Springfield Oregon Downtown Plan

Page 1

Downtown District Urban Design Plan and Implementation Strategy Adopted September 20, 2010

Downtown Citizen Advisory Committee • City of Springfield, Oregon



Acknowledgements Citizen Advisory Committee John Thomas Jeff DeFranco Robyn Sattler Kathy Baker Ted Corbin Kenny Eilers Steve Moe James Yarnall

Karen Hageman Tess Chedsey Shannon Mudge Bob Keefer Annie Hommel Dan Egan John Tuttle

Project Oversight Team Linda Pauly, Planning Supervisor Bill Grile, Development Services Director Greg Mott, Community Planning Mgr. Susie Smith, Public Works Director Tom Boyatt, Engineering and Transportation Mgr. John Tamulonis, Economic Development Robert Duey, Finance Department Director Jeff Towery, Assistant City Manager

Consultants Crandall Arambula PC, Prime Consultant George Crandall, Principal Don Arambula, Principal Jason N Graf, Associate Principal Jessie Maran, Urban Designer Karen Wall, Graphics Coordinator DKS Associates, Transportation Analysis Harper, Houf, Peterson, Righellis, Stormwater Analysis



Table of Contents Executive Summary Project Overview.......................................................... 2 Mobility Oriented Downtown..................................... 3 Fundamental Concept............................................... 4 Downtown Springfield/Glenwood Vision.................. 6 Downtown Build Out.................................................... 8 Land Use........................................................................ 9 Circulation................................................................... 10

Land Use Overview..................................................................... 12 Ground Floor Retail.................................................... 14 Commercial................................................................ 15 Employment................................................................ 15 Civic............................................................................. 16 Cultural........................................................................ 16 Housing........................................................................ 17 Parking......................................................................... 17 Plaza, Parks and Open Spaces................................ 18

Circulation Overview..................................................................... 22 Livability Framework................................................... 24 Mobility Framework.................................................... 28

Implementation Strategy Overview..................................................................... 40 Funding........................................................................ 41 Catalyst Project.......................................................... 42 Key Projects................................................................ 44 Other Actions.............................................................. 46 Public Projects Schedule........................................... 48 Responsibilities............................................................ 49



Executive Summary


pioneer pkwy w.

The Springfield Downtown District Urban Design Plan provides an innovative yet realistic vision and strategy for strengthening downtown Springfield’s role as the economic and cultural heart of the community.

Study Area The project study area is identified to the right. The plan includes consideration of both downtown Springfield and the Glenwood Riverfront District.

Stakeholder Meetings

W

L A I L

M

T E E T

A citizen advisory committee comprised of local neighborhood representatives, citizens, property owners and business representatives provided input and direction for the development of all plan concepts and implementing actions. A technical advisory committee (TAC), consisting of representatives from transportation, planning, public works, and economic development reviewed all plan materials and provided input.

R V E R I

klin

Land Use      

Provide for a community plaza or gathering space Identify opportunities for retail and entertainment uses Provide for safe and convenient parking Preserve and expand downtown employment Revitalize underutilized sites Increase density and mix of uses

Implementation  Encourage investment in public infrastructure  Create standards and guidelines for development  Identify incentives for new and existing businesses

Other  Maintain and enhance historic character  Create a family-friendly downtown  Improve downtown image and increase safety

Identify safe, direct connections to neighborhoods Promote pedestrian-friendly streets Improve access to the river, parks and open space Reduce the impact of truck traffic downtown

IO

NP

I AC

FIC

RA

ILR

OA

a st main st sout

h a st

D

Downtown–Glenwood District Study Area

Circulation    

TC

B lv d

UN

Project Objectives The following stakeholder-created objectives served as touchstones for the development and evaluation of the plan.

Downtown

glenwood Riverfront District Fr an

pioneer pkwy E .

Project Overview

Downtown District Urban Design Plan and Implementation Strategy


Mobility Oriented Downtown Downtown Springfield is envisioned as a destination rather than a thoroughfare. Within a five-minute walk or a five-minute bike ride, residents will be able to access a concentration of retail, employment, and services.

Moffitt Elem. School

)

m in

Hamlin Middle School

(5

il e

1M

Meadow Park

(5 NKL

IN B

LVD

k)

MAIN ST

TC

BUS RA PID TR ANSIT

Willa

S. A ST

Mill Pond

2ND ST

iver

te R

met

A IL

Willamalane Park

A ST

HOT SPOT

Y BL

H HIG

R ED SPE

1 / 4 M il e

FRA

W al

Willamalane Springfield Park Middle School

10TH AVE

PROTECTED BIKEWAY

m

in .

5TH AVE

Eastgate Woodlands

Springfield High School

Y (E)

Kelly Butte Park

VE MC VD

 Auto Travel Distances are Reduced. Most residents do not have to travel outside of the MOD to shop, work or conduct business. Most auto travel is to the commercial core, reducing typical auto travel distances  Auto trips are Reduced. Protected bike lanes allow residents—young and old alike—to substitute safe bicycle travel for auto travel within the downtown  Homeowners’ Fuel Costs are Reduced. The average U.S. household drives 22,000 miles per year. Households within the MOD could drive 50 percent fewer miles for an annual savings of approximately $2,500  Fuel Savings Provide a Local Economic Stimulus. If MOD households spend their energy savings locally— instead of sending the money overseas to multi-national companies—the annual local economic stimulus would likely be $80 million annually in Springfield’s MOD

de

KW EER P PION

What are the benefits of a Springfield MOD?

ke Bi

Ri

D BLV LY KEL

A MOD’s one-mile radius includes:  A Hot Spot. The center or ‘Hot Spot’ contains a concentration of the community’s residential, retail, employment, business, and service uses and a civic plaza  Pedestrian-Friendly Sidewalks. The sidewalks leading to the Hot Spot are comfortable, safe and vibrant  Protected Bikeways. Bicyclists are separated from auto traffic  Transit Supportive. Bus rapid transit will connect to neighborhoods and other centers in the region. Highspeed rail will provide premium transit access between Springfield, Portland, Seattle and Vancouver, B.C.

.

What is a Mobility Oriented Downtown (MOD)?

Dorris Ranch Living History Museum

Springfield Mobility Oriented Downtown

Executive Summary


Fundamental Concept Revitalization of downtown Springfield is dependent on the implementation of a few essential actions. A focused and coordinated effort will be required. Once these projects are implemented, other projects may be considered.  Mill Plaza–the city’s ‘living room’ hosts the community’s day-to-day gatherings. This paved multi-use space is intended to be active 18 hours a day  Retail Hot Spot–oriented around and near the plaza, a variety of local shops and anchor national tenants are envisioned as the main shopping destination and the heart of downtown. A critical mass of at least 150,000 square feet of ground-floor retail is necessary  Neighborhood Retail–Glenwood will have a neighborhood retail hub. To preclude development of a center that competes with the Hot Spot, ground-floor retail should be limited to 50,000 square feet  Two-Way Main Street–one-way street is converted to two-way, providing pedestrian-friendly direct access to downtown retail and providing visibility for Main Street businesses  Mobility Corridors–provide more efficient auto access through downtown and support Bus Rapid Transit (BRT) to the metro area  Protected Bikeways–separate bicycles from auto traffic, providing a safe and direct five-minute or less bike ride from neighborhoods to all downtown destinations  Glenwood Riverfront Housing District–2,000 new residences surrounded by parks and oriented to the riverfront are located within a short walk or bike ride to downtown retail, employment and services

Downtown District Urban Design Plan and Implementation Strategy

Plaza

Retail Hot Spot

Protected Bikeway

Mobility Corridor


NEIGHBORHOOD RETAIL

M

I OB

RET A

PIONEER PKWY EAST

PIONEER PKWY WEST

50,000 SF

C LITY

R

DO

RI OR

H OT PLAZA

A ST

OT

GLENWOOD RIVERFRONT HOUSING DISTRICT

IL

SP

PROTECTED BIKEWAYS

TWO-WAY MAIN STREET TC

SOUTH A

BRT Transit Center

ST

High Speed Rail Station

Downtown Springfield Fundamental Concept Diagram

Executive Summary


Downtown Springfield/Glenwood Vision Downtown Springfield and the Glenwood Riverfront District combined have the capacity to absorb significant amounts of growth over the next 30 years. The buildout plan illustrates the character, location and intensity of new development that may be achieved through implementation of the Downtown Urban Design Plan and the Glenwood North Riverfront Corridor Plan. The Glenwood North Riverfront Corridor Plan and the Downtown Urban Design Plan were separate parallel planning efforts that provide specific recommendations within their respective study areas; but they, collectively addressed the relationship of managing growth and development between downtown and the Glenwood riverfront. The purpose of the Springfield/Glenwood Vision is to illustrate the context and relationship of future development between downtown and the Glenwood Riverfront Corridor instead of as isolated planning efforts.

ug To E

ene

Franklin Multi-Way Boulevard

Legend Proposed Buildings

TC

Transit Center

P

Public Parking

Existing Buildings Parks and Open Space Protected Bikeways

High Speed Rail Station

PR

Downtown District Urban Design Plan and Implementation Strategy

Park and Ride


To Willamalane Park

10th St

To Spr ingfield High School 7th St

5th St

To Gateway Pioneer Pk w y (East)

Pioneer Pk w y (West)

M il l S t nd t te a ll y B u rk To Ke ow Pa Mead

Mill Plaza

Island Park

Protected Bikeways Two-Way Main Street

D St.

