Monthly Status Report November 2013
Program Executive Summary
Program Executive Summary The third quarter of 2013 focused on the completion of interior finishes and site improvements at Segment 5 schools Almira, Orchard and Miles and the occupancy of Dunbar. In addition, the CMR’s site work, foundations and masonry at John Marshall and Max Hayes and the CMR mobilization at Cleveland School of the Arts. Also, completed demolition at select Segment 5 and 6 buildings as well as preparing to bid/award additional demolition at select Segment 6 buildings. CMSD and the OFCC did continue to discuss the program’s Master Plan and Build Out Strategy. The fourth quarter of 2013 will continue to focus on the owner occupancy of Segment 5 PK-8 schools Almira, Orchard and Miles. CMR sitework, slab on grade, masonry, concrete, steel and roofing will continue at Max Hayes and John Marshall. CMR sitework, foundations and concrete will continue at Cleveland School of Arts. Select Segment 5 and 6 existing building demolition did conclude and additional Segment 6 buildings will be in the bid/award phase. CMSD will continue to conduct community meetings to discuss the program’s Master Plan and Build Out Strategy along with continued focus meetings with the OFCC. As always, the goal is to provide improved educational opportunities for the children of Cleveland.
Table of Contents Section 1 2 3 4
Description Program Executive Summary Segment Overview Project Status Exhibits
1
SEGMENT 1
Monthly Status Report November 2013 Segment Overview Segment Overview
Highlights Number of Buildings 4 – High Schools 4 – K-8’s Warm, Safe, Dry Program
Design Phase 0
Construction Phase 0
Completed 4
0
0
4
Complete
Summary
Monthly Status Report March 2012
Segment Closeout documents issued to OSFC in May 2011. Audit to finalize in 2013.
SEGMENT 2 Highlights Number of Buildings 1 - High School 6 – K-8’s
Design Phase 0
Construction Phase 0
Completed 1
0
0
6
Summary Segment closeout documents issued to OSFC in April 2011. Audit to finalize in 2013.
SEGMENT 3
1
Highlights
Overview
Number of Buildings 9 – K-8s
Design Phase 0
Construction Phase 0
Completed 9
Summary Segment closeout documents issued to OSFC in September 2011. Audit to finalize in 2013.
2
SEGMENT 4
1 Monthly Status Report November 2013
Highlights
Overview
Number of Buildings 9 - K-8’s
Design Phase 0
Construction Phase 0
Completed 9
0
0
9
Design Phase 0
Construction Phase 3
Completed 0
5 – K-8’s
0
0
5
Demolition
0
1
7
Demolition
Segment Overview
Summary Segment 4 demolition closeout is complete.
SEGMENT 5 Highlights Number of Buildings 4 High Schools
Summary All buildings in this Segment are slated to be LEED Silver and all of the elementary schools have made Design submissions to GBCI. PK-8 schools Orchard, Almira and Miles have completed city inspections and are preparing for an early December occupancy. Dunbar and Alcott are owner occupied. John Marshall’s CMR has sitework, concrete and masonry ongoing. Max Hayes’ CMR has sitework, concrete slabs, masonry, steel and roofing ongoing. Cleveland School of the Arts’ CMR has completed site remediation and caissons. Grade beams and site utilities are ongoing.
3
SEGMENT 6
Monthly Status Report November 2013 Segment Overview
Highlights Number of Buildings 3 – K-8’s Demolition
Design Phase 0
Construction Phase 0
Completed 0
0
1
5
Summary Select Segment 6 abatement and demolition projects are completing. Additional buildings will be in the bid/award phase during the next 1-2 months.
4
Cleveland Metropolitan School District
Monthly Status Report – November 2013
Section 2 - Project Status
Segment 1 – ALL SCHOOLS Segment 2 – ALL SCHOOLS Segment 3 – ALL SCHOOLS Segment 4 – Close-out phase facility Current Status
All projects in CMSD/OSFC Closeout Phase.
5
Cleveland Metropolitan School District
Monthly Status Report – November 2013
Section 2 - Project Status
Segment 5 – Louisa May Alcott
Segment 5 – Almira
Scope Current Phase Current Activity
New Construction / Renovation Construction Owner Occupancy Phase 1, Phase 2 Owner Occupancy, and Close-Out
Scope Current Phase Current Activity
New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
March ‘12 / April ‘12 April 2012 April 2012 August 2012 (Phase 1) December 2012 (Phase 2)
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
March ’12 / May ‘12 May 2012 May 2012 November 2013
Highlights
Renovated K-5 School Enrollment – 225 students (revised) Square footage – 30,649 (revised per SD documents) LEED Silver, GBCI Registration No. 1000007955
Highlights
New PK-8 School Enrollment – 450 students Square footage – 64,297 (revised per SD documents) LEED Silver, GBCI Registration No. 1000006671
Current Status Current Status All areas are owner occupied. Closeout did complete in June 2013.
Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.
.
6
Cleveland Metropolitan School District
Monthly Status Report – November 2013
Section 2 - Project Status
Segment 5 – Miles Elementary
Segment 5 – Orchard School of Science
Scope Current Phase Current Activity
New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy
Scope Current Phase Current Activity
New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
April ’12 / June ‘12 July 2012 July 2012 November 2013
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
March ’12 / May ‘12 May 2012 May 2012 November 2013
Highlights
New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006082
Highlights
New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006521
Current Status
Current Status
Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.
Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.
7
Cleveland Metropolitan School District
Monthly Status Report – November 2013
Section 2 - Project Status
Segment 5 – Paul Laurence Dunbar
Segment 5 – Cleveland School of the Arts
Scope Current Phase Current Activity
New Construction Construction Owner Occupany, punchout and closeout
Scope Current Phase Current Activity
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
March ‘12 / May ‘12 May 2012 May 2012 August 2013
New Construction Construction City Permit Review Bid/Award, sitework/demolition, Structural concrete, caissons and grade beams
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
August/October ‘12 June 2013 June 2013 Fall 2014
Highlights
New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006522
Highlights
New 6-12 School (revised) Enrollment – 775 students (revised) Square footage – 122,727 (revised) LEED Silver, GBCI Registration No. 1000009154
Current Status Current Status Dunbar achieved occupancy from the City and classes began on 8-1913. The Grand Opening was conducted on 8-29-13. Final punchout and closeout is continuing.
Site utilities storm and sanitary are ongoing. Caissons are complete and grade beams are continuing. Structural concrete retaining walls are ongoing as well as under slab MEP rough-ins. The focus for December 2013 will be complete grade beams, start masonry, continue site utilities and prepare for structural steel framing.
8
Cleveland Metropolitan School District
Monthly Status Report – November 2013
Section 2 - Project Status
Segment 5 – John Marshall High School
Segment 5 – Max Hayes Vocational High School
Scope Current Phase Current Activity
New Construction Construction Bearing masonry, slab on grade, MEP under slab rough-in and site utilities
Scope Current Phase Current Activity
New Construction Construction Bearing masonry, slab on grade, under slab MEP rough-in, steel, roofing and site utilities
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
Feb ‘13/May ‘13 May 2013 June 2013 Aug 2015
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
Nov ’12 / Jan ‘13 Jan 2013 June 2013 Aug 2015
Highlights
New High School Enrollment – 1,260 students Square footage – Revised – 207,182 LEED Silver, GBCI Registration No. 1000006524
Highlights
New High School Enrollment – TBD Square footage – 169,894 LEED Silver, GBCI No. 1000009177
Current Status Current Status Bearing masonry walls are ongoing in gym and dining areas. Under slab MEP rough-in is underway and slab on grade concrete placement is ongoing. The focus for December 2013 will be complete bearing masonry at gym and dining, continue MEP under slab rough-ins and placement of slab on grade in classroom areas.
Bearing masonry walls are complete in the gym and ongoing in the dining, classroom and high bay areas. Structural steel is ongoing in the gym and dining areas. Slab on deck is ongoing in classroom wing. The focus for December 2013 will be continue bearing masonry in the classroom and high bay areas, continue MEP in wall and under slab rough-ins. Also complete structural steel and decking in gym and dining and start roofing.
9
Cleveland Metropolitan School District
Monthly Status Report – November 2013 Segment 5 – Forest Hill Parkway Scope Current Phase Current Activity
Demolition Construction Closeout
Scheduled Bid & Award – March 2013 Scheduled Construction – March 2013 Start – April 2013 Scheduled Completion – September 2013 Highlights
Enrollment – 350 Students Square footage – 52,850 New PK-8 School
Current Status Closeout underway.
Section 2 - Project Status Segment 5 – West Side Relief High School Scope Current Phase Current Activity
New Construction TBD TBD
Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy
TBD TBD TBD TBD
Highlights
New High School Enrollment – 600 students Square footage – 100,200
Current Status CMSD is still finalizing project status.
END OF SEGMENT 5
10
District IRN 43786
SEGMENT SUMMARY COST REPORT All Projects/ Segment 01 District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
FUNDING Project
Original Project Agmt Budget
Description
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
Pending Changes
12/2/2013 1 of 1
STATUS Potential Costs
Projected Committment
(Est. to Compl.)
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Budget vs Est
Proj Budget vs Proj Commitment
Billed to Date
Pct Compl
TYPICAL GROUP TOTALS
$18,838,239.00
$0.00 $146,586,712.00 $134,692,133.00 $5,147,590.00 $139,839,723.00 $138,201,959.21$13,099,608.41 $151,301,567.62
$0.00
$0.00
$151,301,567.62
$6,746,989.00
($4,124,840.27)
$0.00
$7,310,441.73
$7,980,018.00
$0.00
$7,980,018.00
$7,695,512.06 ($297,845.33)
$7,397,666.73
$0.00
($87,225.00)
$7,310,441.73
($669,576.27)
$0.00
$7,310,351.34 99%
($6,362,955.63)
$0.00
$6,428,455.37
$6,994,564.00
$0.00
$6,994,564.00
$6,747,532.83
($46,130.45)
$6,701,402.38
$0.00
($272,947.01)
$6,428,455.37
($566,108.63)
$0.00
$6,428,041.37 96%
($6,129,988.37)
$0.00
$5,158,825.63
$10,434,776.00
$0.00 $10,434,776.00
$5,565,463.70 ($266,311.35)
$5,299,152.35
$0.00
($140,326.72)
$5,158,825.63
($5,275,950.37)
($0.00)
$5,154,867.75 97%
$8,110,173.00
($4,537,000.96)
$0.00
$3,573,172.04
$3,696,904.00
$0.00
$3,696,904.00
$3,858,712.81 ($193,197.33)
$3,665,515.48
$0.00
($92,343.44)
$3,573,172.04
($123,731.96)
$0.00
$3,569,656.73 97%
$11,487,610.00
($6,391,288.70)
$0.00
$5,096,321.30
$4,344,236.00
$0.00
$4,344,236.00
$5,005,503.87
$224,917.20
$5,230,421.07
$0.00
($130,599.77)
$5,099,821.30
$752,085.30
($3,500.00)
$5,099,570.80 97%
($1,515,275.09)
$0.00
$9,895,505.91
$11,506,016.00
$10,279,823.44 ($406,961.46)
$9,872,861.98
$0.00
$22,643.93
$9,895,505.91
($1,610,510.09)
$0.00
$9,894,635.91 100%
$6,898,752.00
($3,735,149.28)
$0.00
$3,163,602.72
$4,874,471.00
$0.00
$4,874,471.00
$2,859,416.07
$278,723.33
$3,138,139.40
$0.00
$29,533.32
$3,167,672.72
($1,710,868.28)
($4,070.00)
$3,167,672.72 101%
$8,586,467.00
($2,908,496.98)
$0.00
$5,677,970.02
$5,263,276.00
$0.00
$5,263,276.00
$5,386,101.35
$233,658.90
$5,619,760.25
$0.00
$58,209.77
$5,677,970.02
$414,694.02
$0.00
$5,677,842.09 101%
GROUP TOTALS
$9,142,514.00
($896,849.09)
$0.00
$8,245,664.91
$9,022,810.00
$0.00
$9,022,810.00
$8,000,999.02($1,172,460.80)
$6,828,538.22
$0.00
$284,437.79
$7,112,976.01
($777,145.09)
$1,132,688.90
$7,118,451.43 104%
GROUP TOTALS
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,381,854.21
$1,330,338.44
$0.00
$0.00
$1,330,338.44
$0.00
($1,330,338.44)
$1,330,288.44 100%
$0.00 $201,136,671.63 $198,809,204.00 $5,147,590.00 $203,956,794.00 $194,982,878.57$11,402,485.35 $206,385,363.92
$0.00
($328,617.13)
$206,056,746.79
($2,820,122.37)
WARM, SAFE, DRY
$12,791,411.00
Group 03
GROUP TOTALS
WARM, SAFE, DRY
$11,435,282.00
Group 02
GROUP TOTALS
WARM, SAFE, DRY
$11,288,814.00
Group 04
GROUP TOTALS
WARM, SAFE, DRY
Group 05
GROUP TOTALS
WARM, SAFE, DRY
Group 06
GROUP TOTALS
WARM, SAFE, DRY
$11,410,781.00
Group 08
GROUP TOTALS
WARM, SAFE, DRY
$0.00 $11,506,016.00
Group 07
GROUP TOTALS
WARM, SAFE, DRY
($4,714,855.62) $151,303,680.68 100%
Group 01
GROUP TOTALS
WARM, SAFE, DRY
$127,748,473.00
Group 09
LFI
SEGMENT PROJECT TOTALS
$218,900,277.00 ($17,763,605.37)
($51,515.77)
PROJECT REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget or vs Projected Commitment)
($4,920,075.16) $206,055,059.26 100%
($4,920,075.16)
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI). 3. The costs shown above does not include the remaining Swing Space Allowance in the amount of $3,958,587 noted in the signed Project Agreement for Segment 1. 4. The costs shown above does not include the Conditional Approval scope of work in the amount of $18,880,604 noted in the signed Project Agreement for Segment 1. 5. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.
Expedition速
Report M_COST_01_00-1b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 01 District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#144 001P1East High SchoolGym Replacement/Addition
001P1
$6,221,336.00
$0.00
$0.00
$6,221,336.00
$6,278,995.00
$276,276.00
$6,555,271.00
$6,331,760.15
$311,876.90
$6,643,637.05
$0.00
$0.00
$6,643,637.05
($333,935.00)
($422,301.05)
$6,643,140.05 100%
Totals
$7,990,764.00
$0.00
$0.00
$7,990,764.00
$9,377,994.00
$0.00
$9,377,994.00
$6,849,464.69
$523,171.61
$7,372,636.30
$0.00
$0.00
$7,372,636.30 ($1,387,230.00)
$618,127.70
$7,372,636.30 100%
John Hay Renovation John Hay Renovation Totals
$25,826,668.00
$8,922,539.00
$0.00 $34,749,207.00
$30,204,007.00 $1,092,572.00 $31,296,579.00
$31,407,279.84
$5,267,435.31 $36,674,715.15
$0.00
$0.00 $36,674,715.15
$14,058,662.00
$2,551,287.00
$0.00 $16,609,949.00
$14,013,138.00 $1,908,759.00 $15,921,897.00
$15,280,126.28
$1,878,941.21 $17,159,067.49
$0.00
$0.00 $17,159,067.49
$333,646.60
$0.00
$0.00
Gym Replacement/Addition
Totals
OPU#514 002P2Lakeside/SuccessTech Lakeside Phase II Renovation
002P2
Lakeside Phase II Renovation
OPU#284 003P1John Hay HS
003P1
$3,452,628.00 ($1,925,508.15) $36,674,706.67 100%
OPU#016 004P1A.J. Rickoff
004P1
A.J. Rickoff New K-8 A.J. Rickoff New K-8 Totals
$688,052.00
($549,118.49) $17,158,713.09 100%
OPU#016 004X1A.J. Rickoff
004X1
A.J. Rickoff-UG Debris Remov A.J. Rickoff-UG Debris Removal Totals
$0.00
$333,647.00
$0.00
$333,647.00
$307,500.00
Totals
$35,733,623.00
$994,472.00
$0.00 $36,728,095.00
Totals
$12,573,930.00
$2,041,283.00
Miles Park New K-8 Miles Park New K-8 Totals
$14,095,938.00 $10,201,144.00
$0.00
$307,500.00
$345,848.69
($12,202.09)
$333,646.60
$26,147.00
$36,092,249.00
$23,108.00 $36,115,357.00
$35,770,857.75
$2,163,626.69 $37,934,484.44
$0.00 $14,615,213.00
$12,790,874.00
$447,824.00 $13,238,698.00
$13,712,349.43
$2,425,983.00
$0.00 $16,521,921.00
$14,266,975.00
$740,434.00 $15,007,409.00
$1,569,028.00
$0.00 $11,770,172.00
$10,143,855.00
$658,617.00 $10,802,472.00
$0.40
$333,646.60 100%
$0.00
($299,246.98) $37,635,237.46
$612,738.00
($907,142.46) $37,937,457.68 100%
$1,705,501.92 $15,417,851.35
$0.00
$0.00 $15,417,851.35
$1,376,515.00
($802,638.35) $15,417,851.32 100%
$16,016,521.05
$721,113.35 $16,737,634.40
$0.00
$0.00 $16,737,634.40
$1,514,512.00
($215,713.40) $16,737,634.23 100%
$11,379,050.87
$657,433.73 $12,036,484.60
$0.00
$299,246.98 $12,335,731.58
$967,700.00
($565,559.58) $12,036,484.50 100%
OPU#271 005P1John Adams HS New John Adams HS
005P1
New John Adams HS
OPU#027 006P1Memorial
006P1
New Memorial K-8 New Memorial K-8
OPU#269 008P1Miles Park K-8
008P1
OPU#485 009P1Riverside ES
009P1
Riverside K-8
Riverside K-8
Totals
OPU#572 126P1Warner Road School Warner Abatement & Demolit
126P1
Warner Abatement & Demolition
$361,122.00
Totals
$0.00
$0.00
$361,122.00
$361,122.00
$0.00
$361,122.00
$304,193.61
$41,468.99
$345,662.60
$0.00
$685,286.00
$855,424.00
$0.00
$855,424.00
$804,506.85
($158,759.21)
$645,747.64
$0.00 $146,586,712.00 $134,692,133.00 $5,147,590.00$139,839,723.00 $138,201,959.21 $13,099,608.41 $151,301,567.62
$0.00
$0.00
$345,662.60
$0.00
$0.00
$645,747.64
$0.00
$0.00 $151,301,567.62
$0.00
$15,459.40
$345,662.60 100%
($170,138.00)
$39,538.36
$645,747.64 100%
OPU#634 128P1Woodhill-Quincy Woodhill-Quincy Demolition
128P1
Woodhill-Quincy Demolition
$685,286.00 $0.00 Totals $127,748,473.00 $18,838,239.00
GROUP TOTALS
WARM, SAFE, DRY
$6,746,989.00 ($4,714,855.62) $151,303,680.68 100%
Group 01
OPU#065 ESCaptainRenovated/Keeper 021W1Captain Arthur Roth Arthur Roth WSD
021W1 WSD Captain Arthur Roth
$510,945.00
$436,560.96
$0.00
$947,505.96
$1,041,994.00
$0.00
$1,041,994.00
$971,880.11
($20,490.39)
$951,389.72
$0.00
($3,883.76)
$947,505.96
($94,488.04)
$0.00
$947,505.96 100%
$643,941.00
$737,905.81
$0.00
$1,381,846.81
$1,576,633.00
$0.00
$1,576,633.00
$1,415,299.44
($28,527.86)
$1,386,771.58
$0.00
($4,924.77)
$1,381,846.81
($194,786.19)
$0.00
$1,381,846.41 100%
$1,646,035.00
($494,019.46)
$0.00
$1,152,015.54
$1,132,964.00
$0.00
$1,132,964.00
$1,212,950.19
($48,426.39)
$1,164,523.80
$0.00
($12,508.26)
$1,152,015.54
$19,051.54
$0.00
$1,151,925.34 99%
$1,525,969.00 ($1,080,744.82)
$0.00
$445,224.18
$475,845.00
$0.00
$475,845.00
$469,312.70
($12,407.31)
$456,905.39
$0.00
($11,681.21)
$445,224.18
($30,620.82)
($0.00)
$445,224.18 97%
$2,343,917.00
($411,720.23)
$0.00
$1,932,196.77
$2,199,080.00
$0.00
$2,199,080.00
$2,039,145.79
($89,069.21)
$1,950,076.58
$0.00
($17,879.81)
$1,932,196.77
($266,883.23)
$0.00
$1,937,287.84 99%
$1,457,186.00 ($622,544.21) Totals WSD South Renovated/Keeper $3,307,289.00 ($2,690,278.32) Totals
$0.00
$834,641.79
$931,256.00
$0.00
$931,256.00
$860,242.19
($14,453.64)
$845,788.55
$0.00
($11,146.76)
$834,641.79
($96,614.21)
($0.00)
$829,550.93 98%
$0.00
$617,010.68
$622,246.00
$0.00
$622,246.00
$726,681.64
($84,470.53)
$642,211.11
$0.00
($25,200.43)
$617,010.68
($5,235.32)
$0.00
$617,010.68 96%
Totals
Renovated/Keeper WSD Iowa-Maple 044W1 WSD Iowa-Maple Totals
OPU#270 044W1Iowa-Maple ES
Renovated/Keeper OPU#482 ES Robert H 070W1Robert H JamisonWSD Jamison
070W1 WSD Robert H Jamison
Totals
OPU#172 094W1Franklin D Roosevelt WSDMS FranklinRenovated/Keeper D Roosevelt
094W1 WSD Franklin D Roosevelt
Totals
OPU#615 MS WhitneyRenovated/Keeper 104W1Whitney M YoungWSD M Young
104W1 WSD Whitney M Young
Totals
Renovated/Keeper OPU#285 HS 113W1John F Kennedy WSD John F Kennedy
113W1 WSD John F Kennedy OPU#512 125W1South HS
125W1 WSD South
Renovated/Keeper OPU#587 587W1Washing Park HCWSD - Washington Park
587W1 WSD - Washington Park
WARM, SAFE, DRY
$0.00
Totals
GROUP TOTALS
$0.00
$11,435,282.00 ($4,124,840.27)
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,310,441.73
$7,980,018.00
$0.00
$7,980,018.00
$7,695,512.06
($297,845.33)
$7,397,666.73
$0.00
($87,225.00)
$7,310,441.73
($669,576.27)
$0.00
$7,310,351.34 99%
$0.00
Group 02
Renovated/Keeper WSD East High 001W2 WSD East High $1,637,557.00 Totals
OPU#144 001W2East High
($693,744.55)
$0.00
$943,812.45
$1,182,837.00
$0.00
$1,182,837.00
$932,808.44
$45,957.99
$978,766.43
$0.00
($34,953.98)
$943,812.45
($239,024.55)
$0.00
$943,812.45 96%
$567,807.00
$48,395.55
$0.00
$616,202.55
$662,696.00
$0.00
$662,696.00
$634,193.24
($5,880.89)
$628,312.35
$0.00
($12,109.80)
$616,202.55
($46,493.45)
$0.00
$616,202.55 98%
$573,070.00
$36,906.55
$0.00
$609,976.55
$542,742.00
$0.00
$542,742.00
$629,149.63
($6,943.74)
$622,205.89
$0.00
($12,229.34)
$609,976.55
$67,234.55
$0.00
$609,976.55 98%
Renovated/Keeper WSD Sunbeam 073W2 WSD Sunbeam $1,804,199.00 Totals
$404,139.87
$0.00
$2,208,338.87
$2,269,893.00
$0.00
$2,269,893.00
$2,235,375.72
$11,489.03
$2,246,864.75
$0.00
($38,525.88)
$2,208,338.87
($61,554.13)
($0.00)
$2,207,924.87 98%
$789,110.00
($430,937.77)
$0.00
$358,172.23
$317,118.00
$0.00
$317,118.00
$379,617.49
($4,611.75)
$375,005.74
$0.00
($16,833.51)
$358,172.23
$41,054.23
$0.00
$358,172.23 96%
$773,991.00
($500,249.42)
$0.00
$273,741.58
$326,133.00
$0.00
$326,133.00
$322,850.17
($32,587.78)
$290,262.39
$0.00
($16,520.81)
$273,741.58
($52,391.42)
($0.00)
$273,741.58 94%
OPU#081 025W2Charles Orr Academy WSD CharlesRenovated/Keeper Orr
025W2 WSD Charles Orr
Totals
Renovated/Keeper OPU#350 056W2Mary McLeod Bethune Bethune WSD ES Mary McLeod
056W2 WSD Mary McLeod Bethune
Totals
OPU#532 073W2Sunbeam ES
Renovated/Keeper WSD Wade Park 077W2 WSD Wade Park Totals
OPU#556 077W2Wade Park ES
OPU#233 096W2Harry E Davis MSWSD Harry E Renovated/Keeper Davis
096W2 WSD Harry E Davis
Totals
Renovated/Keeper OPU#801 of Arts 107W2Cleveland SchoolWSD Cleveland School of Art Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
WARM, SAFE, DRY
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
Group 02
Renovated/Keeper OPU#801 of Arts 107W2Cleveland SchoolWSD Cleveland School of Art
107W2 WSD Cleveland School of Arts
$652,837.00
Totals
($529,378.98)
$0.00
$123,458.02
$169,390.00
$0.00
$169,390.00
$142,448.51
($5,038.87)
$137,409.64
$0.00
($13,951.62)
$123,458.02
($45,931.98)
$0.00
$123,458.02 90%
$4,383,219.00 ($3,571,200.06)
$0.00
$812,018.94
$844,359.00
$0.00
$844,359.00
$942,536.16
($37,004.89)
$905,531.27
$0.00
($93,512.33)
$812,018.94
($32,340.06)
$0.00
$812,018.94 90%
$0.00
$247,643.22
$331,624.00
$0.00
$331,624.00
$273,352.21
($5,258.46)
$268,093.75
$0.00
($20,450.53)
$247,643.22
($83,980.78)
($0.00)
$247,643.22 92%
Renovated/Keeper OPU#161 108W2East Technical HS WSD East Technical
108W2 WSD East Technical
Totals
Renovated/Keeper OPU#355 118W2Martin L King Jr MS/HS WSD Martin Luther King Jr.
118W2 WSD Martin Luther King Jr.
Totals
$959,046.00
($711,402.78)
$650,575.00
($415,484.04)
Renovated/Keeper OPU#347 123W2Mary B Martin ES/MS WSD Mary B Martin
123W2 WSD Mary B Martin
Totals GROUP TOTALS
WARM, SAFE, DRY OPU#012 013W3Almira ES
013W3 WSD Almira OPU#068 022W3Case ES
$0.00 $0.00
$235,090.96
$347,772.00
$0.00
$347,772.00
$255,201.26
($6,251.09)
$248,950.17
$0.00
($13,859.21)
$235,090.96
($112,681.04)
($0.00)
$235,090.96 94%
$6,428,455.37
$6,994,564.00
$0.00
$6,994,564.00
$6,747,532.83
($46,130.45)
$6,701,402.38
$0.00
($272,947.01)
$6,428,455.37
($566,108.63)
$0.00
$6,428,041.37 96%
Group 03 WSD Almira Renovated/Keeper Totals WSD Case
Renovated/Keeper
WSD Clark
Renovated/Keeper
022W3 WSD Case OPU#088 026W3Clark ES
$12,791,411.00 ($6,362,955.63)
Totals
026W3 WSD Clark
Totals
$683,084.00
($496,337.86)
$0.00
$186,746.14
$247,152.00
$0.00
$247,152.00
$210,782.92
($15,541.31)
$195,241.61
$0.00
($8,495.47)
$186,746.14
($60,405.86)
$0.00
$186,545.96 96%
$703,016.00
($536,283.86)
$0.00
$166,732.14
$315,001.00
$0.00
$315,001.00
$190,402.24
($14,947.92)
$175,454.32
$0.00
($8,722.18)
$166,732.14
($148,268.86)
$0.00
$166,732.14 95%
$425,256.00
($103,278.81)
$0.00
$321,977.19
$623,023.00
$0.00
$623,023.00
$354,847.81
($27,603.17)
$327,244.64
$0.00
($5,267.45)
$321,977.19
($301,045.81)
($0.00)
$322,152.19 98%
$396,988.00
$54,869.60
$0.00
$451,857.60
$604,056.00
$0.00
$604,056.00
$475,212.74
($18,441.30)
$456,771.44
$0.00
($4,913.84)
$451,857.60
($152,198.40)
$0.00
$451,857.60 99%
$983,579.00
($14,372.35)
$0.00
$969,206.65
$1,558,214.00
$0.00
$1,558,214.00
$993,590.50
($12,142.98)
$981,447.52
$0.00
($12,240.87)
$969,206.65
($589,007.35)
$0.00
$967,608.82 99%
$877,445.00
($660,579.81)
$0.00
$216,865.19
$388,806.00
$0.00
$388,806.00
$280,050.20
($52,263.51)
$227,786.69
$0.00
($10,921.50)
$216,865.19
($171,940.81)
($0.00)
$214,670.01 94%
$406,763.00
($256,618.17)
$0.00
$150,144.83
$226,131.00
$0.00
$226,131.00
$179,534.11
($24,314.53)
$155,219.58
$0.00
($5,074.75)
$150,144.83
($75,986.17)
$0.00
$150,144.83 97%
$992,413.00
($123,844.45)
$0.00
$868,568.55
$2,059,374.00
$0.00
$2,059,374.00
$891,558.13
($10,621.31)
$880,936.82
$0.00
($12,368.27)
$868,568.55 ($1,190,805.45)
$0.00
$868,446.09 99%
$414,019.00
$3,020.57
$0.00
$417,039.57
$751,581.00
$0.00
$751,581.00
$422,075.35
$94.85
$422,170.20
$0.00
($5,130.63)
$417,039.57
($334,541.43)
$0.00
$417,039.57 99%
$1,355,652.00 ($1,013,144.89)
$0.00
$342,507.11
$638,436.00
$0.00
$638,436.00
$376,621.38
($17,273.14)
$359,348.24
$0.00
($16,841.13)
$342,507.11
($295,928.89)
$0.00
$342,507.10 95%
$0.00
$658,167.31
$946,959.00
$0.00
$946,959.00
$698,886.18
($28,910.50)
$669,975.68
$0.00
($11,808.37)
$658,167.31
($288,791.69)
$0.00
$658,167.31 98%
$0.00
$2,076,043.00
$491,902.14
($44,346.53)
$447,555.61
$0.00
($38,542.26)
$409,013.35 ($1,667,029.65)
($0.00)
$408,996.13 91%
$0.00 $10,434,776.00
$5,565,463.70
($266,311.35)
$5,299,152.35
$0.00
($140,326.72)
$5,158,825.63 ($5,275,950.37)
($0.00)
$5,154,867.75 97%
Renovated/Keeper OPU#340 ES Louisa May 052W3Louisa May AlcottWSD Alcott
052W3 WSD Louisa May Alcott
Totals
Renovated/Keeper OPU#354 055W3Marion-Sterling ES WSD Marion-Sterling
055W3 WSD Marion-Sterling
Totals
OPU#415 064W3Newton D Baker ES WSD Newton Renovated/Keeper D Baker
064W3 WSD Newton D Baker
Totals
Renovated/Keeper WSD Scranton 071W3 WSD Scranton Totals
OPU#500 071W3Scranton ES OPU#596 081W3Waverly ES
WSD WaverlyRenovated/Keeper
081W3 WSD Waverly
Totals WSD Willow Renovated/Keeper 084W3 WSD Willow Totals
OPU#605 084W3Willow ES
OPU#279 MSJoseph Renovated/Keeper 097W3Joseph M Gallagher M Gallagher WSD
097W3 WSD Joseph M Gallagher
Totals
Renovated/Keeper OPU#804 HS Health Careers 110W3Health Careers Ctr WSD Ctr
110W3 WSD Health Careers Ctr
$950,442.00
Totals
($292,274.69)
OPU#090 ES Clara E.Renovated/Keeper 119W3Clara E. Westropp WSD Westropp
119W3 WSD Clara E. Westropp
WARM, SAFE, DRY
$3,100,157.00 ($2,691,143.65)
Totals
GROUP TOTALS
$11,288,814.00 ($6,129,988.37)
$0.00 $0.00
$409,013.35
$2,076,043.00
$5,158,825.63
$10,434,776.00
Group 04
Non-Keeper OPU#636 ES Buckeye-Woodland 019W4Buckeye-Woodland WSD
019W4 WSD Buckeye-Woodland
Totals
$489,508.00
($419,794.43)
$0.00
$69,713.57
$90,006.00
$0.00
$90,006.00
$80,433.04
($5,165.22)
$75,267.82
$0.00
($5,554.25)
$69,713.57
($20,292.43)
$0.00
$69,713.57 93%
$466,641.00
($202,756.75)
$0.00
$263,884.25
$389,195.00
$0.00
$389,195.00
$305,602.06
($36,387.61)
$269,214.45
$0.00
($5,330.20)
$263,884.25
($125,310.75)
$0.00
$263,884.25 98%
$174,525.00
($39,576.37)
$0.00
$134,948.63
$133,972.00
$0.00
$133,972.00
$140,902.02
($3,957.44)
$136,944.58
$0.00
($1,995.95)
$134,948.63
$976.63
$0.00
$134,948.63 99%
$194,027.00
($35,322.99)
$0.00
$158,704.01
$196,553.00
$0.00
$196,553.00
$161,347.86
($424.03)
$160,923.83
$0.00
($2,219.82)
$158,704.01
($37,848.99)
$0.00
$158,704.01 99%
$133,952.00
($82,175.65)
$0.00
$51,776.35
$0.00
$0.00
$0.00
$49,086.19
$4,222.24
$53,308.43
$0.00
($1,532.08)
$51,776.35
$51,776.35
($0.00)
$51,776.35 97%
$562,609.00
($276,418.69)
$0.00
$286,190.31
$337,117.00
$0.00
$337,117.00
$318,886.38
($26,303.51)
$292,582.87
$0.00
($6,392.56)
$286,190.31
($50,926.69)
$0.00
$286,190.31 98%
$268,498.00
($108,223.39)
$0.00
$160,274.61
$83,945.00
$0.00
$83,945.00
$171,373.34
($8,038.53)
$163,334.81
$0.00
($3,060.20)
$160,274.61
$76,329.61
($0.00)
$160,274.61 98%
$510,520.00
($192,828.81)
$0.00
$317,691.19
$263,427.00
$0.00
$263,427.00
$346,187.95
($22,662.57)
$323,525.38
$0.00
($5,834.19)
$317,691.19
$54,264.19
$0.00
$317,670.63 98%
$525,211.00
($216,661.07)
$0.00
$308,549.93
$260,601.00
$0.00
$260,601.00
$329,446.87
($14,935.07)
$314,511.80
$0.00
($5,961.87)
$308,549.93
$47,948.93
($0.00)
$308,549.93 98%
Non-Keeper OPU#077 ES 023W4Charles Dickens WSD Charles Dickens
023W4 WSD Charles Dickens
Totals
Non-Keeper OPU#079 024W4Charles H. Lake ES WSD Charles H. Lake
024W4 WSD Charles H. Lake OPU#107 028W4Cranwood ES
WSD Cranwood 028W4 WSD Cranwood
Totals Non-Keeper
Totals
Non-Keeper OPU#109 ES Daniel E. Morgan 029W4Daniel E. MorganWSD
029W4 WSD Daniel E. Morgan OPU#148 032W4East Clark ES
WSD East Clark 032W4 WSD East Clark
Totals Non-Keeper
Totals
Non-Keeper OPU#168 035W4Euclid Park ES WSD Euclid Park ES
035W4 WSD Euclid Park ES OPU#200 039W4Giddings ES
WSD Giddings 039W4 WSD Giddings
Totals Non-Keeper
Totals
Non-Keeper OPU#252 ES 041W4H.W. Longfellow WSD HW Longfellow
041W4 WSD HW Longfellow
Totals
Non-Keeper OPU#229 ES Hannah Gibbons 042W4Hannah GibbonsWSD Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
WARM, SAFE, DRY
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 3 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
Group 04
Non-Keeper OPU#229 ES Hannah Gibbons 042W4Hannah GibbonsWSD
042W4 WSD Hannah Gibbons
Totals
$133,596.00
($113,671.03)
$0.00
$19,924.97
$14,547.00
$0.00
$14,547.00
$22,591.81
($1,157.76)
$21,434.05
$0.00
($1,509.08)
$19,924.97
$5,377.97
$0.00
$19,924.97 93%
$147,875.00
($51,485.52)
$0.00
$96,389.48
$111,440.00
$0.00
$111,440.00
$103,607.93
($5,519.78)
$98,088.15
$0.00
($1,698.67)
$96,389.48
($15,050.52)
($0.00)
$96,389.48 98%
$205,517.00
($49,082.48)
$0.00
$156,434.52
$212,414.00
$0.00
$212,414.00
$151,893.87
$6,898.97
$158,792.84
$0.00
($2,358.32)
$156,434.52
($55,979.48)
$0.00
$152,940.77 96%
$1,274,115.00 ($1,123,875.11)
$0.00
$150,239.89
$84,000.00
$0.00
$84,000.00
$178,922.84
($14,175.07)
$164,747.77
$0.00
($14,507.88)
$150,239.89
$66,239.89
$0.00
$150,239.89 91%
Non-Keeper OPU#094 045W4J.D. Rockefeller ES WSD JD Rockefeller
045W4 WSD JD Rockefeller
Totals
OPU#339 051W4Louis Pasteur ESWSD Louis PasteurNon-Keeper
051W4 WSD Louis Pasteur OPU#396 062W4Mound ES
Totals Non-Keeper
WSD Mound
062W4 WSD Mound
Totals
OPU#452 067W4Paul Revere ES WSD Paul Revere Non-Keeper
067W4 WSD Paul Revere
Totals
$874,627.00
($446,513.69)
$0.00
$428,113.31
$536,115.00
$0.00
$536,115.00
$463,613.06
($25,522.02)
$438,091.04
$0.00
($9,977.73)
$428,113.31
($108,001.69)
$0.00
$428,113.31 98%
$493,631.00
($204,634.55)
$0.00
$288,996.45
$308,156.00
$0.00
$308,156.00
$321,918.60
($27,316.73)
$294,601.87
$0.00
($5,605.42)
$288,996.45
($19,159.55)
($0.00)
$288,995.45 98%
$859,731.00
($449,094.42)
$0.00
$410,636.58
$431,404.00
$0.00
$431,404.00
$412,363.00
$8,065.63
$420,428.63
$0.00
($9,792.05)
$410,636.58
($20,767.42)
$0.00
$410,636.58 98%
$795,590.00
($524,886.01)
OPU#486 069W4Robert Fulton ESWSD Robert FultonNon-Keeper
069W4 WSD Robert Fulton
Totals
OPU#005 087W4Albert B. Hart MSWSD A.B. Hart
087W4 WSD A.B. Hart
Non-Keeper
Totals
OPU#411 100W4Nathan Hale MS WSD Nathan Hale Non-Keeper
100W4 WSD Nathan Hale
Totals GROUP TOTALS
WARM, SAFE, DRY
$8,110,173.00 ($4,537,000.96)
$0.00 $0.00
$270,703.99
$244,012.00
$0.00
$244,012.00
$300,535.99
($20,818.83)
$279,717.16
$0.00
($9,013.17)
$270,703.99
$26,691.99
$0.00
$270,703.99 97%
$3,573,172.04
$3,696,904.00
$0.00
$3,696,904.00
$3,858,712.81
($193,197.33)
$3,665,515.48
$0.00
($92,343.44)
$3,573,172.04
($123,731.96)
$0.00
$3,569,656.73 97%
Group 05
Renovated/Keeper WSD Buhrer ES 020W5 WSD Buhrer ES Totals
OPU#064 020W5Buhrer ES
$773,468.00
($439,903.05)
$0.00
$333,564.95
$295,955.00
$0.00
$295,955.00
$327,167.68
$15,641.12
$342,808.80
$0.00
($9,243.85)
$333,564.95
$37,609.95
$0.00
$333,564.95 97%
$611,003.00
($507,841.04)
$0.00
$103,161.96
$36,430.00
$0.00
$36,430.00
$113,114.21
($2,671.81)
$110,442.40
$0.00
($7,280.44)
$103,161.96
$66,731.96
($0.00)
$103,161.96 93%
$536,317.00
$713,504.76
$0.00
$1,249,821.76
$1,488,812.00
$0.00
$1,488,812.00
$1,061,793.81
$194,416.60
$1,256,210.41
$0.00
($6,388.65)
$1,249,821.76
($238,990.24)
$0.00
$1,249,821.76 99%
$597,704.00
($419,030.07)
$0.00
$178,673.93
$176,105.00
$0.00
$176,105.00
$177,944.69
$7,876.45
$185,821.14
$0.00
($7,147.21)
$178,673.93
$2,568.93
$0.00
$182,549.43 98%
$882,889.00
($531,699.92)
$0.00
$351,189.08
$333,096.00
$0.00
$333,096.00
$359,073.40
$2,619.19
$361,692.59
$0.00
($10,503.51)
$351,189.08
$18,093.08
$0.00
$351,189.08 97%
$996,180.00
($632,326.87)
$0.00
$363,853.13
$275,352.00
$0.00
$275,352.00
$376,258.55
($512.56)
$375,745.99
$0.00
($11,892.86)
$363,853.13
$88,501.13
$0.00
$363,853.13 97%
$2,745,683.00 ($1,903,826.63)
$0.00
$841,856.37
$600,537.00
$0.00
$600,537.00
$886,324.47
($11,711.53)
$874,612.94
$0.00
($32,756.57)
$841,856.37
$241,319.37
($0.00)
$841,856.37 96%
$1,638,493.00 ($1,061,051.04)
$0.00
$577,441.96
$145,234.00
$0.00
$145,234.00
$536,552.24
$54,034.74
$590,586.98
$0.00
($13,145.02)
$577,441.96
$432,207.96
$0.00
$573,315.96 97%
$1,907,826.00 ($1,539,360.20)
$0.00
$368,465.80
$307,708.00
$0.00
$307,708.00
$405,957.21
($11,250.32)
$394,706.89
$0.00
($22,741.09)
$371,965.80
$60,757.80
($3,500.00)
$371,965.80 94%
Renovated/Keeper OPU#353 K-5 Marion C. 054W5Marion C. SelzterWSD Seltzer ES
054W5 WSD Marion C. Seltzer ES
Totals
OPU#436 K-5 OrchardRenovated/Keeper 065W5Orchard Science WSD
065W5 WSD Orchard
Totals
Renovated/Keeper OPU#592 080W5Watterson-Lake K-5 WSD Watterson-Lake ES
080W5 WSD Watterson-Lake ES
Totals
Renovated/Keeper OPU#328 MS Luis Munoz 098W5Luis Munoz MarinWSD Marin
098W5 WSD Luis Munoz Marin
Totals
Renovated/Keeper OPU#275 112W5Jane Addams 9-12 WSD Jane Addams
112W5 WSD Jane Addams
Totals
Renovated/Keeper OPU#292 114W5John Marshall HSWSD John Marshall
114W5 WSD John Marshall
Totals
OPU#330 115W5Lincoln West HS WSD Lincoln Renovated/Keeper West
115W5 WSD Lincoln West
Totals
Renovated/Keeper OPU#349 116W5Max S Hayes 9-12WSD Max S Hayes
116W5 WSD Max S Hayes
Totals
OPU#227 117W5Halle Cleveland Lrng WSDCtr Halle
Renovated/Keeper
117W5 WSD Halle
$798,047.00
Totals GROUP TOTALS
WARM, SAFE, DRY
($69,754.64)
$11,487,610.00 ($6,391,288.70)
$0.00 $0.00
$728,292.36
$685,007.00
$0.00
$685,007.00
$761,317.61
($23,524.68)
$737,792.93
$0.00
($9,500.57)
$728,292.36
$43,285.36
($0.00)
$728,292.36 99%
$5,096,321.30
$4,344,236.00
$0.00
$4,344,236.00
$5,005,503.87
$224,917.20
$5,230,421.07
$0.00
($130,599.77)
$5,099,821.30
$752,085.30
($3,500.00)
$5,099,570.80 97%
Group 06
Non-Keeper OPU#004 ES 010W6Adlai Stevenson WSD Adlai Stevenson
010W6 WSD Adlai Stevenson
Totals
$139,527.00
($42,767.58)
$0.00
$96,759.42
$82,905.00
$0.00
$82,905.00
$107,200.70
($10,696.87)
$96,503.83
$0.00
$255.59
$96,759.42
$13,854.42
($0.00)
$96,759.42 100%
$1,014,622.00
($431,204.61)
$0.00
$583,417.39
$949,806.00
$0.00
$949,806.00
$593,688.44
($12,271.17)
$581,417.27
$0.00
$2,000.12
$583,417.39
($366,388.61)
$0.00
$583,417.39 100%
$405,597.00
($1,673.96)
$0.00
$403,923.04
$367,855.00
$0.00
$367,855.00
$414,616.97
($11,464.51)
$403,152.46
$0.00
$770.58
$403,923.04
$36,068.04
$0.00
$403,923.04 100%
$195,012.00
($91,929.88)
$0.00
$103,082.12
$101,639.00
$0.00
$101,639.00
$110,813.40
($8,125.34)
$102,688.06
$0.00
$394.06
$103,082.12
$1,443.12
($0.00)
$103,082.12 100%
$253,030.00
$15,498.46
$0.00
$268,528.46
$153,461.00
$0.00
$153,461.00
$271,243.78
($3,237.08)
$268,006.70
$0.00
$521.76
$268,528.46
$115,067.46
($0.00)
$268,528.46 100%
$521,466.00
($200,713.99)
$0.00
$320,752.01
$363,478.00
$0.00
$363,478.00
$329,386.64
($9,669.56)
$319,717.08
$0.00
$1,034.93
$320,752.01
($42,725.99)
$0.00
$320,752.01 100%
$830,968.00
($548,295.32)
$0.00
$282,672.68
$262,186.00
$0.00
$262,186.00
$298,410.77
($17,369.25)
$281,041.52
$0.00
$1,631.16
$282,672.68
$20,486.68
$0.00
$282,672.68 101%
Renovated/Keeper OPU#036 ES Benjamin 016W6Benjamin Franklin Franklin WSD
016W6 WSD Benjamin Franklin OPU#058 018W6Brooklawn ES
018W6 WSD Brooklawn OPU#104 027W6Corlett ES
Totals
Renovated/Keeper WSD Brooklawn
WSD Corlett
027W6 WSD Corlett
Totals Non-Keeper
Totals
Non-Keeper OPU#165 Academy 033W6Emile B. deSauzeWSD Emile B. deSauze
033W6 WSD Emile B. deSauze
Totals
OPU#297 048W6Kenneth W. Clement WSD KennethRenovated/Keeper W. Clement
048W6 WSD Kenneth W. Clement
Totals
Renovated/Keeper OPU#376 060W6MilesStandish/MWhite WSD ES Miles Standish
060W6 WSD Miles Standish
Totals
Non-Keeper OPU#388 ES Moses Cleveland 061W6Moses ClevelandWSD Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
WARM, SAFE, DRY
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 4 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
Group 06
Non-Keeper OPU#388 ES Moses Cleveland 061W6Moses ClevelandWSD
061W6 WSD Moses Cleveland
Totals
$1,393,283.00
$370,095.98
$0.00
$1,763,378.98
$1,642,277.00
$0.00
$1,642,277.00
$1,774,853.91
($14,238.08)
$1,760,615.83
$0.00
$2,763.15
$1,763,378.98
$121,101.98
$0.00
$1,762,508.98 100%
$691,469.00
$677,747.83
$0.00
$1,369,216.83
$1,035,305.00
$0.00
$1,035,305.00
$1,379,546.54
($11,703.28)
$1,367,843.26
$0.00
$1,373.57
$1,369,216.83
$333,911.83
$0.00
$1,369,216.83 100%
$1,522,466.00
($249,973.72)
$0.00
$1,272,492.28
$3,035,471.00
$0.00
$3,035,471.00
$1,602,723.20
($333,233.66)
$1,269,489.54
$0.00
$3,002.74
$1,272,492.28 ($1,762,978.72)
$0.00
$1,272,492.28 100%
$1,833,937.00 ($1,223,579.79)
$0.00
$610,357.21
$687,767.00
$0.00
$687,767.00
$601,319.53
$5,413.51
$606,733.04
$0.00
$3,624.17
$610,357.21
($77,409.79)
($0.00)
$610,357.21 101%
$1,783,279.00
($15,151.93)
$0.00
$1,768,127.07
$1,717,379.00
$0.00
$1,717,379.00
$1,749,843.87
$14,728.95
$1,764,572.82
$0.00
$3,554.25
$1,768,127.07
$50,748.07
$0.00
$1,768,127.07 100%
$826,125.00
$226,673.42
$0.00
$1,106,487.00
$1,046,175.69
$4,904.88
$1,051,080.57
$0.00
$1,717.85
$1,052,798.42
($53,688.58)
$0.00
$1,052,798.42 100%
$0.00 $11,506,016.00
$10,279,823.44
($406,961.46)
$9,872,861.98
$0.00
$22,643.93
$9,895,505.91 ($1,610,510.09)
$0.00
$9,894,635.91 100%
Renovated/Keeper OPU#343 MS Margaret 099W6Margaret SpellacyWSD Spellacy MS
099W6 WSD Margaret Spellacy MS
Totals
Renovated/Keeper OPU#616 105W6Wilbur Wright MSWSD Wilbur Wright
105W6 WSD Wilbur Wright OPU#220 109W6Glenville HS
Totals
WSD GlenvilleRenovated/Keeper
109W6 WSD Glenville
Totals
Renovated/Keeper OPU#273 HS James F. 111W6James F. RhodesWSD Rhodes
111W6 WSD James F. Rhodes
Totals
Renovated/Keeper OPU#171 ES Forest Hill 121W6Forest Hill Parkway WSD Parkway
121W6 WSD Forest Hill Parkway
Totals
GROUP TOTALS
WARM, SAFE, DRY
$11,410,781.00 ($1,515,275.09)
$0.00 $0.00
$1,052,798.42
$1,106,487.00
$9,895,505.91
$11,506,016.00
Group 07
OPU#485 009W7Riverside ES
WSD Riverside 009W7 WSD Riverside
Non-Keeper
Totals
$400,627.00
($400,627.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$316,528.00
($193,780.29)
$0.00
$122,747.71
$217,280.00
$0.00
$217,280.00
$118,716.93
$2,283.57
$121,000.50
$0.00
$1,747.21
$122,747.71
($94,532.29)
$0.00
$122,747.71 101%
$130,530.00
($12,289.33)
$0.00
$118,240.67
$236,481.00
$0.00
$236,481.00
$106,766.01
$9,747.62
$116,513.63
$0.00
$1,727.04
$118,240.67
($118,240.33)
$0.00
$118,240.67 101%
$50,403.00
$23,290.82
$0.00
$73,693.82
$178,719.00
$0.00
$178,719.00
$57,665.62
$14,298.70
$71,964.32
$0.00
$1,729.50
$73,693.82
($105,025.18)
$0.00
$73,693.82 102%
$272,800.00
($224,136.86)
$0.00
$48,663.14
$56,347.00
$0.00
$56,347.00
$49,291.94
($2,347.48)
$46,944.46
$0.00
$1,718.68
$48,663.14
($7,683.86)
$0.00
$48,663.14 104%
$449,260.00
($389,154.28)
$0.00
$60,105.72
$44,493.00
$0.00
$44,493.00
$61,171.19
($2,796.76)
$58,374.43
$0.00
$1,731.29
$60,105.72
$15,612.72
$0.00
$60,105.72 103%
$264,576.00
($152,339.60)
$0.00
$112,236.40
$49,803.00
$0.00
$49,803.00
$65,989.49
$44,493.82
$110,483.31
$0.00
$1,753.09
$112,236.40
$62,433.40
$0.00
$112,236.40 102%
$126,099.00
($126,099.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$384,446.00
($84,024.65)
$0.00
$300,421.35
$426,979.00
$0.00
$426,979.00
$298,988.52
($291.82)
$298,696.70
$0.00
$1,724.65
$300,421.35
($126,557.65)
($0.00)
$300,421.35 101%
$215,918.00
($61,235.92)
$0.00
$154,682.08
$220,529.00
$0.00
$220,529.00
$152,567.26
$377.66
$152,944.92
$0.00
$1,737.16
$154,682.08
($65,846.92)
$0.00
$154,682.08 101%
$434,181.00
$19,738.40
$0.00
$453,919.40
$546,647.00
$0.00
$546,647.00
$512,031.56
($59,833.66)
$452,197.90
$0.00
$1,721.50
$453,919.40
($92,727.60)
$0.00
$453,919.40 100%
$219,632.00
($96,934.34)
$0.00
$122,697.66
$153,683.00
$0.00
$153,683.00
$113,244.97
$7,727.82
$120,972.79
$0.00
$1,724.87
$122,697.66
($30,985.34)
($0.00)
$122,697.66 101%
$481,565.00
($313,390.55)
$0.00
$168,174.45
$364,498.00
$0.00
$364,498.00
$148,747.30
$17,686.51
$166,433.81
$0.00
$1,740.64
$168,174.45
($196,323.55)
$0.00
$168,174.45 101%
$640,763.00
($511,022.43)
$0.00
$129,740.57
$251,503.00
$0.00
$251,503.00
$122,027.63
$5,958.14
$127,985.77
$0.00
$1,754.80
$129,740.57
($121,762.43)
$0.00
$129,740.57 101%
$595,655.00
($420,958.91)
$0.00
$174,696.09
$146,886.00
$0.00
$146,886.00
$140,714.46
$32,253.74
$172,968.20
$0.00
$1,727.89
$174,696.09
$27,810.09
$0.00
$174,696.09 101%
$417,156.00
$8,716.47
$0.00
$425,872.47
$478,521.00
$0.00
$478,521.00
$247,196.96
$176,921.32
$424,118.28
$0.00
$1,754.19
$425,872.47
($52,648.53)
$0.00
$425,872.47 100%
$767,244.00
($451,358.37)
$0.00
$315,885.63
$690,307.00
$0.00
$690,307.00
$323,174.89
($4,958.67)
$318,216.22
$0.00
$1,739.41
$319,955.63
($374,421.37)
($4,070.00)
$319,955.63 101%
$598,908.00
($245,126.26)
$0.00
$353,781.74
$765,628.00
$0.00
$765,628.00
$314,832.67
$37,211.16
$352,043.83
$0.00
$1,737.91
$353,781.74
($411,846.26)
$0.00
$353,781.74 100%
$132,461.00
($104,417.18)
$28,043.82
$46,167.00
$0.00
$46,167.00
$26,288.67
($8.34)
$26,280.33
$0.00
$1,763.49
$28,043.82
($18,123.18)
$0.00
$28,043.82 107%
$3,163,602.72
$4,874,471.00
$0.00
$4,874,471.00
$2,859,416.07
$278,723.33
$3,138,139.40
$0.00
$29,533.32
$3,167,672.72 ($1,710,868.28)
($4,070.00)
$3,167,672.72 101%
OPU#023 015W7Artemus Ward ESWSD Artimus WardNon-Keeper
015W7 WSD Artimus Ward OPU#112 030W7Denison ES
Totals
WSD Denison
030W7 WSD Denison
Non-Keeper
Totals
Non-Keeper OPU#130 ES Douglas MacArthur 031W7Douglas MacArthur WSD
031W7 WSD Douglas MacArthur
Totals WSD Garfield ES Non-Keeper 037W7 WSD Garfield ES Totals
OPU#188 037W7Garfield ES
OPU#338 050W7Louis Agassiz ESWSD Louis AgassizNon-Keeper
050W7 WSD Louis Agassiz
Totals
WSD McKinley ES Non-Keeper 057W7 WSD McKinley ES Totals
OPU#352 057W7McKinley ES
Non-Keeper OPU#451 066W7Paul L. Dunbar ES WSD Paul L. Dunbar
066W7 WSD Paul L. Dunbar OPU#487 068W7R.G. Jones ES
Totals
Non-Keeper WSD R.G. Jones Elementary
068W7 WSD R.G. Jones Elementary
Totals WSD Tremont ES Non-Keeper 074W7 WSD Tremont ES Totals
OPU#544 074W7Tremont ES
OPU#550 076W7Valley View ES WSD Valley View Non-Keeper
076W7 WSD Valley View OPU#560 078W7Walton ES
Totals
WSD Walton
078W7 WSD Walton
Non-Keeper
Totals
Non-Keeper OPU#622 ES 082W7WSD William C. Bryant WSD William Cullen Bryant
082W7 WSD William Cullen Bryant
Totals
Non-Keeper OPU#621 ES William R. Harper 083W7William R. HarperWSD
083W7 WSD William R. Harper
Totals
Non-Keeper OPU#080 MS Charles A. Mooney 092W7Charles A. Mooney WSD
092W7 WSD Charles A. Mooney
Totals
Non-Keeper OPU#412 101W7Nathaniel Hawthorne WSDES Nathaniel Hawthorne
101W7 WSD Nathaniel Hawthorne
Totals
Non-Keeper OPU#536 MS Thomas Jefferson 103W7Thomas Jefferson WSD
103W7 WSD Thomas Jefferson OPU#624 106W7Wilson MS
WSD Wilson
106W7 WSD Wilson
Totals Non-Keeper
Totals
Non-Keeper OPU#224 K-8 H. Barbara Booker 122W7H. Barbara Booker WSD
122W7 WSD H. Barbara Booker
Totals
GROUP TOTALS
WARM, SAFE, DRY
$6,898,752.00 ($3,735,149.28)
$0.00 $0.00
Group 08
Renovated/Keeper OPU#096 6-8 007W8Collinwood CompuTech WSD Collinwood CompuTech Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
WARM, SAFE, DRY
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
Current Estimate
COMMITTED Original Committment
Approved Changes
Revised Committment
12/2/2013 5 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
Group 08
Renovated/Keeper OPU#096 6-8 007W8Collinwood CompuTech WSD Collinwood CompuTech
007W8 WSD Collinwood CompuTech
$3,344,196.00 ($2,523,777.63)
Totals
$0.00
$820,418.37
$484,458.00
$0.00
$484,458.00
$781,413.89
$16,232.69
$797,646.58
$0.00
$22,771.79
$820,418.37
$335,960.37
$0.00
$820,290.44 103%
Renovated/Keeper OPU#010 BellAlexander ES 011W8Alexander Graham WSD Graham Bell
011W8 WSD Alexander Graham Bell
Totals
$785,112.00
($142,085.36)
$0.00
$643,026.64
$412,375.00
$0.00
$412,375.00
$589,428.26
$48,310.54
$637,738.80
$0.00
$5,287.84
$643,026.64
$230,651.64
$0.00
$643,026.64 101%
$246,818.00
($106,304.72)
$0.00
$140,513.28
$182,585.00
$0.00
$182,585.00
$133,023.89
$5,848.39
$138,872.28
$0.00
$1,641.00
$140,513.28
($42,071.72)
($0.00)
$140,513.28 101%
$474,908.00
($67,327.18)
$0.00
$407,580.82
$516,563.00
$0.00
$516,563.00
$351,579.40
$52,795.15
$404,374.55
$0.00
$3,206.27
$407,580.82
($108,982.18)
$0.00
$407,580.82 101%
$984,395.00
($139,799.30)
$0.00
$844,595.70
$655,736.00
$0.00
$655,736.00
$835,610.52
$2,355.47
$837,965.99
$0.00
$6,629.71
$844,595.70
$188,859.70
($0.00)
$844,604.50 101%
$517,101.00
$314,960.32
$0.00
$832,061.32
$652,474.00
$0.00
$652,474.00
$830,449.55
($1,871.83)
$828,577.72
$0.00
$3,483.60
$832,061.32
$179,587.32
($0.00)
$832,061.32 100%
$522,215.00
($215,247.90)
$0.00
$306,967.10
$286,794.00
$0.00
$286,794.00
$283,700.42
$19,746.29
$303,446.71
$0.00
$3,520.39
$306,967.10
$20,173.10
($0.00)
$306,967.10 101%
$816,063.00
$336,894.69
$0.00
$1,152,957.69
$1,530,356.00
$0.00
$1,530,356.00
$1,072,463.88
$74,999.34
$1,147,463.22
$0.00
$5,494.47
$1,152,957.69
($377,398.31)
$0.00
$1,152,957.69 100%
$592,097.00
($241,805.49)
$0.00
$350,291.51
$295,223.00
$0.00
$295,223.00
$336,426.09
$9,834.47
$346,260.56
$0.00
$4,030.95
$350,291.51
$55,068.51
$0.00
$350,291.51 101%
$303,562.00
($124,004.41)
$0.00
$179,557.59
$246,712.00
$0.00
$246,712.00
$172,005.45
$5,408.39
$177,413.84
$0.00
$2,143.75
$179,557.59
($67,154.41)
($0.00)
$179,548.79 101%
$5,677,970.02
$5,263,276.00
$0.00
$5,263,276.00
$5,386,101.35
$233,658.90
$5,619,760.25
$0.00
$58,209.77
$5,677,970.02
$414,694.02
$0.00
$5,677,842.09 101%
OPU#021 014W8Anton Grdina ESWSD Anton GrdinaNon-Keeper
014W8 WSD Anton Grdina OPU#041 017W8Bolton ES
Totals
WSD Bolton Renovated/Keeper
017W8 WSD Bolton
Totals
Renovated/Keeper OPU#225 040W8Gracemount ES WSD Gracemount
040W8 WSD Gracemount
Totals
OPU#294 046W8John W. Raper ES WSD John W.Renovated/Keeper Raper
046W8 WSD John W. Raper OPU#548 075W8Union ES
075W8 WSD Union
Totals WSD Union Renovated/Keeper Totals
OPU#078 093W8Charles Eliot K-8WSD CharlesRenovated/Keeper W. Eliot
093W8 WSD Charles W. Eliot OPU#124 120W8Dike Pre-K - 8
WSD Dike
Totals Renovated/Keeper
120W8 WSD Dike
Totals
Renovated/Keeper OPU#020 124W8Jesse Owens Academy WSD Jesse Owens Academy
124W8 WSD Jesse Owens Academy
Totals
GROUP TOTALS
WARM, SAFE, DRY
$8,586,467.00 ($2,908,496.98)
$0.00
Group 09
Non-Keeper OPU#016 ES Andrew J Rickoff 004W9Andrew J. RickoffWSD
004W9 WSD Andrew J Rickoff
Totals
$419,836.00
$59,676.46
$0.00
$479,512.46
$552,614.00
$0.00
$552,614.00
$458,736.38
$7,492.62
$466,229.00
$0.00
$13,283.46
$479,512.46
($73,101.54)
$0.00
$471,992.97 101%
$404,205.00
($151,101.94)
$0.00
$253,103.06
$223,831.00
$0.00
$223,831.00
$243,822.35
($3,496.11)
$240,326.24
$0.00
$12,796.60
$253,122.84
$29,272.06
($19.78)
$250,580.87 104%
$495,697.00
$912.33
$0.00
$496,609.33
$598,761.00
$0.00
$598,761.00
$477,048.23
$3,871.94
$480,920.17
$0.00
$15,689.16
$496,609.33
($102,151.67)
($0.00)
$485,377.81 101%
$208,648.00
($51,184.02)
$0.00
$157,463.98
$165,062.00
$0.00
$165,062.00
$152,676.06
($1,803.42)
$150,872.64
$0.00
$6,591.34
$157,463.98
($7,598.02)
($0.00)
$156,112.50 103%
$270,839.00
($92,190.65)
$0.00
$178,648.35
$221,169.00
$0.00
$221,169.00
$171,402.99
($914.58)
$170,488.41
$0.00
$8,559.94
$179,048.35
($42,520.65)
($400.00)
$176,396.12 103%
$924,843.00
($88,737.90)
$0.00
$836,105.10
$858,048.00
$0.00
$858,048.00
$769,501.62
$37,264.53
$806,766.15
$0.00
$29,338.95
$836,105.10
($21,942.90)
$0.00
$798,302.93 99%
$584,236.00
($151,565.68)
$0.00
$432,670.32
$463,811.00
$0.00
$463,811.00
$397,879.46
$16,682.93
$414,562.39
$0.00
$18,507.93
$433,070.32
($31,140.68)
($400.00)
$426,757.81 103%
$199,861.00
($69,395.18)
$0.00
$130,465.82
$110,998.00
$0.00
$110,998.00
$125,831.16
($1,732.23)
$124,098.93
$0.00
$6,366.89
$130,465.82
$19,467.82
$0.00
$129,897.90 105%
$220,495.00
($46,336.94)
$0.00
$174,158.06
$177,377.00
$0.00
$177,377.00
$158,723.78
$8,463.76
$167,187.54
$0.00
$6,970.52
$174,158.06
($3,218.94)
$0.00
$173,775.61 104%
$752,456.00
($240,041.11)
$0.00
$512,414.89
$574,884.00
$0.00
$574,884.00
$489,263.99
($287.18)
$488,976.81
$0.00
$23,838.08
$512,814.89
($62,469.11)
($400.00)
$503,448.47 103%
$291,853.00
($244,335.36)
$0.00
$47,517.64
$193,204.00
$0.00
$193,204.00
$201,285.45
($162,994.31)
$38,291.14
$0.00
$9,226.50
$47,517.64
($145,686.36)
$0.00
$199,406.62 521%
$480,010.00
$13,439.65
$0.00
$493,449.65
$510,919.00
$0.00
$510,919.00
$467,684.08
$10,560.31
$478,244.39
$0.00
$15,205.26
$493,449.65
($17,469.35)
$0.00
$485,191.95 101%
$138,025.00
$61,324.94
$0.00
$199,349.94
$286,257.00
$0.00
$286,257.00
$354,639.97
$38,642.54
$393,282.51
$0.00
$4,375.31
$397,657.82
($86,907.06)
($198,307.88)
$397,191.45 101%
$141,699.00
$15,223.52
$0.00
$156,922.52
$171,153.00
$0.00
$171,153.00
$148,476.59
$4,355.89
$152,832.48
$0.00
$4,490.04
$157,322.52
($14,230.48)
($400.00)
$154,858.99 101%
$837,122.00
$280,796.82
$0.00
$1,117,918.82
$1,166,184.00
$0.00
$1,166,184.00
$1,017,868.63 ($1,259,520.01)
($241,651.38)
$0.00
$26,555.11
($215,096.27)
($48,265.18) $1,333,015.09
($221,283.04) 92%
$604,663.00
$57,896.81
$0.00
$662,559.81
$552,832.00
$0.00
$552,832.00
$648,663.63
$0.00
$13,896.18
$662,559.81
Non-Keeper OPU#003 ES Alfred A. Benesch 012W9Alfred A. Benesch WSD
012W9 WSD Alfred A. Benesch
Totals
Non-Keeper OPU#164 ESEmpire CompuTech 034W9Empire CompuTech WSD
034W9 WSD Empire CompuTech OPU#184 036W9Fullerton ES
WSD Fullerton 036W9 WSD Fullerton
Totals Non-Keeper
Totals
Non-Keeper OPU#198 ES George W. Carver 038W9George W. CarverWSD
038W9 WSD George W. Carver
Totals
OPU#240 043W9Harvey Rice ES WSD Harvey Rice Non-Keeper
043W9 WSD Harvey Rice
Totals
Non-Keeper OPU#295 ES Joseph F. Landis 047W9Joseph F. LandisWSD
047W9 WSD Joseph F. Landis OPU#301 049W9Kentucky ES
WSD Kentucky 049W9 WSD Kentucky
Totals Non-Keeper
Totals
Non-Keeper OPU#345 ES Margaret A. Ireland 053W9Margaret A. Ireland WSD
053W9 WSD Margaret A. Ireland OPU#368 058W9Miles ES
WSD Miles
058W9 WSD Miles OPU#372 059W9Miles Park ES
WSD Miles Park 059W9 WSD Miles Park
Totals Non-Keeper
Totals Non-Keeper
Totals
Non-Keeper OPU#400 063W9Mount Auburn ESWSD Mount Auburn
063W9 WSD Mount Auburn
Totals
Non-Keeper OPU#525 ES Stephen E. Howe 072W9Stephen E. HoweWSD
072W9 WSD Stephen E. Howe
Totals
Non-Keeper OPU#638 086W9Woodland Hills ES WSD Woodland Hills ES
086W9 WSD Woodland Hills ES
Totals
Non-Keeper OPU#009 MSAlexander Hamilton 088W9Alexander Hamilton WSD
088W9 WSD Alexander Hamilton OPU#024 089W9Audubon K-8
WSD Audubon 089W9 WSD Audubon
Totals Non-Keeper
Totals
$584,765.29
$63,898.34
$109,727.81
$0.00
$647,672.41 100%
OPU#066 090W9Carl F. Shuler MSWSD Carl F. ShulerNon-Keeper Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
WARM, SAFE, DRY
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 6 of 6
STATUS
Pending Changes
Potential Costs
Projected Committment
Phase Estimate Variance
Est. to Compl.
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
Group 09
OPU#066 090W9Carl F. Shuler MSWSD Carl F. ShulerNon-Keeper
090W9 WSD Carl F. Shuler OPU#076 091W9Central MS
Totals
WSD Central
091W9 WSD Central
$268,625.00
$6,362.03
$0.00
$274,987.03
$260,965.00
$0.00
$260,965.00
$220,292.43
$46,567.47
$266,859.90
$0.00
$8,527.13
$275,387.03
$14,022.03
($400.00)
$268,064.64 100%
$333,183.00
($161,104.14)
$0.00
$172,078.86
$137,170.00
$0.00
$137,170.00
$164,440.40
($2,879.14)
$161,561.26
$0.00
$10,517.60
$172,078.86
$34,908.86
($0.00)
$170,957.88 106%
$407,735.00
($70,574.62)
$0.00
$337,160.38
$308,218.00
$0.00
$308,218.00
$325,428.65
($1,188.61)
$324,240.04
$0.00
$12,920.34
$337,160.38
$28,942.38
$0.00
$336,103.41 104%
$635,273.00
($11,789.10)
$0.00
$623,483.90
$830,129.00
$0.00
$830,129.00
$619,701.80
($16,358.21)
$603,343.59
$0.00
$20,140.31
$623,483.90
($206,645.10)
($0.00)
$607,000.66 101%
$523,210.00
($14,125.01)
$0.00
$509,084.99
$659,224.00
$0.00
$659,224.00
$451,529.71
$40,912.67
$492,442.38
$0.00
$16,641.14
$509,083.52
($150,139.01)
$1.47
$500,643.47 102%
$8,245,664.91
$9,022,810.00
$0.00
$9,022,810.00
$8,000,999.02 ($1,172,460.80)
$6,828,538.22
$0.00
$284,437.79
$7,112,976.01
($777,145.09) $1,132,688.90
$7,118,451.43 104%
$0.00
$0.00
$0.00
$0.00
$723,849.68
$0.00
$0.00
$723,849.68
$0.00
($723,849.68)
$0.00
$0.00
$0.00
$0.00
$651,660.53
($45,171.77)
$606,488.76
$0.00
$0.00
$606,488.76
$0.00
($606,488.76)
$606,438.76 100%
$0.00
$0.00
$0.00
$0.00
$1,381,854.21
($51,515.77)
$1,330,338.44
$0.00
$0.00
$1,330,338.44
$0.00 ($1,330,338.44)
$1,330,288.44 100%
$0.00 $201,136,671.63 $198,809,204.00 $5,147,590.00 $203,956,794.00 $194,982,878.57 $11,402,485.35 $206,385,363.92
$0.00
Non-Keeper
Totals
Non-Keeper OPU#802 095W9Garrett Morgan MS WSD Garrett Morgan
095W9 WSD Garrett Morgan
Totals
OPU#448 102W9Patrick Henry MSWSD Patrick HenryNon-Keeper
102W9 WSD Patrick Henry
Totals
Non-Keeper OPU#428 127W9Oliver H. Perry ESWSD Oliver H. Perry
127W9 WSD Oliver H. Perry
Totals GROUP TOTALS
$9,142,514.00
($896,849.09)
$0.00
LFI OPU#271 005X1John Adams HS John Adams HS Site Remedia
005X1
John Adams HS Site Remediation Totals
$0.00
$0.00
$0.00
$730,193.68
($6,344.00)
$723,849.68 100%
OPU#027 006X1Memorial
006X1
Memorial LFI Building Demol Memorial LFI Building Demolition Totals GROUP TOTALS
$0.00 $0.00
$0.00 $0.00
SEGMENT PROJECT TOTALS $218,900,277.00 ($17,763,605.37)
$0.00 $0.00
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
($328,617.13) $206,056,746.79 ($2,820,122.37) ($4,920,075.16) $206,055,059.26 100%
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($4,920,075.16)
3. The costs shown above does not include the remaining Swing Space Allowance in the amount of $3,958,587 noted in the signed Project Agreement for Segment 1. 4. The costs shown above does not include the Conditional Approval scope of work in the amount of $18,880,604 noted in the signed Project Agreement for Segment 1. 5. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.
Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS All Projects/ Segment 01/ WSD District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
Project
FUNDING
Description
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - RENOVATED/KEEPER BUILDINGS OPU#065 ESCaptain Renovated/Keeper 021W1Captain Arthur Roth WSD Arthur Roth Totals
$510,945.00
$436,560.96
$0.00
$947,505.96
$1,041,994.00
$0.00
$1,041,994.00
$971,880.11
($20,490.39)
$951,389.72
$0.00
($3,883.76)
$947,505.96
$94,488.04
$0.00
$947,505.96
Renovated/Keeper WSD Iowa-Maple 044W1 WSD Iowa-Maple Totals
$643,941.00
$737,905.81
$0.00
$1,381,846.81
$1,576,633.00
$0.00
$1,576,633.00
$1,415,299.44
($28,527.86)
$1,386,771.58
$0.00
($4,924.77)
$1,381,846.81
$194,786.19
$0.00
$1,381,846.41
$1,646,035.00
($494,019.46)
$0.00
$1,152,015.54
$1,132,964.00
$0.00
$1,132,964.00
$1,212,950.19
($48,426.39)
$1,164,523.80
$0.00
($12,508.26)
$1,152,015.54
($19,051.54)
$0.00
$1,151,925.34
$1,525,969.00 ($1,080,744.82)
$0.00
$445,224.18
$475,845.00
$0.00
$475,845.00
$469,312.70
($12,407.31)
$456,905.39
$0.00
($11,681.21)
$445,224.18
$30,620.82
($0.00)
$445,224.18
$2,343,917.00
($411,720.23)
$0.00
$1,932,196.77
$2,199,080.00
$0.00
$2,199,080.00
$2,039,145.79
($89,069.21)
$1,950,076.58
$0.00
($17,879.81)
$1,932,196.77
$266,883.23
$0.00
$1,937,287.84
$1,457,186.00
($622,544.21)
$0.00
$834,641.79
$931,256.00
$0.00
$931,256.00
$860,242.19
($14,453.64)
$845,788.55
$0.00
($11,146.76)
$834,641.79
$96,614.21
($0.00)
$829,550.93
$3,307,289.00 ($2,690,278.32)
$0.00
$617,010.68
$622,246.00
$0.00
$622,246.00
$726,681.64
($84,470.53)
$642,211.11
$0.00
($25,200.43)
$617,010.68
$5,235.32
$0.00
$617,010.68
021W1 WSD Captain Arthur Roth OPU#270 044W1Iowa-Maple ES
OPU#482 ES Robert Renovated/Keeper 070W1Robert H JamisonWSD H Jamison
070W1 WSD Robert H Jamison
Totals
OPU#172 Renovated/Keeper 094W1Franklin D Roosevelt WSDMS Franklin D Roosevelt
094W1 WSD Franklin D Roosevelt
Totals
OPU#615 MS Whitney Renovated/Keeper 104W1Whitney M YoungWSD M Young
104W1 WSD Whitney M Young
Totals
OPU#285 113W1John F Kennedy HS WSD John Renovated/Keeper F Kennedy
113W1 WSD John F Kennedy OPU#512 125W1South HS
Totals
WSD SouthRenovated/Keeper
125W1 WSD South
Totals
OPU#587 Renovated/Keeper 587W1Washing Park HCWSD - Washington Park Totals
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Renovated/Keeper WSD East High 001W2 WSD East High Totals
$1,637,557.00
($693,744.55)
$0.00
$943,812.45
$1,182,837.00
$0.00
$1,182,837.00
$932,808.44
$45,957.99
$978,766.43
$0.00
($34,953.98)
$943,812.45
$239,024.55
$0.00
$943,812.45
$567,807.00
$48,395.55
$0.00
$616,202.55
$662,696.00
$0.00
$662,696.00
$634,193.24
($5,880.89)
$628,312.35
$0.00
($12,109.80)
$616,202.55
$46,493.45
$0.00
$616,202.55
Totals
$573,070.00
$36,906.55
$0.00
$609,976.55
$542,742.00
$0.00
$542,742.00
$629,149.63
($6,943.74)
$622,205.89
$0.00
($12,229.34)
$609,976.55
($67,234.55)
$0.00
$609,976.55
Renovated/Keeper WSD Sunbeam 073W2 WSD Sunbeam Totals
$1,804,199.00
$404,139.87
$0.00
$2,208,338.87
$2,269,893.00
$0.00
$2,269,893.00
$2,235,375.72
$11,489.03
$2,246,864.75
$0.00
($38,525.88)
$2,208,338.87
$61,554.13
($0.00)
$2,207,924.87
$789,110.00
($430,937.77)
$0.00
$358,172.23
$317,118.00
$0.00
$317,118.00
$379,617.49
($4,611.75)
$375,005.74
$0.00
($16,833.51)
$358,172.23
($41,054.23)
$0.00
$358,172.23
$773,991.00
($500,249.42)
$0.00
$273,741.58
$326,133.00
$0.00
$326,133.00
$322,850.17
($32,587.78)
$290,262.39
$0.00
($16,520.81)
$273,741.58
$52,391.42
($0.00)
$273,741.58
$652,837.00
($529,378.98)
$0.00
$123,458.02
$169,390.00
$0.00
$169,390.00
$142,448.51
($5,038.87)
$137,409.64
$0.00
($13,951.62)
$123,458.02
$45,931.98
$0.00
$123,458.02
$4,383,219.00 ($3,571,200.06)
$0.00
$812,018.94
$844,359.00
$0.00
$844,359.00
$942,536.16
($37,004.89)
$905,531.27
$0.00
($93,512.33)
$812,018.94
$32,340.06
$0.00
$812,018.94
587W1 WSD - Washington Park OPU#144 001W2East High
OPU#081 Renovated/Keeper 025W2Charles Orr Academy WSD Charles Orr
025W2 WSD Charles Orr
Totals
OPU#350 056W2Mary McLeod Bethune McLeod Bethun WSD ES Mary Renovated/Keeper
056W2 WSD Mary McLeod Bethune OPU#532 073W2Sunbeam ES
OPU#556 077W2Wade Park ES
WSD WadeRenovated/Keeper Park 077W2 WSD Wade Park Totals
OPU#233 096W2Harry E Davis MSWSD HarryRenovated/Keeper E Davis
096W2 WSD Harry E Davis
Totals
OPU#801 of Arts Renovated/Keeper 107W2Cleveland SchoolWSD Cleveland School of
107W2 WSD Cleveland School of Arts
Totals
OPU#161 Renovated/Keeper 108W2East Technical HSWSD East Technical
108W2 WSD East Technical
Totals
OPU#355 Renovated/Keeper 118W2Martin L King Jr MS/HS WSD Martin Luther King J
118W2 WSD Martin Luther King Jr.
