ARCHITECTURE DESIGN PORTFOLIO / - 2019 by grant rathie
Education
1999 - 2011 Bangkok , THA
Bangkok Christial College
2012 - 2017 Bangkok , THA
Faculty of Architecture, Kasetsart University
Experience
2014 Bangkok , THA
student internship at studio mahutsachan
2015 Bangkok , THA
participate the promenade workshop with tokyo metropolitan university
2016 Bangkok , THA
student internship at Atelier 2+
2017-18 Bangkok , THA
architect at studio mahutsachan
2018-19 Bangkok , THA
architect at openbox architects
Grant Rathie (Doe)
Email : grant.a@outlook.com Tel : (+66) 90-569-9154
111/136 Maneerint Park, Tha-it, Rattanathibet rd., Muang Nonthaburi, Nonthaburi, 11000
Skill and Interests
:: systematic and contextual design from urban structure through the architecture. :: teamwork, adaptability, learn the new things. :: Rhinoceros 3D + Grasshopper, AutoCad, Sketchup, 3dsMax :: Vray, Corona Renderer, Adobe CC (Photoshop, Illustrator, InDesign.) :: 3dprinting, laser-cutting, wood-working, hand-sketching, model-making :: pottery, sculpture, painting
Awards and Exhibition
2014 - tcdc chairs exhibition_TCDC Bangkok :: “Anywhere” - tcdc-seating compettition 2015 - selected design workshop _1 metre / 1 million book :: “1 meter / 1 million” - promenade workshop with tokyo metropolitan university. 2016 - vernacular architecture exhibition _asa expo exhibition 2015 :: “baan arn dao” - volunteer initiative / as art4d, archdaily online entry. 2018 - second prize pavallion design _S2O festival 2019 :: “tube of llight” - S2O art pavillion compettition (unbuild project).
02
:: involved in the experimental design of House A Ratchaburi, THA :: produced architectural 3d models, physical models, rendering and drawing. :: participate site survey wite architect team in house a project and j house.
:: high intense teamwork with the tmu. student to design and produce an alternative solution for the government river front proposal. :: design the book structure that selected work from the workshop.
:: design developed the central roof of the hotel chiangmai and produced the material for presentation withe architect team. :: participated the compettition with many parties (industrial, interior designer) for the newest TCDC at bangrak distric. :: improved a skill of wood hand crafting by tools to build many product design
:: worked closely with design director in project triangle ia office building, explored the design method and produced a drawing, rendering, physical model. :: design developed and made a contract to supplier for the KBV project.
:: participated in many project, start from the landscape to high rise condominium. :: improved the skill in architectural drawing, detail drawing and drawing system.
03
Content.
04
- ungraduated work.
01 02 03 04 05
studio 2 / urban intervention studio 4-1 / inverted path studio 4-2 / introspective / retrospective analysis internship / house a : feature wall asa volunteer no.13
- graduated work.
06 07 08 09 10
triangle ia : the expanding between inside and outside. kbv : the various of the angle / movement - perception nai-lert park : generation of parametric facade kasa development : kasa Samui / kasa villa cpn phuket Compettition : wide open into green space.
05
Therefore, this conditions is an ‘In situ’ process. In situ, in a sense, provides meaning of being in context. It is the moment, once, a solution is decided as a way of responding to such context. And then, if there is a moving forward for another account, that solution, undeniably turns itself to be one of the context that the next solution must pay its attention on.
Studio 2 will work on how a programme of architecture could act as an urban intervention and what a programme of architecture should generate as an urban intervention. Basically, it is any action caused by any proposal that may perform as architectural programc it was or was not designed by architect) that could improve the present situation of such focus area. Basically, the proposal for effective solution either through functions or activities beside architecture could be taken as the clearest example.
Studio 2 / 2013
Urban Intervention : Phase, Cast, in situ. work hour, urban officer foot court after work, sport complex (badminton court) cast from the network in Silom
phase 1 phase 2 cast, in-situ
We can experience such kind of architecture with or without architect in many parts of the city. Systematically, studio will observe these phenomena and put it forward into architectural design proposal. Fitting into the urban context, the content is changed quantitatively and qualitatively. Laying the foundation for growth is a must. Allowing, for alteration in the future expansion seems to be normal for projects in the city centre.
06
07
^ in situ refers to a work of art made specifically for a host site, or that a work of art takes into account the site in which it is installed or exhibited.
08
^ site location is a traditional foot court that developed by a local chief and seller.
09
^ a model.
< the design developed in 3 dimensions, a section in the x, y axis along the project, that is the systematic of the design process that thought by the layer and volumn of each function.