C St.

Post Office Park B St.

P

Justice Center

To Glenw ood River front

A St.

City Hall

W I L

L A

M

M a in St .

E

F

lin

Blv

d

P

TC

R V E R I

PR

S o u th

A S t.

Island Park Enhancements Transit Street and High Speed Rail Station Booth Kelly To Willamette Heights and Dor r is Ranch

E T T

To

k ra n

Millrace Educational and Recreational Enhancements

Executive Summary


Downtown Build-Out The build-out diagram provides a summary of the potential amount and type of new downtown development and public infrastructure projects. Most new development is located on vacant or underutilized sites.

10th Street

Post Office Park

New Development Potential 110,000 sf

Employment (Office)

990,000 sf

Cultural/Education

110,000 sf

Housing

1,080 units

Parking

3,900 sp

New LIbrary

60,000 sf

Wildish Theater

City Hall Emerald Arts Center

5th Street

Justice Center

Pioneer Pkwy (East)

P

Mill Plaza Streets

3200 lin. ft

Pioneer Pkwy (West)

1265 lin. ft

Mill Plaza

.75 ac

Post Office Park/Island Park

2.3 ac

Protected Pedestrian/Bikeway Loop Public Parking Structures

Booth Kelly

New Library

Public Infrastructure projects Two-Way Main Street

Academy of Arts

South A Street

Commercial

Transit Street & Rail Platfrom

Gateways learning Center

Two-Way Main Street

210,000 sf

7th Street

A Street

Retail

Millrace Educational and Recreational Enhancements

PR

TC P

Mill Plaza

9125 lin. ft 1,145 sp

Park and Ride Lot

255 sp

Transit Street & Rail Platform

1,585 lin.ft Island Park Enhancements er

Riv Island Park

Legend New Buildings Existing Buildings

TC

Transit Center

P

Public Parking

PR

Park and Ride

Parks and Open Space

e

ett

lam

Wil

High Speed Rail Station

Downtown Build-Out

Downtown District Urban Design Plan and Implementation Strategy


G ST.

F ST.

Land Use

Kelly Butte

PIONEER PARKWAY EAST

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

. MILL ST

¼

M ile

C ST.

Ra

us di

P A ST. ST. A

P

PLAZA

ill am

MAIN ST.

et

te

Glenwood

P

TC PR

Ri

RANKLIN BLVD

ve

SOUT SO UTH A ST .

B ST.

r

CV AY

Legend

HW Y ific

ac

P ion Un

d oa

il R

Ra

Ground Floor Retail

Housing

Commercial

Transit

Employment

New Parks

Civic/Government

Exisiting Parks & Open Space

Cultural/Education

4TH ST.

M

3RD ST.

C ST. 2ND ST.

Existing private property shown as a public use would operate as is until acquired by a public entity.

D ST.

B ST.

Island Park

W

The land use framework:  Identifies primary land uses; a vertical mix of uses along with the identified primary uses is encouraged  Identifies areas most likely to be developed or redeveloped over time  Builds upon and strengthens existing retail and commercial districts  Builds upon existing employment districts and creates new employment opportunities

WATER ST.

The land use framework identifies a mix of essential uses in locations deliberately selected to maximize development potential and ensure long-term viability. Based upon fundamental real estate siting requirements, the land use framework has the capacity to attract a significant portion of anticipated future region-wide development to the downtown.

PIONEER PARKWAY WEST

E ST.

Washburne District

P

Willamette Heights

Booth Kelly

Primary Land Use Diagram Mill Pond

Public Parking High Speed Rail Tracks

TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride

Executive Summary


G ST.

F ST.

Kelly Butte

Circulation

E ST.

C ST.

Ra

us di

Island Park

B ST.

The circulation framework includes two types of streets. am

MAIN ST.

et

Glenwood North Riverfront District

te

TC SOUTH A

ve

Franklin Blvd

r

B ST.

Y

Legend

Un

Mobility Routes

io

a nP

cific

il Ra

ad Ro

TC

Livability Routes Study Area

BRT/Bus Transit Center High Speed Rail Station

PR

Downtown District Urban Design Plan and Implementation Strategy

Park and Ride

4TH ST.

HW

2ND ST.

AY

3RD ST.

C ST.

M CV

ST.

PR

Ri

10

PLAZA

ill

Livability Framework Key pedestrian, bicycle, and auto routes within downtown and safe routes to neighborhood destinations such as schools and parks:  Retail Main Street  Neighborhood Connections (Mill Street, 5th Street, 7th Street, and 10th Street)

A ST.

W

Mobility Framework Essential auto, truck, transit and protected bikeway routes serving downtown and the metro region:  Pioneer Parkway  South A Street  Downtown Bikeway Loop  Main Street and Garden Bridge Crossings  New Transit Access Street and High-Speed Rail

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

D ST.

ile

The circulation framework supports regional and local access, providing for a wide range of current and future circulation needs. While efficient access to and mobility through the downtown is maintained, there is an increased emphasis on the design of streets to serve pedestrians and bicycles.

PIONEER PARKWAY WEST

Washburne District

Willamette Heights

Booth Kelly

Circulation Diagram

Mill Pond


Land Use


12

et

City Hall

P

Millra

A Stre et Post Office Park

TC

et

ce

re

Main St

reet

Sou

th A

Long-Range Plan In some situations, new uses are identified for parcels that are already occupied by a viable use. In these special cases the framework:  Keeps existing neighborhood plans, other policies and regulations intact  Serves as a guide for a potential new overlay of zoning regulations for the study area  Recognizes that regardless of any future regulatory changes, existing uses should remain and operate as long as property owners wish  Assumes that green space or other public use areas suggested for parcels currently under private ownership will be acquired or dedicated to the City or other government agency

Stre e 7th

5th

Justice Center

10th Stre

Mill Plaza

t

St r ee t

as t) (E ay

on ee rP kw

P

Pi

kw ay Pi on ee rP

Island Park Enhancements

St

The framework responds to the following essential requirements:  Development sites meet proven fundamental real estate needs for housing, employment, retail and parking  Development builds upon and strengthens downtown Springfield’s greatest assets—its historic buildings, closein neighborhoods, network of streets and the Willamette River

Island Park

2n d

The land-use framework provides a vision for unified and coherent growth in which new uses are fostered and existing desirable uses are strengthened.

(W es t)

Overview

Stre

et

Booth Kelly

PR

Build-Out Land Use

Build-Out Summary Land Use

New

Existing

Total

Retail

210,000 SF

40,000 SF

250,000 SF

Commercial

110,000 SF

143,000 SF

253,000 SF

Employment

990,000 SF

32,000 SF

1,022,000 SF

Civic

60,000 SF

234,500 SF

294,500 SF

Arts/Cultural

122,000 SF

44,000 SF

166,000 SF

Housing

1,080 DU

NA

Parking

3,900 SP

2,466 SP

Public Plaza

56,600 SF

Public Parks/Open Space

63,000 SF

Downtown District Urban Design Plan and Implementation Strategy

---2,537,000 SF

1,080 DU 6,366 SF 56,600 SF 2,600,000 SF


F ST.

Kelly Butte

PIONEER PARKWAY EAST

Washburne District

10TH ST.

9TH ST.

8TH ST.

7TH ST.

Âź

6TH ST.

4TH ST.

D ST.

5TH ST.

PIONEER PARKWAY WEST

T. MILL S

WATER ST.

E ST.

M ile

C ST.

Ra

us di B ST.

Island Park

P ST. AAST.

W

ill

PLAZA

am

P MAIN ST.

et te

wood

P

TC

SSO OUUTH THAASST T..

PR

Ri

ve

IN BLVD

r

B ST.

AY

HW

Y

Legend

4TH ST.

CV

3RD ST.

2ND ST.

C ST. M

d oa

Millrace

il R

a cR cifi

Pa Ground ion Floor Retail Un Commercial

Booth Kelly

Housing Transit

Employment

New Parks

Civic/Government Cultural/Education

Existing Parks/ Open Space

P TC

Public Parking BRT/Bus Transit

M

Willamette Heights

High Speed Rail PR

Park and Ride

Primary Land Use Diagram

13 Land Use Land Use


G ST.

Ground-Floor Retail

F ST.

Kelly Butte

PIONEER PARKWAY EAST

12TH ST.

10TH ST.

9TH ST.

7TH ST.

8TH ST.

Shopper-Friendly ¼ Parking Sites M 6TH ST.

5TH ST.

D ST.

4TH ST.

. MILL ST

WATER ST.

Washburne District

C ST.

ile

Ra

us di

Island Retail Hot Spot Park

Historic Main Street Retail

P

B ST.

A ST.

A ST.

P

PLAZA

ill

am

MAIN ST.

MAIN ST.

et

te

Glenwood

P TC

SOUTH A ST.

SOUTH A

PR

Ri

RANKLIN BLVD

ve

B ST.

r

ST.

Legend Ground Floor Retail Study Area

CV AY

HW

Y ion

Un

c Pa

ific

Ra

4TH ST.

