DT SELECTED WORKS 2014-2017
DOMINIC TREWAVAS Architectural Graduate Portfolio Selected works 2014-2017
CONTENTS
1
2
3
4
ated
atform a
eam
form a
462) orm
insulated
ycomb
ng ing
38mm Interior
as
THE STREET FAIR EXPERIENCE Dominic Trewavas 300255253 Arci 212 Project 2
THE EXHIBITION The Exhibition follows the movement described by the two taniwha in the narrative, a perforated concrete faรงad used to provide a spiritual ambiance
5
Kingspan Trapezoidal KS1000 RW insulated roofing system Fletchers Smartfit 1800x1200 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish Fletchers Smartfit 2850x1500 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish Fletchers Smartfit 1800x700 35mm. Platform Double Glazed Aluminium Framed with a Black Anotic Finish Fletchers Smartfit 1200x1200 35mm . Platform Double Glazed Aluminium Framed with a Black Anotic Finish Fletchers Smartfit 3800x1700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
4
Project:
Address:
Lightbox
6
South Elevation 1 : 200
Followed by Construction Detailing and Work Experience.
27 Resolution Street Lyall Bay Wellington
Drawing:
Drawn By:
Group Sheet 2
Checked By:
MT
LIVING, KITCHEN AND DINING PERSPECTIVE - SEMI PUBLIC
CAD Filename:
Drawn Scale:
Reduced Scale:
1 : 200
Project No.
0001
DT
Date:
04/26/16 Sheet No:
A002
Dominic Trewavas 300255253
Revision:
Dominic Trewavas
LA TE NT IN T HE F L AX Masters Research 3.
This research thesis looks at the potential to use computational tools and methods in association with Maori knowledge (mātauranga māori). It explores traditional weaving techniques and patterns as a means of understanding how weaving and woven structures (Hinaki etc.) Can influence architectural topological forms, by incorporating systems such as structure, aperture, fenestration, and construction directly into the geometry of the design.
2. 4.
This thesis initiates an investigation into a pavilion for the people of Te Arawa at the Māori Institute of Arts and Crafts. The design is amalgamated into a rich cultural territory connected to the narratives of the past, present and questions the future of indigenous design.
5.
A series of design iterations and materials studies both in analogue and digital formats will contribute to the large scale prototyping and fabrication of non-linear self-supporting structures. The work will be supported by optimisation software (Rhinoceros & Grasshopper/ Galapagos, Silvereye and Opossum) for finite element analysis (FEA) and formal optimisation. Both subtractive (CNC Milling) and additive (3d printing) manufacturing methods will be used to explore material effects and performance.
6.
In summary, this research explores the potential for indigenous development, cultural empowerment and innovation. As part of SITUA it combines the potential of academia and indigenous groups to foster new knowledge through the exploration of emergent materials and building systems located within specific tribal domain. GSEducationalVersion
Steel Column to Foundation
1. 20mm Interior shell panel flax muka lashed to steel frame. 2. Custom steel bracket N/B/W fix to Portal frame 3. 250mm deep high grade stainless steel portal frame with custom fabricated profile 4. 20mm Exterior shell panel 5. Tension tie chemset into to foundation wall 6. 350mm High Concrete Foundation
A
A’
1.
Panel Count: 1144 Maximum size: 2300 x 1200* Minimum size: 500 x 200* Points were measured at widest points as shapes are irregular
Fabrication Axonometric Plywood Panelling - Outer Shell
THE OLD, THE NEW AND THE GROTESQUE Focusing on the intent to examine the historic grid morphology of Rome and to produce from it an unexpected experience and emblem for the city. The historic grid layout of Historic Rome captures pedestrians in a labyrinth of hard edged buildings with solid facades until the reach courtyards or large public space which are immersed in light. This project looks at focusing on the properties edge and courtyard spaces. A series of initial studies were made to extract lines that make up of the courtyard contours. These existing contours of the city are broken apart, redrawn and fused together to produce are imagined shape for the building. A figure ground study of the city revealed how light is capitalized on through inner courtyards and how the buildings have a strong presence along the street and property edge. By looking at the ontology of these arrangements these objects have begun to be broken down and built back up and applied to site to create a new spatial experiences based on different conditions around context, Environmental controls look at creating a kinetic facade which breathes with the a climate temperature changes to stimulate and regulate the internal temperature of the building to keep it well ventilated.
Matrix 7:
North
From the investigation a new catalogue of figures have been generated to potential create volumetric forms to influence the formal investigation of the design itself. This development have the potential to inform and influence all aspects of the building from the landscape to the interior
0
5m
10m
North
10m
10m
10m
10m
10m
10m
5m
10m
00
d
pic
m
00 azed
e
g
200 lazed
de
ns
pic
m
Yule Y Stre ule Stre et et
L I GHTB OX H OU SE
a
y as
This project was done within a group project where we were asked to design and cost a building for a client. Our client was a musician, with a small family who were looking at taking advantage of there corner site opportunity in Rongotai, Wellington.
The majority of the budget was spent on the Drawing: natural lighting facade as it has significant Dom Sheet Lightbox benefits, thermal insulation maximized in comparison with traditional glazing especially being on the southern face, and the solar and heating advantages through the use Address: 27 Resolution Street of white polycarbonate sheets. Drawn Scale:
Lyall Bay Wellington
As indicated
1 A006 1
My role in this project was in the programmatic scheme of the design, while the other architect worked on the form. The circulation of the building revolves around the prominent polycarbonate facade which helps to maximize the amount of filtered daylight which enters the communal spaces. The arrangement of programs are defined in terms of layers ranging from public communal spaces (Lounge, Kitchen and Dining) toward the more private spaces of the bedrooms and bathrooms. A long promenade connects the main dwelling to the music library and the music room.
Project:polycarbonate
A006
Reso lutio n Reso lutio n
3 1
3
Stre et Stre et
Site Plan 1 : 1000
Site
Drawn By:
DT Plan
Checked By:
CAD Filename:
1 : 1000
Reduced Scale:
Project No.