Totals
$959,046.00
($711,402.78)
$0.00
$247,643.22
$331,624.00
$0.00
$331,624.00
$273,352.21
($5,258.46)
$268,093.75
$0.00
($20,450.53)
$247,643.22
$83,980.78
($0.00)
$247,643.22
$650,575.00
($415,484.04)
$0.00
$235,090.96
$347,772.00
$0.00
$347,772.00
$255,201.26
($6,251.09)
$248,950.17
$0.00
($13,859.21)
$235,090.96
$112,681.04
($0.00)
$235,090.96
$683,084.00
($496,337.86)
$0.00
$186,746.14
$247,152.00
$0.00
$247,152.00
$210,782.92
($15,541.31)
$195,241.61
$0.00
($8,495.47)
$186,746.14
$60,405.86
$0.00
$186,545.96
$703,016.00
($536,283.86)
$0.00
$166,732.14
$315,001.00
$0.00
$315,001.00
$190,402.24
($14,947.92)
$175,454.32
$0.00
($8,722.18)
$166,732.14
$148,268.86
$0.00
$166,732.14
$425,256.00
($103,278.81)
$0.00
$321,977.19
$623,023.00
$0.00
$623,023.00
$354,847.81
($27,603.17)
$327,244.64
$0.00
($5,267.45)
$321,977.19
$301,045.81
($0.00)
$322,152.19
OPU#347 123W2Mary B Martin ES/MS B Martin WSD Mary Renovated/Keeper
123W2 WSD Mary B Martin OPU#012 013W3Almira ES
013W3 WSD Almira OPU#068 022W3Case ES
022W3 WSD Case OPU#088 026W3Clark ES
026W3 WSD Clark
Totals
Renovated/Keeper WSD Almira Totals
WSD Case Renovated/Keeper Totals
WSD ClarkRenovated/Keeper Totals
OPU#340 ES Louisa Renovated/Keeper 052W3Louisa May AlcottWSD May Alcott
Expedition 速
Report M_COST_01_00-7b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193
Project
Date: Page:
FUNDING
Description
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - RENOVATED/KEEPER BUILDINGS OPU#340 ES Louisa Renovated/Keeper 052W3Louisa May AlcottWSD May Alcott
$396,988.00
$54,869.60
$0.00
$451,857.60
$604,056.00
$0.00
$604,056.00
$475,212.74
($18,441.30)
$456,771.44
$0.00
($4,913.84)
$451,857.60
$152,198.40
$0.00
$451,857.60
$983,579.00
($14,372.35)
$0.00
$969,206.65
$1,558,214.00
$0.00
$1,558,214.00
$993,590.50
($12,142.98)
$981,447.52
$0.00
($12,240.87)
$969,206.65
$589,007.35
$0.00
$967,608.82
Totals
$877,445.00
($660,579.81)
$0.00
$216,865.19
$388,806.00
$0.00
$388,806.00
$280,050.20
($52,263.51)
$227,786.69
$0.00
($10,921.50)
$216,865.19
$171,940.81
($0.00)
$214,670.01
Renovated/Keeper WSD Scranton 071W3 WSD Scranton Totals
$406,763.00
($256,618.17)
$0.00
$150,144.83
$226,131.00
$0.00
$226,131.00
$179,534.11
($24,314.53)
$155,219.58
$0.00
($5,074.75)
$150,144.83
$75,986.17
$0.00
$150,144.83
$992,413.00
($123,844.45)
$0.00
$868,568.55
$2,059,374.00
$0.00
$2,059,374.00
$891,558.13
($10,621.31)
$880,936.82
$0.00
($12,368.27)
$868,568.55
$1,190,805.45
$0.00
$868,446.09
$414,019.00
$3,020.57
$0.00
$417,039.57
$751,581.00
$0.00
$751,581.00
$422,075.35
$94.85
$422,170.20
$0.00
($5,130.63)
$417,039.57
$334,541.43
$0.00
$417,039.57
$1,355,652.00 ($1,013,144.89)
$0.00
$342,507.11
$638,436.00
$0.00
$638,436.00
$376,621.38
($17,273.14)
$359,348.24
$0.00
($16,841.13)
$342,507.11
$295,928.89
$0.00
$342,507.10
($292,274.69)
$0.00
$658,167.31
$946,959.00
$0.00
$946,959.00
$698,886.18
($28,910.50)
$669,975.68
$0.00
($11,808.37)
$658,167.31
$288,791.69
$0.00
$658,167.31
$3,100,157.00 ($2,691,143.65)
$0.00
$409,013.35
$2,076,043.00
$0.00
$2,076,043.00
$491,902.14
($44,346.53)
$447,555.61
$0.00
($38,542.26)
$409,013.35
$1,667,029.65
($0.00)
$408,996.13
052W3 WSD Louisa May Alcott
Totals
OPU#354 Renovated/Keeper 055W3Marion-Sterling ES WSD Marion-Sterling
055W3 WSD Marion-Sterling
Totals
OPU#415 Renovated/Keeper 064W3Newton D Baker ES WSD Newton D Baker
064W3 WSD Newton D Baker OPU#500 071W3Scranton ES
OPU#596 081W3Waverly ES
Renovated/Keeper WSD Waverly
081W3 WSD Waverly OPU#605 084W3Willow ES
Totals Renovated/Keeper WSD Willow
084W3 WSD Willow
Totals
OPU#279 MSJoseph Renovated/Keeper 097W3Joseph M Gallagher WSD M Gallagher
097W3 WSD Joseph M Gallagher
Totals
OPU#804 HS Health Renovated/Keeper 110W3Health Careers Ctr WSD Careers Ctr
110W3 WSD Health Careers Ctr
Totals
$950,442.00
OPU#090 ES ClaraRenovated/Keeper 119W3Clara E. WestroppWSD E. Westropp
119W3 WSD Clara E. Westropp
Totals
OPU#064 020W5Buhrer ES
Renovated/Keeper WSD Buhrer ES 020W5 WSD Buhrer ES Totals
$773,468.00
($439,903.05)
$0.00
$333,564.95
$295,955.00
$0.00
$295,955.00
$327,167.68
$15,641.12
$342,808.80
$0.00
($9,243.85)
$333,564.95
($37,609.95)
$0.00
$333,564.95
$611,003.00
($507,841.04)
$0.00
$103,161.96
$36,430.00
$0.00
$36,430.00
$113,114.21
($2,671.81)
$110,442.40
$0.00
($7,280.44)
$103,161.96
($66,731.96)
($0.00)
$103,161.96
$536,317.00
$713,504.76
$0.00
$1,249,821.76
$1,488,812.00
$0.00
$1,488,812.00
$1,061,793.81
$194,416.60
$1,256,210.41
$0.00
($6,388.65)
$1,249,821.76
$238,990.24
$0.00
$1,249,821.76
$597,704.00
($419,030.07)
$0.00
$178,673.93
$176,105.00
$0.00
$176,105.00
$177,944.69
$7,876.45
$185,821.14
$0.00
($7,147.21)
$178,673.93
($2,568.93)
$0.00
$182,549.43
$882,889.00
($531,699.92)
$0.00
$351,189.08
$333,096.00
$0.00
$333,096.00
$359,073.40
$2,619.19
$361,692.59
$0.00
($10,503.51)
$351,189.08
($18,093.08)
$0.00
$351,189.08
$996,180.00
($632,326.87)
$0.00
$363,853.13
$275,352.00
$0.00
$275,352.00
$376,258.55
($512.56)
$375,745.99
$0.00
($11,892.86)
$363,853.13
($88,501.13)
$0.00
$363,853.13
$2,745,683.00 ($1,903,826.63)
$0.00
$841,856.37
$600,537.00
$0.00
$600,537.00
$886,324.47
($11,711.53)
$874,612.94
$0.00
($32,756.57)
$841,856.37
($241,319.37)
($0.00)
$841,856.37
$1,638,493.00 ($1,061,051.04)
$0.00
$577,441.96
$145,234.00
$0.00
$145,234.00
$536,552.24
$54,034.74
$590,586.98
$0.00
($13,145.02)
$577,441.96
($432,207.96)
$0.00
$573,315.96
$1,907,826.00 ($1,539,360.20)
$0.00
$368,465.80
$307,708.00
$0.00
$307,708.00
$405,957.21
($11,250.32)
$394,706.89
$0.00
($22,741.09)
$371,965.80
($64,257.80)
($3,500.00)
$371,965.80
OPU#353 K-5 Marion Renovated/Keeper 054W5Marion C. SelzterWSD C. Seltzer ES
054W5 WSD Marion C. Seltzer ES
Totals
OPU#436 K-5 Orchard Renovated/Keeper 065W5Orchard Science WSD
065W5 WSD Orchard
Totals
OPU#592 Renovated/Keeper 080W5Watterson-Lake K-5 WSD Watterson-Lake ES
080W5 WSD Watterson-Lake ES
Totals
OPU#328 MS Luis Munoz Renovated/Keeper 098W5Luis Munoz MarinWSD Marin
098W5 WSD Luis Munoz Marin
Totals
OPU#275 112W5Jane Addams 9-12 WSD Jane Renovated/Keeper Addams
112W5 WSD Jane Addams
Totals
OPU#292 114W5John Marshall HSWSD John Renovated/Keeper Marshall
114W5 WSD John Marshall
Totals
OPU#330 Renovated/Keeper 115W5Lincoln West HS WSD Lincoln West
115W5 WSD Lincoln West
Totals
OPU#349 116W5Max S Hayes 9-12WSD Max SRenovated/Keeper Hayes
116W5 WSD Max S Hayes
Totals
OPU#227 Ctr 117W5Halle Cleveland Lrng WSD Halle Renovated/Keeper
$798,047.00
($69,754.64)
$0.00
$728,292.36
$685,007.00
$0.00
$685,007.00
$761,317.61
($23,524.68)
$737,792.93
$0.00
($9,500.57)
$728,292.36
($43,285.36)
($0.00)
$728,292.36
Totals
$1,014,622.00
($431,204.61)
$0.00
$583,417.39
$949,806.00
$0.00
$949,806.00
$593,688.44
($12,271.17)
$581,417.27
$0.00
$2,000.12
$583,417.39
$366,388.61
$0.00
$583,417.39
Renovated/Keeper WSD Brooklawn 018W6 WSD Brooklawn Totals
$405,597.00
($1,673.96)
$0.00
$403,923.04
$367,855.00
$0.00
$367,855.00
$414,616.97
($11,464.51)
$403,152.46
$0.00
$770.58
$403,923.04
($36,068.04)
$0.00
$403,923.04
117W5 WSD Halle
Totals
OPU#036 ES Benjamin Renovated/Keeper 016W6Benjamin FranklinWSD Franklin
016W6 WSD Benjamin Franklin OPU#058 018W6Brooklawn ES
OPU#297 Renovated/Keeper 048W6Kenneth W. Clement WSD Kenneth W. Clement
Expedition 速
Report M_COST_01_00-7b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193
Project
Date: Page:
FUNDING
Description
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 3 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - RENOVATED/KEEPER BUILDINGS OPU#297 Renovated/Keeper 048W6Kenneth W. Clement WSD Kenneth W. Clement
048W6 WSD Kenneth W. Clement
Totals
$521,466.00
($200,713.99)
$0.00
$320,752.01
$363,478.00
$0.00
$363,478.00
$329,386.64
($9,669.56)
$319,717.08
$0.00
$1,034.93
$320,752.01
$42,725.99
$0.00
$320,752.01
$830,968.00
($548,295.32)
$0.00
$282,672.68
$262,186.00
$0.00
$262,186.00
$298,410.77
($17,369.25)
$281,041.52
$0.00
$1,631.16
$282,672.68
($20,486.68)
$0.00
$282,672.68
$691,469.00
$677,747.83
$0.00
$1,369,216.83
$1,035,305.00
$0.00
$1,035,305.00
$1,379,546.54
($11,703.28)
$1,367,843.26
$0.00
$1,373.57
$1,369,216.83
($333,911.83)
$0.00
$1,369,216.83
$1,522,466.00
($249,973.72)
$0.00
$1,272,492.28
$3,035,471.00
$0.00
$3,035,471.00
$1,602,723.20
($333,233.66)
$1,269,489.54
$0.00
$3,002.74
$1,272,492.28
$1,762,978.72
$0.00
$1,272,492.28
$1,833,937.00 ($1,223,579.79)
$0.00
$610,357.21
$687,767.00
$0.00
$687,767.00
$601,319.53
$5,413.51
$606,733.04
$0.00
$3,624.17
$610,357.21
$77,409.79
($0.00)
$610,357.21
$1,783,279.00
($15,151.93)
$0.00
$1,768,127.07
$1,717,379.00
$0.00
$1,717,379.00
$1,749,843.87
$14,728.95
$1,764,572.82
$0.00
$3,554.25
$1,768,127.07
($50,748.07)
$0.00
$1,768,127.07
$826,125.00
$226,673.42
$0.00
$1,052,798.42
$1,106,487.00
$0.00
$1,106,487.00
$1,046,175.69
$4,904.88
$1,051,080.57
$0.00
$1,717.85
$1,052,798.42
$53,688.58
$0.00
$1,052,798.42
$3,344,196.00 ($2,523,777.63)
$0.00
$820,418.37
$484,458.00
$0.00
$484,458.00
$781,413.89
$16,232.69
$797,646.58
$0.00
$22,771.79
$820,418.37
($335,960.37)
$0.00
$820,290.44
OPU#376 060W6MilesStandish/MWhite WSD ES MilesRenovated/Keeper Standish
060W6 WSD Miles Standish
Totals
OPU#343 MS Margaret Renovated/Keeper 099W6Margaret SpellacyWSD Spellacy M
099W6 WSD Margaret Spellacy MS
Totals
OPU#616 Renovated/Keeper 105W6Wilbur Wright MSWSD Wilbur Wright
105W6 WSD Wilbur Wright
Totals
OPU#220 109W6Glenville HS
Renovated/Keeper WSD Glenville 109W6 WSD Glenville Totals
OPU#273 HS James Renovated/Keeper 111W6James F. RhodesWSD F. Rhodes
111W6 WSD James F. Rhodes
Totals
OPU#171 ES Forest Renovated/Keeper 121W6Forest Hill Parkway WSD Hill Parkway
121W6 WSD Forest Hill Parkway
Totals
OPU#096 6-8 Renovated/Keeper 007W8Collinwood CompuTech WSD Collinwood CompuT
007W8 WSD Collinwood CompuTech
Totals
OPU#010 Bell Alexander ES Renovated/Keeper 011W8Alexander Graham WSD Graham B
011W8 WSD Alexander Graham Bell OPU#041 017W8Bolton ES
Totals
$785,112.00
($142,085.36)
$0.00
$643,026.64
$412,375.00
$0.00
$412,375.00
$589,428.26
$48,310.54
$637,738.80
$0.00
$5,287.84
$643,026.64
($230,651.64)
$0.00
$643,026.64
$474,908.00
($67,327.18)
$0.00
$407,580.82
$516,563.00
$0.00
$516,563.00
$351,579.40
$52,795.15
$404,374.55
$0.00
$3,206.27
$407,580.82
$108,982.18
$0.00
$407,580.82
$984,395.00
($139,799.30)
$0.00
$844,595.70
$655,736.00
$0.00
$655,736.00
$835,610.52
$2,355.47
$837,965.99
$0.00
$6,629.71
$844,595.70
($188,859.70)
($0.00)
$844,604.50
$517,101.00
$314,960.32
$0.00
$832,061.32
$652,474.00
$0.00
$652,474.00
$830,449.55
($1,871.83)
$828,577.72
$0.00
$3,483.60
$832,061.32
($179,587.32)
($0.00)
$832,061.32
$522,215.00
($215,247.90)
$0.00
$306,967.10
$286,794.00
$0.00
$286,794.00
$283,700.42
$19,746.29
$303,446.71
$0.00
$3,520.39
$306,967.10
($20,173.10)
($0.00)
$306,967.10
$816,063.00
$336,894.69
$0.00
$1,152,957.69
$1,530,356.00
$0.00
$1,530,356.00
$1,072,463.88
$74,999.34
$1,147,463.22
$0.00
$5,494.47
$1,152,957.69
$377,398.31
$0.00
$1,152,957.69
$592,097.00
($241,805.49)
$0.00
$350,291.51
$295,223.00
$0.00
$295,223.00
$336,426.09
$9,834.47
$346,260.56
$0.00
$4,030.95
$350,291.51
($55,068.51)
$0.00
$350,291.51
$303,562.00
($124,004.41)
$0.00
$179,557.59
$246,712.00
$0.00
$246,712.00
$172,005.45
$5,408.39
$177,413.84
$0.00
$2,143.75
$179,557.59
$67,154.41
($0.00)
$179,548.79
$0.00 $37,195,257.70
$44,360,019.00
$0.00 $44,360,019.00
$38,282,801.57
($528,223.51) $37,754,578.06
$0.00
($555,820.36)
$37,198,757.70
$7,161,261.30
($3,500.00)
$37,193,917.00
Renovated/Keeper WSD Bolton
017W8 WSD Bolton
Totals
OPU#225 Renovated/Keeper 040W8Gracemount ES WSD Gracemount
040W8 WSD Gracemount
Totals
OPU#294 046W8John W. Raper ESWSD John Renovated/Keeper W. Raper
046W8 WSD John W. Raper OPU#548 075W8Union ES
Totals
WSD UnionRenovated/Keeper
075W8 WSD Union
Totals
OPU#078 Renovated/Keeper 093W8Charles Eliot K-8 WSD Charles W. Eliot
093W8 WSD Charles W. Eliot OPU#124 120W8Dike Pre-K - 8
Totals
WSD Dike Renovated/Keeper
120W8 WSD Dike
Totals
OPU#020 124W8Jesse Owens Academy WSD JesseRenovated/Keeper Owens Academ
124W8 WSD Jesse Owens Academy
Totals
TYPE TOTALS
$64,772,695.00 ($27,577,437.30)
WSD - NON-KEEPER BUILDINGS OPU#636 ES Buckeye-Woodland Non-Keeper 019W4Buckeye-Woodland WSD
$489,508.00
($419,794.43)
$0.00
$69,713.57
$90,006.00
$0.00
$90,006.00
$80,433.04
($5,165.22)
$75,267.82
$0.00
($5,554.25)
$69,713.57
$20,292.43
$0.00
$69,713.57
$466,641.00
($202,756.75)
$0.00
$263,884.25
$389,195.00
$0.00
$389,195.00
$305,602.06
($36,387.61)
$269,214.45
$0.00
($5,330.20)
$263,884.25
$125,310.75
$0.00
$263,884.25
Totals
$174,525.00
($39,576.37)
$0.00
$134,948.63
$133,972.00
$0.00
$133,972.00
$140,902.02
($3,957.44)
$136,944.58
$0.00
($1,995.95)
$134,948.63
($976.63)
$0.00
$134,948.63
WSD Cranwood Non-Keeper 028W4 WSD Cranwood Totals
$194,027.00
($35,322.99)
$0.00
$158,704.01
$196,553.00
$0.00
$196,553.00
$161,347.86
($424.03)
$160,923.83
$0.00
($2,219.82)
$158,704.01
$37,848.99
$0.00
$158,704.01
019W4 WSD Buckeye-Woodland
Totals
OPU#077 Non-Keeper 023W4Charles Dickens ES WSD Charles Dickens
023W4 WSD Charles Dickens
Totals
OPU#079 024W4Charles H. Lake ES WSD Charles H. Non-Keeper Lake
024W4 WSD Charles H. Lake OPU#107 028W4Cranwood ES
OPU#109 ES Daniel E. Morgan Non-Keeper 029W4Daniel E. MorganWSD
Expedition 速
Report M_COST_01_00-7b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193
FUNDING
Description
Project
Date: Page:
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 4 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - NON-KEEPER BUILDINGS OPU#109 ES Daniel E. Morgan Non-Keeper 029W4Daniel E. MorganWSD Totals
$133,952.00
($82,175.65)
$0.00
$51,776.35
$0.00
$0.00
$0.00
$49,086.19
$4,222.24
$53,308.43
$0.00
($1,532.08)
$51,776.35
($51,776.35)
($0.00)
$51,776.35
WSD East Clark Non-Keeper 032W4 WSD East Clark Totals
$562,609.00
($276,418.69)
$0.00
$286,190.31
$337,117.00
$0.00
$337,117.00
$318,886.38
($26,303.51)
$292,582.87
$0.00
($6,392.56)
$286,190.31
$50,926.69
$0.00
$286,190.31
$268,498.00
($108,223.39)
$0.00
$160,274.61
$83,945.00
$0.00
$83,945.00
$171,373.34
($8,038.53)
$163,334.81
$0.00
($3,060.20)
$160,274.61
($76,329.61)
($0.00)
$160,274.61
$510,520.00
($192,828.81)
$0.00
$317,691.19
$263,427.00
$0.00
$263,427.00
$346,187.95
($22,662.57)
$323,525.38
$0.00
($5,834.19)
$317,691.19
($54,264.19)
$0.00
$317,670.63
$525,211.00
($216,661.07)
$0.00
$308,549.93
$260,601.00
$0.00
$260,601.00
$329,446.87
($14,935.07)
$314,511.80
$0.00
($5,961.87)
$308,549.93
($47,948.93)
($0.00)
$308,549.93
$133,596.00
($113,671.03)
$0.00
$19,924.97
$14,547.00
$0.00
$14,547.00
$22,591.81
($1,157.76)
$21,434.05
$0.00
($1,509.08)
$19,924.97
($5,377.97)
$0.00
$19,924.97
$147,875.00
($51,485.52)
$0.00
$96,389.48
$111,440.00
$0.00
$111,440.00
$103,607.93
($5,519.78)
$98,088.15
$0.00
($1,698.67)
$96,389.48
$15,050.52
($0.00)
$96,389.48
$205,517.00
($49,082.48)
$0.00
$156,434.52
$212,414.00
$0.00
$212,414.00
$151,893.87
$6,898.97
$158,792.84
$0.00
($2,358.32)
$156,434.52
$55,979.48
$0.00
$152,940.77
$1,274,115.00 ($1,123,875.11)
$0.00
$150,239.89
$84,000.00
$0.00
$84,000.00
$178,922.84
($14,175.07)
$164,747.77
$0.00
($14,507.88)
$150,239.89
($66,239.89)
$0.00
$150,239.89
029W4 WSD Daniel E. Morgan OPU#148 032W4East Clark ES
OPU#168 035W4Euclid Park ES
WSD Euclid ParkNon-Keeper ES 035W4 WSD Euclid Park ES Totals
OPU#200 039W4Giddings ES
WSD Giddings Non-Keeper 039W4 WSD Giddings Totals
OPU#252 Non-Keeper 041W4H.W. Longfellow ES WSD HW Longfellow
041W4 WSD HW Longfellow
Totals
OPU#229 ES Hannah Gibbons Non-Keeper 042W4Hannah Gibbons WSD
042W4 WSD Hannah Gibbons
Totals
OPU#094 Non-Keeper 045W4J.D. Rockefeller ES WSD JD Rockefeller
045W4 WSD JD Rockefeller
Totals
OPU#339 Non-Keeper 051W4Louis Pasteur ESWSD Louis Pasteur
051W4 WSD Louis Pasteur OPU#396 062W4Mound ES
WSD Mound
062W4 WSD Mound
Totals Non-Keeper Totals
OPU#452 Non-Keeper 067W4Paul Revere ES WSD Paul Revere
$874,627.00
($446,513.69)
$0.00
$428,113.31
$536,115.00
$0.00
$536,115.00
$463,613.06
($25,522.02)
$438,091.04
$0.00
($9,977.73)
$428,113.31
$108,001.69
$0.00
$428,113.31
$493,631.00
($204,634.55)
$0.00
$288,996.45
$308,156.00
$0.00
$308,156.00
$321,918.60
($27,316.73)
$294,601.87
$0.00
($5,605.42)
$288,996.45
$19,159.55
($0.00)
$288,995.45
$859,731.00
($449,094.42)
$0.00
$410,636.58
$431,404.00
$0.00
$431,404.00
$412,363.00
$8,065.63
$420,428.63
$0.00
($9,792.05)
$410,636.58
$20,767.42
$0.00
$410,636.58
$795,590.00
($524,886.01)
$0.00
$270,703.99
$244,012.00
$0.00
$244,012.00
$300,535.99
($20,818.83)
$279,717.16
$0.00
($9,013.17)
$270,703.99
($26,691.99)
$0.00
$270,703.99
$139,527.00
($42,767.58)
$0.00
$96,759.42
$82,905.00
$0.00
$82,905.00
$107,200.70
($10,696.87)
$96,503.83
$0.00
$255.59
$96,759.42
($13,854.42)
($0.00)
$96,759.42
$195,012.00
($91,929.88)
$0.00
$103,082.12
$101,639.00
$0.00
$101,639.00
$110,813.40
($8,125.34)
$102,688.06
$0.00
$394.06
$103,082.12
($1,443.12)
($0.00)
$103,082.12
$253,030.00
$15,498.46
$0.00
$268,528.46
$153,461.00
$0.00
$153,461.00
$271,243.78
($3,237.08)
$268,006.70
$0.00
$521.76
$268,528.46
($115,067.46)
($0.00)
$268,528.46
Totals
$1,393,283.00
$370,095.98
$0.00
$1,763,378.98
$1,642,277.00
$0.00
$1,642,277.00
$1,774,853.91
($14,238.08)
$1,760,615.83
$0.00
$2,763.15
$1,763,378.98
($121,101.98)
$0.00
$1,762,508.98
WSD Riverside Non-Keeper 009W7 WSD Riverside Totals
$400,627.00
($400,627.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$316,528.00
($193,780.29)
$0.00
$122,747.71
$217,280.00
$0.00
$217,280.00
$118,716.93
$2,283.57
$121,000.50
$0.00
$1,747.21
$122,747.71
$94,532.29
$0.00
$122,747.71
$130,530.00
($12,289.33)
$0.00
$118,240.67
$236,481.00
$0.00
$236,481.00
$106,766.01
$9,747.62
$116,513.63
$0.00
$1,727.04
$118,240.67
$118,240.33
$0.00
$118,240.67
$50,403.00
$23,290.82
$0.00
$73,693.82
$178,719.00
$0.00
$178,719.00
$57,665.62
$14,298.70
$71,964.32
$0.00
$1,729.50
$73,693.82
$105,025.18
$0.00
$73,693.82
067W4 WSD Paul Revere
Totals
OPU#486 Non-Keeper 069W4Robert Fulton ESWSD Robert Fulton
069W4 WSD Robert Fulton OPU#005 087W4Albert B. Hart MSWSD A.B. Hart
087W4 WSD A.B. Hart
Totals Non-Keeper Totals
OPU#411 Non-Keeper 100W4Nathan Hale MS WSD Nathan Hale
100W4 WSD Nathan Hale
Totals
OPU#004 Non-Keeper 010W6Adlai Stevenson ES WSD Adlai Stevenson
010W6 WSD Adlai Stevenson OPU#104 027W6Corlett ES
WSD Corlett
027W6 WSD Corlett
Totals Non-Keeper Totals
OPU#165 Academy Non-Keeper 033W6Emile B. deSauzeWSD Emile B. deSauze
033W6 WSD Emile B. deSauze
Totals
OPU#388 ES Moses Cleveland Non-Keeper 061W6Moses ClevelandWSD
061W6 WSD Moses Cleveland OPU#485 009W7Riverside ES
OPU#023 Non-Keeper 015W7Artemus Ward ESWSD Artimus Ward
015W7 WSD Artimus Ward OPU#112 030W7Denison ES
WSD Denison
030W7 WSD Denison
Totals Non-Keeper Totals
OPU#130 ES Douglas MacArthur Non-Keeper 031W7Douglas MacArthur WSD
031W7 WSD Douglas MacArthur OPU#188 037W7Garfield ES
Expedition 速
Totals
WSD Garfield ESNon-Keeper
Report M_COST_01_00-7b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193
Project
Date: Page:
FUNDING
Description
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 5 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - NON-KEEPER BUILDINGS OPU#188 037W7Garfield ES
WSD Garfield ESNon-Keeper 037W7 WSD Garfield ES Totals
$272,800.00
($224,136.86)
$0.00
$48,663.14
$56,347.00
$0.00
$56,347.00
$49,291.94
($2,347.48)
$46,944.46
$0.00
$1,718.68
$48,663.14
$7,683.86
$0.00
$48,663.14
Totals
$449,260.00
($389,154.28)
$0.00
$60,105.72
$44,493.00
$0.00
$44,493.00
$61,171.19
($2,796.76)
$58,374.43
$0.00
$1,731.29
$60,105.72
($15,612.72)
$0.00
$60,105.72
Non-Keeper WSD McKinley ES 057W7 WSD McKinley ES Totals
$264,576.00
($152,339.60)
$0.00
$112,236.40
$49,803.00
$0.00
$49,803.00
$65,989.49
$44,493.82
$110,483.31
$0.00
$1,753.09
$112,236.40
($62,433.40)
$0.00
$112,236.40
Totals
$126,099.00
($126,099.00)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
WSD R.G. JonesNon-Keeper Elementa 068W7 WSD R.G. Jones Elementary Totals
$384,446.00
($84,024.65)
$0.00
$300,421.35
$426,979.00
$0.00
$426,979.00
$298,988.52
($291.82)
$298,696.70
$0.00
$1,724.65
$300,421.35
$126,557.65
($0.00)
$300,421.35
$215,918.00
($61,235.92)
$0.00
$154,682.08
$220,529.00
$0.00
$220,529.00
$152,567.26
$377.66
$152,944.92
$0.00
$1,737.16
$154,682.08
$65,846.92
$0.00
$154,682.08
$434,181.00
$19,738.40
$0.00
$453,919.40
$546,647.00
$0.00
$546,647.00
$512,031.56
($59,833.66)
$452,197.90
$0.00
$1,721.50
$453,919.40
$92,727.60
$0.00
$453,919.40
$219,632.00
($96,934.34)
$0.00
$122,697.66
$153,683.00
$0.00
$153,683.00
$113,244.97
$7,727.82
$120,972.79
$0.00
$1,724.87
$122,697.66
$30,985.34
($0.00)
$122,697.66
$481,565.00
($313,390.55)
$0.00
$168,174.45
$364,498.00
$0.00
$364,498.00
$148,747.30
$17,686.51
$166,433.81
$0.00
$1,740.64
$168,174.45
$196,323.55
$0.00
$168,174.45
$640,763.00
($511,022.43)
$0.00
$129,740.57
$251,503.00
$0.00
$251,503.00
$122,027.63
$5,958.14
$127,985.77
$0.00
$1,754.80
$129,740.57
$121,762.43
$0.00
$129,740.57
$595,655.00
($420,958.91)
$0.00
$174,696.09
$146,886.00
$0.00
$146,886.00
$140,714.46
$32,253.74
$172,968.20
$0.00
$1,727.89
$174,696.09
($27,810.09)
$0.00
$174,696.09
$417,156.00
$8,716.47
$0.00
$425,872.47
$478,521.00
$0.00
$478,521.00
$247,196.96
$176,921.32
$424,118.28
$0.00
$1,754.19
$425,872.47
$52,648.53
$0.00
$425,872.47
$767,244.00
($451,358.37)
$0.00
$315,885.63
$690,307.00
$0.00
$690,307.00
$323,174.89
($4,958.67)
$318,216.22
$0.00
$1,739.41
$319,955.63
$370,351.37
($4,070.00)
$319,955.63
$598,908.00
($245,126.26)
$0.00
$353,781.74
$765,628.00
$0.00
$765,628.00
$314,832.67
$37,211.16
$352,043.83
$0.00
$1,737.91
$353,781.74
$411,846.26
$0.00
$353,781.74
$132,461.00
($104,417.18)
$0.00
$28,043.82
$46,167.00
$0.00
$46,167.00
$26,288.67
($8.34)
$26,280.33
$0.00
$1,763.49
$28,043.82
$18,123.18
$0.00
$28,043.82
$246,818.00
($106,304.72)
$0.00
$140,513.28
$182,585.00
$0.00
$182,585.00
$133,023.89
$5,848.39
$138,872.28
$0.00
$1,641.00
$140,513.28
$42,071.72
($0.00)
$140,513.28
$419,836.00
$59,676.46
$0.00
$479,512.46
$552,614.00
$0.00
$552,614.00
$458,736.38
$7,492.62
$466,229.00
$0.00
$13,283.46
$479,512.46
$73,101.54
$0.00
$471,992.97
$404,205.00
($151,101.94)
$0.00
$253,103.06
$223,831.00
$0.00
$223,831.00
$243,822.35
($3,496.11)
$240,326.24
$0.00
$12,796.60
$253,122.84
($29,291.84)
($19.78)
$250,580.87
Totals
$495,697.00
$912.33
$0.00
$496,609.33
$598,761.00
$0.00
$598,761.00
$477,048.23
$3,871.94
$480,920.17
$0.00
$15,689.16
$496,609.33
$102,151.67
($0.00)
$485,377.81
WSD Fullerton Non-Keeper 036W9 WSD Fullerton Totals
$208,648.00
($51,184.02)
$0.00
$157,463.98
$165,062.00
$0.00
$165,062.00
$152,676.06
($1,803.42)
$150,872.64
$0.00
$6,591.34
$157,463.98
$7,598.02
($0.00)
$156,112.50
$270,839.00
($92,190.65)
$0.00
$178,648.35
$221,169.00
$0.00
$221,169.00
$171,402.99
($914.58)
$170,488.41
$0.00
$8,559.94
$179,048.35
$42,120.65
($400.00)
$176,396.12
OPU#338 Non-Keeper 050W7Louis Agassiz ESWSD Louis Agassiz
050W7 WSD Louis Agassiz OPU#352 057W7McKinley ES
OPU#451 Non-Keeper 066W7Paul L. Dunbar ESWSD Paul L. Dunbar
066W7 WSD Paul L. Dunbar OPU#487 068W7R.G. Jones ES
OPU#544 074W7Tremont ES
WSD Tremont ESNon-Keeper 074W7 WSD Tremont ES Totals
OPU#550 076W7Valley View ES
WSD Valley ViewNon-Keeper 076W7 WSD Valley View Totals
OPU#560 078W7Walton ES
WSD Walton
078W7 WSD Walton
Non-Keeper Totals
OPU#622 ES Non-Keeper 082W7WSD William C. Bryant WSD William Cullen Bryan
082W7 WSD William Cullen Bryant
Totals
OPU#621 ES William R. Harper Non-Keeper 083W7William R. HarperWSD
083W7 WSD William R. Harper
Totals
OPU#080 MS Charles A. Non-Keeper 092W7Charles A. Mooney WSD Mooney
092W7 WSD Charles A. Mooney
Totals
OPU#412 Non-Keeper 101W7Nathaniel Hawthorne WSDESNathaniel Hawthorne
101W7 WSD Nathaniel Hawthorne
Totals
OPU#536 MS Thomas Jefferson Non-Keeper 103W7Thomas JeffersonWSD
103W7 WSD Thomas Jefferson OPU#624 106W7Wilson MS
WSD Wilson
106W7 WSD Wilson
Totals Non-Keeper Totals
OPU#224 K-8 H. Barbara Non-Keeper 122W7H. Barbara Booker WSD Booker
122W7 WSD H. Barbara Booker
Totals
OPU#021 Non-Keeper 014W8Anton Grdina ES WSD Anton Grdina
014W8 WSD Anton Grdina
Totals
OPU#016 ES Andrew J Rickoff Non-Keeper 004W9Andrew J. RickoffWSD
004W9 WSD Andrew J Rickoff
Totals
OPU#003 ES Alfred A. Benesch Non-Keeper 012W9Alfred A. BeneschWSD
012W9 WSD Alfred A. Benesch
Totals
OPU#164 ESEmpire CompuTech Non-Keeper 034W9Empire CompuTech WSD
034W9 WSD Empire CompuTech OPU#184 036W9Fullerton ES
OPU#198 ES George W. Non-Keeper 038W9George W. CarverWSD Carver
038W9 WSD George W. Carver
Totals
OPU#240 Non-Keeper 043W9Harvey Rice ES WSD Harvey Rice
Expedition 速
Report M_COST_01_00-7b
District IRN 43786
SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193
Project
Date: Page:
FUNDING
Description
Original Proj Agreement Budget
Approved NOI Changes
PHASE ESTIMATE
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 6 of 6
STATUS
Pending Changes
Potential Costs
Projected Commitment
Est. to Compl.
Projected Variance
Projected Remaining Proj Agmt Funds
Cost to Date
Proj Budget vs Proj Committed
Billed to Date
WSD - NON-KEEPER BUILDINGS OPU#240 Non-Keeper 043W9Harvey Rice ES WSD Harvey Rice
$924,843.00
($88,737.90)
$0.00
$836,105.10
$858,048.00
$0.00
$858,048.00
$769,501.62
$37,264.53
$806,766.15
$0.00
$29,338.95
$836,105.10
$21,942.90
$0.00
$798,302.93
Totals
$584,236.00
($151,565.68)
$0.00
$432,670.32
$463,811.00
$0.00
$463,811.00
$397,879.46
$16,682.93
$414,562.39
$0.00
$18,507.93
$433,070.32
$30,740.68
($400.00)
$426,757.81
WSD Kentucky Non-Keeper 049W9 WSD Kentucky Totals
$199,861.00
($69,395.18)
$0.00
$130,465.82
$110,998.00
$0.00
$110,998.00
$125,831.16
($1,732.23)
$124,098.93
$0.00
$6,366.89
$130,465.82
($19,467.82)
$0.00
$129,897.90
$220,495.00
($46,336.94)
$0.00
$174,158.06
$177,377.00
$0.00
$177,377.00
$158,723.78
$8,463.76
$167,187.54
$0.00
$6,970.52
$174,158.06
$3,218.94
$0.00
$173,775.61
Totals
$752,456.00
($240,041.11)
$0.00
$512,414.89
$574,884.00
$0.00
$574,884.00
$489,263.99
($287.18)
$488,976.81
$0.00
$23,838.08
$512,814.89
$62,069.11
($400.00)
$503,448.47
WSD Miles Park Non-Keeper 059W9 WSD Miles Park Totals
$291,853.00
($244,335.36)
$0.00
$47,517.64
$193,204.00
$0.00
$193,204.00
$201,285.45
($162,994.31)
$38,291.14
$0.00
$9,226.50
$47,517.64
$145,686.36
$0.00
$199,406.62
$480,010.00
$13,439.65
$0.00
$493,449.65
$510,919.00
$0.00
$510,919.00
$467,684.08
$10,560.31
$478,244.39
$0.00
$15,205.26
$493,449.65
$17,469.35
$0.00
$485,191.95
$138,025.00
$61,324.94
$0.00
$199,349.94
$286,257.00
$0.00
$286,257.00
$354,639.97
$38,642.54
$393,282.51
$0.00
$4,375.31
$397,657.82
($111,400.82)
($198,307.88)
$397,191.45
$141,699.00
$15,223.52
$0.00
$156,922.52
$171,153.00
$0.00
$171,153.00
$148,476.59
$4,355.89
$152,832.48
$0.00
$4,490.04
$157,322.52
$13,830.48
($400.00)
$154,858.99
Totals
$837,122.00
$280,796.82
$0.00
$1,117,918.82
$1,166,184.00
$0.00
$1,166,184.00
$1,017,868.63 ($1,259,520.01)
($241,651.38)
$0.00
$26,555.11
($215,096.27)
$1,381,280.27
$1,333,015.09
($221,283.04)
WSD Audubon Non-Keeper 089W9 WSD Audubon Totals
$604,663.00
$57,896.81
$0.00
$662,559.81
$552,832.00
$0.00
$552,832.00
$584,765.29
$63,898.34
$648,663.63
$0.00
$13,896.18
$662,559.81
($109,727.81)
$0.00
$647,672.41
$268,625.00
$6,362.03
$0.00
$274,987.03
$260,965.00
$0.00
$260,965.00
$220,292.43
$46,567.47
$266,859.90
$0.00
$8,527.13
$275,387.03
($14,422.03)
($400.00)
$268,064.64
$333,183.00
($161,104.14)
$0.00
$172,078.86
$137,170.00
$0.00
$137,170.00
$164,440.40
($2,879.14)
$161,561.26
$0.00
$10,517.60
$172,078.86
($34,908.86)
($0.00)
$170,957.88
$407,735.00
($70,574.62)
$0.00
$337,160.38
$308,218.00
$0.00
$308,218.00
$325,428.65
($1,188.61)
$324,240.04
$0.00
$12,920.34
$337,160.38
($28,942.38)
$0.00
$336,103.41
$635,273.00
($11,789.10)
$0.00
$623,483.90
$830,129.00
$0.00
$830,129.00
$619,701.80
($16,358.21)
$603,343.59
$0.00
$20,140.31
$623,483.90
$206,645.10
($0.00)
$607,000.66
$523,210.00
($14,125.01)
$0.00
$509,084.99
$659,224.00
$0.00
$659,224.00
$451,529.71
$40,912.67
$492,442.38
$0.00
$16,641.14
$509,083.52
$150,140.48
$1.47
$500,643.47
$16,226,083.03
$3,530,968.97
$1,128,618.90
$16,227,173.14
$53,424,840.73 $10,692,230.27
$1,125,118.90
$53,421,090.14
043W9 WSD Harvey Rice
Totals
OPU#295 ES Joseph F. Landis Non-Keeper 047W9Joseph F. LandisWSD
047W9 WSD Joseph F. Landis OPU#301 049W9Kentucky ES
OPU#345 ES Margaret A.Non-Keeper 053W9Margaret A. Ireland Ireland WSD
053W9 WSD Margaret A. Ireland OPU#368 058W9Miles ES
Totals Non-Keeper
WSD Miles
058W9 WSD Miles OPU#372 059W9Miles Park ES
OPU#400 Non-Keeper 063W9Mount Auburn ESWSD Mount Auburn
063W9 WSD Mount Auburn
Totals
OPU#525 ES Stephen E. Non-Keeper 072W9Stephen E. HoweWSD Howe
072W9 WSD Stephen E. Howe
Totals
OPU#638 Non-Keeper 086W9Woodland Hills ES WSD Woodland Hills ES
086W9 WSD Woodland Hills ES
Totals
OPU#009 MSAlexander Hamilton Non-Keeper 088W9Alexander Hamilton WSD
088W9 WSD Alexander Hamilton OPU#024 089W9Audubon K-8
OPU#066 Non-Keeper 090W9Carl F. Shuler MSWSD Carl F. Shuler
090W9 WSD Carl F. Shuler OPU#076 091W9Central MS
Totals
WSD Central
091W9 WSD Central
Non-Keeper Totals
OPU#802 Non-Keeper 095W9Garrett Morgan MS WSD Garrett Morgan
095W9 WSD Garrett Morgan
Totals
OPU#448 Non-Keeper 102W9Patrick Henry MSWSD Patrick Henry
102W9 WSD Patrick Henry
Totals
OPU#428 Non-Keeper 127W9Oliver H. Perry ESWSD Oliver H. Perry
127W9 WSD Oliver H. Perry
Totals
TYPE TOTALS
$26,379,109.00 ($9,024,407.07)
$0.00 $17,354,701.93
$19,757,052.00
$0.00 $19,757,052.00
$17,116,263.58 ($1,117,383.78) $15,998,879.80
$0.00
$227,203.23
WSD PROJECT TOTALS
$91,151,804.00 ($36,601,844.37)
$0.00
$64,117,071.00
$0.00 $64,117,071.00
$55,399,065.15 ($1,645,607.29) $53,753,457.86
$0.00
($328,617.13)
$54,549,959.63
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
$1,125,118.90
The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project.
1. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.
Expedition 速
Report M_COST_01_00-7b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 02/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 1
STATUS
Pending Changes
Potential Costs
Projected Committment
Phase Estimate Variance
Est. to Compl.
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#372 008P2Mile Park ES
008P2
Miles Park K-8 Demolition Miles Park K-8 Demolition Totals
$0.00
$412,803.88
$10,521,067.82
$0.00
$412,803.88
$750,000.00
$0.00
$750,000.00
$380,466.67
$2,710,638.60
$0.00 $13,231,706.42
$12,345,840.00
$734,727.00 $13,080,567.00
$8,725,568.70
$1,631,221.18
$0.00 $10,356,789.88
$9,516,639.00
$97,727.00
$8,233,832.62
$1,636,714.59
$0.00
$9,870,547.21
$9,514,121.00
$0.00
Totals
$11,995,657.43
$3,359,931.56
$0.00 $15,355,588.99
$12,941,699.70
Totals
$10,163,223.35($10,122,942.11)
$62,337.21
$442,803.88
$0.00
$0.00
$442,803.88
($337,196.12)
($30,000.00)
$442,803.88 100%
$12,684,385.47
$912,697.69 $13,597,083.16
$0.00
$0.00 $13,597,083.16
$151,139.42
($365,376.74) $13,595,950.39 100%
$9,614,366.00
$9,739,242.88
$737,727.03 $10,476,969.91
$0.00
$0.00 $10,476,969.91
$742,423.88
($120,180.03) $10,476,970.51 100%
$9,514,121.00
$8,903,088.20
$936,903.56
$9,839,991.76
$0.00
$0.00
$9,839,991.76
$356,426.21
$669,541.00 $13,611,240.70
$13,985,726.46
$1,560,765.34 $15,546,491.80
$0.00
$0.00 $15,546,491.80
$1,744,348.29
$40,278.11
$0.00
$0.00
$40,278.11
$40,281.24
$3,515,805.69 $16,196,012.34
$0.00
$0.00 $16,196,012.34
$1,714,434.99
OPU#109 ES 029P1Daniel E. MorganDaniel Morgan New K-8
029P1
Daniel Morgan New K-8
Totals
OPU#229 ES 042P1Hannah GibbonsHannah Gibbons New K-8
042P1
Hannah Gibbons New K-8
Totals
OPU#350 ES M. Bethune Renovation/ 056P1Mary M. BethuneMary
056P1
Mary M. Bethune Renovation/Add Totals
$30,555.45
$9,820,549.66 100%
OPU#572 059P1Warner New K-8 Warner New K-8
059P1
Warner New K-8
($190,902.81) $15,543,391.33 100%
OPU#396 062P1Mound K-8
062P1
Mound New K-8 Mound New K-8
$0.00
$40,281.24
$0.00
$0.00 $15,454,616.99
$13,740,182.00
$0.00
$0.00
$40,278.11
$0.00 $13,740,182.00
$12,680,206.65
$0.00
$3.13
$40,277.67 100%
OPU#172 MS D. Roosevelt Renova 094P1Franklin D. Roosevelt Franklin
094P1
Franklin D. Roosevelt Renovation Totals
$11,890,993.50
$3,563,623.49
($741,395.35) $16,193,356.44 100%
OPU#028 ES/MS Relief New K-8 103P1Thomas Jefferson Westside
103P1
Westside Relief New K-8
Totals
$14,581,231.17($14,407,505.37)
$0.00
$173,725.80
$0.00
Totals
$12,073,275.97($11,845,934.67)
$0.00
$227,341.30
$0.00 $24,888,506.05
$0.00
$0.00
$173,722.67
$0.00
$173,722.67
$0.00
$0.00
$173,722.67
$173,725.80
$3.13
$173,722.07 100%
$14,867,619.00
$0.00 $14,867,619.00
$1,191,684.24
($646,129.85)
$545,554.39
$0.00
$0.00
$545,554.39 ($14,640,277.70)
($318,213.09)
$540,523.78 99%
$22,030,822.00
$250,000.00 $22,280,822.00
$21,977,793.72
$3,025,076.86 $25,002,870.58
$0.00
$0.00 $25,002,870.58
OPU#624 106P1Willson ES/MS
106P1
Willson New K-8 Willson New K-8
OPU#273 HS 111P1James F. RhodesJames F. Rhodes Renovation
111P1
James F. Rhodes Renovation
Totals
$18,778,238.29
$6,110,267.76
$2,607,684.05
($114,364.53) $24,999,628.58 100%
OPU#030 HS 114P1West Side Relief West Side Relief New HS
114P1
West Side Relief New HS
Totals
$38,581,969.92($38,054,175.46)
$0.00
$527,794.46
$0.00
$0.00
$0.00
$927,776.83
$0.00
$927,776.83
$0.00
$0.00
$927,776.83
$527,794.46
($399,982.37)
$927,776.42 100%
$24,619,783.27($23,797,296.36)
$0.00
$822,486.91
$0.00
$0.00
$0.00
$822,483.78
$0.00
$822,483.78
$0.00
$0.00
$822,483.78
$822,486.91
$3.13
$822,482.86 100%
$0.00
$9,063,521.34
$8,251,302.00
$111,412.00
$8,362,714.00
$8,284,875.84
$735,924.59
$9,020,800.43
$0.00
$0.00
$9,020,800.43
$700,807.34
$42,720.91
$9,020,799.48 100%
$91,791,731.52 $10,841,108.12 $102,632,839.64
$0.00
$0.00 $102,632,839.64 ($5,395,921.23) ($2,207,129.17) $102,598,233.07 100%
OPU#349 116P1Max S.Hayes Vocational Max S. HS Hayes Renovation
116P1
Max S. Hayes Renovation
Totals
OPU#347 123P1Mary B. Martin ES/MS Mary B. Martin Renovation
123P1
Mary B. Martin Renovation
$8,237,988.86 $825,532.48 Totals $178,402,830.90($77,977,120.43)
GROUP TOTALS
$0.00 $100,425,710.47 $103,958,224.70 $1,863,407.00$105,821,631.70
LFI OPU#624 106X1Willson MS
106X1
Willson - LFI Demolition Phas Willson - LFI Demolition Phase 1 Totals GROUP TOTALS
$0.00 $0.00
$0.00 $0.00
SEGMENT PROJECT TOTALS $178,402,830.90 ($77,977,120.43)
$0.00
$0.00
$0.00
$0.00
$0.00
$247,044.41
$68,815.97
$315,860.38
$0.00
$0.00
$315,860.38
$0.00
($315,860.38)
$315,860.38 100%
$0.00
$0.00
$0.00
$0.00
$247,044.41
$68,815.97
$315,860.38
$0.00
$0.00
$315,860.38
$0.00
($315,860.38)
$315,860.38 100%
$0.00 $100,425,710.47 $103,958,224.70 $1,863,407.00 $105,821,631.70 $92,038,775.93 $10,909,924.09 $102,948,700.02
$0.00
$0.00 $102,948,700.02 ($5,395,921.23) ($2,522,989.55) $102,914,093.45 100%
$0.00
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
Expedition速
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($2,522,989.55)
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 03/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#023 015P1Artemus Ward ESArtemus Ward New K-8
015P1
$11,439,192.26
$2,029,618.33
$250,380.58
$104,470.42
Totals
$9,773,213.22
$3,528,948.77
Buhrer Abate/Demo Buhrer Abate/Demo Totals
$204,693.20
$288,338.78
$11,454,443.79
$2,295,551.53
Artemus Ward New K-8
Totals
$0.00 $13,468,810.59
$14,126,234.91
$0.00 $14,126,234.91
$13,068,156.77
$639,252.72 $13,707,409.49
$0.00
$0.00 $13,707,409.49
($657,424.32)
($41,241.00)
$354,851.00
$0.00
$0.00
$354,851.00
($78,847.36)
$448,359.28 $13,238,742.68
$0.00
$0.00 $13,238,742.68
$753,281.12
$492,829.48
$0.00
$0.00
$492,829.48
($30,632.15)
$556,964.06 $14,226,325.02
$0.00
$0.00 $14,226,325.02
($522,734.90)
$480,616.35
$0.00
$0.00
$480,616.35
($67,161.58)
$932,280.68 $14,926,899.88
$0.00
$0.00 $14,926,899.88
$419,236.99
$305,007.46
$0.00
$0.00
$305,007.46
($38,359.70)
$1,322,805.30 $15,892,384.24
$0.00
$0.00 $15,892,384.24
($130,194.24)
$525,887.00
$0.00
$0.00
$525,887.00
($58,539.40)
$707,466.10 $13,561,068.06
$0.00
$0.00 $13,561,068.06
($537,232.44)
($53,067.39)
$292,487.61
$0.00
$0.00
$292,487.61
($60,079.11)
$654,221.78 $15,062,015.86
$0.00
$0.00 $15,062,015.86
($357,072.66)
($238,598.90) $13,707,401.30 100%
OPU#023 015P2Artemus Ward
015P2
Artemus Ward Abate/Demo Artemus Ward Abate/Demo Totals
$0.00
$354,851.00
$433,698.36
$0.00 $13,302,161.99
$12,548,880.87
$0.00
$433,698.36
$396,092.00
$0.00 $12,548,880.87
$12,790,383.40
$0.00
$354,851.00 100%
OPU#064 020P1Buhrer ES
020P1
Buhrer New K-8 Buhrer New K-8
$63,419.31 $13,238,742.68 100%
OPU#064 020P2Buhrer ES
020P2
$0.00
$493,031.98
$523,664.13
$0.00 $13,749,995.32
$14,272,730.22
$0.00
$523,664.13
$501,945.00
$0.00 $14,272,730.22
$13,669,360.96
($9,115.52)
$202.50
$492,829.48 100%
OPU#148 032P1East Clark ES
032P1
East Clark New K-8 East Clark New K-8 Totals
($476,329.70) $14,226,256.98 100%
OPU#148 032P2East Clark ES
032P2
East Clark Abate/Demo East Clark Abate/Demo Totals
$2,437,933.40 ($1,971,828.40)
$0.00
$466,105.00
$533,266.58 $14,160,346.86
$0.00
$533,266.58
$462,446.35
$0.00 $14,160,346.86
$13,994,619.20
$18,170.00
($14,511.35)
$480,616.35 100%
OPU#188 037P1Garfield ES
037P1
Garfield New K-8 Garfield New K-8
Totals
$10,986,186.85
$3,593,397.00
$0.00 $14,579,583.85
Garfield Abate/Demo Garfield Abate/Demo Totals
$624,133.11
($321,701.56)
$0.00
$302,431.55
$340,791.25
$11,433,030.34
$4,231,766.02
$0.00 $15,664,796.36
$15,794,990.60
($347,316.03) $14,926,898.51 100%
OPU#188 037P2Garfield ES
037P2
$0.00
$340,791.25
$310,950.00
$0.00 $15,794,990.60
$14,569,578.94
($5,942.54)
($2,575.91)
$305,007.46 100%
OPU#240 043P1Harvey Rice ES Harvey Rice New K-8
043P1
Harvey Rice New K-8
Totals
($227,587.88) $15,889,931.83 100%
OPU#240 043P2Harvey Rice ES Harvey Rice Abate/Demo
043P2
Harvey Rice Abate/Demo
$2,250,550.18 ($1,726,143.18)
Totals
$0.00
$524,407.00
$582,946.40
$0.00 $13,299,988.93
$13,837,221.37
$0.00
$582,946.40
$582,887.00
$0.00 $13,837,221.37
$12,853,601.96
($57,000.00)
($1,480.00)
$525,887.00 100%
OPU#487 Lng ES New K-8 068P1R.G. Jones Foreign R.G. Jones
068P1
$11,454,443.79
$1,845,545.14
Totals
$309,913.26
($17,425.65)
Wade Park New K-8 Wade Park New K-8 Totals
$12,123,854.99
$2,563,295.17
$349,210.99
$103,078.12
$0.00
$452,289.11
$498,479.40
$0.00
$498,479.40
$475,253.00
($22,963.89)
$452,289.11
$0.00
$0.00
$452,289.11
($46,190.29)
($0.00)
$452,289.11 100%
$13,472,218.19($13,100,643.35)
$0.00
$371,574.84
$0.00
$0.00
$0.00
$964,830.57
($593,223.00)
$371,607.57
$0.00
$0.00
$371,607.57
$371,574.84
($32.73)
$371,605.86 100%
$0.00
$17,500.00
$0.00
$0.00
$0.00
$17,500.00
$0.00
$17,500.00
$0.00
$0.00
$17,500.00
$17,500.00
$0.00
$17,500.00 100%
$0.00 $14,977,716.98
$15,307,504.90
$0.00 $15,307,504.90
$14,396,606.52
$661,012.73 $15,057,619.25
$0.00
$0.00 $15,057,619.25
($329,787.92)
$353,391.79
$1,424,099.29
$0.00
$0.00
$2,070,630.05 $15,796,615.53
$0.00
$0.00 $15,796,615.53 ($1,597,374.37) ($1,473,222.35) $15,809,808.72 100%
($350,776.26)
$230,470.17
$0.00
$0.00
$230,470.17
$66,221.06
$265,566.34
$230,470.17 100%
$2,281,226.65 ($1,103,856.10)
$1,177,370.55
$0.00
$0.00
$1,177,370.55
$668,653.00
($508,717.55)
$1,177,370.55 100%
$6,127,368.79 $137,594,095.60
$0.00
$0.00 $137,594,095.60 ($2,143,944.81) ($3,902,441.92) $137,586,545.93 100%
$0.00
$0.00
R.G. Jones New K-8
Totals
($261,079.13) $13,561,068.06 100%
OPU#487 Lang ES Abate/Demo 068P2RG Jones Foreign RG Jones
068P2
RG Jones Abate/Demo
$0.00
$292,487.61
$352,566.72
$0.00 $14,687,150.16
$15,044,222.82
$0.00
$352,566.72
$345,555.00
$0.00 $15,044,222.82
$14,407,794.08
$0.00
$292,477.61 100%
OPU#556 077P1Wade Park ES
077P1
($374,865.70) $15,062,015.75 100%
OPU#556 077P2Wade Park ES
077P2
Wade Park Abate/Demo Wade Park Abate/Demo Totals
OPU#080 ES 092P1Charles A. Mooney Charles A. Mooney New K-8
092P1
Charles A. Mooney New K-8
Totals
OPU#080 092P2Charles Mooney ES Charles Mooney Abate/Demo
092P2
Charles Mooney Abate/Demo
$1,273,290.13 ($1,255,790.13)
Totals
OPU#448 102P1Patrick Henry MSPatrick Henry New K-8
102P1
Patrick Henry New K-8
Totals
$11,454,443.79
$3,523,273.19
$835,370.95
$363,317.77
($79,902.27) $15,047,362.22 100%
OPU#448 102P2Patrick Henry MSPatrick Henry Abate/Demo
102P2
Patrick Henry Abate/Demo
Totals
$0.00
$1,198,688.72
$1,127,470.10
$0.00
$1,127,470.10
$1,070,707.50
$0.00 $14,323,393.18
$0.00 $14,323,393.18
$15,920,767.55
$0.00 $15,920,767.55
$13,725,985.48
$0.00
$0.00
$496,036.51
$429,815.45
$0.00
$429,815.45
$0.00
$668,653.00
$0.00
$0.00
$0.00
$1,424,099.29
$71,218.62
($225,410.57)
$1,416,155.29 99%
OPU#624 106P2Willson MS
106P2
Willson New K-8 Willson New K-8
Totals
OPU#624 106P3Willson MS
106P3
Willson Abate/Demo Willson Abate/Demo Totals
$496,036.51
$581,246.43
OPU#030 114P2Westside Relief HS Westside Relief New HS
114P2
Westside Relief New HS
Totals $36,152,160.00($35,483,507.00) $148,278,663.02($14,587,009.34)
GROUP TOTALS
$0.00 $133,691,653.68 $135,835,598.49
$0.00$135,835,598.49 $131,466,726.81
LFI OPU#624 106X2Willsom MS
106X2
Willson LFI Demolition Ph 2 Willson LFI Demolition Ph 2 Totals
OPU# 106X3
Expedition速
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$26,700.00
$0.00
$26,700.00
$26,700.00
$0.00
($26,700.00)
$26,700.00 100%
Willson LFI Additional Parkin
Report M_COST_01_00-2b
District IRN
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Phase Estimate Variance
Est. to Compl.
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
LFI OPU# 106X3
106X3
Willson LFI Additional Parkin Willson LFI Additional Parking Totals GROUP TOTALS
$0.00 $0.00
$0.00 $0.00
SEGMENT PROJECT TOTALS $148,278,663.02 ($14,587,009.34)
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$139,291.60
$20,842.15
$160,133.75
$0.00
$0.00
$160,133.75
$0.00
($160,133.75)
$160,133.75 100%
$0.00
$0.00
$0.00
$0.00
$165,991.60
$20,842.15
$186,833.75
$0.00
$0.00
$186,833.75
$0.00
($186,833.75)
$186,833.75 100%
$6,148,210.94 $137,780,929.35
$0.00
$0.00 $137,780,929.35 ($2,143,944.81) ($4,089,275.67) $137,773,379.68 100%
$0.00 $133,691,653.68 $135,835,598.49
$0.00 $135,835,598.49 $131,632,718.41
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
Expedition速
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($4,089,275.67)
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 04/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#004 010P1Adlai Stevenson Adlai Stevenson New K-8
010P1
Adlai Stevenson New K-8
Totals
$10,434,104.98
$4,441,671.44
$0.00 $14,875,776.42
$14,021,525.81
$0.00 $14,021,525.81
$14,534,499.24
$972,254.70 $15,506,753.94
$0.00
$0.00 $15,506,753.94
$854,250.61
($630,977.52) $15,410,337.66 99%
OPU#004 010P2Adlai Stevenson Adlai Stevenson Abate/Demo
010P2
Adlai Stevenson Abate/Demo
$371,104.82
$44,538.39
$415,643.21
$0.00
$14,916,357.84
$225,412.80
$0.00 $15,141,770.64
$18,980,068.00
$437,521.79
$239,417.06
$0.00
$12,128,122.48
$1,017,763.81
Totals
$0.00
$0.00
$0.00
$358,598.89
$0.00 $18,980,068.00
$16,345,463.16
($168,719.28)
$189,879.61
$0.00
$1,441,289.40 $17,786,752.56
$0.00
$52,500.00
$242,379.61
$415,643.21
$173,263.60
$185,807.91 98%
OPU#021 014P1Anton Grdina ESAnton Grdina New K-8
014P1
Anton Grdina New K-8
Totals
$0.00 $17,786,752.56 ($3,838,297.36) ($2,644,981.92) $17,676,714.21 99%
OPU#021 014P2Anton Grdina ESAnton Grdina Abate/Demo
014P2
Anton Grdina Abate/Demo
Totals
$676,938.85
$0.00
$0.00 $13,145,886.29
$14,147,925.00
$0.00
$0.00
$589,394.06
$0.00 $14,147,925.00
$13,364,973.93
($61,741.88)
$527,652.18
$0.00
$3,049.85
$530,702.03
$676,938.85
$146,236.82
$516,227.18 98%
$862,011.25 $14,226,985.18
$0.00
$0.00 $14,226,985.18 ($1,002,038.71) ($1,081,098.89) $14,191,143.89 100%
OPU#077 ES 023P1Charles Dickens Charles Dickens New K-8
023P1
Charles Dickens New K-8
Totals
OPU#077 ES 023P2Charles Dickens Charles Dickens Abate/Demo
023P2
Charles Dickens Abate/Demo
$366,864.13
$97,643.12
$0.00
$464,507.25
$0.00
$0.00
$0.00
$10,434,104.98 ($9,302,827.10)
$0.00
$1,131,277.88
$0.00
$0.00
$0.00
Totals
$695,613.46
$34,700.00
$730,313.46
$0.00
$0.00
$730,313.46
$464,507.25
($265,806.21)
$730,313.46 100%
$2,547,168.36 ($1,110,706.24)
$1,436,462.12
$0.00
($641,230.76)
$795,231.36
$1,131,277.88
$336,046.52
$1,184,431.27 82%
OPU#079 024P1Charles H Lake ES Charles H Lake New K-8
024P1
Charles H Lake New K-8
Totals
OPU#079 024P2Charles H Lake ES Charles H Lake Abate/Demo
024P2
Totals
$405,732.26
$82,747.96
$0.00
$488,480.22
$0.00
$0.00
$0.00
$505,775.09
$0.00
$505,775.09
$0.00
($17,294.87)
$488,480.22
$488,480.22
$0.00
$492,239.72 97%
Corlett Abate/Demo Corlett Abate/Demo Totals
$306,983.81
$373,876.17
$0.00
$680,859.98
$0.00
$0.00
$0.00
$569,412.06
$142,706.76
$712,118.82
$0.00
($26,538.84)
$685,579.98
$680,859.98
($4,720.00)
$684,459.39 96%
$10,454,887.01
$2,568,118.85
$0.00 $13,023,005.86
$12,751,693.00
$0.00 $12,751,693.00
$13,156,904.30
$1,038,219.82 $14,195,124.12
$0.00
$0.00 $14,195,124.12
$271,312.86 ($1,172,118.26) $14,200,453.13 100%
$1,408,711.57
($863,006.88)
$0.00
$545,704.69
$0.00
$545,704.69
$0.00
$0.00
$545,704.69
$12,128,122.48
$2,197,363.13
$0.00 $14,325,485.61
$15,477,075.00
$637,195.30 $14,116,729.04
$0.00
$0.00 $14,116,729.04 ($1,151,589.39)
$208,756.57 $14,130,403.45 100%
Charles H Lake Abate/Demo
OPU#104 027P2Corlett ES
027P2
OPU#168 035P1Euclid Park ES Euclid Park New K-8
035P1
Euclid Park New K-8
Totals
OPU#168 035P2Euclid Park ES Euclid Park Abate/Demo
035P2
Euclid Park Abate/Demo
Totals
$0.00
$0.00
$512,665.71
$0.00 $15,477,075.00
$13,479,533.74
$33,038.98
$545,704.69
$0.00
$545,688.52 100%
OPU#038 ES 038P1George W CarverGeorge W Carver New K-8
038P1
George W Carver New K-8
Totals
OPU#198 ES 038P2George W CarverGeorge W Carver Abate/Demo
038P2
$445,447.70
$39,201.49
$0.00
$484,649.19
$0.00
$0.00
$0.00
$345,594.69
$168,655.97
$514,250.66
$0.00
$0.00
$514,250.66
$484,649.19
($29,601.47)
$513,949.84 100%
Totals
$531,655.19
$442,928.69
$0.00
$974,583.88
$0.00
$0.00
$0.00
$726,311.99
$300,612.97
$1,026,924.96
$0.00
($10,859.10)
$1,016,065.86
$974,583.88
($41,481.98)
$1,010,869.98 98%
Totals
$12,128,122.48
$1,698,779.82
$0.00 $13,826,902.30
$15,761,397.58
$0.00 $15,761,397.58
$12,841,029.04
$475,640.40 $13,316,669.44
$0.00
Mound Abate/Demo Mound Abate/Demo Totals
$229,816.50
$192,028.67
Totals
$12,128,122.48
$2,487,546.94
Totals
$11,463,972.02($11,164,777.52)
$0.00
$299,194.50
$0.00
$0.00
$0.00
$1,438,196.60
($576,896.00)
$861,300.60
$0.00
($562,105.81)
$299,194.79
$299,194.50
($0.29)
Audubon Abate/Demo Audubon Abate/Demo Totals
$4,460,027.67 ($4,460,027.67)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $12,156,111.19
$14,241,019.00
$0.00 $14,241,019.00
$12,372,949.27
$978,374.22 $13,351,323.49
$0.00
$0.00 $13,351,323.49 ($2,084,907.81) ($1,195,212.30) $13,289,809.97 100%
$215,824.65
$692,543.93
$0.00
$0.00
$1,765,072.48 $17,571,014.26
$0.00
$0.00 $17,571,014.26 ($3,714,521.72)
George W Carver Abate/Demo
Totals
OPU#388 061P2Moses ClevelandMoses Cleveland Abate/Demo
061P2
Moses Cleveland Abate/Demo
OPU#396 062P2Mound ES
062P2
Mound New K-8 Mound New K-8
$0.00 $13,316,669.44 ($1,934,495.28)
$510,232.86 $13,313,707.11 100%
OPU#396 062P3Mound ES
062P3
$0.00
$421,845.17
$0.00
$0.00 $14,615,669.42
$12,542,121.00
$0.00
$0.00
$466,736.80
$0.00 $12,542,121.00
$14,043,407.48
$21,703.01
$488,439.81
$0.00
$799,122.54 $14,842,530.02
$0.00
$1,601.98
$490,041.79
$421,845.17
$0.00 $14,842,530.02
$2,073,548.42
($68,196.62)
$473,368.11 97%
OPU#482 MS 070P1Robert H JamisonRobert H Jamison New K-8
070P1
Robert H Jamison New K-8
($226,860.60) $14,710,308.05 99%
OPU#024 089P1Audubon MS
089P1
Audubon New K-8 Audubon New K-8
$299,194.50 35%
OPU#024 089P2Audubon MS
089P2
$0.00
OPU#411 100P1Nathan Hale MS Nathan Hale New K-8
100P1
Nathan Hale New K-8
Totals
$10,434,104.98
$1,722,006.21
$569,595.39
$106,081.56
OPU#411 100P2Nathan Hale MS Nathan Hale Abate/Demo
100P2
Nathan Hale Abate/Demo
Totals
$0.00
$675,676.95
$0.00
$0.00 $16,820,961.41
$20,535,483.13
$0.00
$0.00
$476,719.28
$0.00 $20,535,483.13
$15,805,941.78
$692,543.93
$675,676.95
($16,866.98)
$692,529.71 100%
OPU#536 MS 103P2Thomas Jefferson Thomas Jefferson New K-8
103P2
Thomas Jefferson New K-8
Totals
$18,228,032.77 ($1,407,071.36)
($750,052.85) $17,502,349.39 100%
OPU#536 MS 103P3Thomas Jefferson Thomas Jefferson Abate/Dem
Expedition速
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Phase Estimate Variance
Est. to Compl.
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#536 MS 103P3Thomas Jefferson Thomas Jefferson Abate/Dem
103P3
Thomas Jefferson Abate/Demo
$952,102.29 $606,621.87 Totals $145,363,617.62 ($8,613,962.55)
GROUP TOTALS
SEGMENT PROJECT TOTALS $145,363,617.62 ($8,613,962.55)
$0.00
$1,558,724.16
$0.00
$0.00
$0.00
$828,166.98
$1,653,791.22
$0.00
$0.00
$1,653,791.22
$1,558,724.16
($95,067.06)
$1,651,291.22 100%
$0.00$138,458,307.52 $136,002,513.17
$8,796,526.03 $144,799,039.20
$0.00 ($1,200,877.55) $143,598,161.65 ($1,708,652.45) ($6,848,506.58) $143,405,597.67 99%
$0.00 $136,749,655.07 $138,458,307.52
$0.00 $138,458,307.52 $136,002,513.17
$8,796,526.03 $144,799,039.20
$0.00 ($1,200,877.55) $143,598,161.65 ($1,708,652.45) ($6,848,506.58) $143,405,597.67 99%
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
Expedition速
$825,624.24
$0.00 $136,749,655.07 $138,458,307.52
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($6,848,506.58)
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 05/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#010 Bell ES Graham Bell Abate 011P1Alexander Graham Alexander
011P1
$0.00
$373,927.00
$373,927.00
$0.00
$13,819,792.33
$0.00
$0.00 $13,819,792.33
$15,208,332.00
$1,756,237.88
$0.00
$0.00
$1,756,237.88
$0.00
$0.00
$0.00
$723,591.67
($66,777.42)
$656,814.25
$0.00
$0.00
$656,814.25
$4,902,995.00
$836,600.83
$0.00
$5,739,595.83
$5,988,862.00
$0.00
$5,988,862.00
$6,350,049.79
$291,703.37
$6,641,753.16
$0.00
$50,362.11
$6,692,115.27
Totals
$13,819,792.33
($143,018.00)
$0.00 $13,676,774.33
$14,971,603.00
$0.00 $14,972,378.74
$16,721,966.48
$407,238.86 $17,129,205.34
$0.00
Totals
$822,935.95
$0.00
$0.00
$822,935.95
$0.00
($57,954.48)
$644,203.52
$0.00
$13,819,792.33
$0.00
$0.00 $13,819,792.33
$15,343,204.00
$336,067.96 $15,793,047.33
$69,981.02
$400,409.02
$0.00
$0.00
$400,409.02
$0.00
$13,819,792.33
$0.00
$0.00 $13,819,792.33
$14,683,492.00
$0.00
$0.00
Alexander Graham Bell Abate/DemTotals
$0.00
$0.00
$0.00
$496,125.69
$0.00 $15,208,332.00
$14,953,469.65
$271.93
$496,397.62
$0.00
$594,751.60 $15,548,221.25
$3,153.32
$323.76
$496,721.38
$373,927.00
($122,794.38)
$407,741.89 82%
OPU#012 013P1Almira ES
013P1
Almira New PreK-8 Almira New PreK-8 Totals
$87,918.53 $15,639,293.10 ($1,388,539.67) ($1,819,500.77) $14,584,389.16 94%
OPU#012 013P2Almira ES
013P2
Almira Abate/Demo Almira Abate/Demo Totals
$1,756,237.88 $1,099,423.63
$656,814.25 100%
OPU#340 ES 052P1Louisa May AlcottLouisa May Alcott Renovation
052P1
Louisa May Alcott Renovation K-5 Totals
($249,266.17)
($952,519.44)
$6,383,443.60 96%
OPU#368 058P1Miles ES
058P1
Miles New PreK-8 Miles New PreK-8
$126,810.62 $17,256,015.96 ($1,295,604.41) ($3,579,241.63) $12,581,636.65 73%
OPU#368 058P2Miles ES
058P2
Miles Abate/Demo Miles Abate/Demo
$0.00
$0.00
$702,158.00
$0.00 $15,343,204.00
$15,456,979.37
$10,402.57
$654,606.09
$822,935.95
$168,329.86
$644,203.52 100%
OPU#436 ScienceSchool New PK-8 065P1Orchard School of Orchard
065P1
Orchard School New PK-8
Totals
$80,791.53 $15,943,819.88 ($1,523,411.67) ($2,124,027.55) $13,644,675.37 86%
OPU#436 SciencePark Abate/Demo 065P2Orchard School of Orchard
065P2
Orchard Park Abate/Demo
Totals
$0.00
$0.00
$514,786.66
$0.00 $14,683,492.00
$15,227,591.60
$41,723.40
$556,510.06
$0.00
$606,509.13 $15,834,100.73
$100,968.58
$0.00
$556,510.06
$400,409.02
($156,101.04)
$556,510.06 100%
OPU#451 ES 066P1Paul Laurence Dunbar Paul Laurence Dunbar PreK-8
066P1
Paul Laurence Dunbar PreK-8
Totals
$64,581.53 $15,999,650.84
($863,699.67) ($2,179,858.51) $14,971,606.91 95%
OPU#451 ES 066P2Paul Laurence Dunbar Paul Laurence Dunbar Abate/
066P2
$288,388.92
Paul Laurence Dunbar Abate/Dem Totals
$288,388.92
$0.00
$0.00 $26,252,144.53
$31,518,397.00
$0.00
$0.00
$456,746.67
($92,651.56)
$364,095.11
$0.00 $31,518,397.00
$3,326,774.37
$414,139.13
$0.00
$0.00
$364,095.11
$288,388.92
($75,706.19)
$364,095.11 100%
$3,740,913.50
$0.00 $28,249,449.69 $31,990,363.19 ($5,266,252.47) ($5,738,218.66)
$2,660,705.36 71%
OPU#801 Arts HS 107P1Cleveland Sch ofCleveland School of Arts New
107P1
Cleveland School of Arts New K-1 Totals
$29,175,112.53 ($2,922,968.00)
OPU#801 of Arts 107P2Cleveland SchoolCleveland School of Arts Aba
107P2
$1,968,266.36
$0.00
$0.00
$1,968,266.36
$0.00
$0.00
$0.00
$1,532,214.00
$134,130.26
$1,666,344.26
$0.00
$0.00
$1,666,344.26
$1,968,266.36
$301,922.10
$1,666,344.26 100%
$11,883,629.38($11,883,629.38)
$0.00
$0.00
$0.00
$0.00
$0.00
$1,046,507.46
($714,538.00)
$331,969.46
$12,223.75
$0.00
$344,193.21
$0.00
($344,193.21)
$314,151.87 95%
$0.00
$0.00
$477,845.69
$0.00
$0.00
$0.00
$378,711.95
($68,512.10)
$310,199.85
$0.00
$0.00
$310,199.85
$477,845.69
$167,645.84
$289,909.02 93%
$17,541,711.93($17,541,711.93)
$0.00
$0.00
$0.00
$0.00
$0.00
$847,238.84
($586,106.20)
$261,132.64
$0.00
$0.00
$261,132.64
$0.00
($261,132.64)
$261,132.64 100%
$0.00
$1,172,419.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,172,419.30
$1,172,419.30
$1,172,419.30
$0.00
$0.00 $43,129,499.56
$45,809,482.00
$0.00 $45,809,482.00
$4,823,762.90
$474,093.00
$5,297,855.90
$0.00 $40,460,100.18 $45,757,956.08 ($2,679,982.44) ($2,628,456.52)
$3,675,787.31 69%
($861,911.42)
$2,511,522.42 100%
Cleveland School of Arts Abate/D Totals
OPU#171 ES/MS 121P1Forest Hill Parkway Forest Hill Parkway New PreK
121P1
Forest Hill Parkway New PreK-8
Totals
OPU#171 121P2Forest Hills Parkwary Forest Hill Parkway Abate/De
121P2
Forest Hill Parkway Abate/Demo
$477,845.69
Totals
OPU#080 129P1Charles Mooney ES Charles Mooney New PK-8
129P1
Charles Mooney New PK-8
Totals
OPU#080 129P2Charles Mooney ES Charles Mooney Abate/Demo
129P2
Charles Mooney Abate/Demo
$1,172,419.30
Totals
$0.00
$0.00
OPU#292 130P1John Marshall HSJohn Marshall New 9-12
130P1
John Marshall New 9-12
Totals
$47,380,879.56 ($4,251,380.00)
OPU#292 130P2John Marshall HSJohn Marshall Abate/Demo
130P2
$0.00
$1,649,611.00
$0.00
$1,649,611.00
$0.00
$0.00
$0.00
$1,839,469.06
$672,053.36
$2,511,522.42
$0.00
$0.00
$2,511,522.42
Totals
$0.00
$994,875.00
$0.00
$994,875.00
$0.00
$0.00
$0.00
$4,880,554.59
$1,298,677.47
$6,179,232.06
$0.00
$0.00
$6,179,232.06
$994,875.00 ($5,184,357.06)
$5,270,757.81 85%
Max Hayes New 9-12 Max Hayes New 9-12 Totals
$35,896,791.80
$0.00
$0.00 $35,896,791.80
$43,665,232.75
$0.00 $43,665,232.75
$1,723,705.00
$2,092,907.69
$3,816,612.69
$0.00 $39,438,260.49 $43,254,873.18 ($7,768,440.95) ($7,358,081.38)
$2,404,446.79 63%
$0.00 $21,661,236.00
$0.00
$108,043.00
$1,955,824.58
John Marshall Abate/Demo
Totals
$1,649,611.00
OPU#066 130P3CarlSchuler/058 Brooklawn John Marshall SS CarlSchule
130P3
John Marshall SS CarlSchuler
OPU#349 131P1Max Hayes HS
131P1
OPU# HS 132P1West Side Reilef West Side Relief New 9-12
132P1
West Side Relief New 9-12
$0.00 Totals $21,661,236.00 $230,608,028.64($32,887,693.48)
GROUP TOTALS
$0.00 $197,720,335.16 $187,188,604.75
$0.00
$0.00
$1,847,781.58
$0.00$187,189,380.49
$93,850,185.33
$5,885,770.40 $99,735,955.73
$0.00 $20,220,610.29 $22,176,434.87 $21,661,236.00
($515,198.87)
$843,354.80 43%
$186,326.67 $129,962,030.60 $229,884,313.00 $10,530,954.67$32,163,977.84) $84,693,228.80 85%
LFI OPU#349 131X1Max Hayes HS
131X1
Max Hayes LFI Clark Ave Max Hayes LFI Clark Ave Totals
OPU#349 131X2Max Hayes HS
Expedition速
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$53,698.71
($5,866.40)
$47,832.31
$0.00
$0.00
$47,832.31
$0.00
($47,832.31)
$47,859.31 100%
Max Hayes LFI Walworth Ave
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
LFI OPU#349 131X2Max Hayes HS
131X2
Max Hayes LFI Walworth Ave Max Hayes LFI Walworth Ave Totals GROUP TOTALS
$0.00 $0.00
$0.00 $0.00
SEGMENT PROJECT TOTALS $230,608,028.64 ($32,887,693.48)
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$444,425.00
$77,803.19
$522,228.19
$0.00
$0.00
$522,228.19
$0.00
($522,228.19)
$500,925.82 96%
$0.00
$0.00
$0.00
$0.00
$498,123.71
$71,936.79
$570,060.50
$0.00
$0.00
$570,060.50
$0.00
($570,060.50)
$548,785.13 96%
$0.00 $197,720,335.16 $187,188,604.75
$0.00 $187,189,380.49 $94,348,309.04
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
Expedition速
$5,957,707.19 $100,306,016.23
$186,326.67 $129,962,030.60 $230,454,373.50 $10,530,954.67$32,734,038.34) $85,242,013.93 85%
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($32,734,038.34)
Report M_COST_01_00-2b
District IRN 43786
SEGMENT PROJECT COST REPORT All Projects/ Segment 06/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
*Some information not displayed due to security restrictions.