M

3RD ST.

C ST.

2ND ST.

Main Street Retail Elements  40,000 sf of street-oriented retail along Main Street, including existing storefronts and new infill sites from Pioneer Parkway West to 5th Street  Storefront spaces ideally suited to specialty and localserving retail businesses  Parking provided at near-by city-owned Main Street facility

Full-Service Grocery

W

Retail Hot Spot Elements  150,000 sf of new ground-floor street-oriented retail on parcels surrounding Mill Plaza  Sites that serve the needs of large-format anchor retailers that draw shoppers to the downtown  Retail-friendly parking located between Pioneer Parkway West and Pioneer Parkway East

PIONEER PARKWAY WEST

E ST.

New and existing storefronts reestablish downtown as the premier pedestrian-oriented shopping destination in Springfield.

Booth Kelly

TC

d oa

BRT/Bus Transit Center High Speed Rail Station

il R

Willamette Heights

Mill Pond

PR

Park and Ride

Ground-Floor Retail Diagram

Downtown Grocery Elements  60,000-sf site that accommodates a new ‘urban style’ fullservice grocery store  Parking provided behind, above, below or within a new adjacent parking structure

Retail Recipe for Success Successful retail development requires following a basic formula for success. The key elements include:  The Right Retail Configuration–approximately 1/4 mile in length which is equal to a five-minute walk  Attractive Retail Presentation–buildings provide retail friendly storefronts with large openings and views of retail displays  High Quality Pedestrian Environment–incorporating wide sidewalks, safe crossings, pedestrian-scaled lighting, and street furniture  Shopper Friendly Parking–no further than a block away from retail  Convenient Auto Access–with direct and easy two-way auto access to storefronts and parking 14

Downtown District Urban Design Plan and Implementation Strategy

Retail Recipe for Success


G ST.

Commercial

F ST.

Kelly Butte

M

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

D ST.

C ST.

Ra

us di B ST.

Island Park

AAST. ST.

W

PLAZA

ill

am

MAIN ST.

et

Lithia Motors

te

Glenwood

TC ve

RANKLIN BLVD

Legend

B ST.

r

The employment framework:  Provides new highly desirable sites with ‘prominent addresses’ along major roadways  Includes parcels large enough to accommodate Class‑A office buildings  Preserves the Booth Kelly site for a future large employment campus

SOUTH A ST.

PR

Ri

Commercial Study Area

HW

Y n nio

U

cific

Pa

4TH ST.

CV AY

3RD ST.

M

2ND ST.

C ST.

Booth Kelly

TC

d oa

BRT/Bus Transit Center

il R

Ra

High Speed Rail Station

Mill Pond

Willamette Heights

PR

G ST.

Park and Ride

Commercial Diagram F ST.

Kelly Butte

Elements of the employment district include:  Variety–provides opportunities for both new construction and/or renovated offices above existing ground-floor uses  Flexibility–provides attractive sites for both major employers and small businesses  Access to services–located close to retail, dining, civic and other services  Access to amenities–including Mill Plaza, riverfront parks and the Millrace open space  Easy access–access to arterial roadways and transit

M

12TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

10TH ST.

D ST.

6TH ST.

4TH ST.

Employment Parking Sites

Washburne District

5TH ST.

PIONEER PARKWAY EAST

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

E ST.

ile

C ST.

Ra

us di

Upper-Floor Employment

Island Park

P

B ST.

A AST.ST.

W ill

PLAZA

am

MAIN ST.

et

te

Glenwood

P

TC

SOUTH A

PR

Ri

ve

RANKLIN BLVD

r

B ST.

ST.

Legend Employment Study Area

M

CV AY

HW

Y ion

Un

ific

c Pa

il R

Ra

3RD ST.

2ND ST.

C ST.

4TH ST.

Employment

Washburne District

ile

The commercial framework:  Includes businesses that sell services such as banks or dry cleaners  Preserves sites of existing viable uses such as Lithia Motors  May include other upper-floor uses such as housing or employment

PIONEER PARKWAY EAST

E ST.

Commercial uses support and complement the Retail Hot Spot.

d oa

Booth Kelly

TC

BRT/Bus Transit Center High Speed Rail Station

Willamette Heights

Mill Pond

PR

Park and Ride

Employment Diagram

15 Land Use Land Use


G ST.

Civic

F ST.

Kelly Butte

PIONEER PARKWAY EAST

M

12TH ST.

10TH ST.

9TH ST.

7TH ST.

¼

D ST.

Post Office

8TH ST.

New Library 6TH ST.

5TH ST.

4TH ST.

. MILL ST

WATER ST.

Washburne District

ile

C ST.

Ra

us di B ST.

Island Park

ST. AAST.

PLAZA

ill

am

City Hall

et

MAIN ST. ST.

te

Glenwood

TC

SOU SOUTH TH A ST.

A ST.

PR

Ri

RANKLIN BLVD

ve

Legend

B ST.

r

Civic Study Area

CV AY

HW

Y

Un

ion

Pa

cific

il Ra

Ro

Booth Kelly

4TH ST.

M

3RD ST.

C ST.

2ND ST.

Should City Hall be reconstructed in the future, the framework identifies a new location north of A Street; relocating City Hall would free up three city blocks for redevelopment and future parking to support Main Street.

Justice Center

W

The civic framework:  Integrates the Justice Center with City Hall  Provides a location for a future new library and other government services between 5th and 6th streets  Preserves 234,500 sf of existing centrally located public and government services  Maintains City Hall in its current location

PIONEER PARKWAY WEST

E ST.

Government uses improve downtown vitality. Downtown businesses benefit from government employees and patrons.

TC

ad

BRT/Bus Transit Center High Speed Rail Station

Willamette Heights

Mill Pond

G ST.

PR

Park and Ride

Civic Diagram

F ST.

Kelly Butte

PIONEER PARKWAY EAST

M

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY WEST

D ST.

C ST.

ile

The cultural framework:  Builds upon existing assets  Provides locations for art galleries, dining and lodging  Encourages art studios and work-live housing  Encourages upgrades to existing storefronts and new infill

MILL ST

WATER ST.

Cultural

.

E ST.

Washburne District

Ra

us di

Springfield Museum

Island Park

B ST. Wildish Theater

Emerald Arts Center

ST. AAST.

W ill

PLAZA

am

MAIN MAINST. ST.

et

te

Glenwood

TC

SOU SOUTH TH A ST.

PR

Ri

ve

FRANKLIN BLVD

r

B ST.

Arts Academy

Gateways

A ST.

Legend Cultural

HW

Y ion

Un

cific

Pa

4TH ST.

CV AY

3RD ST.

2ND ST.

C ST.

M

d oa

il R

Ra

Willamette Heights

Booth Kelly

Study Area

TC

BRT/Bus Transit Center High Speed Rail Station

Mill Pond

PR

Park and Ride

Cultural Diagram

16

Downtown District Urban Design Plan and Implementation Strategy


G ST.

Housing

F ST.

Kelly Butte

PIONEER PARKWAY EAST

Washburne District

M

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

D ST.

4TH ST.

MILL ST

.

WATER ST.

PIONEER PARKWAY WEST

E ST.

Downtown housing helps to create an active and economically successful downtown. Downtown residents are attracted to the services, shopping, cultural activities and employment opportunities.

C ST.

ile

Upper-Floor Housing Ra

us di

B ST.

Island Park

A ST.

W

Post Office Park

PLAZA

ill

am

MAIN ST.

et

te

Glenwood

TC

SOUTH A

Ri

RANKLIN BLVD

ve

ST.

PR

B ST.

r

Legend Housing Study Area

C ST.

CV AY

HW

Y

Un

ion

cific Pa

Ra

Booth Kelly

4TH ST.

M

3RD ST.

2ND ST.

TC

d oa

il R

High Speed Rail Station

Mill Pond

Willamette Heights

PR

G ST.

Park and Ride

Housing Diagram

F ST.

Parking

BRT/Bus Transit Center

Kelly Butte

10TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

D ST.

4TH ST.

Public Parking

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

While a reduction in parking is encouraged, the parking framework ensures that adequate public and private parking is provided.

PIONEER PARKWAY WEST

E ST.

Washburne District

12TH ST.

The housing framework:  Accommodates over 1,000 dwelling units  Provides opportunities for a variety of housing types for residents of all incomes and ages  Locates residential development in desirable areas adjacent to existing or planned plazas, parks, and open spaces  Transitions the building height and massing down to complement the adjacent historic Washburne neighborhood  Locates housing within a five-minute walk to transit  Encourages upper-floor housing along Main Street  Includes parking located on site

Private Parking

M

ile

C ST.

Ra

us di B ST.

Island Park

P A ST. ST. A

W

P

PLAZA

ill

am

MAIN ST.

et

te

Glenwood

P TC

SOUTH A

PR

Ri

FRANKLIN BLVD

ve

B ST.

r

ST.

Legend

P

HW

Y ion

Un

ific

c Pa

il Ra

Ro

4TH ST.

M CV AY

3RD ST.

C ST.

2ND ST.

