

TYPE OF OCCUPANCY ENCLOSED PARKING

AREA

OCCUPANT FACTOR

2600.00m²

27.9m² / PERSON

93 PERSON

TOTAL:- 93 PERSON

LAND KEY :

TABLE : 5 FIRE PROTECTION SYSTEM AS PER UAE FIRE CODE 2017 ,CHAPTER 9

NUMBER OF PEOPLE NO. OF EXIT 2 EXIT

2 EXIT

NO. OF BUILDING 1

NAME OF BUILDING

TYPE OF OCCUPANCY

COMMERCIAL APARTMENT

RESIDENTIAL (GROUP A)

AREA OF BUILDING (SQ.M)

BASEMENT BASEMENT BASEMENT GROUND -3 -2 -1 FLOOR 3591.00m²

3591.00m²

3617.64m²

1 st FLOOR

2 nd FLOOR

3rd FLOOR

4 th FLOOR

5 th FLOOR

2752.95m² 2752.95m² 1603.00m² 1576.00m² 1533.60m² 1533.60m²

6 TH FLOOR

7 TH FLOOR

8 TH FLOOR

9 TH FLOOR

10 TH FLOOR

11 TH FLOOR

12 TH FLOOR

ROOF FLOOR

TOP ROOF FLOOR

TOTAL

1535.70m²

1533.60m²

1530.00m²

1418.50m²

1418.50m²

1418.50m²

1418.50m²

1397.80m²

1397.80m²

35620.64m²

TYPE OF FIRE PROTECTION SYSTEM SPRINKLER SYSTEM + FHC , WET RISER SYSTEM + EXTINGUISHER

TYPE OF FIRE ALARM SYSTEM

FIRE ALARM SMOKE DETECTION SYSTEM

NO LPG SYSTEM IN THIS BUILDING

TABLE : 2A STAIRCASE SCHEDULE AS PER UAE LIFE SAFETY CODE 2017 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

NUMBER OF STAIR

WIDTH OF EACH STAIR IN (mm)

FACTOR OF STAIR IN (mm)

TOTAL PERSON FOR EACH STAIR

COMMERCIAL APARTMENT

BASEMENT-3

EXIT STAIR-1

1300mm

7.6mm

171 PERSONS

BASEMENT-3

COMMERCIAL APARTMENT

EXIT STAIR-2

1300mm

7.6mm

TOTAL NUMBER OF PEOPLE IN THIS FLOOR 93 PERSONS

171 PERSONS

C15

COMPLY

YES

33600

TABLE : 3 MEANS OF EGRESS AS PER UAE FIRE CODE 2017 TABLE No.3.16 CHAPTER 3 PAGE No.321 NAME OF BUILDING

NAME OF FLOOR

NAME OF ROOM

TYPE OF OCCUPANCY

ALLOWED DEAD END

ALLOWED COMMON PATH

ALLOWED TRAVEL DISTANCE

APPLIED DEAD END

APPLIED COMMON PATH

APPLIED TRAVEL DISTANCE

COMPLY

COMMERCIAL APARTMENT

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

45.20m

YES

COMMERCIAL APARTMENT

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

45.60m

YES

COMMERCIAL APARTMENT

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

23.50m

YES

4200

4200

4200

4200

4200

4200

4200

4200

FIRE FIGHTING LEGEND: SYMBOL

FHC

DESCRIPTION FIRE HOSE REEL CABINET. 1 No. Ø25x30 MTR. LONG HOSE REEL. 1 No. Ø25mm GATE VALVE & PRV. 1 No. 4.5KG. DCP FIRE EXTINGUISHER 1 No. 5KG. CO2 FIRE EXTINGUISHER. 1 No. Ø65mm LANDING VALVE.