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 1 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU#636 ES 019P1Buckeye-Woodland New PK-8 Buckeye-Woodland
019P1
Buckeye-Woodland New PK-8
Totals
$14,169,635.00
$0.00
$0.00 $14,169,635.00
$0.00
$0.00
$0.00
$759,040.00
$0.00
$759,040.00
$0.00 $13,231,480.25 $13,990,520.25 $14,169,635.00
$179,114.75
$0.00
$201,600.00
$0.00
$0.00
$0.00 $13,231,480.25 $13,925,767.25 $14,169,635.00
$243,867.75
$0.00
0%
OPU#636 ES 019P2Buckeye-Woodland Abate/De Buckeye-Woodland
019P2
Totals
$201,600.00
$0.00
$0.00
$201,600.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Totals
$14,169,635.00
$0.00
$0.00 $14,169,635.00
$0.00
$0.00
$0.00
$694,287.00
$0.00
$694,287.00
Totals
$325,714.13
$0.00
$0.00
$325,714.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$325,714.13
$325,714.13
$325,714.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Totals
$14,169,635.00
$0.00
$0.00 $14,169,635.00
$0.00
$0.00
$0.00
$665,128.00
$0.00
$665,128.00
$0.00 $13,231,480.25 $13,896,608.25 $14,169,635.00
$273,026.75
$0.00
Totals
$1,569,275.19
$0.00
$0.00
$1,569,275.19
$0.00
$0.00
$0.00
$68,629.27
$0.00
$68,629.27
$0.00
$1,367,394.01
$1,436,023.28
$1,569,275.19
$133,251.91
Giddings Abate/Demo Giddings Abate/Demo Totals
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$361,154.82
$0.00
$0.00
$361,154.82
$0.00
$0.00
$0.00
$459,454.80
($7,023.83)
$452,430.97
$0.00
$2,857.19
$455,288.16
$361,154.82
($94,133.34)
$439,067.96 97%
$378,194.46
$0.00
$0.00
$378,194.46
$0.00
$0.00
$0.00
$65,753.24
$0.00
$65,753.24
$0.00
$329,669.91
$395,423.15
$378,194.46
($17,228.69)
$10,319.24 16%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$369,225.05
$0.00
$0.00
$369,225.05
$0.00
$0.00
$0.00
$597,416.73
($89,442.00)
$507,974.73
$0.00
$2,921.04
$510,895.77
$369,225.05
($141,670.72)
$474,081.40 93%
$276,520.70
$0.00
$0.00
$276,520.70
$0.00
$0.00
$0.00
$48,763.00
$0.00
$48,763.00
$0.00
$259,114.81
$307,877.81
$276,520.70
($31,357.11)
$0.00
$378,065.75
$0.00
$0.00
$378,065.75
$0.00
$0.00
$0.00
$582,603.60
($118,844.16)
$463,759.44
$0.00
$2,990.97
$466,750.41
$378,065.75
($88,684.66)
$443,637.61 96%
Totals
$364,859.50
$0.00
$0.00
$364,859.50
$0.00
$0.00
$0.00
$51,016.00
$0.00
$51,016.00
$0.00
$341,893.01
$392,909.01
$364,859.50
($28,049.51)
$0.00
Robert Fulton Abate/Demo Robert Fulton Abate/Demo Totals
$495,205.53
$0.00
$0.00
$495,205.53
$0.00
$0.00
$0.00
$66,105.29
$0.00
$66,105.29
$0.00
$431,666.39
$497,771.68
$495,205.53
($2,566.15)
$11,246.29 17%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Totals
$266,534.47
$0.00
$0.00
$266,534.47
$0.00
$0.00
$0.00
$613,216.86
$0.00
$613,216.86
$0.00
$2,452.43
$615,669.29
$266,534.47
($349,134.82)
Union Abate/Demo Union Abate/Demo Totals
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$789,816.28
$0.00
$0.00
$789,816.28
$0.00
$0.00
$0.00
$934,513.37
$66,315.62
$1,000,828.99
$0.00
$6,427.75
$1,007,256.74
$789,816.28
($217,440.46)
$826,902.26 83%
$515,508.42
$0.00
$0.00
$515,508.42
$0.00
$0.00
$0.00
$1,045,673.53
($89,664.60)
$956,008.93
$0.00
$6,346.39
$962,355.32
$515,508.42
($446,846.90)
$938,597.70 98%
$3,379,297.29
$0.00
$0.00
$3,379,297.29
$0.00
$0.00
$0.00
$51,016.00
$0.00
$51,016.00
$0.00
$3,166,583.75
$3,217,599.75
$3,379,297.29
$161,697.54
Buckeye-Woodland Abate/Demo
$0.00
$201,600.00
$201,600.00
OPU#068 022P1Case ES
022P1
Case New PK-8 Case New PK-8
0%
OPU#068 022P2Case ES
022P2
Case Abate/Demo Case Abate/Demo
OPU#165 033P1Emile B. deSauzeEmile B. deSauze Abate/Dem
033P1
Emile B. deSauze Abate/Demo
Totals
OPU#164 ES 034P1Empire Computech New PK-8 Empire/Glenville
034P1
Empire/Glenville New PK-8
0%
OPU#164 ES Abate/Demo 034P2Empire Computech Empire
034P2
Empire Abate/Demo
$7,834.27 11%
OPU#200 039P1Giddings ES
039P1
$0.00
OPU#225 040P1Gracemount ES Gracemount Abate/Demo
040P1
Gracemount Abate/Demo
Totals
OPU#252 ES Longfellow Abate/Demo 041P1H.W. Longfellow H.W.
041P1
H.W. Longfellow Abate/Demo
Totals
OPU#094 045P1J.D. Rockefeller ES J.D. Rockefeller Abate/Demo
045P1
J.D. Rockefeller Abate/Demo
Totals
$0.00
OPU#294 046P1John W Raper ESJohn W Raper Abate/Demo
046P1
John W Raper Abate/Demo
Totals
OPU#295 ES 047P1Joseph F. LandisJoseph F. Landis Abate/Demo
047P1
Joseph F. Landis Abate/Demo
Totals
0%
OPU#339 051P1Louis Pasteur ESLouis Pasteur Abate/Demo
051P1
Louis Pasteur Abate/Demo
Totals
OPU#400 063P1Mount Auburn ESMount Auburn Abate/Demo
063P1
Mount Auburn Abate/Demo
0%
OPU#486 069P1Robert Fulton
069P1
OPU#482 ES H. Jamison Abate/Dem 070P2Robert H. Jasmison Robert
070P2
Robert H. Jamison Abate/Demo
Totals
$0.00
OPU#525 ES 072P1Stephen E. HoweStephen E Howe Abate/Demo
072P1
Stephen E Howe Abate/Demo
$116,763.36 19%
OPU#548 075P1Union ES
075P1
$0.00
OPU#005 087P1Albert B Hart MS Albert B Hart Abate/Demo
087P1
Albert B Hart Abate/Demo
Totals
OPU#009 088P1Alexander Hamilton Alexander Hamilton Abate/De
088P1
Alexander Hamilton Abate/Demo Totals
OPU#024 089P3Audubon MS
089P3
Audubon Abate/Demo Audubon Abate/Demo Totals
$0.00
OPU# 124P1Jesse Owens Academy Jesse CLC Owens Academy Abate
Expedition速
Report M_COST_01_00-2b
0%
District IRN 43786
SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193
Date: Page:
PHASE ESTIMATE
FUNDING Project
Description
Original Project Agmt Budget
Approved NOI/AMD Changes
Pending NOI Changes
Projected Budget
Project Estimate
Estimate Adjustments
COMMITTED
Current Estimate
Original Committment
Approved Changes
Revised Committment
12/2/2013 2 of 2
STATUS
Pending Changes
Potential Costs
Projected Committment
Est. to Compl.
Phase Estimate Variance
Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment
Billed to Date
TYPICAL OPU# 124P1Jesse Owens Academy Jesse CLC Owens Academy Abate
124P1
Jesse Owens Academy Abate/DemTotals GROUP TOTALS SEGMENT PROJECT TOTALS
$251,344.78 $52,431,221.37
$52,431,221.37
$251,344.78
$0.00
$0.00
$0.00
$66,793.21
$0.00
$66,793.21
$251,344.78
($33,907.75)
$43,961.47 66%
$0.00
$0.00
$0.00
$0.00
$52,431,221.37
$0.00
$0.00
$0.00
$6,769,409.90
($238,658.97)
$6,530,750.93
$0.00 $46,360,531.85 $52,891,282.78 $52,431,221.37
($460,061.41)
$3,312,411.56 51%
$0.00
$0.00
$52,431,221.37
$0.00
$0.00
$0.00
$6,769,409.90
($238,658.97)
$6,530,750.93
$0.00 $46,360,531.85 $52,891,282.78 $52,431,221.37
($460,061.41)
$3,312,411.56 51%
Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).
Expedition速
$0.00
$218,459.32
$285,252.53
PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)
($460,061.41)
Report M_COST_01_00-2b
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
2012 AUG
JUL
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Bid & Award
0130001005
Bid Opening
0
12APR12A
0
100
0130001010
Bid Evaluation and Award
22
12APR12A
11MAY12A
0
100
0130001015
NTP - BP 061,210,220,230,260,270,300,310,329
0
23MAY12A
0
100
0130001075
Site Mobilization - BP 310 Site Work
10
05JUN12A
08JUN12A
0
100
0130001090
Construction Kick-off Meeting
1
05JUN12A
05JUN12A
0
100
0130001025
Prime Contractors Submit Schedules
5
16JUL12A
20SEP12A
0
100
0130001020
Site Mobilization - BP 061 General Trades
5
23JUL12A
25JUL12A
0
100
0130001060
Site Mobilization - BP 260 Electrical
5
03AUG12A
24AUG12A
0
100
0130001030
Schedule Meeting(s) to Review Schedule
5
09AUG12A
09AUG12A
0
100
0130001035
Prime Contractors/CM Final Review Schedule
5
10AUG12A
17AUG12A
0
100
0130001050
Site Mobilization - BP 220 Plumbing
5
13AUG12A
13AUG12A
0
100
0130001040
Contractors Sign Off - Project Baseline Schedule
0
14SEP12A
0
100
0130001055
Site Mobilization - BP 230 HVAC
5
17JAN13A
17JAN13A
0
100
0130001045
Site Mobilization - BP 210 Fire Protection
5
30JAN13A
30JAN13A
0
100
0130001065
Site Mobilization - BP 270 Technology
5
20MAY13A
20MAY13A
0
100
0130001070
Site Mobilization - BP 300 Site Concrete
1
22JUL13A
22JUL13A
0
100
Bid Opening Bid Evaluation and Award NTP - BP 061,210,220,230,260,270,300,310,329 Site Mobilization - BP 310 Site Work Construction Kick-off Meeting Prime Contractors Submit Schedules Site Mobilization - BP 061 General Trades Site Mobilization - BP 260 Electrical Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Site Mobilization - BP 220 Plumbing Contractors Sign Off - Project Baseline Schedule Site Mobilization - BP 230 HVAC Site Mobilization - BP 210 Fire Protection Site Mobilization - BP 270 Technology Site Mobilization - BP 300 Site Concrete
0130001080
Site Mobilization - BP 329 Landscaping
5
16SEP13*
20SEP13
5
0
Site Mobilization - BP 329 Landscaping
0130001085
Site Mobilization - BP 121 FF & E
5
16SEP13*
20SEP13
5
0
Site Mobilization - BP 121 FF & E
Submittals & Approvals
Site Submittals
0130002025
Site Submittals
5
11MAY12A
24JUN13A
0
100
0130002080
Review and Approval Site Submittal
5
14MAY12A
01AUG13A
0
100
0130002005
Submittal Plumbing
8
08JUN12A
01OCT12A
0
100
0130002030
Submittal Concrete/Rebar
5
12JUN12A
13JUN12A
0
100
0130002075
Review and Approval Plumbing Submittal
15
12JUN12A
30NOV12A
0
100
0130002085
Review and Approval Concrete & Rebar
5
15JUN12A
02JUL12A
0
100
Review and Approval Concrete & Rebar
0130002010
Submittal HVAC Equipment
14
18JUN12A
02JUL12A
0
100
Submittal HVAC Equipment
0130002020
Submittal Electrical
20
18JUN12A
03OCT12A
0
100
0130002050
Submittal Fire Alarm
20
18JUN12A
26OCT12A
0
100
0130002115
Review and Approve HVAC Submittal
15
19JUN12A
07SEP12A
0
100
0130002130
Review & App Electric Submittal
15
20JUN12A
17OCT12A
0
100
0130002035
Submittal Block and Mortar
10
26JUN12A
27JUN12A
0
100
Submittal Block and Mortar
0130002040
Submittal CMU Veneer and Mortar
10
26JUN12A
29JUN12A
0
100
Submittal CMU Veneer and Mortar
0130002090
Review and Approval Block and Mortar
0
29JUN12A
27JUL12A
0
100
0130002060
Submittal HM Frame
20
01JUL12A
01AUG12A
0
100
0130002100
Review and Approval CMU Veneer and Mortar
15
02JUL12A
13JUL12A
0
100
0130002045
Submittal Structural Steel/Joists/Deck
45
19JUL12A
23JUL12A
0
100
0130002110
Review and Approval Structural Steel/Joists/Deck
45
24JUL12A
13SEP12A
0
100
0130002120
Review and Approval HM Frames
15
02AUG12A
24SEP12A
0
100
0130002015
Coordination Drawing Meetings HVAC/E/P/FP/GTC
45
15AUG12A
19OCT12A
0
100
0130002135
City Review & Approval Fire Protection Submittal
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
20
10SEP12A
01OCT12A
0
Review and Approval Site Submittal Submittal Plumbing Submittal Concrete/Rebar Review and Approval Plumbing Submittal
Submittal Electrical Submittal Fire Alarm Review and Approve HVAC Submittal Review & App Electric Submittal
Review and Approval Block and Mortar Submittal HM Frame Review and Approval CMU Veneer and Mortar Submittal Structural Steel/Joists/Deck Review and Approval Structural Steel/Joists/Deck Review and Approval HM Frames Coordination Drawing Meetings HVAC/E/P/FP/GTC City Review & Approval Fire Protection Submittal
100
Early Bar Progress Bar Critical Activity
AL12 - MonthlyRpt - 11x17
Sheet 1 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
2012 AUG
JUL
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Review and Approval Roofing Submittal
0130001125
Review and Approval Roofing Submittal
15
02OCT12A
17OCT12A
0
100
0130002055
Submittal Roofing
20
02OCT12A
02OCT12A
0
100
Submittal Roofing
0130002070
Submittal / Shop Drawings Fire Protection
35
03OCT12A
03OCT12A
0
100
Submittal / Shop Drawings Fire Protection
0130002140
Review and Approval Fire Protection Submittal
15
03OCT12A
26OCT12A
0
100
Review and Approval Fire Protection Submittal Review Coordination Drawings and Sign-Off
0130002150
Review Coordination Drawings and Sign-Off
15
23OCT12A
23OCT12A
0
100
0130002065
Submittal Windows and Curtain Wall
40
26OCT12A
28DEC12A
0
100
0130002160
Review & App Fire Alarm Submittal
15
26OCT12A
21NOV12A
0
100
0130002145
Review and Approve Windows and Curtain Wall
15
28DEC12A
28MAR13A
0
100
0130003010
Delivery of Site Materials
10
13JUN12A
03JUL12A
0
100
0130003025
Fabrication and Delivery - CMU Veneer
35
16JUL12A
08MAY13A
0
100
0130003015
Fabrication and Deliver Concrete Steel/Rebar
5
23JUL12A
29MAR13A
0
100
0130003020
Fabrication and Delivery - CMU Units
5
02AUG12A
04JAN13A
0
100
0130003005
Delivery of Plumbing Material
5
06AUG12A
02NOV12A
0
100
0130003040
Fab & Deliver HVAC Units
60
10SEP12A
01MAY13A
0
100
0130003050
Fabrication and Delivery - HM Frames
30
12SEP12A
05APR13A
0
100
0130003030
Fabrication and Deliver - Structural Steel
40
18SEP12A
17JAN13A
0
100
Fabrication and Deliver - Structural Steel
0130003035
Fabrication and Delivery Steel Joists Deck-Roof
60
18SEP12A
17JAN13A
0
100
Fabrication and Delivery Steel Joists Deck-Roof
0130003045
Fabrication and Delivery - Roofing Materials
40
18OCT12A
29MAR13A
0
100
0130003055
Fabrication and Delivery -Windows & Curtain Wall
80
01APR13A
06SEP13
4
95
0135004030
Rough Grade / Building Pad
5
13JUN12A
13JUL12A
0
100
Rough Grade / Building Pad
0135004005
North Parking Lot Storm Sewer
15
18JUN12A
06JUL12A
0
100
North Parking Lot Storm Sewer
0135004015
Sanitary Sewer
5
25JUN12A
06JUL12A
0
100
Sanitary Sewer
0135004070
South Storm Sewer
3
26JUN12A
06JUL12A
0
100
South Storm Sewer
0135004035
Water & Fire Line
10
06JUL12A
25JUL12A
0
100
Water & Fire Line
0135004020
Access Roads / Laydown / Parking
15
12JUL12A
24JUL12A
0
100
Access Roads / Laydown / Parking
0135004040
Electrical Duct Banks
10
12SEP12A
29OCT12A
0
100
Submittal Windows and Curtain Wall Review & App Fire Alarm Submittal Review and Approve Windows and Curtain Wall
Fab & Deliver
Delivery of Site Materials Fabrication and Delivery - CMU Veneer Fabrication and Deliver Concrete Steel/Rebar Fabrication and Delivery - CMU Units Delivery of Plumbing Material Fab & Deliver HVAC Units Fabrication and Delivery - HM Frames
Fabrication and Delivery - Roofing Materials Fabrication and Delivery -Windows & Curtain Wall
Construction Sitework
Electrical Duct Banks Set Transformer Vault
0135004045
Set Transformer Vault
2
01OCT12A
01OCT12A
0
100
0131104030
Generator Enclosure Concrete & Masonry
15
24MAY13A
17SEP13
11
27
0135004050
Set Permanent Transformer
3
17JUN13A
17JUN13A
0
100
Set Permanent Transformer
0135004060
Energize Transformer
1
18JUN13A
18JUN13A
0
100
Energize Transformer
0135004085
Finish Grading
5
15JUL13A
03SEP13
1
80
0135004190
Site Lighting Conduit
2
15JUL13A
16JUL13A
0
100
0135004115
Site Concrete - North
7
22JUL13A
14AUG13A
0
100
0135004150
Ornamental Fence Posts @ West
3
24JUL13A
03SEP13
1
67
Ornamental Fence Posts @ West
0135004160
Site Concrete - West
7
24JUL13A
03SEP13
1
86
Site Concrete - West
0135004135
Site Concrete - East
8
14AUG13A
05SEP13
3
63
Site Concrete - East
0135004055
Exterior Building Light Fixtures
10
03SEP13
16SEP13
10
0
0135004200
Light Pole Bases
3
03SEP13
05SEP13
3
0
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Generator Enclosure Concrete & Masonry
Finish Grading Site Lighting Conduit Site Concrete - North
Exterior Building Light Fixtures Light Pole Bases AL12 - MonthlyRpt - 11x17
Sheet 2 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
0135004100
Site Concrete - South
3
04SEP13
06SEP13
3
0
Site Concrete - South
0135004170
Playground Asphalt
1
04SEP13
04SEP13
1
0
Playground Asphalt
0135004180
Playground Structure
10
05SEP13
18SEP13
10
0
0135004110
Light Poles & Wiring
4
06SEP13
11SEP13
4
0
0135004120
Paving and Striping
4
12SEP13
17SEP13
4
0
Paving and Striping
0135004125
Site Fencing
10
18SEP13
01OCT13
10
0
Site Fencing
0135004140
Soft Surface
5
19SEP13
25SEP13
5
0
0135004130
Landscaping
5
02OCT13
08OCT13
5
0
0131104005
Foundations Area A
15
23JUL12A
12SEP12A
0
100
0131104010
Rough-in Plumbing U/G - Area A
17
06AUG12A
05SEP12A
0
100
0131104025
Masonry Bearing Walls Area A
25
06AUG12A
21NOV12A
0
100
Masonry Bearing Walls Area A
0131104020
In-wall Electrical Rough-in Area A First Floor
25
22AUG12A
21NOV12A
0
100
In-wall Electrical Rough-in Area A First Floor
0131104305
In Wall Plumbing Rough In
25
04SEP12A
21NOV12A
0
100
In Wall Plumbing Rough In
0131104035
Rough-in Electric U/G - Area A
15
05SEP12A
31OCT12A
0
100
0131104055
Door Frames Area A First Floor
20
17SEP12A
21NOV12A
0
100
0131104040
Plumbing Slab Prep
3
05OCT12A
25OCT12A
0
100
Plumbing Slab Prep
0131104045
Place Slab on Grade Area A
10
08OCT12A
26OCT12A
0
100
Place Slab on Grade Area A
0131104050
Complete In-wall Electrical Rough-in Area A
20
11OCT12A
04FEB13A
0
100
Complete In-wall Electrical Rough-in Area A
0131104060
Interior Masonry Walls Area A First Floor
20
11OCT12A
04FEB13A
0
100
Interior Masonry Walls Area A First Floor
0131104110
Rough-in HVAC Ductwork - Area A First Floor
30
03JAN13A
31MAY13A
0
100
0131104125
Rough-in HVAC Piping - Area A First Floor
30
14JAN13A
21JUN13A
0
100
Rough-in HVAC Piping - Area A First Floor
0131104085
Overhead Rough-in Elec & FA - Area First Floor
35
15JAN13A
21JUN13A
0
100
Overhead Rough-in Elec & FA - Area First Floor
0131104100
E.C. / Rough-in Tech Area A - First Floor
30
15JAN13A
21JUN13A
0
100
E.C. / Rough-in Tech Area A - First Floor
0131104115
Overhead Rough-in Plumbing - Area A First Floor
30
21JAN13A
17MAY13A
0
100
0131104120
Rough-in Fire Prot - Area A First Floor
20
31JAN13A
19JUN13A
0
100
0131104075
Metal Studs Area A First Floor
10
18FEB13A
22FEB13A
0
100
0131104295
Electrical Rough-in - Stud Walls
10
18FEB13A
10APR13A
0
100
0131104140
Rough-in HVAC Insulation - Area A First Floor
30
26MAR13A
14JUN13A
0
100
DEC
Playground Structure Light Poles & Wiring
Soft Surface Landscaping
Area A First Floor Foundations Area A Rough-in Plumbing U/G - Area A
Rough-in Electric U/G - Area A Door Frames Area A First Floor
Rough-in HVAC Ductwork - Area A First Floor
Overhead Rough-in Plumbing - Area A First Floor Rough-in Fire Prot - Area A First Floor Metal Studs Area A First Floor Electrical Rough-in - Stud Walls Rough-in HVAC Insulation - Area A First Floor Stair A,B
0131104135
Stair A,B
10
01APR13A
17APR13A
0
100
0131104065
CMU Veneer Area A First Floor
15
05APR13A
24MAY13A
0
100
0131104150
Stair Concrete Pan Fill - A,B
10
12APR13A
19APR13A
0
100
0131104160
Drywall & Tape Area A First Floor
15
01MAY13A
26JUN13A
0
100
0131104155
Standpipe / Hose Cabinet
3
15MAY13A
07AUG13A
0
100
0131104170
Technology Contractor Rough-in - First Floor
15
20MAY13A
19JUL13A
0
100
Technology Contractor Rough-in - First Floor
0131104165
Prime Paint Area A First Floor
20
22MAY13A
19JUL13A
0
100
Prime Paint Area A First Floor
0131104175
Ceiling Grid Area A First Floor
20
28MAY13A
03JUL13A
0
100
CMU Veneer Area A First Floor Stair Concrete Pan Fill - A,B Drywall & Tape Area A First Floor Standpipe / Hose Cabinet
Ceiling Grid Area A First Floor Frost Slabs
0131104070
Frost Slabs
5
17JUN13A
27JUN13A
0
100
0131104190
Lights in Grid - Area A - First Floor
10
19JUN13A
16AUG13A
0
100
0131104185
HVAC Finishes - Area A First Floor
10
24JUN13A
01AUG13A
0
100
HVAC Finishes - Area A First Floor
0131104180
Fire Prot Finishes - Area A First Floor
10
02JUL13A
01AUG13A
0
100
Fire Prot Finishes - Area A First Floor
0131104195
Finish Paint Area A First Floor
20
08JUL13A
04SEP13
2
90
0131104230
Technology Finishes Area A - First Floor
10
10JUL13A
03SEP13
1
90
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Lights in Grid - Area A - First Floor
Finish Paint Area A First Floor Technology Finishes Area A - First Floor
AL12 - MonthlyRpt - 11x17
Sheet 3 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Ceramic Floor Tile Area A First Floor
0131104225
Ceramic Floor Tile Area A First Floor
20
11JUL13A
18JUL13A
0
100
0131104215
Millwork Area A First Floor
20
16JUL13A
04SEP13
2
90
0131104210
Electric & FA Finishes - Area A First Floor
15
17JUL13A
03SEP13
1
93
Electric & FA Finishes - Area A First Floor
0131104240
Plumbing Finishes - Area A First Floor
20
18JUL13A
09SEP13
5
75
Plumbing Finishes - Area A First Floor
0131104220
VCT / VET Area A First Floor
20
22JUL13A
06SEP13
4
80
VCT / VET Area A First Floor
0131104145
Elevator
20
07AUG13A
05SEP13
3
85
Elevator
0131104205
Ceiling Pads Area A First Floor
10
28AUG13A
13SEP13
9
10
0131104200
Above Ceiling Inspections Complete
0
03SEP13
0131104245
Carpet Area A First Floor
20
05SEP13
0131104255
Toilet Partitions Area A First Floor
10
0131104090
Set Windows Area A First Floor
15
Millwork Area A First Floor
Ceiling Pads Area A First Floor Above Ceiling Inspections Complete
0
0
02OCT13
20
0
05SEP13
18SEP13
10
0
09SEP13
27SEP13
15
0
Set Windows Area A First Floor
Carpet Area A First Floor Toilet Partitions Area A First Floor
0131104260
Doors & Hardware Area A First Floor
10
19SEP13
02OCT13
10
0
Doors & Hardware Area A First Floor
0131104265
Marker / Tack Boards Area A First Floor
10
19SEP13
02OCT13
10
0
Marker / Tack Boards Area A First Floor
0131104280
Toilet Accessories Area A First Floor
5
19SEP13
25SEP13
5
0
Toilet Accessories Area A First Floor
0131104270
Projection Screens Area A First Floor
5
26SEP13
02OCT13
5
0
0131104275
Signage Area A First Floor
5
26SEP13
02OCT13
5
0
0131104105
Building Final Area Enclosure
0
0131104285
FF & E Area A First Floor
3
27SEP13
0
0
03OCT13
07OCT13
3
0
Projection Screens Area A First Floor Signage Area A First Floor Building Final Area Enclosure FF & E Area A First Floor
Second Floor Mechanical Room 0132134015
Wall Electrical Rough-in
15
01APR13A
19APR13A
0
100
Wall Electrical Rough-in
0132134005
Set HVAC Equipment
10
15APR13A
17APR13A
0
100
Set HVAC Equipment
0132134035
HVAC Rough-in - Ductwork
15
22APR13A
02JUL13A
0
100
HVAC Rough-in - Ductwork
0132134040
HVAC Rough-in - Piping
15
23APR13A
12JUL13A
0
100
HVAC Rough-in - Piping
0132134020
Overhead Elec. & Fire Alarm Rough-in
30
22MAY13A
16AUG13A
0
100
0132134025
Fire Protection Rough-in
5
24MAY13A
07JUN13A
0
100
0132134055
Fire Protection Finishes
5
02JUL13A
12JUL13A
0
100
0132134045
HVAC Rough-in - Insulation
15
14AUG13A
05SEP13
3
80
0132134030
Lighting
5
16AUG13A
20AUG13A
0
100
0132134060
Electric & Fire Alarm Finishes
25
16AUG13A
05SEP13
3
88
Electric & Fire Alarm Finishes HVAC Finishes
Overhead Elec. & Fire Alarm Rough-in Fire Protection Rough-in Fire Protection Finishes HVAC Rough-in - Insulation Lighting
0132134065
HVAC Finishes
10
20AUG13A
04SEP13
2
80
0131204010
Structural Steel & Metal Decking
10
25OCT12A
30NOV12A
0
100
0131204035
Electrical Rough-in on Metal Deck
5
26NOV12A
05DEC12A
0
100
Electrical Rough-in on Metal Deck
0131204045
Slab on Metal Deck
2
03DEC12A
07DEC12A
0
100
Slab on Metal Deck
0131204020
In-wall Electrical Rough-in Area A Second Floor
10
10DEC12A
29MAR13A
0
100
0131204025
Masonry Bearing Walls Area A
10
10DEC12A
08JAN13A
0
100
0131204055
Door Frames Area A Second Floor
15
10DEC12A
04MAR13A
0
100
0131204130
In Wall Plumbing Rough In
10
10DEC12A
24MAY13A
0
100
0131204060
Interior Masonry Walls Area A Second Floor
10
25JAN13A
30MAY13A
0
100
0131204110
Rough-in HVAC Ductwork - Area A Second Floor
30
28JAN13A
13JUN13A
0
100
Rough-in HVAC Ductwork - Area A Second Floor
0131204125
Rough-in HVAC Piping - Area A Second Floor
30
06FEB13A
13JUN13A
0
100
Rough-in HVAC Piping - Area A Second Floor
0131204115
Overhead Rough-in Plumbing - Area A Second Floor
20
07FEB13A
24JUN13A
0
100
0131204075
Metal Studs Area A Second Floor
10
18FEB13A
26APR13A
0
100
0131204100
E.C. / Rough-in Tech Area A - Second Floor
30
18FEB13A
27MAY13A
0
100
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Structural Steel & Metal Decking
In-wall Electrical Rough-in Area A Second Floor Masonry Bearing Walls Area A Door Frames Area A Second Floor In Wall Plumbing Rough In Interior Masonry Walls Area A Second Floor
Overhead Rough-in Plumbing - Area A Second Floor Metal Studs Area A Second Floor E.C. / Rough-in Tech Area A - Second Floor
AL12 - MonthlyRpt - 11x17
Sheet 4 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Complete In-wall Electrical Rough-in Area A
0131204050
Complete In-wall Electrical Rough-in Area A
15
01APR13A
16MAY13A
0
100
0131204085
Overhead Rough-in Elec & FA - Area Second Floor
35
08APR13A
10JUL13A
0
100
0131204070
Equipment Pads
5
11APR13A
12APR13A
0
100
0131204120
Rough-in Fire Prot - Area A Second Floor
20
18APR13A
14JUN13A
0
100
0131204160
Drywall & Tape Area A Second Floor
15
09MAY13A
15JUL13A
0
100
0131204065
CMU Veneer Area A Second Floor
20
13MAY13A
25JUN13A
0
100
0131204150
Technology Contractor Rough-in - Second Floor
15
22MAY13A
05JUL13A
0
100
0131204175
Ceiling Grid Area A Second Floor
20
10JUN13A
01JUL13A
0
100
Ceiling Grid Area A Second Floor
0131204165
Prime Paint Area A Second Floor
20
11JUN13A
01JUL13A
0
100
Prime Paint Area A Second Floor
0131204140
Rough-in HVAC Insulation Area A - Second Floor
30
12JUN13A
03JUL13A
0
100
Rough-in HVAC Insulation Area A - Second Floor
0131204155
Standpipe / Hose Cabinet
3
14JUN13A
20JUN13A
0
100
0131204190
Lights in Grid - Area A - Second Floor
10
20JUN13A
03JUL13A
0
100
0131204185
HVAC Finishes - Area A Second Floor
10
26JUN13A
12JUL13A
0
100
0131204180
Fire Prot Finishes - Area A Second Floor
10
08JUL13A
02AUG13A
0
100
0131204210
Electric & FA Finishes - Area A Second Floor
15
10JUL13A
03SEP13
1
93
0131204205
Ceiling Pads Area A Second Floor
10
15JUL13A
12SEP13
8
20
0131204230
Technology Finishes Area A - Second Floor
10
17JUL13A
03SEP13
1
90
0131204225
Ceramic Floor Tile Area A Second Floor
20
19JUL13A
05AUG13A
0
100
0131204195
Finish Paint Area A Second Floor
20
23JUL13A
03SEP13
1
95
Finish Paint Area A Second Floor
0131204215
Millwork Area A Second Floor
20
31JUL13A
05SEP13
3
85
Millwork Area A Second Floor
0131204220
VCT / VET Area A Second Floor
20
05AUG13A
11SEP13
7
65
0131204240
Plumbing Finishes - Area A Second Floor
10
07AUG13A
10SEP13
5
50
0131204200
Above Ceiling Inspections Complete
0
03SEP13
0
0
0131204250
Lockers Area A Second Floor
10
03SEP13
10
0
16SEP13
Overhead Rough-in Elec & FA - Area Second Floor Equipment Pads Rough-in Fire Prot - Area A Second Floor Drywall & Tape Area A Second Floor CMU Veneer Area A Second Floor Technology Contractor Rough-in - Second Floor
Standpipe / Hose Cabinet Lights in Grid - Area A - Second Floor HVAC Finishes - Area A Second Floor Fire Prot Finishes - Area A Second Floor Electric & FA Finishes - Area A Second Floor Ceiling Pads Area A Second Floor Technology Finishes Area A - Second Floor Ceramic Floor Tile Area A Second Floor
VCT / VET Area A Second Floor Plumbing Finishes - Area A Second Floor Above Ceiling Inspections Complete Lockers Area A Second Floor
0131204260
Doors & Hardware Area A Second Floor
10
03SEP13
16SEP13
10
0
Doors & Hardware Area A Second Floor
0131204265
Marker / Tack Boards Area A Second Floor
10
03SEP13
16SEP13
10
0
Marker / Tack Boards Area A Second Floor
0131204255
Toilet Partitions Area A Second Floor
10
04SEP13
17SEP13
10
0
Toilet Partitions Area A Second Floor Projection Screens Area A Second Floor
0131204270
Projection Screens Area A Second Floor
5
12SEP13
18SEP13
5
0
0131204275
Signage Area A Second Floor
5
12SEP13
18SEP13
5
0
0131204090
Set Windows Area A Second Floor
15
16SEP13
04OCT13
15
0
Set Windows Area A Second Floor
0131204280
Toilet Accessories Area A Second Floor
4
16SEP13
19SEP13
4
0
Toilet Accessories Area A Second Floor
0131204285
FF&E Area A Second Floor
3
03OCT13
07OCT13
3
0
FF&E Area A Second Floor
0131204105
Building Final Area Enclosure
0
04OCT13
0
0
Building Final Area Enclosure
0131304010
Structural Steel & Metal Deck
7
07JAN13A
21JAN13A
0
100
0131304020
Ext Masonry In-wall Elect R/I Area A 3rd Flr
20
14JAN13A
25JAN13A
0
100
Ext Masonry In-wall Elect R/I Area A 3rd Flr
0131304025
Exterior Masonry Bearing Walls Area A 3rd Floor
15
14JAN13A
25JAN13A
0
100
Exterior Masonry Bearing Walls Area A 3rd Floor
0131304030
Electrical Rough-in on Metal Deck
5
28JAN13A
07FEB13A
0
100
0131304150
Slab On Metal Deck
4
11FEB13A
15FEB13A
0
100
0131304050
Interior Masonry Bearing Walls
15
22FEB13A
14MAR13A
0
100
0131304055
Door Frames Area A Third Floor
20
22FEB13A
19APR13A
0
100
0131304060
Interior Masonry Walls Area A Third Floor
10
22FEB13A
31MAY13A
0
100
0131304145
In Wall Plumbing Rough-in - Area A Third Floor
28
22FEB13A
24MAY13A
0
100
0131304295
Interior Bearing Masonry In-wall Elect. R/I
15
22FEB13A
14MAR13A
0
100
Signage Area A Second Floor
Third Floor
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Structural Steel & Metal Deck
Electrical Rough-in on Metal Deck Slab On Metal Deck Interior Masonry Bearing Walls Door Frames Area A Third Floor Interior Masonry Walls Area A Third Floor In Wall Plumbing Rough-in - Area A Third Floor Interior Bearing Masonry In-wall Elect. R/I AL12 - MonthlyRpt - 11x17
Sheet 5 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
Roof Structural Steel & Deck
0131304040
Roof Structural Steel & Deck
20
12MAR13A
27MAR13A
0
100
0131304110
Rough-in HVAC Ductwork - Area A Third Floor
30
27MAR13A
14JUN13A
0
100
Rough-in HVAC Ductwork - Area A Third Floor
0131304125
Rough-in HVAC Piping - Area A Third Floor
30
27MAR13A
25JUN13A
0
100
Rough-in HVAC Piping - Area A Third Floor
0131304080
Roofing
10
02APR13A
06APR13A
0
100
0131304075
Metal Studs Area A Third Floor
10
03APR13A
10APR13A
0
100
0131304135
Complete In Wall Electrical Rough In Area A
15
06APR13A
16MAY13A
0
100
0131304130
Area A - Temporary Building Enclosure Complete
0
06APR13A
0
100
Area A - Temporary Building Enclosure Complete
0131304070
Equipment Pads
5
11APR13A
12APR13A
0
100
Equipment Pads
0131304115
Overhead Rough-in Plumbing - Area A Third Floor
28
22APR13A
25JUN13A
0
100
0131304085
Overhead Rough-in Elec & FA - Area Third Floor
30
24APR13A
25JUL13A
0
100
0131304100
E.C. / Rough-in Tech Area A - Third Floor
30
24APR13A
21JUN13A
0
100
0131304065
CMU Veneer Area A Third Floor
20
08MAY13A
24JUN13A
0
100
0131304160
Drywall & Tape Area A Third Floor
15
17MAY13A
10JUL13A
0
100
Drywall & Tape Area A Third Floor
0131304120
Rough-in Fire Prot - Area A Third Floor
20
10JUN13A
03JUL13A
0
100
Rough-in Fire Prot - Area A Third Floor
0131304170
Technology Contractor Rough-in - Third Floor
15
10JUN13A
10JUL13A
0
100
0131304165
Prime Paint Area A Third Floor
20
12JUN13A
16AUG13A
0
100
0131304155
Standpipe / Hose Cabinet
3
14JUN13A
20JUN13A
0
100
0131304175
Ceiling Grid Area A Third Floor
20
18JUN13A
01JUL13A
0
100
0131304140
Rough-in HVAC Insulation - Area A Third Floor
30
24JUN13A
17JUL13A
0
100
0131304190
Lights in Grid - Area A - Third Floor
5
08JUL13A
24JUL13A
0
100
0131304185
HVAC Finishes - Area A Third Floor
10
12JUL13A
18JUL13A
0
100
0131304180
Fire Prot Finishes - Area A Third Floor
10
15JUL13A
02AUG13A
0
100
0131304205
Ceiling Pads Area A Third Floor
10
16JUL13A
13SEP13
9
10
Roofing Metal Studs Area A Third Floor Complete In Wall Electrical Rough In Area A
Overhead Rough-in Plumbing - Area A Third Floor
Overhead Rough-in Elec & FA - Area Third Floor E.C. / Rough-in Tech Area A - Third Floor CMU Veneer Area A Third Floor
Technology Contractor Rough-in - Third Floor Prime Paint Area A Third Floor Standpipe / Hose Cabinet Ceiling Grid Area A Third Floor Rough-in HVAC Insulation - Area A Third Floor Lights in Grid - Area A - Third Floor HVAC Finishes - Area A Third Floor Fire Prot Finishes - Area A Third Floor Ceiling Pads Area A Third Floor Electric & FA Finishes - Area A Third Floor
0131304210
Electric & FA Finishes - Area A Third Floor
15
17JUL13A
03SEP13
1
93
0131304225
Ceramic Floor Tile Area A Third Floor
15
19JUL13A
26JUL13A
0
100
0131304195
Finish Paint Area A Third Floor
20
29JUL13A
23AUG13A
0
100
0131304230
Technology Finishes Area A - Third Floor
10
05AUG13A
03SEP13
1
90
Technology Finishes Area A - Third Floor
0131304240
Plumbing Finishes - Area A Third Floor
10
05AUG13A
04SEP13
1
90
Plumbing Finishes - Area A Third Floor
0131304215
Millwork Area A Third Floor
20
16AUG13A
23SEP13
15
25
0131304200
Above Ceiling Inspections Complete
0
03SEP13
0
0
0131304220
VCT / VET Area A Third Floor
20
03SEP13
30SEP13
20
0
0131304090
Set Windows Area A Third Floor
15
23SEP13
11OCT13
15
0
Set Windows Area A Third Floor
0131304255
Toilet Partitions Area A Third Floor
5
24SEP13
30SEP13
5
0
Toilet Partitions Area A Third Floor
0131304260
Doors & Hardware Area A Third Floor
10
24SEP13
07OCT13
10
0
Doors & Hardware Area A Third Floor
0131304280
Toilet Accessories Area A Third Floor
5
24SEP13
30SEP13
5
0
Toilet Accessories Area A Third Floor
Ceramic Floor Tile Area A Third Floor Finish Paint Area A Third Floor
Millwork Area A Third Floor Above Ceiling Inspections Complete VCT / VET Area A Third Floor
0131304265
Marker / Tack Boards Area A Third Floor
5
01OCT13
07OCT13
5
0
Marker / Tack Boards Area A Third Floor
0131304270
Projection Screens Area A Third Floor
2
01OCT13
02OCT13
2
0
Projection Screens Area A Third Floor
0131304275
Signage Area A Third Floor
5
01OCT13
07OCT13
5
0
Signage Area A Third Floor
0131304285
FF & E Area A Third Floor
3
01OCT13
03OCT13
3
0
0131304105
Building Final Area Enclosure
0
11OCT13
0
DEC
FF & E Area A Third Floor Building Final Area Enclosure
0
Area B
gym west ab error
First Floor Gymnasium 0132114115
Load Bearing Masonry
20
31AUG12A
24NOV12A
0
100
0132114120
Structural Steel & Deck
4
19DEC12A
28DEC12A
0
100
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Load Bearing Masonry Structural Steel & Deck
AL12 - MonthlyRpt - 11x17
Sheet 6 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Gymnasium Plumbing Rough-in Roof Drains
0132114135
Plumbing Rough-in Roof Drains
10
16JAN13A
20MAY13A
0
100
0132114130
Roofing
10
17JAN13A
15MAR13A
0
100
0132114150
Gymnasium Temporary Enclosure Complete
0
15MAR13A
0
100
0132114010
Slab on Grade
5
28MAR13A
0
100
Slab on Grade Underground Electrical Rough-in
19MAR13A
0132114005
Underground Electrical Rough-in
10
26MAR13A
27MAR13A
0
100
0132114140
CMU Veneer - East, South, West
20
03APR13A
20JUN13A
0
100
0132114025
Fire Protection Rough-in
10
08APR13A
03MAY13A
0
100
0132114015
Overhead Elec. & Fire Alarm Rough-in
25
16APR13A
03JUN13A
0
100
Roofing Gymnasium Temporary Enclosure Complete
CMU Veneer - East, South, West Fire Protection Rough-in Overhead Elec. & Fire Alarm Rough-in Fire Protection Finishes
0132114055
Fire Protection Finishes
5
01MAY13A
03MAY13A
0
100
0132114030
HVAC Rough-in - Ductwork
15
13MAY13A
31MAY13A
0
100
0132114050
Finish Painting
5
20MAY13A
01JUL13A
0
100
0132114125
CMU Veneer - North
10
10JUN13A
20JUN13A
0
100
0132114160
Technology Contractor Rough-in - Gym
5
01JUL13A
16AUG13A
0
100
0132114060
HVAC Finishes
10
08JUL13A
12JUL13A
0
100
0132114075
Gym Equipment
10
08JUL13A
30AUG13A
0
100
0132114065
Electric & Fire Alarm Finishes
5
05AUG13A
16AUG13A
0
100
Electric & Fire Alarm Finishes
0132114035
Gym Lighting
5
09AUG13A
16AUG13A
0
100
Gym Lighting
0132114085
Stage Equipment
10
03SEP13
16SEP13
10
0
0132114145
HVAC Operable
0
03SEP13*
0
0
0132114170
Gym Windows
5
09SEP13
13SEP13
5
0
0132114095
Gym Flooring
25
16SEP13
18OCT13
25
0
0132114090
Stage Lighting
5
17SEP13
23SEP13
5
0
0132114100
Gym Bleachers
10
21OCT13
01NOV13
10
0
0132114105
Stage Flooring
5
21OCT13
25OCT13
5
0
HVAC Rough-in - Ductwork Finish Painting CMU Veneer - North Technology Contractor Rough-in - Gym HVAC Finishes Gym Equipment
Stage Equipment HVAC Operable Gym Windows Gym Flooring Stage Lighting Gym Bleachers Stage Flooring
0132104270
Proj Screen @ Stage
5
28OCT13
01NOV13
5
0
Proj Screen @ Stage
0132114110
Operable Partition
5
28OCT13
01NOV13
5
0
Operable Partition
0132124095
Underslab Plumbing Rough-in
10
07SEP12A
13SEP12A
0
100
0132124075
Plumbing Slab Prep
3
13SEP12A
17SEP12A
0
100
0132124125
Load Bearing Masonry
1
05NOV12A
04DEC12A
0
100
0132124090
Underslab Electrical Rough-in
5
07NOV12A
12NOV12A
0
100
Underslab Electrical Rough-in
0132124085
Slab on Grade
5
13NOV12A
13NOV12A
0
100
Slab on Grade
0132124135
Structural Steel & Metal Deck
5
05DEC12A
18DEC12A
0
100
0132124105
In Wall Plumbing Rough-in
20
12FEB13A
24MAY13A
0
100
0132124145
Roofing
5
13FEB13A
15FEB13A
0
100
0132124115
Overhead Plumbing Rough-in
20
18FEB13A
12JUL13A
0
100
0132124030
HVAC Rough-in
10
26FEB13A
20JUN13A
0
100
Kitchen
0132124065
Fire Protection Rough-in
10
12APR13A
17MAY13A
0
100
0132124035
Electrical Rough-in
10
22APR13A
09SEP13
5
50
0132124155
Prime Paint
5
29JUL13A
01AUG13A
0
100
0132124025
Finish Paint
5
12AUG13A
03SEP13
1
80
0132124045
HVAC Finishes
5
19AUG13A
26AUG13A
0
100
0132124020
Security Grille
5
03SEP13*
09SEP13
5
0
0132124080
Plumbing Finishes
10
04SEP13
17SEP13
10
0
0132124100
Above Ceiling Inspections Complete
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
0
09SEP13
0
Underslab Plumbing Rough-in Plumbing Slab Prep Load Bearing Masonry
Structural Steel & Metal Deck In Wall Plumbing Rough-in Roofing Overhead Plumbing Rough-in HVAC Rough-in Fire Protection Rough-in Electrical Rough-in Prime Paint Finish Paint HVAC Finishes Security Grille Plumbing Finishes Above Ceiling Inspections Complete
0
Early Bar Progress Bar Critical Activity
AL12 - MonthlyRpt - 11x17
Sheet 7 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Kitchen Install Kitchen Tile
0132124015
Install Kitchen Tile
10
10SEP13
23SEP13
10
0
0132124040
Electrical Finishes
5
10SEP13
16SEP13
5
0
Electrical Finishes
0132124050
Ceiling Grid
5
24SEP13
26SEP13
3
40
Ceiling Grid
0132124055
Lights in Grid
5
27SEP13
03OCT13
5
0
Lights in Grid
0132124070
Fire Protection Finishes
5
27SEP13
03OCT13
5
0
Fire Protection Finishes
0132124060
Ceiling Pads
2
04OCT13
07OCT13
2
0
0132124010
Install Kitchen Equipment
5
08OCT13
14OCT13
5
0
Install Kitchen Equipment
10
0
Kitchen Equipment Hook-ups
0
100
0132124005
Kitchen Equipment Hook-ups
10
15OCT13
28OCT13
0132104005
Foundations Area B
15
06AUG12A
0132104010
Rough-in Plumbing U/G - Area B
12
03SEP12A
13SEP12A
0
100
0132104025
Masonry Bearing Walls Area B
50
04SEP12A
15MAR13A
0
100
0132104035
Rough-in Electric U/G - Area B
20
12OCT12A
12APR13A
0
100
Ceiling Pads
Area B
0132104040
Structural Steel & Deck - Roof & Mechanical Room
15
11JAN13A
15MAR13A
0
100
0132104020
In-wall Elec & FA Rough-in Area B First Floor
50
18JAN13A
29MAY13A
0
100
0132104110
Rough-in HVAC Ductwork - Area B First Floor
20
01MAR13A
12JUL13A
0
100
0132104125
Rough-in HVAC Piping - Area B First Floor
20
12MAR13A
12JUL13A
0
100
0132104085
Overhead Rough-in Elec & FA - Area B First Floor
20
15MAR13A
04SEP13
2
90
0132104115
Overhead Rough-in Plumbing - Area B First Floor
30
15MAR13A
03JUL13A
0
100
0132104130
In Wall Plumbing Rough-in
20
15MAR13A
29MAY13A
0
100
0132104140
Rough-in HVAC Insulation - Area B First Floor
20
03APR13A
03SEP13
1
95
0132104080
Roofing Area B
10
04APR13A
06APR13A
0
100
0132104065
CMU Veneer
20
05APR13A
28JUN13A
0
100
0132104300
Area B Temporary Enclosure Complete
0
06APR13A
0
100
0132104135
Stair C
5
15APR13A
0
100
08APR13A
Foundations Area B Rough-in Plumbing U/G - Area B Masonry Bearing Walls Area B Rough-in Electric U/G - Area B Structural Steel & Deck - Roof & Mechanical Room In-wall Elec & FA Rough-in Area B First Floor Rough-in HVAC Ductwork - Area B First Floor Rough-in HVAC Piping - Area B First Floor Overhead Rough-in Elec & FA - Area B First Floor Overhead Rough-in Plumbing - Area B First Floor In Wall Plumbing Rough-in Rough-in HVAC Insulation - Area B First Floor Roofing Area B CMU Veneer Area B Temporary Enclosure Complete Stair C Plumbing Slab Prep
0132104030
Plumbing Slab Prep
2
11APR13A
12APR13A
0
100
0132104295
Fire Protection Riser
10
12APR13A
26JUL13A
0
100
0132104120
Rough-in Fire Prot - Area B First Floor
20
15APR13A
24MAY13A
0
100
0132104150
Stair Pan Concrete Fill
5
15APR13A
15APR13A
0
100
Stair Pan Concrete Fill
0132104045
Place SOG Area B Stud.Dining/Gall./Vest.
8
17APR13A
17APR13A
0
100
Place SOG Area B Stud.Dining/Gall./Vest.
0132104055
Door Frames Area B First Floor in Metal Studs
10
22APR13A
28JUN13A
0
100
0132104075
Metal Studs Area B First Floor
10
22APR13A
07JUN13A
0
100
0132104160
Drywall & Tape Area B First Floor
15
07MAY13A
26AUG13A
0
100
0132104060
Interior Masonry Area B First Floor
10
23MAY13A
29MAY13A
0
100
0132104100
EC Rough-in Tech Area B - First Floor
20
30MAY13A
01JUL13A
0
100
0132104175
Ceiling Grid Area B First Floor
20
12JUN13A
27AUG13A
0
100
0132104165
Prime Paint Area B First Floor
20
14JUN13A
18SEP13
12
40
0132104070
Frost Slabs
5
17JUN13A
21JUN13A
0
100
0132104170
Technology Contractor Rough-in / Area B
15
26JUN13A
03SEP13
1
93
0132104185
HVAC Finishes - Area B First Floor
10
28JUN13A
04SEP13
1
90
0132104180
Fire Prot Finishes - Area B First Floor
10
03JUL13A
03SEP13
1
90
0132104225
Ceramic Floor Tile Area B First Floor
20
29JUL13A
02AUG13A
0
100
0132104195
Finish Paint Area B First Floor
20
07AUG13A
16SEP13
10
50
0132104240
Plumbing Finishes - Area B First Floor
15
12AUG13A
16SEP13
10
33
0132104190
Lights in Grid - Area B - First Floor
20
19AUG13A
30SEP13
20
0
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
Fire Protection Riser Rough-in Fire Prot - Area B First Floor
Door Frames Area B First Floor in Metal Studs Metal Studs Area B First Floor Drywall & Tape Area B First Floor Interior Masonry Area B First Floor EC Rough-in Tech Area B - First Floor Ceiling Grid Area B First Floor Prime Paint Area B First Floor Frost Slabs Technology Contractor Rough-in / Area B HVAC Finishes - Area B First Floor Fire Prot Finishes - Area B First Floor Ceramic Floor Tile Area B First Floor Finish Paint Area B First Floor Plumbing Finishes - Area B First Floor Lights in Grid - Area B - First Floor AL12 - MonthlyRpt - 11x17
Sheet 8 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Area B 0132104210
Electric & FA Finishes - Area B First Floor
20
19AUG13A
25SEP13
15
25
Electric & FA Finishes - Area B First Floor
0132104230
Technology Finishes Area B - First Floor
20
20AUG13A
17SEP13
10
50
Technology Finishes Area B - First Floor
0132104215
Millwork Area B First Floor
10
03SEP13
16SEP13
10
0
Millwork Area B First Floor
0132104220
VCT / VET Area B First Floor
20
03SEP13
30SEP13
20
0
VCT / VET Area B First Floor
0132104090
Set Windows Area B First Floor
20
09SEP13
04OCT13
20
0
Set Windows Area B First Floor
0132104235
Acoustic Panels Area B First Floor
10
17SEP13
30SEP13
10
0
0132104275
Signage Area B First Floor
5
17SEP13
23SEP13
5
0
0132104245
Carpet Area B First Floor
10
24SEP13
07OCT13
10
0
0132104200
Above Ceiling Inspections Complete
0
01OCT13
0132104205
Ceiling Pads Area B First Floor
15
01OCT13
0132104250
Lockers Area B First Floor
10
01OCT13
Acoustic Panels Area B First Floor Signage Area B First Floor Carpet Area B First Floor Above Ceiling Inspections Complete
0
0
21OCT13
15
0
14OCT13
10
0
Lockers Area B First Floor
Ceiling Pads Area B First Floor
0132104255
Toilet Partitions Area B First Floor
10
01OCT13
14OCT13
10
0
Toilet Partitions Area B First Floor
0132104260
Doors & Hardware Area B First Floor
10
01OCT13
14OCT13
10
0
Doors & Hardware Area B First Floor
0132104265
Marker / Tack Boards Area B First Floor
10
01OCT13
14OCT13
10
0
Marker / Tack Boards Area B First Floor
0132104280
Toilet Accessories Area B First Floor
10
03OCT13
16OCT13
10
0
Toilet Accessories Area B First Floor
0132104285
FF & E Area B First Floor
3
03OCT13
07OCT13
3
0
0132104105
Building Area Final Enclosure
0
04OCT13
0
0
FF & E Area B First Floor Building Area Final Enclosure
Second Floor Mechanical Room Area B SOD 2nd Floor
0132234075
Area B SOD 2nd Floor
1
19DEC12A
19DEC12A
0
100
0132234085
Area B 2nd Floor Mech Rm CMU
5
26DEC12A
08JAN13A
0
100
Area B 2nd Floor Mech Rm CMU
0132234015
Wall Electrical Rough-in
15
31DEC12A
08JAN13A
0
100
Wall Electrical Rough-in
0132234095
Area B Roof Steel Mech Rm.
3
11JAN13A
18JAN13A
0
100
0132234105
Area B Mech Rm Roof
4
13FEB13A
13FEB13A
0
100
0132234115
Set Switch Gear
1
26FEB13A
26FEB13A
0
100
0132234005
Set HVAC Equipment
10
02APR13A
12APR13A
0
100
0132234035
HVAC Rough-in - Ductwork
15
06JUN13A
19AUG13A
0
100
0132234040
HVAC Rough-in - Piping
15
11JUN13A
16AUG13A
0
100
0132234065
HVAC Finishes
10
02JUL13A
05JUL13A
0
100
0132234055
Fire Protection Finishes
5
05JUL13A
10JUL13A
0
100
0132234020
Overhead Elec. & Fire Alarm Rough-in
30
12JUL13A
10SEP13
6
80
0132234025
Fire Protection Rough-in
5
15JUL13A
18JUL13A
0
100
0132234045
HVAC Rough-in - Insulation
15
19AUG13A
05SEP13
3
80
0132234030
Lighting
5
11SEP13
17SEP13
5
0
0132234060
Electric & Fire Alarm Finishes
10
0130007005
Operation & Maintenance Manuals Submitted
0
0130007010
Contractor Punchlist
10
0130007015
HVAC Controls Check-out and Balancing
0130007120
LEED Air Testing
11SEP13
24SEP13
10
0
16SEP13
0
0
29OCT13
11NOV13
10
0
10
29OCT13
11NOV13
10
0
1
02NOV13
02NOV13
1
0
Area B Roof Steel Mech Rm. Area B Mech Rm Roof Set Switch Gear Set HVAC Equipment HVAC Rough-in - Ductwork HVAC Rough-in - Piping HVAC Finishes Fire Protection Finishes Overhead Elec. & Fire Alarm Rough-in Fire Protection Rough-in HVAC Rough-in - Insulation Lighting Electric & Fire Alarm Finishes
Close-Out
Operation & Maintenance Manuals Submitted Contractor Punchlist HVAC Controls Check-out and Balancing LEED Air Testing
0130007020
Final Inspections / Testing
5
05NOV13
11NOV13
5
0
Final Inspections / Testing
0130007025
Initial Architect's Punchlist
5
05NOV13
11NOV13
5
0
Initial Architect's Punchlist
0130007030
Fire Alarm Programming & Testing
5
05NOV13
11NOV13
5
0
Fire Alarm Programming & Testing
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Early Bar Progress Bar Critical Activity
AL12 - MonthlyRpt - 11x17
Sheet 9 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
07NOV13
13NOV13
5
0
Demonstration & Training
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
0130007085
Demonstration & Training
5
0130007040
Final Inspections Complete
0
11NOV13
0
0
Final Inspections Complete
0130007075
Certificate of Occupancy
0
11NOV13
0
0
Certificate of Occupancy
0130007035
JACE Interface Check-out
5
12NOV13
18NOV13
5
0
JACE Interface Check-out
0130007050
Architect's Final Punch List
5
12NOV13
18NOV13
5
0
Architect's Final Punch List
0130007055
As-Built Documents Submitted
5
12NOV13
18NOV13
5
0
As-Built Documents Submitted
0130007080
Owner Move In
5
12NOV13
18NOV13
5
0
0130007090
Close-out Documents / Add'l Training
45
0130007100
Owner Move-in Complete
0
0130007060
Project Team - Controls Check-out
5
0130007065
Building Commissioning
5
13JAN14
45
0
18NOV13
0
0
Owner Move-in Complete
19NOV13
25NOV13
5
0
26NOV13
02DEC13
5
0
0130007070
MEP Commissioning Complete
0
02DEC13
0
0
0130007105
Contract Close-out
0
13JAN14
0
0
Start Date Finish Date Data Date Run Date
01FEB12 13JAN14 02SEP13 03SEP13 11:21
Owner Move In Close-out Documents / Add'l Training
12NOV13
Early Bar Progress Bar Critical Activity
Project Team - Controls Check-out Building Commissioning MEP Commissioning Complete
AL12 - MonthlyRpt - 11x17
Sheet 10 of 10
Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013
Š Primavera Systems, Inc.