0001
DT
Date:
05/02/16 Sheet No:
A006
Revision:
Kingspan Trapezoidal KS1000 RW insulated roofing Trapezoidal system Kingspan KS1000 RW insulated roofing system Marley Typhoon Spouting Copper Marley Typhoon Spouting Copper Marley RP80 Downpipe Copper
F.F.L Second Floor F.F.L Second Floor 6000 6000
Marley RP80Smartfit Downpipe Copper 35mm Platform Fletchers 2850x1500 DoubleSmartfit Glazed 2850x1500 Aluminium Framed with a Fletchers 35mm Platform BlackGlazed Anotic Aluminium Finish Double Framed with a Black Anotic Epic Finish Eurostyle Metal Profile Cladding 600mmEpic pan Metal w/ 38mm double standing Eurostyle Profile Cladding - seam 600mm pan w/ 38mm double standing seam Fletchers Smartfit 1800x700 35mm Platform DoubleSmartfit Glazed Aluminium Framed with a Fletchers 1800x700 35mm Platform BlackGlazed Anotic Aluminium Finish Double Framed with a Trend Sliding Stack Door (Model: SSD2462) Black Anotic Finish Single Glazed 5400x2400 102mm Platform Trend Sliding Stack Door (Model: SSD2462) Anotic Black5400x2400 102mm Platform Single Glazed Anotic Black
F.F.L First Floor F.F.L First Floor 3000 3000 F.F.L Ground Floor F.F.L Ground Floor 150 150
1 1
East Elevation East Elevation 1 : 200 1 : 200
Kingspan Trapezoidal KS1000 RW insulated roofing Trapezoidal system Kingspan KS1000 RW insulated roofing system
Kingspan Trapezoidal KS1000 RW insulated roofing system
Floor
oor
Floor
F.F.L Second Floor F.F.L Second Floor 6000 6000
Marley Typhoon Spouting Copper
F.F.L First Floor F.F.L First Floor 3000 3000
Eurostyle Epic Metal Profile Cladding 600mm pan w/ 38mm double standing seam
F.F.L Ground Floor F.F.L Ground Floor 150 150
Elevation
2 2
Marley RP80 Downpipe Copper
1 : 200 1 : 200 Precast Concrete Stair 1000mm wide, 3000mm rise with Stainless Steel Precast Concrete Stair 1000mm wide, Kingspan Trapezoidal KS1000 RW insulated Balustrade and Stainless HorizontalSteel Wire Rigging 3000mm with roofingrise system Balustrade and Horizontal Wire Rigging
3 3
Sunlite PVC Roofing (Light Blue) 2400x690mm
Floor
:etaD
61/62/40
noisiveR or
:oN teehS
m. m53 0021x0021 tiftramS srehct muinimulA dezalG elbuoD mroft hsiniF citonA kcalB a htiw dema mm53 0071x0083 tiftramS srehct muinimulA dezalG elbuoD mroft hsiniF citonA kcalB a htiw dema
noitavelE htuoS
1 : 200 1 : 200
002 : 1
Precast Concrete Stair 1000mm wide, 3000mm rise with Stainless Steel Balustrade and Horizontal Wire Rigging
This design and drawing is the copyright :This yB dedesign kcehCand drawing :yB nwarD the copyright of MDSN Limitedisand is not to TofDMDSN Limited be reproduced without permission. and is not to TMwritten be reproduced without written permission. :emaneliF DAC
MDSN MDSN 200A Victoria University of Wellington Victoria University of Wellington
Elevation
m . m53 007x0081 tiftramS srehct muinimulA dezalG elbuoD mroft hsiniF citonA kcalB a htiw dema
Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
North Elevation North Elevation
.oN tcejorP
Floor
mm53 0051x0582 tiftramS srehct muinimulA dezalG elbuoD mroft hsiniF citonA kcalB a htiw dema
Eurostyle Epic Metal Profile Cladding 600mm pan w/ 38mm double standing seam
F.F.L Ground Floor F.F.L Ground Floor 150 150
Elevation
WR 0001SK ladiozeparT napsg metsys gnifoor detalu mm53 0021x0081 tiftramS srehct muinimulA dezalG elbuoD mroft hsiniF citonA kcalB a htiw dema
PPR Polycarbonate Twinwall Honeycomb Sheet (Clear) 4800x600x8mm
F.F.L First Floor F.F.L First Floor 3000 3000
Floor
EurostyleFrame Clad Exterior, 12mm Ply Interior Aluminium Black Anotic with 38mm 860 x 1991 Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
West Elevation West Elevation
F.F.L Second Floor F.F.L Second Floor 6000 6000
oor
Eurostyle Epic Metal Profile Cladding 600mmEpic pan Metal w/ 38mm double standing Eurostyle Profile Cladding seampan w/ 38mm double standing 600mm seam Aluminium Frame Black Anotic with 38mm
Fletchers Smartfit 1800x700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish Trend Sliding Stack Door (Model: SSD2462) Single Glazed 5400x2400 102mm Platform Anotic Black
Sunlite PVC Roofing (Light Blue) 2400x690mm Sunlite PVC Roofing (Light Blue) 2400x690mm
Floor
PPR Polycarbonate Twinwall Honeycomb Sheet (Clear) 4800x600x8mm PPR Polycarbonate Twinwall Honeycomb Sheet (Clear) 4800x600x8mm
Fletchers Smartfit 2850x1500 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
1000
Status: Status:
:elacS decudeR
2 teehS puorG
:gniwarD
htiw citonA kcalB emarF muinim mm21 ,roiretxE dalC elytsoruE mm 1991 x 068 roiretnI
4 Kingspan Trapezoidal KS1000 RW insulated roofing system Fletchers Smartfit 1800x1200 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Project:
Fletchers Smartfit 2850x1500Project: 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Lig x Ligh
Fletchers Smartfit 1800x700 35mm. -Interior renders of Kitchen, Living space, Music Studio and MusicDouble Library.Glazed Aluminium Platform Address: Furniture not included in budget. with a Black Anotic Finish -Interior renders of Kitchen, Living space, Music Studio andFramed Music Library. Address: Furniture not included in budget. Fletchers Smartfit 1200x1200 35mm . Platform Double Glazed Aluminium :elacS nwarD Framed with a Black Anotic Finish
002 : 1
teertS noit27 u27 loR Lya y Lyal We n ot Wel
Fletchers Smartfit 3800x1700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
4
Fletchers Smartfit 1800x700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
140x140 3m Rough Sawn Radiata Timber Carport Post Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
38mm Profile Eurostyle Epic Cladding on 90x45 timber framed structure on 12mm Treated Plywood with Earthwool Glasswool Insulation R2.2
Carport
90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood and GIB 10mm Noiseline with Enigma Paint Interior
Acoustic Foam Panels to comply with NZBC G6
Back Entrance
Alpine Smooth Interior Timber Door (Hume Doors)
UP
Precast Concrete Staircase with mild steel balustrade with 200UB25.4 support beams to comply to NZBC D1
Fletchers Smartfit 1800x700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Music Studio
Lighting Plus Wall Lighting
Existing 300x450 Concrete Column
Fletchers Smartfit 6000x1700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Music Storage
Lighting Plus Wall Lighting Through Corridor 6 x Fletchers Smartfit 1200x1200 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Country Co. 1.1m tall Fig Trees Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
Marley RP80 Downpipe Copper to comply with NZBC E2 90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood either side
100x100 3m Rough Sawn Radiata Timber Pergola Post Fletchers Smartfit 1800x1200 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Interior Hallway
Steel Portal Frame 410UB54 sections at 8m centres with DHS 250/18 purlins at 1.2m centres
Storage Outdoor Patio
Trend Sliding Stack Door (Model: SSD2462) Single Glazed 5400x2400 102mm Platform Anotic Black Marley RP80 Downpipe Copper to comply with NZBC E2 Fletchers Smartfit 3800x1700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish Timber Staircase with simple balustrade to comply with NZBC D1 Lighting Plus Wall Lighting
Guest Bedroom
180L Stainless Steel Mains Pressure HJ Coopers hot water cylinder 38mm Profile Eurostyle Epic Cladding on 90x45 timber framed structure on 12mm Treated Plywood with Earthwool Glasswool Insulation R2.2 Service Void for Plumbing etc Interior Wall finishes will not be applied to this area as they are not needed
1
Open Living and Dining
1
Kitchen Cavity for Sliding Doors (Hume Doors)
A003
200mm Exposed Diamond Grinded Finished Precast Concrete Floor Existing 150x300 Concrete Column
Ma
A003
90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood and GIB 10mm Aqualine to comply with NZBC E2 in Wet Areas
UP
Front Entrance
2
Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
A003
1
Ground Floor Plan
2
1 : 200
Status:
-Interior renders of Kitchen, Living space, Music Studio and Music Library. Furniture not included in budget.