The parking framework:  Is consistent with the downtown parking study  Supports the transition of public parking from lots to structures as demand warrants  Includes private parking provided in either structures or lots; unless accommodated within public facilities, or other parking arrangement, private parking must be provided on site  Ensures parking lots are located behind buildings or screened from public view  Maximizes on-street parking along Main Street and surrounding Mill Plaza  Limits loading zones and parking access on streets with ground-floor retail frontages

Booth Kelly

TC

ad

Public Parking Structure Study Area BRT/Bus Transit Center High Speed Rail Station

Willamette Heights

PR

Mill Pond

Public Park and Ride

Parking Diagram

17 Land Use Land Use


G ST.

Plaza, Parks and Open Spaces

F ST.

Kelly Butte

PIONEER PARKWAY EAST

Parks and Plaza

M

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

¼

6TH ST.

5TH ST.

4TH ST.

MILL ST

.

WATER ST.

Legend D ST.

Existing Parks/ Open Space Study Area

C ST.

Ra

us di

Mill Plaza

Post Office Park B ST.

TC

BRT/Bus Transit Center High Speed Rail Station

ST. AAST.

PLAZA

ill

am

PR

Park and Ride

MAINST. MAIN ST.

et

te

Glenwood

TC

SOU SOUTH TH A ST.

A ST.

PR

Ri

ve

Island Park Enhancements

FRANKLIN BLVD

r

B ST.

Pedestrian and Bicycle Bridge

Mill Plaza The 1.3-acre Mill Plaza located on the west end of Main Street is a focus for creating a downtown retail destination and central gathering space for the community. The design of the plaza includes mostly hardscape elements and is flexible enough to accommodate large downtown events as well as everyday uses.

HW

Y

Un

ion

ific

c Pa

4TH ST.

CV AY

3RD ST.

2ND ST.

C ST.

M

Booth Kelly

d oa

Millrace Enhancements

il R

Ra

Willamette Heights

Mill Pond

Plaza and Parks Diagram

Island Park

Connection to Island Park

Curbless Streets

Mill Street

Retail Pavilion Landscaping and Seating Areas

Ne

w

re

et

150’

7’

Public Art/Fountain

t

ee

Str

Island Park Enhancements Island Park, a passive park and public assembly area, continues to draw residents and visitors to downtown. Proposed enhancements to 1.45 acres of the existing park will create a formal garden for strolling, sitting, and viewing the Willamette River.

St

37

in Ma

Design elements include:  A direct pedestrian and bicycle connection from the plaza to Island Park  Special brick or concrete pavers  Curbless streets surrounding the plaza that expand the usable space and perceived visual dimensions of the assembly area  A retail pavilion with a bike station, cafe and restrooms  Street trees and landscaping  Lighting and street furniture such as benches and trash receptacles  Public art

Washburne District

ile

Island Park

W

New, existing and enhanced plazas, parks and open spaces create a variety of active and passive places in the following locations:  Mill Plaza  Island Park Enhancements  Post Office Park  Millrace Enhancements

PIONEER PARKWAY WEST

E ST.

The Mill Plaza, park and open space enhancements serve as downtown organizing elements and amenities, support natural storage of downtown stormwater, and provide community access to ecologically restored public waterways.

st)

ay (We

r Parkw

Pionee

Mill Plaza- Looking West

18

Downtown District Urban Design Plan and Implementation Strategy


h

Sloug

Formal Garden Island Park

Island Park Enhancements- Looking East

Washburne Historic District

Play Structures and Informal Play Areas

7th

Str

Housing

Lawn and Passive Use Areas

Post Office

A Street

Housing

Neighborhood Park

et

Millrace Enhancements The 44-acre former Mill Pond will be transformed into a natural citywide stormwater park, reducing the impact on and extending the life of existing stormwater infrastructure. Enhancements will provide for fish, wildlife and riparian areas with public trail access for viewing the restored habitat. Design elements include:  Trails and view points  Historic steam plant interpretative information center and restrooms  Natural and historical interpretation sites  Picnic pavilion  Parking  A new pedestrian and bicycle rail crossing, providing safe and direct access to and from downtown

Main Street

Gardens

8th Stre

Design elements include:  Primarily lawn, street trees and planting beds  Paved walkways, an assembly area and a possible water feature  Informal sport and game areas  Children’s play areas and structures  Pedestrian-scale lighting, benches and bike parking

Connection to Mill Plaza

ee t

Post Office Park Located along A Street opposite of the existing Springfield Post Office, this one-acre neighborhood park is centrally located to serve high-density housing on adjacent blocks and the Washburne Historic District.

Mill Plaza

A Street

Design elements include:  A direct connection from the park to Mill Plaza  The slough as a natural water feature that showcases sustainable stormwater management  Paved or crushed rock pathways  A variety of landscape beds, trees, shrubs and perennials  Planting beds and pervious paving that incorporate sustainable stormwater management  Pedestrian-scale lighting, benches and bike parking

Housing

Main Stre

et

Walkways, Gathering Area, and Water Feature

Adjacent Housing

Post Office Park- Looking North

19 Land Use Land Use



Circulation


Overview The circulation framework supports downtown’s role as a destination rather than a place to pass through. The framework provides regional access for autos, trucks and transit and significantly improves pedestrian and bicycle access within a five-minute walk or bike ride to and from downtown. Main Street is reestablished as a pedestrian-friendly destination. The circulation framework establishes a hierarchy of transportation routes. The diagram on the opposite page identifies the location of Livability and Mobility routes. Livability Framework  A Retail Main Street–Details Main Street improvements that strengthen the retail environment by reestablishing two-way auto travel and identifying pedestrian-friendly improvements to sidewalks and intersections  Neighborhood Connections–Provide safe routes to schools, parks and civic facilities. Improvements include both pedestrian and bicycle enhancements Mobility Framework  Protected Bikeways–Identify safe routes separated from auto traffic that will significantly increase bicycle ridership up to a mile from downtown  Bus Rapid Transit and High Speed Rail Routes– Expand the current bus rapid transit east along South A and identify a future high-speed rail and station adjacent to the Union Pacific rail corridor that will reduce auto dependency and help to provide access within the Springfield and Eugene metro area and the Pacific Northwest region  Regional Truck and Auto Access Corridors–Provide for through auto and truck traffic along South A Street, Pioneer Parkway West, and Pioneer Parkway East

22

Downtown District Urban Design Plan and Implementation Strategy

Pedestrians

Bicyclists

Transit

Automobiles and Trucks


F ST.

Kelly Butte E ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

Âź

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

D ST.

M

C ST.

ile Ra

us di

PIONEER PARKWAY WEST

T. MILL S

WATER ST.

Washburne District

Mobility Routes

Island Park Livability Routes

B ST.

A ST.

W

ill

PLAZA

am

MAIN ST.

et

te

Glenwood North Riverfront District

TC

SOUTH A

PR

Ri

ve

Franklin Blvd

r

B ST.

HW

Y

ail

ion

Un

Pa

cR cifi

ad

4TH ST.

AY

3RD ST.

CV

2ND ST.

C ST. M

ST.

Booth Kelly

Millrace

Ro

Willamette Heights

Legend TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride Study Area

Circulation Diagram

Circulation

23


G ST.

Livability Framework

F ST.

Kelly Butte E ST.

Streets and sidewalks make up more than 40 percent of the land area within downtown. Well-designed pedestrian- and bicycle-friendly streets contribute to a successful and vibrant downtown.

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

C ST.

Ra

us di

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

M

B ST.

A ST.

ill

PLAZA

am

MAIN ST.

et

te

Glenwood North Riverfront District

TC

SOUTH A

ST.

PR

Ri

ve

Franklin Blvd

r

B ST.

Legend

HW

Y

U

n nio

c Pa

ific

Ra

d oa

4TH ST.

CV AY

3RD ST.

M

2ND ST.

C ST.

il R

Neighborhood Connections The framework identifies key pedestrian and bicycle improvement routes that link neighborhoods, schools and parks with downtown.

24

¼

Island Park

W

Projected regional growth and new planned downtown development will exacerbate the current degraded retail environment along Main Street. To reverse this trend and make Main Street attractive for retail businesses, the framework:  Creates two-way traffic movement at least from Mill Street to 10th Street  Preserves on-street curbside parking  Redesigns intersections to reduce pedestrian crossing distances  Improves the pedestrian environment by incorporating pedestrian-scaled lighting, street trees and street furniture  Includes curbless streetscape elements around Mill Plaza  Redirects east/west truck and automobile commuter traffic to South A Street

Livability Routes

D ST.

ile

Retail Main Street

Washburne District

Downtown District Urban Design Plan and Implementation Strategy

Willamette Heights

Booth Kelly

TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride

Mill Pond

Study Area

Livability Diagram


G ST.

F ST.

Kelly Butte

Retail Main Street

E ST.

12TH ST.

10TH ST. C ST.

us di B ST.

Retail Main Street

A ST.

PLAZA

am

MAIN ST.

et

te

Glenwood North Riverfront District

TC

SOUTH A

PR

Ri

ve

Franklin Blvd

r

B ST.

Y Un

ion

Pa

cific

il R

Ra

4TH ST.

d oa

3RD ST.

HW

2ND ST.

M

ST.

Legend

C ST.