10
11
House A, the house that covers by bricks, site located at suan-pheung in Ratchaburi. We categorize the bricks from a local brick kiln and experiment by the context and condition in the pattern of masonry with a difference of brick dimension, user movement and perception to the various effect (shadow, viewpoint, a gradation of angle.)
And design the ruler (a tool for mason how can build easier and high manmade precision) for support the concept of these house, and categorize units of the ruler and draw a set of information about how to use.
12
Internship / 2014
house a : feature wall design, at studio mahutsachan dimension parametric human movement / perception method how to build perfectly target
13
< the experimants of bricks pattern by rotation the angle but the same in thier own panel.
^ a set of drawing of tools that explain how to use and build for the bricks pattern.
< applies a various angle pattern into one panel makes more dynamic perception.
14
15
There is no single object that works alone in system of spatial organisation of architecture. It is neither its form nor its function nor its tectonic that incorporate with the others, always. Therefore, one single direction of design process might not cover the issue.
So, Where it is (in relation ship with.) ? How it works (along with.) ? How does it look (with its surrounding space) ?
Studio 4-1 / 2015
Inverted Path : refining the design for accommodating the potentiality. Authorising the agency between the BTS, MRT and Bangkok metropolitant.
Along the design process, there are issues of relationship between one space to the others and among the others that surround such single space. The reciprocal process of thinking will accommodate such relationship to be fitted in the spatial organisation of architecture.
16
17
< the buildings have a difference of context, building system / structure / accessibility / etc. so this project is simulation if we can manage, organize, redesign their authority to make more usable space or function that makes more potentiality than the present.
18
19
ACCESS POSSIBILITY
EXCAVATING VOLUME
EXISTING BUILDING’s FACE WALKWAY TO SATHORN NAKORN
BTS EXIT TO SATHORN NAKORN PARKING BTS PUBLIC EXIT
BRT STATION
BTS EXIT TO SATHORN SQUARE
WALKWAY TO SATHORN SQUARE
BTS EXIT TO MAHANAKORN PAVILLION
BTS LINE
PUBLIC SPACE’s CASED VOLUME
BRT STATION SATHORN NAKORN PARKING BUILDING EMPIRE TOWER SKY LIGHT
THRESHOLD SPACE
SECTION DIAGRAM
^ plan show how the design extensively by the building context.
KEYPLAN 1:5000
SATHORN SQUARE PARKING BASEMENT FLOOR
^ design approach : to reorganize and rearrange the system of public space. the diagram inform the system of user circulation in this junction and a section shows the level of buildings that connect on podium level (podium level of the office building has many public space.)
20
21
Design approach is to decoding the city (Bang-rak district), thatâ&#x20AC;&#x2122;s focussing on how to create and find a new type of urban planning and completely useable of public space that negotiated all of existing or surrounding (eg. urban system, local community system and local resident system by new insertion of public space (commercial and residential volume).
In detail of office building, how to circulate user (residential, officer) use public space volume (core volume) by excavating into their building in 3 dimensions, X - Y axis is building floor (public space / inside building space / shared space) and Z axis is building core system that circulate the officer user to their function.
Studio 4-2 / 2016
Introspective / Retrospective analysis the radical nostalgia of the city - architecture - construction. try to propose how to design by information of the city (data dynamic) the gradation of central business district
From group proposal if continue (looking back) some kind of system in the past, city will develop in other way and looking at the surrounding and existing context on this site is transportation (hua lumpong st.), this area can develop to be transportation hub, incress a public space and addition a new type of CBD, focusing to the agenda how the public space volume negotiated with residential (area;semi-privete) and office building (volume;private).
22
23
parameter method
< the scope area, that proposes to redesign the new CBD district, lead by the approach and connection of mass transit, start from Hua Lumpong station (as a center of commercial station) circulate down to Silom rd. (as a node of the office building) and the last is Charoen Krung rd. is a local market district (on the ground level and underground level).
(4) CBD FACING WITH COMMUNITY
(3) MALL : MAIN OFFICE BUILDING (CBD)
(2) MRT (LINKAGE) : MAIN COMPLEX (MALL)
(1) MRT STATION : HUALUMPONG HUB
^ in detail of office building, how to circulate user (residential, officer) use public space volume (core volume) by excavating into their building in 3 dimensions, X - Y axis is building floor (public space / inside building space / shared space) and Z axis is building core system that circulates the officer user to their function.
< plan show how the design extensive into the Bangrak urban system.
24
25
The design was developed following the requirements for the building to function as a welcoming space set within the Baan Kum Chompoo School that leads visitors to other areas of the program with its open floor plan housing a library, medical room and restrooms.
flowerpots made by the students being meaningfully incorporated in as a part of the decoration. Since the building was designed to accommodate future additions, the plan is to adapt the space into a medical room, co-op shop and a reception room within the future.
