GROWSPACE IT CENTER
CAPSTONE PROJECT AUTHOR: DISHA DINESHA
01 INTRODUCTION 02 THEORETICAL CONCEPT 03 SITE ANALYSIS 04 PROGRAM 05 DESIGN
INDEX
INTRODUCTION
The architectural space directly effects the wellbeing and wellness of human being, and workspace is almost used 50-60% time in a day on an average. This would also directly and indirectly effect on lot of factors of a person’s life. This project of redesigning would be carried on a mixture of the analysis of evolution of workspaces and culture with the different plugins guiding this, the analysis defines the economical, physical, psychological requirement which would then lead to the justification of productivity and human comfort. the workspace specifically would be tackling the IT type of office building design with rental office and public spaces. The culture now has drastically shifted to the work from culture, so the design not only will be dealing with the quantifiable aspects but also the culture and aspects of work flexibility, interaction etc. Hence resulting into the characteristics, spatial arrangements and plugins making it a design for better human comfort.
INTRODUCTION
02
THEORETICAL CONCEPT
Productivity
ENVIRONMENTAL SUPPORT
IMPACT
Workplace Design
Employee’s wellbeing
Every person spends a major part of their lives in an office space making it their most used space. This space usually defines all the factors, the direct and indirect ones in shaping a person’s lifestyle. Hence designing workspace must consider all aspects like the physical, mental, economical and innovative factors.
WORKPLACE EQUILIBRIUM
ENHANCEMENT
04
WORK STATION LAYOUT
PRIVACY
LIGHTING AND ACOUSTIC
SPATIAL COMFORT
THERMAL COMFORT
AIR QUALITY
There are different stategies in physical enviorment which can have direct influence on the users. They easily can inspire their creativity and productivity by enhancing their well-being and satisfaction in the building which motivates them to put more efforts in work and be efficient.
PHYSICAL DESIGN FACTOR
05
SITE
ANALYSIS
SITE
The site chosen for the project is situated in Surat, Gujarat. The project being an IT office space fits in the land use map and justifies the need of such a project in the area, helping in making the area grow.
Surat, Gujarat
SITE MAP, author produced
SATALITE MAP 2020,
SITE DETAILS: Buildable site: 5577.62 m2 Open site: 4106.99 m2 Main access road: 18m Total site area: 2.3 acers
google earth map the space around the site are still unoccupied. The site is barren flat land.
ANALYSIS
LAND USE MAP-2035, SUDA Residential zone Commercial zone Public open zone Public As suggested in the map the plot 70 is specifically dedicated for the IT/ cooperate office space.
07
Residential/ Commercial Zone Agricultural land Tapi River SVNIT College IT Offices Site Industrial Zone Airport Zone
5KM RADIUS AREA SITE ANALYSIS
08
ANALYSIS
Commercial zones Residential zones Religious institutes Open spaces Within 500m radius of the site there are all the facilities like residencies, shopping complexes, health care centres, religious institutes, educational institutes. Making it desirable for the employees working in the building in terms of lifestyle.
Tertiary roads Secondary roads Primary roads City bus stop smc bicycles Auto stands The map depicts the ease of commute and the details of connectivity, the site hence has comparatively easy
SITE
WINTER WINDS
The climate is hot and dry. temperature can go up to forty three to forty five degrees C. The nights are comparably pleasant. Humidity – 67% Average annual temperature: 27.2 °C MONSOON WINDS
Annual rainfall: 1192 mm
09
SHADOW ANALYSIS
SHADOW AT 07:00 AM
SHADOW AT 12:30 PM
The site not being surrounded by much of the buildings makes it an open site, it receives maximum of sunlight between12:00pm to 6:00pm. Most of buildings in the immediate context are in range of 12 to 15 floors high. These are usually the residential buildings whereas the commercial buildings lie between 6 to 7floors high. SHADOW AT 5:30 PM
10
VEHICULAR DENSITY MAPPING
ACTIVITY MAPPING
INTERPRETATION: The access roads to the site on an average are always moderately vehicular dense, the access from the public zone is comparatively less denser. The immediate junction is also with moderate density and other remaining junctions become more denser. Hence ease of commute can be seen for the site The site and context being majorly residential zone, activities hence include the daily chores. all the junctions are always densely occupied because of all the informal hawkers and commercial complex being near the same. Next to the site there are majorly vehicular activites wheras on the immediate boundaries there are other recreational activites happening.
Low density Moderate density High density
Commute Recreational activity(walking/ cycling/ socializing Shopping(selling and buying, informal hawkes)
Construction Solid line - high density Dashed line - low density
11
PROJECT DESIGN
PRIMARY SPACE
WORKSTATION PERSONAL OFFICE MEETING SPACES RENTAL OFFICE SPACES
S
C SPA
E
EC
ON D
ION
LAT
SPA
C
IR
CE
CU
ARY
STAIRCASE ELEVATOR ESCALATOR CORRIDORS
RECEPTION RESTAURANTS/ FOOD COURT CONFERENCE SPACE RECREATIONAL SPACE
STORAGE SECURITY MECHANICAL ROOM SERVER ROOM
SERVICE SPACE
The project is an IT office center with IT OFFICE space and which then becomes the private space owned by the company and then comes the common or public zones like the aminities and park areas. Then are the rental office spaces which would provide the opportunity for concepts of startups, coworking space and other services related to the same.
BUILDING COMPONENT 13
IT OFFICE EMPLOYEE
RENTAL OFFICE SPACES
CUSTOMERS:
Clients and lounging space
PUBLIC PARK USERS
OUTDOOR SEATING USERS:
Recreational space
SERVICES PROVIDERS:
Food court services, security, mechanical services etc.
B U I L D I N G U S E R GROUP 14
IT OFFICE SPACES
BUILDING SPACES
This exercise makes it easier to decide the basic space areas for all the specified areas in the program of the building. the corelation between different spaces is depicted making it easier to understand and design those space. immediately adjacent nearby unimportent remote
Y - yes
H - high
N - No/ None
M - medium
I - Important but not requiered
L - low
SPACE
MATRIX
ANALYSIS 15
These were few initial ideas of how the spaces whould form, with different ideas which could make the space people centric and work friendly in nature. Even the massing options were worked on to bring the synergy between differnt types of spaces.
INITIAL
SKETCHES 16
MASTER PLAN 17
18
BASEMENT FLOOR
19
GROUND
FLOOR
19
FIRST
FLOOR
20
SECOND
FLOOR
21
THIRD
FLOOR
SECTIONAL AXONOMETRIC VIEW
22
SECTIONAL AXONOMETRIC VIEW
23
BUILDING SECTION
24
FRONT ELEVATIONAL VIEW
25
BACK ELEVATIONAL VIEW
26
View from the green bridge connecting the public park and the office building at all the levels.
View of the food court area with pergolas as the green roof.
BUILDING VIEW
27
The transition from building to the green bridge through the common corridors.
The view from the green bridge corridor looking towards the building, with punctures of green spaces.
BUILDING VIEW
28
THANK YOU