CV AY

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

¼

Ra

PIONEER PARKWAY WEST

. MILL ST

D ST.

ile

Plaza Streets

ill

The following existing elements will not change:  The number or width of travel and parking lanes  Existing sidewalks

Island Park

W

The following improvements will reestablish Main Street as a pedestrian-oriented retail destination. Improvements include:  Reorienting traffic signals for two-way travel  Constructing new 25’ radius curb extensions with landscaping  Painting new crosswalks with ladder stripping  Constructing tabled intersections to calm traffic and improve ADA accessibility  Designing a consistent ‘family of elements’ for street, furniture, including signal poles, pedestrian-scale lighting, planters, benches, trash receptacles, bicycle racks, bollards, and newspaper corrals that create a cohesive pedestrian environment

WATER ST.

Washburne District

TC

Booth Kelly

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

Convert to Two-Way

Replace Curb Extensions

) y (East

Replace Corners with Tighter Turning Radius to Reduce Pedestrian Crossing Distance

Table Intersections

r Pkw Pionee

Pioneer

Pkwy (W

est)

Retail Main Street Diagram

Main Street

Add Pedestrian Scale Lighting and Street Furniture

Typical Section

Typical Block-Looking North

Circulation

25


Plaza Streets Curbless Streets Bollards

On-Street Parking et

est) wy (W er Pk Pione

Design elements include:  Two-way auto travel on curbless streets that can be closed to traffic to enlarge the overall plaza area for special events  Bollards along the plaza side of the street that provide access for maintenance vehicles  Curb extensions with ornamental trees  Canopy street trees  On-street parking along building frontages separating pedestrians from auto travel and supporting needed parking for retail  A consistent ‘family of elements’ for street furniture, including signal poles, pedestrian-scale lighting, planters, benches, trash receptacles, bicycle racks, bollards, and newspaper corrals that create a cohesive pedestrian environment

Street Trees, Pedestrian-Scale Lighting and Street Furniture

Mill Str e

Plaza streets are located along Mill Street and a new street fronting the north side of Mill Plaza.

Mill Plaza

Main Street

Plaza Streets- Looking North

Typical Curbless Street

26

Downtown District Urban Design Plan and Implementation Strategy


G ST.

F ST.

Kelly Butte E ST.

Neighborhood Connections

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

M

C ST.

us di

Island Park

B ST.

A ST.

ill

PLAZA

am

MAIN ST.

et

te

Glenwood North Riverfront District

TC

SOUTH A ST.

Ri

PR

ve

Franklin Blvd

r

B ST.

Legend

HW

Y ific

Un

c Pa ion

il R Ra

d oa

4TH ST.

CV AY

3RD ST.

M

2ND ST.

C ST.

Minimum pedestrian design elements include:  6’ wide continuous sidewalks  Ladder-striped crosswalks  Stop signs or signalized intersections

¼

Ra

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

D ST.

ile

Neighborhood Connections

W

The neighborhood connections include:  Mill Street–Connects the Kelly Butte neighborhood to downtown and provides a direct link between Meadow Park and the Mill Plaza  5th Street–Connects the Washburne District to downtown and provides a direct link between the public library and the Hamlin Sports Complex  7th Street–Provides a safe route to school with a direct link between Springfield High School, Gateway Learning Center, the future high-speed rail station and the Millrace  10th Street–Provides a safe route to school with a direct link between Springfield Middle School/Willamalane Park, and the South A Street protected bikeway

Washburne District

Willamette Heights

TC

Booth Kelly

BRT/Bus Transit Center High Speed Rail Station

Millrace

PR

Park and Ride

Mill Pond

Study Area

Neighborhood Connections Diagram

Bicycle design elements may include:  Protected bikeways (preferred)  Bike lanes  Bike boulevards on 7th Street north of B Street (outside of the downtown plan study area)  Biking for children on the sidewalk along routes to schools where space is constrained

Routes to Schools

Protected Bikeway

Circulation

27


G ST.

Mobility Framework

F ST.

Kelly Butte E ST.

The mobility framework identifies key routes that provide access to the region and enable the revitalization of Main Street.

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

PIONEER PARKWAY WEST

us di B ST.

ill

am

MAINST. ST. MAIN

et

te

Glenwood North Riverfront District

TC

SOUTH A

ST.

PR

Ri

ve

B ST.

r

Bus Rapid Transit (BRT) and High-Speed Rail

Legend

HW

Y ific

Un

c Pa ion

d oa

4TH ST.

CV AY

3RD ST.

M

2ND ST.

C ST.

il R

Ra

Automobile and Truck Mobility Streets Auto and truck streets include:  A route along South A Street, serving as the primary east/west auto and truck route for the metro area  Routes along Pioneer Parkway West and Pioneer Parkway East, serving as the primary north/south auto route, connecting downtown with the Gateway/Riverbend District and providing regional access to I-5

28

C ST.

A ST.

Franklin Blvd

BRT and High-speed rail include:  Routes along South A, Pioneer Parkway West and Pioneer Parkway East, serving current and future bus rapid transit  A new high-speed rail and station located within the existing rail right-of-way, providing premium access between Springfield, Portland, Seattle and Vancouver B.C.  A new bus and BRT transit street, integrating the existing transit center with a new high-speed rail station

M

Ra

Island Mobility Routes Park

¼

W

Protected bikeways include:  A downtown loop along A Street, 10th Street, South A and Island Park  New river crossings between Glenwood and downtown along the existing Main Street bridge and a new pedestrian and bicycle bridge that extends westerly from A Street

D ST.

ile

Protected Bikeways

. MILL ST

WATER ST.

Washburne District

Downtown District Urban Design Plan and Implementation Strategy

Willamette Heights

Booth Kelly

TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride

Mill Pond

Study Area

Mobility Diagram


G ST.

F ST.

Kelly Butte E ST.

Protected Bikeways

12TH ST.

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

¼

C ST.

Ra

us di

Island Park

B ST.

A ST.

W ill

am

MAIN ST.

et

Glenwood North Riverfront District

te

TC

SO SOU UTH TH A ST.

PR

Ri

ve

Franklin Blvd

B ST.

r

Legend CV AY

HW

Y ific

Un

c Pa ion

il R Ra

d oa

TC

Booth Kelly

4TH ST.

M

3RD ST.

C ST.

2ND ST.

Protected bikeways include:  Glenwood Connections–Provide a direct connection from A Street to the Glenwood Riverfront District and from Main Street to the regional trail network along Franklin Boulevard  Downtown Loop–Creates a continuous loop from A Street to 10th Street and along South A Street to Island Park  Other Connections–Include access to key destinations along Pioneer Parkway to the north, 2nd Street to the south and South A Street to the east

Protected Bikeways

D ST.

ile

Protected bikeways provide safe, direct and convenient access to downtown within a five-minute ride from surrounding neighborhoods and connect to the Springfield/Eugene regional bicycle network.

PIONEER PARKWAY WEST

Washburne District

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

Protected Bikeways Diagram

Main Street Bridge Protected Pedestrian/Bikeway

er

Riv

Island Park e

ett

llam

Wi

Garden Bridge

Glenwood Waterfront

Glenwood Connections

Circulation

29


G ST.

F ST.

Kelly Butte E ST.

Glenwood Connections

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

M

C ST.

Ra

us di

Island Park

B ST.

ST. AA ST.

ill

am

MAIN ST.

et

Glenwood North Riverfront District

te SOU SOUTH TH A A ST. ST.

Ri

ve

Franklin Blvd

r

Main Street Bridge

B ST.

Legend

CV AY

HW

Y Un

ion

Pa

cific

Ra

d oa

4TH ST.

M

3RD ST.

C ST.

2ND ST.

Minimum bicycle design elements include:  A direct bridge alignment that continues the A Street protected bikeway across the river to the future Glenwood waterfront trail  A minimum 10’ bi-directional bikeway separated from pedestrian traffic by striping or barrier  Bridge ramps that transition directly to existing grade on both sides of the river; corkscrew or switch-back ramps are not appropriate

¼

W

These include: Garden Bridge–A pedestrian- and bicycle-only bridge that connects Island Park to the Glenwood waterfront and provides Glenwood residents direct downtown access

Garden Bridge

D ST.

ile

 Support an active waterfront on both sides of the river by linking the Glenwood Riverfront District to Island Park and downtown.  Extend the primary east/west bicycle commuter route from downtown along South A and across the Main Street Bridge to Franklin Boulevard

. MILL ST

WATER ST.

Two bridge crossings offer distinct opportunities to:

PIONEER PARKWAY WEST

Washburne District

il R

Willamette Heights

Booth Kelly

TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride

Mill Pond

Study Area

Glenwood Connections Diagram

The image below right identifies a typical pedestrian and bicycle bridge in Eugene.

Cantilever

Main Street Bridge–A possible cantilevered or underbridge crossing along the Main Street bridge to Franklin Boulevard, providing a regional bicycle connection between downtown Springfield and Eugene Minimum bicycle design elements include:  A minimum 10’ bi-directional bikeway separated from pedestrian traffic by striping or barrier  Bridge ramps that transition directly to existing grade on each side of the river are preferred over corkscrew or switch-back ramps

Under Bridge Crossing

The image below left illustrates a potential under-bridge crossing on the Main Street Bridge.

Main Street Bridge Option- Looking West

30

Downtown District Urban Design Plan and Implementation Strategy

Pedestrian and Bicycle Bridge- Eugene


G ST.