Project:
Address:
Lightbox 27 Resolution Street
Drawing:
First Floor Pla 1 : 200
Group Sheet
y
eet
Sunlite PVC Roofing (Light Blue) 2400x690mm Fletchers Smartfit 1800x700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Precast Concrete Stair 1000mm wide, 3000mm rise with Stainless Steel Balustrade and Horizontal Wire Rigging 38mm Profile Eurostyle Epic Cladding on 90x45 timber framed structure on 12mm Treated Plywood with Earthwool Glasswool Insulation R2.2
38mm Profile Eurostyle Epic Cladding on 90x45 timber framed structure on 12mm Treated Plywood with Earthwool Glasswool Insulation R2.2
3900x3000 Trestle Unit Radiata Rough Sawn 75x20 H4 Treated
Roof Fall 5°
655x3000 Trestle Unit Radiata Rough Sawn 75x20 H4 Treated
Acoustic Foam Panels to comply with NZBC G6
6200x3000 Trestle Unit Radiata Rough Sawn 75x20 H4 Treated
Alpine Smooth Interior Timber Door (Hume Doors)
Garden Planter box 4300x2170 - H4 treated Rough Sawn Radiata with 3.8m³ of soil Garden Planter box 9200x800 - H4 treated Rough Sawn Radiata with 2.8m³ of soil
Fletchers Smartfit 1800x700 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Existing 300x450 Concrete Column
Rooftop Garden
Existing 300x450 Concrete Column
Kingspan Trapezoidal KS1000 RW insulated roofing system
Lighting Plus Wall Lighting Through Corridor 6 x Fletchers Smartfit 1200x1200 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish
Marley Typhoon Spouting Copper 150x50 Rough Sawn Radiata Timber Pergola Rafter and Purlins
Marley RP80 Downpipe Copper to comply with NZBC E2
Marley RP80 Downpipe Copper to comply with NZBC E2
Roof Fall 1.5°
90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood either side
PPR Polycarbonate Twinwall Honeycomb Sheet (Clear) 4800x600x8mm Existing 150x300 Concrete Column
180L Stainless Steel Mains Pressure HJ Coopers hot water cylinder 38mm Profile Eurostyle Epic Cladding on 90x45 timber framed structure on 12mm Treated Plywood with Earthwool Glasswool Insulation R2.2
Cavity for Sliding Doors (Hume Doors) Fletchers Smartfit 2850x1500 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish 90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood either side
Bedroom
Service Void for Plumbing etc Interior Wall finishes will not be applied to this area as they are not needed
Service Void for Plumbing etc Interior Wall finishes will not be applied to this area as they are not needed
1 Cavity for Sliding Doors (Hume Doors)
VOID
Master Bedroom
Fletchers Smartfit 1800x1500 35mm Platform Double Glazed Aluminium Framed with a Black Anotic Finish 90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood and GIB 10mm Aqualine to comply with NZBC E2 in Wet Areas
Bathroom
A003
90x45 Timber Framed Structure to comply with NZS3604 with 12mm Treated Plywood and GIB 10mm Aqualine to comply with NZBC E2 in Wet Areas Aluminium Frame Black Anotic with 38mm Eurostyle Clad Exterior, 12mm Ply Interior 860 x 1991
Interior Hallway
200mm Exposed Diamond Grinded Finished Precast Concrete Floor Stainless Steel balustrade w/ horizontal wire rigging
VOID
Steel Portal Frame 410UB54 sections at 8m centres with DHS 250/18 purlins at 1.2m centres Timber Staircase with simple balustrade to comply with NZBC D1
2 A003
2
Drawing:
First Floor Plan 1 : 200
Group Sheet 1
Drawn By:
Checked By:
MT CAD Filename:
DT
Date:
04/26/16 Sheet No:
Revision:
taitai
EAR THQ U A KE MUSEUM
The Narrative: The Legend of Ngake andThe Whataitai Narrative: The Legend of Ngake and Whataitai
The Narrative: The Legend of Ngake and Whataitai
In an effort to promote a better understanding of earthquakes in New Zealand, to alert and prepare the public for catastrophic disasters, and in memorial of the losses caused by earthquakes in the country. This project took precedents from the historic narrative of Ngake and Whataitai, illustrated into a picture book around 8 key moments and then translated into the formal and programmatic development of the building Narrative: The Legend of Ngake and Whataitai The Narrative: The Legend ofThe Ngake and Whataitai
The Narrative: The Narrative: The Legend The Legend of Ngake of Ngake and Whataitai and Whataitai
3.
SECOND FLOOR 1. Lookout THE RAMP
2. Exhibition/Exhibiton
Creating an experience which captures the narrative of Ngake’s leap through the cliff face into the Cook Strait. For Whataitai it is the spiritual journey undertaken after being uplifted by a massive earthquake.
2.
THE LOOKOUT
The lookout to Mt Victoria is framed to show where Te Keo sat to watch Whaitaitai body turn to stone and show the grieve shared between the wildlife which help to feed him and keep his body moist.
3. Bathroom
1.
1.
FIRST FLOOR
2.
1. Staff Block 2. Exhibition 3. Bathroom
3. 5.
THE RAMP
Creating an experience which captures the narrative of Ngake’s leap through the cliff face into the Cook Strait. For Whataitai it is the spiritual journey undertaken after being uplifted by a massive earthquake.
4. Café/Restruant 5. Kitchen
6.
6. Barista/Counter
4.
3. 2.
6.
4.
5.
7.
8.
9.
1.
THE EXHIBITION
GROUND FLOOR
The Exhibition follows the movement described by the two taniwha in the narrative, a perforated concrete façad used to provide a spiritual ambiance
1 .Entrance 2. Reception 3. Staff Block 4. Memorial 5.Main Hall 6. Open Lecture Theatre 7. Bathroom 8. Shop 9.Exhibition
THE ENTRANCE The Entrance is used to symbolise the entrance into the lake of Ngake and Whataitai, People are introduced to
SHELL
STRUCTURE
SECOND FLOOR
FIRST FLOOR
GROUND FLOOR
EXPLODED AXONOMETRIC
WHATAITAI preferred to laze on the lake’s shores, sunbathing and dreaming taniwha dreams.