P+++

PRESSURE LEVEL (AT MAIN STAIRCASE'S & FIRE LIFT SHAFT)

4.5KG DRY POWDER FIRE EXTINGUISHER 5KG CO2 EXTINGUISHER 2 HOUR (120min.) FIRE RATED WALL 1 HOUR (60min.) FIRE RATED WALL EXIT STAIRWAY FD60 FD90

45000 GALLONS

60 mins FIRE RATED DOOR 90 mins FIRE RATED DOOR DEAD END TRAVEL DISTANCE

FHC

COMMON PATH 1300

2800

1300

R.C.C WALLS

1200

FD90

1100 EXIT-2

P+++

2800

FIRE ESCAPE ROUTE

1200

EGRESS PATH

5400

03

FOR AUTHORITY APPROVAL

02

FOR AUTHORITY APPROVAL

23-05-2021

00

FOR AUTHORITY APPROVAL

19-06-2018

DESCRIPTION

DATE

REV. NO.

04-07-2021

MASTER DEVELOPER : P+++

ALDAR

FHC

OWNER:

FHC

CONSULTANT :

EMPLOYER : A FHC

1100

PROJECT NAME : 1200

1300

FD90 1200

2.

Fire Pump capacity shall be calculated according to the building type and civil defense requirement and shall be submitted in shop drawing submittal.

3.

Fire Reserve Water Tank shall be calculated according to the building type and Civil Defense requirement and shall be submitted in shop drawing submittal.

4.

There are no installations for LPG central system in these building.

5.

All gas piping (LPG central system) shall be exposed on the outside elevations filling line and risers if the system is provided.

6.

All Stairways shall be provided with marking signs.

8.

All Smoke Management System and Elevators shall be interlocking with the alarm system.

9.

2800

COMMERCIAL / RESIDENTIAL TOWER ZONE :

PLOT NO :

C15

AL DANA NORTH SECTOR NO :

RBW8

RAMP ( SLOPE 8%)

Determine the total area of the opening between adjacent façade of two different buildings as percentage as per UAE fire and life safety code and international codes.

7.

P+++

A

2800

All items in these documents are guidance only: detailed of Fire Alarm, Fire Fighting and all ventilation system in all items shall be submitted in shop drawing submittal.

5400

R.C.C WALLS 1.

1300

06

Architectural Modifications: [C15]: Residential & Commercial Tower

PROJECT DESCRIPTION :

INTERNAL MODIFICATIONS TO MATCH THE ARCHITECTURAL DRAWINGS

All horizontal and vertical opening on external façade, on internal, shafts or voids shall be fire rated according to the rating degree of the compartment within the building or on elevation.

FHC

10. All portable fire extinguishers shall be provided as per UAE fore and life safety code and NFPA 10

‫ﻟﻣﻁﺎﺑﻘﺔ ﺍﻟﻣﺧﻁﻁﺎﺕ ﺍﻟﻣﻌﻣﺎﺭﻳﺔ‬

‫ﺗﻌﺩﻳﻼﺕ ﺩﺍﺧﻠﻳﺔ‬

11. Emergency light and exit signs shall be provided according to UAE fire and life safety code and NFPA 101

DRAWING TITLE :

12. All structure elements shall have the fire resistance rating according to NFPA 5000 and other international standards. 13. All stairways shall be provided with two ways fire telephone communication. 14. All portions of these buildings and common and services areas shall be fully cover by smoke detections and fully covered by voice announcement system according to NFPA 72.

BASEMENT 3 FIRE & LIFE SAFETY STRATEGY LAYOUT

15. All portions of these building shall be fully protected by automatic sprinklers system according to NFPA 13. 16. Standpipe system shall be provided in these building according to NFPA 14. 17. All Fire Door and Windows shall be according to NFPA 80.

20. Fire command center room shall be provided according to UAE fore and life safety code and NFPA requirement.

SUBMISSION DATE :