F ST.

Kelly Butte E ST.

Downtown Protected Bikeway Loop

12TH ST.

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

¼

C ST.

ile

Ra

us di

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

D ST.

Island Park

B ST.

A ST.

PLAZA

ill

am

MAIN ST.

et

Glenwood North Riverfront District

te

TC

SOUTH A

ve

Franklin Blvd

r

B ST.

Legend

Y Un

ion

Pa

cific

il R

Ra

d oa

4TH ST.

HW

3RD ST.

CV AY

2ND ST.

C ST.

M

ST.

PR

Ri

Design elements include:  A protected bikeway separated from auto traffic by a landscape buffer, curb-side parking or a grade separation  Colored pavement indicating the bike route; colored pavement should continue through intersections  Secured bike parking at key destinations and transit centers  A bike station at Mill Plaza, including changing rooms, showers, and storage and rental facilities

Protected Bikeway Loop

W

The bicycle loop provides safe and convenient access to downtown attractions. The loop includes.  A Street from 10th Street to the existing Island Park pedestrian and bicycle trail  10th Street from A Street to South A Street  South A Street from 10th Street to the existing Island Park pedestrian and bicycle trail  Existing Island Park Trail from South A Street under the bridge to A Street

Washburne District

Willamette Heights

Booth Kelly

TC

BRT/Bus Transit Center High Speed Rail Station

PR

Park and Ride

Mill Pond

Study Area

Downtown Protected Bikeway Loop Diagram

Typical Bikeway Section

Bike Station

Circulation

31


G ST.

F ST.

Kelly Butte E ST.

Other Connections

12TH ST.

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

¼

C ST.

Ra

us di

Island Connections Other Park

B ST.

A ST.

W

PLAZA

ill

am

MAIN ST.

et

Glenwood North Riverfront District

te

TC

SOUTH A

ve

Franklin Blvd

r

B ST.

Legend

Y Un

ion

Pa

cific

d oa

4TH ST.

HW

2ND ST.

CV AY

3RD ST.

C ST.

M

TC

Booth Kelly

BRT/Bus Transit Center High Speed Rail Station

il R

Ra

ST.

PR

Ri

Design elements include:  A protected bikeway separated from auto traffic by a landscape buffer, curb-side parking or grade separation  Colored pavement indicating the bike route; colored pavement should continue through intersections  Secured bike parking at key destinations and transit facilities

D ST.

ile

Other connections provide an essential link between key destinations and downtown. The connections include:  Pioneer Parkway–Links Gateway and the Sacred Heart Medical Center to downtown  2nd Street–Links the Willamette Heights neighborhood and Dorris Ranch to downtown  South A Street–Links the Regional Sports Center to downtown

PIONEER PARKWAY WEST

Washburne District

Park and Ride

PR

Willamette Heights

Mill Pond

Study Area

d 2n

Wil

lam

ett e

et re

St

Riv er

Other Connections Diagram

Dorris Ranch

Sacred Heart Medical Center

32

Downtown District Urban Design Plan and Implementation Strategy

Dorris Ranch Living History Farm


G ST.

F ST.

Kelly Butte

Bus Rapid Transit and High-Speed Rail

E ST.

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

4TH ST.

5TH ST.

PIONEER PARKWAY EAST

PIONEER PARKWAY (EAST)

MILL ST

.

WATER ST.

A ST. ST.

ill

PLAZA

am

MAIN ST.

et

te

Glenwood North Riverfront District

TC

SOUTH A

Ri

ve

Franklin Blvd

r

B ST.

Legend

Y ac nP

ific

il Ra

Ro

ad

io

Un

TC

Booth Kelly

4TH ST.

HW

2ND ST.

CV AY

3RD ST.

C ST.

M

ST.

PR

New Transit Access Street

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

st

8th Street

5th Str eet

7th Street

y Ea Par kwa eer

City Hall

Pion

eer Par k

wa

yW est

Transit and High Speed Rail

Pio n

 Extends the existing LTD bus-only street  Links BRT transit center, high-speed rail and park-andride lot

us di B ST.

W

 Provides a terminus station and park-and-ride facility  Locates a platform and trackway within the existing Union Pacific right-of-way

C ST.

Island Park

 Is accommodated to support planned LTD expansion of the BRT route east of downtown

High-Speed Rail

M

Ra

Bus Rapid Transit

D ST.

¼

ile

The BRT and high-speed rail framework builds off of Lane Transit District’s (LTD) investment in existing BRT and provides for possible high-speed rail in downtown Springfield.

PIONEER (WEST) PIONEERPARKWAY PARKWAY WEST

Washburne District

Existing Transit Center South A Street

New Transit Access Street

Proposed BRT Route East

TC PR Future HighSpeed Rail

Existing Transit Center

Circulation

33


G ST.

F ST.

Kelly Butte

12TH ST.

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

4TH ST.

5TH ST.

PIONEER PARKWAY EAST

PIONEER PARKWAY (EAST)

M

C ST.

Ra

us di

PIONEER (WEST) PIONEERPARKWAY PARKWAY WEST

. MILL ST

D ST.

¼

Island Park

B ST.

A ST. A ST.

W

PLAZA

ill

am

te

Glenwood North Riverfront District

TC

SOUTH A

ve

r

B ST.

Legend

Y ac nP

ific

il R Ra

io Un

4TH ST.

d oa

3RD ST.

HW

2ND ST.

C ST.

M

ST.

PR

Ri

Franklin Blvd

CV AY

Proposed and Existing Bus Rapid Transit Routes

MAIN ST.

et

Further refinement and analysis should consider and support:  Two-way traffic on Main Street  Possible two-way traffic on South A Street  Rerouting the east/west alignment along the proposed transit street and South A Street as indicated  Design of South A Street to accommodate either an exclusive BRT guideway or shared lanes

Planned and Existing Bus Routes

ile

The Regional Transportation Plan calls for the Planned EmX BRT (see image lower right) route to run as a couplet system along Main and South A Streets. The City should work in conjunction with LTD to coordinate and accommodate a refinement to the EmX BRT alignment running east from the transit center.

E ST.

Washburne District WATER ST.

Bus Rapid Transit

TC

Booth Kelly

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

Transit Street

Gateway and Riverbend

Existing EmX BRT Route to Gateway

Downtown Eugene

Downtown Springfield

Existing EmX BRT Route to Eugene

Planned EmX BRT Route

Bus Rapid Transit System- Regional Transportation Plan

34

Downtown District Urban Design Plan and Implementation Strategy


G ST.

F ST.

Kelly Butte E ST.

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

¼

PR

us di

Island Park

BRT/Bus Transit Center High Speed Rail Station

C ST.

Ra

PIONEER PARKWAY WEST

. MILL ST

WATER ST.

TC

D ST.

ile

High-speed rail provides a unique opportunity for economic development, reduced roadway congestion and improved air quality in downtown Springfield. Further study of high-speed rail would identify:  Trackway and station platform needs  Park-and-ride needs  Acquisition requirements of properties east of the study area for maintenance and other facilities

Park and Ride Study Area

B ST.

A ST. ST. A

W ill

am

MAIN ST.

et

Glenwood North Riverfront District

te

TC

SOU SOUT THHAAST. ST.

PR

Ri

ve

Franklin Blvd

Y Un

ion

Pa

cif

a ic R

il

ad Ro

High-Speed Rail

Booth Kelly

4TH ST.

HW

3RD ST.

CV AY

2ND ST.

C ST.

M

Potential High Speed Rail Maintenance Facility

B ST.

r

Design elements include:  A 1,000’ station platform with shelters and ticketing facilities  Wide walkways with benches connecting the platform to the park-and-ride lot  A pedestrian and bike bridge with access over the trackway to the station platform  A drop-off area on the new transit access street

Legend

Washburne District

12TH ST.

High-Speed Rail

Pond Mill Millrace

Willamette Heights

High Speed Rail Diagram

BRT/Bus Stop

7th

Elevator to Platform Str

treet

hAS

Sout

Station Platform

ee

t treet

nly S

sit O

Tran

Park and Ride

e

ail Lin

UP R

Ramp to Sidewalk

Millrace Enhancement Area

Pedestrian and Bike Bridge

High Speed Rail Station/Park and Ride

Circulation

35


G ST.

F ST.

Kelly Butte E ST.

New Transit Access Street

12TH ST.

10TH ST.

9TH ST.

M

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

¼

C ST.

Existing Transit Center and Bus-Only Street Ra

us di

Island Park

B ST.

New Transit Access A ST. Street

W ill

am

te

Glenwood North Riverfront District

TC

SOU SOUT A ST. H TH A ST.

PR

Ri

ve

Franklin Blvd

r

B ST.

Legend

Y ac nP

ific

il R

Ra

d oa

io

Un

TC

Booth Kelly

4TH ST.

HW

2ND ST.

M

3RD ST.

C ST.

CV AY

Proposed BRT Exclusive Guideway or Shared Lanes

MAIN ST.

et

The design of the new transit street includes:  Exclusive two-way transit-only lanes serving BRT and buses  Two-way office and parking access lanes  A parking lane for short-term transit drop off and office loading/service  A walkway connecting the high-speed rail park-and-ride lot to the transit center

Existing BRT routes

D ST.

ile

The new transit access street begins at Pioneer Parkway East and ends at 8th Street, avoiding the need to locate BRT lanes along South A Street where the right-of-way is constrained.