DEC
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
0580001005 Bid Opening
0
26APR12A
0580001010 Bid Evaluation and Award
23
26APR12A
0580001015 NTP - BP
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Bid & Award
Bid Opening
100
0 26APR1
29JUN12A
100
0 26APR1 29JUN12
0
29JUN12A
100
0
29JUN12
0580001090 Construction Kick-off Meeting
0
12JUL12A
100
0
12JUL12
0580001025 Prime Contractors Submit Schedules
10
23JUL12A
10AUG12A
100
0 23JUL1210AUG12
0580001075 Site Mobilization - BP 310 Site Work
10
30JUL12A
03AUG12A
100
0 30JUL1203AUG12
0580001030 Schedule Meeting(s) to Review
10
23AUG12A 20SEP12A
100
0 23AUG120SEP12
0580001020 Site Mobilization - BP 061 General
10
27AUG12A 07SEP12A
100
0 27AUG107SEP12
Site Mobilization - BP 061 General Trades
0580001060 Site Mobilization - BP 260 Electrical
10
10SEP12A
20SEP12A
100
0 10SEP1 20SEP12
Site Mobilization - BP 260 Electrical
0580001065 Site Mobilization - BP 270 Technology
10
10SEP12A
21SEP12A
100
0 10SEP1 21SEP12
Site Mobilization - BP 270 Technology
0580001035 Prime Contractors/CM Final Review
5
12SEP12A
19SEP12A
100
0 12SEP1 19SEP12
Prime Contractors/CM Final Review Schedule
0580001040 Contractors Sign Off - Project Baseline
0
20SEP12A
100
0
0580001050 Site Mobilization - BP 220 Plumbing
10
21SEP12A 05OCT12A
100
0 21SEP1 05OCT12
0580001055 Site Mobilization - BP 230 HVAC
10
28JAN13A
30JAN13A
100
0 28JAN1330JAN13
0580001045 Site Mobilization - BP 210 Fire
3
07FEB13A
14FEB13A
100
0 07FEB1 14FEB13
0580001070 Site Mobilization - BP 300 Site
10
17JUL13A
23JUL13A
100
0580001085 Site Mobilization - BP 121 FF & E
10
30SEP13
11OCT13
0
10
0580001080 Site Mobilization - BP 329 Landscaping 10
08OCT13
21OCT13
0
10
02JUL12A
31JUL12A
100
Bid Evaluation and Award NTP - BP 061,210,220,230,260,270,300,310,329 Construction Kick-off Meeting Prime Contractors Submit Schedules Site Mobilization - BP 310 Site Work Schedule Meeting(s) to Review Schedule
Contractors Sign Off - Project Baseline Schedule
20SEP12
Site Mobilization - BP 220 Plumbing Site Mobilization - BP 230 HVAC Site Mobilization - BP 210 Fire Protection Site Mobilization - BP 300 Site Concrete
0 17JUL1323JUL13
Site Mobilization - BP 121 FF & E Site Mobilization - BP 329 Landscaping
Submittals & Approvals
0580002010 Submittal HVAC Equipment
20
0 02JUL1231JUL12
Submittal HVAC Equipment Submittal Roofing
0580002055 Submittal Roofing
20
02JUL12A
30JUL12A
100
0 02JUL1230JUL12
0580002025 Site Submittals
4
09JUL12A
23JUL12A
100
0 09JUL1223JUL12
0580002030 Submittal Concrete/Rebar
10
10JUL12A
12JUL12A
100
0 10JUL1212JUL12
0580002040 Submittal Brick and Mortar
10
13JUL12A
20JUL12A
100
0 13JUL1220JUL12
0580002045 Submittal Structural Steel/Joists/Deck
45
16JUL12A
24AUG12A
100
0 16JUL1224AUG12
0580002085 Review and Approval Concrete &
5
16JUL12A
20JUL12A
100
0 16JUL1220JUL12
0580002035 Submittal Block and Mortar
10
20JUL12A
27JUL12A
100
0 20JUL1227JUL12
0580002090 Review and Approval Block and Mortar
15
20JUL12A
22AUG12A
100
0 20JUL1222AUG12
0580002080 Review and Approval Site Submittal
5
25JUL12A
31JUL12A
100
0 25JUL1231JUL12
0580002015 Coordination Drawing Meetings
45
27JUL12A
19OCT12A
100
0 27JUL1219OCT12
Site Submittals Submittal Concrete/Rebar Submittal Brick and Mortar Submittal Structural Steel/Joists/Deck Review and Approval Concrete & Rebar Submittal Block and Mortar Review and Approval Block and Mortar Review and Approval Site Submittal Coordination Drawing Meetings HVAC/E/P/FP/GTC Review and Approval Brick and Mortar
0580002100 Review and Approval Brick and Mortar
15
30JUL12A
24AUG12A
100
0 30JUL1224AUG12
0580001125 Review and Approval Roofing
15
31JUL12A
18DEC12A
100
0 31JUL1218DEC12
0580002095 Submittal - Precast Concrete Plank
20
31JUL12A
01AUG12A
100
0 31JUL1201AUG12
0580002105 Review and Approve Precast Concrete
15
06AUG12A 19SEP12A
100
0 06AUG119SEP12
0580002060 Submittal HM Frame
20
13AUG12A 04SEP12A
100
0 13AUG104SEP12
0580002065 Submittal Windows and Curtain Wall
40
13AUG12A 27NOV12A
100
0 13AUG127NOV12
0580002110 Review and Approval Structural
45
24AUG12A 18SEP12A
100
0 24AUG118SEP12
0580002020 Submittal Electrical and Fire Alarm
25
27AUG12A 14SEP12A
100
0 27AUG114SEP12
0580002145 Review and Approve Windows and
15
27AUG12A 04FEB13A
100
0 27AUG104FEB13
0580002005 Submittal Plumbing
10
28AUG12A 28SEP12A
100
0 28AUG128SEP12
0580002070 Submittal / Shop Drawings Fire
35
03SEP12A 03OCT12A
100
0 03SEP1 03OCT12
0580002120 Review and Approval HM Frames
15
04SEP12A
25SEP12A
100
0 04SEP1 25SEP12
Review and Approval HM Frames
0580002135 City Review & Approval Fire Protection
20
06SEP12A
27SEP12A
100
0 06SEP1 27SEP12
City Review & Approval Fire Protection Submittal
0580002130 Review & App Electric and Fire Alarm
15
17SEP12A 11DEC12A
100
0 17SEP1 11DEC12
0580002075 Review and Approval Plumbing
15
28SEP12A 28NOV12A
100
0 28SEP1 28NOV12
Review and Approval Plumbing Submittal
0580002115 Review and Approve HVAC Submittal
15
28SEP12A 07DEC12A
100
0 28SEP1 07DEC12
Review and Approve HVAC Submittal
0580002140 Review and Approval Fire Submittal
15
05OCT12A 19OCT12A
100
0 05OCT119OCT12
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Review and Approval Roofing Submittal Submittal - Precast Concrete Plank Review and Approve Precast Concrete Plank Submittal HM Frame Submittal Windows and Curtain Wall Review and Approval Structural Steel/Joists/Deck Submittal Electrical and Fire Alarm Review and Approve Windows and Curtain Wall Submittal Plumbing Submittal / Shop Drawings Fire Protection
Review & App Electric and Fire Alarm Submittal
Review and Approval Fire Submittal Miles K-8 P58
Sheet 1 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
0580002150 Review Coordination Drawings and
15
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
21NOV12A 06DEC12A
100
0 21NOV106DEC12
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Review Coordination Drawings and Sign-Off
Fab & Deliver
0580003015 Fabrication and Deliver Concrete
6
30JUL12A
24AUG12A
100
0 30JUL1224AUG12
Fabrication and Deliver Concrete Steel/Rebar
0580003010 Delivery of Site Materials
10
20AUG12A 24AUG12A
100
0 20AUG124AUG12
Delivery of Site Materials
0580003020 Fabrication and Delivery - CMU Units
16
10SEP12A
14SEP12A
100
0 10SEP1 14SEP12
0580003065 Fabrication & Delivery of Precast
30
24SEP12A 30NOV12A
100
0 24SEP1 30NOV12
0580003050 Fabrication and Delivery - HM Frames
30
26SEP12A
04JAN13A
100
0 26SEP1 04JAN13
Fabrication and Delivery - HM Frames
0580003030 Fabrication and Deliver - Structural
40
02OCT12A
04JAN13A
100
0 02OCT104JAN13
Fabrication and Deliver - Structural Steel
0580003035 Fabrication and Delivery Steel Joists
60
02OCT12A
04JAN13A
100
0 02OCT104JAN13
0580003005 Delivery of Plumbing Material
5
03OCT12A 17OCT12A
100
0 03OCT117OCT12
0580003025 Fabrication and Delivery - Brick
35
15OCT12A 29MAR13A
100
0 15OCT129MAR13
0580003045 Fabrication and Delivery - Roofing
60
19DEC12A 11MAR13A
100
0 19DEC111MAR13
0580003040 Fab & Deliver HVAC Units
60
16JAN13A
22APR13A
100
0 16JAN1322APR13
0580003055 Fabrication and Delivery -Windows &
80
12FEB13A 24MAY13A
100
0 12FEB1 24MAY13
0585004030 Rough Grade / Building Pad
5
23JUL12A
24AUG12A
100
0 23JUL1224AUG12
0585004005 South Parking Lot Storm Sewer
15
01AUG12A 02AUG13A
100
0 01AUG102AUG13
0585004070 North Storm Sewer
10
03SEP12A
14SEP12A
100
0 03SEP1 14SEP12
0585004015 Sanitary Sewer
5
11SEP12A
18SEP12A
100
0 11SEP1 18SEP12
Sanitary Sewer
0585004020 Access Roads / Laydown / Parking
10
13SEP12A
20SEP12A
100
0 13SEP1 20SEP12
Access Roads / Laydown / Parking
0585004035 Water & Fire Line
10
13SEP12A
21SEP12A
100
0 13SEP1 21SEP12
Water & Fire Line
0585004040 Electrical Duct Banks
10
25FEB13A 01MAR13A
100
0 25FEB1 01MAR13
0585004045 Set Transformer Vault
2
18MAR13A 19MAR13A
100
0 18MAR119MAR13
0581104030 Generator & Chiller Concrete Pad
15
01JUL13A
03JUL13A
100
0 01JUL1303JUL13
0585004085 Finish Grading
5
08JUL13A
26SEP13
20
4 08JUL13
0585004105 Site Improvements
45
08JUL13A
18OCT13
56
20 08JUL13
Fabrication and Delivery - CMU Units Fabrication & Delivery of Precast Concrete Plank
Fabrication and Delivery Steel Joists Deck-Roof Delivery of Plumbing Material Fabrication and Delivery - Brick Fabrication and Delivery - Roofing Materials Fab & Deliver HVAC Units Fabrication and Delivery -Windows & Curtain Wall
Construction Sitework
Rough Grade / Building Pad 07SEP12
South Parking Lot Storm Sewer
01AUG13 North Storm Sewer
Electrical Duct Banks Set Transformer Vault Generator & Chiller Concrete Pad 09AUG13
Finish Grading
16AUG13
Site Improvements
0585004050 Set Transformer / Energize
5
12JUL13A
16JUL13A
100
0 12JUL1316JUL13
0585004135 Retaining Walll
10
12JUL13A
26JUL13A
100
0 12JUL1326JUL13
0585004100 Curbs
15
23JUL13A
09AUG13A
100
0 23JUL1309AUG13
0585004095 Bio Retention Basin
10
30JUL13A
02AUG13A
100
0 30JUL1302AUG13
0585004115 Sidewalks
15
02AUG13A
27SEP13
67
0585004120 Paving and Striping
10
23SEP13
04OCT13
0
10
0585004110 Light Poles & Wiring
15
07OCT13
25OCT13
0
15
0585004140 Playground Structures
15
07OCT13
25OCT13
0
15
0585004130 Landscaping
10
08OCT13
21OCT13
0
10
0585004055 Exterior Building Light Fixtures
10
09OCT13
22OCT13
0
10
0585004125 Site Fencing
10
09OCT13
22OCT13
0
10
Set Transformer / Energize Retaining Walll Curbs Bio Retention Basin Sidewalks
5 02AUG1
Paving and Striping Light Poles & Wiring Playground Structures Landscaping Exterior Building Light Fixtures Site Fencing
Area C First Floor 0583104005 Foundations
15
27AUG12A 14SEP12A
100
0 27AUG114SEP12
0583104015 Masonry & In-wall Rough-in
55
18SEP12A
07FEB13A
100
0 18SEP1 07FEB13
0583104025 Masonry Bearing Walls
20
18SEP12A 29NOV12A
100
0 18SEP1 29NOV12
0583104050 Complete In-wall Electrical Rough-in
20
01OCT12A 21FEB13A
100
0 01OCT121FEB13
0583104020 In-wall Electrical Rough-in
20
05OCT12A 29NOV12A
100
0 05OCT129NOV12
0583104010 Rough-in Plumbing U/G
15
08OCT12A 19OCT12A
100
0 08OCT119OCT12
0583104095 Complete MEP Rough-in - In wall &
136
08OCT12A 28FEB13A
100
0 08OCT128FEB13
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Foundations Masonry & In-wall Rough-in 21SEP12
Masonry Bearing Walls
06NOV12
Complete In-wall Electrical Rough-in In-wall Electrical Rough-in Rough-in Plumbing U/G Complete MEP Rough-in - In wall & Overhead Miles K-8 P58
Sheet 2 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
2014 JAN F
Rough-in Electric U/G
0583104035 Rough-in Electric U/G
10
18OCT12A 26OCT12A
100
0 18OCT126OCT12
0583104045 Place Slab on Grade
10
29OCT12A 07NOV12A
100
0 29OCT107NOV12
0583104115 Rough-in Plumbing
40
05DEC12A 15MAR13A
100
0 05DEC115MAR13
0583104055 Door Frames
20
20DEC12A
24JAN13A
100
0 20DEC124JAN13
0583104060 Interior Masonry Walls
20
24DEC12A 07FEB13A
100
0 24DEC107FEB13
0583104085 Overhead Rough-in Elec & FA
35
21JAN13A
08APR13A
100
0 21JAN1308APR13
0583104110 Rough-in HVAC Ductwork
30
28JAN13A 08MAR13A
100
0 28JAN1308MAR13
0583104120 Rough-in Fire Prot
20
07FEB13A
15FEB13A
100
0 07FEB1 15FEB13
Rough-in Fire Prot
0583104075 Metal Studs
10
14FEB13A
28FEB13A
100
0 14FEB1 28FEB13
Metal Studs
0583104295 Electrical Rough-in - Stud Walls
10
19FEB13A 22MAR13A
100
0 19FEB1 22MAR13
0583104125 Rough-in HVAC Piping
30
06MAR13A 17APR13A
100
0 06MAR117APR13
0583104130 Equipment Pads
5
13MAR13A 15MAR13A
100
0 13MAR115MAR13
0583104135 Stair B,C
10
18MAR13A 22MAR13A
100
0 18MAR122MAR13
0583104150 Stair Concrete Pan Fill
10
04APR13A 05APR13A
100
0 04APR1 05APR13
0583104065 Brick Veneer
10
17APR13A 30APR13A
100
0 17APR1 30APR13
0583104140 Rough-in HVAC Insulation
30
13MAY13A 23AUG13A
100
0 13MAY123AUG13
0583104090 Set Windows
15
04JUN13A
24JUN13A
100
0 04JUN1 24JUN13
0583104100 Rough-in Tech Wire
30
10JUN13A
28JUN13A
100
0 10JUN1 28JUN13
0583104155 Standpipe / Hose Cabinet
3
10JUN13A
13JUN13A
100
0 10JUN1 13JUN13
0583104105 Building Final Area Enclosure
0
24JUN13A
100
0
0583104070 Frost Slabs
5
27JUN13A
01JUL13A
100
0 27JUN1 01JUL13
0583104160 Drywall & Tape
15
10JUL13A
31JUL13A
100
0 10JUL1331JUL13
0583104165 Prime Paint
20
05AUG13A 30AUG13A
100
0583104170 Finishes
70
05AUG13A
01NOV13
57
0583104145 Elevator
20
08AUG13A 06SEP13A
100
0 08AUG106SEP13
0583104185 HVAC Finishes
10
02SEP13A
100
0 02SEP1 13SEP13
HVAC Finishes Ceiling Grid
13SEP13A
DEC
Place Slab on Grade Rough-in Plumbing Door Frames 04JAN13
Interior Masonry Walls
22JAN13
Overhead Rough-in Elec & FA Rough-in HVAC Ductwork
Electrical Rough-in - Stud Walls Rough-in HVAC Piping Equipment Pads Stair B,C Stair Concrete Pan Fill Brick Veneer Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Standpipe / Hose Cabinet Building Final Area Enclosure
24JUN13
Frost Slabs Drywall & Tape Prime Paint
0 05AUG130AUG13
Finishes
30 05AUG1 Elevator
0583104175 Ceiling Grid
20
03SEP13A
11SEP13A
100
0 03SEP1 11SEP13
0583104190 Lights in Grid
10
06SEP13A
18SEP13A
100
0 06SEP1 18SEP13
Lights in Grid
0583104225 Ceramic Floor Tile
20
16SEP13A
19SEP13A
100
0 16SEP1 19SEP13
Ceramic Floor Tile
0583104180 Fire Prot Finishes
10
23SEP13
04OCT13
0
10
0583104215 Millwork
20
23SEP13
18OCT13
0
20
Fire Prot Finishes Millwork Doors & Hardware
0583104260 Doors & Hardware
10
23SEP13
04OCT13
0
10
0583104195 Finish Paint
20
30SEP13
25OCT13
0
20
0583104220 VCT / VET
15
30SEP13
18OCT13
0
15
0583104240 Plumbing Finishes
20
30SEP13
25OCT13
0
20
0583104200 Above Ceiling Inspections Complete
0
03OCT13
0
0
0583104235 Acoustic Panels
5
04OCT13
10OCT13
0
5
Acoustic Panels
0583104205 Ceiling Pads
10
07OCT13
18OCT13
0
10
Ceiling Pads
0583104210 Electric & FA Finishes
15
07OCT13
25OCT13
0
15
Electric & FA Finishes
0583104245 Carpet
10
11OCT13
24OCT13
0
10
Carpet
0583104230 Technology Finishes
10
15OCT13
28OCT13
0
10
0583104265 Marker / Tack Boards
10
21OCT13
01NOV13
0
10
0583104270 Projection Screens
5
21OCT13
25OCT13
0
5
Projection Screens
0583104275 Signage
5
21OCT13
25OCT13
0
5
Signage
0583104255 Toilet Partitions
10
28OCT13
08NOV13
0
10
Toilet Partitions
0583104280 Toilet Accessories
5
28OCT13
01NOV13
0
5
Toilet Accessories
0583104285 FF & E
3
28OCT13
30OCT13
0
3
FF & E
Finish Paint VCT / VET Plumbing Finishes Above Ceiling Inspections Complete
Technology Finishes Marker / Tack Boards
Second Floor 0583204010 Precast Concrete Deck& Topping
5
03DEC12A 06DEC12A
100
0 03DEC106DEC12
0583204015 Masonry & In-wall Rough-in
40
10DEC12A 11APR13A
100
0 10DEC111APR13
0583204020 In-wall Electrical Rough-in
20
10DEC12A
11JAN13A
100
0 10DEC111JAN13
0583204025 Masonry Bearing Walls
20
10DEC12A
12JAN13A
100
0 10DEC112JAN13
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Precast Concrete Deck& Topping Masonry & In-wall Rough-in In-wall Electrical Rough-in 20DEC12 Miles K-8 P58
Masonry Bearing Walls
07JAN13 Sheet 3 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
0583204055 Door Frames
20
10DEC12A 04APR13A
100
0 10DEC104APR13
0583204095 Complete MEP Rough-in - In wall &
109
10DEC12A
09JUL13A
100
0 10DEC109JUL13
0583204085 Overhead Rough-in Elec & FA
35
18FEB13A
06JUN13A
100
0 18FEB1 06JUN13
0583204110 Rough-in HVAC Ductwork
30
25FEB13A
18JUL13A
100
0 25FEB1 18JUL13
0583204075 Metal Studs
0
04MAR13A 18APR13A
100
0 04MAR118APR13
0583204120 Fire Protection Rough-in
20
04MAR13A 15MAR13A
100
0 04MAR115MAR13
0583204115 Rough-in Plumbing
30
12MAR13A 07JUN13A
100
0 12MAR107JUN13
0583204050 Complete In-wall Electrical Rough-in
15
20MAR13A 07JUN13A
100
0 20MAR107JUN13
0583204060 Interior Masonry Walls
10
20MAR13A 12APR13A
100
0 20MAR112APR13
0583204125 Rough-in HVAC Piping
30
16APR13A
100
0 16APR1 12JUL13
12JUL13A
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Door Frames Complete MEP Rough-in - In wall & Overhead Overhead Rough-in Elec & FA Rough-in HVAC Ductwork Metal Studs Fire Protection Rough-in Rough-in Plumbing Complete In-wall Electrical Rough-in Interior Masonry Walls Rough-in HVAC Piping Brick Veneer
0583204065 Brick Veneer
10
24APR13A 27MAY13A
100
0 24APR1 27MAY13
0583204140 Rough-in HVAC Insulation
30
27MAY13A 20AUG13A
100
0 27MAY120AUG13
0583204090 Set Windows
15
03JUN13A
12JUL13A
100
0 03JUN1 12JUL13
0583204100 Rough-in Tech Wire
30
03JUN13A
12JUL13A
100
0 03JUN1 12JUL13
0583204155 Standpipe / Hose Cabinet
3
12JUN13A
13JUN13A
100
0 12JUN1 13JUN13
0583204105 Building Final Area Enclosure
0
12JUL13A
100
0
0583204160 Drywall & Tape
15
15JUL13A
16AUG13A
100
0 15JUL1316AUG13
Drywall & Tape
0583204165 Prime Paint
20
29JUL13A
23AUG13A
100
0 29JUL1323AUG13
Prime Paint
0583204170 Finishes
83
29JUL13A
01NOV13
64
0583204175 Ceiling Grid
20
26AUG13A 26AUG13A
100
0 26AUG126AUG13
0583204185 HVAC Finishes
10
02SEP13A
09SEP13A
100
0 02SEP1 09SEP13
HVAC Finishes
0583204190 Lights in Grid
10
03SEP13A
11SEP13A
100
0 03SEP1 11SEP13
Lights in Grid
0583204215 Millwork
20
09SEP13A
19SEP13A
100
0 09SEP1 19SEP13
0583204225 Ceramic Floor Tile
10
09SEP13A
13SEP13A
100
0 09SEP1 13SEP13
0583204180 Fire Prot Finishes
10
11SEP13A
17SEP13A
100
0583204220 VCT / VET
15
19SEP13A
09OCT13
13
0583204195 Finish Paint
20
23SEP13
18OCT13
0
20
0583204250 Lockers
10
26SEP13
09OCT13
0
10
Lockers
0583204260 Doors & Hardware
10
26SEP13
09OCT13
0
10
Doors & Hardware
0583204210 Electric & FA Finishes
15
30SEP13
18OCT13
0
15
0583204200 Above Ceiling Inspections Complete
0
01OCT13
0
0
0583204205 Ceiling Pads
10
02OCT13
15OCT13
0
10
0583204265 Marker / Tack Boards
5
10OCT13
16OCT13
0
5
0583204275 Signage
5
16OCT13
22OCT13
0
5
0583204230 Technology Finishes
10
21OCT13
01NOV13
0
10
0583204235 Acoustic Panels
5
21OCT13
25OCT13
0
5
0583204240 Plumbing Finishes
10
21OCT13
01NOV13
0
10
0583204255 Toilet Partitions
10
24OCT13
06NOV13
0
10
Toilet Partitions
0583204280 Toilet Accessories
4
24OCT13
29OCT13
0
4
Toilet Accessories
0583204245 Carpet
10
28OCT13
08NOV13
0
10
0583204270 Projection Screens
5
01NOV13
07NOV13
0
5
Projection Screens
0583204285 FF & E
3
01NOV13
05NOV13
0
3
FF & E
Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Standpipe / Hose Cabinet Building Final Area Enclosure
12JUL13
Finishes
30 29JUL13 Ceiling Grid
Millwork Ceramic Floor Tile Fire Prot Finishes
0 11SEP1 17SEP13
VCT / VET
13 19SEP1
Finish Paint
Electric & FA Finishes Above Ceiling Inspections Complete Ceiling Pads Marker / Tack Boards Signage Technology Finishes Acoustic Panels Plumbing Finishes
Carpet
Third Floor 0583304010 Precast Concrete Deck & Topping
5
28JAN13A
13FEB13A
100
0 28JAN1313FEB13
0583304015 Masonry & In-wall Rough-in
126
26FEB13A
14JUN13A
100
0 26FEB1 14JUN13
0583304020 In-wall Electrical Rough-in
50
26FEB13A
21JUN13A
100
0 26FEB1 21JUN13
0583304025 Masonry Bearing Walls
20
26FEB13A
04APR13A
100
0 26FEB1 04APR13
0583304095 Complete MEP Rough-in - In wall &
90
04MAR13A 21JUN13A
100
0 04MAR121JUN13
0583304055 Door Frames
20
01APR13A
14JUN13A
100
0 01APR1 14JUN13
0583304085 Overhead Rough-in Elec & FA
30
01APR13A
11JUL13A
100
0 01APR1 11JUL13
0583304040 Roof Structural Steel & Deck
20
08APR13A 19APR13A
100
0 08APR1 19APR13
0583304080 Roofing
20
25APR13A 15MAY13A
100
0 25APR1 15MAY13
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Precast Concrete Deck & Topping Masonry & In-wall Rough-in In-wall Electrical Rough-in Masonry Bearing Walls Complete MEP Rough-in - In wall & Overhead Door Frames Overhead Rough-in Elec & FA Roof Structural Steel & Deck Roofing Miles K-8 P58
Sheet 4 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
0583304115 Rough-in Plumbing
30
29APR13A
14JUN13A
100
0 29APR1 14JUN13
0583304125 Rough-in HVAC Piping
30
03MAY13A 17MAY13A
100
0 03MAY117MAY13
0583304050 Complete In-wall Electrical Rough-in
15
06MAY13A 21JUN13A
100
0 06MAY121JUN13
0583304065 Brick Veneer
10
06MAY13A 05JUN13A
100
0 06MAY105JUN13
0583304075 Metal Studs
10
06MAY13A 22MAY13A
100
0 06MAY122MAY13
0583304100 Rough-in Tech Wire
30
24MAY13A 14JUN13A
100
0 24MAY114JUN13
0583304090 Set Windows
15
05JUN13A
18JUN13A
100
0 05JUN1 18JUN13
0583304130 Area C - Temporary Building Enclosure
0
07JUN13A
100
0
0583304120 Rough-in Fire Prot
15
10JUN13A
21JUN13A
100
0 10JUN1 21JUN13
0583304155 Standpipe / Hose Cabinet
3
11JUN13A
14JUN13A
100
0 11JUN1 14JUN13
0583304060 Interior Masonry Walls
10
17JUN13A
21JUN13A
100
0 17JUN1 21JUN13
0583304140 Rough-in HVAC Insulation
30
24JUN13A 23AUG13A
100
0 24JUN1 23AUG13
0583304110 Rough-in HVAC Ductwork
30
01JUL13A
05JUL13A
100
0 01JUL1305JUL13
Rough-in HVAC Ductwork Building Final Area Enclosure
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
Rough-in Plumbing Rough-in HVAC Piping Complete In-wall Electrical Rough-in Brick Veneer Metal Studs Rough-in Tech Wire Set Windows Area C - Temporary Building Enclosure Complete
07JUN13
Rough-in Fire Prot Standpipe / Hose Cabinet Interior Masonry Walls Rough-in HVAC Insulation
0583304105 Building Final Area Enclosure
0
01JUL13A
100
0
0583304160 Drywall & Tape
15
10JUL13A
19JUL13A
100
0 10JUL1319JUL13
0583304165 Prime Paint
20
22JUL13A
16AUG13A
100
0 22JUL1316AUG13
0583304170 Finishes
60
22JUL13A
15NOV13
0583304175 Ceiling Grid
20
19AUG13A 23AUG13A
100
0 19AUG123AUG13
0583304215 Millwork
20
26AUG13A 06SEP13A
100
0 26AUG106SEP13
Millwork
0583304190 Lights in Grid
5
28AUG13A 30AUG13A
100
0 28AUG130AUG13
Lights in Grid
0583304185 HVAC Finishes
10
04SEP13A
19SEP13A
100
0 04SEP1 19SEP13
0583304210 Electric & FA Finishes
15
05SEP13A
11OCT13
0
0583304220 VCT / VET
10
09SEP13A
18SEP13A
100
0 09SEP1 18SEP13
VCT / VET
0583304225 Ceramic Floor Tile
15
09SEP13A
17SEP13A
100
0 09SEP1 17SEP13
Ceramic Floor Tile
0583304180 Fire Prot Finishes
10
19SEP13A
04OCT13
0
10 19SEP1
Fire Prot Finishes
0583304240 Plumbing Finishes
10
19SEP13A
02OCT13
20
8 19SEP1
Plumbing Finishes
0583304250 Lockers
10
23SEP13
04OCT13
0
10
0583304195 Finish Paint
20
25SEP13
22OCT13
0
20
Finish Paint
0583304260 Doors & Hardware
10
30SEP13
11OCT13
0
10
Doors & Hardware
0583304200 Above Ceiling Inspections Complete
0
02OCT13
0583304205 Ceiling Pads
10
07OCT13
18OCT13
33
01JUL13
Drywall & Tape Prime Paint Finishes
40 22JUL13 Ceiling Grid
HVAC Finishes Electric & FA Finishes
15 05SEP1
0
0
0
10
2014 JAN F
Lockers
Above Ceiling Inspections Complete Ceiling Pads Marker / Tack Boards
0583304265 Marker / Tack Boards
5
09OCT13
15OCT13
0
5
0583304230 Technology Finishes
10
16OCT13
29OCT13
0
10
0583304270 Projection Screens
2
16OCT13
17OCT13
0
2
0583304235 Acoustic Panels
5
23OCT13
29OCT13
0
5
Acoustic Panels
0583304255 Toilet Partitions
5
23OCT13
29OCT13
0
5
Toilet Partitions
0583304245 Carpet
10
25OCT13
07NOV13
0
10
Carpet
0583304275 Signage
5
25OCT13
31OCT13
0
5
Signage
0583304280 Toilet Accessories
5
25OCT13
31OCT13
0
5
Toilet Accessories
0583304285 FF & E
3
04NOV13
06NOV13
0
3
Technology Finishes Projection Screens
FF & E
Area B First Floor Gymnasium 0582114115 Load Bearing Masonry
20
11OCT12A 11FEB13A
100
0 11OCT111FEB13
0582114120 Structural Steel & Deck
10
11DEC12A 14FEB13A
100
0 11DEC114FEB13
0582114005 Underground Electrical Rough-in
10
14JAN13A
18JAN13A
100
0 14JAN1318JAN13
0582114130 Roofing
10
18MAR13A 04APR13A
100
0 18MAR104APR13
0582114010 Slab on Grade
5
01APR13A 08APR13A
100
0 01APR1 08APR13
0582114020 Interior MEP Rough-in
55
15APR13A
100
0 15APR1 05JUL13
05JUL13A
0582114025 Fire Protection Rough-in
10
15APR13A 18APR13A
100
0 15APR1 18APR13
0582114140 Brick Veneer
20
15APR13A 09MAY13A
100
0 15APR1 09MAY13
0582114015 Overhead Elec. & Fire Alarm Rough-in
25
17APR13A 29APR13A
100
0 17APR1 29APR13
0582114030 HVAC Rough-in - Ductwork
15
29APR13A
100
0 29APR1 05JUL13
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
05JUL13A
Early Bar Progress Bar Critical Activity
13NOV12
Load Bearing Masonry
07FEB13
Structural Steel & Deck Underground Electrical Rough-in Roofing Slab on Grade Interior MEP Rough-in Fire Protection Rough-in Brick Veneer Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Ductwork Miles K-8 P58
Sheet 5 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Gymnasium Gymnasium Temporary Enclosure Complete
0582114150 Gymnasium Temporary Enclosure
0
09MAY13A
100
0
09MAY13
0582114040 HVAC Rough-in - Piping
10
27MAY13A 06JUN13A
100
0 27MAY106JUN13
0582114055 Fire Protection Finishes
5
27MAY13A 31MAY13A
100
0 27MAY131MAY13
0582114035 Gym Lighting
5
10JUN13A
14JUN13A
100
0 10JUN1 14JUN13
0582114045 HVAC Rough-in - Insulation
10
17JUN13A
28JUN13A
100
0 17JUN1 28JUN13
HVAC Rough-in - Insulation
0582114135 Rouhg-in Tech Wire
20
01JUL13A
12JUL13A
100
0 01JUL1312JUL13
Rouhg-in Tech Wire
0582114050 Finish Painting
5
08JUL13A
19JUL13A
100
0 08JUL1319JUL13
Finish Painting
0582114080 Finishes
60
08JUL13A
25OCT13
58
0582114075 Gym Equipment
10
15JUL13A
24JUL13A
100
0 15JUL1324JUL13
0582114060 HVAC Finishes
10
09SEP13A
13SEP13A
100
0 09SEP1 13SEP13
0582114070 Interior MEP Finishes
15
09SEP13A
27SEP13
67
0582114065 Electric & Fire Alarm Finishes
5
23SEP13
27SEP13
0582114125 Technology Finish
5
23SEP13
27SEP13
0582114085 Stage Equipment
10
26SEP13
0582114090 Stage Lighting
5
0582114095 Gym Flooring
HVAC Rough-in - Piping Fire Protection Finishes Gym Lighting
Finishes
25 08JUL13 Gym Equipment
HVAC Finishes
5 09SEP1
Interior MEP Finishes
0
5
Electric & Fire Alarm Finishes
0
5
Technology Finish
09OCT13
0
10
03OCT13
09OCT13
0
5
25
03OCT13
06NOV13
0
25
0582104270 Proj Screen @ Stage
5
09OCT13
15OCT13
0
5
0582114105 Stage Flooring
10
18OCT13
31OCT13
0
10
0582114110 Operable Partition
5
24OCT13
30OCT13
0
5
Operable Partition
0582114100 Gym Bleachers
10
29OCT13
11NOV13
0
10
Gym Bleachers
Stage Equipment Stage Lighting Gym Flooring Proj Screen @ Stage Stage Flooring
Mechanical Room 0582134015 Wall Electrical Rough-in
15
22OCT12A 29NOV12A
0582134010 MEP Rough-in & Finishes
102
22APR13A
0582134020 Overhead Elec. & Fire Alarm Rough-in
30
22APR13A 17MAY13A
100
0 22APR1 17MAY13
0582134035 HVAC Rough-in - Ductwork
15
06MAY13A 16AUG13A
100
0 06MAY116AUG13
0582134005 Set HVAC Equipment
10
13JUN13A
26JUN13A
100
0 13JUN1 26JUN13
0582134040 HVAC Rough-in - Piping
15
27JUN13A
17SEP13A
100
0 27JUN1 17SEP13
01NOV13
100 71
Wall Electrical Rough-in
0 22OCT129NOV12
MEP Rough-in & Finishes
30 22APR1 Overhead Elec. & Fire Alarm Rough-in
HVAC Rough-in - Ductwork Set HVAC Equipment HVAC Rough-in - Piping
0 29JUL1320AUG13
Fire Protection Rough-in
0 26AUG106SEP13
HVAC Finishes
0582134025 Fire Protection Rough-in
5
29JUL13A
20AUG13A
100
0582134065 HVAC Finishes
10
26AUG13A 06SEP13A
100
0582134045 HVAC Rough-in - Insulation
15
09SEP13A
04OCT13
33
0582134055 Fire Protection Finishes
5
27SEP13
03OCT13
0
5
0582134060 Electric & Fire Alarm Finishes
25
04OCT13
07NOV13
0
25
0582134075 Prime Paint
3
07OCT13
09OCT13
0
3
0582134050 Finish Painting
10
10OCT13
23OCT13
0
10
0582134030 Lighting
5
24OCT13
30OCT13
0
5
HVAC Rough-in - Insulation
10 09SEP1
Fire Protection Finishes Electric & Fire Alarm Finishes Prime Paint Finish Painting Lighting
Area B Foundations
0582104005 Foundations
15
13SEP12A 08OCT12A
100
0 13SEP1 08OCT12
0582104010 Rough-in Plumbing U/G
20
19OCT12A 09NOV12A
100
0 19OCT109NOV12
Rough-in Plumbing U/G
0582104035 Rough-in Electric U/G
10
31OCT12A 16NOV12A
100
0 31OCT116NOV12
Rough-in Electric U/G
0582104045 Place Slab on Grade
5
16NOV12A 20NOV12A
100
0 16NOV120NOV12
Place Slab on Grade
0582104015 Masonry & In-wall Rough-ins
47
03DEC12A 08MAR13A
100
0 03DEC108MAR13
0582104020 In-wall Elec & FA Rough-in
20
03DEC12A 26MAR13A
100
0 03DEC126MAR13
0582104025 Masonry Bearing Walls
20
03DEC12A
16JAN13A
100
0 03DEC116JAN13
0582104040 Structural Steel & Deck
15
28JAN13A
05FEB13A
100
0 28JAN1305FEB13
0582104115 Rough-in Plumbing
20
04FEB13A 15MAR13A
100
0 04FEB1 15MAR13
0582104060 Interior Masonry
15
11FEB13A 08MAR13A
100
0 11FEB1 08MAR13
0582104095 MEP Rough-in
60
18FEB13A 17MAY13A
100
0 18FEB1 17MAY13
0582104120 Rough-in Fire Prot
20
18FEB13A 01MAR13A
100
0 18FEB1 01MAR13
Rough-in Fire Prot
0582104295 Fire Protection Rough - in
10
18FEB13A
28FEB13A
100
0 18FEB1 28FEB13
Fire Protection Rough - in
0582104050 Complete In-wall Rough-in
10
11MAR13A 26MAR13A
100
0 11MAR126MAR13
Complete In-wall Rough-in
0582104075 Metal Studs
10
18MAR13A 26MAR13A
100
0 18MAR126MAR13
Metal Studs
0582104110 Rough-in HVAC Ductwork
20
18MAR13A 15APR13A
100
0 18MAR115APR13
0582104135 Stair D
5
18MAR13A 22MAR13A
100
0 18MAR122MAR13
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Masonry & In-wall Rough-ins In-wall Elec & FA Rough-in 07DEC12
Masonry Bearing Walls
10JAN13
Structural Steel & Deck Rough-in Plumbing Interior Masonry MEP Rough-in
Rough-in HVAC Ductwork Stair D Miles K-8 P58
Sheet 6 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Area B 0582104055 Door Frames in Metal Studs
10
20MAR13A 29MAR13A
100
0 20MAR129MAR13
0582104085 Overhead Rough-in Elec & FA
20
01APR13A 03MAY13A
100
0 01APR1 03MAY13
0582104125 Rough-in HVAC Piping
20
01APR13A 18APR13A
100
0 01APR1 18APR13
Door Frames in Metal Studs Overhead Rough-in Elec & FA Rough-in HVAC Piping Stair Pan Concrete Fill
0582104150 Stair Pan Concrete Fill
5
04APR13A 05APR13A
100
0 04APR1 05APR13
0582104065 Brick Veneer
10
13MAY13A 28MAY13A
100
0 13MAY128MAY13
Brick Veneer
0582104080 Roofing
20
17MAY13A 29MAY13A
100
0 17MAY129MAY13
Roofing
0582104140 Rough-in HVAC Insulation
20
03JUN13A
06SEP13A
100
0 03JUN1 06SEP13
0582104155 Standpipe / Hose Cabinet
3
03JUN13A
06JUN13A
100
0 03JUN1 06JUN13
0582104090 Set Windows
20
12JUN13A
21JUN13A
100
0 12JUN1 21JUN13
0582104105 Building Area Final Enclosure
0
21JUN13A
100
0
21JUN13
Building Area Final Enclosure
0582104300 Area B Temporary Enclosure Complete
0
21JUN13A
100
0
21JUN13
Area B Temporary Enclosure Complete
0582104100 Rough-in Tech Wire
20
24JUN13A
19JUL13A
100
0 24JUN1 19JUL13
0582104070 Frost Slabs
5
27JUN13A
01JUL13A
100
0 27JUN1 01JUL13
0582104160 Drywall & Tape
15
01JUL13A
30AUG13A
100
0 01JUL1330AUG13
Drywall & Tape
0582104165 Prime Paint
20
29JUL13A
06SEP13A
100
0 29JUL1306SEP13
Prime Paint
0582104170 Finishes
60
29JUL13A
25OCT13
58
25 29JUL13
0582104290 Fire System Manifold
5
12AUG13A
27SEP13
0
5 12AUG1
0582104175 Ceiling Grid
15
09SEP13A
13SEP13A
100
0 09SEP1 13SEP13
Ceiling Grid
0582104185 HVAC Finishes
10
09SEP13A
13SEP13A
100
0 09SEP1 13SEP13
HVAC Finishes
0582104190 Lights in Grid
15
11SEP13A
18SEP13A
100
0 11SEP1 18SEP13
Lights in Grid
0582104180 Fire Prot Finishes
10
19SEP13A
04OCT13
0
10 19SEP1
0582104195 Finish Paint
20
23SEP13
18OCT13
0
20
0582104215 Millwork
10
30SEP13
11OCT13
0
10
0582104220 VCT / VET
10
30SEP13
11OCT13
0
10
0582104200 Above Ceiling Inspections Complete
0
07OCT13
0
0
0582104205 Ceiling Pads
15
07OCT13
25OCT13
0
15
0582104210 Electric & FA Finishes
20
07OCT13
01NOV13
0
20
0582104225 Ceramic Floor Tile
10
07OCT13
18OCT13
0
10
Ceramic Floor Tile
0582104235 Acoustic Panels
10
09OCT13
22OCT13
0
10
Acoustic Panels
0582104230 Technology Finishes
20
14OCT13
08NOV13
0
20
0582104240 Plumbing Finishes
10
14OCT13
25OCT13
0
10
Plumbing Finishes
0582104250 Lockers
10
14OCT13
25OCT13
0
10
Lockers
0582104260 Doors & Hardware
10
14OCT13
25OCT13
0
10
Doors & Hardware
0582104245 Carpet
10
18OCT13
31OCT13
0
10
Carpet
0582104255 Toilet Partitions
10
21OCT13
01NOV13
0
10
Toilet Partitions
0582104265 Marker / Tack Boards
10
21OCT13
01NOV13
0
10
0582104275 Signage
5
21OCT13
25OCT13
0
5
0582104280 Toilet Accessories
5
28OCT13
01NOV13
0
5
0582104285 FF & E
3
05NOV13
07NOV13
0
3
Rough-in HVAC Insulation Standpipe / Hose Cabinet Set Windows
Rough-in Tech Wire Frost Slabs
Finishes Fire System Manifold
Fire Prot Finishes Finish Paint Millwork VCT / VET Above Ceiling Inspections Complete Ceiling Pads Electric & FA Finishes
Technology Finishes
Marker / Tack Boards Signage Toilet Accessories FF & E
Area A First Floor Kitchen Underslab Plumbing Rough-in
0581124095 Underslab Plumbing Rough-in
8
12NOV12A 26NOV12A
100
0 12NOV126NOV12
0581124090 Underslab Electrical Rough-in
8
16NOV12A 03DEC12A
100
0 16NOV103DEC12
0581124085 Slab on Grade
5
04DEC12A 12DEC12A
100
0 04DEC112DEC12
0581124065 Fire Protection Rough-in
10
14MAY13A 20MAY13A
100
0 14MAY120MAY13
0581124075 MEP Rough-in
20
14MAY13A 28JUN13A
100
0 14MAY128JUN13
MEP Rough-in
0581124035 Electrical Rough-in
10
17JUN13A
28JUN13A
100
0 17JUN1 28JUN13
Electrical Rough-in
0581124030 HVAC Rough-in
10
12AUG13A 30AUG13A
100
0 12AUG130AUG13
0581124105 Finishes
63
12AUG13A
0581124020 Security Grille
5
0581124025 Finish Paint
5
0581124050 Ceiling Grid
5
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
Underslab Electrical Rough-in Slab on Grade Fire Protection Rough-in
HVAC Rough-in Finishes
29OCT13
57
27 12AUG1
23SEP13
27SEP13
0
5
Security Grille
25SEP13
01OCT13
0
5
Finish Paint
25SEP13
01OCT13
0
5
Ceiling Grid Early Bar Progress Bar Critical Activity
Miles K-8 P58
Sheet 7 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
0581124040 Electrical Finishes
5
30SEP13
04OCT13
0
5
Electrical Finishes
0581124070 Fire Protection Finishes
3
30SEP13
02OCT13
0
3
Fire Protection Finishes
0581124080 Plumbing Finishes
5
30SEP13
04OCT13
0
5
Plumbing Finishes
0581124015 Install Kitchen Tile
10
02OCT13
15OCT13
0
10
0581124055 Lights in Grid
5
02OCT13
08OCT13
0
5
0581124100 Above Ceiling Inspections Complete
0
03OCT13
0
0
0581124045 HVAC Finishes
5
07OCT13
11OCT13
0
5
HVAC Finishes
0581124060 Ceiling Pads
5
07OCT13
11OCT13
0
5
Ceiling Pads
0581124010 Install Kitchen Equipment
10
16OCT13
29OCT13
0
10
0581124005 Kitchen Equipment Hook-ups
15
21OCT13
08NOV13
0
15
0581104005 Foundations
15
20SEP12A 01OCT12A
100
0 20SEP1 01OCT12
0581104010 Rough-in Plumbing U/G
10
09NOV12A 15NOV12A
100
0 09NOV115NOV12
0581104035 Rough-in Electric U/G
15
13NOV12A 03DEC12A
100
0 13NOV103DEC12
0581104015 Masonry & In-wall Rough-in
30
03DEC12A 05APR13A
100
0 03DEC105APR13
23JAN13
11FEB13
0581104020 In-wall Electrical Rough-in
30
03DEC12A 05APR13A
100
0 03DEC105APR13
23JAN13
11FEB13
0581104025 Masonry Bearing Walls
30
03DEC12A 06MAR13A
100
0 03DEC106MAR13
23JAN13
11FEB13
0581104050 Complete In-wall Electrical Rough-in
30
03DEC12A 16MAY13A
100
0 03DEC116MAY13
23JAN13
11FEB13
0581104095 Complete MEP Rough-in - In wall &
110
03DEC12A 14JUN13A
100
0 03DEC114JUN13
0581104045 Place Slab on Grade
10
04DEC12A 12DEC12A
100
0 04DEC112DEC12
0581104055 Door Frames
20
14JAN13A
12APR13A
100
0 14JAN1312APR13
0581104135 Structural Steel & Deck
15
04MAR13A 28MAR13A
100
0 04MAR128MAR13
0581104060 Interior Masonry Walls
20
25MAR13A 05APR13A
100
0 25MAR105APR13
0581104075 Metal Studs
10
03APR13A 11APR13A
100
0581104170 Finishes
80
03APR13A
0581104295 Electrical Rough-in - Stud Walls
10
15APR13A 16MAY13A
100
0 15APR1 16MAY13
0581104115 Rough-in Plumbing
30
22APR13A
100
0 22APR1 21JUN13
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Kitchen
Install Kitchen Tile Lights in Grid Above Ceiling Inspections Complete
Install Kitchen Equipment Kitchen Equipment Hook-ups
Area A
30OCT13 21JUN13A
65
Foundations Rough-in Plumbing U/G Rough-in Electric U/G Masonry & In-wall Rough-in In-wall Electrical Rough-in Masonry Bearing Walls Complete In-wall Electrical Rough-in Complete MEP Rough-in - In wall & Overhead Place Slab on Grade Door Frames Structural Steel & Deck Interior Masonry Walls Metal Studs
0 03APR1 11APR13
Finishes
28 03APR1 Electrical Rough-in - Stud Walls Rough-in Plumbing Rough-in Fire Prot
0581104120 Rough-in Fire Prot
20
22APR13A 03MAY13A
100
0 22APR1 03MAY13
0581104085 Overhead Rough-in Elec & FA
30
29APR13A 17MAY13A
100
0 29APR1 17MAY13
Overhead Rough-in Elec & FA
0581104065 Brick Veneer
10
14MAY13A 18JUN13A
100
0 14MAY118JUN13
Brick Veneer
0581104110 Rough-in HVAC Ductwork
30
20MAY13A 28JUN13A
100
0 20MAY128JUN13
0581104125 Rough-in HVAC Piping
30
20MAY13A
100
0 20MAY105JUL13
05JUL13A
0581104130 Roofing
10
27MAY13A 05JUN13A
100
0 27MAY105JUN13
0581104155 Standpipe / Hose Cabinet
3
27MAY13A 30MAY13A
100
0 27MAY130MAY13
0581104140 Rough-in HVAC Insulation
30
10JUN13A
13SEP13A
100
0 10JUN1 13SEP13
0581104090 Set Windows
10
13JUN13A
12JUL13A
100
0 13JUN1 12JUL13
0581104100 Rough-in Tech Wire
30
24JUN13A
18JUL13A
100
0 24JUN1 18JUL13
02JUL13A
Rough-in HVAC Ductwork Rough-in HVAC Piping Roofing Standpipe / Hose Cabinet Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Frost Slabs
0581104070 Frost Slabs
5
08JUL13A
100
0 02JUL1308JUL13
0581104105 Building Final Area Enclosure
0
12JUL13A
100
0
12JUL13
Building Final Area Enclosure
0581104160 Drywall & Tape
15
21AUG13A 04SEP13A
100
0 21AUG104SEP13
Drywall & Tape
0581104165 Prime Paint
15
05SEP13A
11SEP13A
100
0 05SEP1 11SEP13
Prime Paint
0581104175 Ceiling Grid
15
12SEP13A
11OCT13
0
Ceiling Grid
15 12SEP1
Ceramic Floor Tile
0581104225 Ceramic Floor Tile
10
19SEP13A
20SEP13A
100
0581104190 Lights in Grid
10
23SEP13
04OCT13
0
10
0581104210 Electric & FA Finishes
15
27SEP13
17OCT13
0
15
0581104195 Finish Paint
15
30SEP13
18OCT13
0
15
0581104200 Above Ceiling Inspections Complete
0
07OCT13
0
0
0581104215 Millwork
20
07OCT13
01NOV13
0
20
0581104235 Acoustic Panels
5
07OCT13
11OCT13
0
5
Acoustic Panels
0581104275 Signage
5
07OCT13
11OCT13
0
5
Signage
0581104265 Marker / Tack Boards
10
08OCT13
21OCT13
0
10
0581104180 Fire Prot Finishes
10
14OCT13
25OCT13
0
10
Fire Prot Finishes
0581104185 HVAC Finishes
10
14OCT13
25OCT13
0
10
HVAC Finishes
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
0 19SEP1 20SEP13
Lights in Grid Electric & FA Finishes Finish Paint Above Ceiling Inspections Complete Millwork
Marker / Tack Boards
Early Bar Progress Bar Critical Activity
Miles K-8 P58
Sheet 8 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
% Rem Actual Comp Dur Start
Actual Finish
Suspend Date
Resume Date
0581104220 VCT / VET
20
14OCT13
08NOV13
0
20
0581104230 Technology Finishes
10
14OCT13
25OCT13
0
10
Technology Finishes
0581104240 Plumbing Finishes
10
14OCT13
25OCT13
0
10
Plumbing Finishes
0581104245 Carpet
15
14OCT13
01NOV13
0
15
0581104270 Projection Screens
5
14OCT13
18OCT13
0
5
Projection Screens
0581104205 Ceiling Pads
10
15OCT13
28OCT13
0
10
Ceiling Pads
0581104255 Toilet Partitions
10
17OCT13
30OCT13
0
10
Toilet Partitions
0581104260 Doors & Hardware
10
21OCT13
01NOV13
0
10
Doors & Hardware
0581104280 Toilet Accessories
5
31OCT13
06NOV13
0
5
Toilet Accessories
0581104285 FF & E
3
31OCT13
04NOV13
0
3
FF & E
0580007110 Punchlist
20
11OCT13
07NOV13
0
20
0580007010 Contractor Punchlist
20
16OCT13
12NOV13
0
20
0580007060 Project Team - Controls Check-out
5
16OCT13
22OCT13
0
5
Project Team - Controls Check-out
0580007015 HVAC Controls Check-out and
15
17OCT13
06NOV13
0
15
HVAC Controls Check-out and Balancing
0580007035 JACE Interface Check-out
5
17OCT13
23OCT13
0
5
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
2013 JUL
AUG
SEP
OCT
NOV
DEC
2014 JAN F
Area A VCT / VET
Carpet
Close-Out
0580007055 As-Built Documents Submitted
5
21OCT13
25OCT13
0
5
0580007065 Building Commissioning
5
24OCT13
30OCT13
0
5
0580007005 Operation & Maintenance Manuals
0
25OCT13
0
0
Punchlist Contractor Punchlist
JACE Interface Check-out As-Built Documents Submitted Building Commissioning Operation & Maintenance Manuals Submitted Demonstration & Training
0580007085 Demonstration & Training
5
28OCT13
01NOV13
0
5
0580007025 Initial Architect's Punchlist/ Final
10
25OCT13
07NOV13
0
10
0580007090 Close-out Documents
45
30OCT13
31DEC13
0
45
Close-out Documents Final Inspections / Testing
Initial Architect's Punchlist/ Final Cleaning
0580007020 Final Inspections / Testing
5
31OCT13
06NOV13
0
5
0580007050 Architect's Punch List
5
05NOV13
11NOV13
0
5
0580007030 Fire Alarm Programming & Testing
5
05NOV13
11NOV13
0
5
0580007040 Final Inspections Complete
0
11NOV13
0
0
Final Inspections Complete MEP Commissioning Complete
0580007070 MEP Commissioning Complete
0
0580007120 LEED Air Testing
1
0580007075 Certificate of Occupancy
0
0580007080 Owner Move In
10
0580007100 Owner Move-in Complete
0
0580007105 Contract Close-out
0
Start Date Finish Date Data Date Run Date
26APR12 07JAN14 23SEP13 25SEP13 09:58
Š Primavera Systems, Inc.
11NOV13 13NOV13*
11NOV13
0
0
11NOV13
0
1
12NOV13
0
0
26NOV13
0
10
26NOV13
0
0
07JAN14
0
0
Architect's Punch List Fire Alarm Programming & Testing
LEED Air Testing Certificate of Occupancy Owner Move In Owner Move-in Complete Contract Close-out
Early Bar Progress Bar Critical Activity
Miles K-8 P58
Sheet 9 of 9
Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
2013 JUN
JUL
AUG
SEP
OCT
NOV
Bid & Award
Bid Opening
0650001005
Bid Opening
0
19APR12A
0
100
0650001010
Bid Evaluation and Award
25
19APR12A
23MAY12A
0
100
0650001095
Hold Bid
1
19APR12A
19APR12A
0
100
0650001015
NTP - BP 061,210,220,230,260,270,300,310,329
0
23MAY12A
0
100
0650001090
Construction Kick-off Meeting
1
31MAY12A
31MAY12A
0
100
0650001020
Site Mobilization - BP 061 General Trades
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 061 General Trades
0650001025
Prime Contractors Submit Schedules
10
01JUN12A
14JUN12A
0
100
Prime Contractors Submit Schedules
0650001045
Site Mobilization - BP 210 Fire Protection
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 210 Fire Protection
0650001050
Site Mobilization - BP 220 Plumbing
10
01JUN12A
14JUN12A
0
100
Bid Evaluation and Award Hold Bid NTP - BP 061,210,220,230,260,270,300,310,329 Construction Kick-off Meeting
Site Mobilization - BP 220 Plumbing Site Mobilization - BP 230 HVAC
0650001055
Site Mobilization - BP 230 HVAC
7
01JUN12A
11JUN12A
0
100
0650001060
Site Mobilization - BP 260 Electrical
10
01JUN12A
14JUN12A
0
100
0650001065
Site Mobilization - BP 270 Technology
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 270 Technology
0650001070
Site Mobilization - BP 300 Site Concrete
7
01JUN12A
11JUN12A
0
100
Site Mobilization - BP 300 Site Concrete
0650001075
Site Mobilization - BP 310 Site Work
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 310 Site Work
0650001080
Site Mobilization - BP 329 Landscaping
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 329 Landscaping
0650001085
Site Mobilization - BP 121 FF & E
10
01JUN12A
14JUN12A
0
100
Site Mobilization - BP 121 FF & E
0650001030
Schedule Meeting(s) to Review Schedule
10
15JUN12A
28JUN12A
0
100
0650001035
Prime Contractors/CM Final Review Schedule
45
03JUL12A
03SEP12A
0
100
0650001040
Contractors Sign Off - Project Baseline Schedule
0
21SEP12A
0
100
Site Mobilization - BP 260 Electrical
Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Contractors Sign Off - Project Baseline Schedule
Submittals & Approvals
Submittal Plumbing
0650002005
Submittal Plumbing
10
30APR12A
11MAY12A
0
100
0650002010
Submittal HVAC Equipment
20
30APR12A
25MAY12A
0
100
0650002015
Coordination Drawing Meetings HVAC/E/P/FP/GTC
45
30APR12A
29JUN12A
0
100
0650002020
Submittal Electrical & Fire Alarm
25
30APR12A
01JUN12A
0
100
0650002025
Site Submittals
5
30APR12A
04MAY12A
0
100
0650002035
Submittal Block and Mortar
10
30APR12A
11MAY12A
0
100
Submittal Block and Mortar
0650002040
Submittal Brick and Mortar
10
30APR12A
11MAY12A
0
100
Submittal Brick and Mortar
0650002045
Submittal Structural Steel/Joists/Deck
45
30APR12A
29JUN12A
0
100
0650002055
Submittal Roofing
20
30APR12A
25MAY12A
0
100
Submittal Roofing
0650002060
Submittal HM Frame
20
30APR12A
25MAY12A
0
100
Submittal HM Frame
0650002065
Submittal Windows and Curtain Wall
40
30APR12A
22JUN12A
0
100
0650002070
Submittal / Shop Drawings Fire Protection
35
30APR12A
15JUN12A
0
100
0650002125
Geopier Design Submittal for Record
25
30APR12A
01JUN12A
0
100
0650002075
Review and Approval Plumbing Submittal
15
07MAY12A
25MAY12A
0
100
0650002080
Review and Approval Site Submittal
5
07MAY12A
11MAY12A
0
100
0650002090
Review and Approval Block and Mortar
15
14MAY12A
01JUN12A
0
100
Review and Approval Block and Mortar
0650002100
Review and Approval Brick and Mortar
15
14MAY12A
01JUN12A
0
100
Review and Approval Brick and Mortar
0650002110
Review and Approval Structural Steel/Joists/Deck
45
21MAY12A
20JUL12A
0
100
0650001125
Review and Approval Roofing Submittal
15
28MAY12A
15JUN12A
0
100
Review and Approval Roofing Submittal
0650002115
Review and Approve HVAC Submittal
15
28MAY12A
15JUN12A
0
100
Review and Approve HVAC Submittal
0650002120
Review and Approval HM Frames
15
28MAY12A
15JUN12A
0
100
Review and Approval HM Frames
0650002130
Review & App Electric and Fire Alarm Submittal
15
04JUN12A
22JUN12A
0
100
0650002135
City Review & Approval Fire Protection Submittal
20
18JUN12A
13JUL12A
0
100
0650002140
Review and Approval Fire Submittal
15
18JUN12A
06JUL12A
0
100
0650002145
Review and Approve Windows and Curtain Wall
15
25JUN12A
13JUL12A
0
100
0650002095
Submittal - Precast Concrete Plank
20
26JUN12A
26JUN12A
0
100
0650002105
Review and Approve Precast Concrete Plank
15
26JUN12A
21AUG12A
0
100
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Submittal HVAC Equipment Coordination Drawing Meetings HVAC/E/P/FP/GTC Submittal Electrical & Fire Alarm Site Submittals
Submittal Structural Steel/Joists/Deck
Submittal Windows and Curtain Wall Submittal / Shop Drawings Fire Protection Geopier Design Submittal for Record Review and Approval Plumbing Submittal Review and Approval Site Submittal
Review and Approval Structural Steel/Joists/Deck
Review & App Electric and Fire Alarm Submittal City Review & Approval Fire Protection Submittal Review and Approval Fire Submittal Review and Approve Windows and Curtain Wall Submittal - Precast Concrete Plank Review and Approve Precast Concrete Plank O011 - MonthlyRpt - 11x17
Sheet 1 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
19JUL12A
19JUL12A
0
100
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Submittal Concrete/Rebar
0650002030
Submittal Concrete/Rebar
10
0650002085
Review and Approval Concrete & Rebar
5
19JUL12A
02AUG12A
0
100
0650002150
Review Coordination Drawings and Sign-Off
5
05NOV12A
05NOV12A
0
100
0650003005
Delivery of Plumbing Material
5
10MAY12A
16MAY12A
0
100
Delivery of Plumbing Material
0650003010
Delivery of Site Materials
10
14MAY12A
25MAY12A
0
100
Delivery of Site Materials
0650003015
Fabrication and Deliver Concrete Steel/Rebar
5
21MAY12A
25MAY12A
0
100
Fabrication and Deliver Concrete Steel/Rebar
0650003020
Fabrication and Delivery - CMU Units
5
04JUN12A
08JUN12A
0
100
Fabrication and Delivery - CMU Units
0650003025
Fabrication and Delivery - CMU
35
04JUN12A
20JUL12A
0
100
0650003030
Fabrication and Deliver - Structural Steel
40
11JUN12A
03AUG12A
0
100
0650003035
Fabrication and Delivery Steel Joists Deck-Roof
60
11JUN12A
31AUG12A
0
100
0650003040
Fab & Deliver HVAC Units
60
18JUN12A
07SEP12A
0
100
0650003045
Fabrication and Delivery - Roofing Materials
60
18JUN12A
07SEP12A
0
100
0650003050
Fabrication and Delivery - HM Frames
30
18JUN12A
27JUL12A
0
100
Fabrication and Delivery - HM Frames
0650003065
Fabrication & Delivery of Precast Concrete Plank
30
18JUN12A
27JUL12A
0
100
Fabrication & Delivery of Precast Concrete Plank
0650003055
Fabrication and Delivery -Windows & Curtain Wall
80
16JUL12A
16APR13A
0
100
Review and Approval Concrete & Rebar Review Coordination Drawings and Sign-Off
Fab & Deliver
Fabrication and Delivery - CMU Fabrication and Deliver - Structural Steel Fabrication and Delivery Steel Joists Deck-Roof Fab & Deliver HVAC Units Fabrication and Delivery - Roofing Materials
Fabrication and Delivery -Windows & Curtain Wall
Construction Sitework
0655004030
Rough Grade / Building Pad
5
13JUN12A
25APR12A
0
100
Rough Grade / Building Pad
0655004035
Water & Fire Line
10
20JUL12A
24JUL12A
0
100
Water & Fire Line
0655004015
Sanitary Sewer
5
25JUL12A
10AUG12A
0
100
Sanitary Sewer
0655004070
South Storm Sewer
10
25JUL12A
03AUG12A
0
100
South Storm Sewer
0655004005
North Parking Lot Storm Sewer
15
30JUL12A
03AUG12A
0
100
North Parking Lot Storm Sewer
0655004020
Access Roads / Laydown / Parking
10
08AUG12A
03SEP12A
0
100
0655004040
Electrical Duct Banks
10
28AUG12A
07SEP12A
0
100
0655004045
Set Transformer Vault
2
29AUG12A
30AUG12A
0
100
0655004050
Set Transformer
5
11FEB13A
12FEB13A
0
100
0651104030
Generator Enclosure Concrete & Masonry
15
15JUL13A
17JUL13A
0
100
0655004085
Finish Grading
5
15JUL13A
01AUG13A
0
100
0655004100
Curbs
15
15JUL13A
24SEP13
0
98
0655004115
Sidewalks
15
15JUL13A
24SEP13
0
98
0655004105
Site Improvements
45
01AUG13A
09OCT13
11
75
0655004110
Light Poles & Wiring
15
27AUG13A
30SEP13
4
75
Access Roads / Laydown / Parking Electrical Duct Banks Set Transformer Vault Set Transformer Generator Enclosure Concrete & Masonry Finish Grading Curbs Sidewalks Site Improvements Light Poles & Wiring
0655004055
Exterior Building Light Fixtures
5
25SEP13
01OCT13
5
0
Exterior Building Light Fixtures
0655004120
Paving and Striping
5
25SEP13
01OCT13
5
0
Paving and Striping
0655004125
Site Fencing
5
02OCT13
08OCT13
5
0
0655004130
Landscaping
5
07OCT13
11OCT13
5
0
0651104015
Masonry & In-wall Rough-in
30
17JUL12A
27AUG12A
0
100
0651104305
Geopiers
15
24JUL12A
01AUG12A
0
100
0651104005
Foundations Area A
15
13AUG12A
05SEP12A
0
100
0651104010
Rough-in Plumbing U/G - Area A
10
13AUG12A
11SEP12A
0
100
0651104025
Masonry Bearing Walls Area A
30
15AUG12A
10NOV12A
0
100
Masonry Bearing Walls Area A
0651104055
Door Frames Area A First Floor
20
15AUG12A
10NOV12A
0
100
Door Frames Area A First Floor
0651104020
In-wall Electrical Rough-in Area A First Floor
30
22AUG12A
16OCT12A
0
100
0651104035
Rough-in Electric U/G - Area A
15
22AUG12A
09OCT12A
0
100
Site Fencing Landscaping
Area A First Floor
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Masonry & In-wall Rough-in Geopiers Foundations Area A Rough-in Plumbing U/G - Area A
In-wall Electrical Rough-in Area A First Floor Rough-in Electric U/G - Area A O011 - MonthlyRpt - 11x17
Sheet 2 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor Place Slab on Grade Area A
0651104045
Place Slab on Grade Area A
10
21SEP12A
12OCT12A
0
100
0651104115
Rough-in Plumbing - Area A First Floor
40
09NOV12A
15MAR13A
0
100
0651104110
Rough-in HVAC Ductwork - Area A First Floor
30
15NOV12A
18JUL13A
0
100
0651104060
Interior Masonry Walls Area A First Floor
20
03DEC12A
21FEB13A
0
100
0651104130
Equipment Pads
5
10DEC12A
10DEC12A
0
100
0651104120
Rough-in Fire Prot - Area A First Floor
20
19DEC12A
18JAN13A
0
100
Rough-in Fire Prot - Area A First Floor
0651104125
Rough-in HVAC Piping - Area A First Floor
30
19DEC12A
17JAN13A
0
100
Rough-in HVAC Piping - Area A First Floor
0651104050
Complete In-wall Electrical Rough-in Area A
20
21JAN13A
21FEB13A
0
100
0651104085
Overhead Rough-in Elec & FA - Area First Floor
35
21JAN13A
19SEP13A
0
100
0651104135
Stair B,C
10
21JAN13A
06MAR13A
0
100
Stair B,C
0651104150
Stair Concrete Pan Fill
10
06MAR13A
06MAR13A
0
100
Stair Concrete Pan Fill
0651104075
Metal Studs Area A First Floor
7
01APR13A
13MAY13A
0
100
0651104140
Rough-in HVAC Insulation - Area A First Floor
30
06APR13A
01AUG13A
0
100
Rough-in HVAC Insulation - Area A First Floor
0651104155
Standpipe / Hose Cabinet
3
08APR13A
16SEP13A
0
100
Standpipe / Hose Cabinet
0651104295
Electrical Rough-in - Stud Walls
7
08APR13A
14JUN13A
0
100
0651104100
Rough-in Tech Area A - First Floor
30
15APR13A
27MAY13A
0
100
0651104065
CMU Veneer Area A First Floor
15
30APR13A
24SEP13
0
98
0651104090
Set Windows Area A First Floor
20
15JUL13A
15AUG13A
0
100
0651104160
Drywall & Tape Area A First Floor
12
01AUG13A
09SEP13A
0
100
0651104165
Prime Paint Area A First Floor
10
05AUG13A
09SEP13A
0
100
0651104070
Frost Slabs
5
07AUG13A
13AUG13A
0
100
Rough-in Plumbing - Area A First Floor Rough-in HVAC Ductwork - Area A First Floor Interior Masonry Walls Area A First Floor Equipment Pads
Complete In-wall Electrical Rough-in Area A Overhead Rough-in Elec & FA - Area First Floor
Metal Studs Area A First Floor
Electrical Rough-in - Stud Walls Rough-in Tech Area A - First Floor CMU Veneer Area A First Floor Set Windows Area A First Floor Drywall & Tape Area A First Floor Prime Paint Area A First Floor Frost Slabs Ceiling Grid Area A First Floor
0651104175
Ceiling Grid Area A First Floor
20
08AUG13A
17SEP13A
0
100
0651104195
Finish Paint Area A First Floor
10
12AUG13A
26SEP13
2
80
0651104180
Fire Prot Finishes - Area A First Floor
10
14AUG13A
27SEP13
3
75
0651104145
Elevator
20
26AUG13A
27SEP13
3
85
0651104215
Millwork Area A First Floor
20
10SEP13A
30SEP13
4
80
Millwork Area A First Floor
0651104260
Doors & Hardware Area A First Floor
10
10SEP13A
25SEP13
1
90
Doors & Hardware Area A First Floor
0651104105
Building Final Area Enclosure
0
10SEP13A
0
100
0651104225
Ceramic Floor Tile Area A First Floor
20
11SEP13A
17SEP13A
0
100
0651104185
HVAC Finishes - Area A First Floor
10
13SEP13A
24SEP13
0
98
0651104285
FF & E Area A First Floor
3
16SEP13A
24SEP13
0
85
0651104190
Lights in Grid - Area A - First Floor
10
20SEP13A
0651104200
Above Ceiling Inspections Complete
0
25SEP13
0651104205
Ceiling Pads Area A First Floor
5
25SEP13
0651104210
Electric & FA Finishes - Area A First Floor
5
25SEP13
0651104220
VCT / VET Area A First Floor
5
25SEP13
Finish Paint Area A First Floor Fire Prot Finishes - Area A First Floor Elevator
Building Final Area Enclosure Ceramic Floor Tile Area A First Floor HVAC Finishes - Area A First Floor FF & E Area A First Floor
5
50
Lights in Grid - Area A - First Floor
0
0
Above Ceiling Inspections Complete
01OCT13
5
0
Ceiling Pads Area A First Floor
01OCT13
5
0
Electric & FA Finishes - Area A First Floor
01OCT13
5
0
VCT / VET Area A First Floor
01OCT13
0651104230
Technology Finishes Area A - First Floor
5
25SEP13
01OCT13
5
0
Technology Finishes Area A - First Floor
0651104235
Acoustic Panels Area A First Floor
5
25SEP13
01OCT13
5
0
Acoustic Panels Area A First Floor
0651104245
Carpet Area A First Floor
10
25SEP13
08OCT13
10
0
0651104240
Plumbing Finishes - Area A First Floor
10
27SEP13
10OCT13
10
0
0651104255
Toilet Partitions Area A First Floor
5
02OCT13
08OCT13
5
0
Toilet Partitions Area A First Floor
Carpet Area A First Floor Plumbing Finishes - Area A First Floor
0651104265
Marker / Tack Boards Area A First Floor
5
02OCT13
08OCT13
5
0
Marker / Tack Boards Area A First Floor
0651104270
Projection Screens Area A First Floor
5
02OCT13
08OCT13
5
0
Projection Screens Area A First Floor
0651104275
Signage Area A First Floor
5
02OCT13
08OCT13
5
0
Signage Area A First Floor
0651104280
Toilet Accessories Area A Third Floor
5
02OCT13
08OCT13
5
0
Toilet Accessories Area A Third Floor
0651204010
Precast Concrete Deck
1
01NOV12A
08NOV12A
0
100
0651204015
Masonry & In-wall Rough-in
5
10NOV12A
01DEC12A
0
100
Masonry & In-wall Rough-in
0651204025
Masonry Bearing Walls Area A
5
10NOV12A
01DEC12A
0
100
Masonry Bearing Walls Area A
0651204055
Door Frames Area A Second Floor
20
20NOV12A
04FEB13A
0
100
0651204060
Interior Masonry Walls Area A Second Floor
10
23NOV12A
14JUN13A
0
100
0651204070
Equipment Pads
5
17DEC12A
18DEC12A
0
100
0651204120
Rough-in Fire Prot - Area A Second Floor
20
15JAN13A
25JAN13A
0
100
Second Floor
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Precast Concrete Deck
Door Frames Area A Second Floor Interior Masonry Walls Area A Second Floor Equipment Pads Rough-in Fire Prot - Area A Second Floor O011 - MonthlyRpt - 11x17
Sheet 3 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
17JAN13A
31JAN13A
0
100
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Second Floor 0651204125
Rough-in HVAC Piping - Area A Second Floor
30
0651204085
Overhead Rough-in Elec & FA - Area Second Floor
35
28JAN13A
23MAY13A
0
100
0651204020
In-wall Electrical Rough-in Area A Second Floor
2
18FEB13A
15JUL13A
0
100
0651204050
Complete In-wall Electrical Rough-in Area A
15
18FEB13A
10JUN13A
0
100
0651204110
Rough-in HVAC Ductwork - Area A Second Floor
30
18MAR13A
15JUL13A
0
100
0651204115
Rough-in Plumbing - Area A Second Floor
30
20MAR13A
21MAY13A
0
100
0651204095
Complete MEP Rough-in - In wall & Overhead
70
25MAR13A
28MAY13A
0
100
0651204140
Rough-in HVAC Insulation - Area A Second Floor
30
08APR13A
01AUG13A
0
100
0651204155
Standpipe / Hose Cabinet
3
08APR13A
15JUL13A
0
100
0651204100
Rough-in Tech Area A - Second Floor
30
15APR13A
23JUL13A
0
100
Rough-in HVAC Piping - Area A Second Floor Overhead Rough-in Elec & FA - Area Second Floor In-wall Electrical Rough-in Area A Second Floor Complete In-wall Electrical Rough-in Area A Rough-in HVAC Ductwork - Area A Second Floor Rough-in Plumbing - Area A Second Floor Complete MEP Rough-in - In wall & Overhead Rough-in HVAC Insulation - Area A Second Floor Standpipe / Hose Cabinet Rough-in Tech Area A - Second Floor Metal Studs Area A Second Floor
0651204075
Metal Studs Area A Second Floor
10
22APR13A
11JUN13A
0
100
0651204065
CMU Veneer Area A Second Floor
20
06MAY13A
22JUL13A
0
100
0651204160
Drywall & Tape Area A Second Floor
15
12JUN13A
09SEP13A
0
100
Drywall & Tape Area A Second Floor
0651204165
Prime Paint Area A Second Floor
20
12JUN13A
10SEP13A
0
100
Prime Paint Area A Second Floor
0651204175
Ceiling Grid Area A Second Floor
17
17JUL13A
24SEP13
0
98
0651204090
Set Windows Area A Second Floor
10
22JUL13A
12AUG13A
0
100
CMU Veneer Area A Second Floor
Ceiling Grid Area A Second Floor Set Windows Area A Second Floor
0651204180
Fire Prot Finishes - Area A Second Floor
10
05AUG13A
24SEP13
0
98
Fire Prot Finishes - Area A Second Floor
0651204195
Finish Paint Area A Second Floor
10
05AUG13A
26SEP13
2
85
Finish Paint Area A Second Floor
0651204185
HVAC Finishes - Area A Second Floor
10
12AUG13A
24SEP13
0
98
HVAC Finishes - Area A Second Floor
0651204250
Lockers Area A Second Floor
10
13AUG13A
14AUG13A
0
100
0651204215
Millwork Area A Second Floor
10
19AUG13A
09SEP13A
0
100
0651204265
Marker / Tack Boards Area A Second Floor
10
29AUG13A
25SEP13
1
95
0651204190
Lights in Grid - Area A - Second Floor
10
06SEP13A
24SEP13
0
98
0651204220
VCT / VET Area A Second Floor
20
09SEP13A
24SEP13
0
98
VCT / VET Area A Second Floor
0651204260
Doors & Hardware Area A Second Floor
10
09SEP13A
25SEP13
1
95
Doors & Hardware Area A Second Floor
0651204210
Electric & FA Finishes - Area A Second Floor
15
10SEP13A
30SEP13
4
75
Electric & FA Finishes - Area A Second Floor
0651204225
Ceramic Floor Tile Area A Second Floor
20
11SEP13A
17SEP13A
0
100
Ceramic Floor Tile Area A Second Floor
0651204200
Above Ceiling Inspections Complete
0
16SEP13A
0
100
Above Ceiling Inspections Complete
0651204205
Ceiling Pads Area A Second Floor
5
16SEP13A
30SEP13
4
30
Ceiling Pads Area A Second Floor
0651204230
Technology Finishes Area A - Second Floor
10
16SEP13A
27SEP13
3
75
Technology Finishes Area A - Second Floor
0651204240
Plumbing Finishes - Area A Second Floor
20
16SEP13A
01OCT13
5
75
Plumbing Finishes - Area A Second Floor
0651204285
FF & E Area A Second Floor
3
16SEP13A
25SEP13
1
60
FF & E Area A Second Floor Building Final Area Enclosure
0651204105
Building Final Area Enclosure
0
18SEP13A
0
100
0651204270
Projection Screens Area A Second Floor
5
20SEP13A
01OCT13
5
10
0651204235
Acoustic Panels Area A Second Floor
5
25SEP13
01OCT13
5
0
0651204245
Carpet Area A Second Floor
15
25SEP13
15OCT13
15
0
Lockers Area A Second Floor Millwork Area A Second Floor Marker / Tack Boards Area A Second Floor Lights in Grid - Area A - Second Floor
Projection Screens Area A Second Floor Acoustic Panels Area A Second Floor Carpet Area A Second Floor Toilet Partitions Area A Second Floor
0651204255
Toilet Partitions Area A Second Floor
10
27SEP13
10OCT13
10
0
0651204280
Toilet Accessories Area A Second Floor
4
03OCT13
08OCT13
4
0
Toilet Accessories Area A Second Floor
0651204275
Signage Area A Second Floor
5
04OCT13
10OCT13
5
0
Signage Area A Second Floor
Third Floor Precast Concrete Deck
0651304010
Precast Concrete Deck
5
03DEC12A
06DEC12A
0
100
0651304015
Masonry & In-wall Rough-in
15
10DEC12A
12FEB13A
0
100
Masonry & In-wall Rough-in
0651304020
In-wall Electrical Rough-in Area A Third Floor
15
10DEC12A
12FEB13A
0
100
In-wall Electrical Rough-in Area A Third Floor
0651304025
Masonry Bearing Walls Area A Third Floor
15
10DEC12A
12FEB13A
0
100
Masonry Bearing Walls Area A Third Floor
0651304060
Interior Masonry Walls Area A Third Floor
10
07JAN13A
13JUN13A
0
100
0651304055
Door Frames Area A Third Floor
20
12JAN13A
12FEB13A
0
100
0651304070
Equipment Pads
5
15JAN13A
16JAN13A
0
100
0651304040
Roof Structural Steel & Deck
20
15FEB13A
28MAR13A
0
100
0651304080
Roofing
11
05MAR13A
28MAR13A
0
100
0651304085
Overhead Rough-in Elec & FA - Area Third Floor
30
18MAR13A
20SEP13A
0
100
0651304125
Rough-in HVAC Piping - Area A Third Floor
30
20MAR13A
07JUN13A
0
100
0651304095
Complete MEP Rough-in - In wall & Overhead
20
21MAR13A
07JUN13A
0
100
0651304130
Area A - Temporary Building Enclosure Complete
0
28MAR13A
0
100
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Interior Masonry Walls Area A Third Floor Door Frames Area A Third Floor Equipment Pads Roof Structural Steel & Deck Roofing Overhead Rough-in Elec & FA - Area Third Floor Rough-in HVAC Piping - Area A Third Floor Complete MEP Rough-in - In wall & Overhead Area A - Temporary Building Enclosure Complete O011 - MonthlyRpt - 11x17
Sheet 4 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
20SEP13A
0
100
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Third Floor 0651304110
Rough-in HVAC Ductwork - Area A Third Floor
30
01APR13A
0651304115
Rough-in Plumbing - Area A Third Floor
30
01APR13A
14JUN13A
0
100
0651304120
Rough-in Fire Prot - Area A Third Floor
20
01APR13A
17MAY13A
0
100
0651304140
Rough-in HVAC Insulation - Area A Third Floor
30
08APR13A
01AUG13A
0
100
0651304155
Standpipe / Hose Cabinet
3
11APR13A
15JUL13A
0
100
0651304100
Rough-in Tech Area A - Third Floor
30
15APR13A
13SEP13A
0
100
0651304075
Metal Studs Area A Third Floor
10
01MAY13A
14JUN13A
0
100
0651304065
CMU Veneer Area A Third Floor
20
14MAY13A
25JUL13A
0
100
0651304050
Complete In-wall Electrical Rough-in Area A
15
03JUN13A
13AUG13A
0
100
0651304165
Prime Paint Area A Third Floor
15
11JUN13A
01AUG13A
0
100
0651304160
Drywall & Tape Area A Third Floor
15
24JUN13A
28JUN13A
0
100
0651304175
Ceiling Grid Area A Third Floor
15
15JUL13A
24SEP13
0
98
0651304090
Set Windows Area A Third Floor
10
23JUL13A
01AUG13A
0
100
0651304215
Millwork Area A Third Floor
20
26JUL13A
26SEP13
2
90
0651304180
Fire Prot Finishes - Area A Third Floor
10
29JUL13A
24SEP13
0
98
0651304190
Lights in Grid - Area A - Third Floor
5
05AUG13A
24SEP13
0
98
0651304195
Finish Paint Area A Third Floor
10
05AUG13A
24SEP13
0
98
Rough-in HVAC Ductwork - Area A Third Floor Rough-in Plumbing - Area A Third Floor Rough-in Fire Prot - Area A Third Floor Rough-in HVAC Insulation - Area A Third Floor Standpipe / Hose Cabinet Rough-in Tech Area A - Third Floor Metal Studs Area A Third Floor CMU Veneer Area A Third Floor Complete In-wall Electrical Rough-in Area A Prime Paint Area A Third Floor Drywall & Tape Area A Third Floor Ceiling Grid Area A Third Floor Set Windows Area A Third Floor Millwork Area A Third Floor Fire Prot Finishes - Area A Third Floor Lights in Grid - Area A - Third Floor Finish Paint Area A Third Floor HVAC Finishes - Area A Third Floor
0651304185
HVAC Finishes - Area A Third Floor
10
07AUG13A
24SEP13
0
98
0651304210
Electric & FA Finishes - Area A Third Floor
15
12AUG13A
26SEP13
2
90
Electric & FA Finishes - Area A Third Floor
0651304240
Plumbing Finishes - Area A Third Floor
15
12AUG13A
26SEP13
2
90
Plumbing Finishes - Area A Third Floor
0651304265
Marker / Tack Boards Area A Third Floor
5
29AUG13A
30AUG13A
0
100
0651304220
VCT / VET Area A Third Floor
20
03SEP13A
24SEP13
0
98
VCT / VET Area A Third Floor
1
95
Doors & Hardware Area A Third Floor
0
100
Above Ceiling Inspections Complete
25SEP13
Marker / Tack Boards Area A Third Floor
0651304260
Doors & Hardware Area A Third Floor
10
04SEP13A
0651304200
Above Ceiling Inspections Complete
0
06SEP13A
0651304205
Ceiling Pads Area A Third Floor
10
09SEP13A
24SEP13
0
98
0651304225
Ceramic Floor Tile Area A Third Floor
15
11SEP13A
17SEP13A
0
100
Ceramic Floor Tile Area A Third Floor
0651304230
Technology Finishes Area A - Third Floor
10
12SEP13A
25SEP13
1
90
Technology Finishes Area A - Third Floor
0651304270
Projection Screens Area A Third Floor
2
16SEP13A
25SEP13
1
70
0651304285
FF & E Area A Third Floor
3
16SEP13A
0651304105
Building Final Area Enclosure
0
0651304235
Acoustic Panels Area A Third Floor
5
0651304245
Carpet Area A Third Floor
15
Ceiling Pads Area A Third Floor
Projection Screens Area A Third Floor
26SEP13
2
30
FF & E Area A Third Floor
18SEP13A
0
100
Building Final Area Enclosure
25SEP13
01OCT13
5
0
25SEP13
15OCT13
15
0
Carpet Area A Third Floor
Acoustic Panels Area A Third Floor
0651304255
Toilet Partitions Area A Third Floor
5
25SEP13
01OCT13
5
0
Toilet Partitions Area A Third Floor
0651304280
Toilet Accessories Area A Third Floor
5
25SEP13
01OCT13
5
0
Toilet Accessories Area A Third Floor
0651304275
Signage Area A Third Floor
5
02OCT13
08OCT13
5
0
0652114115
Load Bearing Masonry
20
23AUG12A
20NOV12A
0
100
0652114005
Underground Electrical Rough-in
10
11SEP12A
18DEC12A
0
100
0652114120
Structural Steel & Deck
15
27NOV12A
26DEC12A
0
100
0652114010
Slab on Grade
5
12DEC12A
16JAN13A
0
100
0652114130
Roofing
10
16JAN13A
19JAN13A
0
100
0652114025
Fire Protection Rough-in
10
28JAN13A
11MAR13A
0
100
Signage Area A Third Floor
Area B Gymnasium First Floor
0652114020
HVAC Piping Rough-in
20
0652114150
Gymnasium Temporary Enclosure Complete
0
0652114045
HVAC Rough-in - Insulation
10
0652114040
HVAC Rough-in - Ductwork
0652114015
14FEB13A
0
100
15FEB13A
0
100
01MAR13A
15JUL13A
0
100
10
04MAR13A
16AUG13A
0
100
Overhead Elec. & Fire Alarm Rough-in
25
22APR13A
17SEP13A
0
100
0652114035
Gym Lighting
5
22APR13A
06AUG13A
0
100
0652114140
CMU Veneer
20
01MAY13A
14JUN13A
0
100
0652114055
Fire Protection Finishes
5
05JUL13A
10JUL13A
0
100
0652114060
HVAC Finishes
10
22JUL13A
16AUG13A
0
100
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
04FEB13A
Early Bar Progress Bar Critical Activity
Load Bearing Masonry Underground Electrical Rough-in Structural Steel & Deck Slab on Grade Roofing Fire Protection Rough-in HVAC Piping Rough-in Gymnasium Temporary Enclosure Complete HVAC Rough-in - Insulation HVAC Rough-in - Ductwork Overhead Elec. & Fire Alarm Rough-in Gym Lighting CMU Veneer Fire Protection Finishes HVAC Finishes O011 - MonthlyRpt - 11x17
Sheet 5 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
13SEP13A
0
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor 0652114050
Finish Painting
4
26JUL13A
0652114110
Operable Partition
5
20AUG13A
27SEP13
3
50
0652114075
Gym Equipment
5
26AUG13A
27AUG13A
0
100
0652114070
Interior MEP Finishes
15
03SEP13A
09SEP13A
0
100
0652114065
Electric & Fire Alarm Finishes
5
04SEP13A
24SEP13
0
95
0652114085
Stage Equipment
5
11SEP13A
25SEP13
1
80
Finish Painting
100
Operable Partition Gym Equipment Interior MEP Finishes Electric & Fire Alarm Finishes Stage Equipment Proj Screen @ Stage
0652104270
Proj Screen @ Stage
5
25SEP13
01OCT13
5
0
0652114090
Stage Lighting
5
25SEP13
01OCT13
5
0
0652114095
Gym Flooring
15
25SEP13
15OCT13
15
0
0652114100
Gym Bleachers
5
25SEP13
01OCT13
5
0
0652114105
Stage Flooring
10
25SEP13
08OCT13
10
0
0652124095
Underslab Plumbing Rough-in
5
30AUG12A
14SEP12A
0
100
0652124090
Underslab Electrical Rough-in
5
11SEP12A
23OCT12A
0
100
0652124085
Slab on Grade
5
21NOV12A
26NOV12A
0
100
0652124075
MEP Rough-in
18
08JAN13A
08MAR13A
0
100
0652124030
HVAC Rough-in
10
14FEB13A
05AUG13A
0
100
0652124065
Fire Protection Rough-in
10
18FEB13A
22FEB13A
0
100
0652124035
Electrical Rough-in
10
25MAR13A
20AUG13A
0
100
Electrical Rough-in
0652124050
Ceiling Grid
5
19AUG13A
20AUG13A
0
100
Ceiling Grid
0652124015
Install Kitchen Tile
10
16SEP13A
17SEP13A
0
100
0652124010
Install Kitchen Equipment
10
19SEP13A
25SEP13
1
90
0652124100
Above Ceiling Inspections Complete
0
24SEP13
0
0
0652124005
Kitchen Equipment Hook-ups
15
25SEP13
15OCT13
15
0
0652124020
Security Grille
5
25SEP13
01OCT13
5
0
Security Grille
0652124025
Finish Paint
5
25SEP13
01OCT13
5
0
Finish Paint
0652124040
Electrical Finishes
5
25SEP13
01OCT13
5
0
Electrical Finishes
0652124045
HVAC Finishes
5
25SEP13
01OCT13
5
0
HVAC Finishes
0652124055
Lights in Grid
5
25SEP13
01OCT13
5
0
Lights in Grid
0652124060
Ceiling Pads
5
25SEP13
01OCT13
5
0
0652124070
Fire Protection Finishes
5
25SEP13
01OCT13
5
0
0652124080
Plumbing Finishes
5
25SEP13
01OCT13
5
0
17DEC12A
18DEC12A
0
100
Stage Lighting Gym Flooring Gym Bleachers Stage Flooring
Kitchen First Floor Underslab Plumbing Rough-in Underslab Electrical Rough-in Slab on Grade MEP Rough-in HVAC Rough-in Fire Protection Rough-in
Install Kitchen Tile Install Kitchen Equipment Above Ceiling Inspections Complete Kitchen Equipment Hook-ups
Ceiling Pads Fire Protection Finishes Plumbing Finishes
Mechanical Room First Floor Set HVAC Equipment
0652134005
Set HVAC Equipment
10
0652134015
Wall Electrical Rough-in
15
28JAN13A
01JUL13A
0
100
0652134020
Overhead Elec. & Fire Alarm Rough-in
30
15FEB13A
01OCT13
5
85
0652134025
Fire Protection Rough-in
5
21FEB13A
28JUN13A
0
100
Fire Protection Rough-in
0652134040
HVAC Rough-in - Piping
15
21FEB13A
01JUL13A
0
100
HVAC Rough-in - Piping
0652134075
Prime Paint
2
13JUN13A
25SEP13
1
50
0652134035
HVAC Rough-in - Ductwork
15
01JUL13A
15JUL13A
0
100
0652134045
HVAC Rough-in - Insulation
15
01JUL13A
24SEP13
0
98
0652134055
Fire Protection Finishes
5
24JUL13A
25SEP13
1
85
0652134065
HVAC Finishes
10
16SEP13A
25SEP13
1
90
0652134050
Finish Painting
5
25SEP13
01OCT13
5
0
0652134060
Electric & Fire Alarm Finishes
15
25SEP13
15OCT13
15
0
0652134030
Lighting
5
26SEP13
02OCT13
5
0
0652234005
Set HVAC Equipment
10
17DEC12A
18DEC12A
0
100
0652234015
Wall Electrical Rough-in
15
28JAN13A
20AUG13A
0
100
Wall Electrical Rough-in Overhead Elec. & Fire Alarm Rough-in
Prime Paint HVAC Rough-in - Ductwork HVAC Rough-in - Insulation Fire Protection Finishes HVAC Finishes Finish Painting Electric & Fire Alarm Finishes Lighting
Second Floor
0652234040
HVAC Rough-in - Piping
15
04FEB13A
17JUL13A
0
100
0652234020
Overhead Elec. & Fire Alarm Rough-in
30
15APR13A
26SEP13
2
95
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Set HVAC Equipment Wall Electrical Rough-in HVAC Rough-in - Piping Overhead Elec. & Fire Alarm Rough-in O011 - MonthlyRpt - 11x17
Sheet 6 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Second Floor Fire Protection Rough-in
0652234025
Fire Protection Rough-in
5
24JUN13A
28JUN13A
0
100
0652234035
HVAC Rough-in - Ductwork
15
13JUL13A
28AUG13A
0
100
0652234055
Fire Protection Finishes
5
16JUL13A
24SEP13
0
95
Fire Protection Finishes
0652234045
HVAC Rough-in - Insulation
15
20JUL13A
24SEP13
0
98
HVAC Rough-in - Insulation
0652234060
Electric & Fire Alarm Finishes
10
03SEP13A
04OCT13
8
20
0652234065
HVAC Finishes
10
10SEP13A
20SEP13A
0
100
0652234030
Lighting
5
25SEP13
01OCT13
5
0
Lighting
0652234050
Finish Painting
5
25SEP13
01OCT13
5
0
Finish Painting
0652104145
Geopiers
15
02AUG12A
09AUG12A
0
100
0652104005
Foundations Area B
15
13AUG12A
03SEP12A
0
100
0652104025
Masonry Bearing Walls Area B
10
15AUG12A
04DEC12A
0
100
0652104010
Rough-in Plumbing U/G - Area B
20
20AUG12A
28SEP12A
0
100
0652104020
In-wall Elec & FA Rough-in Area B First Floor
50
23AUG12A
08MAR13A
0
100
0652104035
Rough-in Electric U/G - Area B
20
23AUG12A
12MAR13A
0
100
0652104045
Place Slab on Grade Area B
5
17OCT12A
12MAR13A
0
100
0652104130
Precast Concrete Deck @ Second Floor Mech Room
1
16NOV12A
18NOV12A
0
100
0652104040
Structural Steel & Deck
15
28NOV12A
28JAN13A
0
100
0652104115
Rough-in Plumbing - Area B First Floor
20
03DEC12A
29MAR13A
0
100
0652104060
Interior Masonry Area B First Floor
15
18DEC12A
15MAR13A
0
100
0652104080
Roofing Area B
10
17JAN13A
21JUN13A
0
100
0652104135
Stair D
5
21JAN13A
21JAN13A
0
100
0652104120
Rough-in Fire Prot - Area B First Floor
20
30JAN13A
15FEB13A
0
100
0652104125
Rough-in HVAC Piping - Area B First Floor
20
15FEB13A
01MAR13A
0
100
0652104110
Rough-in HVAC Ductwork - Area B First Floor
20
18FEB13A
18SEP13A
0
100
0652104300
Area B Temporary Enclosure Complete
0
01MAR13A
0
100
0652104150
Stair D Pan Concrete Fill
5
15MAR13A
15MAR13A
0
100
0652104075
Metal Studs Area B First Floor
10
18MAR13A
16APR13A
0
100
HVAC Rough-in - Ductwork
Electric & Fire Alarm Finishes HVAC Finishes
Area B First Floor Geopiers Foundations Area B Masonry Bearing Walls Area B Rough-in Plumbing U/G - Area B In-wall Elec & FA Rough-in Area B First Floor Rough-in Electric U/G - Area B Place Slab on Grade Area B Precast Concrete Deck @ Second Floor Mech Room Structural Steel & Deck Rough-in Plumbing - Area B First Floor Interior Masonry Area B First Floor Roofing Area B Stair D Rough-in Fire Prot - Area B First Floor Rough-in HVAC Piping - Area B First Floor Rough-in HVAC Ductwork - Area B First Floor Area B Temporary Enclosure Complete Stair D Pan Concrete Fill Metal Studs Area B First Floor
0652104085
Overhead Rough-in Elec & FA - Area B First Floor
20
18MAR13A
25SEP13
1
95
Overhead Rough-in Elec & FA - Area B First Floor
0652104140
Rough-in HVAC Insulation - Area B First Floor
20
19MAR13A
25SEP13
1
95
Rough-in HVAC Insulation - Area B First Floor
0652104050
Complete In-wall Rough-in Area B
10
29MAR13A
16APR13A
0
100
0652104100
Rough-in Tech Area B - First Floor
20
15APR13A
25SEP13
1
95
0652104155
Standpipe / Hose Cabinet
3
15APR13A
01MAY13A
0
100
0652104065
CMU Veneer
20
16APR13A
22JUL13A
0
100
0652104090
Set Windows Area B First Floor
10
15JUL13A
11SEP13A
0
100
0652104070
Frost Slabs
5
16JUL13A
13AUG13A
0
100
0652104290
Fire Pump
5
23JUL13A
25SEP13
1
90
Complete In-wall Rough-in Area B Rough-in Tech Area B - First Floor Standpipe / Hose Cabinet CMU Veneer Set Windows Area B First Floor Frost Slabs Fire Pump
0652104165
Prime Paint Area B First Floor
20
07AUG13A
25SEP13
1
95
Prime Paint Area B First Floor
0652104160
Drywall & Tape Area B First Floor
15
12AUG13A
13SEP13A
0
100
Drywall & Tape Area B First Floor
0652104295
Fire Protection Riser
10
12AUG13A
26SEP13
2
85
0652104055
Door Frames Area B First Floor in Metal Studs
10
13AUG13A
15AUG13A
0
100
Door Frames Area B First Floor in Metal Studs
0652104190
Lights in Grid - Area B - First Floor
20
14AUG13A
30SEP13
4
80
Lights in Grid - Area B - First Floor
0652104195
Finish Paint Area B First Floor
15
04SEP13A
01OCT13
5
67
0652104175
Ceiling Grid Area B First Floor
10
09SEP13A
26SEP13
2
85
0652104260
Doors & Hardware Area B First Floor
10
11SEP13A
25SEP13
1
90
0652104180
Fire Prot Finishes - Area B First Floor
10
16SEP13A
07OCT13
9
15
0652104185
HVAC Finishes - Area B First Floor
10
16SEP13A
25SEP13
1
90
HVAC Finishes - Area B First Floor
Doors & Hardware Area B First Floor Fire Prot Finishes - Area B First Floor
0
100
18SEP13A
0
100
Building Area Final Enclosure
0
0
8
0
Ceiling Pads Area B First Floor
5
0
Millwork Area B First Floor
20
Building Area Final Enclosure
0
0652104200
Above Ceiling Inspections Complete
0
25SEP13
0652104205
Ceiling Pads Area B First Floor
8
25SEP13
04OCT13
0652104215
Millwork Area B First Floor
5
25SEP13
01OCT13
Š Primavera Systems, Inc.