21. Carbon monoxide detector shall be provided to detect the CO concentration.

26. Fire pump and fire water tank shall be listed and tested according to civil defense requirement and international standards. 27. All open space floors shall be used as a single tenant floor only, if it used as a multiple tenancy, then fire rated corridor not less than one hour shall be connected to the bath staircase. 28. Fire or smoke damper shall be provided in these building on all duct shaft according to UAE fire and life safety code and NFPA 90A, NFPA90B and shall be submitted in shop drawing submittal. 29. All penetrations through fire resistance rated walls shall be protected by approved fire stop system and materials, installed and tested in accordance with ASTM E 814 or UL 1479. 30. All means of egress components details and dimensions shall be provided and constructed according to UAE fire and life safety code and NFPA 101 and 5000. 31. Consultant and contractor shall comply with UAE fire and life safety code chapter 12 in terms of requirements of building under construction. 32. Emergency action plan shall be implementing in these buildings according to UAE annexure B2 in the UAE Fire and Life Safety Code. 33. Consultant and contractors shall comply with UAE fire and life safety annexure B.1 in terms of the requirement of balcony, terrace and windows. 34. Private Fire Hydrants shall provide around these building as per UAE Fire and Life Safety Code. 35. Consultant and contractors must comply with the general notes and applicable codes and standards even if the code requirement was missed during plan review.

SCALE :

04-07-2021

22. Central battery system for emergency lighting systems and other system shall be provided. 23. Internal roads indicating how fire-men emergency tracks will maneuver on the site and occupants assemblies areas. 24. Total duration time of full evacuation of the building at discharging level, up to assemblies' areas assemblies' areas shall be sized according total number of occupants.

03

F100

19. All interiors finishing material shall be provided as UAE fire and life safety code and NFPA 101.

25. All curtain walls and cladding insulations, exterior wall cladding and roofing system shall be provide as UAE fire and life safety code annexure A.1.21 and international codes and standards, after tender is approved bring shop drawing and support information for civil defense approval.

REVISION NO:

DRAWING NO :

18. All types of smoke management systems (include pressure difference between adjacent zones) shall be following NFPA 90A, NFPA 92A, NFPA 92B and other international codes and standards and shall be submitted in shop drawing submittal.

SMOKE EXTRACTION SHAFT WITH 6 TO 10 AIR CHANGES PER HOUR

PROJECT ID :

1:150@A1

B1N-2018-000265-CD03

FOR CIVIL DEFENSE APPROVAL :


Editing Key Legend according to needed revisions

TABLE : 1 OCCUPANCY LOAD AS PER UAE FIRE CODE 2017 ,TABLE No.3.14 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

NAME OF ROOM

COMMERCIAL APARTMENT

BASEMENT-3

PARKING AREA

TYPE OF OCCUPANCY ENCLOSED PARKING

AREA

OCCUPANT FACTOR

2600.00m²

27.9m² / PERSON

TABLE : 5 FIRE PROTECTION SYSTEM AS PER UAE FIRE CODE 2017 ,CHAPTER 9

NUMBER OF PEOPLE NO. OF EXIT 93 PERSON

TOTAL:- 93 PERSON

2 EXIT

2 EXIT

NO. OF BUILDING 1

NAME OF BUILDING

TYPE OF OCCUPANCY

COMMERCIAL APARTMENT

RESIDENTIAL (GROUP A)

AREA OF BUILDING (SQ.M)

BASEMENT BASEMENT BASEMENT GROUND -3 -2 -1 FLOOR 3591.00m²

3591.00m²

3617.64m²

1 st FLOOR

2 nd FLOOR

3rd FLOOR

4 th FLOOR

5 th FLOOR

2752.95m² 2752.95m² 1603.00m² 1576.00m² 1533.60m² 1533.60m²

6 TH FLOOR

7 TH FLOOR

8 TH FLOOR

9 TH FLOOR

10 TH FLOOR

11 TH FLOOR

12 TH FLOOR

ROOF FLOOR

TOP ROOF FLOOR

TOTAL

1535.70m²

1533.60m²

1530.00m²

1418.50m²

1418.50m²

1418.50m²

1418.50m²

1397.80m²

1397.80m²

35620.64m²

TYPE OF FIRE PROTECTION SYSTEM SPRINKLER SYSTEM + FHC , WET RISER SYSTEM + EXTINGUISHER

TYPE OF FIRE ALARM SYSTEM

FIRE ALARM SMOKE DETECTION SYSTEM

TABLE : 2A STAIRCASE SCHEDULE AS PER UAE LIFE SAFETY CODE 2017 PAGE No.311&312 NAME OF BUILDING

NAME OF FLOOR

NUMBER OF STAIR

WIDTH OF EACH STAIR IN (mm)