PIONEER PARKWAY WEST

Washburne District

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

New Transit Access Street Diagram

7th Stree

t

City Hall

Auto Lanes (Two-Way) Main Stre

Proposed BRT Exclusive Guideway or Shared Lanes

et

Bus-Only Lanes (Two-Way)

TC Parking Structure

Sout

hAS

treet BRT O

nly

Tran

sit O

Existing Transit Center and Bus-Only Street Booth Kelly

nly

PR

Pedestrian and Bicycle Bridge High Speed Rail Station Platform

New Transit Access Street

36

Downtown District Urban Design Plan and Implementation Strategy


G ST.

F ST.

Kelly Butte E ST.

Automobile and Truck Mobility Streets

us di B ST.

A ST.

W ill

PLAZA

am

MAIN ST.

et te

Glenwood North Riverfront District

TC

SOUTH A

Ri

ve

r

B ST.

Special Traffic Study Area CV

HW

Y ion Un

cific Pa

il R Ra

d oa

3RD ST.

2ND ST.

M

Legend

C ST.

4TH ST.

Franklin Blvd

ST.

PR

TC

Booth Kelly

BRT/Bus Transit Center High Speed Rail Station

PR

Willamette Heights

Park and Ride

Mill Pond

Study Area

Pioneer Parkway Mobility Streets Elements  Removal of right turn-lane to Main Street along Pioneer Parkway West

PLAZA

3 Lanes (Possible Two-Way)

2 LanesNo Trucks (Possible Two-Way)

Pioneer Pkwy (East)

Automobile and Truck Diagram

Pioneer Pkwy (West)

Special Traffic Study Area An additional traffic study is required to determine the feasibility of converting Main Street from a one-way to a two-way street and to relocate through traffic to South A. Options to resolve congestion and traffic issues between the eastern bridgehead and Pioneer Parkway should be explored. Options may consider:  A new intersection at the eastern bridgehead  A roundabout at the eastern bridgehead  Two-way bridges  Other

12TH ST.

C ST.

Island Park

AY

10TH ST.

9TH ST.

8TH ST.

7TH ST.

6TH ST.

5TH ST.

4TH ST.

PIONEER PARKWAY EAST

. MILL ST

WATER ST.

M

Auto and Truck Mobility Streets

Provide downtown routes for regional through traffic and enable the conversion of Main Street to two-way. Downtown Mobility Streets include: South A Mobility Street Elements  Two-way travel from the eastern bridgehead through downtown  A BRT guideway or shared lane from the eastern bridgehead to the transit center and an exclusive guideway or shared lane from 8th Street east  Turn lanes for northbound access to Pioneer Parkway  The designated truck route that replaces the current Main Street route

¼

Ra

Downtown Mobility Streets

D ST.

ile

The automobile and truck framework includes a network of streets that ensure the efficient travel of freight and commuter traffic through downtown.

PIONEER PARKWAY WEST

Washburne District

Main Street

6 Lanes- Auto and Truck Route (Two-Way)

S

5 to 6 Lanes (Two-Way)

The image on the right identifies a possible conceptual mobility option within the special traffic study area. South A Street

New Signalized Intersection

Shared Auto/BRT Lane

2nd Street

Main Street Main Street should not serve as a regional mobility street. An additional traffic study may be needed to:  Convert Main Street to a two-way street between at least Mill and 10th streets  Remove the Main Street truck route designation between, at a minimum, Mill and 10th streets

TC

Conceptual Mobility Option for Special Traffic Study Area

Circulation

37



Implementation Strategy


Overview Key Project Catalyst Project

10th St

pioneer parkway (east)

The implementation strategy is founded on the principle that public dollars must be spent on projects that stimulate significant private investment in the downtown. The strategy includes:  Catalyst and Key Projects–Essential projects and actions that stimulate downtown investment and support revitalization efforts over time  Other Actions–Actions that demonstrate momentum and establish the regulatory framework needed to implement the plan  Schedule–A schedule for implementing the downtown plan’s projects and actions  Responsibilities–Identifies a comprehensive, consistent and coordinated effort

Downtown Urban Renewal District Boundary

pioneer parkway (west)

The implementation strategy prescribes a program for creating positive change and stimulating development momentum in downtown Springfield.

Parking

Plaza Two-way main Street

Implementation Projects

40

Downtown District Urban Design Plan and Implementation Strategy


Funding Public investment in infrastructure and open space will be necessary to improve the private investment environment within the Downtown Springfield study area. The area currently lacks fundamental components of a vibrant downtown such as a public plaza, a significant retail presence and a pedestrian-friendly shopping street. Therefore, the Implementation Strategy suggests focusing on the catalyst and key public projects as the initial step required to stimulate adjacent private development.

10th Street

7th Street

Gateways learning Center

Public Investment

Academy of Arts

City Hall Emerald Arts Center

5th Street

Public Investment Tools

Nationwide, tax increment financing of public projects has proven the most effective tool for funding downtown infrastructure. The Downtown Urban Renewal District has produced a limited amount of increment; however, over time, it will be an invaluable source of financing implementation projects.

Justice Center

Two-Way Main Street

Pioneer Pkwy (East)

South A Street

Funding of downtown public projects will likely come from various sources. Some of these sources, such as Tax Increment Financing (TIF) or the City’s Capital Improvements Program (CIP), are currently in place. Additional funding from local, state and national sources should be explored.

Public Parking Site

A Street

It is important to keep in mind what Springfield “wants to be when it grows up” and to devise an implementation strategy around that notion rather than simply crafting a strategy based upon limited available funds. For Downtown Springfield to be revitalized and the community’s vision to be realized, a concerted and disciplined adherence to the strategies and elements of the plan will be required.

Pioneer Pkwy (West)

Mill Plaza

Two-Way Main Street

With limited public funds available, it will take time to build out all of the public actions identified in the plan. To limit public costs, catalyst and key projects such as the Mill Plaza and development of public parking facilities can be phased to limit public financial exposure in the early stages of implementation. The figure to the right illustrates the location and relationship of catalyst and key public infrastructure projects.

Wildish Theater

Catalyst and Key Projects

41 Implementation Strategy Implementation


Catalyst Project Mill Plaza is a public catalyst project that is essential to creating a positive downtown atmosphere and triggering significant private development surrounding the plaza.

a Street

a Street

Alley

1

2

3

main St

Required Land Assembly

42

Downtown District Urban Design Plan and Implementation Strategy

mill St

t mill S

Acquisition of the Mill Plaza site should occur immediately. The Mill Plaza site is comprised of three parcels under separate ownership. The diagram to the right identifies the parcels that must be assembled.

pioneer parkway (west)

Mill Plaza

pioneer parkway (west)

The project will serve as an amenity and focus for downtown development. It will help to create a downtown identity that will add value to surrounding parcels.

main St

Mill Plaza Project Concept


Public Investment A conceptual estimate of the public cost to acquire and build the plaza is approximately $3.7 million. mill plaza Acquire Site (Estimated Value)

$1.1 mil

Construct Plaza (56,600 sf @ $45.00 sf) $2.6mil Total:

$3.7 mil in Ma Str eet

Mill Plaza (Looking Northwest)

Private Investment The potential for private investment adjacent to the plaza is approximately $81 million.

A

Main and Mill Office and Retail

$11.5 mil

Pk

$80.8 mil

D

er

Total:

t)

$16.0 mil

(W es

A Street Housing and Retail

wy

$11.6 mil

E Sout

hAS

ne

Plaza Office and Retail

C

Pio

$6.7 mil et

A Street Parking Structure

St re

$35.0 mil

ill

Mill Street Office and Retail

M

PRIVATE INVESTMENT

A B C D E

B

tree

t

Stimulated Private Investment

43 Implementation Strategy Implementation


Key Projects 10th St

9th St

8th St

7th St

6th St

South a St

10th St

9th St

8th St

7th St

Downtown District Urban Design Plan and Implementation Strategy

a Street 6th St

Two-Way Main Street

5th St

44

pioneer parkway (west)

No changes are required to Main Street’s existing sidewalks, curb extensions or crosswalks to implement two-way travel.

a Street

Existing Conditions mill St

Currently, Main Street’s one-way travel limits business accessibility and visibility and reduces pedestrian safety. Returning Main Street to its historic two-way travel pattern will create an environment in which businesses can thrive. The following actions should be implemented over time.  At a minimum, Main Street should include two-way travel between Mill Street and 10th Street  Curbside on-street parking should be maintained  Traffic signals should be reconfigured along with roadway striping

Existing One-Way Main Street

5th St

Two-Way Main Street

mill St

The two key projects are:  Converting Main Street from one-way to two-way travel  Securing a significant public parking site

pioneer parkway (west)

After the Mill Plaza site is secured, key projects must be implemented to support retail revitalization.

South a St

Two-Way Main Street Limits


Public Parking Site Public parking will be needed to serve customers who frequent ground-floor retail uses surrounding Mill Plaza. Parking can be built in phases as shown below.