Ceiling Grid Area B First Floor
19SEP13A
Ceramic Floor Tile Area B First Floor
0652104105
19APR12 20DEC13 25SEP13 27SEP13 13:36
Finish Paint Area B First Floor
Ceramic Floor Tile Area B First Floor
0652104225
Start Date Finish Date Data Date Run Date
16SEP13A
Fire Protection Riser
Early Bar Progress Bar Critical Activity
Above Ceiling Inspections Complete
O011 - MonthlyRpt - 11x17
Sheet 7 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
10
25SEP13
08OCT13
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor 0652104220
VCT / VET Area B First Floor
10
0
VCT / VET Area B First Floor Technology Finishes Area B - First Floor
0652104230
Technology Finishes Area B - First Floor
10
25SEP13
08OCT13
10
0
0652104235
Acoustic Panels Area B First Floor
10
25SEP13
08OCT13
10
0
Acoustic Panels Area B First Floor
0652104240
Plumbing Finishes - Area B First Floor
10
25SEP13
08OCT13
10
0
Plumbing Finishes - Area B First Floor
0652104250
Lockers Area B First Floor
10
25SEP13
08OCT13
10
0
Lockers Area B First Floor
0652104255
Toilet Partitions Area B First Floor
10
25SEP13
08OCT13
10
0
Toilet Partitions Area B First Floor
0652104275
Signage Area B First Floor
5
25SEP13
01OCT13
5
0
Signage Area B First Floor
0652104210
Electric & FA Finishes - Area B First Floor
10
26SEP13
09OCT13
10
0
Electric & FA Finishes - Area B First Floor
0652104265
Marker / Tack Boards Area B First Floor
5
26SEP13
02OCT13
5
0
Marker / Tack Boards Area B First Floor
0652104280
Toilet Accessories Area B First Floor
10
26SEP13
09OCT13
10
0
Toilet Accessories Area B First Floor
0652104245
Carpet Area B First Floor
5
07OCT13
11OCT13
5
0
Carpet Area B First Floor
0652104285
FF & E Area B First Floor
3
07OCT13
09OCT13
3
0
FF & E Area B First Floor
Close-Out
Operation & Maintenance Manuals Submitted
0650007005
Operation & Maintenance Manuals Submitted
0
24SEP13
0
0
0650007010
Contractor Punchlist
20
25SEP13
22OCT13
20
0
0650007015
HVAC Controls Check-out and Balancing
15
25SEP13
15OCT13
15
0
0650007110
Punchlist
20
25SEP13
22OCT13
20
0
0650007020
Final Inspections / Testing
5
30SEP13
04OCT13
5
0
0650007040
Final Inspections Complete
0
04OCT13
0
0
0650007030
Fire Alarm Programming & Testing
5
07OCT13
11OCT13
5
0
0650007035
JACE Interface Check-out
5
16OCT13
22OCT13
5
0
JACE Interface Check-out
Contractor Punchlist HVAC Controls Check-out and Balancing Punchlist Final Inspections / Testing Final Inspections Complete Fire Alarm Programming & Testing
22OCT13
5
0
As-Built Documents Submitted
18OCT13
0
0
Certificate of Occupancy
21OCT13
01NOV13
10
0
Architect's Punchlist
21OCT13
20DEC13
45
0
Close-out Documents
5
22OCT13
28OCT13
5
0
Project Team - Controls Check-out
Building Commissioning
5
22OCT13
28OCT13
5
0
Building Commissioning
0650007120
LEED Air Testing
1
22OCT13
22OCT13
1
0
LEED Air Testing
0650007070
MEP Commissioning Complete
0
28OCT13
0
0
0650007085
Demonstration & Training
5
05NOV13
11NOV13
5
0
0650007080
Owner Move In
7
26NOV13
04DEC13
7
0
0650007100
Owner Move-in Complete
0
04DEC13
0
0
0650007105
Contract Close-out
0
20DEC13
0
0
0650007055
As-Built Documents Submitted
5
0650007075
Certificate of Occupancy
0
0650007025
Architect's Punchlist
10
0650007090
Close-out Documents
45
0650007060
Project Team - Controls Check-out
0650007065
Start Date Finish Date Data Date Run Date
19APR12 20DEC13 25SEP13 27SEP13 13:36
Š Primavera Systems, Inc.
16OCT13
Early Bar Progress Bar Critical Activity
MEP Commissioning Complete Demonstration & Training Owner Move In
O011 - MonthlyRpt - 11x17
Sheet 8 of 8
Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
2012 AUG
JUL
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
2013 JUN
JUL
AUG
SEP
OCT
NOV
Bid & Award
0660001005
Bid Opening
0
19APR12A
0660001010
Bid Evaluation and Award
32
19APR12A
0660001015
NTP - BP
0
0660001090
Construction Kick-off Meeting
0
31MAY12A
0660001020
Site Mobilization - BP 061 General Trades
10
06JUN12A
0660001025
Prime Contractors Submit Schedules
11
0660001045
Site Mobilization - BP 210 Fire Protection
10
0660001050
Site Mobilization - BP 220 Plumbing
0660001055
Bid Opening
0
100
23MAY12A
0
100
23MAY12A
0
100
0
100
20JUN12A
0
100
Site Mobilization - BP 061 General Trades
06JUN12A
20JUN12A
0
100
Prime Contractors Submit Schedules
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 210 Fire Protection
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 220 Plumbing
Site Mobilization - BP 230 HVAC
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 230 HVAC
0660001060
Site Mobilization - BP 260 Electrical
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 260 Electrical
0660001065
Site Mobilization - BP 270 Technology
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 270 Technology
0660001070
Site Mobilization - BP 300 Site Concrete
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 300 Site Concrete
0660001080
Site Mobilization - BP 329 Landscaping
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 329 Landscaping
0660001085
Site Mobilization - BP 121 FF & E
10
06JUN12A
20JUN12A
0
100
Site Mobilization - BP 121 FF & E
0660001075
Site Mobilization - BP 310 Site Work
10
18JUN12A
20JUN12A
0
100
Site Mobilization - BP 310 Site Work
0660001030
Schedule Meeting(s) to Review Schedule
10
26JUN12A
20JUL12A
0
100
0660001035
Prime Contractors/CM Final Review Schedule
5
10SEP12A
17SEP12A
0
100
0660001040
Contractors Sign Off - Project Baseline Schedule
0
15OCT12A
0
100
Bid Evaluation and Award NTP - BP Construction Kick-off Meeting
Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Contractors Sign Off - Project Baseline Schedule
Submittals & Approvals
0660002025
Site Submittals
5
14JUN12A
14JUN12A
0
100
Site Submittals
0660002080
Review and Approval Site Submittal
5
14JUN12A
14JUN12A
0
100
Review and Approval Site Submittal
0660002015
Coordination Drawing Meetings HVAC/E/P/FP/GTC
45
18JUN12A
16NOV12A
0
100
0660002035
Submittal Block and Mortar
10
03JUL12A
03JUL12A
0
100
0660002090
Review and Approval Block and Mortar
15
03JUL12A
30JUL12A
0
100
0660002005
Submittal Plumbing
10
06JUL12A
06JUL12A
0
100
Submittal Plumbing
0660002010
Submittal HVAC Equipment
20
06JUL12A
06JUL12A
0
100
Submittal HVAC Equipment
0660002030
Submittal Concrete/Rebar
10
06JUL12A
06JUL12A
0
100
Submittal Concrete/Rebar
0660002075
Review and Approval Plumbing Submittal
15
06JUL12A
30JUL12A
0
100
0660002115
Review and Approve HVAC Submittal
15
06JUL12A
30JUL12A
0
100
0660002020
Submittal Electrical & Fire Alarm
25
13JUL12A
13JUL12A
0
100
0660002130
Review & App Electric and Fire Alarm Submittal
15
13JUL12A
03AUG12A
0
100
0660002135
City Review & Approval Fire Protection Submittal
20
13JUL12A
10AUG12A
0
100
0660002045
Submittal Structural Steel/Joists/Deck
45
17JUL12A
17JUL12A
0
100
0660002110
Review and Approval Structural Steel/Joists/Deck
45
17JUL12A
03AUG12A
0
100
0660002125
Geopier Design Submittal for Record
25
17JUL12A
17JUL12A
0
100
0660002085
Review and Approval Concrete & Rebar
5
18JUL12A
03AUG12A
0
100
0660002145
Review and Approve Windows and Curtain Wall
15
18JUL12A
09AUG12A
0
100
0660002040
Submittal Brick and Mortar
10
20JUL12A
20JUL12A
0
100
0660002100
Review and Approval Brick and Mortar
15
20JUL12A
09AUG12A
0
100
0660002060
Submittal HM Frame
20
26JUL12A
26JUL12A
0
100
0660002065
Submittal Windows and Curtain Wall
40
03AUG12A
03AUG12A
0
100
0660002120
Review and Approval HM Frames
15
09AUG12A
15AUG12A
0
100
Review and Approval HM Frames
0660002095
Submittal - Precast Concrete Plank
20
10AUG12A
10AUG12A
0
100
Submittal - Precast Concrete Plank
0660002105
Review and Approve Precast Concrete Plank
15
10AUG12A
21AUG12A
0
100
0660002140
Review and Approval Fire Submittal
15
13AUG12A
12OCT12A
0
100
Review and Approval Fire Submittal
0660001125
Review and Approval Roofing Submittal
15
30AUG12A
12OCT12A
0
100
Review and Approval Roofing Submittal
0660002055
Submittal Roofing
20
30AUG12A
30AUG12A
0
100
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Coordination Drawing Meetings HVAC/E/P/FP/GTC Submittal Block and Mortar Review and Approval Block and Mortar
Review and Approval Plumbing Submittal Review and Approve HVAC Submittal Submittal Electrical & Fire Alarm Review & App Electric and Fire Alarm Submittal City Review & Approval Fire Protection Submittal Submittal Structural Steel/Joists/Deck Review and Approval Structural Steel/Joists/Deck Geopier Design Submittal for Record Review and Approval Concrete & Rebar Review and Approve Windows and Curtain Wall Submittal Brick and Mortar Review and Approval Brick and Mortar Submittal HM Frame Submittal Windows and Curtain Wall
Review and Approve Precast Concrete Plank
Submittal Roofing D011 - MonthlyRpt - 11x17
Sheet 1 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
0660002070
Submittal / Shop Drawings Fire Protection
35
20SEP12A
24SEP12A
0
100
0660002150
Review Coordination Drawings and Sign-Off
1
19NOV12A
19NOV12A
0
100
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Submittal / Shop Drawings Fire Protection Review Coordination Drawings and Sign-Off
Fab & Deliver
Fabrication and Deliver Concrete Steel/Rebar
0660003015
Fabrication and Deliver Concrete Steel/Rebar
5
13JUL12A
19JUL12A
0
100
0660003025
Fabrication and Delivery - CMU
35
31JUL12A
01AUG12A
0
100
0660003005
Delivery of Plumbing Material
5
03AUG12A
07SEP12A
0
100
0660003010
Delivery of Site Materials
10
06AUG12A
10AUG12A
0
100
0660003030
Fabrication and Deliver - Structural Steel
40
23AUG12A
21SEP12A
0
100
Fabrication and Deliver - Structural Steel
0660003050
Fabrication and Delivery - HM Frames
30
17SEP12A
01OCT12A
0
100
Fabrication and Delivery - HM Frames
0660003035
Fabrication and Delivery Steel Joists Deck-Roof
14
18SEP12A
05OCT12A
0
100
Fabrication and Delivery Steel Joists Deck-Roof
0660003045
Fabrication and Delivery - Roofing Materials
10
01OCT12A
16OCT12A
0
100
Fabrication and Delivery - Roofing Materials
0660003040
Fab & Deliver HVAC Units
6
15OCT12A
26OCT12A
0
100
Fab & Deliver HVAC Units
0660003065
Fabrication & Delivery of Precast Concrete Plank
10
15OCT12A
24OCT12A
0
100
Fabrication & Delivery of Precast Concrete Plank
0660003055
Fabrication and Delivery -Windows & Curtain Wall
65
16NOV12A
09AUG13A
0
100
0665004030
Rough Grade / Building Pad
5
19JUN12A
02JUL12A
0
100
0665004020
Access Roads / Laydown / Parking
10
25JUN12A
03OCT12A
0
100
0665004070
South Storm Sewer
10
29AUG12A
04SEP12A
0
100
0665004005
North Parking Lot & East Site Storm Sewer
15
04SEP12A
10SEP12A
0
100
0665004015
Sanitary Sewer
5
04SEP12A
06SEP12A
0
100
0665004040
Electrical Duct Banks
10
04SEP12A
05SEP12A
0
100
Electrical Duct Banks Set Transformer Vault
Fabrication and Delivery - CMU Delivery of Plumbing Material Delivery of Site Materials
Fabrication and Delivery -Windows & Curtain Wall
Construction Sitework
Rough Grade / Building Pad Access Roads / Laydown / Parking South Storm Sewer North Parking Lot & East Site Storm Sewer Sanitary Sewer
0665004045
Set Transformer Vault
2
04SEP12A
04SEP12A
0
100
0665004035
Water & Fire Line
10
19SEP12A
25SEP12A
0
100
0665004050
Set Transformer / Energize
5
01FEB13A
01FEB13A
0
100
0661104030
Generator Enclosure Concrete & Masonry
15
10MAY13A
29MAY13A
0
100
0665004100
Curbs
15
17JUN13A
15JUL13A
0
100
0665004110
Light Poles & Wiring
15
20JUN13A
22JUL13A
0
100
0665004055
Exterior Building Light Fixtures
10
24JUN13A
08JUL13A
0
100
0665004085
Finish Grading
5
24JUN13A
27JUN13A
0
100
0665004115
Sidewalks
15
28JUN13A
15JUL13A
0
100
0665004120
Paving and Striping
5
18JUL13A
27JUL13A
0
100
0665004130
Landscaping
10
29JUL13A
09AUG13A
0
100
Landscaping
0665004125
Site Fencing
10
02AUG13A
09AUG13A
0
100
Site Fencing
0661104305
Geopiers
15
29JUN12A
11JUL12A
0
100
0661104005
Foundation
15
17JUL12A
26JUL12A
0
100
Foundation
0661104070
Frost Slabs
6
17JUL12A
26JUL12A
0
100
Frost Slabs
0661104145
Foundation Insulation
15
17JUL12A
26JUL12A
0
100
Foundation Insulation
0661104035
Electric Underground Rough-in
5
01AUG12A
15AUG12A
0
100
0661104315
Masonry Foundation
3
01AUG12A
06AUG12A
0
100
0661104010
Plumbing Underground
10
03AUG12A
13AUG12A
0
100
0661104015
MEP Masonry Rough-in
30
03AUG12A
19OCT12A
0
100
Water & Fire Line Set Transformer / Energize Generator Enclosure Concrete & Masonry Curbs Light Poles & Wiring Exterior Building Light Fixtures Finish Grading Sidewalks Paving and Striping
Area A First Floor Geopiers
Electric Underground Rough-in Masonry Foundation Plumbing Underground MEP Masonry Rough-in Place Slab on Grade Prep
0661104045
Place Slab on Grade Prep
5
11SEP12A
01OCT12A
0
100
0661104020
In-wall Electrical Rough-in
30
12SEP12A
19OCT12A
0
100
In-wall Electrical Rough-in
0661104025
Masonry Bearing Walls
15
12SEP12A
19OCT12A
0
100
Masonry Bearing Walls
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
D011 - MonthlyRpt - 11x17
Sheet 2 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor Door Frames
0661104055
Door Frames
5
19SEP12A
11OCT12A
0
100
0661104365
Slab on Grade
5
19SEP12A
03OCT12A
0
100
0661104115
Sanitary Rough-in Plumbing
1
20SEP12A
20OCT12A
0
100
0661104080
MEP Interior Masonry Rough-in
20
25SEP12A
08JAN13A
0
100
0661104060
Interior Masonry Walls
15
24OCT12A
18DEC12A
0
100
0661104325
Plumbing Above Ceiling
15
16NOV12A
28JAN13A
0
100
0661104125
Rough-in HVAC Piping/Mains/Branches/Boxes
20
20DEC12A
24JAN13A
0
100
0661104110
Rough-in HVAC Ductwork/FPB
15
21DEC12A
18JUL13A
0
100
0661104135
Stairs
10
03JAN13A
04JAN13A
0
100
0661104120
Rough-in Fire Prot
20
14JAN13A
18JAN13A
0
100
Rough-in Fire Prot
0661104075
Metal Studs
10
15JAN13A
28JAN13A
0
100
Metal Studs
0661104085
Overhead Rough-in Elec & FA
35
17JAN13A
03JUL13A
0
100
0661104150
Stair Concrete Pan Fill
10
21JAN13A
30JAN13A
0
100
0661104295
Electrical Rough-in - Stud Walls
10
29JAN13A
08FEB13A
0
100
0661104140
HVAC Insulation
30
30JAN13A
02JUL13A
0
100
0661104165
Prime Paint
20
08APR13A
30MAY13A
0
100
0661104065
CMU Veneer
15
09APR13A
28MAY13A
0
100
CMU Veneer
0661104335
Plumbing Insulation/Testing
10
10APR13A
10APR13A
0
100
Plumbing Insulation/Testing
0661104155
Standpipe / Hose Cabinet
3
11APR13A
15JUL13A
0
100
0661104345
Plumbing Inspections
0
11APR13A
0
100
0661104355
Exterior Framing
5
26APR13A
02MAY13A
0
100
0661104300
Temperature Controls
15
01MAY13A
10SEP13
1
95
0661104160
Drywall & Tape
15
08MAY13A
20MAY13A
0
100
Drywall & Tape
0661104195
Finish Paint
20
13MAY13A
30MAY13A
0
100
Finish Paint
0661104185
HVAC Finishes
10
20MAY13A
24JUN13A
0
100
HVAC Finishes
0661104180
Fire Prot Finishes
10
22MAY13A
14JUN13A
0
100
Fire Prot Finishes
0661104360
Storefronts
5
22MAY13A
02AUG13A
0
100
0661104175
Ceiling Grid
20
28MAY13A
07JUN13A
0
100
0661104190
Lights in Grid
10
06JUN13A
31JUL13A
0
100
0661104370
Curtainwall
4
07JUN13A
10JUN13A
0
100
0661104240
Plumbing Finishes
20
10JUN13A
19JUL13A
0
100
Plumbing Finishes Technology Finishes
0661104230
Technology Finishes
10
11JUN13A
15JUL13A
0
100
0661104205
Ceiling Pads
10
18JUN13A
26JUL13A
0
100
0661104210
Electric & FA Finishes
15
25JUN13A
17JUL13A
0
100
0661104320
Unit Heater/AC-1/CU-1 Set
5
25JUN13A
09AUG13A
0
100
0661104225
Ceramic Floor Tile
20
01JUL13A
13AUG13A
0
100
Slab on Grade Sanitary Rough-in Plumbing MEP Interior Masonry Rough-in Interior Masonry Walls Plumbing Above Ceiling Rough-in HVAC Piping/Mains/Branches/Boxes Rough-in HVAC Ductwork/FPB Stairs
Overhead Rough-in Elec & FA Stair Concrete Pan Fill Electrical Rough-in - Stud Walls HVAC Insulation Prime Paint
Standpipe / Hose Cabinet Plumbing Inspections Exterior Framing Temperature Controls
Storefronts Ceiling Grid Lights in Grid Curtainwall
Ceiling Pads Electric & FA Finishes Unit Heater/AC-1/CU-1 Set Ceramic Floor Tile Millwork
0661104215
Millwork
20
03JUL13A
02AUG13A
0
100
0661104100
Rough-in Tech T-116
30
16JUL13A
26JUL13A
0
100
0661104200
Above Ceiling Inspections Complete
0
16JUL13A
0
100
0661104270
Projection Screens
5
23JUL13A
29JUL13A
0
100
Projection Screens
0661104290
Final Cleaning
5
24JUL13A
13AUG13A
0
100
Final Cleaning
0661104260
Doors & Hardware
10
26JUL13A
13AUG13A
0
100
Doors & Hardware
0661104220
VCT / VET
10
29JUL13A
09AUG13A
0
100
0661104285
FF & E
3
29JUL13A
03AUG13A
0
100
FF & E
0661104235
Acoustic Panels
5
01AUG13A
02AUG13A
0
100
Acoustic Panels
0661104245
Carpet
20
01AUG13A
09AUG13A
0
100
Carpet
0661104255
Toilet Partitions
10
01AUG13A
09AUG13A
0
100
Toilet Partitions
0661104380
Glazing - Curtainwall
2
02AUG13A
16AUG13A
0
100
0661104280
Toilet Accessories
5
05AUG13A
13AUG13A
0
100
0661104275
Signage
5
07AUG13A
08AUG13A
0
100
0661104090
Set Windows
20
09AUG13A
15AUG13A
0
100
0661104105
Building Final Area Enclosure
0
16AUG13A
0
100
0661104265
Marker / Tack Boards
0
100
Start Date Finish Date Data Date Run Date
10 19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
23AUG13A
27AUG13A
Early Bar Progress Bar Critical Activity
Rough-in Tech T-116 Above Ceiling Inspections Complete
VCT / VET
Glazing - Curtainwall Toilet Accessories Signage Set Windows Building Final Area Enclosure Marker / Tack Boards D011 - MonthlyRpt - 11x17
Sheet 3 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Balancing
5
03SEP13A
12SEP13
3
50
0661204010
Precast Concrete Deck
2
24OCT12A
28OCT12A
0
100
0661204020
In-wall Electrical Rough-in
1
29OCT12A
24JUN13A
0
100
0661204025
Masonry Bearing Walls
5
29OCT12A
11DEC12A
0
100
0661204115
Rough-in Plumbing Walls
8
29OCT12A
16JUL13A
0
100
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor 0661104310
Balancing
Second Floor
0661204055
Door Frames
5
28NOV12A
18MAR13A
0
100
0661204060
Interior Masonry Walls
10
28NOV12A
13FEB13A
0
100
0661204135
Roof Structural Steel & Deck
5
11DEC12A
20DEC12A
0
100
0661204385
Roofing
7
08JAN13A
12JAN13A
0
100
0661204125
Rough-in HVAC Piping/Mains/Branches/FPB
20
10JAN13A
13MAY13A
0
100
Precast Concrete Deck In-wall Electrical Rough-in Masonry Bearing Walls Rough-in Plumbing Walls Door Frames Interior Masonry Walls Roof Structural Steel & Deck Roofing Rough-in HVAC Piping/Mains/Branches/FPB Temporary Enclosure
0661204295
Temporary Enclosure
0
12JAN13A
0
100
0661204030
Precast Concrete Topping
5
16JAN13A
23JAN13A
0
100
0661204075
Metal Studs
10
29JAN13A
31JAN13A
0
100
0661204345
Plumbing Above Ceiling Piping
9
29JAN13A
13MAR13A
0
100
0661204110
Rough-in HVAC Ductwork/FPB
30
01FEB13A
08APR13A
0
100
0661204085
Overhead Rough-in Elec & FA
35
11FEB13A
28JUN13A
0
100
0661204120
Rough-in Fire Prot
20
19FEB13A
22FEB13A
0
100
0661204140
Rough-in HVAC Insulation
30
19FEB13A
25JUN13A
0
100
0661204155
Standpipe / Hose Cabinet
3
05APR13A
15JUL13A
0
100
0661204035
Dampproofing
5
08APR13A
04MAY13A
0
100
0661204065
CMU Veneer
20
09APR13A
29MAY13A
0
100
0661204355
Plumbing Insulation/Testing
5
11APR13A
22JUL13A
0
100
Plumbing Insulation/Testing
0661204100
Rough-in Tech
30
15APR13A
23JUL13A
0
100
Rough-in Tech
0661204150
Temperature Control
10
02MAY13A
16SEP13
5
50
0661204165
Prime Paint
53
03MAY13A
16JUL13A
0
100
0661204320
Refrigeration/AC Condensate
5
08MAY13A
31JUL13A
0
100
Precast Concrete Topping Metal Studs Plumbing Above Ceiling Piping Rough-in HVAC Ductwork/FPB Overhead Rough-in Elec & FA Rough-in Fire Prot Rough-in HVAC Insulation Standpipe / Hose Cabinet Dampproofing CMU Veneer
Temperature Control Prime Paint Refrigeration/AC Condensate Drywall & Tape
0661204160
Drywall & Tape
15
13MAY13A
24JUN13A
0
100
0661204175
Ceiling Grid
20
07JUN13A
14JUN13A
0
100
Ceiling Grid
0661204190
Lights in Grid
10
10JUN13A
10JUN13A
0
100
Lights in Grid
0661204210
Electric & FA Finishes
15
15JUN13A
02AUG13A
0
100
0661204180
Fire Prot Finishes
10
17JUN13A
24JUN13A
0
100
Fire Prot Finishes
0661204215
Millwork
20
17JUN13A
25JUL13A
0
100
Millwork
0661204185
HVAC Finishes
10
25JUN13A
27JUN13A
0
100
0661204205
Ceiling Pads
10
25JUN13A
25JUL13A
0
100
Ceiling Pads
0661204220
VCT / VET
5
25JUN13A
24JUL13A
0
100
VCT / VET
0661204310
Exhaust Fans/ACU-3/CU-3
5
25JUN13A
01JUL13A
0
100
0661204195
Finish Paint
20
26JUN13A
05JUL13A
0
100
0661204225
Ceramic Floor Tile
20
08JUL13A
18JUL13A
0
100
Ceramic Floor Tile
0661204200
Above Ceiling Inspections Complete
0
16JUL13A
0
100
Above Ceiling Inspections Complete
0661204240
Plumbing Finishes
20
16JUL13A
09AUG13A
0
100
0661204245
Carpet
20
16JUL13A
26JUL13A
0
100
Carpet
0661204325
Plumbing Above Ground
8
16JUL13A
25JUL13A
0
100
Plumbing Above Ground
0661204250
Lockers
10
24JUL13A
13AUG13A
0
100
0661204260
Doors & Hardware
10
26JUL13A
13AUG13A
0
100
0661204285
FF & E
3
29JUL13A
03AUG13A
0
100
0661204270
Projection Screens
5
30JUL13A
05AUG13A
0
100
Electric & FA Finishes
HVAC Finishes
Exhaust Fans/ACU-3/CU-3 Finish Paint
Plumbing Finishes
Lockers Doors & Hardware FF & E Projection Screens Acoustic Panels
0661204235
Acoustic Panels
5
01AUG13A
02AUG13A
0
100
0661204255
Toilet Partitions
10
01AUG13A
09AUG13A
0
100
Toilet Partitions
0661204280
Toilet Accessories
4
01AUG13A
09AUG13A
0
100
Toilet Accessories
0661204230
Technology Finishes
10
02AUG13A
13AUG13A
0
100
0661204275
Signage
5
07AUG13A
08AUG13A
0
100
0661204090
Set Windows
3
09AUG13A
13AUG13A
0
100
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Technology Finishes Signage Set Windows D011 - MonthlyRpt - 11x17
Sheet 4 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Second Floor 0661204105
Building Final Area Enclosure
0
0661204265
Marker / Tack Boards
10
0661204300
Balancing
10
0662114125
Interior/Exterior Masonry Gym
15
0662114115
Load Bearing Masonry
20
Building Final Area Enclosure
13AUG13A
0
100
23AUG13A
27AUG13A
0
100
Marker / Tack Boards
03SEP13A
12SEP13
3
50
Balancing
17AUG12A
14SEP12A
0
100
22AUG12A
01OCT12A
0
100
Area B Gymnasium First Floor Interior/Exterior Masonry Gym Load Bearing Masonry Underground Plumbing Rough-in Locker Room
0662114135
Underground Plumbing Rough-in Locker Room
5
05SEP12A
18SEP12A
0
100
0662114120
Structural Steel & Deck
15
01OCT12A
05OCT12A
0
100
0662114005
Underground Electrical Rough-in
10
08OCT12A
17OCT12A
0
100
0662114130
Roofing
10
16OCT12A
22OCT12A
0
100
0662114010
Slab on Grade
5
18OCT12A
29OCT12A
0
100
0662114030
HVAC Rough-in - Ductwork/TB Boxes
5
10DEC12A
25JUN13A
0
100
0662114025
Fire Protection Rough-in
10
07JAN13A
14JAN13A
0
100
0662114035
Gym Lighting
1
08JAN13A
18JAN13A
0
100
Gym Lighting
0662114150
Gymnasium Temporary Enclosure Complete
0
17JAN13A
0
100
Gymnasium Temporary Enclosure Complete
0662114015
Overhead Elec. & Fire Alarm Rough-in
25
15FEB13A
25JUN13A
0
100
0662114040
HVAC Rough-in - Piping/Mains/Branches
5
05MAR13A
08MAR13A
0
100
0662114045
HVAC Rough-in - Insulation
5
29MAR13A
20MAY13A
0
100
HVAC Rough-in - Insulation
0662114140
CMU Veneer
20
01MAY13A
20MAY13A
0
100
CMU Veneer
0662114145
Temperture Controls
5
08MAY13A
20MAY13A
0
100
Temperture Controls
0662114060
HVAC Finishes
5
10MAY13A
13JUN13A
0
100
0662114055
Fire Protection Finishes
5
20MAY13A
14JUN13A
0
100
Structural Steel & Deck Underground Electrical Rough-in Roofing Slab on Grade HVAC Rough-in - Ductwork/TB Boxes Fire Protection Rough-in
Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Piping/Mains/Branches
HVAC Finishes Fire Protection Finishes Stage Lighting
0662114090
Stage Lighting
5
20MAY13A
24MAY13A
0
100
0662114050
Finish Painting
5
21MAY13A
14JUN13A
0
100
0662114075
Gym Equipment
10
17JUN13A
20JUN13A
0
100
0662114085
Stage Equipment
10
20JUN13A
22JUL13A
0
100
Stage Equipment
0662114110
Operable Partition
5
20JUN13A
18JUL13A
0
100
Operable Partition
0662114095
Gym Flooring
20
24JUN13A
17JUL13A
0
100
Gym Flooring
0662114065
Electric & Fire Alarm Finishes
5
25JUN13A
09AUG13A
0
100
0662114105
Stage Flooring
10
16JUL13A
01AUG13A
0
100
Stage Flooring
0662104270
Proj Screen @ Stage
5
18JUL13A
24JUL13A
0
100
Proj Screen @ Stage
0662114100
Gym Bleachers
10
30JUL13A
01AUG13A
0
100
Gym Bleachers
0662114155
Balancing
5
03SEP13A
12SEP13
3
50
0662124095
Underslab Plumbing Rough-in
5
15OCT12A
19OCT12A
0
100
Underslab Plumbing Rough-in
0662124090
Underslab Electrical Rough-in
5
17OCT12A
22OCT12A
0
100
Underslab Electrical Rough-in
0662124085
Slab on Grade Prep
2
22OCT12A
25OCT12A
0
100
Slab on Grade Prep
0662124125
Slab on Grade
3
26OCT12A
26OCT12A
0
100
Slab on Grade
0662124030
HVAC Rough-in
10
11JAN13A
17JUN13A
0
100
0662124035
Electrical Rough-in
10
21FEB13A
12JUL13A
0
100
0662124065
Fire Protection Rough-in
10
15MAR13A
22MAR13A
0
100
0662104320
Kitchen Hood
1
01JUN13A
19JUN13A
0
100
0662124025
Finish Paint
1
03JUN13A
09AUG13A
0
100
Finish Painting Gym Equipment
Electric & Fire Alarm Finishes
Balancing
Kitchen First Floor
HVAC Rough-in Electrical Rough-in Fire Protection Rough-in Kitchen Hood Finish Paint HVAC Finishes
0662124045
HVAC Finishes
5
25JUN13A
01JUL13A
0
100
0662124005
Kitchen Equipment Hook-ups
15
16JUL13A
05AUG13A
0
100
0662124015
Install Kitchen Tile
10
16JUL13A
29JUL13A
0
100
0662124050
Ceiling Grid
5
16JUL13A
22JUL13A
0
100
Ceiling Grid
0662124055
Lights in Grid
5
16JUL13A
22JUL13A
0
100
Lights in Grid
0662124070
Fire Protection Finishes
5
16JUL13A
22JUL13A
0
100
Fire Protection Finishes
0662124080
Plumbing Finishes
5
16JUL13A
09AUG13A
0
100
Plumbing Finishes
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Kitchen Equipment Hook-ups Install Kitchen Tile
D011 - MonthlyRpt - 11x17
Sheet 5 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor 0662124100
Above Ceiling Inspections Complete
0
0662124060
Ceiling Pads
5
0662124020
Security Grille
5
0662124010
Install Kitchen Equipment
0662124040
Electrical Finishes
Above Ceiling Inspections Complete
15JUL13A
0
100
23JUL13A
29JUL13A
0
100
27JUL13A
03AUG13A
0
100
Security Grille
10
29JUL13A
02AUG13A
0
100
Install Kitchen Equipment
5
03AUG13A
07AUG13A
0
100
5
13DEC12A
14DEC12A
0
100
Set HVAC Equipment AHU-1/HRU-1/Exh Fans Set Boilers/Hydronic Equip/Unit Heaters
Ceiling Pads
Electrical Finishes
Mechanical Room - 200 Second Floor 0662234005
Set HVAC Equipment AHU-1/HRU-1/Exh Fans
0662234115
Set Boilers/Hydronic Equip/Unit Heaters
5
13DEC12A
14DEC12A
0
100
0662234035
HVAC Rough-in - Ductwork
15
27MAR13A
18JUL13A
0
100
0662234025
Fire Protection Rough-in
5
01APR13A
03APR13A
0
100
0662234040
HVAC Rough-in - Piping/Mains/Branches/Boxes
15
17APR13A
17JUL13A
0
100
0662234020
Overhead Elec. & Fire Alarm Rough-in
30
20MAY13A
02JUL13A
0
100
0662234045
HVAC Rough-in - Insulation
20
20MAY13A
19JUL13A
0
100
0662234015
Wall Electrical Rough-in
4
25JUN13A
28JUN13A
0
100
0662234065
HVAC Finishes
5
25JUN13A
09AUG13A
0
100
0662234030
Lights
5
16JUL13A
22JUL13A
0
100
Lights
0662234050
Finish Painting
5
16JUL13A
22JUL13A
0
100
Finish Painting
0662234055
Fire Protection Finishes
5
16JUL13A
22JUL13A
0
100
Fire Protection Finishes
0662234060
Electric & Fire Alarm Finishes
10
16JUL13A
29JUL13A
0
100
0662234070
Temperture Controls
45
03SEP13A
09SEP13
0
99
0662234080
Balancing
10
03SEP13A
12SEP13
3
70
HVAC Rough-in - Ductwork Fire Protection Rough-in HVAC Rough-in - Piping/Mains/Branches/Boxes Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Insulation Wall Electrical Rough-in HVAC Finishes
Electric & Fire Alarm Finishes Temperture Controls Balancing
Mechanical Room - 211 Second Floor Set HVAC Equipment AHU-2/HRU-2/Exhaust Fans
0662234075
Set HVAC Equipment AHU-2/HRU-2/Exhaust Fans
5
28NOV12A
19DEC12A
0
100
0662234085
HVAC Rough-in - Ductwork
5
28MAR13A
25JUN13A
0
100
0662234120
Temperture Controls
35
01MAY13A
09SEP13
0
99
0662234095
HVAC Rough-in - Insulation
3
20MAY13A
17JUL13A
0
100
HVAC Rough-in - Insulation
0662234100
HVAC Rough-in - Piping/Mains/Branches
15
20MAY13A
28JUN13A
0
100
HVAC Rough-in - Piping/Mains/Branches
0662234105
HVAC Finishes
5
25JUN13A
16JUL13A
0
100
0662234090
Balancing
10
03SEP13A
09SEP13
0
99
0662104145
Geopiers
15
12JUL12A
23JUL12A
0
100
0662104005
Foundations/Insulation
15
27JUL12A
06AUG12A
0
100
0662104135
Masonry Sub Grade
5
06AUG12A
21AUG12A
0
100
0662104035
Electric Underground
5
16AUG12A
18OCT12A
0
100
HVAC Rough-in - Ductwork Temperture Controls
HVAC Finishes Balancing
Area B First Floor Geopiers Foundations/Insulation Masonry Sub Grade Electric Underground
0662104305
Plumbing Underground
20
17AUG12A
18SEP12A
0
100
Plumbing Underground
0662104095
Slab on Grade Prep
5
12SEP12A
19SEP12A
0
100
Slab on Grade Prep
0662104045
Place Slab on Grade
5
19SEP12A
12MAR13A
0
100
0662104025
Masonry Bearing Walls
2
20SEP12A
19MAR13A
0
100
0662104130
Precast Concrete Deck @ Second Floor Mech Room
1
26NOV12A
28NOV12A
0
100
0662104020
In-wall Elec & FA Rough-in
7
28NOV12A
16JAN13A
0
100
In-wall Elec & FA Rough-in
0662104115
Rough-in Plumbing Walls
10
28NOV12A
16JAN13A
0
100
Rough-in Plumbing Walls
0662114185
Masonry - Interior
6
28NOV12A
16JAN13A
0
100
Masonry - Interior
0662104055
Door Frames in Metal Studs
10
16JAN13A
28JAN13A
0
100
0662104075
Metal Studs
10
16JAN13A
28JAN13A
0
100
0662104365
Frames
10
16JAN13A
21JAN13A
0
100
0662104120
Rough-in Fire Prot
15
07FEB13A
05APR13A
0
100
0662104125
Rough-in HVAC Piping/Mains/Branches/TB Boxes
20
08FEB13A
28MAY13A
0
100
0662104085
Overhead Rough-in Elec & FA
20
14FEB13A
10JUN13A
0
100
0662104325
Plumbing Above Ceiling
5
19FEB13A
11APR13A
0
100
0661104250
Set AHU-3 Room 100J
1
05MAR13A
06MAR13A
0
100
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Place Slab on Grade Masonry Bearing Walls Precast Concrete Deck @ Second Floor Mech Room
Door Frames in Metal Studs Metal Studs Frames Rough-in Fire Prot Rough-in HVAC Piping/Mains/Branches/TB Boxes Overhead Rough-in Elec & FA Plumbing Above Ceiling Set AHU-3 Room 100J D011 - MonthlyRpt - 11x17
Sheet 6 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
First Floor Rough-in HVAC Ductwork/FPB
0662104110
Rough-in HVAC Ductwork/FPB
20
06MAR13A
15JUL13A
0
100
0662104335
Plumbing Insulation/Testing
10
18MAR13A
11APR13A
0
100
0662104155
Standpipe / Hose Cabinet
3
05APR13A
15JUL13A
0
100
0661104350
Refrigeration/AC Condensate
10
08APR13A
31JUL13A
0
100
0662104065
CMU Veneer
20
08APR13A
28MAY13A
0
100
0662104165
Prime Paint
20
29APR13A
22JUN13A
0
100
0662104310
Temperture Controls
40
07MAY13A
09SEP13
0
99
0662104160
Drywall & Tape
15
15MAY13A
31JUL13A
0
100
0662104195
Finish Paint
20
16MAY13A
06AUG13A
0
100
0662104100
Rough-in Tech
20
20MAY13A
13JUN13A
0
100
0661104340
Set Chiller
1
29MAY13A
29MAY13A
0
100
0662104360
Glazing - Curtainwall
2
07JUN13A
09AUG13A
0
100
0662104190
Lights in Grid
20
10JUN13A
25JUN13A
0
100
0662104215
Millwork
10
17JUN13A
28JUN13A
0
100
0662104220
VCT / VET
20
17JUN13A
24JUL13A
0
100
VCT / VET
0662104225
Ceramic Floor Tile
20
17JUN13A
12JUL13A
0
100
Ceramic Floor Tile
0662104175
Ceiling Grid
20
19JUN13A
16JUL13A
0
100
0661104330
Set AC-2/CU-2/Unit Heater/Exhaust Fan
5
25JUN13A
01JUL13A
0
100
0662104140
Rough-in HVAC Insulation
40
25JUN13A
29JUL13A
0
100
0662104185
HVAC Finishes
15
25JUN13A
18JUL13A
0
100
0662104210
Electric & FA Finishes
20
02JUL13A
22JUL13A
0
100
Plumbing Insulation/Testing Standpipe / Hose Cabinet Refrigeration/AC Condensate CMU Veneer Prime Paint Temperture Controls Drywall & Tape Finish Paint Rough-in Tech Set Chiller Glazing - Curtainwall Lights in Grid Millwork
Ceiling Grid Set AC-2/CU-2/Unit Heater/Exhaust Fan Rough-in HVAC Insulation HVAC Finishes Electric & FA Finishes Lockers
0662104250
Lockers
10
08JUL13A
19JUL13A
0
100
0662104146
Elevator
20
10JUL13A
23JUL13A
0
100
Elevator
0662104070
Frost Slabs
5
16JUL13A
22JUL13A
0
100
Frost Slabs
0662104180
Fire Prot Finishes
5
16JUL13A
22JUL13A
0
100
Fire Prot Finishes
0662104230
Technology Finishes
20
16JUL13A
26JUL13A
0
100
Technology Finishes
0662104240
Plumbing Finishes
10
16JUL13A
26JUL13A
0
100
Plumbing Finishes
0662104295
Fire Protection Riser
10
16JUL13A
29JUL13A
0
100
Fire Protection Riser
0662104315
Plumbing Above Ground
5
16JUL13A
22JUL13A
0
100
Plumbing Above Ground
0662104340
Storefronts
6
16JUL13A
02AUG13A
0
100
0662104205
Ceiling Pads
15
17JUL13A
26JUL13A
0
100
Ceiling Pads
0662104200
Above Ceiling Inspections Complete
0
23JUL13A
0
100
Above Ceiling Inspections Complete
0662104260
Doors & Hardware
10
26JUL13A
13AUG13A
0
100
0662104285
FF & E
3
29JUL13A
03AUG13A
0
100
FF & E
0662104235
Acoustic Panels
10
01AUG13A
02AUG13A
0
100
Acoustic Panels
0662104245
Carpet
10
01AUG13A
09AUG13A
0
100
Carpet
0662104255
Toilet Partitions
10
01AUG13A
09AUG13A
0
100
Toilet Partitions
0662104350
Glazing
2
02AUG13A
16AUG13A
0
100
0662104280
Toilet Accessories
10
05AUG13A
13AUG13A
0
100
0662104275
Signage
5
07AUG13A
08AUG13A
0
100
0662104090
Set Windows
20
09AUG13A
13AUG13A
0
100
0662104105
Building Area Final Enclosure
0
13AUG13A
0
100
0662104265
Marker / Tack Boards
10
23AUG13A
27AUG13A
0
100
0662104330
Balancing
5
03SEP13A
11SEP13
2
70
0662204010
Prescast Concrete Deck
5
26NOV12A
28NOV12A
0
100
0662204020
In-wall Electrical Rough-in
5
28NOV12A
26JUN13A
0
100
Storefronts
Doors & Hardware
Glazing Toilet Accessories Signage Set Windows Building Area Final Enclosure Marker / Tack Boards Balancing
Second Floor
0662204035
Masonry - Exterior Bearing
6
30NOV12A
22DEC12A
0
100
0662204070
Equipment Pads
5
12DEC12A
12DEC12A
0
100
0662204040
Roof Structural Steel & Deck
20
20DEC12A
16JAN13A
0
100
0662204125
Rough-in HVAC Piping
10
31JAN13A
08APR13A
0
100
0662204085
Overhead Rough-in Elec & FA
30
08FEB13A
24JUN13A
0
100
0662204080
Roofing
5
11FEB13A
08APR13A
0
100
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
Prescast Concrete Deck In-wall Electrical Rough-in Masonry - Exterior Bearing Equipment Pads Roof Structural Steel & Deck Rough-in HVAC Piping Overhead Rough-in Elec & FA Roofing D011 - MonthlyRpt - 11x17
Sheet 7 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
10
18FEB13A
22FEB13A
0
100
Sanitary Aboveground Precast Topping
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
NOV
Second Floor 0662204315
Sanitary Aboveground
0662204030
Precast Topping
5
20FEB13A
20FEB13A
0
100
0662204055
Door Frames
20
26FEB13A
28FEB13A
0
100
0662204050
Interior Masonry Walls
20
27FEB13A
07MAR13A
0
100
0662204075
Metal Studs
10
28FEB13A
01MAR13A
0
100
0662104150
Exhaust Fans/MAU/Unit Heaters
5
01MAR13A
25JUN13A
0
100
0662204140
Rough-in HVAC Insulation
3
07MAR13A
16JUL13A
0
100
0662204120
Rough-in Fire Prot
20
14MAR13A
12JUL13A
0
100
0662204325
Plumbing Above Ceiling Piping
10
18MAR13A
12APR13A
0
100
0662204110
Rough-in HVAC Ductwork
20
22MAR13A
24JUN13A
0
100
Door Frames Interior Masonry Walls Metal Studs Exhaust Fans/MAU/Unit Heaters Rough-in HVAC Insulation Rough-in Fire Prot Plumbing Above Ceiling Piping Rough-in HVAC Ductwork Dampproofing CMU
0662204135
Dampproofing CMU
5
04APR13A
08MAY13A
0
100
0662204155
Standpipe / Hose Cabinet
3
05APR13A
17JUL13A
0
100
0662204130
Area B - Temporary Building Enclosure Complete
0
09APR13A
0
100
0662204335
Plumbing Insulation/Testing
10
11APR13A
18JUL13A
0
100
0662204145
Temperture Controls
10
06MAY13A
09SEP13
0
99
0662204165
Prime Paint
20
06MAY13A
03JUN13A
0
100
0662204065
CMU Veneer
20
09MAY13A
24MAY13A
0
100
0662204160
Drywall & Tape
15
13MAY13A
0
100
0662204100
Rough-in Tech
30
17MAY13A
20JUN13A
0
100
0662204195
Finish Paint
20
03JUN13A
09AUG13A
0
100
0662204175
Ceiling Grid
20
11JUN13A
15JUL13A
0
100
Ceiling Grid
0662204190
Lights in Grid
5
18JUN13A
15JUL13A
0
100
Lights in Grid
0662204210
Electric & FA Finishes
15
18JUN13A
16JUL13A
0
100
Electric & FA Finishes
0662204180
Fire Prot Finishes
10
20JUN13A
16JUL13A
0
100
0662204185
HVAC Finishes
10
20JUN13A
25JUN13A
0
100
0662204215
Millwork
20
01JUL13A
26JUL13A
0
100
0662204150
Storefronts
1
16JUL13A
02AUG13A
0
100
0662204200
Above Ceiling Inspections Complete
0
16JUL13A
0
100
0662204225
Ceramic Floor Tile
15
16JUL13A
26JUL13A
0
100
0662204230
Technology Finishes
10
16JUL13A
29JUL13A
0
100
0662204240
Plumbing Finishes
15
16JUL13A
26JUL13A
0
100
0662204300
Glazing - Storefronts
1
16JUL13A
16AUG13A
0
100
0662204310
Curtainwall
6
16JUL13A
16AUG13A
0
100
Curtainwall
0662204345
Plumbing Fixtures
6
16JUL13A
23JUL13A
0
100
Plumbing Fixtures
0662204205
Ceiling Pads
10
17JUL13A
23JUL13A
0
100
Ceiling Pads
0662204220
VCT / VET
20
18JUL13A
25JUL13A
0
100
VCT / VET
0662204250
Lockers
10
25JUL13A
31JUL13A
0
100
Lockers
0662204260
Doors & Hardware
10
26JUL13A
13AUG13A
0
100
0662204285
FF & E
3
29JUL13A
03AUG13A
0
100
FF & E
0662204235
Acoustic Panels
5
01AUG13A
02AUG13A
0
100
Acoustic Panels
0662204245
Carpet
15
01AUG13A
09AUG13A
0
100
Carpet
0662204255
Toilet Partitions
5
01AUG13A
09AUG13A
0
100
Toilet Partitions
0662204280
Toilet Accessories
5
05AUG13A
13AUG13A
0
100
0662204275
Signage
5
07AUG13A
08AUG13A
0
100
0662204090
Set Windows
15
09AUG13A
13AUG13A
0
100
0662204105
Building Final Area Enclosure
0
13AUG13A
0
100
0662204265
Marker / Tack Boards
5
23AUG13A
27AUG13A
0
100
0662204295
Balancing
3
03SEP13A
10SEP13
1
80
Balancing
Initial Architect's Punchlist
10
01AUG13A
13AUG13A
0
100
Initial Architect's Punchlist
Standpipe / Hose Cabinet Area B - Temporary Building Enclosure Complete Plumbing Insulation/Testing Temperture Controls Prime Paint CMU Veneer Drywall & Tape Rough-in Tech Finish Paint
Fire Prot Finishes HVAC Finishes Millwork Storefronts Above Ceiling Inspections Complete Ceramic Floor Tile Technology Finishes Plumbing Finishes Glazing - Storefronts
Doors & Hardware
Toilet Accessories Signage Set Windows Building Final Area Enclosure Marker / Tack Boards
Close-Out
0660007025 Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
D011 - MonthlyRpt - 11x17
Sheet 8 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Description
Orig Dur
Early Start
Early Finish
Rem % Dur Comp
Suspend Date
Resume Date
APR
MAY
JUN
JUL
2012 AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
2013 JUN
MAY
JUL
AUG
SEP
OCT
Architect's Punch List
0660007050
Architect's Punch List
5
01AUG13A
13AUG13A
0
100
0660007030
Fire Alarm Programming & Testing
5
05AUG13A
07AUG13A
0
100
0660007120
LEED Air Testing
1
12AUG13A
12AUG13A
0
100
LEED Air Testing
0660007080
Owner Move In
10
13AUG13A
15AUG13A
0
100
Owner Move In
0660007020
Final Inspections / Testing
5
16AUG13A
16AUG13A
0
100
Final Inspections / Testing
0660007100
Owner Move-in Complete
0
15AUG13A
0
100
0660007075
Temporary Certificate of Occupancy
0
16AUG13A
0
100
0660007110
Punchlist
19
19AUG13A
16SEP13
5
75
0660007085
Demonstration & Training
5
26AUG13A
16SEP13
5
10
0660007005
Operation & Maintenance Manuals Submitted
0
09SEP13
0
0
0660007040
Final Inspections Complete
0
09SEP13
0
0
Fire Alarm Programming & Testing
Owner Move-in Complete Temporary Certificate of Occupancy Punchlist Demonstration & Training Operation & Maintenance Manuals Submitted Final Inspections Complete
0660007015
HVAC Controls Check-out and Balancing
15
10SEP13
30SEP13
15
0
HVAC Controls Check-out and Balancing
0660007055
As-Built Documents Submitted
5
10SEP13
16SEP13
5
0
As-Built Documents Submitted
0660007090
Close-out Documents
39
17SEP13
08NOV13
39
0
0660007035
JACE Interface Check-out
5
01OCT13
07OCT13
5
0
0660007060
Project Team - Controls Check-out
5
08OCT13
14OCT13
5
0
0660007065
Building Commissioning
5
15OCT13
21OCT13
5
0
0660007070
MEP Commissioning Complete
0
21OCT13
0
0
0660007105
Contract Close-out
0
08NOV13
0
0
Start Date Finish Date Data Date Run Date
19APR12 08NOV13 10SEP13 10SEP13 10:09
Š Primavera Systems, Inc.
Early Bar Progress Bar Critical Activity
NOV
Close-out Documents JACE Interface Check-out Project Team - Controls Check-out Building Commissioning MEP Commissioning Complete Contract Close-out
D011 - MonthlyRpt - 11x17
Sheet 9 of 9
Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013
OHGR Team Date
Revision
Checked
Approved
Activity ID
Activity Name
Original Duration
Start
Finish
2013 Jun
Jul
2014 Aug
Sep
Oct
Nov
Dec
Jan
Feb Mar
Apr
May
Jun
Jul
2016
2015 Aug
Sep
Oct
Nov
Dec
Jan
Feb Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
CLEVELAND SCHOOL OF THE ARTS GMP SCHEDULE CONSTRUCTION SITEWORK
A1000
CONSTRUCTION FENCE
5
07-22-13*
07-26-13
CONSTRUCTION FENCE
A1080
SANITARY SEWER APPROVALS & FABRICATION
30
08-05-13*
09-16-13
A1010
MOBILIZE *08/26/13*
5
08-26-13*
08-30-13
A1020
SITE CLEARING
5
08-30-13
09-06-13
A1030
SITE DEMO (EXCLUDES SIDEWALKS & JOHN HAY LOT)
15
09-09-13
09-27-13
A1090
SANITARY SEWER RELOCATION
15
09-16-13
10-04-13
SANITARY SEWER RELOCATION
A1040
SITE GRADING (PAD)
30
09-23-13
11-01-13
SITE GRADING (PAD)
A1120
WATER SERVICE
10
09-23-13
10-04-13
A1100
TELECOM DUCT BANKS
15
10-07-13
10-25-13
TELECOM DUCT BANKS
A1130
ELEC DUCT BANKS
25
10-07-13
11-08-13
ELEC DUCT BANKS
A1140
STORM SEWER - EAST MAIN RUN
25
10-07-13
11-08-13
STORM SEWER - EAST MAIN RUN
A1110
MOVE TELE LINES
10
10-28-13
11-08-13
MOVE TELE LINES
A1060
SITE GRADING (SITE)
30
11-04-13
12-16-13
A1150
STORM SEWER - WEST MAIN RUN
20
11-11-13
12-09-13
A1470
GAS LINE
10
05-26-14*
06-09-14
A1430
JOHN HAY PARKING LOT (ALL WORK)
40
06-10-14*
08-05-14
JOHN HAY PARKING LOT (ALL WORK)
A1440
SITE CONC. OUTSIDE P.L.
40
06-10-14
08-05-14
SITE CONC. OUTSIDE P.L.
A1160
EXTEND SITE UTILITIES TO BUILDING (INTERMITTENT)
98
07-30-14*
12-15-14
A1450
SITE CONC / PAVING INSIDE P.L.