LONG SECTION | 1: 200 @ A0
NGAKE Had Loads of Energy liked to race around the shores, chasing fish and eels and leaping after birds that came too close.
THE STREET FAIR EXPERIENCE Dominic Trewavas 300255253 Arci 212 Project 2
ul St
This has created on opportunity in plan through a continuous ramp for the cyclist (coming from the new cycle lane), to continually keep bike without needing to stop but having an opportunity to stop at any floor to interact with the design. The pedestrian circulation through the site produces at short cut between Rintoul and Colombo Street. also follows the continuous nature of the bike ramp, helping to guide people through each program.
t St Emmet
Rinto
The Boutique Cinema has been strongly influenced by the circulation and form, taken from how layout of the festival down Riddiford street. The circulation runs in a continuous line around the form of the building with program branching off down the streets running perpendicular down Riddiford Street.
Riddiford St
Newtown is a culturally diverse place, which has successfully cemented its vibrant nature into the greater context of Wellington. The annual festival held at the start of every year is a performance of the colourful personalities which make the suburb the place it is. From the context and research analysis the festival presented an opportunity to lend itself to influencing a new proposed architecture, which helps to contribute to the community.
Green
Wilson
St
St
ble St
Consta
The form of the design looks at how resident shops down Riddiford Street react to the nature of the event by moving from the interior to the exterior hence blurring the line between the two realms. this detail has been pushed into the cinema through producing an external weather condition which the design to a certain extent
ve wn A
Newto
by St
Norman
The inhabitation of the roof has been influenced through the use of the performance stages which are located at the ends of the each street, preventing the extension of circulation an further, but provided a place of visual entertainment after being actively moving through the festival.
n St
d Mclea
Donal
Newtown Festival Context Scale : NTS
N
Site Plan Scale 1:500
Rintou
et
et rd Stre
l Stree t
F
o Stre
Riddifo
DW
Colom b
N
Section Perspective - Newtown Festival
Ground Floor Scale 1:100 1. Lobby 2. Bike Repair and Rental 3. Staff Room 4. Reception / Ticket Counter 5. Cafe / Function 6. Kitchen 7.Bike Cycle Parking 8. Office 9. Bathroom 10. Performance Space
2 1
7
1
N DW F
4
3 8
9 2
10 9
6 7
4 5
Outdoor Cinema +10800
Second Floor +7800
First Floor +4000
Dominic Trewavas Section Transverse 300255253 Scale 1: 50 Arci 212 Project 2
5
5
3
Second Floor Scale 1:100 1. Cushion Counter 2. Bathroom 3. Cinema Storage 4. Lobby / Bike Parking 5. Outdoor Cinema
First Floor Scale 1:100 1.Gallery 2. Cinema 1 (50 ppl) 3. Cinema 2 (45 ppl) 4. Projection Room 5. Bathroom 6. Lobby / Bike Parking
N
N 4
3 1
2
4
6
2
5
NORTH
Context Plan Scale 1:500
2ND YEAR DESIGN - Caretaker’s Cabin
This project p roposes the missing link bet w een the residential and rec reation al context. It d e velops a p rog ress ive understanding which c reates an a- rchi tectural rel a tionship bet w een the tw o identitie s, drawing inspiration from the tension c reated from both private and pu b lic realm s. From the position on Re gent Street the d w elling see ms secluded – character ised primarily by the b lank façade and harsh materialit y. As each ind ividual tra vels through the d w elling they - ex perience an exhibition of light and patte rn c reating a contrasting openness from the st reet façade. From Ca rrara Park the d w elling appears transpa rent entang led in a -con stant perfo rmance from the g ardening communit y.
Short Section Scale 1 : 100
Long Section Scale 1 : 100
LIVING, KITCHEN AND DINING PERSPECTIVE - SEMI PUBLIC
Dominic Trewavas
Roof
001
1.
002
First Floor
r he
8. Structure
003
Green Facade
Ground Floor 3. 004
N
2.
Exploded Axonometric Scale 1:100
First Floor Scale 1:50
5.
2.
1.
4.
NORTH
Key: 1. Outdoor Living 2. Kitchen 3. Dining 4. Living 5. Bike Storage 6. Bathroom 7. Processing Room 8. Storage
3.
6.
7.
8.
003
First Floor Scale 1:50
NORTH
Key: 1. Sunroom 2. Outdoor Living 3. Greenhouse 4. Bedroom Void
3.
2.
1.
4.
02
01
04
03
05
02 A201
29663
Level 06
1--A203
03 A201
23063
Level 05
1A202 ---
19574
Level 04
18563
Level 03
16063
Level 02
1 A202
12563
Level 01
1
Transverse Section 1 : 50
Project 3 - 421 Dominic Trewavas Design shown is copyright of VUW
3 06
Drawing Schedule A100
Transverse Section
1:50
A201
Detail Area 1
1:5
A202
Detail Area 2
1:5
A203
Detail Area 3
1:2, 1:5
A301
Exploded Axonometric
-
NORTH 01 --A100
PROJECT DESCRIPTION
4TH YEAR CONSTRUCTION
01 A201
02 A202
The construction of the building is intended to reflect the natural environment of the hillside, this is down through the use of the LVL beams and columns for the buildings shell. Polished concrete floors provide an element of the Wellington shoreline. The Material used have focussed on the speed of construction time and the overall lifespan of each component as the site is open to the environment perched close to the harbour. The natural timbers are contrasted against steel elements which are recessed at junction to create the appearance of a floating structure. Through the middle of the building is a 15m tall gantry which could be considered an urban playground. The structure is incredibly rigid and the top beams are supporting the function of the space as the floors, and stairs are hung from the top of the structure. Between these two moments, a parametric structure emerges from the ground and twists and turns to the roof. This structure is yet again hung from the beams to prevent the structure failing in lateral movement.
