FACTS: Site: OYS 2030 new building section of Building B, Oulu University Hospital Year of completion: 2023 Contractors: New hospital buildings implemented with the alliance model. Companies implementing Building B: Skanska Talonrakennus Oy, Caverion Suomi Oy, Siemens Osakeyhtiö, A-lnsinöörit Oy, Arkkitehtitoimisto Tähti-Set Oy, Arkkitehtitoimisto Lukkaroinen Oy, UKI Arkkitehdit Oy, Granlund Oy. Doka products used: The MF240 climbing formwork system, Framax Xlife plus, Dokaflex floor-slab formwork
1 The MF240 climbing formwork system was used at the hospital site. The Framax Xlife plus system was used as wall formwork for Building B. 2 The center of the building has fourteen elevator shafts and contains a stairwell in four separate shaft groups, a few of which are visible in the photograph.