60
03-09-15*
05-29-15
A1460
LANDSCAPING
60
04-06-15
06-26-15
SANITARY SEWER APPROVALS & FABRICATION MOBILIZE *08/26/13* SITE CLEARING SITE DEMO (EXCLUDES SIDEWALKS & JOHN HAY LOT)
WATER SERVICE
SITE GRADING (SITE) STORM SEWER - WEST MAIN RUN GAS LINE
EXTEND SITE UTILITIES TO BUILDING (INTERMITTENT) SITE CONC / PAVING INSIDE P.L. LANDSCAPING
SHELL AND CORE GENERAL A1480
STEEL DESIGN CHANGE (ADMINISTRATIVE)
25
08-26-13*
09-30-13
A1490
STEEL SHOP DRAWINGS & FAB
95
09-30-13
02-12-14
A1070
CAISSONS
60
10-21-13
01-15-14
A1170
PILECAPS & GRADE BEAMS
60
11-11-13
02-05-14
07-31-13 16:52 CSA - W/O BASEMENT Sheet 1 of 2
STEEL DESIGN CHANGE (ADMINISTRATIVE) STEEL SHOP DRAWINGS & FAB CAISSONS PILECAPS & GRADE BEAMS
CLEVELAND SCHOOL OF THE ARTS SCHEDULE UPDATE 06-17-13
Dec Jan
Activity ID
Activity Name
Original Duration
Start
Finish
2013 Jun
Jul
2014 Aug
Sep
Oct
Nov
Dec
Jan
Feb Mar
Apr
May
Jun
Jul
2016
2015 Aug
Sep
A1180
LOAD BEARING CMU
65
11-25-13
02-25-14
A1190
MEP U/G UTIL
50
12-09-13
02-18-14
A1200
STRUCT. STEEL & MD
60
02-18-14
05-12-14
STRUCT. STEEL & MD
A1220
PERIMETER CMU
15
04-21-14*
05-09-14
PERIMETER CMU
A1210
SOMD
30
05-13-14
06-24-14
A1230
SLAB ON GRADE #2
20
05-13-14
06-10-14
A1240
EXT. FRAMING / SHEATHING
80
06-04-14
09-25-14
A1260
CURTAINWALLS & WINDOWS
117
07-02-14
12-15-14
A1250
ROOFING
60
07-31-14
10-23-14
A1270
BRICK VENEER
50
08-28-14
11-06-14
A1280
METAL PANELS
80
08-28-14
12-18-14
Oct
Nov
Dec
Jan
Feb Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
LOAD BEARING CMU MEP U/G UTIL
SOMD SLAB ON GRADE #2 EXT. FRAMING / SHEATHING CURTAINWALLS & WINDOWS ROOFING BRICK VENEER METAL PANELS
INTERIOR BUILDOUT GENERAL A1380
ROUGH INTERIOR
95
06-11-14
10-23-14
A1390
FINISH INTERIOR
177
10-24-14*
06-29-15
FINISH INTERIOR
A1400
PUNCHLIST
30
05-19-15
06-29-15
PUNCHLIST
A1420
CONSTRUCTION COMPLETION
06-29-15
CONSTRUCTION COMPLETION
A1410
OWNER CLOSEOUT / COMMISIONING
07-31-13 16:52 CSA - W/O BASEMENT Sheet 2 of 2
*05/01/15*
0 60
06-30-15
ROUGH INTERIOR
09-21-15
*05/01/15*
OWNER CLOSEOUT / COMMISIONING
CLEVELAND SCHOOL OF THE ARTS SCHEDULE UPDATE 06-17-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL PRE-CONSTRUCTION GENERAL GENERAL
PRCO-10
COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING
1 02-22-13 A
02-22-13 A
PRCO-15
REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD
1 03-04-13 A
03-04-13 A
PRCO-30
NOTIFY TDA OF VE CHANGES - CMSD
4 03-11-13 A
03-14-13 A
PRCO-20
CMSD TO APPROVE - CMSD
1 04-01-13 A
04-01-13 A
PRCO-40
CITY PERMIT REVIEW - SITE
46 04-08-13 A
06-11-13 A
CITY PERMIT REVIEW - SITE
PRCO-25
FINALIZE GMP & CONTRACT NEGOTIATION
1 04-26-13 A
04-26-13 A
FINALIZE GMP & CONTRACT NEGOTIATION
PRCO-35
COMPLETE SITE CONSTRUCTION DOCUMENTS
0
04-26-13 A
COMPLETE SITE CONSTRUCTION DOCUMENTS
PRCO-50
COMPLETE BUILDING CONSTRUCTION DOCUMENTS
0
05-31-13 A
PRCO-55
CITY PERMIT REVIEW - BUILDING
34 06-03-13 A
07-19-13 A
PRCO-60
BIDDING PROCESS
15 06-18-13 A
07-09-13 A
PRCO-75
BIDDING PROCESS / AWARD - FOOD SERVICES
11 08-12-13 A
08-23-13 A
PRCO-100
AMH - SCOPE AND AWARD
10 09-05-13 A
10-14-13 A
PRCO-70
BIDDING PROCESS / AWARD - FURNITURE
11 01-02-14*
01-16-14
COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD NOTIFY TDA OF VE CHANGES - CMSD CMSD TO APPROVE - CMSD
COMPLETE BUILDING CONSTRUCTION DOCUMENTS CITY PERMIT REVIEW - BUILDING BIDDING PROCESS BIDDING PROCESS / AWARD - FOOD SERVICES AMH - SCOPE AND AWARD BIDDING PROCESS / AWARD - FURNITURE
NOTICE TO PROCEED PRCO-80
NTP - SITE
0 05-24-13 A
PRCO-85
NTP - MASON, CONCRETE, STEEL, GENERAL
0 06-27-13 A
PRCO-90
NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION
0 07-10-13 A
PRCO-110
NTP - ROOFING, GLAZING
0 07-25-13 A
PRCO-95
NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING NTP - FOOD SERVICES
0 09-05-13 A
NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING
0 09-05-13 A
NTP - FOOD SERVICES
PRCO-105
NTP - SITE NTP - MASON, CONCRETE, STEEL, GENERAL NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION NTP - ROOFING, GLAZING
ISSUES / DELAYS
PRCO-115
BUILDING PERMIT - DELAY
10 07-08-13 A
07-19-13 A
BUILDING PERMIT - DELAY
SUB-125
LINTELS - A, B, C
10 07-08-13 A
07-19-13 A
LINTELS - A, B, C
SUB-150
BAR JOISTS - A
10 07-26-13 A
08-08-13 A
BAR JOISTS - A
SUB-155
BAR JOISTS - B
10 07-26-13 A
08-08-13 A
BAR JOISTS - B
SUB-160
BAR JOISTS - C
10 07-26-13 A
08-08-13 A
BAR JOISTS - C
SUB-100
STRUCTURAL STEEL - A
10 07-31-13 A
08-13-13 A
STEEL SUBMITTALS
11-21-13 13:04 MAX HAYES HS Sheet 1 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
STRUCTURAL STEEL - A
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-105
STRUCTURAL STEEL - B
10 08-06-13 A
08-19-13 A
STRUCTURAL STEEL - B
SUB-110
STRUCTURAL STEEL - C
10 08-06-13 A
08-19-13 A
STRUCTURAL STEEL - C
SUB-165
BAR JOISTS - D
10 08-06-13 A
08-19-13 A
BAR JOISTS - D
SUB-170
BAR JOISTS - E
10 08-06-13 A
08-19-13 A
BAR JOISTS - E
SUB-175
METAL STAIRS AND HANDRAIL
10 09-10-13 A
09-23-13 A
SUB-130
LINTELS - D AND E
10 10-08-13 A
10-21-13 A
SUB-115
STRUCTURAL STEEL - D
10 10-21-13 A
11-11-13 A
STRUCTURAL STEEL - D
SUB-120
STRUCTURAL STEEL - E
10 10-21-13 A
11-11-13 A
STRUCTURAL STEEL - E
APP-125
LINTELS - A, B, C
10 07-19-13 A
08-08-13 A
APP-150
BAR JOISTS - A
10 08-08-13 A
08-22-13 A
BAR JOISTS - A
APP-155
BAR JOISTS - B
10 08-08-13 A
08-22-13 A
BAR JOISTS - B
APP-160
BAR JOISTS - C
10 08-08-13 A
08-22-13 A
BAR JOISTS - C
APP-100
STRUCTURAL STEEL - A
10 08-13-13 A
08-21-13 A
STRUCTURAL STEEL - A
APP-105
STRUCTURAL STEEL - B
10 08-19-13 A
08-23-13 A
STRUCTURAL STEEL - B
APP-110
STRUCTURAL STEEL - C
10 08-19-13 A
08-23-13 A
STRUCTURAL STEEL - C
APP-165
BAR JOISTS - D
10 08-19-13 A
08-27-13 A
BAR JOISTS - D
APP-170
BAR JOISTS - E
10 08-19-13 A
08-27-13 A
BAR JOISTS - E
APP-175
METAL STAIRS AND HANDRAIL
10 09-23-13 A
10-28-13 A
METAL STAIRS AND HANDRAIL
APP-130
LINTELS - D AND E
10 10-21-13 A
10-25-13 A
LINTELS - D AND E
APP-115
STRUCTURAL STEEL - D
10 11-11-13 A
11-22-13
STRUCTURAL STEEL - D
APP-120
STRUCTURAL STEEL - E
10 11-11-13 A
11-22-13
STRUCTURAL STEEL - E
LEAD-125
LINTELS - A
10 08-08-13 A
08-12-13 A
LEAD-126
LINTELS - B
10 08-08-13 A
08-19-13 A
LEAD-127
LINTELS - C
10 08-08-13 A
09-26-13 A
LINTELS - C
LEAD-100
STRUCTURAL STEEL - A
25 08-21-13 A
09-30-13 A
STRUCTURAL STEEL - A
LEAD-150
BAR JOISTS - A
25 08-22-13 A
10-02-13 A
BAR JOISTS - A
LEAD-155
BAR JOISTS - B
25 08-22-13 A
10-01-13 A
BAR JOISTS - B
LEAD-160
BAR JOISTS - C
25 08-22-13 A
10-03-13 A
BAR JOISTS - C
LEAD-105
STRUCTURAL STEEL - B
19 08-23-13 A
08-28-13 A
LEAD-110
STRUCTURAL STEEL - C
19 08-23-13 A
09-26-13 A
LEAD-128
LINTELS - D
10 10-25-13 A
11-19-13
LINTELS - D
LEAD-129
LINTELS - E
10 10-25-13 A
11-19-13
LINTELS - E
METAL STAIRS AND HANDRAIL LINTELS - D AND E
APPROVALS
LINTELS - A, B, C
LEAD TIMES
11-21-13 13:04 MAX HAYES HS Sheet 2 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
LINTELS - A LINTELS - B
STRUCTURAL STEEL - B STRUCTURAL STEEL - C
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
LEAD-175
METAL STAIRS AND HANDRAIL - A / B
15 10-28-13 A
11-05-13 A
LEAD-165
BAR JOISTS - D
30 11-19-13
01-02-14
BAR JOISTS - D
LEAD-170
BAR JOISTS - E
30 11-19-13
01-02-14
BAR JOISTS - E
LEAD-115
STRUCTURAL STEEL - D
20 11-25-13
12-23-13
STRUCTURAL STEEL - D
LEAD-120
STRUCTURAL STEEL - E
20 11-25-13
12-23-13
STRUCTURAL STEEL - E
METAL STAIRS AND HANDRAIL - A / B
ROUGH CARPENTRY SUBMITTALS
SUB-405
H.M. FRAMES
10 08-01-13 A
08-14-13 A
H.M. FRAMES
SUB-410
WOOD DOORS
10 08-01-13 A
08-14-13 A
WOOD DOORS
SUB-420
FRP DOORS
10 08-26-13 A
09-11-13 A
SUB-415
HARDWARE
10 09-26-13 A
10-14-13 A
APP-405
H.M. FRAMES
10 08-14-13 A
09-05-13 A
H.M. FRAMES
APP-410
WOOD DOORS
10 08-14-13 A
09-05-13 A
WOOD DOORS
APP-420
FRP DOORS
10 09-12-13 A
10-07-13 A
APP-415
HARDWARE
10 10-14-13 A
11-18-13 A
LEAD-405
H.M. FRAMES
20 09-05-13 A
10-03-13 A
LEAD-410
WOOD DOORS
40 09-06-13 A
11-19-13
WOOD DOORS
LEAD-420
FRP DOORS
10 10-07-13 A
11-19-13
FRP DOORS
LEAD-415
HARDWARE
40 11-18-13 A
01-15-14
SUB-260
HOT WATER RADIATOR
10 07-15-13 A
07-26-13 A
HOT WATER RADIATOR
SUB-300
RADIANT HEATER
10 07-15-13 A
07-26-13 A
RADIANT HEATER
SUB-220
GRILLES AND DIFFUSERS
10 07-16-13 A
07-29-13 A
GRILLES AND DIFFUSERS
SUB-265
AIR CURTAIN (HAC)
10 07-16-13 A
07-29-13 A
AIR CURTAIN (HAC)
SUB-280
LOUVERS
10 07-16-13 A
07-29-13 A
LOUVERS
SUB-230
GRAVITY VENTILATOR
10 07-23-13 A
08-05-13 A
GRAVITY VENTILATOR
SUB-295
EXHAUST FAN
10 07-23-13 A
08-05-13 A
EXHAUST FAN
SUB-310
SUPPLY FAN
10 07-23-13 A
08-05-13 A
SUPPLY FAN
SUB-320
AIR HANDLING UNIT
10 07-23-13 A
08-05-13 A
AIR HANDLING UNIT
FRP DOORS HARDWARE
APPROVALS
FRP DOORS HARDWARE
LEAD TIMES
H.M. FRAMES
HARDWARE
HVAC SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 3 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-275
FAN POWERED VAV BOXES
10 07-24-13 A
08-06-13 A
FAN POWERED VAV BOXES
SUB-225
MECHANICAL PUMPS
10 07-25-13 A
08-07-13 A
MECHANICAL PUMPS
SUB-245
HOT WATER BOILERS
10 07-25-13 A
08-07-13 A
HOT WATER BOILERS
SUB-250
HOT WATER UNIT HEATER
10 07-25-13 A
08-07-13 A
HOT WATER UNIT HEATER
SUB-235
VAV BOXES
10 07-29-13 A
08-09-13 A
VAV BOXES
SUB-270
ROOFTOP UNIT HEATING AND VENTILLATION
10 07-29-13 A
08-09-13 A
ROOFTOP UNIT HEATING AND VENTILLATION
SUB-305
MAKE-UP AIR UNIT
10 07-29-13 A
08-09-13 A
MAKE-UP AIR UNIT
SUB-240
AIR CONDITIONING UNIT
10 08-02-13 A
08-16-13 A
AIR CONDITIONING UNIT
SUB-255
CABINET UNIT HEATER
10 08-02-13 A
08-16-13 A
CABINET UNIT HEATER
SUB-285
CHILLER
10 08-05-13 A
11-18-13 A
SUB-290
AIR COOLED CONDENSING UNIT
10 08-05-13 A
08-16-13 A
AIR COOLED CONDENSING UNIT
SUB-315
FAN COIL UNIT
10 08-05-13 A
08-16-13 A
FAN COIL UNIT
SUB-325
CONTROL THERMOSTATS
10 10-31-13 A
11-18-13 A
CONTROL THERMOSTATS
SUB-330
CONTROL VALVES
10 10-31-13 A
11-18-13 A
CONTROL VALVES
APP-260
HOT WATER RADIATOR
10 07-26-13 A
08-12-13 A
HOT WATER RADIATOR
APP-300
RADIANT HEATER
10 07-26-13 A
08-15-13 A
RADIANT HEATER
APP-220
GRILLES AND DIFFUSERS
10 07-29-13 A
08-06-13 A
GRILLES AND DIFFUSERS
APP-265
AIR CURTAIN (HAC)
10 07-29-13 A
08-05-13 A
AIR CURTAIN (HAC)
APP-280
LOUVERS
10 07-29-13 A
08-06-13 A
LOUVERS
APP-230
GRAVITY VENTILATOR
10 08-05-13 A
08-15-13 A
GRAVITY VENTILATOR
APP-295
EXHAUST FAN
10 08-05-13 A
08-12-13 A
EXHAUST FAN
APP-310
SUPPLY FAN
10 08-05-13 A
11-19-13
APP-320
AIR HANDLING UNIT
10 08-05-13 A
08-19-13 A
APP-275
FAN POWERED VAV BOXES
10 08-06-13 A
09-10-13 A
APP-225
MECHANICAL PUMPS
10 08-07-13 A
08-23-13 A
MECHANICAL PUMPS
APP-245
HOT WATER BOILERS
10 08-07-13 A
08-23-13 A
HOT WATER BOILERS
APP-250
HOT WATER UNIT HEATER
10 08-08-13 A
08-12-13 A
HOT WATER UNIT HEATER
APP-235
VAV BOXES
10 08-09-13 A
08-22-13 A
APP-305
MAKE-UP AIR UNIT
10 08-09-13 A
09-20-13 A
APP-270
ROOFTOP UNIT HEATING AND VENTILLATION
10 08-12-13 A
08-29-13 A
ROOFTOP UNIT HEATING AND VENTILLATION
APP-240
AIR CONDITIONING UNIT
10 08-16-13 A
08-28-13 A
AIR CONDITIONING UNIT
APP-255
CABINET UNIT HEATER
10 08-16-13 A
08-29-13 A
CABINET UNIT HEATER
APP-290
AIR COOLED CONDENSING UNIT
10 08-16-13 A
08-26-13 A
AIR COOLED CONDENSING UNIT
APP-315
FAN COIL UNIT
10 08-16-13 A
08-29-13 A
CHILLER
APPROVALS
11-21-13 13:05 MAX HAYES HS Sheet 4 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SUPPLY FAN AIR HANDLING UNIT FAN POWERED VAV BOXES
VAV BOXES MAKE-UP AIR UNIT
FAN COIL UNIT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APP-285
CHILLER
10 11-19-13
12-03-13
CHILLER
APP-325
CONTROL THERMOSTATS
10 11-19-13
12-03-13
CONTROL THERMOSTATS
APP-330
CONTROL VALVES
10 11-19-13
12-03-13
CONTROL VALVES
LEAD-265
AIR CURTAIN (HAC)
25 08-05-13 A
11-19-13
AIR CURTAIN (HAC)
LEAD-220
GRILLES AND DIFFUSERS
15 08-06-13 A
11-19-13
GRILLES AND DIFFUSERS
LEAD-280
LOUVERS
25 08-06-13 A
11-19-13
LOUVERS
LEAD-250
HOT WATER UNIT HEATER
25 08-12-13 A
11-19-13
HOT WATER UNIT HEATER
LEAD-260
HOT WATER RADIATOR
25 08-12-13 A
11-19-13
HOT WATER RADIATOR
LEAD-295
EXHAUST FAN
25 08-12-13 A
11-19-13
EXHAUST FAN
LEAD-230
GRAVITY VENTILATOR
15 08-15-13 A
11-19-13
GRAVITY VENTILATOR
LEAD-300
RADIANT HEATER
25 08-15-13 A
11-19-13
RADIANT HEATER
LEAD-320
AIR HANDLING UNIT
60 08-19-13 A
11-19-13
AIR HANDLING UNIT
LEAD-235
VAV BOXES
30 08-22-13 A
11-19-13
VAV BOXES
LEAD-225
MECHANICAL PUMPS
65 08-23-13 A
11-22-13
MECHANICAL PUMPS
LEAD-245
HOT WATER BOILERS
50 08-23-13 A
11-19-13
HOT WATER BOILERS
LEAD-290
AIR COOLED CONDENSING UNIT
40 08-26-13 A
11-19-13
AIR COOLED CONDENSING UNIT
LEAD-240
AIR CONDITIONING UNIT
60 08-28-13 A
11-20-13
AIR CONDITIONING UNIT
LEAD-255
CABINET UNIT HEATERS
25 08-29-13 A
11-19-13
CABINET UNIT HEATERS
LEAD-270
ROOFTOP UNIT HEATING AND VENTILLATION
60 08-29-13 A
11-21-13
ROOFTOP UNIT HEATING AND VENTILLATION
LEAD-315
FAN COIL UNIT
25 08-29-13 A
11-19-13
FAN COIL UNIT
LEAD-275
FAN POWERED VAV BOXES
25 09-10-13 A
11-19-13
FAN POWERED VAV BOXES
LEAD-305
MAKE-UP AIR UNIT
50 09-23-13 A
12-02-13
LEAD-310
SUPPLY FAN
25 11-20-13
12-26-13
LEAD-285
CHILLER
50 12-04-13
02-13-14
CHILLER
LEAD-325
CONTROL THERMOSTATS
15 12-04-13
12-24-13
CONTROL THERMOSTATS
LEAD-330
CONTROL VALVES
15 12-04-13
12-24-13
CONTROL VALVES
SUB-370
CABLE TRAY
10 08-02-13 A
08-16-13 A
CABLE TRAY
SUB-375
LIGHT FIXTURES
10 08-06-13 A
08-20-13 A
LIGHT FIXTURES
SUB-365
POWER DISTRIBUTION
10 09-09-13 A
09-20-13 A
SUB-360
FIRE ALARM DEVICES
10 10-08-13 A
10-21-13 A
SUB-380
IT DEVICES
10 11-19-13
12-03-13
LEAD TIMES
MAKE-UP AIR UNIT SUPPLY FAN
ELECTRICAL SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 5 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
POWER DISTRIBUTION FIRE ALARM DEVICES IT DEVICES
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APPROVALS
APP-370
CABLE TRAY
10 08-16-13 A
09-20-13 A
APP-375
LIGHT FIXTURES - EXTERIOR
10 08-20-13 A
09-06-13 A
APP-376
LIGHT FIXTURES - INTERIOR
10 08-20-13 A
10-03-13 A
APP-365
POWER DISTRIBUTION
10 09-20-13 A
11-19-13
POWER DISTRIBUTION
APP-360
FIRE ALARM DEVICES
10 10-21-13 A
11-19-13
FIRE ALARM DEVICES
APP-380
IT DEVICES
10 12-04-13
12-17-13
IT DEVICES
CABLE TRAY
LEAD-370
CABLE TRAY
30 09-23-13 A
11-19-13
LEAD-375
LIGHT FIXTURES
50 10-03-13 A
12-12-13
LEAD-360
FIRE ALARM DEVICES
40 11-20-13
01-17-14
LEAD-365
POWER DISTRIBUTION
60 11-20-13
02-14-14
POWER DISTRIBUTION
LEAD-380
IT DEVICES
40 12-18-13
02-13-14
IT DEVICES
LIGHT FIXTURES - EXTERIOR LIGHT FIXTURES - INTERIOR
LEAD TIMES
CABLE TRAY LIGHT FIXTURES FIRE ALARM DEVICES
FIRE PROTECTION SUBMITTALS
SUB-335
FIRE VALVE CABINET
10 11-04-13 A
11-15-13 A
FIRE VALVE CABINET
SUB-340
FIRE SPRINKLER PUMP
10 11-04-13 A
11-15-13 A
FIRE SPRINKLER PUMP
SUB-345
FIRE SPRINKLER JOCKEY PUMP
10 11-04-13 A
11-15-13 A
FIRE SPRINKLER JOCKEY PUMP
SUB-350
SIAMESE FIRE DEPARTMENT CONNECTION
10 11-04-13 A
11-19-13
APP-335
FIRE VALVE CABINET
10 11-15-13 A
11-29-13
FIRE VALVE CABINET
APP-340
FIRE SPRINKLER PUMP
10 11-15-13 A
11-29-13
FIRE SPRINKLER PUMP
APP-345
FIRE SPRINKLER JOCKEY PUMP
10 11-15-13 A
11-29-13
FIRE SPRINKLER JOCKEY PUMP
APP-350
SIAMESE FIRE DEPARTMENT CONNECTION
10 11-20-13
12-04-13
LEAD-335
FIRE VALVE CABINET
20 12-02-13
12-30-13
LEAD-340
FIRE SPRINKLER PUMP
40 12-02-13
01-28-14
FIRE SPRINKLER PUMP
LEAD-345
FIRE SPRINKLER JOCKEY PUMP
40 12-02-13
01-28-14
FIRE SPRINKLER JOCKEY PUMP
LEAD-350
SIAMESE FIRE DEPARTMENT CONNECTION
20 12-05-13
01-03-14
SIAMESE FIRE DEPARTMENT CONNECTION
APPROVALS
SIAMESE FIRE DEPARTMENT CONNECTION
LEAD TIMES
FIRE VALVE CABINET
SIAMESE FIRE DEPARTMENT CONNECTION
CARPENTRY SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 6 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-355
ELEVATOR
10 07-19-13 A
08-01-13 A
ELEVATOR
SUB-510
FIRE EXTINGUISHER AND CABINETS
10 07-22-13 A
08-02-13 A
FIRE EXTINGUISHER AND CABINETS
SUB-525
TELESCOPING STANDS
10 09-11-13 A
09-25-13 A
SUB-440
WOOD GYM FLOOR
10 09-17-13 A
09-30-13 A
SUB-475
SCOREKEEPING SYSTEM
10 10-09-13 A
10-22-13 A
SUB-215
LAB FUME HOOD
10 11-19-13
12-03-13
LAB FUME HOOD
SUB-425
OVERHEAD COILING DOORS
10 11-19-13
12-03-13
OVERHEAD COILING DOORS
SUB-445
VOLLEYBALL POST AND NET
10 11-19-13
12-03-13
VOLLEYBALL POST AND NET
SUB-450
WINDOW ROLLER SHADES
10 11-19-13
12-03-13
WINDOW ROLLER SHADES
SUB-455
GYM DIVIDERS
10 11-19-13
12-03-13
GYM DIVIDERS
SUB-460
WIRE MESH PARTITIONS
10 11-19-13
12-03-13
WIRE MESH PARTITIONS
SUB-465
ART KILN
10 11-19-13
12-03-13
ART KILN
SUB-470
PROJECTION SCREENS
10 11-19-13
12-03-13
PROJECTION SCREENS
SUB-485
METAL LOCKERS
10 11-19-13
12-03-13
METAL LOCKERS
SUB-495
METAL STORAGE SHELVING
10 11-19-13
12-03-13
METAL STORAGE SHELVING
SUB-500
TOILET AND SHOWER COMPARTMENTS
10 11-19-13
12-03-13
TOILET AND SHOWER COMPARTMENTS
SUB-505
SIGNAGE
10 11-19-13
12-03-13
SIGNAGE
SUB-515
LAB CASEWORK
10 11-19-13
12-03-13
LAB CASEWORK
SUB-520
P-LAM CASEWORK
10 11-19-13
12-03-13
P-LAM CASEWORK
SUB-490
SITE FURNISHINGS
10 01-17-14
01-30-14
APP-355
ELEVATOR
10 08-01-13 A
08-23-13 A
ELEVATOR
APP-510
FIRE EXTINGUISHER AND CABINETS
10 08-02-13 A
08-22-13 A
FIRE EXTINGUISHER AND CABINETS
APP-525
TELESCOPING STANDS
10 09-25-13 A
11-08-13 A
TELESCOPING STANDS
APP-440
WOOD GYM FLOOR
10 09-30-13 A
11-08-13 A
WOOD GYM FLOOR
APP-475
SCOREKEEPING SYSTEM
10 10-22-13 A
11-19-13
SCOREKEEPING SYSTEM
APP-215
LAB FUME HOOD
10 12-04-13
12-17-13
LAB FUME HOOD
APP-425
OVERHEAD COILING DOORS
10 12-04-13
12-17-13
OVERHEAD COILING DOORS
APP-445
VOLLEYBALL POST AND NET
10 12-04-13
12-17-13
VOLLEYBALL POST AND NET
APP-450
WINDOW ROLLER SHADES
10 12-04-13
12-17-13
WINDOW ROLLER SHADES
APP-455
GYM DIVIDERS
10 12-04-13
12-17-13
GYM DIVIDERS
APP-460
WIRE MESH PARTITIONS
10 12-04-13
12-17-13
WIRE MESH PARTITIONS
APP-465
ART KILN
10 12-04-13
12-17-13
ART KILN
APP-470
PROJECTION SCREENS
10 12-04-13
12-17-13
PROJECTION SCREENS
TELESCOPING STANDS WOOD GYM FLOOR SCOREKEEPING SYSTEM
SITE FURNISHINGS
APPROVALS
11-21-13 13:05 MAX HAYES HS Sheet 7 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APP-485
METAL LOCKERS
10 12-04-13
12-17-13
METAL LOCKERS
APP-495
METAL STORAGE SHELVING
10 12-04-13
12-17-13
METAL STORAGE SHELVING
APP-500
TOILET AND SHOWER COMPARTMENTS
10 12-04-13
12-17-13
TOILET AND SHOWER COMPARTMENTS
APP-505
SIGNAGE
10 12-04-13
12-17-13
SIGNAGE
APP-515
LAB CASEWORK
10 12-04-13
12-17-13
LAB CASEWORK
APP-520
P-LAM CASEWORK
10 12-04-13
12-17-13
P-LAM CASEWORK
APP-490
SITE FURNISHINGS
10 01-31-14
02-13-14
LEAD-510
FIRE EXTINGUISHER AND CABINETS
20 08-22-13 A
11-19-13
FIRE EXTINGUISHER AND CABINETS
LEAD-355
ELEVATOR
50 08-26-13 A
11-19-13
ELEVATOR
LEAD-440
WOOD GYM FLOOR
20 11-08-13 A
12-06-13
LEAD-525
TELESCOPING STANDS
40 11-08-13 A
01-07-14
LEAD-475
SCOREKEEPING SYSTEM
20 11-20-13
12-18-13
LEAD-215
LAB FUME HOOD
50 12-18-13
02-27-14
LEAD-425
OVERHEAD COILING DOORS
30 12-18-13
01-30-14
LEAD-445
VOLLEYBALL POST AND NET
20 12-18-13
01-16-14
VOLLEYBALL POST AND NET
LEAD-450
WINDOW ROLLER SHADES
20 12-18-13
01-16-14
WINDOW ROLLER SHADES
LEAD-455
GYM DIVIDERS
40 12-18-13
02-13-14
GYM DIVIDERS
LEAD-460
WIRE MESH PARTITIONS
20 12-18-13
01-16-14
WIRE MESH PARTITIONS
LEAD-465
ART KILN
10 12-18-13
01-02-14
LEAD-470
PROJECTION SCREENS
20 12-18-13
01-16-14
LEAD-485
METAL LOCKERS
30 12-18-13
01-30-14
LEAD-495
METAL STORAGE SHELVING
20 12-18-13
01-16-14
LEAD-500
TOILET AND SHOWER COMPARTMENTS
30 12-18-13
01-30-14
TOILET AND SHOWER COMPARTMENTS
LEAD-505
SIGNAGE
30 12-18-13
01-30-14
SIGNAGE
LEAD-515
LAB CASEWORK
40 12-18-13
02-13-14
LAB CASEWORK
LEAD-520
P-LAM CASEWORK
40 12-18-13
02-13-14
P-LAM CASEWORK
LEAD-490
SITE FURNISHINGS
20 02-14-14
03-13-14
SUB-190
DOMESTIC WATER HEATER
10 07-10-13 A
07-24-13 A
SUB-200
PLUMBING PUMPS
10 07-29-13 A
08-09-13 A
SUB-180
PLUMBING FIXTURES
10 08-06-13 A
08-19-13 A
PLUMBING FIXTURES
SUB-195
STORAGE TANK
10 08-07-13 A
08-20-13 A
STORAGE TANK
SITE FURNISHINGS
LEAD TIMES
WOOD GYM FLOOR TELESCOPING STANDS SCOREKEEPING SYSTEM LAB FUME HOOD OVERHEAD COILING DOORS
ART KILN PROJECTION SCREENS METAL LOCKERS METAL STORAGE SHELVING
SITE FURNISHINGS
PLUMBING SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 8 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
DOMESTIC WATER HEATER PLUMBING PUMPS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-185
AIR COMPRESSOR (AC)
10 08-14-13 A
08-27-13 A
AIR COMPRESSOR (AC)
SUB-205
GAS REGULATOR
10 09-18-13 A
10-01-13 A
GAS REGULATOR
APP-190
DOMESTIC WATER HEATER
10 07-24-13 A
08-19-13 A
DOMESTIC WATER HEATER
APP-200
PLUMBING PUMPS
10 08-09-13 A
08-19-13 A
PLUMBING PUMPS
APP-180
PLUMBING FIXTURES
10 08-19-13 A
08-28-13 A
PLUMBING FIXTURES
APP-195
STORAGE TANK
10 08-21-13 A
08-27-13 A
STORAGE TANK
APP-185
AIR COMPRESSOR (AC)
10 08-27-13 A
10-09-13 A
APP-205
GAS REGULATOR
10 10-01-13 A
10-03-13 A
LEAD-190
DOMESTIC WATER HEATER
10 08-19-13 A
11-19-13
DOMESTIC WATER HEATER
LEAD-200
PLUMBING PUMPS
20 08-19-13 A
11-19-13
PLUMBING PUMPS
LEAD-195
STORAGE TANK
10 08-27-13 A
11-19-13
STORAGE TANK
LEAD-180
PLUMBING FIXTURES
20 08-28-13 A
11-19-13
PLUMBING FIXTURES
LEAD-205
GAS REGULATOR
10 10-03-13 A
11-19-13
GAS REGULATOR
LEAD-185
AIR COMPRESSOR (AC)
20 10-09-13 A
11-19-13
AIR COMPRESSOR (AC)
SUB-545
FRX PLYWOOD SHEATHING
10 09-03-13 A
09-11-13 A
SUB-550
COLD FORM FRAMING ENGINEERING
10 09-30-13 A
10-11-13 A
SUB-535
ACT
10 11-19-13
12-02-13
ACT
SUB-540
SOUND ABSORBING PANELS
10 11-19-13
12-02-13
SOUND ABSORBING PANELS
APP-545
FRX PLYWOOD SHEATHING
10 09-11-13 A
10-01-13 A
APP-550
COLD FORM FRAMING ENGINEERING
10 10-11-13 A
11-19-13
APP-535
ACT
10 12-03-13
12-16-13
ACT
APP-540
SOUND ABSORBING PANELS
10 12-03-13
12-16-13
SOUND ABSORBING PANELS
APPROVALS
AIR COMPRESSOR (AC) GAS REGULATOR
LEAD TIMES
DRYWALL SUBMITTALS
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING
APPROVALS
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING
LEAD TIMES
LEAD-545
FRX PLYWOOD SHEATHING
LEAD-550
COLD FORM FRAMING ENGINEERING
15 11-20-13
12-10-13
LEAD-535
ACT
15 12-17-13
01-06-14
11-21-13 13:05 MAX HAYES HS Sheet 9 of 26
6 10-01-13 A
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
11-11-13 A
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING ACT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID LEAD-540
Activity Name
Original Start Duration
Finish
2013
2014
SOUND ABSORBING PANELS
25 12-17-13
01-20-14
SOUND ABSORBING PANELS
SUB-395
PRE-CAST PLANKS
10 07-11-13 A
07-24-13 A
SUB-385
FACE BRICK
10 07-17-13 A
07-30-13 A
SUB-390
PRE-CAST STONE
10 08-07-13 A
08-20-13 A
APP-395
PRE-CAST PLANKS
10 07-24-13 A
08-01-13 A
PRE-CAST PLANKS
APP-385
FACE BRICK
10 07-30-13 A
08-21-13 A
FACE BRICK
APP-390
PRE-CAST STONE
10 08-20-13 A
09-12-13 A
LEAD-395
PRE-CAST PLANKS
15 08-01-13 A
10-17-13 A
LEAD-385
FACE BRICK
20 08-21-13 A
11-19-13
FACE BRICK
LEAD-390
PRE-CAST STONE
40 09-12-13 A
11-19-13
PRE-CAST STONE
SUB-436
ROOF COPING
10 08-27-13 A
09-09-13 A
SUB-400
ROOF HATCH
10 09-09-13 A
09-20-13 A
ROOF HATCH
APP-436
ROOF COPING
10 09-09-13 A
09-23-13 A
ROOF COPING
APP-400
ROOF HATCH
10 09-20-13 A
09-27-13 A
ROOF HATCH
LEAD-436
ROOF COPING
30 09-23-13 A
11-19-13
ROOF COPING
LEAD-400
ROOF HATCH
10 09-27-13 A
11-19-13
ROOF HATCH
SUB-435
SKY LIGHTS
10 09-16-13 A
09-20-13 A
SKY LIGHTS
SUB-530
WINDOWS
10 09-16-13 A
09-24-13 A
WINDOWS
SUB-430
ALUMINUM FRAMED STOREFRONT
10 10-03-13 A
10-16-13 A
MASON SUBMITTALS
PRE-CAST PLANKS FACE BRICK PRE-CAST STONE
APPROVALS
PRE-CAST STONE
LEAD TIMES
PRE-CAST PLANKS
ROOF SUBMITTALS
ROOF COPING
APPROVALS
LEAD TIMES
GLASS SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 10 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
ALUMINUM FRAMED STOREFRONT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APPROVALS
APP-435
SKY LIGHTS
10 09-20-13 A
10-22-13 A
APP-530
WINDOWS
10 09-24-13 A
10-10-13 A
APP-430
ALUMINUM FRAMED STOREFRONT
10 10-16-13 A
10-25-13 A
SKY LIGHTS
LEAD-530
WINDOWS
50 10-10-13 A
12-19-13
LEAD-435
SKY LIGHTS
30 10-22-13 A
12-03-13
LEAD-430
ALUMINUM FRAMED STOREFRONT
10 10-25-13 A
11-19-13
SUB-565
CARPET
10 11-18-13 A
11-29-13
CARPET
SUB-555
CERAMIC TILE
10 11-18-13 A
11-29-13
CERAMIC TILE
SUB-560
SHEET VINYL
10 11-18-13 A
11-29-13
SHEET VINYL
SUB-570
RUBBER FLOORING
10 11-18-13 A
11-29-13
RUBBER FLOORING
SUB-575
VCT
10 11-18-13 A
11-29-13
VCT
SUB-580
RUBBER BASE
10 11-18-13 A
11-29-13
RUBBER BASE
APP-555
CERAMIC TILE
10 12-02-13
12-13-13
CERAMIC TILE
APP-560
SHEET VINYL
10 12-02-13
12-13-13
SHEET VINYL
APP-565
CARPET
10 12-02-13
12-13-13
CARPET
APP-570
RUBBER FLOORING
10 12-02-13
12-13-13
RUBBER FLOORING
APP-575
VCT
10 12-02-13
12-13-13
VCT
APP-580
RUBBER BASE
10 12-02-13
12-13-13
RUBBER BASE
LEAD-555
CERAMIC TILE
30 12-16-13
01-24-14
CERAMIC TILE
LEAD-560
SHEET VINYL
30 12-16-13
01-24-14
SHEET VINYL
LEAD-565
CARPET
30 12-16-13
01-24-14
CARPET
LEAD-570
RUBBER FLOORING
30 12-16-13
01-24-14
RUBBER FLOORING
LEAD-575
VCT
30 12-16-13
01-24-14
VCT
LEAD-580
RUBBER BASE
30 12-16-13
01-24-14
RUBBER BASE
WINDOWS ALUMINUM FRAMED STOREFRONT
LEAD TIMES
WINDOWS SKY LIGHTS ALUMINUM FRAMED STOREFRONT
FLOORING SUBMITTALS
APPROVALS
LEAD TIMES
F, F & E - TBD
11-21-13 13:05 MAX HAYES HS Sheet 11 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SUBMITTALS
SUB-480
FF&E
10 11-19-13
12-03-13
FF&E
10 12-04-13
12-17-13
FF&E
10 12-18-13
01-02-14
KITCHEN EQUIPMENT
10 09-19-13 A
10-14-13 A
KITCHEN EQUIPMENT
10 10-14-13 A
11-14-13 A
KITCHEN EQUIPMENT
80 11-14-13 A
03-10-14
FF&E
APPROVALS
APP-480
FF&E
LEAD TIMES
LEAD-480
FF&E
KITCHEN EQUIPMENT SUBMITTALS
SUB-210
KITCHEN EQUIPMENT
APPROVALS
APP-210
KITCHEN EQUIPMENT
LEAD TIMES
LEAD-210
KITCHEN EQUIPMENT
CONSTRUCTION GENERAL MILESTONES
MILE-1030
PERMANENT WATER
0
01-15-14*
MILE-1020
PERMANENT ELECTRICAL
0
04-01-14*
MILE-1010
CASEWORK AVAILABLE - A / B / C
0
05-01-14*
CASEWORK AVAILABLE - A / B / C
MILE-1040
CONDITIONED AIR - A, B, C
0
05-01-14*
CONDITIONED AIR - A, B, C
0
12-17-13*
0
01-13-14*
*05/01/14*
PERMANENT WATER PERMANENT ELECTRICAL *05/01/14*
TEMPORARY ENCLOSURE MILESTONES MILE-1075
TEMPORARY ENCLOSURE - B GYM
*12/31/13*
MILE-1055
TEMPORARY ENCLOSURE - B REMAINING
MILE-1050
TEMPORARY ENCLOSURE - A
*12/31/13*
0
01-20-14*
TEMPORARY ENCLOSURE - A
MILE-1060
TEMPORARY ENCLOSURE - C
*12/31/13*
0
01-22-14*
TEMPORARY ENCLOSURE - C
MILE-1065
TARGET TEMPORARY ENCLOSURE - D
0
05-16-14*
MILE-1070
TARGET TEMPORARY ENCLOSURE - E
0
06-09-14*
0
07-30-14*
*12/31/13*
*09/18/14* *10/31/14*
TEMPORARY ENCLOSURE - B GYM
*12/31/13*
TEMPORARY ENCLOSURE - B REMAINING
*12/31/13*
*12/31/13* *12/31/13*
TARGET TEMPORARY ENCLOSURE - D
*09/18/14*
TARGET TEMPORARY ENCLOSURE - E
*10/31/14*
TARGET COMPLETION MILESTONES MILE-B400
11-21-13 13:05 MAX HAYES HS Sheet 12 of 26
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*06/18/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MILE-B200
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*
0
08-20-14*
MILE-A100
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*
0
08-25-14*
MILE-A200
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*
0
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2
MILE-B100
TARGET COMPLETION MILESTONE - BUILDING B - GYM *9/11/14*
0
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING B - GYM
MILE-B300
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*
0
09-23-14*
MILE-B500
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
0
12-17-14*
MILE-B600
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
0
12-24-14*
MILE-D200
TARGET COMPLETION MILESTONE - BUILDING D *06/24/15* REVISED *03/06/15*
0
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING D
MILE-E300
TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*
ORIGINAL
0
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING E
MILE-C100
TARGET COMPLETION MILESTONE - BUILDING C
*03/19/15*
0
03-05-15*
ORIGINAL
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1
15 06-10-13 A
06-28-13 A
SITE-15
CLEAR SITE & SITE SETUP
10 06-10-13 A
06-21-13 A
SITE-20
SITE DEMO
20 06-24-13 A
07-22-13 A
SITE-25
CONTRACTUAL SOIL REMEDIATION
30 06-24-13 A
07-31-13 A
SITE-115
CUT & FILL SITE TO GRADE
20 07-09-13 A
11-29-13
SITE-190
U/G SANITARY SEWERS
SITE-35
MOBILIZE - FENCING, SWPPP CLEAR SITE & SITE SETUP SITE DEMO CONTRACTUAL SOIL REMEDIATION CUT & FILL SITE TO GRADE
NON-GMP SOIL REMEDIATION
25 07-22-13 A
08-07-13 A
SHNC-95
TEMP. ROAD ON SITE
30 07-29-13 A
11-29-13
TEMP. ROAD ON SITE
SITE-110
U/G STORM SEWERS
30 08-16-13 A
11-29-13
U/G STORM SEWERS
SITE-155
U/G UTILITIES TO BUILDING
30 09-13-13 A
12-13-13
SITE-120
FINISH PAVING & STRIPING
20 10-20-14
11-14-14
U/G SANITARY SEWERS NON-GMP SOIL REMEDIATION
U/G UTILITIES TO BUILDING FINISH PAVING & STRIPING
BUILDING SITE
SITE-70
9 06-24-13 A
07-05-13 A
EXCAVATE / FILL A TO GRADE
EXCAVATE B TO GRADE
10 07-08-13 A
07-19-13 A
EXCAVATE B TO GRADE
SITE-80
EXCAVATE / FILL C TO GRADE
10 07-22-13 A
07-31-13 A
SITE-85
EXCAVATE / FILL D TO GRADE
10 08-02-13 A
08-16-13 A
EXCAVATE / FILL D TO GRADE
SITE-90
EXCAVATE / FILL E TO GRADE
10 08-02-13 A
08-16-13 A
EXCAVATE / FILL E TO GRADE
EXCAVATE / FILL C TO GRADE
SOUTH SITE
11-21-13 13:05 MAX HAYES HS Sheet 13 of 26
*10/20/14*
TARGET COMPLETION MILESTONE - BUILDING C
07-17-13 A
EXCAVATE / FILL A TO GRADE
*9/11/14*
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
2 07-16-13 A
SITE-75
*10/16/14*
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
GENERAL
MOBILIZE - FENCING, SWPPP
*09/15/14*
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS
SITE
SITE-10
*08/22/14*
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
ORIGINAL *06/24/15* ORIGINAL *07/01/15* *03/19/15*
REVIS
REVISE
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
SITE-30
EXCAVATE & STONE - PARKING LOT
24 06-24-13 A
11-15-13 A
SITE-130
CREATE DETENTION SYSTEM
15 08-05-13 A
10-25-13 A
SITE-175
COMPLETE CPP AND CEI ACCESS
SITE-41
EXCAVATE & STONE - PARKING LOT CREATE DETENTION SYSTEM
9 09-03-13 A
11-22-13
RELOCATE CPP
30 09-23-13 A
11-29-13
SITE-180
INSTALL CEI DUCTBANK
10 10-28-13 A
11-22-13
SITE-185
OBTAIN EASEMENT - CEI DUCTBANK
52 11-14-13 A
01-24-14
SITE-40
RELOCATE CEI
10 01-27-14
02-07-14
SITE-135
PAVING STONE AND ASPHALT BASE COURSE
15 08-15-14
09-08-14
SITE-140
LANDSCAPING
10 09-02-14*
09-15-14
LANDSCAPING
SITE-170
PERMIABLE PAVERS
10 09-02-14*
09-15-14
PERMIABLE PAVERS
COMPLETE CPP AND CEI ACCESS
SITE-50
NORTH RETAINING WALL
10 08-05-13 A
08-09-13 A
SITE-165
LANDSCAPING
10 09-02-14
09-15-14
SITE-160
PAVING STONE AND ASPHALT BASE COURSE
15 09-08-14*
09-29-14
SITE-150
INSTALL PERM. FENCING
10 01-06-15
01-19-15
SITE-60
INSTALL RETAINING WALL
20 08-26-13 A
08-30-13 A
SITE-166
LANDSCAPING
10 09-16-14
09-29-14
SITE-167
PAVING STONE AND ASPHALT BASE COURSE
15 09-29-14
10-17-14*
RELOCATE CPP INSTALL CEI DUCTBANK OBTAIN EASEMENT - CEI DUCTBANK RELOCATE CEI PAVING STONE AND ASPHALT BASE COURSE
NORTH SITE
NORTH RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE INSTALL PERM. FENCING
EAST SITE
INSTALL RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE
WALWORTH SITE
SITE-101
DOMINION GAS ENGINEERING AND CAP EXISTING
30 08-12-13 A
09-12-13 A
SITE-100
LIGHT WT. FILL
10 09-23-13 A
10-04-13 A
LIGHT WT. FILL
SITE-105
DEMO ROADWAY
10 09-23-13 A
09-27-13 A
DEMO ROADWAY
SITE-116
TEMP CAP 16" WATER MAIN
3 09-25-13 A
09-27-13 A
TEMP CAP 16" WATER MAIN
SITE-111
CLEVELAND WATER DEPT. WORK
5 09-30-13 A
10-04-13 A
SITE-95
RELOCATE GAS LINE
10 10-30-13 A
11-05-13 A
DOMINION GAS ENGINEERING AND CAP EXISTING
LANDSCAPING
10 09-16-14
09-29-14
CLEVELAND WATER DEPT. WORK RELOCATE GAS LINE
WEST SITE
SITE-169
LANDSCAPING
BUILDING A SHELL AND CORE
SHCA-10
11-21-13 13:05 MAX HAYES HS Sheet 14 of 26
FOOTINGS
9 07-30-13 A
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
08-19-13 A
FOOTINGS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SHCA-15
U/G MEP
5 08-12-13 A
08-22-13 A
U/G MEP
SHCA-20
FOUNDATION BLOCK
5 08-12-13 A
08-21-13 A
FOUNDATION BLOCK
SHCA-25
VAPOR SYSTEM & STONE
6 08-23-13 A
09-03-13 A
VAPOR SYSTEM & STONE
SHCA-30
POUR S.O.G.
3 09-04-13 A
09-06-13 A
POUR S.O.G.
SHCA-40
BLOCK TO 2ND FLR
15 09-09-13 A
10-01-13 A
SHCA-35
H.M. FRAMES - 1ST FLR
3 09-23-13 A
09-25-13 A
H.M. FRAMES - 1ST FLR
SHCA-95
STRUCTURAL STEEL
3 10-01-13 A
10-03-13 A
STRUCTURAL STEEL
SHCA-45
JOIST, DECK - 2ND FLR
5 10-03-13 A
10-15-13 A
JOIST, DECK - 2ND FLR
SHCA-100
POUR CONCRETE - 2ND FLR
2 10-16-13 A
10-18-13 A
POUR CONCRETE - 2ND FLR
SHCA-105
CURE CONCRETE - 2ND FLR
5 10-21-13 A
10-25-13 A
SHCA-50
H.M. FRAMES - 2ND FLR
3 10-28-13 A
11-19-13
H.M. FRAMES - 2ND FLR
SHCA-55
BLOCK TO ROOF
15 10-28-13 A
11-19-13
BLOCK TO ROOF
SHCA-60
JOIST & DECK - ROOF
10 11-15-13 A
12-02-13
SHCA-70
MASONRY VENEER REQUIRED FOR ENCLOSURE
15 11-20-13
12-11-13
MASONRY VENEER REQUIRED FOR ENCLOSURE
SHCA-110
ROOF BLOCKING
5 12-03-13
12-09-13
ROOF BLOCKING
SHCA-115
MEP CURBS & DRAINS
5 12-03-13
12-09-13
MEP CURBS & DRAINS
SHCA-75
ROOFING A
15 12-10-13
12-31-13
ROOFING A
SHCA-80
METAL PANELS
15 12-12-13
01-03-14
METAL PANELS
SHCA-120
MASONRY VENEER - REMAINING
15 12-12-13
01-01-14
MASONRY VENEER - REMAINING
SHCA-85
WINDOWS & CURTAIN WALL
20 12-20-13
01-20-14
SHCA-90
ROOFING TRIM
5 01-06-14
01-10-14
BLOCK TO 2ND FLR
CURE CONCRETE - 2ND FLR
JOIST & DECK - ROOF
WINDOWS & CURTAIN WALL ROOFING TRIM
INTERIOR BUILDOUT 1ST FLOOR INTA-112
OVERHEAD ELECTRICAL
40 10-21-13 A
12-16-13
OVERHEAD ELECTRICAL
INTA-113
OVERHEAD PLUMBING
40 10-21-13 A
12-16-13
OVERHEAD PLUMBING
INTA-110
OVERHEAD DUCTWORK
40 10-28-13 A
12-16-13
OVERHEAD DUCTWORK
INTA-114
OVERHEAD FIRE PROTECTION
10 11-19-13
12-03-13
INTA-115
INTERIOR FRAMING
20 12-17-13
01-15-14
INTA-111
OVERHEAD HVAC PIPING
40 12-26-13
02-20-14
INTA-120
ELECTRICAL IN WALL ROUGH-IN
20 01-16-14
02-12-14
ELECTRICAL IN WALL ROUGH-IN
INTA-121
PLUMBING IN WALL ROUGH-IN
20 01-16-14
02-12-14
PLUMBING IN WALL ROUGH-IN
INTA-125
HANG DRYWALL
10 02-13-14
02-26-14
INTA-126
TAPE AND FINISH
10 04-01-14*
04-14-14
INTA-200
ELEVATOR INSTALLATION
15 04-02-14
04-22-14
INTA-130
CERAMIC TILE
15 04-15-14
05-05-14
CERAMIC TILE
INTA-135
PRIME PAINT
15 04-15-14
05-05-14
PRIME PAINT
11-21-13 13:05 MAX HAYES HS Sheet 15 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
OVERHEAD FIRE PROTECTION INTERIOR FRAMING OVERHEAD HVAC PIPING
HANG DRYWALL TAPE AND FINISH ELEVATOR INSTALLATION
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTA-145
CLG GRID
15 04-29-14
05-19-14
CLG GRID
INTA-140
CASEWORK
15 05-02-14
05-22-14
CASEWORK
INTA-150
LIGHT FIXTURES
30 05-13-14
06-24-14
LIGHT FIXTURES
INTA-151
DIFFUSERS
30 05-13-14
06-24-14
DIFFUSERS
INTA-152
PLUMBING FINISHES
30 05-13-14
06-24-14
PLUMBING FINISHES
INTA-153
FIRE PROTECTION FINISHES
30 05-13-14
06-24-14
FIRE PROTECTION FINISHES
INTA-155
FINISH PAINT
30 05-28-14
07-09-14
INTA-160
SPECIALTY FLOORING
10 06-18-14
07-01-14
SPECIALTY FLOORING
INTA-165
DOORS & HARDWARE
15 06-18-14
07-09-14
DOORS & HARDWARE
INTA-170
CLG TILE
15 06-25-14
07-16-14
INTA-175
VCT & VINYL FLOORING
15 07-02-14
07-23-14
VCT & VINYL FLOORING
INTA-180
CARPET
10 07-10-14
07-23-14
CARPET
INTA-185
SPECIALTIES
10 07-24-14
08-06-14
INTA-190
PUNCHLIST
20 07-29-14
08-25-14
INTA-195
TESTING & INSPECTIONS
15 07-29-14
08-18-14
MILE-A105
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*
0
FINISH PAINT
CLG TILE
SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
08-25-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1
2ND FLOOR INTA-210
OVERHEAD DUCTWORK
40 12-03-13
01-29-14
OVERHEAD DUCTWORK
INTA-211
OVERHEAD HVAC PIPING
40 12-03-13
01-29-14
OVERHEAD HVAC PIPING
INTA-212
OVERHEAD ELECTRICAL
40 12-03-13
01-29-14
OVERHEAD ELECTRICAL
INTA-213
OVERHEAD PLUMBING
40 12-03-13
01-29-14
OVERHEAD PLUMBING
INTA-214
OVERHEAD FIRE PROTECTION
40 12-03-13
01-29-14
OVERHEAD FIRE PROTECTION
INTA-215
INTERIOR FRAMING
20 01-30-14
02-26-14
INTA-220
ELECTRICAL IN WALL ROUGH-IN
20 02-27-14
03-26-14
ELECTRICAL IN WALL ROUGH-IN
INTA-221
PLUMBING IN WALL ROUGH-IN
20 02-27-14
03-26-14
PLUMBING IN WALL ROUGH-IN
INTA-225
HANG DRYWALL
10 03-27-14
04-09-14
INTA-226
TAPE AND FINISH
10 04-15-14*
04-28-14
INTA-230
CERAMIC TILE
15 04-29-14
05-19-14
CERAMIC TILE
INTA-235
PRIME PAINT
15 04-29-14
05-19-14
PRIME PAINT
INTA-245
CLG GRID
15 05-13-14
06-03-14
CLG GRID
INTA-240
CASEWORK
15 05-23-14
06-13-14
INTA-250
LIGHT FIXTURES
30 05-28-14
07-09-14
LIGHT FIXTURES
INTA-251
DIFFUSERS
30 05-28-14
07-09-14
DIFFUSERS
INTA-252
PLUMBING FINISHES
30 05-28-14
07-09-14
PLUMBING FINISHES
INTA-253
FIRE PROTECTION FINISHES
30 05-28-14
07-09-14
FIRE PROTECTION FINISHES
INTA-255
FINISH PAINT
30 06-11-14
07-23-14
11-21-13 13:05 MAX HAYES HS Sheet 16 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
INTERIOR FRAMING
HANG DRYWALL TAPE AND FINISH
CASEWORK
FINISH PAINT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*09/15/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTA-260
SPECIALTY FLOORING
10 07-02-14
07-16-14
SPECIALTY FLOORING
INTA-265
DOORS & HARDWARE
15 07-02-14
07-23-14
DOORS & HARDWARE
INTA-270
CLG TILE
15 07-10-14
07-30-14
INTA-275
VCT & VINYL FLOORING
15 07-17-14
08-06-14
VCT & VINYL FLOORING
INTA-280
CARPET
10 07-24-14
08-06-14
CARPET
INTA-285
SPECIALTIES
10 08-07-14
08-20-14
INTA-290
PUNCHLIST
20 08-12-14
09-09-14
INTA-295
TESTING & INSPECTIONS
15 08-12-14
09-02-14
MILE-A205
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*
0
CLG TILE
SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2
BUILDING B - GYM SHELL AND CORE
SHCB-100
FOOTINGS - GYM & REMAINING
10 08-08-13 A
08-23-13 A
SHCB-105
BLOCK TO ROOF
20 08-14-13 A
09-16-13 A
SHCB-110
ROOF JOIST & DECK
7 10-17-13 A
11-22-13
SHCB-126
VAPOR SYSTEM & STONE
3 11-01-13 A
11-08-13 A
VAPOR SYSTEM & STONE
SHCB-120
U/G MEP
2 11-04-13 A
11-05-13 A
U/G MEP
SHCB-135
POUR S.O.G.
3 11-12-13 A
11-14-13 A
SHCB-115
MASONRY ACCESS OPENING
5 11-15-13 A
11-20-13
SHCB-155
ROOF BLOCKING
5 11-19-13
11-25-13
ROOF BLOCKING
SHCB-160
MEP CURBS & DRAINS
5 11-19-13
11-25-13
MEP CURBS & DRAINS
SHCB-130
ROOFING
15 11-26-13
12-17-13
SHCB-145
ROOFING TRIM
5 12-18-13
12-24-13
SHCB-140
BRICK VENEER
15 03-31-14*
04-18-14
SHCB-150
METAL PANELS
15 04-21-14
05-09-14
FOOTINGS - GYM & REMAINING BLOCK TO ROOF ROOF JOIST & DECK
POUR S.O.G. MASONRY ACCESS OPENING
ROOFING ROOFING TRIM BRICK VENEER METAL PANELS
INTERIOR BUILDOUT
INTB-100
OVERHEAD DUCTWORK
30 12-18-13
01-30-14
OVERHEAD DUCTWORK
INTB-110
OVERHEAD ELECTRICAL
30 12-18-13
01-30-14
OVERHEAD ELECTRICAL
INTB-115
OVERHEAD PLUMBING
30 12-18-13
01-30-14
OVERHEAD PLUMBING
INTB-120
OVERHEAD FIRE PROTECTION
30 12-18-13
01-30-14
OVERHEAD FIRE PROTECTION
INTB-105
OVERHEAD HVAC PIPING
30 12-26-13
02-06-14
INTB-125
ELECTRICAL ROUGH-INS
20 01-31-14
02-27-14
ELECTRICAL ROUGH-INS
INTB-130
PLUMBING ROUGH-INS
20 01-31-14
02-27-14
PLUMBING ROUGH-INS
INTB-135
PRIME PAINT
15 02-28-14
03-20-14
INTB-140
DIFFUSERS
15 03-21-14
04-10-14
11-21-13 13:05 MAX HAYES HS Sheet 17 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
OVERHEAD HVAC PIPING
PRIME PAINT DIFFUSERS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*10/16/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-145
PLUMBING FINISHES
15 03-21-14
04-10-14
PLUMBING FINISHES
INTB-150
FIRE PROTECTION FINISHES
15 03-21-14
04-10-14
FIRE PROTECTION FINISHES
INTB-155
LIGHT FIXTURES
15 03-21-14
04-10-14
LIGHT FIXTURES
INTB-160
FINISH PAINT
15 04-11-14
05-01-14
FINISH PAINT
INTB-170
ACOUSTIC PANELS
5 05-02-14
05-08-14
INTB-175
ATHLETIC EQUIPMENT
30 05-09-14
06-20-14
INTB-165
DOORS & HARDWARE
10 05-23-14
06-06-14
INTB-180
WOOD GYM FLOORING
30 06-23-14
08-04-14
INTB-195
BLEACHERS
5 08-05-14
08-11-14
INTB-185
PUNCHLIST
20 08-12-14
09-09-14
INTB-190
TESTING & INSPECTIONS
15 08-12-14
09-02-14
MILE-B105
TARGET COMPLETION MILESTONE - BUILDING B - GYM *09/11/14*
0
09-09-14*
5 08-19-13 A
08-23-13 A
10 08-26-13 A
09-09-13 A
5 09-03-13 A
09-25-13 A
10 09-03-13 A
09-12-13 A
ACOUSTIC PANELS ATHLETIC EQUIPMENT DOORS & HARDWARE WOOD GYM FLOORING BLEACHERS PUNCHLIST TESTING & INSPECTIONS TARGET COMPLETION MILESTONE - BUILDING B - GYM
BUILDING B - REMAINING SHELL AND CORE
SHCB-200
FOUNDATION BLOCK TO GRADE
SHCB-205
U/G MEP IN LOCKER ROOMS
SHCB-215
VAPOR SYSTEM & STONE IN LOCKER ROOMS
SHCB-210
U/G MEP IN KITCHEN
SHCB-220
VAPOR SYSTEM & STONE IN KITCHEN
5 09-03-13 A
09-20-13 A
VAPOR SYSTEM & STONE IN KITCHEN
SHCB-310
U/G MEP IN MECH ROOMS
5 09-13-13 A
09-24-13 A
U/G MEP IN MECH ROOMS
SHCB-225
POUR S.O.G. - KITCHEN / DINING ROOMS
3 09-23-13 A
09-25-13 A
POUR S.O.G. - KITCHEN / DINING ROOMS
SHCB-226
POUR S.O.G. - LOCKER ROOMS
3 09-25-13 A
09-27-13 A
POUR S.O.G. - LOCKER ROOMS
SHCB-315
VAPOR SYSTEM & STONE IN MECH ROOMS
3 09-26-13 A
09-30-13 A
VAPOR SYSTEM & STONE IN MECH ROOMS
SHCB-235
BLOCK TO ROOF - KITCHEN / DINING ROOMS
20 09-30-13 A
10-28-13 A
SHCB-320
POUR S.O.G - MECH ROOM
5 10-02-13 A
10-08-13 A
SHCB-230
H.M. FRAMES
20 10-03-13 A
10-28-13 A
SHCB-240
BLOCK TO MEZZANINE
8 10-07-13 A
10-16-13 A
BLOCK TO MEZZANINE
SHCB-245
MEZZANINE PRECAST
2 10-17-13 A
10-18-13 A
MEZZANINE PRECAST
SHCB-255
BLOCK TO ROOF - LOCKER / MEZZ
9 10-21-13 A
11-01-13 A
SHCB-325
STRUCTURAL STEEL - KITCHEN
2 10-25-13 A
10-25-13 A
SHCB-250
ROOF JOISTS & DECK - KITCHEN
15 10-25-13 A
11-01-13 A
ROOF JOISTS & DECK - KITCHEN
SHCB-260
ROOF JOISTS & DECK - DINING
8 10-30-13 A
11-13-13 A
ROOF JOISTS & DECK - DINING
SHCB-265
ROOF JOISTS & DECK - LOCKER / MEZZ
15 11-04-13 A
12-05-13
SHCB-305
STAIRS TO MEZZANINE
10 11-04-13 A
11-15-13 A
STAIRS TO MEZZANINE
SHCB-256
MEZZANINE TOPPING
5 11-07-13 A
11-15-13 A
MEZZANINE TOPPING
11-21-13 13:05 MAX HAYES HS Sheet 18 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
FOUNDATION BLOCK TO GRADE U/G MEP IN LOCKER ROOMS VAPOR SYSTEM & STONE IN LOCKER ROOMS U/G MEP IN KITCHEN
BLOCK TO ROOF - KITCHEN / DINING ROOMS POUR S.O.G - MECH ROOM H.M. FRAMES
BLOCK TO ROOF - LOCKER / MEZZ STRUCTURAL STEEL - KITCHEN
ROOF JOISTS & DECK - LOCKER / MEZZ
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*09/11/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SHCB-330
ROOF BLOCKING - KITCHEN
5 11-11-13 A
11-15-13 A
ROOF BLOCKING - KITCHEN
SHCB-340
MEP CURBS & DRAINS - KITCHEN
5 11-11-13 A
11-15-13 A
MEP CURBS & DRAINS - KITCHEN
SHCB-345
ROOF BLOCKING - DINING
5 11-14-13 A
11-22-13
ROOF BLOCKING - DINING
SHCB-350
MEP CURBS & DRAINS - DINING
5 11-14-13 A
11-22-13
MEP CURBS & DRAINS - DINING
SHCB-270
ROOFING - KITCHEN
10 11-18-13 A
12-02-13
SHCB-365
MECHANICAL HOUSEKEEPING PADS
5 11-19-13
11-25-13
MECHANICAL HOUSEKEEPING PADS
SHCB-280
MASONRY VENEER REQUIRED FOR ENCLOSURE
5 11-20-13
11-26-13
MASONRY VENEER REQUIRED FOR ENCLOSURE
SHCB-257
LOAD MEP EQUIPMENT TO MEZZ
7 11-26-13
12-05-13
SHCB-275
ROOFING - DINING
15 12-02-13
12-20-13
SHCB-355
ROOF BLOCKING - LOCKER / MEZZ
5 12-06-13
12-12-13
ROOF BLOCKING - LOCKER / MEZZ
SHCB-360
MEP CURBS & DRAINS - LOCKER / MEZZ
5 12-06-13
12-12-13
MEP CURBS & DRAINS - LOCKER / MEZZ
SHCB-285
ROOFING - LOCKER / MEZZ
15 12-13-13
01-06-14
SHCB-295
WINDOWS & C.W.
15 12-20-13
01-13-14
WINDOWS & C.W.
SHCB-300
ROOFING TRIM
5 01-07-14
01-13-14
ROOFING TRIM
SHCB-335
MASONRY VENEER - REMAINING
5 03-31-14*
04-04-14
SHCB-290
METAL PANELS
ROOFING - KITCHEN
LOAD MEP EQUIPMENT TO MEZZ ROOFING - DINING
ROOFING - LOCKER / MEZZ
MASONRY VENEER - REMAINING
15 04-07-14
04-25-14
METAL PANELS
INTERIOR BUILDOUT MEZZANINE INTB-402
PLUMBING EQUIPMENT / PIPING
80 01-07-14
04-28-14
PLUMBING EQUIPMENT / PIPING
INTB-400
ELECTRICAL EQUIPMENT / PIPING
80 01-07-14
04-28-14
ELECTRICAL EQUIPMENT / PIPING
INTB-401
MECHANICAL EQUIPMENT / PIPING
80 01-07-14
04-28-14
MECHANICAL EQUIPMENT / PIPING
INTB-405
ELECTRICAL ROUGH-INS
35 01-07-14
02-24-14
ELECTRICAL ROUGH-INS
INTB-406
PLUMBING ROUGH-INS
35 01-07-14
02-24-14
PLUMBING ROUGH-INS
INTB-410
PRIME PAINT
5 04-29-14
05-05-14
INTB-415
LIGHT FIXTURES
10 05-06-14
05-19-14
LIGHT FIXTURES
INTB-420
DIFFUSERS
10 05-06-14
05-19-14
DIFFUSERS
INTB-425
FINISH PAINT
10 05-20-14
06-03-14
INTB-430
DOORS & HARDWARE
5 06-04-14
06-10-14
DOORS & HARDWARE
INTB-440
SPECIALTIES
20 06-11-14
07-09-14
SPECIALTIES
INTB-445
PUNCHLIST
20 07-02-14
07-30-14
INTB-450
TESTING & INSPECTIONS
15 07-02-14
07-23-14
MILE-B405
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*
0
PRIME PAINT
FINISH PAINT
PUNCHLIST TESTING & INSPECTIONS
07-30-14*
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE
LOCKER ROOMS INTB-300
OVERHEAD DUCTWORK
15 12-06-13
12-27-13
OVERHEAD DUCTWORK
INTB-301
OVERHEAD HVAC PIPING
15 12-06-13
12-27-13
OVERHEAD HVAC PIPING
INTB-302
OVERHEAD ELECTRICAL
15 12-06-13
12-27-13
OVERHEAD ELECTRICAL
11-21-13 13:05 MAX HAYES HS Sheet 19 of 26
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*06/18/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-303
OVERHEAD PLUMBING
15 12-06-13
12-27-13
OVERHEAD PLUMBING
INTB-304
OVERHEAD FIRE PROTECTION
15 12-06-13
12-27-13
OVERHEAD FIRE PROTECTION
INTB-305
ELECTRICAL ROUGH-INS
15 12-30-13
01-20-14
ELECTRICAL ROUGH-INS
INTB-306
PLUMBING ROUGH-INS
15 12-30-13
01-20-14
PLUMBING ROUGH-INS
INTB-311
FRAME DRYWALL CEILING
10 01-14-14
01-27-14
INTB-310
DRYWALL CEILING
10 01-28-14
02-10-14
INTB-315
TAPE AND FINISH CEILING
10 04-01-14*
04-14-14
INTB-320
CERAMIC TILE
10 04-15-14
04-28-14
INTB-325
PRIME PAINT
5 04-15-14
04-21-14
INTB-330
PLUMBING FINISHES
10 04-15-14
04-28-14
PLUMBING FINISHES
INTB-335
FIRE PROTECTION FINISHES
10 04-15-14
04-28-14
FIRE PROTECTION FINISHES
INTB-340
CASEWORK
5 06-16-14
06-20-14
CASEWORK
INTB-345
FINISH PAINT
10 06-23-14
07-07-14
INTB-350
DOORS & HARDWARE
10 07-08-14
07-21-14
INTB-370
FLOORING
10 07-22-14
08-04-14
INTB-355
SPECIALTIES
20 08-05-14
09-02-14
INTB-360
PUNCHLIST
20 08-26-14
09-23-14
INTB-365
TESTING & INSPECTIONS
15 08-26-14
09-16-14
MILE-B305
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*
0
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
FRAME DRYWALL CEILING DRYWALL CEILING TAPE AND FINISH CEILING CERAMIC TILE PRIME PAINT
FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
09-23-14*
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS
*10/20/14*
MECHANICAL / ELECTRICAL ROOMS INTB-200
PLUMBING EQUIPMENT / PIPING
70 01-07-14
04-14-14
PLUMBING EQUIPMENT / PIPING
INTB-201
ELECTRICAL EQUIPMENT / PIPING
70 01-07-14
04-14-14
ELECTRICAL EQUIPMENT / PIPING
INTB-202
FIRE PUMP EQUIPMENT / PIPING
70 01-07-14
04-14-14
FIRE PUMP EQUIPMENT / PIPING
INTB-205
ELECTRICAL ROUGH-INS
10 04-15-14
04-28-14
ELECTRICAL ROUGH-INS
INTB-206
PLUMBING ROUGH-INS
10 04-15-14
04-28-14
PLUMBING ROUGH-INS
INTB-210
PRIME PAINT
5 04-29-14
05-05-14
INTB-215
LIGHT FIXTURES
10 05-06-14
05-19-14
LIGHT FIXTURES
INTB-220
DIFFUSERS
10 05-06-14
05-19-14
DIFFUSERS
INTB-225
FINISH PAINT
10 05-20-14
06-03-14
INTB-230
DOORS & HARDWARE
10 06-04-14
06-17-14
INTB-235
FLOORING
10 06-18-14
07-01-14
INTB-240
SPECIALTIES
20 07-02-14
07-30-14
INTB-245
PUNCHLIST
20 07-24-14
08-20-14
INTB-250
TESTING & INSPECTIONS
15 07-24-14
08-13-14
MILE-B205
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*
11-21-13 13:05 MAX HAYES HS Sheet 20 of 26
0
PRIME PAINT
FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
08-20-14*
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*08/22/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
KITCHEN INTB-500
OVERHEAD DUCTWORK
30 12-03-13
01-15-14
OVERHEAD DUCTWORK
INTB-501
OVERHEAD HVAC PIPING
30 12-03-13
01-15-14
OVERHEAD HVAC PIPING
INTB-502
OVERHEAD ELECTRICAL
30 12-03-13
01-15-14
OVERHEAD ELECTRICAL
INTB-503
OVERHEAD PLUMBING
30 12-03-13
01-15-14
OVERHEAD PLUMBING
INTB-504
OVERHEAD FIRE PROTECTION
30 12-03-13
01-15-14
OVERHEAD FIRE PROTECTION
INTB-505
ELECTRICAL ROUGH-INS
35 01-16-14
03-05-14
ELECTRICAL ROUGH-INS
INTB-506
PLUMBING ROUGH-INS
35 01-16-14
03-05-14
PLUMBING ROUGH-INS
INTB-507
KITCHEN EQUIPMENT ROUGH-INS
35 01-16-14
03-05-14
KITCHEN EQUIPMENT ROUGH-INS
INTB-510
PRIME PAINT
10 03-06-14
03-19-14
PRIME PAINT
INTB-520
CLG GRID
15 03-20-14
04-09-14
CLG GRID
INTB-525
PLUMBING FINISHES
15 04-10-14
04-30-14
PLUMBING FINISHES
INTB-530
FIRE PROTECTION FINISHES
15 04-10-14
04-30-14
FIRE PROTECTION FINISHES
INTB-535
LIGHT FIXTURES
15 04-10-14
04-30-14
LIGHT FIXTURES
INTB-540
DIFFUSERS
15 04-10-14
04-30-14
DIFFUSERS
INTB-515
CASEWORK
25 06-23-14
07-28-14
INTB-545
FINISH PAINT
10 07-29-14
08-11-14
INTB-550
CLG TILE
5 09-10-14
09-16-14
INTB-555
DOORS & HARDWARE
10 09-10-14
09-23-14
INTB-560
FLOORING
20 09-10-14
10-07-14
INTB-565
KITCHEN EQUIPMENT
30 10-08-14
11-18-14
INTB-570
SPECIALTIES
20 10-08-14
11-04-14
INTB-575
PUNCHLIST
20 11-19-14
12-17-14
INTB-580
TESTING & INSPECTIONS
15 11-19-14
12-10-14
MILE-B505
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
0
CASEWORK FINISH PAINT CLG TILE DOORS & HARDWARE FLOORING KITCHEN EQUIPMENT SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
12-17-14*
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN
STUDENT DINING INTB-600
OVERHEAD DUCTWORK
20 12-23-13
01-21-14
OVERHEAD DUCTWORK
INTB-602
OVERHEAD ELECTRICAL
20 12-23-13
01-21-14
OVERHEAD ELECTRICAL
INTB-603
OVERHEAD PLUMBING
20 12-23-13
01-21-14
OVERHEAD PLUMBING
INTB-604
OVERHEAD FIRE PROTECTION
20 12-23-13
01-21-14
OVERHEAD FIRE PROTECTION
INTB-601
OVERHEAD HVAC PIPING
20 12-26-13
01-23-14
OVERHEAD HVAC PIPING
INTB-605
ELECTRICAL ROUGH-INS
15 01-22-14
02-11-14
ELECTRICAL ROUGH-INS
INTB-606
PLUMBING ROUGH-INS
15 01-22-14
02-11-14
PLUMBING ROUGH-INS
INTB-610
PRIME PAINT
10 02-12-14
02-25-14
INTB-620
CLG GRID
10 02-26-14
03-11-14
INTB-625
PLUMBING FINISHES
10 03-12-14
03-25-14
11-21-13 13:05 MAX HAYES HS Sheet 21 of 26
PRIME PAINT CLG GRID PLUMBING FINISHES
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*01/13/15*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-630
FIRE PROTECTION FINISHES
10 03-12-14
03-25-14
FIRE PROTECTION FINISHES
INTB-635
LIGHT FIXTURES
10 03-12-14
03-25-14
LIGHT FIXTURES
INTB-640
DIFFUSERS
10 03-12-14
03-25-14
DIFFUSERS
INTB-615
CASEWORK
15 07-29-14
08-18-14
INTB-645
FINISH PAINT
10 08-19-14
09-02-14
INTB-650
CLG TILE
10 10-01-14
10-14-14
CLG TILE
INTB-655
DOORS & HARDWARE
10 10-01-14
10-14-14
DOORS & HARDWARE
INTB-660
FLOORING
20 10-01-14
10-28-14
INTB-665
SPECIALTIES
20 10-29-14
11-26-14
SPECIALTIES
INTB-680
ACOUSTIC PANELS
20 10-29-14
11-26-14
ACOUSTIC PANELS
INTB-670
PUNCHLIST
20 11-27-14
12-24-14
INTB-675
TESTING & INSPECTIONS
15 11-27-14
12-17-14
MILE-B605
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
0
CASEWORK FINISH PAINT
FLOORING
PUNCHLIST TESTING & INSPECTIONS
12-24-14*
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
BUILDING C SHELL AND CORE
SHCC-235
FOOTINGS
10 08-22-13 A
09-03-13 A
SHCC-240
U/G MEP
10 09-04-13 A
09-24-13 A
SHCC-245
FOUNDATION BLOCK
5 09-04-13 A
09-06-13 A
SHCC-250
VAPOR SYSTEM & STONE
11 09-16-13 A
09-27-13 A
SHCC-255
POUR S.O.G. / CURE
4 09-27-13 A
10-04-13 A
SHCC-260
H.M. FRAMES
5 10-21-13 A
11-22-13
H.M. FRAMES
SHCC-265
BLOCK TO ROOF
20 10-21-13 A
11-22-13
BLOCK TO ROOF
SHCC-270
ROOF JOIST & DECK
15 11-25-13
12-16-13
ROOF JOIST & DECK
SHCC-285
BRICK VENEER
15 11-25-13
12-16-13
BRICK VENEER
SHCC-290
METAL PANELS
15 12-17-13
01-08-14
SHCC-365
ROOF BLOCKING
5 12-17-13
12-23-13
ROOF BLOCKING
SHCC-370
MEP CURBS & DRAINS
5 12-17-13
12-23-13
MEP CURBS & DRAINS
SHCC-295
WINDOWS & C.W.
15 12-20-13
01-13-14
SHCC-280
ROOFING
15 01-02-14
01-22-14
SHCC-296
ROOFING TRIM
5 01-23-14
01-29-14
FOOTINGS U/G MEP FOUNDATION BLOCK VAPOR SYSTEM & STONE POUR S.O.G. / CURE
METAL PANELS
WINDOWS & C.W. ROOFING ROOFING TRIM
INTERIOR BUILDOUT
INTC-115
OVERHEAD DUCTWORK
40 01-23-14
03-19-14
OVERHEAD DUCTWORK
INTC-116
OVERHEAD HVAC PIPING
40 01-23-14
03-19-14
OVERHEAD HVAC PIPING
INTC-117
OVERHEAD ELECTRICAL
40 01-23-14
03-19-14
OVERHEAD ELECTRICAL
11-21-13 13:05 MAX HAYES HS Sheet 22 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTC-118
OVERHEAD PLUMBING
40 01-23-14
03-19-14
OVERHEAD PLUMBING
INTC-119
OVERHEAD FIRE PROTECTION
40 01-23-14
03-19-14
OVERHEAD FIRE PROTECTION
INTC-125
PLUMBING ROUGH-INS
35 03-20-14
05-07-14
PLUMBING ROUGH-INS
INTC-120
ELECTRICAL ROUGH-INS
35 03-20-14
05-07-14
ELECTRICAL ROUGH-INS
INTC-210
FRAME DRYWALL CEILING
5 05-08-14
05-14-14
FRAME DRYWALL CEILING
INTC-220
HANG DRYWALL CEILING
5 05-15-14
05-21-14
HANG DRYWALL CEILING
INTC-130
TAPE & FINISH CEILING
40 05-22-14*
07-18-14
INTC-135
CERAMIC TILE
30 05-30-14
07-11-14
CERAMIC TILE
INTC-140
PRIME PAINT
15 06-20-14
07-11-14
PRIME PAINT
INTC-150
CLG GRID
30 07-07-14
08-15-14
INTC-155
PLUMBING FINISHES
30 08-18-14
09-29-14
PLUMBING FINISHES
INTC-156
FIRE PROTECTION FINISHES
30 08-18-14
09-29-14
FIRE PROTECTION FINISHES
INTC-157
LIGHT FIXTURES
30 08-18-14
09-29-14
LIGHT FIXTURES
INTC-158
DIFFUSERS
30 08-18-14
09-29-14
DIFFUSERS
INTC-145
CASEWORK
25 08-19-14
09-23-14
INTC-160
FINISH PAINT
15 09-30-14
10-20-14
INTC-165
SPECIALTY FLOORING
30 10-21-14
12-02-14
SPECIALTY FLOORING
INTC-170
DOORS & HARDWARE
15 11-11-14
12-02-14
DOORS & HARDWARE
INTC-175
CLG TILE
20 11-11-14
12-09-14
INTC-180
VCT & VINYL FLOORING
20 11-26-14
12-23-14
INTC-185
CARPET
20 12-24-14
01-22-15
INTC-190
SPECIALTIES
20 01-09-15
02-05-15
INTC-195
PUNCHLIST
20 02-06-15
03-05-15
INTC-200
TESTING & INSPECTIONS
15 02-06-15
02-26-15
MILE-C105
TARGET COMPLETION MILESTONE - BUILDING C
*03/19/15*
0
TAPE & FINISH CEILING
CLG GRID
CASEWORK FINISH PAINT
CLG TILE VCT & VINYL FLOORING CARPET SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
03-05-15*
TARGET COMPLETION MILESTONE - BUILDING C
BUILDING D SHELL AND CORE
SHCD-305
FOOTINGS
SHCD-310
FOUNDATION BLOCK
SHCD-345
U/G MEP
SHCD-315
H.M. FRAMES - D WEST BOX
SHCD-320
10 09-04-13 A
09-17-13 A
5 09-18-13 A
09-27-13 A
FOOTINGS FOUNDATION BLOCK
10 09-18-13 A
04-03-14
5 11-04-13 A
12-06-13
H.M. FRAMES - D WEST BOX
BLOCK TO ROOF - D WEST BOX
20 11-04-13 A
12-06-13
BLOCK TO ROOF - D WEST BOX
SHCD-370
BLOCK TO ROOF - D REMAINING
15 12-09-13
12-30-13
BLOCK TO ROOF - D REMAINING
SHCD-321
STRUCTURAL STEEL - D WEST BOX
2 12-24-13
12-26-13
STRUCTURAL STEEL - D WEST BOX
SHCD-330
H.M. FRAMES - D REMAINING
5 12-24-13
12-30-13
H.M. FRAMES - D REMAINING
11-21-13 13:05 MAX HAYES HS Sheet 23 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
U/G MEP
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*03/19/15*
Activity ID
Activity Name
SHCD-325
ROOF JOIST & DECK - D WEST BOX
SHCD-385
Original Start Duration
Finish
2013
2014
2015
30 01-03-14
02-13-14
STRUCTURAL STEEL - D REMAINING
2 01-22-14
01-23-14
SHCD-390
ROOF JOIST & DECK - D REMAINING
30 01-24-14
03-06-14
SHCD-375
ROOF BLOCKING - D WEST BOX
5 02-14-14
02-20-14
ROOF BLOCKING - D WEST BOX
SHCD-380
MEP CURBS & DRAINS - D WEST BOX
5 02-14-14
02-20-14
MEP CURBS & DRAINS - D WEST BOX
SHCD-335
ROOFING - D WEST BOX
20 02-21-14
03-20-14
SHCD-395
ROOF BLOCKING - D REMAINING
5 03-07-14
03-13-14
SHCD-400
MEP CURBS & DRAINS - D REMAINING
5 03-14-14
03-20-14
SHCD-340
ROOFING TRIM - D WEST BOX
5 03-21-14
03-27-14
SHCD-405
ROOFING - D REMAINING
20 03-21-14
04-17-14
SHCD-415
VAPOR SYSTEM & STONE - D REMAINING
10 03-31-14*
04-11-14
VAPOR SYSTEM & STONE - D REMAINING
SHCD-350
VAPOR SYSTEM & STONE - D WEST BOX
10 04-04-14*
04-17-14
VAPOR SYSTEM & STONE - D WEST BOX
SHCD-355
BRICK VENEER
15 04-07-14
04-25-14
BRICK VENEER
SHCD-420
POUR S.O.G. - REMAINING
10 04-14-14
04-25-14
POUR S.O.G. - REMAINING
SHCD-360
POUR S.O.G. - D WEST BOX
10 04-18-14
05-01-14
POUR S.O.G. - D WEST BOX
SHCD-410
ROOFING TRIM - D REMAINING
5 04-18-14
04-24-14
ROOFING TRIM - D REMAINING
SHCD-425
WINDOWS & C.W. - D REMAINING
15 04-25-14
05-15-14
WINDOWS & C.W. - D REMAINING
SHCD-365
METAL PANELS
15 04-28-14
05-16-14
METAL PANELS
SHCD-369
WINDOWS & C.W. - D WEST BOX
15 04-28-14
05-16-14
WINDOWS & C.W. - D WEST BOX
ROOF JOIST & DECK - D WEST BOX
NON BEARING MASONRY WALLS
STRUCTURAL STEEL - D REMAINING ROOF JOIST & DECK - D REMAINING
ROOFING - D WEST BOX ROOF BLOCKING - D REMAINING MEP CURBS & DRAINS - D REMAINING ROOFING TRIM - D WEST BOX ROOFING - D REMAINING
INTERIOR BUILDOUT
INTD-105
NON BEARING MASONRY WALLS
10 05-02-14
05-15-14
INTD-110
OVERHEAD DUCTWORK
55 05-16-14
08-04-14
OVERHEAD DUCTWORK
INTD-111
OVERHEAD HVAC PIPING
55 05-16-14
08-04-14
OVERHEAD HVAC PIPING
INTD-112
OVERHEAD ELECTRICAL
55 05-16-14
08-04-14
OVERHEAD ELECTRICAL
INTD-113
OVERHEAD PLUMBING
55 05-16-14
08-04-14
OVERHEAD PLUMBING
INTD-114
OVERHEAD FIRE PROTECTION
55 05-16-14
08-04-14
OVERHEAD FIRE PROTECTION
INTD-125
ELECTRICAL ROUGH-INS
35 07-08-14
08-25-14
ELECTRICAL ROUGH-INS
INTD-126
PLUMBING ROUGH-INS
35 07-08-14
08-25-14
PLUMBING ROUGH-INS
INTD-130
FRAME DRYWALL CEILING
15 08-05-14
08-25-14
FRAME DRYWALL CEILING
INTD-131
HANG DRYWALL CEILING
15 08-26-14
09-16-14
INTD-132
TAPE AND FINISH CEILING
15 09-17-14
10-07-14
INTD-135
CERAMIC TILE
20 10-08-14
11-04-14
CERAMIC TILE
INTD-140
PRIME PAINT
20 10-08-14
11-04-14
PRIME PAINT
INTD-145
CASEWORK
15 10-22-14
11-11-14
CASEWORK
INTD-150
CLG GRID
30 10-22-14
12-03-14
11-21-13 13:05 MAX HAYES HS Sheet 24 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
HANG DRYWALL CEILING TAPE AND FINISH CEILING
CLG GRID
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTD-155
PLUMBING FINISHES
40 11-05-14
01-02-15
PLUMBING FINISHES
INTD-156
FIRE PROTECTION FINISHES
40 11-05-14
01-02-15
FIRE PROTECTION FINISHES
INTD-157
LIGHT FIXTURES
40 11-05-14
01-02-15
LIGHT FIXTURES
INTD-158
DIFFUSERS
40 11-05-14
01-02-15
DIFFUSERS
INTD-160
FINISH PAINT
30 11-19-14
01-02-15
FINISH PAINT
INTD-165
SEAL CONCRETE FLOORING
15 11-27-14
12-17-14
SEAL CONCRETE FLOORING
INTD-170
DOORS & HARDWARE
25 12-04-14
01-09-15
DOORS & HARDWARE
INTD-175
CLG TILE
15 12-11-14
01-02-15
INTD-180
VCT & VINYL FLOORING
15 12-26-14
01-16-15
INTD-190
INSTALL EQUIPMENT
30 01-05-15
02-13-15
INTD-195
PUNCHLIST
15 01-30-15
02-19-15
PUNCHLIST
INTD-200
TESTING & INSPECTIONS
15 01-30-15
02-19-15
TESTING & INSPECTIONS
MILE-D205
TARGET COMPLETION MILESTONE - BUILDING D ORIGINAL *06/24/15* REVISED *03/06/15*
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING D
0
CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT
BUILDING E SHELL AND CORE
SHCE-375
FOOTINGS
SHCE-380
10 09-18-13 A
11-25-13
FOUNDATION BLOCK
5 11-26-13
12-03-13
SHCE-385
H.M. FRAMES
5 12-09-13
12-13-13
SHCE-390
BLOCK TO ROOF
30 12-09-13
01-21-14
BLOCK TO ROOF
SHCE-391
STRUCTURAL STEEL
2 01-22-14
01-23-14
STRUCTURAL STEEL
SHCE-395
ROOF JOIST & DECK
30 01-24-14
03-06-14
ROOF JOIST & DECK
SHCE-445
ROOF BLOCKING
5 03-07-14
03-13-14
ROOF BLOCKING
SHCE-450
MEP CURBS & DRAINS
5 03-07-14
03-13-14
MEP CURBS & DRAINS
SHCE-410
ROOFING
20 03-14-14
04-10-14
SHCE-405
U/G MEP
10 04-11-14
04-24-14
SHCE-420
VAPOR SYSTEM & STONE
10 04-25-14
05-08-14
SHCE-415
BRICK VENEER
15 04-28-14
05-16-14
BRICK VENEER
SHCE-440
POUR S.O.G.
10 05-09-14
05-22-14
POUR S.O.G.
SHCE-425
METAL PANELS
15 05-19-14
06-09-14
METAL PANELS
SHCE-430
WINDOWS & C.W.
15 05-19-14
06-09-14
WINDOWS & C.W.