Architecture for Development Volunteer Club / 2015-16
hollow block : Systematic of the Number and Student-made. the dimension of 20 x 20 cm. direction student man-made challenge multi build schedule process
The hollow concrete blocks not only enhance natural ventilation but also bring about unique aesthetic qualities. Space is now being used to house a classroom for second-grade students of the school with the
26
27
< the design direction is from the dimension of a brick size 20 x 20 (including mortar paste). the number of 20 is a minimum workable sacling of the things to their students and kids who come interact with the architecture (sush as sitting, climbing, hide and seek, etc).
^ building : â&#x20AC;&#x153; baan arn daoâ&#x20AC;?
28
29
The triangle ia is an interior studio office building project. The design condition is an unperpendicular site boundary deal with the domestic scale of office functional and highly function request and site regulation, there is a conflict between a square useable space and a pieces of triangle space (a boundary that intersect from square space with it site). The design issue is how to connect interior space to exterior space (to the environments) by a triangle space that used for green-open space to create new perception of employee who work in there.
In detail of design process, experiment the ideal system of interior design studio. They have many huge solid and complex functions that fixed in their company, so we merge and treated by the cluster of function that can rearrange the system connection of studio system.
30
Work with studio mahutsachan / 2017-18
triangle ia : the expanding between inside and outside.
31
< the first and the second design schematic. (re-design in many fix condition by fend-shui.)
< explored a building envelope. (how to substract by site and interior condition.)
^ the series of design process models. (systemati to schematic) and the diagram models explored the connection of office space.
32
33
^ first schmatic design perspective.
34
35
Work with studio mahutsachan / 2017-18
^ the parametric timber louver facade design with sun shading and use movement.
KBV : the various of the angle / movement - perception part of timber louver facade module and setting out drawing. v
I had involved in a part of facade design, that designed by a condition of an interior and exterior user movement. In the design expreiment was working with a physical model. And in the design develop stage, had to produced the drawings and design the detail of its parts.
36
37
Nai-Lert Park development had launched the newest project, had to join a part of design (the sale gallery and main project building). The sale gallery is construction on site with many old trees (that is a strong signature of Nai-Lert Park development) and used for an existing condition. The design concept is a simple thought glass house fit in a jungle in an urban fabric.
The design concept of the glass facade is a cloud that concealed the glass house, in the detail of a sticker dot of cloud that represent the branding of the nai-lert park development by a company logo.
38
Work with openbox architect / 2018-19
NLP Sale Gallery : generation of parametric facade human scale / existing input grasshopper coding design tools the gradation of dots on glass surface output
39
^ in detail of the first script that shows the dots is overlapping by itselves.
^ the first script of an idea represents the cloud-dots on the glass surface by the method of gradient and scaling the logo out of the reference line.
the developed script show the dots represent a brand logo clearly.
^ a developed script. add a factor that controls a minimum and maximum size of logo dots.
40
41
^
^ 1st floor nai-lert parkâ&#x20AC;&#x2122;s sale gallery constrcution stage.
42
^ entrance of nai-lert parkâ&#x20AC;&#x2122;s sale gallery / a clear glass facade (cancel a cloud pattern sticker by owner)
43
I had participated in a first big scale development project the project is a mix-used (residential and hotel). the intensity condition of the project is a site topography located on highly slope and personal regulation in Koh Samui. The design concept is trying to simulate like terrain by architecture.
And the next project of Kasa development is a Kasa villa its site is the same in Koh Samui but the difference program. It is a housing estate. But the condition of design is in the same regulation and topography issue.
44
Work with openbox architects / 2018-19
Kasa development : Kasa Samui / Kasa villa
45
^ overall perspective of Kasa Samui
46
^ sea view perspective of Kasa Samui.
47
^ overall perspective of Kasa Villa
48
^ interior perspective of Kasa Villa
49
The competition from Central Pattana (CPN Group) that located on Phuket, Thailand. The project is an extension from Central Festival Phuket. The programmatic is a mix-used function that including Centara (luxury hotel) co-si (medium grade hotel) Convention Hall and Theatre.
and direct to the user. We treated the functions as a volumn and explored how to break the volumn by inside to direct the circulation destination by itself and reshape roof form to create an air volumn circulate through the project.
Work with openbox architects / 2018-19
CPN phuket Compettition : wide-around open into green space.
In the design process stage, the project has a completely different program and the design method was trying to create a system that how to suggest
50
51
< the diagram of the design process, the transformation of volumetric of function to conceptual design. ^ perspective
52
53
_