The construction of the building is intended to reflect the natural environment of the hillside, this is down through the use of the LVL beams and columns for the buildings shell. Polished concrete floors provide an element of the Wellington shoreline. The Material used have focussed on the speed of construction time and the overall lifespan of each component as the site is open to the environment perched close to the harbour. The natural timbers are contrasted against steel elements which are recessed at junction to create the appearance of a floating structure. Through the middle of the building is a 15m tall gantry which could be considered an urban playground. The structure is incredibly rigid and the top beams are supporting the function of the space as the floors, and stairs are hung from the top of Dominic Trewavas the structure. Between these two moments, a parametric structure 0000003 emerges from the ground and twists and turns to the roof. ThisMIRAMAR structure is yet again hung from theCOMPLEX beams to prevent the structure failing in lateral Miramar Peninsula movement. By the Roundabout 300255253 Project:
04 A202
No:
Address:
Tutor Name
????? Drawn By:
14/10/16 DT
Scale:
As indicated
Issue Date:
Reduced Scales:
1:100 - x 1.00 1:50 - x 0.50
Section Drawing
03
06 3
06 3
29663
29663
Level 06
Level 06
10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish 90 x 45 Timber Purlins @ 600 crns to support Kingspan Unit nailed through 90x45x50mm recess in LVL beam
Kingspan KS1000 RW Trapezoidal Roof Cladding 35mm prefixed to insulation in factory for a shorter construction time, Screwed at Profile Ridges through to Purlins, Black powdercoat finish
Kingspan KS1000 RW Trapezoidal Roof Cladding 35mm prefixed to insulation in factory for a shorter construction time, Screwed at Profile Ridges through to Purlins, Black powdercoat finish
Kingspan KS1000 RW Trapezoidal Roof Polyisocyanurate 100mm Unit
Kingspan KS1000 RW Trapezoidal Roof Polyisocyanurate 100mm Unit
140mm Deep Marley Typhoon Square Spouting screwed through to 90x45 top plate, Black powdercoat finish
140mm Deep Marley Typhoon Square Spouting screwed through to 90x45 top plate, Black powdercoat finish 500x350 LVL Beam fixed with Zinc coated M16 B/N/W through welded metal plate fillet welded to steel connection .
18563
2/ 500 x 350 x 5mm steel plate fillet welded to 300 x 300 x 35 Hollow section to welded onsite with LVL connection
Marley Typhoon Internal Bracket to support spouting unit
Marley Typhoon Internal Bracket to support spouting unit
6x 4mm Butyl Sealant applied continuously
6x 4mm Butyl Sealant applied continuously
300mm JSC Fascia Board Ironsand paint finish, nail fixings at top and bottom
300mm JSC Fascia Board Ironsand paint finish, nail fixings at top and bottom
Level 03
500x350 LVL Column fixed with Zinc coated M16 B/N/W through welded metal plate fillet welded to steel connection . 6mm Rigid Air Barrier (RAB) board pre-cladding as weather protection against high wind pressures in 20mm cavity
Timber blocking to allow to fixings
Timber blocking to allow to fixings
Colourstell 0.7 BMT cladding apron flashing
Colourstell 0.7 BMT cladding apron flashing
Continuous building wrap to cover all exposed timber members
Continuous building wrap to cover all exposed timber members
38mm profile Eurostyle Epic black powder coat finish dladding with a roll cap system. Fixings @ 1200mm through nogging.
38mm profile Eurostyle Epic black powder coat finish dladding with a roll cap system. Fixings @ 1200mm through nogging.
Timber battens for cladding fixing and supplied 20mm min air cavity
Timber battens for cladding fixing and supplied 20mm min air cavity
Eathwool Glasswool R2.2 wall insulation
Eathwool Glasswool R2.2 wall insulation
Beam Detail
01
Column to Beam Detail
02
1:5
Roof Apex Detail 01
01
Louvretec mechancial shutters Louvretec 0.5 BMT shutter flashing with weatherstrip to comply with E2 Fill gaps with Canister FR foam filler top and bottom Kingspan KS1000 RW Trapezoidal Roof Cladding 35mm pre-fixed to insulation in factory for a shorter construction time, Screwed at Profile Ridges through to Purlins, Black powdercoat finish Kingspan KS1000 RW Trapezoidal Roof Polyisocyanurate 100mm Unit Continuous building wrap to cover all exposed timber members
Louvretec mechancial shutters Louvretec 0.5 BMT shutter flashing with weatherstrip to comply with E2 Fill gaps with Canister FR foam filler top and bottom Kingspan KS1000 RW Trapezoidal Roof Cladding 35mm pre-fixed to insulation in factory for a shorter construction time, Screwed at Profile Ridges through to Purlins, Black powdercoat finish Kingspan KS1000 RW Trapezoidal Roof Polyisocyanurate 100mm Unit Continuous building wrap to cover all exposed timber members
23063
23063
90 x 45 Timber Purlins @ 600 crns to support Kingspan Unit nailed through 90x45x50mm recess in LVL beam 500x350 LVL Column fixed with Zinc coated M16 B/N/W through welded metal plate fillet welded to steel connection .
03
Roof to Wall Detail 1:5
Packing 2/ 90 x 45 Timber blocking 0.5 BMT black powdercoats ridge flashing with 150mm sealed overlap fixing through the rides 0.5 BMT flashing to run from under window flashing to underside of Kingspan unit 6x 4mm Butyl Sealant applied continuously
500x350 LVL Beam fixed with Zinc coated M16 B/N/W through insert metal plate to prevent shear breakage . 350 x250 x 10 metal plate to prevent shear breakage .
Level 05
Level 05
10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish
02
1:5
10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish 90 x 45 Timber Purlins @ 600 crns to support Kingspan Unit nailed through 90x45x50mm recess in LVL beam 500x350 LVL Column fixed with Zinc coated M16 B/N/W through welded metal plate fillet welded to steel connection .
03
Roof to Wall Detail 1:5
Packin
2/ 90 x
0.5 BM flashin overla
0.5 BM under under
6x 4m
500x35 B/N/W breaka
350 x2 breaka
Project 3
03
Dominic Tre Design shown is copyright of
Foam Ridge Filler (3-RWFILL) sealed top and bottom with gun grade sealant
9663
el 06
Drawing S
Fill gaps with Canister FR foam filler 0.5 BMT black powdercoats ridge flashing with 150mm sealed overlap fixing through the ridges
ding 35mm pretruction time, Black
socyanurate Kingspan KS1000 RW Trapezoidal Roof Cladding 35mm pre-fixed to insulation in factory for a shorter construction time, Screwed at Profile Ridges through to Purlins, Black powdercoat finish
ng
Kingspan KS1000 RW Trapezoidal Roof Polyisocyanurate 100mm Unit
A100
Transverse Sec
A201
Detail Area 1
A202
Detail Area 2
A203
Detail Area 3
A301
Exploded Axono
Continuous building wrap to cover all exposed timber members
PROJ DESCR
90 x 45 Timber Purlins @ 600 crns to support Kingspan Unit nailed through 90x45x50mm recess in LVL beam 10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish
The construction of t intended to reflect th environment of the h down through the us beams and columns shell. Polished concr provide an element o shoreline. The Mater focussed on the spe construction time an lifespan of each com site is open to the en perched close to the natural timbers are c against steel elemen recessed at junction appearance of a floa Through the middle o a 15m tall gantry whi considered an urban structure is incredibly top beams are suppo function of the space and stairs are hung f the structure. Betwee moments, a paramet emerges from the gr and turns to the roof is yet again hung fro prevent the structure movement.
500x350 LVL Beam fixed with Zinc coated M16 B/N/W through insert metal plate to prevent shear breakage . 1000 x 500 x 10 metal plate to prevent shear breakage .