SHCE-435
ROOFING TRIM
5 05-19-14
05-23-14
FOOTINGS FOUNDATION BLOCK H.M. FRAMES
ROOFING U/G MEP VAPOR SYSTEM & STONE
ROOFING TRIM
INTERIOR BUILDOUT
INTE-105
NON BEARING MASONRY WALLS
10 05-23-14
06-06-14
INTE-115
OVERHEAD DUCTWORK
40 06-09-14
08-04-14
11-21-13 13:05 MAX HAYES HS Sheet 25 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
NON BEARING MASONRY WALLS OVERHEAD DUCTWORK
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
ORIGINAL *06/24/15*
REV
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
INTE-116
OVERHEAD HVAC PIPING
40 06-09-14
08-04-14
OVERHEAD HVAC PIPING
INTE-117
OVERHEAD ELECTRICAL
40 06-09-14
08-04-14
OVERHEAD ELECTRICAL
INTE-118
OVERHEAD PLUMBING
40 06-09-14
08-04-14
OVERHEAD PLUMBING
INTE-119
OVERHEAD FIRE PROTECTION
40 06-09-14
08-04-14
OVERHEAD FIRE PROTECTION
INTE-125
ELECTRICAL ROUGH-INS
35 07-08-14
08-25-14
ELECTRICAL ROUGH-INS
INTE-126
PLUMBING ROUGH-INS
35 07-08-14
08-25-14
PLUMBING ROUGH-INS
INTE-130
FRAME DRYWALL CEILING
15 08-05-14
08-25-14
FRAME DRYWALL CEILING
INTE-131
HANG DRYWALL CEILING
15 08-26-14
09-16-14
INTE-132
TAPE AND FINISH CEILING
15 09-17-14
10-07-14
INTE-135
CERAMIC TILE
20 10-08-14
11-04-14
CERAMIC TILE
INTE-140
PRIME PAINT
20 10-08-14
11-04-14
PRIME PAINT
INTE-150
CLG GRID
30 10-22-14
12-03-14
INTE-155
PLUMBING FINISHES
40 11-05-14
01-02-15
PLUMBING FINISHES
INTE-156
FIRE PROTECTION FINISHES
40 11-05-14
01-02-15
FIRE PROTECTION FINISHES
INTE-157
LIGHT FIXTURES
40 11-05-14
01-02-15
LIGHT FIXTURES
INTE-158
DIFFUSERS
40 11-05-14
01-02-15
DIFFUSERS
INTE-145
CASEWORK
15 11-12-14
12-03-14
INTE-160
FINISH PAINT
30 11-19-14
01-02-15
INTE-165
SEAL CONCRETE FLOOR
15 11-27-14
12-17-14
INTE-170
DOORS & HARDWARE
25 12-04-14
01-09-15
INTE-175
CLG TILE
15 12-11-14
01-02-15
INTE-180
VCT & VINYL FLOORING
20 12-18-14
01-16-15
INTE-190
INSTALL EQUIPMENT
30 01-05-15
02-13-15
INTE-195
PUNCHLIST
15 01-30-15
02-19-15
PUNCHLIST
INTE-200
TESTING & INSPECTIONS
15 01-30-15
02-19-15
TESTING & INSPECTIONS
MILE-E305
TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING E
ORIGINAL
0
HANG DRYWALL CEILING TAPE AND FINISH CEILING
CLG GRID
CASEWORK FINISH PAINT SEAL CONCRETE FLOOR DOORS & HARDWARE CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT
ORIGINAL *07/01/15*
REVISE
PROJECT COMPLETION PROJECT COMPLETION GENERAL
COMP-495
PROJECT COMPLETION ACTIVITIES
COMP-505
CONSTRUCTION COMPLETION
COMP-500
OWNER CLOSEOUT / COMMISSIONING / LEED
COMP-510
CERTIFICATE OF OCCUPANCY
11-21-13 13:05 MAX HAYES HS Sheet 26 of 26
*7/1/15*
*7/1/15*
43 01-06-15 0 65 07-01-15
03-05-15
PROJECT COMPLETION ACTIVITIES
03-05-15*
CONSTRUCTION COMPLETION
09-30-15
*7/1/15*
OWNER CLOSEOUT / COMMISSIONING / LEED
0 07-01-15*
CERTIFICATE OF OCCUPANCY
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*7/1/15*
Activity ID
Activity Name
Orig Start Dur
Milestones Entire Project All Areas 0620A-ALL-1000 0620A-ALL-1020 0620A-ALL-1030 0620A-ALL-1040 0620A-ALL-1050 0620A-ALL-1060 0620A-ALL-1070 0620A-ALL-1120 0620A-RMM-1600 0620A-ALL-1250 0620A-ALL-1420 0620A-ALL-1450 Site Mobilization Entire Project All Areas
Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy
0620A-ALL-1010 Site Mobilization Material Procurement Entire Project All Areas 0620A-CTI-1000 0620A-CTT-3000 0620A-CTT-3010 0620A-CTT-3020 0620A-CTT-3030 0620A-GSC-1000 0620A-CTT-3040 0620A-CTI-1020 0620A-GEO-1000 0620A-GEO-1010 0620A-CTT-3050 0620A-CTT-3060 0620A-CTT-3070 0620A-GSC-1010 0620A-CTT-3080 0620A-GEO-1020 0620A-GEO-1030 0620A-CTI-1040 0620A-RMM-1000 0620A-GEO-1040 0620A-GEO-1050 0620A-CTT-3090 0620A-CTT-3100 0620A-RMM-1010 0620A-ZSE-1000 0620A-ZSE-1010 0620A-CTT-3110 0620A-ZSE-1090 0620A-RMM-2430 0620A-RMM-1060 0620A-RMM-2440 0620A-ZSE-1570
Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 1 of 25
545 545 545 545 0 0 0 0 0 0 0 0 5 0 0 0 15 15 15 15 15 332 332 332 332 10 10 15 15 15 20 10 10 10 10 10 10 15 10 1 10 10 1 30 1 1 1 1 10 30 50 1 10 1 1 1 1
06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A
11-21-14
06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-25-13 A 06-25-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-10-13 A 07-17-13 A 07-17-13 A 07-17-13 A 07-22-13 A 07-22-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-03-13 A 09-16-13 A 09-16-13 A 10-21-13 11-14-13 02-24-14 04-07-14 05-06-14 05-13-14
Finish
07-31-15 07-31-15 07-31-15 07-31-15 06-11-13 A 06-18-13 A 07-01-13 A 07-22-13 A 09-11-13 A 09-23-13 A 10-25-13 10-23-14 11-28-14 04-16-15 07-15-15 07-31-15* 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 09-30-14 09-30-14 09-30-14 09-30-14 06-24-13 A 06-24-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-09-13 A 07-09-13 A 07-09-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-23-13 A 07-23-13 A 07-17-13 A 07-30-13 A 07-30-13 A 07-22-13 A 08-30-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-16-13 A 11-13-13* 12-12-13 10-21-13 11-27-13 02-24-14 04-07-14 05-06-14 05-13-14
Late Start
10-21-13 10-21-13 10-21-13 10-21-13
01-07-15
10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 02-04-14 03-03-14 02-25-14 03-10-14 03-21-14 06-16-14 06-16-14 07-02-14
Late Finish 07-31-15 07-31-15 07-31-15 07-31-15 10-21-13 10-21-13 11-01-13 10-21-13 10-21-13 10-21-13 11-01-13 11-05-14 01-13-15 05-06-15 07-24-15 07-31-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-10-14 11-10-14 11-10-14 11-10-14 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 03-07-14 05-02-14 02-25-14 03-21-14 03-21-14 06-16-14 06-16-14 07-02-14
Total Free Float Float 0 0 0 0
0 0 0 0
5 9 30 14 7 0
0 2 0 0 7 0 0 0 0 0
29 29 29 29
0 0 0 0
79 98 88 79 19 48 28 35
0 0 0 44 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D
J
F
2016 M A M J
Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy
Site Mobilization -
Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site
Activity ID
0620A-RMM-2450 0620A-RMM-2460 0620A-GSC-1020 Project Coordination Academic Area First Floor
Activity Name
Orig Start Dur
Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site
0620A-RMM-1020 0620A-MPH-1030 0620A-SAC-1000 0620A-ZSE-1100 0620A-ZST-1000 Second Floor
HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)
0620A-RMM-1050 0620A-MPH-1430 0620A-SAC-1030 0620A-ZSE-1350 0620A-ZST-1030 Third Floor
HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)
0620A-RMM-1070 0620A-MPH-1450 0620A-SAC-1040 0620A-ZSE-1370 0620A-ZST-1040 One Story Areas Area A/B/C (1-Story)
HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)
0620A-RMM-1030 0620A-MPH-1300 0620A-SAC-1010 0620A-ZSE-1190 0620A-ZST-1010 Area D/E/F (1-Story)
HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)
0620A-RMM-1040 HVAC Coordination - Area D/E/F (Low Roof) 0620A-MPH-1420 Plumbing Coordination - Area D/E/F (Low Roof) 0620A-SAC-1020 Fire Protection Coordination - Area D/E/F (Low Roof) 0620A-ZSE-1290 Electrical Coordination - Area D/E/F (Low Roof) 0620A-ZST-1020 Tech Coordination - Area D/E/F (Low Roof) Site Preparation/ Rou Rough-in Site Preparation All Areas 0620A-CTI-1010 0620A-CTI-1030 0620A-CTI-1050 0620A-CTI-1070 Site Rough-in All Areas 0620A-CTI-1060 0620A-CTI-1080 0620A-MPH-1330 0620A-MPH-1410
Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)
Storm Sewers Sanitary Sewers Site Water Line Site Gas Line
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 2 of 25
1 1 1 199 199 79 79 30 30 30 30 30 76 76 30 30 30 30 30 76 76 30 30 30 30 30 106 76 76 30 30 30 30 30 76 76 30 30 30 30 30 191 33 33 33 5 3 9 6 169 169 169 25 10 10 10
06-05-14 09-16-14 09-30-14 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 10-11-13 10-25-13 11-08-13 11-22-13 01-28-14 01-28-14 01-28-14 02-19-14 03-05-14 03-19-14 04-02-14 03-11-14 03-11-14 03-11-14 04-02-14 04-16-14 05-01-14 05-15-14 10-31-13 10-31-13 10-31-13 10-31-13 11-22-13 12-09-13 12-23-13 01-08-14 12-13-13 12-13-13 12-13-13 01-08-14 01-22-14 02-05-14 02-19-14 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 07-15-13 A 07-22-13 A 08-07-13 A 07-22-13 A 07-22-13 A 07-22-13 A 07-22-13 A 09-05-13 A 11-05-13 11-21-13
Finish
06-05-14 09-16-14 09-30-14 06-26-14 06-26-14 01-07-14 01-07-14 10-30-13 11-21-13 12-06-13 12-20-13 01-07-14 05-14-14 05-14-14 03-10-14 04-01-14 04-15-14 04-30-14 05-14-14 06-26-14 06-26-14 04-22-14 05-14-14 05-29-14 06-12-14 06-26-14 04-01-14 02-18-14 02-18-14 12-12-13 01-07-14 01-21-14 02-04-14 02-18-14 04-01-14 04-01-14 01-27-14 02-18-14 03-04-14 03-18-14 04-01-14 03-19-14 08-15-13 A 08-15-13 A 08-15-13 A 06-27-13 A 07-17-13 A 08-06-13 A 08-15-13 A 03-19-14 03-19-14 03-19-14 09-04-13 A 09-20-13 A 11-19-13 12-06-13
Late Start
06-17-14 09-25-14 11-10-14 10-23-13 10-23-13 10-23-13 10-23-13 10-23-13 01-10-14 01-24-14 02-07-14 02-21-14 02-07-14 02-07-14 02-07-14 07-14-14 07-28-14 08-11-14 08-25-14 05-19-14 05-19-14 05-19-14 08-25-14 09-09-14 09-23-14 10-07-14 11-12-13 11-12-13 11-12-13 11-12-13 02-21-14 03-07-14 03-21-14 04-04-14 12-26-13 12-26-13 12-26-13 05-30-14 06-13-14 06-27-14 07-14-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-14-13 11-14-13 11-14-13 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 04-14-14
Late Finish 06-17-14 09-25-14 11-10-14 11-17-14 11-17-14 04-03-14 04-03-14 11-11-13 02-20-14 03-06-14 03-20-14 04-03-14 10-06-14 10-06-14 03-20-14 08-22-14 09-08-14 09-22-14 10-06-14 11-17-14 11-17-14 06-30-14 10-06-14 10-20-14 11-03-14 11-17-14 08-22-14 05-16-14 05-16-14 12-24-13 04-03-14 04-17-14 05-02-14 05-16-14 08-22-14 08-22-14 02-06-14 07-11-14 07-25-14 08-08-14 08-22-14 05-05-15 11-14-13 11-14-13 11-14-13 10-21-13 11-14-13 11-14-13 11-14-13 05-05-15 05-05-15 05-05-15 03-27-14 03-27-14 04-11-14 05-02-14
Total Free Float Float 8 7 29 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 100 100 48 100 100 100 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 286
286 286 286
63 63
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A 0620A 0620A 0620A 0620A 0620A 0620A -
T/P T/P T/P T/P T/P T/P T/P
Remaining Work Critical Remaining Work
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site
HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)
HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)
HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)
HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)
HVAC Coordination - Area D/E/F (Low Roof) Plumbing Coordination - Area D/E/F (Low Roof) Fire Protection Coordination - Area D/E/F (Low Roof) Electrical Coordination - Area D/E/F (Low Roof) Tech Coordination - Area D/E/F (Low Roof)
Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)
0 0 0
0 4
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
Storm Sewers Sanitary Sewers Site Water Line Site Gas Line
J
F
2016 M A M J
Activity ID
0620A-ZSE-1250 0620A-CTI-1090 Building Structure Academic Area First Floor Area D (1st Flr) 0620A-CTT-1040 0620A-CTT-1070 0620A-CTT-1110 0620A-CTT-1130 0620A-CTT-1140 0620A-MPH-1130 0620A-MPH-1200 0620A-MPH-1230 0620A-ZSE-3370 0620A-ZSE-1080 0620A-GEO-1090 0620A-GEO-1110 0620A-MPH-1160 0620A-TFC-3020 0620A-CTT-1380 0620A-ZSE-1330 0620A-CTT-1390 0620A-ZSE-1360 0620A-CVS-1050 0620A-CVS-1080 0620A-ZSE-1470 0620A-ALL-1090 0620A-CTT-1650 Area E (1st Flr) 0620A-CTT-1020 0620A-CTT-1030 0620A-CTT-1080 0620A-CTT-1100 0620A-CTT-1150 0620A-MPH-1110 0620A-MPH-1120 0620A-MPH-1140 0620A-ZSE-1050 0620A-ZSE-1060 0620A-GEO-1080 0620A-GEO-1100 0620A-MPH-1100 0620A-TFC-3010 0620A-CTT-1360 0620A-ZSE-1210 0620A-CTT-1370 0620A-ZSE-1280 0620A-CVS-1030 0620A-CVS-1040 0620A-ZSE-1380 0620A-CTT-1570 Area F (1st Flr) 0620A-CTT-1000 0620A-CTT-1010 0620A-CTT-1050 0620A-CTT-1060
Activity Name
Orig Start Dur
Utility Ductbank Finish Earthwork
Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr) Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr) Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 3 of 25
10 15 347 347 261 208 4 2 4 2 8 5 1 3 7 3 2 5 2 5 7 7 12 12 15 5 5 0 5 241 4 4 3 3 10 5 1 3 7 7 2 5 2 5 7 7 15 15 15 5 5 5 261 4 2 4 3
12-13-13 02-21-14 07-25-13 A 07-25-13 A 07-25-13 A 08-15-13 A 08-15-13 A 08-21-13 A 09-02-13 A 09-09-13 A 09-09-13 A 09-30-13 A 10-04-13 A 10-04-13 A 10-11-13 10-21-13 10-25-13 10-29-13 11-06-13 11-06-13 11-14-13 11-14-13 11-26-13 11-26-13 01-17-14 02-26-14 02-26-14 06-04-14 08-01-13 A 08-01-13 A 08-08-13 A 08-22-13 A 08-27-13 A 09-09-13 A 09-23-13 A 09-27-13 A 09-27-13 A 10-22-13 10-25-13 11-06-13 11-08-13 11-18-13 11-18-13 12-23-13 12-23-13 01-17-14 01-17-14 03-07-14 04-03-14 04-03-14 07-07-14 07-25-13 A 07-25-13 A 07-29-13 A 08-13-13 A 08-19-13 A
Finish
01-20-14 03-19-14 12-01-14 12-01-14 07-30-14 06-10-14 09-03-13 A 08-30-13 A 09-06-13 A 09-10-13 A 09-13-13 A 10-04-13 A 10-04-13 A 10-08-13 A 10-22-13 10-23-13 10-28-13 11-05-13 11-07-13 11-13-13 11-25-13 11-25-13 12-13-13 12-13-13 02-25-14 03-06-14 03-06-14 05-09-14 06-10-14 07-14-14 08-08-13 A 08-15-13 A 08-26-13 A 08-30-13 A 09-09-13 A 09-27-13 A 09-27-13 A 10-01-13 A 10-31-13 11-05-13 11-07-13 11-15-13 11-19-13 11-25-13 01-16-14 01-16-14 02-25-14 02-25-14 04-02-14 04-10-14 04-10-14 07-14-14 07-30-14 08-05-13 A 08-06-13 A 08-16-13 A 08-21-13 A
Late Start
05-05-14 04-09-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-21-13 10-29-13 11-01-13 11-06-13 11-14-13 11-14-13 11-22-13 11-22-13 12-05-13 12-05-13 02-26-14 03-26-14 06-24-14 06-24-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-08-13 11-13-13 11-26-13 12-02-13 12-09-13 12-09-13 01-13-14 01-13-14 01-28-14 01-28-14 03-25-14 05-28-14 07-30-14 07-30-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13
Late Finish 05-20-14 05-05-15 03-17-15 03-17-15 09-12-14 07-02-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-30-13 10-31-13 11-05-13 11-13-13 11-15-13 11-21-13 12-04-13 12-04-13 01-10-14 01-10-14 03-25-14 04-02-14 07-02-14 06-17-14 07-02-14 08-07-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-19-13 11-22-13 11-27-13 12-06-13 12-10-13 12-13-13 01-27-14 01-27-14 03-06-14 03-06-14 04-17-14 06-05-14 08-07-14 08-07-14 09-12-14 10-21-13 10-21-13 10-21-13 10-21-13
Total Free Float Float 59 198 74 74 31 16
5 5 5 5 5 5 5 5 5 5 15 15 64 26 12 18
11 11 12 12 12 12 5 5 5 5 9 29 64 14 31
15 187 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 15 19 5 0
0 0 0 0 0 2 0 0 0 0 0 5 5 5 0
Calendar 2013 J Jul A S O N D 0620A - Prec 0620A - T/P
Remaining Work Critical Remaining Work
2014 F M A M J Jul A S O N D Utility Ductbank Finish Earthwork
J
2015 F M A M J Jul A S O N D
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec
Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr)
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr)
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
F
2016 M A M J
Activity ID
0620A-CTT-1090 0620A-MPH-1000 0620A-MPH-2370 0620A-MPH-1080 0620A-MPH-1090 0620A-GEO-1240 0620A-ZSE-1030 0620A-ZSE-1040 0620A-GEO-1060 0620A-GEO-1070 0620A-MPH-1020 0620A-TFC-3000 0620A-CTT-1300 0620A-ZSE-1160 0620A-CTT-1330 0620A-ZSE-1180 0620A-CVS-1010 0620A-ZSE-1310 0620A-CVS-1020 0620A-CTT-1470 Second Floor Area G (2nd Flr) 0620A-MPH-1480 0620A-ZSE-1480 0620A-TFC-3090 0620A-CTT-1490 0620A-ZSE-1530 0620A-CTT-1550 0620A-ZSE-1560 0620A-CVS-1140 0620A-CVS-1160 0620A-ZSE-1710 0620A-CTT-2110 0620A-ALL-1100 Area H (2nd Flr) 0620A-MPH-1460 0620A-ZSE-1390 0620A-TFC-3060 0620A-CTT-1420 0620A-ZSE-1450 0620A-CTT-1460 0620A-ZSE-1490 0620A-CVS-1110 0620A-CVS-1130 0620A-ZSE-1600 0620A-CTT-1950 Area I (2nd Flr) 0620A-MPH-1440 0620A-ZSE-1340 0620A-TFC-3040 0620A-CTT-1400 0620A-ZSE-1400 0620A-CTT-1410 0620A-ZSE-1420 0620A-CVS-1070 0620A-ZSE-1520 0620A-CVS-1090
Activity Name
Orig Start Dur
Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)
Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 4 of 25
7 4 2 1 3 1 7 5 2 5 2 5 5 5 15 15 10 3 5 5 176 176 2 5 5 7 7 10 10 15 5 5 5 0 140 2 8 5 8 8 10 10 15 5 5 5 138 2 5 5 5 5 10 10 10 3 5
08-26-13 A 10-14-13* 10-21-13* 10-22-13 10-22-13 10-23-13 10-31-13 11-06-13 11-14-13 11-18-13 11-26-13 11-26-13 02-26-14 02-26-14 03-07-14 03-07-14 04-03-14 04-22-14 04-22-14 07-23-14 02-26-14 02-26-14 02-26-14 02-26-14 03-07-14 04-03-14 04-03-14 04-15-14 04-15-14 05-06-14 06-04-14 06-04-14 08-29-14 04-03-14 04-03-14 04-03-14 04-17-14 05-06-14 05-06-14 05-20-14 05-20-14 06-09-14 07-07-14 07-07-14 10-14-14 04-22-14 04-22-14 04-22-14 05-02-14 06-09-14 06-09-14 06-18-14 06-18-14 07-07-14 07-23-14 07-23-14
Finish
08-29-13 A 10-18-13 10-22-13 10-22-13 10-25-13 10-23-13 11-11-13 11-13-13 11-15-13 11-25-13 11-27-13 12-04-13 03-06-14 03-06-14 04-02-14 04-02-14 04-18-14 04-25-14 04-29-14 07-30-14 11-04-14 11-04-14 02-27-14 03-06-14 03-17-14 04-14-14 04-14-14 05-05-14 05-05-14 06-02-14 06-10-14 06-10-14 09-08-14 11-04-14 10-21-14 04-04-14 04-15-14 04-25-14 05-19-14 05-19-14 06-06-14 06-06-14 07-03-14 07-14-14 07-14-14 10-21-14 11-04-14 04-23-14 04-29-14 05-09-14 06-17-14 06-17-14 07-03-14 07-03-14 07-22-14 07-28-14 07-30-14
Late Start
10-21-13 10-25-13 10-31-13 11-19-13 11-19-13 11-05-13 11-19-13 11-25-13 12-10-13 12-12-13 02-18-14 02-26-14 03-07-14 03-07-14 03-18-14 03-18-14 05-09-14 09-09-14 06-06-14 09-05-14 03-26-14 03-26-14 03-28-14 03-26-14 04-03-14 04-11-14 04-11-14 04-25-14 04-25-14 05-19-14 06-17-14 09-19-14 10-10-14 04-18-14 04-29-14 04-18-14 05-06-14 05-15-14 05-15-14 05-30-14 05-30-14 06-19-14 12-02-14 09-29-14 11-07-14 05-30-14 06-04-14 05-30-14 06-09-14 06-18-14 06-18-14 06-25-14 06-25-14 08-11-14 10-08-14 12-09-14
Late Finish 10-21-13 10-30-13 11-01-13 11-19-13 11-22-13 11-05-13 12-02-13 12-03-13 12-11-13 01-08-14 02-21-14 03-06-14 03-17-14 03-17-14 04-10-14 04-10-14 05-27-14 09-12-14 06-13-14 09-12-14 12-15-14 12-15-14 03-31-14 04-02-14 04-10-14 04-23-14 04-23-14 05-14-14 05-14-14 06-13-14 06-23-14 09-26-14 10-17-14 12-15-14 12-08-14 05-02-14 05-05-14 05-14-14 05-28-14 05-28-14 06-17-14 06-17-14 07-16-14 12-08-14 10-06-14 11-14-14 12-15-14 06-05-14 06-06-14 06-17-14 06-24-14 06-24-14 07-14-14 07-14-14 08-26-14 10-10-14 12-15-14
Total Free Float Float
7 7 17 17 7 11 11 15 15 30 15 5 5 5 5 19 77 24 25 28 28 17 15 15 5 5 5 5 7 7 61 23 28 33 14 9 9 5 5 5 5 6 85 48 15 28 22 20 20 5 5 5 5 20 43 80
0 0 0 6 2 0 0 0 0 0 9 0 0 0 0 0 19 5 17 0 0 2 0 10 0 0 0 0 0 0 9 16 0 0 5 0 4 0 0 0 0 0 5 5 3 0 2 0 0 0 0 0 0 0 7 55
Calendar
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
2013 2014 2015 J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)
Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)
J
F
2016 M A M J
Activity ID
0620A-CTT-1680 Third Floor Area G (3rd Flr) 0620A-MPH-1570 0620A-ZSE-1720 0620A-TFC-3130 0620A-CTT-1820 0620A-ZSE-1810 0620A-CTT-1880 0620A-ZSE-1870 0620A-CVS-1190 0620A-ZSE-2040 0620A-CTT-2130 0620A-CTT-2150 0620A-CTT-2180 0620A-ALL-1160 Area H (3rd Flr) 0620A-MPH-1520 0620A-ZSE-1610 0620A-TFC-3120 0620A-CTT-1640 0620A-ZSE-1690 0620A-CTT-1770 0620A-ZSE-1780 0620A-CVS-1180 0620A-ZSE-1940 0620A-CTT-1970 0620A-CTT-2000 0620A-CTT-2010 Area I (3rd Flr) 0620A-MPH-1490 0620A-ZSE-1500 0620A-TFC-3100 0620A-CTT-1560 0620A-ZSE-1590 0620A-CTT-1600 0620A-ZSE-1650 0620A-CVS-1150 0620A-ZSE-1740 0620A-CTT-1700 0620A-CTT-1710 0620A-CTT-1750 One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1180 0620A-CTT-1230 0620A-ZSE-1020 0620A-CVS-1000 0620A-CTT-1310 0620A-CTT-1320 0620A-CTT-1340 0620A-ZSE-1110 0620A-GEO-1130 0620A-GEO-1150 0620A-TFC-3050 0620A-ALL-1080
Activity Name
Orig Start Dur
Temp Enclosure (as needed) - Area I (2nd Flr)
Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)
Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 5 of 25
5 126 114 2 5 5 7 7 10 10 15 5 5 5 5 0 98 2 8 5 15 15 10 10 15 5 5 5 5 92 2 5 5 5 5 8 8 10 3 5 5 5 311 145 145 2 15 15 8 5 5 5 3 3 7 5 0
10-28-14 06-04-14 06-04-14 06-04-14 06-04-14 06-12-14 07-07-14 07-07-14 07-18-14 07-18-14 08-05-14 08-29-14 08-29-14 09-05-14 11-05-14 07-07-14 07-07-14 07-07-14 07-21-14 08-05-14 08-05-14 08-29-14 08-29-14 09-18-14 10-14-14 10-14-14 10-20-14 11-13-14 07-23-14 07-23-14 07-23-14 07-31-14 09-18-14 09-18-14 09-26-14 09-26-14 10-10-14 10-28-14 10-28-14 10-31-14 11-21-14 08-01-13 A 09-13-13 A 09-13-13 A 09-13-13 A 09-25-13 A 09-25-13 A 10-22-13 11-05-13 11-05-13 11-08-13 01-03-14 01-10-14 01-29-14 03-05-14*
Finish
11-04-14 12-01-14 11-12-14 06-05-14 06-10-14 06-19-14 07-17-14 07-17-14 08-04-14 08-04-14 08-28-14 09-08-14 09-08-14 09-12-14 11-12-14 11-07-14 11-20-14 07-08-14 07-18-14 07-28-14 08-28-14 08-28-14 09-17-14 09-17-14 10-13-14 10-21-14 10-21-14 10-27-14 11-20-14 12-01-14 07-25-14 07-30-14 08-08-14 09-25-14 09-25-14 10-09-14 10-09-14 10-27-14 10-30-14 11-04-14 11-07-14 12-01-14 11-13-14 03-20-14 03-20-14 09-18-13 A 10-21-13 10-21-13 11-01-13 11-11-13 11-11-13 11-15-13 01-09-14 01-16-14 02-21-14 03-11-14 03-11-14
Late Start
12-09-14 06-17-14 06-17-14 06-19-14 06-17-14 06-24-14 07-16-14 07-16-14 07-28-14 07-28-14 09-09-14 10-13-14 10-06-14 10-10-14 12-17-14 07-17-14 07-25-14 07-17-14 07-30-14 08-14-14 08-14-14 09-09-14 09-09-14 09-29-14 10-27-14 11-04-14 11-07-14 01-28-15 08-27-14 08-29-14 08-27-14 09-05-14 09-26-14 09-26-14 10-14-14 10-14-14 10-28-14 11-13-14 12-04-14 12-09-14 03-06-15 10-23-13 11-18-13 11-18-13 11-18-13 11-25-13 11-25-13 03-10-14 04-04-14 03-31-14 04-04-14 03-24-14 03-27-14 04-02-14 04-14-14
Late Finish 12-15-14 03-17-15 01-12-15 06-20-14 06-23-14 07-02-14 07-25-14 07-25-14 08-12-14 08-12-14 10-03-14 10-20-14 10-13-14 10-17-14 01-12-15 12-19-14 02-10-15 07-28-14 07-29-14 08-07-14 09-08-14 09-08-14 09-25-14 09-25-14 10-23-14 10-31-14 11-10-14 11-14-14 02-10-15 03-17-15 09-03-14 09-04-14 09-12-14 10-03-14 10-03-14 10-27-14 10-27-14 11-12-14 11-17-14 12-10-14 12-15-14 03-17-15 02-17-15 12-12-14 12-12-14 11-18-13 12-04-13 12-04-13 03-24-14 04-11-14 04-07-14 04-11-14 03-26-14 03-31-14 04-11-14 04-22-14 12-12-14
Total Free Float Float 25 74 40 9 7 7 5 5 5 5 20 24 20 20 26 29 55 11 6 6 5 5 5 5 6 7 12 12 32 74 22 20 20 5 5 10 10 10 10 22 22 43 65 186 186
0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0 35 0 0 0
26 26 61 68 46 46 34 34 28 23 193
0 0 0 45 0 23 0 6 5 0 167
Calendar 2013 J Jul A S O N D 0620A - Prec
0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec
0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Temp Enclosure (as needed) - Area I (2nd Flr)
J
F
2016 M A M J
Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)
Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)
Activity ID
0620A-ZSE-1430 Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1120 0620A-CTT-1160 0620A-CTT-1170 0620A-MPH-1060 0620A-MPH-1240 0620A-MPH-1260 0620A-CTT-1350 0620A-ZSE-1200 0620A-ZSE-1070 0620A-ZSE-1140 0620A-GEO-1120 0620A-GEO-1140 0620A-MPH-1170 0620A-TFC-3030 0620A-CVS-1060 0620A-CTT-1440 0620A-CTT-1450 0620A-TFC-3110 0620A-CTT-1500 0620A-ZSE-1540 Area B (Low Roof) 0620A-CTT-1200 0620A-CTT-1220 0620A-CTT-1260 0620A-MPH-1190 0620A-MPH-1280 0620A-MPH-1290 0620A-ZSE-1150 0620A-ZSE-1230 0620A-GEO-1160 0620A-GEO-1180 0620A-MPH-1220 0620A-TFC-3070 0620A-CTT-1430 0620A-ZSE-1460 0620A-CVS-1100 0620A-CTT-1510 0620A-CTT-1530 0620A-CTT-1660 0620A-ZSE-1630 Area C (Low Roof) 0620A-CTT-1190 0620A-CTT-1240 0620A-MPH-1270 0620A-CTT-1280 0620A-MPH-1350 0620A-MPH-1360 0620A-ZSE-1220 0620A-ZSE-1270 0620A-GEO-1170 0620A-GEO-1190 0620A-MPH-1310 0620A-TFC-3080 0620A-CTT-1480
Activity Name
Orig Start Dur
Temp Power - Area B (Gym)
Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 6 of 25
5 227 185 6 5 5 7 1 3 30 30 5 5 3 7 2 5 20 10 10 5 5 10 190 4 4 5 3 1 2 5 10 3 7 2 5 10 10 8 5 5 5 10 214 3 3 10 5 1 3 5 5 3 7 2 5 20
03-14-14 09-04-13 A 09-04-13 A 09-04-13 A 09-10-13 A 09-12-13 A 10-29-13 11-07-13 11-07-13 11-22-13 11-22-13 12-02-13 12-10-13 01-03-14 01-16-14 01-29-14 02-21-14 03-05-14 03-31-14 04-04-14 04-23-14 04-23-14 05-05-14 09-19-13 A 09-19-13 A 09-23-13 A 10-21-13 10-23-13 10-28-13 10-28-13 11-21-13 11-22-13 12-10-13 12-13-13 01-16-14 03-10-14 03-24-14 03-24-14 04-09-14 04-23-14 05-05-14 05-06-14 05-22-14 09-18-13 A 09-18-13 A 09-30-13 A 10-07-13 A 10-11-13 10-22-13 10-22-13 11-13-13 11-14-13 11-22-13 11-27-13 12-10-13 03-17-14 04-09-14
Finish
03-20-14 07-21-14 05-20-14 09-13-13 A 09-20-13 A 11-01-13 11-07-13 11-07-13 11-11-13 03-20-14 03-20-14 12-06-13 12-23-13 01-09-14 01-28-14 02-06-14 02-27-14 04-07-14 04-15-14 04-22-14 05-02-14 05-02-14 05-20-14 06-09-14 09-20-13 A 09-27-13 A 10-28-13 10-28-13 10-28-13 10-29-13 11-27-13 12-09-13 12-12-13 01-13-14 01-17-14 03-18-14 04-07-14 04-07-14 04-22-14 05-02-14 05-12-14 05-14-14 06-09-14 07-21-14 09-27-13 A 10-04-13 A 10-21-13 10-18-13 10-22-13 10-25-13 11-19-13 11-21-13 11-26-13 12-09-13 12-11-13 03-24-14 05-15-14
Late Start
05-08-14 11-18-13 11-18-13 11-18-13 11-18-13 01-20-14 02-18-14 09-26-14 09-26-14 12-05-13 12-05-13 01-20-14 01-21-14 02-06-14 02-13-14 02-28-14 03-06-14 03-18-14 04-11-14 04-17-14 05-08-14 06-10-14 05-16-14 11-18-13 11-18-13 11-18-13 12-03-13 12-05-13 12-09-13 12-09-13 12-10-13 12-11-13 01-17-14 01-24-14 02-26-14 04-18-14 04-29-14 05-12-14 06-23-14 07-08-14 08-08-14 07-14-14 07-10-14 11-18-13 11-18-13 11-18-13 11-18-13 11-18-13 11-27-13 11-27-13 12-03-13 12-04-13 12-23-13 01-09-14 02-24-14 05-08-14 05-19-14
Late Finish 05-15-14 10-03-14 09-30-14 11-18-13 11-18-13 01-27-14 02-28-14 09-26-14 09-30-14 04-02-14 04-02-14 01-28-14 01-29-14 02-10-14 02-27-14 03-05-14 03-14-14 04-18-14 04-29-14 05-06-14 05-15-14 06-18-14 06-04-14 08-15-14 11-18-13 11-18-13 12-09-13 12-09-13 12-09-13 12-10-13 12-23-13 01-16-14 01-21-14 02-10-14 02-27-14 04-28-14 05-16-14 05-28-14 07-07-14 07-16-14 08-15-14 07-21-14 07-25-14 10-03-14 11-18-13 11-18-13 11-26-13 11-25-13 11-27-13 12-03-13 12-09-13 12-10-13 01-08-14 01-21-14 02-25-14 05-15-14 06-23-14
Total Free Float Float 30 53 92
37 47 162 162 7 7 18 13 13 11 11 7 7 7 7 7 25 7 48
25 25 25 25 11 11 11 11 16 23 21 27 40 40 53 37 26 53
22 22 22 22 11 11 14 14 24 29 21
0 0 0
0 0 0 2 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0
0 0 0 5 0 0 0 0 5 0 0 0 0 3 10 0 0 0
0 0 0 0 0 0 0 0 8 9 0
Calendar 2013 J Jul A S O N D 0620A - Prec
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D Temp Power - Area B (Gym)
J
2015 F M A M J Jul A S O N D
Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)
J
F
2016 M A M J
Activity ID
Activity Name
Orig Start Dur
0620A-ZSE-1510 Elec at Brng Masonry - Area C (Low Roof) 0620A-CTT-1520 Set Precast at Mech Rm - Area C (Low Roof) 0620A-CVS-1120 Roof Structural Steel/ Metal Deck - Area C (Low Roof) 0620A-CTT-1610 Temp Enclosure (as needed) - Area C (Low Roof) 0620A-CTT-1620 Roof Blocking - Area C (Low Roof) 0620A-ZSE-1680 Temp Power - Area C (Low Roof) 0620A-CTT-1790 Roofing Dry-in - Area C (Low Roof) 0620A-ALL-1110 Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Sto Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-1210 Foundations - Area C (Aux Gym) 0620A-CTT-1580 Bearing Masonry - Area C (Aux Gym) 0620A-ZSE-1620 Elec at Brng Masonry - Area C (Aux Gym) 0620A-ZSE-1700 Underground Conduit - Area C (Aux Gym) 0620A-CVS-1170 Roof Structural Steel/ Metal Deck - Area C (Aux Gym) 0620A-GEO-1200 Prep for Venting - Area C (Aux Gym) 0620A-CTT-1720 Temp Enclosure (as needed) - Area C (Aux Gym) 0620A-CTT-1730 Roof Blocking - Area C (Aux Gym) 0620A-GEO-1210 Geo-Seal/ Vapor Vent - Area C (Aux Gym) 0620A-CTT-1860 Roofing Dry-in - Area C (Aux Gym) 0620A-TFC-3140 Prep/ Pour SOG - Area C (Aux Gym) 0620A-ALL-1130 Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) 0620A-ZSE-1890 Temp Power - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-1250 Foundations - Area D/E/F (Low Roof) 0620A-CTT-1270 Masonry to Grade - Area D/E/F (Low Roof) 0620A-MPH-2340 Underground Plumbing - Area D/E/F (Low Roof) 0620A-MPH-2350 Underground Testing/ Inspection - Area D/E/F (Low Roof) 0620A-MPH-2360 Backfill Underground Plumbing - Area D/E/F (Low Roof) 0620A-CTT-1290 Backfill Foundations - Area D/E/F (Low Roof) 0620A-MPH-1320 Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1390 Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1400 Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-ZSE-1260 Underground Conduit (Seq 1) - Area D/E/F (Low Roof) 0620A-CTT-1670 Bearing Masonry - Area D/E/F (Low Roof) 0620A-ZSE-1730 Elec at Brng Masonry - Area D/E/F (Low Roof) 0620A-CVS-1200 Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) 0620A-ZSE-1320 Underground Conduit (Seq 2) - Area D/E/F (Low Roof) 0620A-GEO-1220 Prep for Venting - Area D/E/F (Low Roof) 0620A-CTT-2210 Temp Enclosure (as needed) - Area D/E/F (Low Roof) 0620A-CTT-2230 Roof Blocking - Area D/E/F (Low Roof) 0620A-GEO-1230 Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) 0620A-CTT-2260 Roofing Dry-in - Area D/E/F (Low Roof) 0620A-MPH-1370 FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) 0620A-TFC-3150 Prep/ Pour SOG - Area D/E/F (Low Roof) 0620A-ALL-1180 Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low R 0620A-ZSE-2140 Temp Power - Area D/E/F (Low Roof) Building Shell Academic Area First Floor Area D (1st Flr) 0620A-CTT-2100 Masonry Veneer - Area D (1st Flr) 0620A-GSC-1420 Curtain Wall/ Windows - Area D (1st Flr) 0620A-GSC-1540 Entrances - Area D (1st Flr) 0620A-CTT-2350 Misc Shell Finishes - Area D (1st Flr) Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 7 of 25
20 5 10 5 5 5 5 0 232 232 2 20 20 2 8 3 5 5 7 5 5 0 5 278 278 4 4 5 1 3 5 5 1 3 5 15 15 15 6 3 5 10 7 10 2 5 0 6 188 141 136 123 5 34 19 5 110
04-09-14 04-28-14 05-14-14 06-02-14 06-02-14 06-10-14 07-14-14 09-19-13 A 09-19-13 A 09-19-13 A 05-16-14 05-16-14 06-23-14 06-23-14 07-08-14 07-08-14 07-08-14 07-14-14 07-28-14 08-05-14 08-14-14 08-01-13 A 08-01-13 A 08-01-13 A 08-13-13 A 10-07-13 A 10-11-13 10-11-13 11-01-13 11-08-13 11-15-13 11-15-13 12-09-13 08-19-14 08-19-14 09-15-14 09-26-14 10-08-14 10-10-14 10-10-14 10-13-14 10-16-14 10-24-14 10-28-14 11-05-14 07-22-14 09-26-14 09-26-14 09-26-14 09-26-14 11-17-14 02-24-15 03-13-15 10-23-14
Finish
05-15-14 05-06-14 05-30-14 06-09-14 06-09-14 06-18-14 07-21-14 07-21-14 08-20-14 08-20-14 09-27-13 A 06-20-14 06-20-14 06-24-14 07-07-14 07-11-14 07-16-14 07-16-14 07-23-14 08-04-14 08-12-14 08-12-14 08-20-14 11-13-14 11-13-14 09-03-13 A 09-10-13 A 10-11-13 10-11-13 10-16-13 11-11-13 11-15-13 11-15-13 11-19-13 12-13-13 09-12-14 09-12-14 10-09-14 10-06-14 10-10-14 10-17-14 10-27-14 10-23-14 10-30-14 10-27-14 11-04-14 11-04-14 11-13-14 04-16-15 04-16-15 04-09-15 03-20-15 10-03-14 01-06-15 03-20-15 03-19-15 03-30-15
Late Start
05-30-14 06-06-14 07-29-14 09-08-14 08-15-14 09-08-14 08-28-14 07-07-14 07-07-14 07-07-14 07-07-14 07-07-14 09-11-14 08-11-14 09-15-14 09-23-14 08-25-14 09-19-14 09-23-14 10-01-14 11-04-14 10-23-13 10-23-13 11-18-13 09-17-14 10-23-13 11-14-13 11-14-13 09-22-14 09-25-14 10-01-14 10-01-14 10-06-14 09-17-14 09-17-14 10-13-14 10-08-14 10-17-14 12-10-14 11-26-14 10-23-14 12-03-14 11-04-14 11-06-14 11-14-14 09-08-14 10-06-14 10-06-14 10-06-14 10-06-14 12-05-14 03-13-15 03-31-15 10-30-14
Late Finish 07-03-14 06-13-14 08-14-14 09-15-14 08-22-14 09-15-14 09-05-14 10-03-14 11-10-14 11-10-14 07-07-14 08-08-14 08-08-14 09-12-14 08-22-14 09-18-14 09-30-14 08-29-14 09-30-14 09-30-14 10-09-14 10-09-14 11-10-14 02-17-15 02-17-15 11-18-13 09-17-14 10-23-13 11-14-13 11-18-13 09-29-14 10-01-14 10-01-14 10-06-14 10-13-14 10-10-14 10-10-14 11-05-14 10-16-14 10-21-14 12-16-14 12-11-14 10-31-14 12-16-14 11-05-14 11-13-14 02-17-15 11-24-14 05-06-15 05-06-15 05-06-15 04-09-15 10-13-14 01-23-15 04-09-15 04-08-15 04-17-15
Total Free Float Float 27 21 42 55 42 50 27 53 57 57
0 0 0 15 15 0 0 0 0 0
27 27 45 27 39 44 27 39 33 33 41 47 65 65
0 0 6 0 0 11 0 6 0 0 0 19 0 0
7 20 20 161 160 160 160 149 16 16 16 6 6 36 28 6 28 6 6 72 6 14 14 19 13 5 13 13 11 13
0 0 3 1 0 0 154 143 0 0 0 0 0 10 0 0 2 0 0 6 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days
0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P Work Days 0620A - Prec
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days 0620A - Prec
0620A - T/P Work Days Work Days 0620A - Prec
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Elec at Brng Masonry - Area C (Low Roof) Set Precast at Mech Rm - Area C (Low Roof) Roof Structural Steel/ Metal Deck - Area C (Low Roof) Temp Enclosure (as needed) - Area C (Low Roof) Roof Blocking - Area C (Low Roof) Temp Power - Area C (Low Roof) Roofing Dry-in - Area C (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Story)
2016 M A M J
Foundations - Area C (Aux Gym) Bearing Masonry - Area C (Aux Gym) Elec at Brng Masonry - Area C (Aux Gym) Underground Conduit - Area C (Aux Gym) Roof Structural Steel/ Metal Deck - Area C (Aux Gym) Prep for Venting - Area C (Aux Gym) Temp Enclosure (as needed) - Area C (Aux Gym) Roof Blocking - Area C (Aux Gym) Geo-Seal/ Vapor Vent - Area C (Aux Gym) Roofing Dry-in - Area C (Aux Gym) Prep/ Pour SOG - Area C (Aux Gym) Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) Temp Power - Area C (Aux Gym)
Foundations - Area D/E/F (Low Roof) Masonry to Grade - Area D/E/F (Low Roof) Underground Plumbing - Area D/E/F (Low Roof) Underground Testing/ Inspection - Area D/E/F (Low Roof) Backfill Underground Plumbing - Area D/E/F (Low Roof) Backfill Foundations - Area D/E/F (Low Roof) Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Conduit (Seq 1) - Area D/E/F (Low Roof) Bearing Masonry - Area D/E/F (Low Roof) Elec at Brng Masonry - Area D/E/F (Low Roof) Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) Underground Conduit (Seq 2) - Area D/E/F (Low Roof) Prep for Venting - Area D/E/F (Low Roof) Temp Enclosure (as needed) - Area D/E/F (Low Roof) Roof Blocking - Area D/E/F (Low Roof) Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) Roofing Dry-in - Area D/E/F (Low Roof) FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) Prep/ Pour SOG - Area D/E/F (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low Roof) Temp Power - Area D/E/F (Low Roof)
Masonry Veneer - Area D (1st Flr) Curtain Wall/ Windows - Area D (1st Flr) Entrances - Area D (1st Flr) Misc Shell Finishes - Area D (1st Flr)
Activity ID
Activity Name
0620A-CTT-1960 Masonry Veneer - Area E (1st Flr) 0620A-GSC-1300 Curtain Wall/ Windows - Area E (1st Flr) 0620A-GSC-1340 Entrances - Area E (1st Flr) 0620A-CTT-2290 Misc Shell Finishes - Area E (1st Flr) Area F (1st Flr) 0620A-CTT-1690 Masonry Veneer - Area F (1st Flr) 0620A-GSC-1060 Curtain Wall/ Windows - Area F (1st Flr) 0620A-GSC-3220 Entrances - Area F (1st Flr) 0620A-CTT-2240 Misc Shell Finishes - Area F (1st Flr) Second Floor Area G (2nd Flr) 0620A-CTT-2190 Masonry Veneer - Area G (2nd Flr) 0620A-GSC-1440 Curtain Wall/ Windows - Area G (2nd Flr) 0620A-CTT-2360 Misc Shell Finishes - Area G (2nd Flr) Area H (2nd Flr) 0620A-CTT-2020 Masonry Veneer - Area H (2nd Flr) 0620A-GSC-1320 Curtain Wall/ Windows - Area H (2nd Flr) 0620A-CTT-2320 Misc Shell Finishes - Area H (2nd Flr) Area I (2nd Flr) 0620A-CTT-1760 Masonry Veneer - Area I (2nd Flr) 0620A-GSC-1070 Curtain Wall/ Windows - Area I (2nd Flr) 0620A-CTT-2270 Misc Shell Finishes - Area I (2nd Flr) Third Floor Area G (3rd Flr) 0620A-CTT-2250 Masonry Veneer - Area G (3rd Flr) 0620A-CTT-2300 Roofing Finishes - Area G (3rd Flr) 0620A-GSC-1470 Curtain Wall/ Windows - Area G (3rd Flr) 0620A-ALL-1190 Full Building Enclosure - Academic Area 0620A-CTT-2370 Misc Shell Finishes - Area G (3rd Flr) Area H (3rd Flr) 0620A-CTT-2060 Masonry Veneer - Area H (3rd Flr) 0620A-GSC-1330 Curtain Wall/ Windows - Area H (3rd Flr) 0620A-CTT-2120 Roofing Finishes - Area H (3rd Flr) 0620A-CTT-2330 Misc Shell Finishes - Area H (3rd Flr) Area I (3rd Flr) 0620A-CTT-1800 Masonry Veneer - Area I (3rd Flr) 0620A-CTT-1870 Roofing Finishes - Area I (3rd Flr) 0620A-GSC-1090 Curtain Wall/ Windows - Area I (3rd Flr) 0620A-CTT-2280 Misc Shell Finishes - Area I (3rd Flr) One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1810 Metal Wall Panels - Area B (Gym) 0620A-CTT-1890 Roofing Finishes - Area B (Gym) 0620A-GSC-1110 Curtain Wall/ Windows - Area B (Gym) 0620A-CTT-1910 Misc Shell Finishes - Area B (Gym) Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1840 Masonry Veneer - Area A (Low Roof) 0620A-GSC-1140 Curtain Wall/ Windows - Area A (Low Roof) 0620A-CTT-1940 Roofing Finishes - Area A (Low Roof) 0620A-CTT-1990 Misc Shell Finishes - Area A (Low Roof) 0620A-GSC-1180 Entrances - Area A (Low Roof) Area B (Low Roof) 0620A-CTT-1900 Masonry Veneer - Area B (Low Roof) 0620A-GSC-1190 Curtain Wall/ Windows - Area B (Low Roof) 0620A-CTT-2040 Misc Shell Finishes - Area B (Low Roof) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 8 of 25
Orig Start Dur 5 14 6 5 100 5 14 2 5 132 119 5 34 5 107 5 14 5 96 5 14 5 129 115 5 5 34 0 5 104 5 14 5 5 93 5 5 14 5 168 54 54 10 5 4 5 41 33 10 5 10 5 5 22 5 2 5
10-23-14 11-17-14 03-23-15 03-24-15 11-17-14 11-17-14 12-29-14 03-31-15 04-01-15 10-06-14 10-06-14 10-06-14 12-11-14 03-17-15 10-30-14 10-30-14 11-26-14 03-26-15 11-25-14 11-25-14 01-08-15 04-07-15 10-14-14 10-14-14 10-14-14 12-04-14 01-07-15 03-19-15 11-07-14 11-07-14 12-08-14 12-11-14 03-30-15 12-04-14 12-04-14 01-02-15 01-16-15 04-09-15 07-22-14 07-22-14 07-22-14 07-22-14 08-08-14 09-25-14 09-29-14 09-15-14 09-15-14 09-15-14 10-01-14 10-01-14 10-08-14 10-23-14 10-01-14 10-01-14 10-10-14 10-16-14
Finish
10-29-14 12-05-14 03-30-15 03-30-15 04-09-15 11-24-14 01-16-15 04-01-15 04-09-15 04-13-15 03-24-15 10-13-14 01-29-15 03-24-15 04-01-15 11-06-14 12-16-14 04-01-15 04-13-15 12-03-14 01-27-15 04-13-15 04-16-15 03-26-15 10-21-14 12-10-14 02-23-15 02-23-15 03-26-15 04-07-15 11-14-14 12-26-14 12-17-14 04-07-15 04-16-15 12-10-14 01-15-15 02-04-15 04-16-15 03-18-15 10-06-14 10-06-14 08-07-14 08-15-14 09-30-14* 10-06-14 11-10-14 10-29-14 09-30-14 10-07-14 10-17-14 10-14-14 10-29-14 10-30-14 10-09-14 10-13-14 10-23-14
Late Start
10-30-14 12-01-14 04-10-15 04-10-15 11-25-14 11-25-14 01-12-15 05-05-15 04-21-15 10-14-14 10-14-14 10-14-14 12-31-14 04-02-15 11-07-14 11-07-14 12-10-14 04-15-15 12-04-14 12-04-14 01-21-15 04-24-15 10-23-14 10-23-14 10-23-14 03-30-15 01-26-15 04-08-15 11-17-14 11-17-14 12-19-14 04-20-15 04-17-15 12-11-14 12-11-14 04-28-15 01-29-15 04-28-15 09-08-14 09-08-14 09-08-14 09-08-14 02-25-15 09-25-14 03-17-15 10-23-14 10-23-14 10-23-14 11-11-14 03-05-15 03-25-15 12-01-14 11-07-14 11-07-14 11-21-14 04-01-15
Late Finish 11-06-14 12-18-14 04-17-15 04-17-15 05-06-15 12-03-14 01-29-15 05-06-15 04-28-15 05-01-15 04-10-15 10-21-14 02-17-15 04-10-15 04-21-15 11-14-14 12-30-14 04-21-15 05-01-15 12-10-14 02-09-15 05-01-15 05-06-15 04-15-15 10-29-14 04-07-15 03-12-15 04-13-15 04-15-15 04-27-15 11-24-14 01-09-15 04-27-15 04-24-15 05-06-15 12-17-14 05-06-15 02-17-15 05-06-15 05-06-15 03-24-15 03-24-15 09-23-14 03-04-15 09-30-14 03-24-15 04-17-15 03-31-15 11-06-14 11-17-14 03-24-15 03-31-15 12-05-14 04-09-15 11-14-14 11-24-14 04-09-15
Total Free Float Float 5 9 13 11 19 5 9 24 11 14 12 5 13 11 13 5 9 11 14 5 9 11 14 13 5 48 13 34 11 14 5 9 55 11 14 5 55 9 11 34 118 118 27 98 0 79 110 106 22 29 72 79 26 111 22 30 79
0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 44 0 0 0 0 0 0 26 0 0 0 0 0 0 0 0 0 0 0 2 6
Calendar 2013 J Jul A S O N D 0620A - T/P Work Days Work Days 0620A - Prec 0620A - T/P Work Days Work Days 0620A - Prec
Remaining Work Critical Remaining Work
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Masonry Veneer - Area E (1st Flr) Curtain Wall/ Windows - Area E (1st Flr) Entrances - Area E (1st Flr) Misc Shell Finishes - Area E (1st Flr) Masonry Veneer - Area F (1st Flr) Curtain Wall/ Windows - Area F (1st Flr) Entrances - Area F (1st Flr) Misc Shell Finishes - Area F (1st Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area G (2nd Flr) Curtain Wall/ Windows - Area G (2nd Flr) Misc Shell Finishes - Area G (2nd Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area H (2nd Flr) Curtain Wall/ Windows - Area H (2nd Flr) Misc Shell Finishes - Area H (2nd Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area I (2nd Flr) Curtain Wall/ Windows - Area I (2nd Flr) Misc Shell Finishes - Area I (2nd Flr)
0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec
Masonry Veneer - Area G (3rd Flr) Roofing Finishes - Area G (3rd Flr) Curtain Wall/ Windows - Area G (3rd Flr) Full Building Enclosure - Academic Area Misc Shell Finishes - Area G (3rd Flr)
0620A - T/P Work Days 0620A - Prec 0620A - Prec
Masonry Veneer - Area H (3rd Flr) Curtain Wall/ Windows - Area H (3rd Flr) Roofing Finishes - Area H (3rd Flr) Misc Shell Finishes - Area H (3rd Flr)
0620A - T/P 0620A - Prec Work Days 0620A - Prec
Masonry Veneer - Area I (3rd Flr) Roofing Finishes - Area I (3rd Flr) Curtain Wall/ Windows - Area I (3rd Flr) Misc Shell Finishes - Area I (3rd Flr)
0620A - T/P 0620A - Prec Work Days 0620A - Prec
0620A - T/P Work Days 0620A - Prec 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
Metal Wall Panels - Area B (Gym) Roofing Finishes - Area B (Gym) Curtain Wall/ Windows - Area B (Gym) Misc Shell Finishes - Area B (Gym)
Masonry Veneer - Area A (Low Roof) Curtain Wall/ Windows - Area A (Low Roof) Roofing Finishes - Area A (Low Roof) Misc Shell Finishes - Area A (Low Roof) Entrances - Area A (Low Roof) Masonry Veneer - Area B (Low Roof) Curtain Wall/ Windows - Area B (Low Roof) Misc Shell Finishes - Area B (Low Roof)
2016 M A M J
Activity ID
Activity Name
Orig Start Dur
0620A-CTT-2050 Roofing Finishes - Area B (Low Roof) 0620A-GSC-1210 Entrances - Area B (Low Roof) Area C (Low Roof) 0620A-CTT-1980 Masonry Veneer - Area C (Low Roof) 0620A-GSC-1220 Curtain Wall/ Windows - Area C (Low Roof) 0620A-CTT-2090 Roofing Finishes - Area C (Low Roof) 0620A-GSC-1240 Entrances - Area C (Low Roof) 0620A-CTT-2080 Misc Shell Finishes - Area C (Low Roof) 0620A-ALL-1150 Full Building Enclosure - Areas A/B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-2030 Masonry Veneer - Area C (Aux Gym) 0620A-ALL-1140 Full Building Enclosure - Area C (Aux Gym) 0620A-GSC-1270 Entrances - Area C (Aux Gym) 0620A-CTT-2170 Roofing Finishes - Area C (Aux Gym) 0620A-CTT-2140 Misc Shell Finishes - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2220 Masonry Veneer - Area D/E/F (Low Roof) 0620A-CTT-2340 Roofing Finishes - Area D/E/F (Low Roof) 0620A-GSC-1530 Curtain Wall/ Windows - Area D/E/F (Low Roof) 0620A-ALL-1200 Full Building Enclosure - Area D/E/F (Low Roof) 0620A-CTT-2380 Misc Shell Finishes - Area D/E/F (Low Roof) 0620A-GSC-1640 Entrances - Area D/E/F (Low Roof) Interior Rough-in Academic Area First Floor Area D (1st Flr) 0620A-CTT-1920 Non-Bearing Masonry Rough-in - Area D (1st Flr) 0620A-ZSE-1920 Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) 0620A-MPH-1630 Plumbing Chase Rough-in - Area D (1st Flr) 0620A-RMM-1280 HVAC Ductwork Rough-in - Area D (1st Flr) 0620A-RMM-1300 HVAC Piping Rough-in - Area D (1st Flr) 0620A-MPH-1690 Plumbing Rough-in - Area D (1st Flr) 0620A-ZSE-1950 Switchgear - Area D (1st Flr) 0620A-ZSE-1990 Conduit - Overhead - Area D (1st Flr) 0620A-RMM-1350 HVAC Controls Rough-in - Area D (1st Flr) 0620A-SAC-1130 Fire Protection Rough-in - Area D (1st Flr) 0620A-ZSE-2110 Pull Electrical Wires - Area D (1st Flr) 0620A-RMM-1380 HVAC Insulation - Area D (1st Flr) 0620A-SAC-1140 Fire Protection Above Ceiling Finalization - Area D (1st Flr) 0620A-ZSE-2240 Cable Tray - Area D (1st Flr) 0620A-ZSE-2250 Electrical Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1280 Metal Studs - Area D (1st Flr) 0620A-RMM-1500 HVAC System Testing - Area D (1st Flr) 0620A-RMM-1510 HVAC Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1350 Block Filler - Area D (1st Flr) 0620A-MPH-1900 Plumbing Insulation - Area D (1st Flr) 0620A-GSC-1480 Gypsum Board - Area D (1st Flr) 0620A-MPH-1910 Plumbing Above Ceiling Finalization - Area D (1st Flr) 0620A-ZST-1210 Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) 0620A-ZST-1270 Tech Cabling Rough-in (In-Class) - Area D (1st Flr) 0620A-ZST-1280 Tech Above Ceiling Finalization - Area D (1st Flr) 0620A-ALL-1210 Interior Rough-in Substantially Complete - 1st Flr Area E (1st Flr) 0620A-RMM-1230 Set Large Mech Equipment - Area E (1st Flr) 0620A-MPH-1560 Plumbing Chase Rough-in - Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 9 of 25
5 1 22 5 3 5 2 5 0 22 22 5 0 2 5 5 99 99 10 10 10 0 5 20 306 306 226 112 15 15 5 25 25 15 1 10 10 12 14 20 5 5 5 5 5 5 5 8 15 5 10 7 5 0 226 1 5
10-20-14 10-30-14 10-10-14 10-10-14 10-20-14 10-28-14 10-31-14 11-04-14 10-20-14 10-20-14 10-20-14 11-04-14 11-05-14 11-12-14 10-28-14 10-28-14 10-28-14 11-13-14 02-05-15 02-19-15 02-19-15 02-25-14 02-25-14 02-25-14 06-13-14 06-13-14 06-13-14 06-20-14 06-20-14 06-27-14 07-07-14 07-10-14 07-14-14 07-28-14 07-28-14 07-28-14 08-04-14 08-06-14 08-15-14 08-15-14 08-19-14 09-02-14 09-02-14 09-15-14 09-15-14 09-15-14 09-18-14 09-29-14 10-13-14 10-15-14 02-25-14 02-25-14 07-29-14
Finish
10-27-14 10-30-14 11-10-14 10-17-14 10-22-14 11-04-14 11-03-14 11-10-14 11-05-14 11-18-14 11-18-14 10-27-14 10-27-14 11-05-14 11-12-14 11-18-14 03-18-15 03-18-15 11-12-14 12-01-14 02-18-15 02-18-15 02-25-15 03-18-15 05-08-15 05-08-15 01-15-15 11-19-14 07-03-14 07-03-14 06-26-14 07-25-14 08-01-14 07-25-14 07-10-14 07-25-14 08-08-14 08-12-14 08-14-14 08-29-14 08-12-14 08-21-14 08-21-14 08-25-14 09-08-14 09-08-14 09-19-14 09-24-14 10-03-14 09-24-14 10-10-14 10-21-14 10-21-14 11-19-14 01-15-15 02-25-14 08-04-14
Late Start
03-25-15 12-08-14 11-17-14 11-17-14 11-25-14 04-01-15 12-09-14 04-10-15 11-25-14 11-25-14 11-25-14 12-11-14 04-10-15 04-20-15 12-04-14 12-04-14 12-04-14 04-20-15 02-18-15 04-28-15 04-09-15 03-24-14 03-24-14 03-24-14 07-03-14 09-02-14 09-02-14 09-09-14 07-03-14 07-11-14 09-26-14 10-13-14 10-14-14 12-18-14 11-05-14 10-28-14 11-21-14 12-26-14 11-17-14 12-26-14 11-03-14 12-26-14 12-26-14 12-04-14 11-28-14 11-10-14 12-26-14 11-24-14 12-09-14 12-26-14 03-24-14 03-24-14 09-30-14
Late Finish 03-31-15 12-08-14 04-17-15 11-24-14 11-28-14 04-09-15 12-10-14 04-17-15 12-12-14 04-27-15 04-27-15 12-03-14 01-06-15 12-12-14 04-17-15 04-27-15 05-06-15 05-06-15 12-17-14 05-06-15 03-03-15 03-03-15 05-06-15 05-06-15 07-17-15 07-17-15 07-13-15 01-02-15 09-22-14 09-22-14 09-15-14 08-07-14 08-14-14 10-16-14 10-13-14 10-27-14 01-02-15 11-20-14 11-14-14 12-19-14 01-02-15 11-21-14 01-02-15 11-07-14 01-02-15 01-02-15 12-10-14 12-09-14 12-01-14 01-02-15 12-08-14 12-17-14 01-02-15 01-02-15 07-13-15 03-24-14 10-06-14
Total Free Float Float 72 26 110 22 26 72 26 73 26 110 110 22 48 26 72 73 34 34 22 72 9 9 39 34 49 49 125 29 55 55 55 9 9 58 66 65 101 71 65 78 99 65 92 53 81 81 57 53 40 69 40 40 50 29 125 19 44
0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 34 0 0 0 61 0 0 28 20 0 0 0 0 13 13 0 0 0 0 1 0 16 0 0 0 24 0 14 0 0 11 0 0 0 26 0 0 2 16 0 7 4
Calendar 2013 J Jul A S O N D 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec Work Days 0620A - Prec Work Days
0620A - T/P Work Days Work Days 0620A - Prec 0620A - Prec
0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Roofing Finishes - Area B (Low Roof) Entrances - Area B (Low Roof)
J
F
2016 M A M J
Masonry Veneer - Area C (Low Roof) Curtain Wall/ Windows - Area C (Low Roof) Roofing Finishes - Area C (Low Roof) Entrances - Area C (Low Roof) Misc Shell Finishes - Area C (Low Roof) Full Building Enclosure - Areas A/B/C (1-Story)
Masonry Veneer - Area C (Aux Gym) Full Building Enclosure - Area C (Aux Gym) Entrances - Area C (Aux Gym) Roofing Finishes - Area C (Aux Gym) Misc Shell Finishes - Area C (Aux Gym)
Masonry Veneer - Area D/E/F (Low Roof) Roofing Finishes - Area D/E/F (Low Roof) Curtain Wall/ Windows - Area D/E/F (Low Roof) Full Building Enclosure - Area D/E/F (Low Roof) Misc Shell Finishes - Area D/E/F (Low Roof) Entrances - Area D/E/F (Low Roof)
Non-Bearing Masonry Rough-in - Area D (1st Flr) Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) Plumbing Chase Rough-in - Area D (1st Flr) HVAC Ductwork Rough-in - Area D (1st Flr) HVAC Piping Rough-in - Area D (1st Flr) Plumbing Rough-in - Area D (1st Flr) Switchgear - Area D (1st Flr) Conduit - Overhead - Area D (1st Flr) HVAC Controls Rough-in - Area D (1st Flr) Fire Protection Rough-in - Area D (1st Flr) Pull Electrical Wires - Area D (1st Flr) HVAC Insulation - Area D (1st Flr) Fire Protection Above Ceiling Finalization - Area D (1st Flr) Cable Tray - Area D (1st Flr) Electrical Above Ceiling Finalization - Area D (1st Flr) Metal Studs - Area D (1st Flr) HVAC System Testing - Area D (1st Flr) HVAC Above Ceiling Finalization - Area D (1st Flr) Block Filler - Area D (1st Flr) Plumbing Insulation - Area D (1st Flr) Gypsum Board - Area D (1st Flr) Plumbing Above Ceiling Finalization - Area D (1st Flr) Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) Tech Cabling Rough-in (In-Class) - Area D (1st Flr) Tech Above Ceiling Finalization - Area D (1st Flr) Interior Rough-in Substantially Complete - 1st Flr Set Large Mech Equipment - Area E (1st Flr) Plumbing Chase Rough-in - Area E (1st Flr)
Activity ID
0620A-CTT-1830 0620A-ZSE-1820 0620A-RMM-1150 0620A-ZSE-1860 0620A-RMM-1170 0620A-MPH-1600 0620A-ZSE-1960 0620A-GSC-1230 0620A-RMM-1370 0620A-ZSE-2020 0620A-RMM-1270 0620A-SAC-1070 0620A-RMM-1290 0620A-ZSE-2090 0620A-ZSE-2100 0620A-SAC-1090 0620A-RMM-1330 0620A-RMM-1340 0620A-RMM-1560 0620A-ZST-1150 0620A-ZST-1180 0620A-ZST-1190 0620A-GSC-1250 0620A-MPH-1840 0620A-GSC-1430 0620A-MPH-1860 0620A-RMM-1710 0620A-ZSE-2390 0620A-RMM-2000 Area F (1st Flr) 0620A-MPH-1500 0620A-CTT-1740 0620A-ZSE-1760 0620A-ZSE-1800 0620A-RMM-1110 0620A-GSC-1160 0620A-RMM-1120 0620A-MPH-1510 0620A-ZSE-1850 0620A-RMM-1130 0620A-SAC-1050 0620A-ZSE-1970 0620A-RMM-1140 0620A-SAC-1060 0620A-ZSE-3380 0620A-ZSE-1980 0620A-ZST-1050 0620A-RMM-1210 0620A-RMM-1220 0620A-MPH-1800 0620A-GSC-1360 0620A-MPH-1810 0620A-ZST-1110 0620A-GSC-1200 0620A-ZST-1120 Second Floor Area G (2nd Flr)
Activity Name
Orig Start Dur
Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 10 of 25
15 15 25 5 25 15 8 10 20 9 10 15 10 5 5 5 5 5 20 4 5 3 5 8 15 5 10 17 10 82 5 10 10 4 25 7 25 15 18 7 13 11 17 5 5 3 10 5 5 8 10 5 7 5 5 175 136
07-29-14 07-29-14 07-29-14 08-05-14 08-05-14 08-12-14 08-19-14 08-26-14 08-27-14 08-29-14 09-03-14 09-03-14 09-10-14 09-12-14 09-12-14 09-17-14 09-24-14 09-24-14 10-07-14 10-22-14 10-24-14 10-28-14 10-28-14 10-28-14 10-28-14 10-31-14 11-04-14 11-04-14 01-02-15 08-11-14 08-11-14 08-19-14 08-19-14 08-26-14 09-03-14 09-10-14 09-10-14 09-17-14 09-17-14 10-08-14 10-08-14 10-13-14 10-15-14 10-20-14 10-28-14 10-30-14 11-04-14 11-07-14 11-07-14 11-10-14 11-11-14 11-13-14 11-25-14 11-26-14 11-28-14 06-06-14 06-26-14
Finish
08-18-14 08-18-14 09-02-14 08-11-14 09-09-14 09-02-14 08-28-14 09-09-14 09-24-14 09-11-14 09-16-14 09-23-14 09-23-14 09-18-14 09-18-14 09-23-14 09-30-14 09-30-14 11-03-14 10-27-14 10-30-14 10-30-14 11-03-14 11-06-14 11-17-14 11-06-14 11-17-14 11-26-14 01-15-15 12-04-14 08-15-14 09-02-14 09-02-14 08-29-14 10-07-14 09-18-14 10-14-14 10-07-14 10-10-14 10-16-14 10-24-14 10-27-14 11-06-14 10-24-14 11-03-14 11-03-14 11-17-14 11-13-14 11-13-14 11-19-14 11-24-14 11-19-14 12-04-14 12-03-14 12-04-14 02-12-15 01-08-15
Late Start
09-23-14 09-23-14 08-08-14 10-21-14 08-15-14 10-17-14 10-29-14 11-26-14 10-14-14 11-21-14 01-07-15 11-21-14 12-22-14 12-11-14 01-14-15 01-14-15 01-14-15 01-14-15 01-29-15 12-18-14 01-14-15 12-24-14 12-26-14 12-10-14 12-11-14 01-14-15 05-22-15 06-19-15 06-08-15 09-15-14 10-28-14 10-21-14 10-21-14 10-28-14 09-15-14 12-18-14 09-22-14 11-07-14 11-10-14 01-28-15 12-15-14 12-05-14 01-07-15 01-30-15 12-22-14 02-03-15 12-30-14 01-30-15 01-30-15 12-22-14 12-30-14 01-30-15 01-14-15 01-28-15 01-30-15 06-18-14 10-20-14
Late Finish 10-13-14 10-13-14 09-12-14 10-27-14 09-19-14 11-06-14 11-07-14 12-10-14 11-10-14 12-04-14 01-20-15 12-12-14 01-06-15 12-17-14 01-20-15 01-20-15 01-20-15 01-20-15 02-25-15 12-23-14 01-20-15 12-29-14 01-02-15 12-19-14 01-02-15 01-20-15 06-05-15 07-13-15 06-19-15 02-05-15 11-03-14 11-03-14 11-03-14 10-31-14 10-17-14 12-29-14 10-24-14 11-28-14 12-04-14 02-05-15 01-02-15 12-19-14 01-29-15 02-05-15 12-29-14 02-05-15 01-13-15 02-05-15 02-05-15 01-02-15 01-13-15 02-05-15 01-22-15 02-03-15 02-05-15 07-17-15 02-23-15
Total Free Float Float 39 39 8 54 8 47 50 65 33 59 87 57 72 63 85 82 77 77 79 40 55 40 41 30 31 50 139 158 109 43 55 44 44 44 8 70 8 37 38 77 47 38 57 71 38 65 38 57 57 29 33 53 33 42 43 109 32
0 0 0 5 0 0 0 0 0 0 10 0 0 0 29 18 0 27 0 0 19 0 0 0 0 4 30 23 0 0 11 0 0 6 0 0 0 0 0 13 0 0 0 9 0 17 5 0 0 0 0 4 0 0 18 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)
Activity ID
0620A-MPH-1670 0620A-CTT-1930 0620A-ZSE-1930 0620A-GSC-1620 0620A-GSC-1520 0620A-RMM-1630 0620A-RMM-1690 0620A-MPH-1950 0620A-SAC-1240 0620A-ZSE-2410 0620A-RMM-1790 0620A-SAC-1270 0620A-RMM-1830 0620A-RMM-1810 0620A-RMM-1820 0620A-GSC-1730 0620A-MPH-1980 0620A-ZSE-2600 0620A-MPH-2050 0620A-ZSE-2620 0620A-ZSE-2680 0620A-ZST-1530 0620A-ZST-1630 0620A-ZST-1650 0620A-ALL-1230 Area H (2nd Flr) 0620A-RMM-1250 0620A-MPH-1650 0620A-CTT-1850 0620A-ZSE-1840 0620A-GSC-1550 0620A-GSC-1460 0620A-RMM-1720 0620A-RMM-1450 0620A-RMM-1530 0620A-MPH-1850 0620A-SAC-1180 0620A-ZSE-2290 0620A-MPH-1960 0620A-GSC-1630 0620A-RMM-1900 0620A-MPH-1970 0620A-RMM-1620 0620A-SAC-1220 0620A-RMM-1680 0620A-ZSE-2380 0620A-RMM-1740 0620A-RMM-1760 0620A-ZSE-2750 0620A-RMM-1990 0620A-ZST-1390 0620A-RMM-2110 0620A-ZST-1460 0620A-ZST-1470 0620A-ZSE-2500 0620A-ZSE-2520 Area I (2nd Flr)
Activity Name
Orig Start Dur
Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 11 of 25
5 15 15 10 5 20 20 5 12 17 10 5 10 5 5 15 5 9 5 5 6 10 7 5 0 168 1 5 15 15 10 5 20 20 20 5 15 16 5 15 20 5 10 5 10 14 5 5 4 10 7 10 5 5 6 5 130
06-26-14 07-11-14 07-11-14 09-19-14 09-22-14 10-08-14 10-15-14 10-22-14 10-29-14 10-29-14 11-05-14 11-07-14 11-12-14 11-14-14 11-14-14 11-18-14 11-20-14 11-21-14 11-26-14 11-28-14 12-05-14 12-15-14 12-30-14 01-02-15 06-06-14 06-06-14 07-29-14 08-01-14 08-01-14 10-03-14 11-04-14 11-04-14 11-05-14 11-12-14 11-19-14 11-26-14 11-26-14 11-28-14 12-01-14 12-03-14 12-04-14 12-04-14 12-11-14 12-11-14 12-19-14 12-26-14 12-26-14 01-02-15 01-02-15 01-12-15 01-16-15 01-21-15 01-21-15 01-27-15 01-28-15 08-11-14
Finish
07-02-14 07-31-14 07-31-14 10-02-14 09-26-14 11-04-14 11-11-14 10-28-14 11-13-14 11-20-14 11-18-14 11-13-14 11-25-14 11-20-14 11-20-14 12-09-14 11-26-14 12-04-14 12-03-14 12-04-14 12-12-14 12-29-14 01-08-15 01-08-15 01-08-15 02-03-15 06-06-14 08-04-14 08-21-14 08-21-14 10-16-14 11-10-14 12-02-14 12-03-14 12-10-14 11-25-14 12-17-14 12-18-14 12-04-14 12-19-14 12-31-14 12-10-14 12-17-14 12-17-14 12-24-14 01-09-15 01-02-15 01-02-15 01-07-15 01-15-15 01-20-15 01-29-15 01-27-15 01-27-15 02-03-15 02-03-15 02-12-15
Late Start
11-04-14 11-14-14 11-14-14 01-05-15 12-11-14 10-20-14 10-27-14 12-01-14 01-16-15 12-08-14 02-10-15 02-17-15 02-03-15 02-17-15 02-17-15 01-22-15 01-29-15 01-02-15 02-17-15 02-17-15 01-15-15 01-23-15 02-06-15 02-17-15 06-18-14 06-18-14 11-11-14 12-08-14 12-08-14 01-19-15 01-07-15 02-26-15 11-17-14 11-24-14 12-29-14 02-03-15 01-06-15 02-05-15 02-03-15 03-26-15 03-05-15 03-09-15 03-05-15 02-25-15 01-28-15 03-25-15 03-25-15 07-14-15 06-08-15 02-17-15 06-22-15 02-26-15 03-05-15 03-24-15 03-25-15 11-18-14
Late Finish 11-10-14 12-05-14 12-05-14 01-16-15 12-17-14 11-14-14 11-21-14 12-05-14 02-02-15 12-31-14 02-23-15 02-23-15 02-16-15 02-23-15 02-23-15 02-11-15 02-04-15 01-14-15 02-23-15 02-23-15 01-22-15 02-05-15 02-16-15 02-23-15 02-23-15 07-17-15 06-18-14 11-17-14 12-29-14 12-29-14 01-30-15 01-13-15 03-25-15 12-15-14 12-22-14 01-05-15 02-23-15 01-27-15 02-11-15 02-23-15 04-23-15 03-11-15 03-20-15 03-11-15 03-10-15 02-16-15 03-31-15 03-31-15 07-17-15 06-19-15 02-25-15 07-03-15 03-04-15 03-11-15 03-31-15 03-31-15 04-08-15
Total Free Float Float 91 89 89 73 57 8 8 27 54 27 66 69 56 64 64 44 47 27 56 55 27 27 27 32 32 116 8 74 89 89 73 43 79 8 8 26 46 26 47 44 79 63 65 58 52 26 62 62 135 109 26 109 26 31 40 40 38
17 0 0 0 0 0 0 0 0 0 2 18 0 0 23 0 0 0 0 23 0 0 0 0 19 0 0 4 0 0 0 1 0 0 0 0 0 0 4 0 0 13 10 13 0 0 0 15 98 0 0 30 0 7 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)
Activity ID
0620A-MPH-1640 0620A-CTT-1780 0620A-ZSE-1790 0620A-GSC-1450 0620A-GSC-1410 0620A-RMM-1360 0620A-RMM-1390 0620A-GSC-1590 0620A-MPH-1760 0620A-ZSE-2070 0620A-MPH-1930 0620A-SAC-1150 0620A-MPH-1940 0620A-RMM-1440 0620A-SAC-1160 0620A-ZSE-2270 0620A-RMM-1520 0620A-ZSE-2310 0620A-RMM-1570 0620A-RMM-1580 0620A-ZST-1310 0620A-ZSE-2300 0620A-ZST-1340 0620A-ZST-1350 Third Floor Area G (3rd Flr) 0620A-CTT-2310 0620A-ZSE-2230 0620A-MPH-1780 0620A-MPH-1820 0620A-GSC-1690 0620A-GSC-1920 0620A-GSC-2030 0620A-RMM-2100 0620A-RMM-2130 0620A-MPH-2160 0620A-ZSE-2880 0620A-MPH-2170 0620A-MPH-2180 0620A-RMM-2190 0620A-SAC-1420 0620A-RMM-2210 0620A-SAC-1450 0620A-ZSE-3040 0620A-RMM-2250 0620A-RMM-2260 0620A-ZSE-3120 0620A-ZSE-3130 0620A-ZST-2180 0620A-ZST-2210 0620A-ZST-2220 0620A-ALL-1300 Area H (3rd Flr) 0620A-RMM-1260 0620A-MPH-1750 0620A-CTT-2160 0620A-ZSE-2080
Activity Name
Orig Start Dur
Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)
Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 12 of 25
5 10 10 7 5 20 20 10 5 5 8 13 5 7 5 7 10 4 5 5 7 5 5 5 174 149 15 15 10 5 5 10 15 20 20 10 17 5 5 10 12 10 5 9 5 5 6 5 10 7 5 0 152 1 10 15 15
08-11-14 08-22-14 08-22-14 10-17-14 12-04-14 12-04-14 12-11-14 12-15-14 12-18-14 12-26-14 12-26-14 12-26-14 12-31-14 01-05-15 01-08-15 01-12-15 01-12-15 01-21-15 01-26-15 01-26-15 01-28-15 02-04-15 02-06-15 02-06-15 09-03-14 09-03-14 09-03-14 09-03-14 09-09-14 09-23-14 09-29-14 11-19-14 12-22-14 01-05-15 01-12-15 01-19-15 01-26-15 02-02-15 02-02-15 02-02-15 02-02-15 02-09-15 02-11-15 02-18-15 02-23-15 02-23-15 03-03-15 03-04-15 03-11-15 03-25-15 03-27-15 09-17-14 09-17-14 10-22-14 10-22-14 10-22-14
Finish
08-15-14 09-05-14 09-05-14 10-27-14 12-10-14 01-02-15 01-09-15 12-29-14 12-24-14 01-02-15 01-07-15 01-14-15 01-07-15 01-13-15 01-14-15 01-20-15 01-23-15 01-26-15 01-30-15 01-30-15 02-05-15 02-10-15 02-12-15 02-12-15 05-08-15 04-02-15 09-23-14 09-23-14 09-22-14 09-29-14 10-03-14 12-03-14 01-13-15 01-30-15 02-06-15 01-30-15 02-17-15 02-06-15 02-06-15 02-13-15 02-17-15 02-20-15 02-17-15 03-02-15 02-27-15 02-27-15 03-10-15 03-10-15 03-24-15 04-02-15 04-02-15 04-02-15 04-22-15 09-17-14 11-04-14 11-11-14 11-11-14
Late Start
11-18-14 12-30-14 12-30-14 02-02-15 02-06-15 12-16-14 12-23-14 02-27-15 01-22-15 01-29-15 02-12-15 03-06-15 03-23-15 03-23-15 03-23-15 02-19-15 03-11-15 03-18-15 04-01-15 04-01-15 03-05-15 04-01-15 03-16-15 03-23-15 09-26-14 10-21-14 11-26-14 11-26-14 10-21-14 12-30-14 12-18-14 02-18-15 03-06-15 01-15-15 01-22-15 01-29-15 02-05-15 03-25-15 04-09-15 04-01-15 03-25-15 03-25-15 04-09-15 03-02-15 04-09-15 04-09-15 03-13-15 04-09-15 03-23-15 04-07-15 04-09-15 09-26-14 09-26-14 11-04-14 12-22-14 12-22-14
Late Finish 11-24-14 01-13-15 01-13-15 02-10-15 02-12-15 01-14-15 01-21-15 03-12-15 01-28-15 02-04-15 02-23-15 03-24-15 03-27-15 03-31-15 03-27-15 02-27-15 03-24-15 03-23-15 04-08-15 04-08-15 03-13-15 04-08-15 03-20-15 03-27-15 07-17-15 04-15-15 12-17-14 12-17-14 11-03-14 01-06-15 12-24-14 03-03-15 03-26-15 02-11-15 02-18-15 02-11-15 02-27-15 03-31-15 04-15-15 04-15-15 04-10-15 04-08-15 04-15-15 03-12-15 04-15-15 04-15-15 03-20-15 04-15-15 04-03-15 04-15-15 04-15-15 04-15-15 07-17-15 09-26-14 11-17-14 01-13-15 01-13-15