FACTOR OF STAIR IN (mm)

TOTAL PERSON FOR EACH STAIR

COMMERCIAL APARTMENT

BASEMENT-3

EXIT STAIR-1

1300mm

7.6mm

171 PERSONS

COMMERCIAL APARTMENT

BASEMENT-3

EXIT STAIR-2

1300mm

7.6mm

171 PERSONS

TOTAL NUMBER OF PEOPLE IN THIS FLOOR 93 PERSONS

COMPLY

YES

TABLE : 3 MEANS OF EGRESS AS PER UAE FIRE CODE 2017 TABLE No.3.16 CHAPTER 3 PAGE No.321 NAME OF BUILDING

NAME OF FLOOR

COMMERCIAL APARTMENT COMMERCIAL APARTMENT COMMERCIAL APARTMENT

NAME OF ROOM

TYPE OF OCCUPANCY

ALLOWED DEAD END

ALLOWED COMMON PATH

ALLOWED TRAVEL DISTANCE

APPLIED DEAD END

APPLIED COMMON PATH

APPLIED TRAVEL DISTANCE

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

45.20m

YES

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

45.60m

YES

BASEMENT-3

PARKING AREA

ENCLOSED PARKING

15.00m

15.00m

60.00m

-

0.00m

23.50m

YES

33600 4200

4200

4200

4200

4200

4200

4200

4200

COMPLY

FIRE FIGHTING LEGEND: SYMBOL

FHC

DESCRIPTION FIRE HOSE REEL CABINET. 1 No. Ø25x30 MTR. LONG HOSE REEL. 1 No. Ø25mm GATE VALVE & PRV. 1 No. 4.5KG. DCP FIRE EXTINGUISHER 1 No. 5KG. CO2 FIRE EXTINGUISHER. 1 No. Ø65mm LANDING VALVE.

P+++

PRESSURE LEVEL (AT MAIN STAIRCASE'S & FIRE LIFT SHAFT)

4.5KG DRY POWDER FIRE EXTINGUISHER 5KG CO2 EXTINGUISHER 2 HOUR (120min.) FIRE RATED WALL 1 HOUR (60min.) FIRE RATED WALL EXIT STAIRWAY

45000 GALLONS

60 mins FIRE RATED DOOR 90 mins FIRE RATED DOOR DEAD END TRAVEL DISTANCE COMMON PATH 1300

2800

1300

P+++ FD90

P+++

*Attaching key legend to each plan and providing needed modifications as revisions with their tags. *Hatch of revision plans indicates non modified part of drawings. FHC

A

5400

2800

FIRE ESCAPE ROUTE

1200

EGRESS PATH

1200

FD90

FHC

FD60

1100 EXIT-2

06

Architectural Modifications: [C15]: Residential & Commercial Tower


Conclusion


Skilled applied/learned

Knowledge gained:

*AutoCAD for Drafting and Preparing Paper space according to company’s layout, and printing settings.

*Setting Layers properties are essential in all drafting process.

*AutoCAD for Drafting and Area Estimation.

*Shortcuts and few tricks in using some AutoCAD commands.

*AutoCAD for Applying Fire fighting Studies.

*Municipality Regulations and Building codes.

*AutoCAD for Revision clouds.

*Scale setting of the drawings while preparing for print layout.

*Word for editing Legend Keys.

*Format of Project Submission to Tanasok, Abu Dhabi Municipality.

*AutoCAD for Drafting and Preparing Paper space according to company’s layout, and printing settings, including pen assignments.

*Format of Feasibility Study Report submitted to ADCE (Abu Dhabi Commercial Engineering Services).

*Excel for filling in Figures and comparing flat areas and room usage.

*Coordinating Revision Clouds with proper legend description, and setting proper hatching for its print layout.

*A drawing should be easily communicated through use of current line weights, line type, and color.

*Proper Fire & Life Safety Strategy Drawing Layout.

*Coordinating details with key drawings.


Thank you Diana Enab