02
Roof Apex Detail 1:5
01
Packing 2/ 90 x 45 Timber blocking 0.5 BMT black powdercoats ridge flashing with 150mm sealed overlap fixing through the rides 0.5 BMT flashing to run from under window flashing to underside of Kingspan unit 6x 4mm Butyl Sealant applied continuously
500x350 LVL Beam fixed with Zinc coated M16 B/N/W through insert metal plate to prevent shear breakage . 350 x250 x 10 metal plate to prevent shear breakage .
300255253 Project:
Dominic T
04 500 x 500 Universal steel column fillet welded to zinc steel grade 304 plate with a Yellow Intumescent level 4 paint finish 20mm Rectangular steel hollow section. grade 304 white powdercoat finish.
13mm Hex washer head slotted concrete screw anchor
550 x 550 x 20mm Zinc steel grade 304 plate fillet welded to 150mm steel grade 304 hollow section to be welded on site M20 Concrete Anchors with a Ramset chemset adheasive 101. Low visocity, high strength 5mm epoxy injection to prevent shear cracking on connection for depth refer to Engineer PS1 specs. 20mm Sika monotop high build packing mortar 75mm secondary exposed aggregate topping with a diamond grinded polished finish, 30mm Rebate on edge for wall connection 100mm Reinforced cast in-situ concrete slab on grade
12563
Level 01 Thermakraft 250micron concrete slab underlay applied between slab and sand blinding 50mm Sand Blinding Graded medium soil base
1
Moment Frame to Ground 1:5
19574
Level 04
25mm Perry grating walkway 4mm Foam seal around perimeter 360UB45 Trimmer beam to collect the stair and landing loads, fillet welded plate to stair tread to be done onsite then boltsed with M20 zinc B/N/W. Yellow Powdercoat finish 310UB32 Secondary beam. Yellow Powdercoat finish Rubber nose cap with adheasive 25mm Perry Grating Stair Tread 6mm solid steel wire grade 304 fillet welded on steel plates to collect tension loads and act as a balustrade Fillet Welded steel tread and risers to stinger. Red Powdercoat finish
500x3 coated M steel
350 x 35 plate fillet we hollo
20mm S
75mm secondary exp diamond grinded po
M20 Co chemset ad strength 5 shear cr
Therm underlay
3
Steel Stair Landing 1:2
Pr Design shown is
06 3
Draw
10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish
500x350 LVL Column fixed with Zinc coated M16 B/N/W through welded metal plate fillet welded to steel connection .
38mm profile Eurostyle Epic black powder coat finish dladding with a roll cap system. Fixings @ 1200mm through nogging.
A100
Tran
A201
Deta
A202
Deta
A203
Deta
A301
Expl
P DES
Eathwool Glasswool R2.2 wall insulation
6mm Rigid Air Barrier (RAB) board pre-cladding as weather protection against high wind pressures in 20mm cavity
The cons intended environm down thro beams an shell. Pol provide a shoreline focussed construct lifespan o site is op perched c natural tim against s recessed appearan Through a 15m tal considere structure top beam function o and stairs the struct moments emerges and turns is yet aga prevent t movemen
Timber battens for cladding fixing and supplied 20mm min air cavity
02
Exterior Corner Plan Section 1:5
06 3 10mm Gib plasterboard with screw fixings into purlins with a level 4 paint finish 6mm Rigid Air Barrier (RAB) board pre-cladding as weather protection against high wind pressures in 20mm cavity
Eathwool Glasswool R2.2 wall insulation 500x350 LVL Column fixed with Zinc coated M16 B/N/W through welded zinc steel grade 304 plate fillet welded to steel connection .
38mm profile Eurostyle Epic black powder coat finish dladding with a roll cap system. Fixings @ 1200mm through nogging.
350 x 350 x 20mm Zinc steel grade 304 plate fillet welded to 150mm steel grade 304 hollow section to be welded on site
Timber battens for cladding fixing and supplied 20mm min air cavity
20mm Sika monotop high build packing mortar
Continuous building wrap to cover all exposed timber members
12563
75mm secondary exposed aggregate topping with01a Level diamond grinded polished finish, 30mm Rebate on edge for wall connection
Colourstell 0.7 BMT cladding Vermin flashing
M20 Concrete Anchors with a Ramset chemset adheasive 101. Low visocity, high strength 5mm epoxy injection to prevent shear cracking on connection for depth refer to Engineer PS1 specs.
Dom
300255253 Project:
MIRAM COMP
100mm Reinforced cast in-situ concrete slab on grade
Address:
Miramar P By the Ro
Thermakraft 250micron concrete slab underlay applied between slab and sand blinding 50mm Sand Blinding Graded medium soil base
Tutor Name
Reduced Scales:
??
1:100 - x 1:50 - x
Detail Area Tw
04
Exterior Corner 1:5 Sheet:
3RD YEAR CONSTRUCTION DETAILS
2 6123 1535
3022
20mm Perry Grating Steel Welded Grating according to meeting the requirements of AS/NZ1657-2013 Walkway Standards 142
Steel Walkway
H
676
DW
750 RO
Kitchenette
F
(Room to be wrapped with 2 layers of Gib Fyreline according to NZBC C/AS5)
3752
129
1456
Service Access Are
WC vent
2870
Female WC
860 RO
110
1271
119 860 RO 292
516
90 x 45 Timber framed walls, 13mm Gib Aqualine to Bathrooms according to NZBC E3/AS1
9049
400mm Reinforced Concrete Wall on 45 x 45 Timber strapping on 2 layers 13mm Gib Fyreline according to NZBC C/AS5 with acoustic insulation
Stair Pressurisation
Hot/Cold Water
Kitchenette Riser
2x Retail Riser
HVAC Supply
2565
140 x 45 Timber framed walls according to NZS 3604 (table 8.4) with 2 x Gib Fyreline both sides according to NZBC C/AS5
1027
Carpark Extract
3044
3411
400mm Reinforced Concrete Wall on 45 x 45 Timber strapping on 2 layers 13mm Gib Fyreline according to NZBC C/AS5 with acoustic insulation both sides
---
Toilet Exhaust
226
9945
-
4897 936
90
2596
129 600 129
Bathroom Hallway
517 1944
1210
1200
1210
90 x 45 Timber framed walls acording to NZS 3604 on 2 layers 13mm Gib Fyreline according to NZBC C/AS5 both sides
Dominic Trewavas
300255253
Project:
Drawing:
Project Name
Primary Core - S
3
5 197
3202
197
1566 2052
1247
1956
-/60/60 FRR Fire-rated Door
Data x 2
810 RO
NORTH
2645
HVAC Return
Comms Room
766 116
ACC WC
0
1343 110
955
1057
516
-/60/60 FRR Firerated Door
4403
1200
90
1210
1827
100
292 516
860 RO
860 RO
2192
C
1592
3636
90 x 45 Timber framed walls, 13mm Gib Aqualine to Bathrooms according to NZBC E3/AS1
400mm Reinforced Concrete Wall on 45 x 45 Timber strapping on 2 layers 13mm Gib Fyreline according to NZBC C/AS5 with acoustic insulation
110
1905
Male WC
129 860 RO
)
-/60/60 FRR Fire-rated Door
610 RO
(Room to be wrapped with 2 layers of Gib Fyreline according to NZBC C/AS5)
ea
2
140 x 45 Timber framed walls according to NZS 3604 (table 8.4) with 2 x Gib Fyreline both sides according to NZBC C/AS5
116
1200 x 2400 Aluminium Grooved IGU with NewDecor Milky Frosted Film
Tutor
Simon CAD Filename:
Service Drawn Scale:
Project No.