Phase I Parking Lot

Phase I

a Street

a Street

Design and build the parking structure to serve primarily ground-floor ‘hot spot’ retail uses. At full retail build-out, approximately 475 spaces would be required.

pioneer parkway (east)

2

Phase II

pioneer parkway (west)

1

pioneer parkway (east)

pioneer parkway (west)

 Acquire sites: 1) the north side of the block currently under private ownership and occupied by County services 2) the south side of the block currently occupied by the Springfield Utility Board  Design and build a surface lot with approximately 135 parking stalls

main St

main St

Public Parking Site–Phase I

Public Parking Site–Required Land Assembly

ill

Phase II Parking Structure

t ee

r

St

hAS

Legend

tree

t

Pio

Sout

nee

rP

kw

Pio

ne e

r

y (E ast

)

Pk

w

y

(W

es

t)

M

New Retail Existing Retail New Parking Structure

Public Parking Site–Phase II

45 Implementation Strategy Implementation


Other Actions Other actions are necessary to ensure that projects are implemented as envisioned by the plan. The other actions are:  Plan adoption  Updates to existing policy and regulatory documents  Additional planning efforts  A Main Street demonstration block project

Plan Adoption The following plans should be adopted by city council.

Downtown Urban Design Plan and Implementation Strategy Adoption Plan adoption is the first step in providing a clear commitment to Springfield’s future and a tool for decision makers to use to prioritize public investment that will generate significant and sustained private investment. The plan should be reviewed by the Planning Commission with recommendations presented to the City Council. The plan should be adopted by City Council as a subarea plan or other policy-guiding resolution as an amendment to the Downtown Refinement Plan, the Eugene-Springfield Metro Plan, and the Springfield 2030–Comprehensive Plan.

Parking Management Plan Adoption Adoption of the Parking Management Plan will strategically support development identified in the 30-year build-out plan.

Policy and Regulatory Updates Plan recommendations generally comply with existing and updated plans, policies and regulations. Where recommendations do not comply or additional regulations are needed, updates to the existing policies and regulations should be made to ensure that the intent of the Urban Design Plan is realized.

Springfield Development Code Update The current Mixed-Use Zoning Districts (3.2-600) and Mixed-Use Development Standards (3.2-615) identified in the Springfield Development Code are not consistent 46

with the plan. Staff and Council should consider the modification of existing zones/standards and the addition of mixed-use zones/standards as needed to support development consistent with the Urban Design Plan. Recommended code modifications are identified in the appendix to this report.

Downtown Design Guidelines The City should initiate a process for the creation of design guidelines and a design review process as an essential tool for review of downtown projects. Typically, more extensive (major) projects could be reviewed by a review committee, while less extensive (minor) projects could be reviewed by planning staff.

Downtown Street Standards Design standards and details that are consistent with the circulation framework should be developed for the downtown streets, sidewalks, intersections and public spaces. These standards must address roadway safety requirements and have an emphasis on pedestrians and bicycles.

Additional Planning Efforts The following planning efforts are necessary to ensure that the implementation strategy is executed in a timely manner and is consistent with the Urban Design Plan’s recommendations.

Develop a Retail Strategy and Implementation Plan The City needs to fund a retail strategy that identifies retail development sites, recruitment, management and financial incentives to ensure a critical mass of retail in the downtown. The strategy should incorporate:  A comprehensive database as a leasing and information tool  A recruitment brochure and information on downtown sites and opportunities  Formation of a representative retail recruitment team  Development incentives for retailers and public/private partnerships to encourage retail development

Downtown District Urban Design Plan and Implementation Strategy

Initiate a Two-Way Main Street Transportation Study A two-way Main Street will ensure successful development of future retail along Main Street. The study should include a plan for:  Converting Main Street to two-way from Mill Street to 10th Avenue at a minimum.  Including the two-way conversion as a priority project in the update to the Transportation System Plan  Funding improvements and a schedule for implementation To enable conversion of Main Street, the study should also develop a design concept for converting South A Street to a mobility corridor for autos, trucks and transit traffic through downtown. The design should consider:  Two-way conversion of South A Street  Potential impacts of two-way streets (South A and Main) accessing or exiting from a one-way bridge crossing on the eastside of the Willamette River  The impacts and need for additional road widening and new signalization  An east/west truck route along South A Street or other streets  Protected bikeways on the south side of the street  Pedestrian-friendly and safe crossings at key intersections

Develop a High-Speed Rail Plan The Urban Design Plan proposes a “multi-modal hub” that maximizes current investment in transit by locating a HighSpeed Rail (HSR) station and a park-and-ride lot/structure in close proximity to the current BRT station. Additionally, the proposed station location is adjacent to properties outside the downtown study area that are ideally located and large enough to serve as maintenance facilities needed for HSR system operations. Efforts should be made by the City to include the proposed station and related transit facilities as part of ODOT’s ongoing HSR environmental analysis or any subsequent supplemental environmental analysis, engineering and design studies.


pioneer parkway (east)

pioneer parkway (west)

pioneer parkway (east)

The demonstration block would showcase improvements that would eventually be made to nine blocks of Main Street between Mill Street and 10th Street. The approximate cost for improvements to one block and two intersections would range from $0.5 to $0.9 million.

pioneer parkway (west)

Main Street Demonstration Block

main Street

main Street

Design and Construct Demonstration Block

Demonstration Block

South a Street South a Street

Existing Conditions

Future Development

Proposed Construction Limits

Future Development

Mill Plaza

Main Street Demonstration Block (Looking East)

47 Implementation Strategy Implementation


Public Projects Schedule

2010 Mar

First 120 Days 1. Adopt Downtown District Urban Design Plan & Implementation Strategy 2. Adopt Parking Management Plan 3. Establish an Inter-Departmental Implementation Team 4. Develop Financing Strategy to Secure Mill Plaza Site and Public Parking Site 5. Initiate Update to Development Code, Design Guidelines, and Street Standards 6. Initiate Two-Way Main Street Transportation Study 7. Initiate Retail Strategy and Implementation Plan

Six Months 1. Secure Mill Plaza Site 2. Develop a High-Speed Rail Plan

One Year 1. Complete Two-Way Main Street Transportation Study 2. Complete Update to Development Code and Design Guidelines 3. Complete Retail Strategy and Implementation Plan 4. Design Mill Plaza 5. Secure Public Parking Site

Two to Three Years 1. Construct Mill Plaza 2. Design and Construct Public Parking Surface Lot 3. Obtain Approvals for Two-Way Main Street Recommendations 4. Complete Update to Street Standards

Three to Seven Years 1. Construct Main Street Demonstration Project 2. Construct Improvements Identified in Two-Way Main Street Transportation Study

48

Downtown District Urban Design Plan and Implementation Strategy

June

Sept

Mar

June

2013

2012

2011 Sept

Mar

June

Sept

Mar

June

Sept


Responsibilities Implementation of this plan will require focused, aggressive efforts by the public and private sectors over the coming years. For this plan to be successful, a comprehensive, consistent and coordinated effort will be necessary. Plan success depends upon establishing implementation momentum.

Managing Implementation The key entities below will be responsible for managing aspects of plan implementation: City of Springfield  Convene Downtown Citizen Advisory Committee meetings every six months or more frequently if needed to review plan implementation progress  Establish an inter-departmental implementation team to coordinate public and private sector efforts  Create a Parking Manager position and Parking Advisory Committee to assist in the parking program implementation  Coordinate design and construction of public infrastructure and amenities such as the Main Street Demonstration Project and Mill Plaza  Administer loan and grant programs contributing to downtown revitalization and affordable housing  Encourage creation of a downtown business association City of Springfield, Development Services Planning Division  Coordinate a public process for amending code and development standards and new downtown design guidelines consistent with the recommendations identified in the Downtown Urban Design Plan  Support adoption of the Downtown Urban Design Plan as an amendment to the Downtown Refinement Plan City of Springfield, City Manager’s Office  Develop and implement urban redevelopment activities, such as attracting developers and assisting in site assembly

City of Springfield, Public Works  Manage study of two-way conversion of Main Street and additional South A traffic analysis  Coordinate a public process for amendments to downtown street standards consistent with the recommendations identified in the downtown plan  Coordinate a public process for design and construction of the Main Street Demonstration Project

Other Implementors  Local and national foundations  Other governmental entities

Downtown Citizen Advisory Committee  Meet on a regular basis to review and provide recommendations to the City and Council on implementation progress  Provide updates to constituent groups for downtown revitalization and implementation progress Willamalane Parks and Recreation District  Coordinate with the City on design, construction, funding and management of park improvement projects, such as Mill Plaza and the Island Park enhancements Oregon Department of Transportation  Coordinate with the City for the study of two-way conversion of Main Street and additional South A traffic analysis Springfield Chamber of Commerce  Promote tourism marketing  Identify planning strategies for attracting visitors, meetings and events Property Owners and Business Owners  Organize a downtown business association and coordinate planning efforts and needs with the City interdepartmental team responsible for the downtown plan implementation  Focus on building renovations and tenant upgrades by taking advantage of available loan and grant programs  Provide the information required to create an effective leasing strategy and marketing materials for the downtown  Participate in retail and office recruitment outreach and marketing programs

49 Implementation Strategy Implementation



Crandall Arambula

www.ca-city.com

Revitalizing America’s Cities