Date:
07/31/15 Sheet No:
A102
542 73
400
71
Brandford Acoustic Gold Insulation according to NZBC G6/AS1
100
45 x 45 Bottom Plate according to NZS 3604
Steel PFC - Refer Struc. eng. spec.
Tray-dec UltraSpan-80 Metal deck with a 160mm Insitu Concrete topping
140
261
Floor finish to be selected by tenant over 10mm Gib Soundbarrier according to NZBC G6/AS1
100 x 10 Timber Skirting
M20 Masonary/Concrete High Tensile Steel Hook Anchor with washer and nut 400mm Reinforced Concrete Wall
2 layer 13mm Gib Fyreline staggered joints according to NZBC C/AS5 Timber blocking 90x45 - Provide connection for Gib Fire Protection accorfding to NZBC C/AS5 45 x 45 Top Plate according to NZS 3604 2 layer 13mm Gib Fyreline according to NZBC C/AS5 45 x 45 Timber Strapping on Reinforced Concrete Wall direction connection
1
Floor to Concrete Wall Connection 1:10
Recess cut into PFC - Welded plate added for direct bolt connection to primary member - refer struc eng spec. M16 x 60 HDG 8.8 STRUCT B/N/W complying to AS/NZS1252 and AS/NZS 4100 Primary Steel UB - Refer Struc. eng. spec.
C
deck e
1000mm high Galvanized Steel Railing with Balustrades at 150 centers to comply with NZBC D1/AS1
Tray-dec UltraSpan-80 Metal deck with a 160mm Insitu Concrete topping
20mm Perry Grating Steel Welded Grating according to meeting the requirements of AS/NZ1657-2013 Walkway Standards
to PFC - Welded plate rect bolt connection to ember - refer struc eng spec.
G 8.8 STRUCT B/N/W NZS1252 and AS/NZS 4100
PFC Steel Walkway supports coated in Phoenix 700-60 FRR 120/-/60 Intumescent Coating according to NZBC C/AS5 - refer struc eng spec.
mary Steel UB - Refer Struc. eng. spec.
Welding Plate with M16 x 60 HDG 8.8 STRUCT B/N/W complying to AS/NZS1252 and AS/NZS 4100
Timber blocking 90x45 - Provide connection for Gib Fire Protection accorfding to NZBC C/AS5 2 layer 13mm Gib Fyreline staggered joints according to NZBC C/AS5
2
Steel Walkway to Primary Steel Support 1:10
Tutor
Simon CAD Filename:
Drawn Scale:
Project No.
1 : 10
Project Number
Date:
07/31/15 Sheet No:
A401
stair and landing finish to be consulted with tenants 448
25
Floor Leveling Compound Grout - easily able to be stripped back to remove steel rod 25mm Concrete recess in slab to be filled with FLC Grout 50Mpa Bonding Grout to hold steel rod in place
25
200mm Precast Stair Landing to comply with NZBC D1/AS1
200
200mm stair/landing overh seismic loads - exceedin standard 100m
100 x 100 x 10 Rectangular Hollow galvanized Steel section with Phoenix 700-60 FRR 120/-/60 Intumescent Coating according to NZBC C/AS5
3
Dominic Trewavas
300255253
Project:
Precast Stair Flight 1:5
Drawing:
Project Name
Detail 3
16mm High Tensile Steel Rod - To be replaced after excessive seismic activity
Alloy Steel anti-slip Stair Cap 25
130
25mm Tread Projection to comply with NZBC D1/AS1 Figure 12
25mm diameter x 130 deep recess through stair and landing
200mm Precast Stair to comply with NZBC D1/AS1 PFC Steel beam with Phoenix 70060 FRR 120/-/60 Intumescent Coating according to NZBC C/AS5 refer to struct eng spec.
hang to support ng NZBC min. mm
ht to Precast Landing
Tutor
Simon CAD Filename:
3 Drawn Scale:
Project No.
1:5
Project Number
Date:
08/06/15 Sheet No:
A402
Floor finish to be decided by client
---
Galvanized steel walkway, 600 mm wide
14800
Level 04 160mm Metal Deck floor system 30mpa
Prefabricated Aluminum shading system with 40x155 verticals welded to UC @ variable intervals. 30mm diameter horizontal rods welded to verticals. Level 5 intumescent paint finish - colour dependant on client
600
1200x600 suspend plasterboard ceiling tile Thermosash IGU curtain wall system 150x75mm mullions at 1500mm cntrs with siesmic strengthening , flashing around top edge of exposed UB Structural Column 310UC158
-
240mm Steel bracket bolted into concrete floorsystem with anchor bolts, sizing and thickness refer to Engineer specs.
---
11100
-
Level 03
Exposed structural steel frame, 310UB32 Level 5 intumescent paint finish - colour dependant on client
---
310UB32 Secondary Beams, connected to UC with Bolt spec by Eng. Aluminium Panel with Level 5 intumescent paint finish - colour dependant on client
Thermosash IGU curtain wall system 150x75mm mullions at 1500mm cntrs
Drawn Scale: Project:
minic Trewavas
Address:
Facade Concept Design
Drawing:
220 Wakefield Quay Development, Wellington Waterfront
1 : 20
Section
Drawn By:
Sim
Sheet No:
Date:
13mm plasterboard lining with Level 4 paint finish
Checke
DT
A105
10/14/15
13mm Gib fyreline to Steel I cavity with continous corner flashing between both mullions
Thermosash double glazed curtain wall system with 150 x 75 mm mullion/transoms 1 A105
240mm Galvanised steel brackets @ 1500mm ctrns
600m wide glavanized steel walkway
Thermosash IGU curtain wall with seimic strengtherning 150 x 65 millions and 150 x 65 transoms
Prefabricated Aluminium shading system welded to steel framing. 30mm diameter pipe horizontal @ vaired intervals, 100x50 verticals Exposed structural 310UB32 steel frame, Level 5 Intumescent paint finish
Drawn Scale: Name
Dominic Trewavas
Project:
Address:
Facade Concept Design
Drawing:
220 Wakefield Quay Development, Wellington
1 : 20
PLan
Date:
Drawn By:
DT
Checked By:
Simon
Sheet No:
Floor finish to be decided by client
160mm Metal Deck floor system 30mpa
1200x600 suspend plasterboard ceiling tile
Aluminium Panel with Level 5 intumescent paint finish - colour dependant on client
Thermosash IGU curtain wall system 150x75mm mullions at 1500mm cntrs
Galvanized steel walkway, 600 mm wide 240mm Steel bracket bolted into concrete floorsystem with anchor bolts, sizing and thickness refer to Engineer specs.
Exposed structural steel frame, 310UB32 Level 5 intumescent paint finish colour dependant on client
Thermosash IGU curtain wall system 150x75mm mullions at 1500mm cntrs with siesmic strengthening , flashing around top edge of exposed UB
Prefabricated Aluminum shading system with 40x155 verticals welded to UC @ variable intervals. 30mm diameter horizontal rods welded to verticals. Level 5 intumescent paint finish - colour dependant on client
Drawn Scale: Project:
wavas
Address:
Facade Concept Design
Drawing:
220 Wakefield Quay Development, Wellington Waterfront
Prefabricated Aluminium shading system welded to steel framing. 30mm diameter pipe horizontal @ vaired intervals, 100x50 verticals
Drawn By:
DT
3d Cutaway
Date: Thermosash double glazed curtain wall system with 150 x 75 mm mullion/transoms
10/15/15
600mm wide Galvinized steel grated walkway
Seismic support welded to exterior UB Thermosash IGU curtain wall with seimic strengtherning 150 x 65 millions and 150 x 65 transoms
Flashing and drip edge for water run off
Exposed structural 310UB32 steel frame, Level 5 Intumescent paint finish
240mm Galvanised steel brackets bolted into the floor system with concrete anchors
Sheet N
A10
1. Roof
2. Tahuhu
3. Heke
4. Maihi
6. Tukutuku
5. Raparapa
7. Poupou
8. Pou tuarongo
11 Tekoteko
9. Te Pou Toko Manawa
12 Koruru
9. Te Pou Tahu
10 Tuapapa 13 Pare
14 Tekoteko
15 Te Roro
Exploded Axonometric Kit-Set Wharenui
D A3.1
DOWN
A A3.1
C A3.1
C A3.3
Fr.
ENTRY
LANDING
A' A3.1
Lounge & Kitchen 29 m2
ENTRY BED 13.2 m2
BED 10.6 m2
H A4.2
Lounge & Kitchen 20 m2 C A4.1
C A4.2
Fr.
BED 10.2 m2
D A4.2
E A4.2
WM
5.75 m2
B A3.1
BED 9.1 m2
F A4.2
5.46 m2 B' A3.1
WM
D' A3.1
Notes:
for this space is 10% of the floor area. Existing windows to stay the same size and to be replaced with
2.0.1 Bedrooms in Apartment 1. Natural light is provided via the Northern windows. Minimum requirements new timber framed, double glazed windows. Must comply with Heritage requirements and to installed in accordance with E2/AS1 2.0.2 Kitchen in Apartment 1. Natural light to living space provided by skylights, See drawing A3.4 for size and installations details. Joinery and wall details refer Drawing A3.7. 2.0.3 Living Area. Natural light provide via skylight. Complying with requirement of 10% of floor area. See drawing A3.4 for size and installation details. 2.0.4 Bathroom constructed on 180mm raised floor to provide required fall to back of the building. See drawing A2.5 and A3.5 for plumbing. For Construction drawings of the bathroom see Drawings A3.1 and A3.5. See Schedule 5.2 for furnishings. 2.0.5 Inter-tenacy wall. To comply with C1/AS2 Fire protection risk group SM & G1/AS1 Airbound and impact sound. 2.0.6 Bedrooms in Apartment 2. Natural light is provided via skylights. Minimum requirements for this space is 10% of the floor area. Must comply with Heritage requirements and to installed in accordance with E2/AS1 See drawing 3.4 for sizing and installation details. 2.0.7 Kitchen in Apartment 2. Natural light to living space provided by skylights and exsiting windows, See Window schedule for size and installations details.(Note exitisting windows to be retrofited with double glazing) Joinery and wall details refer Drawing A3.8. 2.0.8 Living Area. Natural light provide via skylight. Complying with requirement of 10% of floor area. See drawing A3.4 for size and installation details. 2.0.9 Bathroom constructed with larger wall cavity to provide required space for services from both apartments. See drawing A2.5 and A3.5 for plumbing. For Construction drawings of the bathroom see Drawings A3.2 and A3.5
C' A3.1
A A4.1
3.2.2 3.2.11, 12
3.2.7
3.2.7
3.2.4
B A4.1
3.2.1
3.2.7 1000mm
450mm
3.2.10
850mm
3.2.9
Section C- C'
Notes: Walls 3.2.1 Exterior Walls to be strapped and lined with Gib Rondo metal Batten system. To be combined with 40mm polystyrene insulation to provide required R-value of 1.0 minimum. Normal wall thickness to be 75mm,(unless stated otherwise) Battens to be installed at 600mm Cr. Using the A2039 masonry clip at 1200mm Cr vertically, 308 batten is to be used in accordance with manufactures specifications. 3.2.2 Western wall service ducting for water and waste. Full height in bathroom only and all penetrations through inter-tenancy wall to comply with FFR system of 60/60/60.Gib noise control, two way FFR system to be used. See drawing A2.3, A3.3, 3.5 3.2.3 Internal partition walls Non- structural. Stud spacing 600cr timber constructions. 10mm Gib lined with level 4 plaster finish. Refer Drawing A4.2 for typical detail 3.2.4 Walls to comply with internal moister E3/AS1, in bathroom and kitchen Area. Gib aqualine to be used on walls in kitchen and walls and ceiling in bathrooms. 3.2.5 Inter-tenacy wall. To comply with C1/AS2 Fire protection risk group SM & G1/AS1 Airbound and impact sound. FFR 60/60/60 and STC 55. Refer Drawing A2.3 and 4.2 for construction details and further fire system information. Glazing 3.2.6 Skylights to comply with the natural light to habitable spaces requirements G7/AS1. Window area to be 10% floor area For details relating to E2 compliance see Drawing A3.4 for details 3.2.7 Existing Windows are to be retrofitted with with double glazing
850mm
Extruded aluminium frame Condensation gutter Fixing into upright 110mm minimum upstand required by E2/AS1
Flashing to finish on top of upstand and start under roofing profile Building wrap to cover upstand
Set one corner of upstand higher up roof plane to provide cross-fall to kerb gutter Flashing to finish at a minimum 250mm up roof from upstand
Sealant
B - Skylight Typical Detail Upper Plane Scale 1:5
Draft Seal
Sealant 110mm minimum upstand required by E2/AS1
Condensation Weep Holes
Building wrap to cover upstand Internal Gib level four plaster finish
Extruded thermal PVC curb frame
Packing Extra purlin to support weight from skylight
Flashing to finish on top of upstand and start on top of roofing profile
C - Skylight Typical Detail Lower Plane Scale 1:5