Total Free Float Float 70 89 89 73 44 8 8 52 23 23 33 49 57 55 52 28 42 40 47 47 26 40 26 31 49 8 60 60 30 68 57 62 52 8 8 8 8 37 47 42 37 32 40 8 32 32 8 25 8 8 8 8 61 7 9 42 42
14 29 29 11 0 0 0 0 0 5 0 0 17 13 19 0 0 0 0 15 0 15 0 18 0 0 3 3 0 26 16 0 0 0 0 0 0 0 15 10 0 0 18 0 0 15 0 13 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)
Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)
Activity ID
0620A-ZSE-2120 0620A-ZSE-2170 0620A-MPH-1770 0620A-GSC-1600 0620A-GSC-1820 0620A-RMM-2010 0620A-GSC-1930 0620A-RMM-2150 0620A-RMM-1940 0620A-RMM-1970 0620A-MPH-2090 0620A-ZSE-2770 0620A-RMM-2240 0620A-MPH-2140 0620A-MPH-2150 0620A-RMM-2090 0620A-SAC-1360 0620A-RMM-2120 0620A-RMM-2290 0620A-ZSE-2980 0620A-ZSE-2820 0620A-SAC-1380 0620A-RMM-2170 0620A-RMM-2180 0620A-ZSE-2930 0620A-ZST-1870 0620A-ZST-1980 0620A-ZST-1990 Area I (3rd Flr) 0620A-MPH-1730 0620A-MPH-1660 0620A-CTT-2070 0620A-ZSE-2000 0620A-ZSE-2030 0620A-GSC-1580 0620A-GSC-1720 0620A-GSC-1860 0620A-RMM-1800 0620A-MPH-2020 0620A-RMM-1840 0620A-ZSE-2590 0620A-MPH-2040 0620A-MPH-2070 0620A-SAC-1320 0620A-RMM-1930 0620A-SAC-1330 0620A-ZSE-2690 0620A-RMM-1960 0620A-ZSE-2710 0620A-RMM-2030 0620A-RMM-2050 0620A-ZST-1710 0620A-ZST-1750 0620A-ZST-1770 One Story Areas Area B (Gym) Area B.1 (Gym)
Activity Name
Orig Start Dur
Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Flr) HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd Flr) Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr) Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 13 of 25
Finish
Late Start
Late Finish
Total Free Float Float
Calendar 2013 J Jul A S O N D
4 2 5 5 10 20 15 20 20
10-29-14 11-04-14 11-05-14 11-12-14 12-04-14 01-02-15 01-05-15 01-30-15 02-02-15
11-03-14 11-05-14 11-11-14 11-18-14 12-17-14 01-29-15 01-23-15 02-26-15 02-27-15
02-19-15 02-25-15 01-07-15 01-14-15 03-04-15 04-24-15 03-18-15 05-22-15 02-12-15
02-24-15 02-26-15 01-13-15 01-20-15 03-17-15 05-21-15 04-08-15 06-19-15 03-11-15
78 78 42 42 62 79 52 79 8
0 9 0 0 0 0 0 0 0
Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days
20 10 14 10 5 5 10 15 10 10 12 16 5 5 5 5 7 5 5 129 10 5 10 10 4 5 7 10 20 10 20 7 5 5 13 7 5 7 10 5 5 5 7 5 5 283 131 131
02-09-15 02-16-15 02-23-15 02-27-15 03-02-15 03-02-15 03-02-15 03-02-15 03-09-15 03-13-15 03-13-15 03-13-15 03-16-15 03-23-15 03-23-15 03-30-15 04-07-15 04-16-15 04-16-15 11-05-14 11-05-14 11-12-14 11-12-14 11-12-14 11-19-14 12-11-14 12-18-14 01-19-15 03-02-15 03-09-15 03-09-15 03-16-15 03-23-15 03-23-15 03-23-15 03-30-15 04-02-15 04-07-15 04-07-15 04-09-15 04-21-15 04-21-15 04-23-15 05-04-15 05-04-15 03-21-14 03-21-14 03-21-14
03-06-15 02-27-15 03-12-15 03-12-15 03-06-15 03-06-15 03-13-15 03-20-15 03-20-15 03-26-15 03-30-15 04-03-15 03-20-15 03-27-15 03-27-15 04-03-15 04-15-15 04-22-15 04-22-15 05-08-15 11-18-14 11-18-14 11-25-14 11-25-14 11-24-14 12-17-14 12-29-14 01-30-15 03-27-15 03-20-15 04-03-15 03-24-15 03-27-15 03-27-15 04-09-15 04-08-15 04-09-15 04-15-15 04-20-15 04-15-15 04-27-15 04-27-15 05-01-15 05-08-15 05-08-15 05-01-15 09-25-14 09-25-14
02-19-15 02-26-15 03-05-15 06-22-15 04-01-15 05-07-15 04-21-15 04-13-15 04-14-15 07-06-15 04-21-15 03-25-15 04-28-15 04-28-15 04-28-15 04-28-15 04-17-15 04-28-15 04-28-15 11-18-14 11-18-14 02-06-15 01-30-15 01-30-15 02-27-15 02-13-15 03-23-15 04-01-15 03-18-15 03-25-15 04-01-15 04-15-15 04-09-15 05-14-15 05-04-15 05-12-15 05-14-15 04-24-15 04-30-15 05-14-15 05-14-15 05-14-15 05-05-15 05-14-15 05-14-15 05-19-14 05-19-14 05-19-14
03-18-15 03-11-15 03-24-15 07-03-15 04-08-15 05-13-15 05-04-15 05-01-15 04-27-15 07-17-15 05-06-15 04-16-15 05-04-15 05-04-15 05-04-15 05-04-15 04-27-15 05-04-15 05-04-15 05-20-15 12-02-14 02-12-15 02-12-15 02-12-15 03-04-15 02-19-15 03-31-15 04-15-15 04-15-15 04-08-15 04-29-15 04-23-15 04-15-15 05-20-15 05-20-15 05-20-15 05-20-15 05-04-15 05-13-15 05-20-15 05-20-15 05-20-15 05-13-15 05-20-15 05-20-15 06-05-15 02-13-15 02-13-15
8 8 8 79 22 47 35 29 25 79 26 8 30 25 25 20 8 8 8 8 9 59 54 54 69 44 65 52 12 12 17 21 12 37 29 30 29 13 17 25 17 17 8 8 8 24 98 98
0 0 0 0 0 10 10 0 0 71 12 0 8 0 15 2 0 0 0 0 2 5 0 0 0 31 13 44 0 0 0 8 0 29 0 13 21 0 0 17 0 9 0 0 0 0 0 0
Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Fl HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd F Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)
Activity ID
0620A-MPH-1470 0620A-RMM-1080 0620A-RMM-1090 0620A-RMM-1100 0620A-SAC-1080 0620A-MPH-1700 0620A-GSC-1150 0620A-ZSE-2010 0620A-SAC-1110 0620A-ZSE-2160 0620A-ZSE-2190 0620A-RMM-1490 0620A-ZST-1080 0620A-ZST-1090 0620A-ALL-1170 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-3230 0620A-CTT-1540 0620A-ZSE-1550 0620A-ZSE-1580 0620A-MPH-1530 0620A-MPH-1540 0620A-SSI-1000 0620A-RMM-1160 0620A-RMM-1180 0620A-MPH-1610 0620A-ZSE-1770 0620A-GSC-1030 0620A-GSC-1040 0620A-MPH-1680 0620A-ZSE-1900 0620A-ZSE-1910 0620A-SAC-1100 0620A-MPH-1720 0620A-RMM-1400 0620A-ZSE-2050 0620A-ZSE-2060 0620A-RMM-1430 0620A-SAC-1120 0620A-ZSE-2180 0620A-ZSE-2220 0620A-ZST-1100 0620A-ZST-1130 0620A-GSC-1170 0620A-ZST-1170 0620A-RMM-1650 0620A-RMM-1660 0620A-SSI-1010 Area B (Low Roof) 0620A-RMM-1190 0620A-GSC-3240 0620A-CTT-1590 0620A-ZSE-1640 0620A-ZSE-1660 0620A-MPH-1550 0620A-MPH-1580
Activity Name
Orig Start Dur
Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)
Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 14 of 25
10 12 3 5 15 5 5 17 5 5 4 5 1 1 0 191 137 10 15 15 16 5 10 3 60 60 25 24 5 10 12 20 23 36 5 15 10 12 30 5 3 5 5 5 15 5 5 5 5 183 1 9 10 10 20 5 10
03-21-14 04-04-14 04-23-14 04-28-14 07-10-14 07-29-14 08-19-14 08-26-14 09-08-14 09-18-14 09-19-14 09-19-14 09-25-14 09-25-14 04-07-14 04-23-14 04-23-14 05-07-14 05-07-14 05-14-14 05-21-14 05-29-14 06-03-14 06-05-14 06-12-14 06-19-14 06-26-14 07-22-14 07-22-14 07-25-14 07-31-14 07-31-14 07-31-14 08-05-14 08-29-14 09-03-14 09-03-14 09-08-14 09-15-14 09-19-14 09-25-14 09-26-14 10-03-14 10-08-14 10-10-14 10-20-14 10-20-14 10-29-14 04-07-14 04-07-14 05-15-14 05-29-14 05-29-14 06-06-14 06-10-14 06-17-14
Finish
04-03-14 04-22-14 04-25-14 05-02-14 07-30-14 08-04-14 08-25-14 09-18-14 09-12-14 09-24-14 09-24-14 09-25-14 09-25-14 09-25-14 09-25-14 01-07-15 11-04-14 05-06-14 05-28-14 05-28-14 06-05-14 05-28-14 06-11-14 06-05-14 08-28-14 09-05-14 07-24-14 07-30-14 07-28-14 08-04-14 08-11-14 08-27-14 09-02-14 09-19-14 08-11-14 09-19-14 09-16-14 09-18-14 10-17-14 09-19-14 09-23-14 10-01-14 10-02-14 10-09-14 10-28-14 10-16-14 10-24-14 10-24-14 11-04-14 12-24-14 04-07-14 05-28-14 06-11-14 06-11-14 07-03-14 06-16-14 06-30-14
Late Start
05-19-14 06-03-14 11-12-14 11-25-14 08-08-14 12-03-14 11-19-14 10-24-14 12-03-14 12-03-14 11-18-14 12-03-14 11-24-14 12-09-14 05-29-14 05-29-14 05-29-14 06-26-14 06-26-14 07-03-14 06-05-14 06-12-14 12-10-14 06-19-14 06-26-14 07-21-14 07-28-14 10-22-14 10-06-14 12-01-14 10-03-14 09-30-14 08-29-14 12-10-14 11-17-14 12-03-14 10-31-14 10-20-14 12-10-14 11-20-14 12-10-14 11-25-14 12-03-14 11-18-14 12-10-14 12-10-14 12-10-14 12-10-14 06-16-14 06-16-14 07-22-14 08-04-14 08-04-14 09-10-14 07-28-14 08-04-14
Late Finish 06-02-14 06-18-14 11-14-14 12-02-14 08-28-14 12-09-14 11-25-14 11-17-14 12-09-14 12-09-14 11-21-14 12-09-14 11-24-14 12-09-14 02-13-15 06-05-15 12-16-14 06-11-14 07-17-14 07-17-14 07-25-14 06-11-14 06-25-14 12-12-14 09-12-14 09-19-14 08-22-14 08-28-14 10-28-14 10-17-14 12-16-14 10-30-14 10-30-14 10-20-14 12-16-14 12-08-14 12-16-14 11-17-14 12-01-14 12-16-14 11-24-14 12-16-14 12-02-14 12-09-14 12-09-14 12-16-14 12-16-14 12-16-14 12-16-14 06-01-15 06-16-14 08-01-14 08-15-14 08-15-14 10-07-14 08-01-14 08-15-14
Total Free Float Float 40 40 142 148 21 89 65 42 61 53 42 52 42 52 98 105 29 25 35 35 35 10 10 133 10 10 21 21 65 53 89 45 42 21 89 55 64 42 30 61 44 53 42 42 29 42 36 36 29 109 48 46 46 46 66 33 33
0 0 0 96 0 0 0 0 0 0 0 0 0 0 88 0 0 0 0 0 0 0 0 107 0 0 0 0 0 0 0 3 0 0 3 5 11 0 0 28 2 6 0 0 0 5 0 5 3 0 1 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)
Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)
F
2016 M A M J
Activity ID
0620A-RMM-1200 0620A-GSC-1050 0620A-RMM-1320 0620A-GSC-1080 0620A-RMM-1410 0620A-RMM-1420 0620A-MPH-1790 0620A-ZSE-2200 0620A-ZSE-2150 0620A-RMM-1480 0620A-RMM-1540 0620A-ZSE-2280 0620A-MPH-1880 0620A-SAC-1170 0620A-MPH-1890 0620A-ZSE-2320 0620A-ZSE-2330 0620A-ZST-1200 0620A-RMM-1670 0620A-GSC-1260 0620A-ZST-1230 0620A-ZST-1240 0620A-SAC-1190 0620A-RMM-1730 0620A-RMM-1750 0620A-RMM-1850 Area C (Low Roof) 0620A-RMM-1240 0620A-CTT-1630 0620A-ZSE-1670 0620A-MPH-1590 0620A-MPH-1620 0620A-ZSE-1750 0620A-GSC-3250 0620A-RMM-1310 0620A-GSC-1100 0620A-GSC-1120 0620A-RMM-1470 0620A-RMM-1550 0620A-RMM-1590 0620A-MPH-1920 0620A-ZSE-2370 0620A-RMM-1640 0620A-GSC-1310 0620A-ZSE-2430 0620A-MPH-1990 0620A-ZSE-2490 0620A-MPH-2010 0620A-ZSE-2510 0620A-ZST-1360 0620A-RMM-1870 0620A-SAC-1280 0620A-ZST-1410 0620A-ZST-1420 0620A-RMM-1910 0620A-RMM-1980 0620A-SAC-1290
Activity Name
Orig Start Dur
HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 15 of 25
20 5 40 5 20 20 15 8 5 20 10 8 7 23 5 5 3 5 10 10 5 5 5 5 5 20 170 1 20 20 5 10 3 1 20 10 5 8 40 40 20 11 4 5 10 10 5 5 4 5 10 26 5 5 20 4 5
07-01-14 07-29-14 07-30-14 08-05-14 08-29-14 09-08-14 09-15-14 09-22-14 09-25-14 09-25-14 09-29-14 10-02-14 10-06-14 10-06-14 10-08-14 10-10-14 10-14-14 10-17-14 10-20-14 10-22-14 10-24-14 10-24-14 10-30-14 11-03-14 11-03-14 11-26-14 05-07-14 05-07-14 06-12-14 06-12-14 06-19-14 07-01-14 07-07-14 07-22-14 07-30-14 08-05-14 08-12-14 09-25-14 09-29-14 10-06-14 10-13-14 10-20-14 10-23-14 11-03-14 11-04-14 11-10-14 11-17-14 11-17-14 11-18-14 11-24-14 11-24-14 11-28-14 12-02-14 12-02-14 12-02-14 12-26-14 12-30-14
Finish
07-29-14 08-04-14 09-24-14 08-11-14 09-26-14 10-03-14 10-03-14 10-01-14 10-01-14 10-22-14 10-10-14 10-13-14 10-14-14 11-05-14 10-14-14 10-16-14 10-16-14 10-23-14 10-31-14 11-04-14 10-30-14 10-30-14 11-05-14 11-07-14 11-07-14 12-24-14 01-07-15 05-07-14 07-10-14 07-10-14 06-25-14 07-15-14 07-09-14 07-22-14 08-26-14 08-18-14 08-18-14 10-06-14 11-21-14 12-01-14 11-07-14 11-03-14 10-28-14 11-07-14 11-17-14 11-21-14 11-21-14 11-21-14 11-21-14 12-01-14 12-08-14 01-06-15 12-08-14 12-08-14 12-30-14 12-31-14 01-06-15
Late Start
08-18-14 10-29-14 09-25-14 10-20-14 09-15-14 09-22-14 09-30-14 11-17-14 11-20-14 04-20-15 12-09-14 11-28-14 12-24-14 10-21-14 12-29-14 12-29-14 12-16-14 12-19-14 12-02-14 12-17-14 12-29-14 12-29-14 12-29-14 12-29-14 12-29-14 05-04-15 06-17-14 06-17-14 09-29-14 09-29-14 09-19-14 09-26-14 10-08-14 09-15-14 09-16-14 11-05-14 10-27-14 01-19-15 10-13-14 10-20-14 11-14-14 12-02-14 05-18-15 01-13-15 12-17-14 01-08-15 01-15-15 01-15-15 01-02-15 01-08-15 12-31-14 12-15-14 01-15-15 01-15-15 12-16-14 06-02-15 01-15-15
Late Finish 09-15-14 11-04-14 11-19-14 10-24-14 10-10-14 10-17-14 10-20-14 11-26-14 11-26-14 05-15-15 12-22-14 12-09-14 01-05-15 11-20-14 01-05-15 01-05-15 12-18-14 12-26-14 12-15-14 12-31-14 01-05-15 01-05-15 01-05-15 01-05-15 01-05-15 06-01-15 06-05-15 06-17-14 10-24-14 10-24-14 09-25-14 10-09-14 10-10-14 09-15-14 10-13-14 11-18-14 10-31-14 01-28-15 12-08-14 12-15-14 12-12-14 12-16-14 05-21-15 01-19-15 12-31-14 01-21-15 01-21-15 01-21-15 01-07-15 01-14-15 01-14-15 01-21-15 01-21-15 01-21-15 01-14-15 06-05-15 01-21-15
Total Free Float Float 33 65 40 53 10 10 11 40 40 143 50 40 56 11 56 54 44 44 30 39 44 44 40 38 38 109 105 28 75 75 64 61 66 38 33 65 53 79 10 10 24 30 143 48 30 40 40 40 30 30 25 11 30 30 10 109 11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 0 0 0 0 0 0 18 10 0 12 0 0 4 0 0 0 20 0 5 0 0 0 0 0 0 0 0 4 9 0 0 30 30 0 0 15 0 0 0 0 0 1
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)
Activity ID
Activity Name
Orig Start Dur
0620A-RMM-2020 HVAC System Testing - Area C (Low Roof) 0620A-RMM-2040 HVAC Above Ceiling Finalization - Area C (Low Roof) 0620A-ALL-1220 Interior Rough-in Substantially Complete - Area A /B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-MPH-1710 Storm Drain Rough-in - Area C (Aux Gym) 0620A-MPH-1740 Plumbing Above Ceiling Finalization - Area C (Aux Gym) 0620A-GSC-1130 Block Filler - Area C (Aux Gym) 0620A-RMM-1460 HVAC Ductwork Rough-in - Area C (Aux Gym) 0620A-ZSE-2260 Conduit - Overhead - Area C (Aux Gym) 0620A-RMM-1610 HVAC Controls Rough-in - Area C (Aux Gym) 0620A-ZSE-2340 Pull Electrical Wires - Area C (Aux Gym) 0620A-ZSE-2360 Electrical Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1260 Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) 0620A-SAC-1200 Fire Protection Rough-in - Area C (Aux Gym) 0620A-SAC-1210 Fire Protection Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1450 Tech Above Ceiling Finalization - Area C (Aux Gym) 0620A-RMM-2070 HVAC System Testing - Area C (Aux Gym) 0620A-RMM-2080 HVAC Above Ceiling Finalization - Area C (Aux Gym) 0620A-ALL-1240 Interior Rough-in Substantially Complete - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2200 Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2130 Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1390 Metal Studs - Area D/E/F (Low Roof) 0620A-MPH-1830 Plumbing Chase Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1510 Gypsum Board - Area D/E/F (Low Roof) 0620A-GSC-1400 Block Filler - Area D/E/F (Low Roof) 0620A-MPH-1870 Storm Drain Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2210 Switchgear - Area D/E/F (Low Roof) 0620A-RMM-1880 HVAC Ductwork Rough-in - Area D/E/F (Low Roof) 0620A-RMM-1920 HVAC Piping Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2080 Plumbing Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2730 Conduit - Overhead - Area D/E/F (Low Roof) 0620A-MPH-2120 Plumbing Insulation - Area D/E/F (Low Roof) 0620A-SAC-1430 Fire Protection Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2130 Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZSE-2790 Pull Electrical Wires - Area D/E/F (Low Roof) 0620A-ZSE-2830 Cable Tray - Area D/E/F (Low Roof) 0620A-ZSE-2860 Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1800 Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) 0620A-ZST-1840 Tech Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1850 Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) 0620A-RMM-2270 HVAC Controls Rough-in - Area D/E/F (Low Roof) 0620A-RMM-2280 HVAC Insulation - Area D/E/F (Low Roof) 0620A-SAC-1460 Fire Protection Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-RMM-2330 HVAC System Testing - Area D/E/F (Low Roof) 0620A-RMM-2340 HVAC Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ALL-1310 Interior Rough-in Substantially Complete - Area D/E/F (Low Roof) Interior Finishes Academic Area First Floor Area D (1st Flr) 0620A-ZST-1160 Tech Rm Build-out and Backbone - Area D (1st Flr) 0620A-GSC-1770 Paint - Area D (1st Flr) 0620A-GSC-1800 Ceiling Grid - Area D (1st Flr) 0620A-ZSE-2560 Light Fixtures - Area D (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 16 of 25
5 5 0 107 107 7 5 5 8 7 5 5 5 1 15 5 5 5 5 0 124 124 5 5 5 5 5 5 10 6 65 65 15 12 7 54 5 13 7 5 6 5 4 10 27 5 5 5 0 208 202 135 135 5 12 12 8
12-31-14 12-31-14 08-13-14 08-13-14 08-13-14 08-15-14 08-26-14 09-25-14 10-07-14 10-13-14 10-16-14 10-17-14 10-31-14 11-06-14 11-20-14 12-09-14 01-08-15 01-08-15 11-05-14 11-05-14 11-05-14 11-05-14 11-12-14 11-14-14 11-19-14 11-19-14 11-21-14 11-25-14 12-08-14 12-15-14 12-22-14 12-30-14 01-14-15 01-14-15 01-16-15 01-16-15 02-04-15 02-06-15 02-13-15 02-20-15 02-23-15 03-11-15 03-18-15 03-24-15 04-27-15 04-27-15 09-22-14 09-22-14 09-22-14 09-22-14 09-22-14 12-11-14 12-15-14 12-23-14
Finish
01-07-15 01-07-15 01-07-15 01-14-15 01-14-15 08-21-14 08-21-14 09-02-14 10-06-14 10-15-14 10-17-14 10-22-14 10-23-14 10-31-14 11-26-14 11-26-14 12-15-14 01-14-15 01-14-15 01-14-15 05-01-15 05-01-15 11-11-14 11-11-14 11-18-14 11-20-14 11-25-14 11-25-14 12-05-14 12-03-14 03-10-15 03-17-15 01-13-15 01-15-15 01-22-15 03-30-15 01-22-15 02-03-15 02-12-15 02-12-15 02-20-15 02-26-15 02-26-15 03-24-15 04-24-15 03-30-15 05-01-15 05-01-15 05-01-15 07-15-15 07-07-15 04-01-15 04-01-15 09-26-14 12-29-14 12-31-14 01-05-15
Late Start
01-15-15 01-15-15 10-10-14 10-10-14 10-10-14 12-19-14 11-26-14 11-11-14 12-01-14 12-23-14 12-10-14 01-08-15 01-07-15 11-21-14 01-08-15 04-29-15 02-18-15 02-18-15 11-25-14 11-25-14 01-14-15 01-14-15 02-11-15 11-25-14 02-25-15 01-21-15 12-03-14 03-05-15 12-17-14 12-24-14 02-04-15 03-13-15 05-04-15 02-25-15 05-06-15 03-31-15 04-20-15 05-06-15 04-29-15 05-06-15 05-07-15 04-29-15 03-27-15 05-06-15 05-06-15 05-06-15 11-17-14 11-17-14 11-17-14 11-17-14 11-17-14 12-31-14 01-05-15 02-09-15
Late Finish 01-21-15 01-21-15 01-21-15 05-05-15 05-05-15 10-20-14 12-26-14 12-03-14 11-20-14 12-09-14 12-30-14 12-16-14 01-14-15 01-07-15 12-12-14 01-14-15 05-05-15 02-24-15 02-24-15 02-24-15 05-12-15 05-12-15 01-20-15 01-20-15 02-17-15 12-02-14 03-03-15 01-27-15 12-16-14 03-12-15 03-19-15 03-26-15 02-24-15 03-30-15 05-12-15 05-12-15 05-12-15 04-17-15 04-28-15 05-12-15 05-06-15 05-12-15 05-12-15 05-12-15 05-05-15 05-12-15 05-12-15 05-12-15 05-12-15 07-24-15 07-17-15 07-10-15 07-10-15 11-21-14 01-16-15 01-20-15 02-18-15
Total Free Float Float 10 10 10 78 78 41 88 65 33 38 50 38 56 45 11 32 98 29 29 29 7 7 47 47 62 7 67 42 7 69 7 7 30 52 77 30 77 52 52 62 52 52 52 34 7 30 7 7 7 7 8 70 70 40 13 13 32
0 0 0 0 0 0 32 8 0 0 25 1 16 15 0 21 46 0 0 19 0 0 0 0 0 0 58 0 0 17 0 0 0 0 0 0 70 0 0 55 0 45 0 27 0 23 0 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J HVAC System Testing - Area C (Low Roof) HVAC Above Ceiling Finalization - Area C (Low Roof) Interior Rough-in Substantially Complete - Area A /B/C (1-Story)
Storm Drain Rough-in - Area C (Aux Gym) Plumbing Above Ceiling Finalization - Area C (Aux Gym) Block Filler - Area C (Aux Gym) HVAC Ductwork Rough-in - Area C (Aux Gym) Conduit - Overhead - Area C (Aux Gym) HVAC Controls Rough-in - Area C (Aux Gym) Pull Electrical Wires - Area C (Aux Gym) Electrical Above Ceiling Finalization - Area C (Aux Gym) Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) Fire Protection Rough-in - Area C (Aux Gym) Fire Protection Above Ceiling Finalization - Area C (Aux Gym) Tech Above Ceiling Finalization - Area C (Aux Gym) HVAC System Testing - Area C (Aux Gym) HVAC Above Ceiling Finalization - Area C (Aux Gym) Interior Rough-in Substantially Complete - Area C (Aux Gym)
Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) Metal Studs - Area D/E/F (Low Roof) Plumbing Chase Rough-in - Area D/E/F (Low Roof) Gypsum Board - Area D/E/F (Low Roof) Block Filler - Area D/E/F (Low Roof) Storm Drain Rough-in - Area D/E/F (Low Roof) Switchgear - Area D/E/F (Low Roof) HVAC Ductwork Rough-in - Area D/E/F (Low Roof) HVAC Piping Rough-in - Area D/E/F (Low Roof) Plumbing Rough-in - Area D/E/F (Low Roof) Conduit - Overhead - Area D/E/F (Low Roof) Plumbing Insulation - Area D/E/F (Low Roof) Fire Protection Rough-in - Area D/E/F (Low Roof) Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) Pull Electrical Wires - Area D/E/F (Low Roof) Cable Tray - Area D/E/F (Low Roof) Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) Tech Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) HVAC Controls Rough-in - Area D/E/F (Low Roof) HVAC Insulation - Area D/E/F (Low Roof) Fire Protection Above Ceiling Finalization - Area D/E/F (L HVAC System Testing - Area D/E/F (Low Roof) HVAC Above Ceiling Finalization - Area D/E/F (Low Interior Rough-in Substantially Complete - Area D/E/
Tech Rm Build-out and Backbone - Area D (1st Flr) Paint - Area D (1st Flr) Ceiling Grid - Area D (1st Flr) Light Fixtures - Area D (1st Flr)
Activity ID
0620A-RMM-1890 0620A-GSC-1910 0620A-ZST-1370 0620A-SAC-1310 0620A-ZSE-2630 0620A-GSC-1980 0620A-ZSE-2670 0620A-FEC-1040 0620A-GSC-2080 0620A-ZSE-2720 0620A-GSC-2090 0620A-ZST-1520 0620A-MPH-2100 0620A-ZST-1580 0620A-GSC-2190 0620A-GSC-2210 0620A-ZST-1680 0620A-GSC-2240 0620A-GSC-2250 0620A-ZST-1740 0620A-ZST-1820 0620A-GSC-2570 0620A-GSC-2220 0620A-ALL-1280 Area E (1st Flr) 0620A-GSC-1670 0620A-GSC-1700 0620A-ZSE-2440 0620A-RMM-1780 0620A-ZST-1300 0620A-GSC-1760 0620A-SAC-1260 0620A-ZSE-2480 0620A-GSC-1840 0620A-ZSE-2550 0620A-FEC-1020 0620A-ZSE-2570 0620A-GSC-1900 0620A-ZST-1400 0620A-GSC-1940 0620A-ZST-1430 0620A-MPH-2060 0620A-ZST-1720 0620A-GSC-2000 0620A-GSC-2040 0620A-GSC-2060 0620A-GSC-2070 0620A-ZST-1790 0620A-GSC-2050 Area F (1st Flr) 0620A-ZST-1070 0620A-GSC-1560 0620A-GSC-1570 0620A-ZSE-2350 0620A-RMM-1700 0620A-GSC-1660 0620A-ZST-1250
Activity Name
Orig Start Dur
HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr) Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 17 of 25
6 10 10 3 3 10 5 8 15 1 5 5 10 5 10 3 5 5 6 5 10 10 5 0 57 12 12 7 6 5 10 3 4 10 3 8 1 15 2 5 2 10 2 10 3 4 6 4 5 94 5 12 12 10 6 8 10
12-26-14 12-30-14 12-30-14 12-31-14 01-06-15 01-06-15 01-09-15 01-12-15 01-14-15 01-16-15 01-20-15 01-20-15 01-20-15 01-27-15 01-28-15 02-03-15 02-03-15 02-04-15 02-04-15 02-10-15 02-17-15 03-03-15 03-06-15 12-30-14 12-30-14 01-02-15 01-13-15 01-14-15 01-16-15 01-16-15 01-19-15 01-22-15 01-22-15 01-28-15 01-28-15 02-02-15 02-04-15 02-05-15 02-05-15 02-09-15 02-10-15 02-17-15 02-18-15 02-24-15 02-25-15 02-25-15 03-03-15 03-13-15 11-18-14 11-18-14 01-16-15 01-20-15 01-26-15 01-30-15 02-03-15 02-03-15
Finish
01-05-15 01-13-15 01-13-15 01-05-15 01-08-15 01-19-15 01-15-15 01-21-15 02-03-15 01-16-15 01-26-15 01-26-15 02-02-15 02-02-15 02-10-15 02-05-15 02-09-15 02-10-15 02-11-15 02-16-15 03-02-15 03-16-15 03-12-15 04-01-15 03-19-15 01-15-15 01-19-15 01-21-15 01-21-15 01-22-15 01-29-15 01-21-15 01-27-15 02-04-15 01-30-15 02-06-15 02-02-15 02-24-15 02-06-15 02-11-15 02-10-15 02-23-15 02-18-15 03-03-15 02-26-15 03-02-15 03-04-15 03-06-15 03-19-15 04-01-15 11-24-14 02-02-15 02-04-15 02-06-15 02-06-15 02-12-15 02-16-15
Late Start
02-06-15 02-18-15 03-24-15 02-11-15 05-15-15 02-16-15 06-10-15 03-04-15 03-18-15 07-07-15 03-26-15 04-09-15 04-28-15 04-16-15 04-30-15 05-21-15 04-23-15 06-15-15 05-04-15 04-30-15 05-07-15 06-29-15 06-08-15 01-19-15 01-19-15 01-21-15 02-19-15 02-20-15 04-08-15 03-04-15 02-25-15 05-20-15 03-02-15 06-17-15 03-16-15 07-08-15 04-09-15 04-27-15 04-08-15 05-04-15 05-12-15 05-18-15 05-14-15 05-27-15 06-22-15 05-12-15 05-21-15 06-15-15 01-07-15 01-07-15 02-04-15 02-06-15 03-02-15 03-06-15 03-18-15 04-15-15
Late Finish 02-13-15 03-03-15 04-07-15 02-13-15 05-19-15 02-27-15 06-16-15 03-13-15 04-08-15 07-07-15 04-01-15 04-15-15 05-11-15 04-22-15 05-13-15 05-26-15 04-29-15 06-19-15 05-11-15 05-06-15 05-20-15 07-10-15 06-12-15 07-10-15 07-08-15 02-03-15 02-05-15 02-27-15 02-27-15 04-14-15 03-17-15 02-27-15 05-26-15 03-13-15 06-19-15 03-25-15 07-08-15 04-29-15 04-28-15 04-14-15 05-05-15 05-26-15 05-19-15 05-28-15 05-29-15 06-25-15 05-19-15 05-27-15 06-19-15 07-09-15 01-13-15 02-19-15 02-23-15 03-13-15 03-13-15 03-27-15 04-28-15
Total Free Float Float 29 35 59 29 92 29 106 37 45 120 47 56 69 56 65 76 56 91 62 56 56 82 64 70 77 13 13 27 27 57 33 27 83 27 98 33 110 45 56 43 59 64 63 60 64 81 53 56 64 69 33 13 13 25 25 31 50
0 0 2 0 0 0 0 0 0 10 2 0 0 0 5 12 0 10 9 0 0 12 0 0 0 0 0 0 0 7 2 0 0 0 0 2 15 0 0 5 4 0 8 1 0 6 4 8 4 0 0 0 0 0 0 4 2
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
2015 J F M A M J Jul A S O N D J HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr)
Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)
F
2016 M A M J
Activity ID
0620A-SAC-1230 0620A-GSC-1710 0620A-ZSE-2400 0620A-FEC-1000 0620A-ZSE-2450 0620A-GSC-1750 0620A-ZST-1290 0620A-ZSE-2460 0620A-GSC-1740 0620A-ZST-1330 0620A-MPH-2000 0620A-ZST-1600 0620A-GSC-1850 0620A-GSC-1870 0620A-GSC-1880 0620A-ZST-1670 0620A-ZST-1730 Second Floor Area G (2nd Flr) 0620A-GSC-2100 0620A-GSC-2280 0620A-ZSE-2850 0620A-RMM-2160 0620A-GSC-2260 0620A-ZST-1660 0620A-SAC-1390 0620A-ZSE-2900 0620A-GSC-2380 0620A-ZSE-2950 0620A-FEC-1080 0620A-GSC-2580 0620A-GSC-2400 0620A-ZSE-2970 0620A-GSC-2820 0620A-ZST-1920 0620A-MPH-2260 0620A-ZST-2050 0620A-ZST-2070 0620A-GSC-2930 0620A-GSC-2940 0620A-GSC-2950 0620A-GSC-2960 0620A-ZST-2140 0620A-GSC-2910 0620A-ALL-1320 Area H (2nd Flr) 0620A-ZST-1690 0620A-GSC-1950 0620A-GSC-2110 0620A-ZSE-2800 0620A-RMM-2060 0620A-ZST-1550 0620A-GSC-2180 0620A-SAC-1350 0620A-ZSE-2840 0620A-GSC-2320 0620A-FEC-1060
Activity Name
Orig Start Dur
Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)
Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 18 of 25
3 8 8 8 3 5 5 1 10 5 8 5 8 3 6 5 10 119 80 12 12 7 6 10 10 3 3 10 3 8 10 5 1 15 5 10 3 5 3 4 5 6 10 10 0 111 10 12 12 9 6 7 10 3 7 10 8
02-04-15 02-09-15 02-09-15 02-11-15 02-19-15 02-19-15 02-19-15 02-24-15 02-25-15 02-26-15 03-03-15 03-05-15 03-05-15 03-11-15 03-11-15 03-12-15 03-19-15 12-08-14 02-03-15 02-03-15 02-05-15 02-16-15 02-17-15 02-19-15 02-19-15 02-20-15 02-25-15 02-25-15 03-02-15 03-03-15 03-03-15 03-04-15 03-05-15 03-05-15 03-11-15 03-12-15 03-18-15 03-23-15 03-26-15 03-26-15 03-26-15 03-26-15 04-02-15 04-17-15 12-08-14 12-08-14 02-19-15 02-23-15 02-26-15 03-05-15 03-09-15 03-09-15 03-10-15 03-11-15 03-13-15 03-19-15
Finish
02-06-15 02-18-15 02-18-15 02-20-15 02-23-15 02-25-15 02-25-15 02-24-15 03-10-15 03-04-15 03-12-15 03-11-15 03-16-15 03-13-15 03-18-15 03-18-15 04-01-15 05-27-15 05-27-15 02-18-15 02-20-15 02-24-15 02-24-15 03-04-15 03-04-15 02-24-15 02-27-15 03-10-15 03-04-15 03-12-15 03-16-15 03-10-15 03-05-15 03-25-15 03-17-15 03-25-15 03-20-15 03-27-15 03-30-15 03-31-15 04-01-15 04-02-15 04-16-15 04-30-15 05-27-15 05-14-15 12-19-14 03-06-15 03-10-15 03-10-15 03-12-15 03-17-15 03-20-15 03-12-15 03-19-15 03-26-15 03-30-15
Late Start
03-11-15 03-16-15 05-27-15 03-26-15 06-22-15 04-15-15 04-29-15 07-09-15 04-30-15 05-06-15 05-29-15 05-13-15 05-29-15 06-26-15 05-20-15 05-20-15 05-28-15 02-20-15 02-20-15 02-20-15 02-24-15 03-17-15 03-18-15 03-30-15 05-08-15 03-23-15 06-08-15 03-26-15 06-25-15 04-08-15 07-06-15 04-22-15 07-10-15 04-14-15 05-22-15 05-14-15 06-01-15 06-04-15 06-22-15 06-30-15 06-22-15 05-29-15 06-11-15 06-03-15 03-10-15 06-08-15 03-10-15 03-12-15 03-27-15 04-01-15 06-01-15 04-21-15 04-07-15 06-11-15 04-10-15 04-20-15
Late Finish 03-13-15 03-25-15 06-05-15 04-07-15 06-24-15 04-21-15 05-05-15 07-09-15 05-13-15 05-12-15 06-09-15 05-19-15 06-09-15 06-30-15 05-28-15 05-27-15 06-10-15 07-17-15 07-17-15 03-09-15 03-11-15 03-25-15 03-25-15 04-13-15 05-21-15 03-25-15 06-10-15 04-09-15 06-29-15 04-17-15 07-17-15 04-28-15 07-10-15 05-04-15 05-29-15 05-28-15 06-03-15 06-10-15 06-24-15 07-03-15 06-26-15 06-05-15 06-24-15 06-16-15 07-17-15 07-17-15 06-19-15 03-25-15 03-27-15 04-09-15 04-09-15 06-09-15 05-04-15 04-09-15 06-19-15 04-23-15 04-29-15
Total Free Float Float 25 25 75 31 85 38 48 95 45 48 61 48 59 75 49 48 48 37 37 13 13 21 21 27 55 21 71 21 81 25 87 34 89 27 51 44 51 51 60 66 60 44 48 32 37 45 126 13 13 21 19 58 30 19 64 19 21
0 0 0 6 0 4 0 6 0 0 39 0 12 13 5 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 50 7 13 0 0 0 0 3 0 11 9 9 0 0 0 0 17 0 0 0 0 5 2 0 0 0 2
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D J Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)
F
Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)
2016 M A M J
Activity ID
0620A-ZSE-2890 0620A-ZSE-2920 0620A-GSC-2660 0620A-GSC-2370 0620A-ZST-1810 0620A-MPH-2240 0620A-ZST-1860 0620A-ZST-1910 0620A-GSC-2780 0620A-GSC-2790 0620A-GSC-2800 0620A-GSC-2810 0620A-ZST-2060 0620A-ZST-2150 0620A-GSC-2760 Area I (2nd Flr) 0620A-GSC-1810 0620A-GSC-1960 0620A-ZSE-2660 0620A-RMM-1950 0620A-ZST-1500 0620A-GSC-2010 0620A-SAC-1340 0620A-ZSE-2740 0620A-GSC-2160 0620A-FEC-1050 0620A-ZSE-2760 0620A-ZSE-2780 0620A-GSC-2200 0620A-ZST-1620 0620A-GSC-2520 0620A-ZST-1700 0620A-ZST-1780 0620A-MPH-2200 0620A-ZST-1930 0620A-GSC-2640 0620A-GSC-2650 0620A-GSC-2700 Third Floor Area G (3rd Flr) 0620A-GSC-2590 0620A-GSC-2270 0620A-ZST-2160 0620A-GSC-2830 0620A-GSC-2740 0620A-ZSE-3210 0620A-RMM-2350 0620A-SAC-1500 0620A-ZSE-3220 0620A-GSC-2970 0620A-ZSE-3240 0620A-ZSE-3250 0620A-FEC-1130 0620A-GSC-3020 0620A-GSC-3040 0620A-ZST-2280 0620A-MPH-2290
Activity Name
Orig Start Dur
Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr)
3 1 15 5 5 10 3 3 3 5 6 6 7 10 10 56 12 12 10 6 7 8 3 5 8 8 3 1 5 5 12 3 3 8 7 3 6 8 89 89 10 12 10 12 10 7 6 3 2 10 2 1 8 15 5 5 10
Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)
Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 19 of 25
03-20-15 03-25-15 03-26-15 03-27-15 03-27-15 04-01-15 04-03-15 04-09-15 04-16-15 04-16-15 04-17-15 04-17-15 04-17-15 04-28-15 05-01-15 03-09-15 03-09-15 03-11-15 03-17-15 03-23-15 03-25-15 03-25-15 03-26-15 03-31-15 03-31-15 04-02-15 04-08-15 04-13-15 04-13-15 04-13-15 04-17-15 04-20-15 04-23-15 04-23-15 04-28-15 05-05-15 05-05-15 05-15-15 03-03-15 03-03-15 03-03-15 03-12-15 03-30-15 04-03-15 04-10-15 04-15-15 04-16-15 04-21-15 04-24-15 04-24-15 04-28-15 04-30-15 04-30-15 05-04-15 05-08-15 05-08-15 05-08-15
Finish
03-24-15 03-25-15 04-16-15 04-02-15 04-02-15 04-15-15 04-08-15 04-13-15 04-20-15 04-22-15 04-24-15 04-24-15 04-27-15 05-11-15 05-14-15 05-27-15 03-24-15 03-26-15 03-30-15 03-30-15 04-02-15 04-03-15 03-30-15 04-07-15 04-10-15 04-14-15 04-10-15 04-13-15 04-17-15 04-17-15 05-04-15 04-22-15 04-27-15 05-04-15 05-06-15 05-07-15 05-12-15 05-27-15 07-07-15 07-07-15 03-16-15 03-27-15 04-13-15 04-21-15 04-23-15 04-23-15 04-23-15 04-23-15 04-27-15 05-07-15 04-29-15 04-30-15 05-11-15 05-22-15 05-14-15 05-14-15 05-21-15
Late Start
06-30-15 07-13-15 05-05-15 05-08-15 06-10-15 05-29-15 06-17-15 06-22-15 06-29-15 06-29-15 06-08-15 07-06-15 06-25-15 07-06-15 06-17-15 03-26-15 03-26-15 03-30-15 04-10-15 04-16-15 06-15-15 05-14-15 04-21-15 06-22-15 04-24-15 04-30-15 07-03-15 07-14-15 05-15-15 06-24-15 05-27-15 07-01-15 07-06-15 06-12-15 07-09-15 07-14-15 06-16-15 07-01-15 04-14-15 04-14-15 06-10-15 04-14-15 05-12-15 04-16-15 04-30-15 04-27-15 04-28-15 05-01-15 06-29-15 05-06-15 07-08-15 07-15-15 05-12-15 05-14-15 05-22-15 05-27-15 06-10-15
Late Finish 07-02-15 07-13-15 05-26-15 05-14-15 06-16-15 06-11-15 06-19-15 06-24-15 07-01-15 07-03-15 06-15-15 07-13-15 07-03-15 07-17-15 06-30-15 07-17-15 04-13-15 04-15-15 04-23-15 04-23-15 06-23-15 05-26-15 04-23-15 06-26-15 05-05-15 05-11-15 07-07-15 07-14-15 05-21-15 06-30-15 06-11-15 07-03-15 07-08-15 06-23-15 07-17-15 07-16-15 06-23-15 07-10-15 07-17-15 07-17-15 06-23-15 04-29-15 05-26-15 05-01-15 05-13-15 05-05-15 05-05-15 05-05-15 06-30-15 05-19-15 07-09-15 07-15-15 05-21-15 06-04-15 05-29-15 06-02-15 06-23-15
Total Free Float Float 70 76 27 29 51 40 51 51 51 51 35 55 48 48 32 37 13 13 17 17 56 35 17 57 17 19 61 65 24 51 27 51 51 35 51 49 29 32 8 8 69 22 30 8 14 8 8 8 45 8 50 53 8 8 10 12 22
0 11 0 5 0 0 0 3 0 18 6 6 0 11 0 0 0 0 0 0 5 8 0 0 0 8 0 12 7 0 0 0 0 16 14 13 8 0 0 0 48 0 2 0 0 0 0 0 0 0 0 16 0 0 2 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr) Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)
Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)
Activity ID
0620A-GSC-3070 0620A-ZST-2300 0620A-GSC-3100 0620A-GSC-3110 0620A-ZST-2320 0620A-GSC-3120 0620A-GSC-3130 0620A-ZST-2340 0620A-ALL-1380 Area H (3rd Flr) 0620A-GSC-2170 0620A-ZST-2100 0620A-GSC-2530 0620A-GSC-2610 0620A-ZSE-3150 0620A-RMM-2310 0620A-SAC-1480 0620A-ZSE-3170 0620A-GSC-2710 0620A-FEC-1120 0620A-ZSE-3190 0620A-ZSE-3200 0620A-GSC-2750 0620A-GSC-2770 0620A-ZST-2230 0620A-MPH-2250 0620A-ZST-2240 0620A-ZST-2250 0620A-GSC-2860 0620A-ZST-2260 0620A-GSC-2880 0620A-GSC-2890 0620A-GSC-2980 0620A-GSC-2990 Area I (3rd Flr) 0620A-GSC-1990 0620A-ZST-2000 0620A-GSC-2510 0620A-GSC-2340 0620A-ZSE-2940 0620A-RMM-2200 0620A-SAC-1440 0620A-ZSE-3010 0620A-GSC-2430 0620A-FEC-1090 0620A-ZSE-3060 0620A-ZSE-3090 0620A-GSC-2540 0620A-ZST-2090 0620A-GSC-2620 0620A-ZST-2130 0620A-MPH-2220 0620A-ZST-2170 0620A-GSC-2670 0620A-ZST-2190 0620A-GSC-2720 0620A-GSC-2730
Activity Name
Orig Start Dur
Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr
3 3 10 5 5 4 6 10 0 67 12 7 12 10 9 6 3 5 10 8 3 1 15 5 5 10 3 3 10 7 6 6 3 5 58 12 7 8 12 10 6 3 5 8 8 2 1 5 5 10 3 8 3 8 7 3 6
Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 20 of 25
05-15-15 05-15-15 05-18-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 03-30-15 03-30-15 04-16-15 04-23-15 04-24-15 04-30-15 05-05-15 05-08-15 05-13-15 05-13-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 05-28-15 06-01-15 06-04-15 06-09-15 06-09-15 06-12-15 06-16-15 06-16-15 06-26-15 06-26-15 04-16-15 04-16-15 05-04-15 05-08-15 05-11-15 05-15-15 05-21-15 05-27-15 06-01-15 06-01-15 06-03-15 06-08-15 06-10-15 06-11-15 06-11-15 06-16-15 06-18-15 06-22-15 06-23-15 06-24-15 06-26-15 06-30-15 06-30-15
Finish
05-19-15 05-19-15 06-01-15 05-26-15 05-27-15 05-29-15 06-02-15 06-10-15 07-07-15 07-02-15 04-15-15 04-24-15 05-08-15 05-07-15 05-12-15 05-12-15 05-12-15 05-19-15 05-27-15 05-29-15 05-22-15 05-26-15 06-15-15 06-03-15 06-03-15 06-12-15 06-08-15 06-11-15 06-22-15 06-22-15 06-23-15 06-23-15 06-30-15 07-02-15 07-07-15 05-01-15 05-12-15 05-19-15 05-27-15 05-29-15 05-29-15 05-29-15 06-05-15 06-10-15 06-12-15 06-09-15 06-10-15 06-17-15 06-17-15 06-29-15 06-22-15 07-01-15 06-25-15 07-03-15 07-06-15 07-02-15 07-07-15
Late Start
07-03-15 06-03-15 06-10-15 07-06-15 06-08-15 07-01-15 06-24-15 06-15-15 05-01-15 05-01-15 06-03-15 05-05-15 05-21-15 05-14-15 05-19-15 05-22-15 07-01-15 05-28-15 06-03-15 07-10-15 07-16-15 06-05-15 06-15-15 06-12-15 06-24-15 06-19-15 06-24-15 06-24-15 06-29-15 07-02-15 07-07-15 07-13-15 07-13-15 05-19-15 05-19-15 06-12-15 06-16-15 05-21-15 05-28-15 06-03-15 06-08-15 07-08-15 06-11-15 06-24-15 07-15-15 07-17-15 06-29-15 06-23-15 06-26-15 06-30-15 07-08-15 07-03-15 07-08-15 07-08-15 07-15-15 07-10-15
Late Finish 07-07-15 06-05-15 06-23-15 07-10-15 06-12-15 07-06-15 07-01-15 06-26-15 07-17-15 07-17-15 05-18-15 06-11-15 05-20-15 06-04-15 05-27-15 05-27-15 05-27-15 07-07-15 06-10-15 06-12-15 07-14-15 07-16-15 06-25-15 06-19-15 06-18-15 07-07-15 06-23-15 06-26-15 07-07-15 07-07-15 07-09-15 07-14-15 07-15-15 07-17-15 07-17-15 06-04-15 06-22-15 06-25-15 06-08-15 06-10-15 06-10-15 06-10-15 07-14-15 06-22-15 07-03-15 07-16-15 07-17-15 07-03-15 06-29-15 07-09-15 07-02-15 07-17-15 07-07-15 07-17-15 07-16-15 07-17-15 07-17-15
Total Free Float Float 34 12 16 33 12 26 21 12 8 11 23 33 8 19 10 10 10 34 10 10 36 37 8 12 11 17 11 11 11 11 12 15 11 11 8 23 28 26 8 8 8 8 27 8 15 27 27 12 8 8 8 12 8 10 8 11 8
2 0 5 22 0 11 9 1 0 0 0 5 0 0 0 0 0 0 0 2 0 10 0 4 0 5 0 0 1 3 4 4 0 0 0 0 20 18 0 0 0 0 0 0 7 0 19 4 0 0 0 4 0 2 0 3 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)
Activity ID
One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-SAC-1400 0620A-GSC-2360 0620A-ZSE-2990 0620A-RMM-2220 0620A-ZSE-3000 0620A-ZSE-3030 0620A-GSC-2450 0620A-ZSE-3070 0620A-ZSE-3110 0620A-ZSE-3160 0620A-ZST-1880 0620A-ZST-1900 0620A-ZST-1940 0620A-ZST-2020 0620A-ZST-2080 0620A-GSC-2410 0620A-GSC-2560 0620A-GSC-2680 0620A-GSC-2840 0620A-GSC-2870 0620A-GSC-3030 0620A-ZSE-3390 0620A-ALL-1340 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-1290 0620A-GSC-1680 0620A-RMM-1770 0620A-ZSE-2420 0620A-SAC-1250 0620A-ZST-1060 0620A-GSC-1370 0620A-ZSE-2470 0620A-GSC-1830 0620A-ZSE-2530 0620A-FEC-1010 0620A-GSC-1890 0620A-ZSE-2580 0620A-ZST-1380 0620A-ZST-1440 0620A-ZSE-2650 0620A-ZST-1490 0620A-MPH-2030 0620A-ZST-1540 0620A-GSC-2120 0620A-GSC-2130 0620A-SSI-1020 0620A-GSC-2150 0620A-ZST-1560 0620A-ZST-1610 0620A-SSI-1030 0620A-GSC-2020 0620A-GSC-3210 Area B (Low Roof)
Activity Name
Orig Start Dur
Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)
Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 21 of 25
175 107 107 3 7 4 5 1 5 8 1 8 3 1 1 1 1 1 5 5 27 5 15 2 4 0 85 85 12 12 6 8 6 5 10 3 10 5 8 18 6 4 5 18 5 13 3 5 6 7 20 5 5 3 5 10 53
11-06-14 01-28-15 01-28-15 01-28-15 02-02-15 02-11-15 02-11-15 02-17-15 02-18-15 02-18-15 02-25-15 03-02-15 03-12-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 03-26-15 04-02-15 04-10-15 05-19-15 06-03-15 06-24-15 06-24-15 11-06-14 11-06-14 11-06-14 11-10-14 11-18-14 11-18-14 11-20-14 11-24-14 11-24-14 12-01-14 12-01-14 12-04-14 12-05-14 12-09-14 12-11-14 12-15-14 12-19-14 12-19-14 12-29-14 01-05-15 01-06-15 01-06-15 01-06-15 01-06-15 01-06-15 01-09-15 01-16-15 01-22-15 01-22-15 02-24-15 11-24-14
Finish
07-15-15 06-29-15 06-29-15 01-30-15 02-10-15 02-16-15 02-17-15 02-17-15 02-24-15 02-27-15 02-25-15 03-11-15 03-16-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 04-01-15 04-09-15 05-18-15 05-26-15 06-23-15 06-25-15 06-29-15 06-29-15 03-09-15 03-09-15 11-21-14 11-25-14 11-25-14 11-28-14 11-28-14 12-01-14 12-08-14 12-03-14 12-12-14 12-10-14 12-16-14 01-05-15 12-18-14 12-18-14 12-26-14 01-15-15 01-05-15 01-21-15 01-08-15 01-12-15 01-13-15 01-14-15 02-02-15 01-15-15 01-22-15 01-26-15 01-28-15 03-09-15 02-09-15
Late Start
12-15-14 02-11-15 02-11-15 02-11-15 02-16-15 03-23-15 03-19-15 03-27-15 03-30-15 03-26-15 04-07-15 04-08-15 04-20-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-09-15 04-16-15 04-23-15 06-02-15 06-16-15 07-09-15 07-07-15 12-15-14 12-15-14 12-15-14 12-17-14 01-06-15 12-29-14 01-06-15 02-27-15 01-08-15 01-09-15 01-14-15 01-14-15 01-20-15 01-22-15 01-21-15 03-06-15 03-12-15 01-29-15 03-19-15 04-09-15 03-26-15 06-16-15 06-10-15 04-10-15 02-25-15 03-31-15 06-22-15 07-01-15 05-22-15 04-09-15 01-02-15
Late Finish 07-24-15 07-10-15 07-10-15 02-13-15 02-24-15 03-26-15 03-25-15 03-27-15 04-03-15 04-07-15 04-07-15 04-17-15 04-22-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-15-15 04-22-15 06-01-15 06-08-15 07-06-15 07-10-15 07-10-15 07-10-15 07-03-15 07-03-15 12-31-14 01-05-15 01-13-15 01-08-15 01-13-15 03-05-15 01-21-15 01-13-15 01-27-15 01-20-15 01-29-15 02-16-15 01-28-15 03-11-15 03-18-15 02-23-15 03-25-15 04-27-15 03-30-15 06-22-15 06-17-15 04-20-15 03-24-15 04-07-15 06-26-15 07-03-15 05-29-15 04-22-15 07-03-15
Total Free Float Float 7 9 9 10 10 28 26 28 28 26 28 26 26 18 18 18 18 18 9 9 9 9 9 11 9 9 82 82 26 26 32 27 30 66 30 27 30 27 30 30 27 57 57 27 57 67 57 113 109 67 36 57 109 112 85 31 102
0 0 0 0 0 0 0 0 0 0 1 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 13 12 0 0 0 3 30 21 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D
J
F
2016 M A M J
Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)
Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)
Activity ID
0620A-GSC-1380 0620A-GSC-1780 0620A-ZSE-2540 0620A-RMM-1860 0620A-SAC-1300 0620A-GSC-1490 0620A-ZST-1140 0620A-ZSE-2610 0620A-GSC-1970 0620A-ZSE-2640 0620A-FEC-1030 0620A-ZSE-2700 0620A-ZST-1480 0620A-ZST-1510 0620A-GSC-2140 0620A-ZST-1570 0620A-ZST-1590 0620A-ZST-1640 0620A-MPH-2110 0620A-ZST-1760 0620A-GSC-2290 0620A-GSC-2300 0620A-GSC-2310 Area C (Low Roof) 0620A-GSC-1500 0620A-ZST-1220 0620A-GSC-1610 0620A-GSC-2230 0620A-ZSE-2810 0620A-RMM-2140 0620A-SAC-1370 0620A-ZSE-2870 0620A-GSC-2330 0620A-FEC-1070 0620A-GSC-2350 0620A-ZSE-2910 0620A-ZSE-2960 0620A-ZST-1830 0620A-MPH-2190 0620A-GSC-2390 0620A-ZST-1890 0620A-ZST-1960 0620A-GSC-2460 0620A-ZST-2030 0620A-GSC-2470 0620A-GSC-2480 0620A-GSC-2490 0620A-GSC-2500 0620A-ALL-1260 Area C (Aux Gym) Area C (Aux Gym) 0620A-SAC-1410 0620A-GSC-2420 0620A-ZSE-3020 0620A-RMM-2230 0620A-ZSE-3050 0620A-ZSE-3080
Activity Name
Orig Start Dur
Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)
Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 22 of 25
12 12 9 6 4 5 5 1 6 5 8 2 4 5 18 5 3 5 2 5 2 6 5 61 12 5 10 12 9 6 4 5 8 8 18 3 1 4 10 10 5 3 10 5 3 5 3 6 0 104 104 4 5 4 5 1 2
11-24-14 11-26-14 12-04-14 12-09-14 12-11-14 12-11-14 12-11-14 12-17-14 12-17-14 12-18-14 12-19-14 12-26-14 12-26-14 01-02-15 01-06-15 01-09-15 01-16-15 01-21-15 01-22-15 01-28-15 01-30-15 01-30-15 02-03-15 12-11-14 12-11-14 12-30-14 12-30-14 01-08-15 01-16-15 01-20-15 01-22-15 01-29-15 01-29-15 02-02-15 02-04-15 02-05-15 02-10-15 02-10-15 02-10-15 02-10-15 02-16-15 02-23-15 02-23-15 02-26-15 02-27-15 02-27-15 03-02-15 03-02-15 02-02-15 02-02-15 02-02-15 02-11-15 02-18-15 02-18-15 02-24-15 02-25-15
Finish
12-10-14 12-12-14 12-16-14 12-16-14 12-16-14 12-17-14 12-17-14 12-17-14 12-24-14 12-24-14 12-31-14 12-29-14 12-31-14 01-08-15 01-29-15 01-15-15 01-20-15 01-27-15 01-23-15 02-03-15 02-02-15 02-06-15 02-09-15 03-09-15 12-29-14 01-06-15 01-13-15 01-23-15 01-28-15 01-27-15 01-27-15 02-04-15 02-09-15 02-11-15 02-27-15 02-09-15 02-10-15 02-13-15 02-23-15 02-23-15 02-20-15 02-25-15 03-06-15 03-04-15 03-03-15 03-05-15 03-04-15 03-09-15 03-09-15 06-29-15 06-29-15 02-05-15 02-17-15 02-23-15 02-24-15 02-24-15 02-26-15
Late Start
01-02-15 01-06-15 01-16-15 03-03-15 01-30-15 02-10-15 03-06-15 03-17-15 02-11-15 03-18-15 02-13-15 04-01-15 03-13-15 03-19-15 02-17-15 03-26-15 04-02-15 04-08-15 04-28-15 06-29-15 06-23-15 06-18-15 03-25-15 01-20-15 01-20-15 03-20-15 02-27-15 01-22-15 02-24-15 03-11-15 02-05-15 03-18-15 03-09-15 03-11-15 03-13-15 03-25-15 04-03-15 03-27-15 04-30-15 03-19-15 04-02-15 04-10-15 04-01-15 04-15-15 06-01-15 06-01-15 06-25-15 06-26-15 02-19-15 02-19-15 02-19-15 02-25-15 05-19-15 05-15-15 06-04-15 06-05-15
Late Finish 01-19-15 01-21-15 01-28-15 03-10-15 02-04-15 02-16-15 03-12-15 03-17-15 02-18-15 03-24-15 02-24-15 04-02-15 03-18-15 03-25-15 03-12-15 04-01-15 04-07-15 04-14-15 04-29-15 07-03-15 06-24-15 06-25-15 03-31-15 07-03-15 02-04-15 03-26-15 03-12-15 02-06-15 03-06-15 03-18-15 02-10-15 03-24-15 03-18-15 03-20-15 04-08-15 03-27-15 04-03-15 04-01-15 05-13-15 04-01-15 04-09-15 04-14-15 04-15-15 04-21-15 06-03-15 06-05-15 06-29-15 07-03-15 07-03-15 07-17-15 07-17-15 02-24-15 03-03-15 05-22-15 05-21-15 06-04-15 06-08-15
Total Free Float Float 26 26 29 58 34 41 59 62 38 62 38 67 54 54 30 54 54 54 67 106 100 97 36 82 26 57 42 10 27 36 10 34 27 27 27 34 38 33 56 27 33 33 27 33 64 64 81 82 82 14 14 13 10 63 61 70 70
0 0 0 22 0 7 5 0 0 0 8 29 0 0 0 0 0 0 11 24 19 15 9 0 0 24 15 0 0 10 0 0 0 0 0 0 10 0 3 0 0 0 1 3 0 0 3 0 0 0 0 3 0 0 54 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
2015 2016 J F M A M J Jul A S O N D J F M A M J Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)
Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)
Activity ID
Activity Name
Orig Start Dur
0620A-ZSE-3100 Lighting Controls - Area C (Aux Gym) 0620A-GSC-2550 Gym Equipment - Area C (Aux Gym) 0620A-ZST-1950 Tech Terminations - Area C (Aux Gym) 0620A-ZST-1970 Paging Devices - Area C (Aux Gym) 0620A-ZST-2010 Security Devices - Area C (Aux Gym) 0620A-ZST-2040 Tech Devices - Area C (Aux Gym) 0620A-ZST-2110 A/V Devices - Area C (Aux Gym) 0620A-GSC-2440 Misc Finishes - Area C (Aux Gym) 0620A-GSC-2630 Specialties - Area C (Aux Gym) 0620A-GSC-2850 Gym Flooring - Area C (Aux Gym) 0620A-GSC-2920 Gym Floor Striping - Area C (Aux Gym) 0620A-GSC-3000 Doors/ Hardware - Area C (Aux Gym) 0620A-ALL-1330 Substantial Completion - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-GSC-1650 Paint - Area D/E/F (Low Roof) 0620A-ZST-1320 Tech Terminations - Area D/E/F (Low Roof) 0620A-GSC-1790 Misc Finishes - Area D/E/F (Low Roof) 0620A-GSC-2900 Ceiling Grid - Area D/E/F (Low Roof) 0620A-ZSE-3230 Light Fixtures - Area D/E/F (Low Roof) 0620A-RMM-2360 HVAC Ceiling Finishes - Area D/E/F (Low Roof) 0620A-SAC-1510 Fire Protection Heads - Area D/E/F (Low Roof) 0620A-ZSE-3280 Wiring Devices - Area D/E/F (Low Roof) 0620A-GSC-3060 Ceiling Pads - Area D/E/F (Low Roof) 0620A-FEC-1160 Casework - Area D/E/F (Low Roof) 0620A-ZSE-3300 Fire Alarm System - Area D/E/F (Low Roof) 0620A-GSC-3090 Flooring - Area D/E/F (Low Roof) 0620A-ZSE-3320 Lighting Controls - Area D/E/F (Low Roof) 0620A-MPH-2310 Plumbing Fixtures - Area D/E/F (Low Roof) 0620A-ZST-2330 Paging Devices - Area D/E/F (Low Roof) 0620A-GSC-3140 Toilet Partitions - Area D/E/F (Low Roof) 0620A-ZST-2350 Security Devices - Area D/E/F (Low Roof) 0620A-ZST-2360 Tech Devices - Area D/E/F (Low Roof) 0620A-GSC-3170 Specialties - Area D/E/F (Low Roof) 0620A-GSC-3150 Toilet Accessories - Area D/E/F (Low Roof) 0620A-ZST-2380 A/V Devices - Area D/E/F (Low Roof) 0620A-GSC-3180 Doors/ Hardware - Area D/E/F (Low Roof) 0620A-GSC-3190 Furnishings - Area D/E/F (Low Roof) 0620A-ALL-1430 Substantial Completion - Area D/E/F (Low Roof) Site Finishes Site Finishes Entire Site
1 5 1 1 1 1 1 5 5 15 5 2 0 103 103 15 6 10 15 9 10 9 5 10 12 3 25 1 10 3 3 3 3 10 5 6 6 6 0 63 63 63 63 10 20 15 10 15 5 5 5 5 0 95 11 11 11
0620A-NCP-1000 Finish Grading - All 0620A-NCP-1010 Curbs/ Walks - All 0620A-NCP-1020 Pavement - All 0620A-NCP-1030 Seeding/ Planting - All 0620A-ZSE-3270 Site Lighting Rough-in 0620A-NCP-1040 Misc Finishes - All 0620A-NCP-1050 Specialties - All 0620A-ZSE-3330 Light Poles 0620A-ZSE-3350 Emergency Generator 0620A-ALL-1390 Site Substantial Completion Punch List/ Commissioning Commiss Entire Project All Areas
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 23 of 25
02-27-15 03-02-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-02-15 04-10-15 05-19-15 06-10-15 06-26-15 02-19-15 02-19-15 02-19-15 03-12-15 03-12-15 05-04-15 05-12-15 05-13-15 05-14-15 05-26-15 05-28-15 06-01-15 06-02-15 06-03-15 06-05-15 06-09-15 06-18-15 06-23-15 06-23-15 06-26-15 07-01-15 07-03-15 07-07-15 07-08-15 07-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-16-15 05-05-15 05-13-15 05-21-15 06-03-15 06-03-15 06-19-15 06-29-15 03-10-15 07-07-15 07-07-15 07-07-15
Finish
02-27-15 03-06-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-09-15 04-16-15 06-09-15 06-16-15 06-29-15 06-29-15 07-15-15 07-15-15 03-11-15 03-19-15 03-25-15 05-22-15 05-22-15 05-27-15 05-27-15 06-01-15 06-10-15 06-16-15 06-04-15 07-07-15 06-05-15 06-22-15 06-22-15 06-25-15 06-25-15 06-30-15 07-14-15 07-09-15 07-14-15 07-15-15 07-15-15 07-15-15 07-06-15 07-06-15 07-06-15 07-06-15 04-23-15 05-19-15 06-02-15 06-02-15 06-18-15 06-10-15 06-10-15 06-26-15 07-06-15 07-06-15 07-22-15 07-21-15 07-21-15 07-21-15
Late Start
06-09-15 06-03-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-23-15 05-27-15 06-10-15 07-01-15 07-15-15 03-04-15 03-04-15 03-04-15 04-08-15 03-25-15 05-13-15 05-26-15 05-22-15 05-26-15 07-14-15 06-08-15 06-10-15 07-21-15 06-12-15 07-24-15 06-24-15 07-06-15 07-08-15 07-09-15 07-14-15 07-13-15 07-20-15 07-17-15 07-17-15 07-17-15 04-27-15 04-27-15 04-27-15 04-27-15 04-27-15 05-06-15 06-22-15 07-08-15 06-12-15 07-20-15 07-20-15 07-08-15 07-20-15 07-06-15 07-17-15 07-17-15 07-17-15
Late Finish 06-09-15 06-09-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-29-15 06-02-15 06-30-15 07-07-15 07-16-15 07-17-15 07-24-15 07-24-15 03-24-15 04-15-15 04-08-15 06-03-15 06-05-15 06-05-15 06-05-15 07-20-15 06-19-15 06-25-15 07-23-15 07-16-15 07-24-15 07-07-15 07-08-15 07-10-15 07-13-15 07-16-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 05-13-15 06-11-15 07-16-15 07-24-15 07-07-15 07-24-15 07-24-15 07-16-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15
Total Free Float Float 70 65 34 43 47 49 50 14 32 15 15 13 14 7 7 9 18 9 7 9 7 7 35 7 7 35 7 35 11 12 11 12 12 8 11 8 7 7 7 14 14 14 14 11 11 26 31 11 26 26 11 11 14 7 8 8 8
55 50 0 0 0 0 35 0 0 0 2 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 4 1 4 1 0 0 0 0 0 0 0 0 0 0 20 0 15 15 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec Work Days Work Days Work Days Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Lighting Controls - Area C (Aux Gym) Gym Equipment - Area C (Aux Gym) Tech Terminations - Area C (Aux Gym) Paging Devices - Area C (Aux Gym) Security Devices - Area C (Aux Gym) Tech Devices - Area C (Aux Gym) A/V Devices - Area C (Aux Gym) Misc Finishes - Area C (Aux Gym) Specialties - Area C (Aux Gym) Gym Flooring - Area C (Aux Gym) Gym Floor Striping - Area C (Aux Gym) Doors/ Hardware - Area C (Aux Gym) Substantial Completion - Area C (Aux Gym)
Paint - Area D/E/F (Low Roof) Tech Terminations - Area D/E/F (Low Roof) Misc Finishes - Area D/E/F (Low Roof) Ceiling Grid - Area D/E/F (Low Roof) Light Fixtures - Area D/E/F (Low Roof) HVAC Ceiling Finishes - Area D/E/F (Low Roof) Fire Protection Heads - Area D/E/F (Low Roof) Wiring Devices - Area D/E/F (Low Roof) Ceiling Pads - Area D/E/F (Low Roof) Casework - Area D/E/F (Low Roof) Fire Alarm System - Area D/E/F (Low Roof) Flooring - Area D/E/F (Low Roof) Lighting Controls - Area D/E/F (Low Roof) Plumbing Fixtures - Area D/E/F (Low Roof) Paging Devices - Area D/E/F (Low Roof) Toilet Partitions - Area D/E/F (Low Roof) Security Devices - Area D/E/F (Low Roof) Tech Devices - Area D/E/F (Low Roof) Specialties - Area D/E/F (Low Roof) Toilet Accessories - Area D/E/F (Low Roof) A/V Devices - Area D/E/F (Low Roof) Doors/ Hardware - Area D/E/F (Low Roof) Furnishings - Area D/E/F (Low Roof) Substantial Completion - Area D/E/F (Low
Finish Grading - All Curbs/ Walks - All Pavement - All Seeding/ Planting - All Site Lighting Rough-in Misc Finishes - All Specialties - All Light Poles Emergency Generator Site Substantial Completion
Activity ID
0620A-ZSE-3400 0620A-RMM-2410 0620A-ZSE-3410 0620A-ZSE-3420 Academic Area First Floor
Activity Name
Orig Start Dur
Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections
0620A-RMM-2320 0620A-ZSE-3180 0620A-ZST-2200 0620A-MPH-2230 0620A-SAC-1490 0620A-GSC-2690 0620A-CTT-2400 0620A-FEC-1110 0620A-ALL-1290 Second Floor
HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr
0620A-RMM-2370 0620A-ZSE-3260 0620A-ZST-2270 0620A-MPH-2270 0620A-SAC-1520 0620A-GSC-3010 0620A-CTT-2410 0620A-FEC-1140 0620A-ALL-1350 Third Floor
HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd Flr CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr
0620A-RMM-2400 0620A-ZSE-3340 0620A-ZST-2370 0620A-MPH-2320 0620A-SAC-1550 0620A-GSC-3160 0620A-CTT-2440 0620A-FEC-1180 0620A-ALL-1400 One Story Areas Area B (Gym)
HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning - 3rd Flr CT Taylor Punch List/ Commissioning - 3rd Flr Casework Punch List/ Commissioning - 3rd Flr Final Completion - 3rd Flr
0620A-RMM-2380 0620A-ZSE-3290 0620A-ZST-2290 0620A-MPH-2280 0620A-SAC-1530 0620A-GSC-3050 0620A-CTT-2420 0620A-FEC-1150 0620A-ALL-1360 Area A/B/C (1-Story) 0620A-SSI-1040 0620A-RMM-2300 0620A-ZSE-3140 0620A-ZST-2120 0620A-MPH-2210
HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - Area B (Gym) CT Taylor Punch List/ Commissioning - Area B (Gym) Casework Punch List/ Commissioning - Area B (Gym) Final Completion - Area B (Gym)
Kitchen Equipment Punch List/ Commissioning - Area A/B/C (1-Stor HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 24 of 25
5 10 5 1 77 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 10 10 5 5 5 5 5 5 5 5 0 95 5 5 5 5 5 5 5 5 5 5 0 5 5 3 5 5 5 5
07-07-15 07-08-15 07-14-15 07-21-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 03-10-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15
Finish
07-13-15 07-21-15* 07-20-15 07-21-15 07-21-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 07-21-15 07-21-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-21-15 07-22-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 03-16-15 03-16-15 03-12-15 03-16-15 03-16-15 03-16-15 03-16-15
Late Start
07-17-15 07-20-15 07-24-15 07-31-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-06-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-06-15 07-06-15 07-29-15 07-06-15 07-06-15 07-06-15 07-06-15
Late Finish 07-23-15 07-31-15 07-30-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-31-15 07-10-15 07-10-15 07-10-15 07-10-15
Total Free Float Float 8 8 8 8 8 80 80 70 70 70 70 70 70 70 70 80 42 42 37 37 37 37 37 37 37 37 42 8 8 13 13 13 13 13 13 13 13 8 7 19 19 9 9 9 9 9 9 9 9 19 97 97 99 82 82 82 82
0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 0 42 0 0 5 5 5 5 5 5 5 5 8 0 0 0 0 0 0 0 0 0 0 0 19 0 0 2 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections
HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr
HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd F CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr
HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - 3rd Casework Punch List/ Commissioning - 3r Final Completion - 3rd Flr
HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Area Casework Punch List/ Commissioning - Are Final Completion - Area B (Gym)
Kitchen Equipment Punch List/ Commissioning - Area A/B/ HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)
Activity ID
Activity Name
Orig Start Dur
0620A-SAC-1470 0620A-GSC-2600 0620A-CTT-2390 0620A-FEC-1100 0620A-ALL-1270 Area C (Aux Gym)
Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-Story) CT Taylor Punch List/ Commissioning - Area A/B/C (1-Story) Casework Punch List/ Commissioning - Area A/B/C (1-Story) Final Completion - Area A/B/C (1-Story)
0620A-RMM-2390 0620A-ZSE-3310 0620A-ZST-2310 0620A-MPH-2300 0620A-SAC-1540 0620A-GSC-3080 0620A-CTT-2430 0620A-FEC-1170 0620A-ALL-1370 Area D/E/F (1-Story)
HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux Gym) Greenspace Punch List/ Commissioning - Area C (Gym) CT Taylor Punch List/ Commissioning - Area C (Gym) Casework Punch List/ Commissioning - Area C (Gym) Final Completion - Area C (Gym)
0620A-RMM-2420 0620A-ZSE-3360 0620A-ZST-2390 0620A-MPH-2330 0620A-SAC-1560 0620A-GSC-3200 0620A-CTT-2450 0620A-FEC-1190 0620A-ALL-1440 Site Finishes Entire Site 0620A-NCP-1060 0620A-ALL-1410
HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story) Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story) Fire Protection Punch List - Area D/E/F (Low Roof) Greenspace Punch List/ Commissioning - Area D/E/F (1-Story) CT Taylor Punch List/ Commissioning - Area D/E/F (1-Story) Casework Punch List/ Commissioning - Area D/E/F (1-Story) Final Completion - Area D/E/F (1-Story)
Punch List/ Commissioning - Site Final Completion - Site
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 25 of 25
5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 7 7 7 5 0
03-10-15 03-10-15 03-10-15 03-10-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-07-15 07-07-15 07-07-15 07-07-15
Finish
03-16-15 03-16-15 03-16-15 03-16-15 03-16-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-15-15 07-15-15 07-15-15 07-15-15 07-15-15
Late Start
07-06-15 07-06-15 07-06-15 07-06-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15
Late Finish 07-10-15 07-10-15 07-10-15 07-10-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15
Total Free Float Float 82 82 82 82 97 14 14 9 9 9 9 9 9 9 9 14 7 7 7 7 7 7 7 7 7 7 7 12 12 12 11 12
0 0 0 0 97 0 0 2 2 2 2 2 0 0 0 14 0 0 7 7 7 7 7 0 0 0 7 0 0 0 0 12
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A - T/P Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-S CT Taylor Punch List/ Commissioning - Area A/B/C (1-Sto Casework Punch List/ Commissioning - Area A/B/C (1-Sto Final Completion - Area A/B/C (1-Story)
HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux G Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Are Casework Punch List/ Commissioning - Ar Final Completion - Area C (Gym)
HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story Fire Protection Punch List - Area D/E/F (L Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - Ar Casework Punch List/ Commissioning - A Final Completion - Area D/E/F (1-Story)
Punch List/ Commissioning - Site Final Completion - Site
Activity ID
Activity Name
Orig Start Dur
Milestones Entire Project All Areas 0620A-ALL-1000 0620A-ALL-1020 0620A-ALL-1030 0620A-ALL-1040 0620A-ALL-1050 0620A-ALL-1060 0620A-ALL-1070 0620A-ALL-1120 0620A-RMM-1600 0620A-ALL-1250 0620A-ALL-1420 0620A-ALL-1450 Site Mobilization Entire Project All Areas
Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy
0620A-ALL-1010 Site Mobilization Material Procurement Entire Project All Areas 0620A-CTI-1000 0620A-CTT-3000 0620A-CTT-3010 0620A-CTT-3020 0620A-CTT-3030 0620A-GSC-1000 0620A-CTT-3040 0620A-CTI-1020 0620A-GEO-1000 0620A-GEO-1010 0620A-CTT-3050 0620A-CTT-3060 0620A-CTT-3070 0620A-GSC-1010 0620A-CTT-3080 0620A-GEO-1020 0620A-GEO-1030 0620A-CTI-1040 0620A-RMM-1000 0620A-GEO-1040 0620A-GEO-1050 0620A-CTT-3090 0620A-CTT-3100 0620A-RMM-1010 0620A-ZSE-1000 0620A-ZSE-1010 0620A-CTT-3110 0620A-ZSE-1090 0620A-RMM-2430 0620A-RMM-1060 0620A-RMM-2440 0620A-ZSE-1570
Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 1 of 25
545 545 545 545 0 0 0 0 0 0 0 0 5 0 0 0 15 15 15 15 15 332 332 332 332 10 10 15 15 15 20 10 10 10 10 10 10 15 10 1 10 10 1 30 1 1 1 1 10 30 50 1 10 1 1 1 1
06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A
11-21-14
06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-25-13 A 06-25-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-10-13 A 07-17-13 A 07-17-13 A 07-17-13 A 07-22-13 A 07-22-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-03-13 A 09-16-13 A 09-16-13 A 10-21-13 11-14-13 02-24-14 04-07-14 05-06-14 05-13-14
Finish
07-31-15 07-31-15 07-31-15 07-31-15 06-11-13 A 06-18-13 A 07-01-13 A 07-22-13 A 09-11-13 A 09-23-13 A 10-25-13 10-23-14 11-28-14 04-16-15 07-15-15 07-31-15* 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 09-30-14 09-30-14 09-30-14 09-30-14 06-24-13 A 06-24-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-09-13 A 07-09-13 A 07-09-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-23-13 A 07-23-13 A 07-17-13 A 07-30-13 A 07-30-13 A 07-22-13 A 08-30-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-16-13 A 11-13-13* 12-12-13 10-21-13 11-27-13 02-24-14 04-07-14 05-06-14 05-13-14
Late Start
10-21-13 10-21-13 10-21-13 10-21-13
01-07-15
10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 02-04-14 03-03-14 02-25-14 03-10-14 03-21-14 06-16-14 06-16-14 07-02-14
Late Finish 07-31-15 07-31-15 07-31-15 07-31-15 10-21-13 10-21-13 11-01-13 10-21-13 10-21-13 10-21-13 11-01-13 11-05-14 01-13-15 05-06-15 07-24-15 07-31-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-10-14 11-10-14 11-10-14 11-10-14 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 03-07-14 05-02-14 02-25-14 03-21-14 03-21-14 06-16-14 06-16-14 07-02-14
Total Free Float Float 0 0 0 0
0 0 0 0
5 9 30 14 7 0
0 2 0 0 7 0 0 0 0 0
29 29 29 29
0 0 0 0
79 98 88 79 19 48 28 35
0 0 0 44 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D
J
F
2016 M A M J
Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy
Site Mobilization -
Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site
Activity ID
0620A-RMM-2450 0620A-RMM-2460 0620A-GSC-1020 Project Coordination Academic Area First Floor
Activity Name
Orig Start Dur
Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site
0620A-RMM-1020 0620A-MPH-1030 0620A-SAC-1000 0620A-ZSE-1100 0620A-ZST-1000 Second Floor
HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)
0620A-RMM-1050 0620A-MPH-1430 0620A-SAC-1030 0620A-ZSE-1350 0620A-ZST-1030 Third Floor
HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)
0620A-RMM-1070 0620A-MPH-1450 0620A-SAC-1040 0620A-ZSE-1370 0620A-ZST-1040 One Story Areas Area A/B/C (1-Story)
HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)
0620A-RMM-1030 0620A-MPH-1300 0620A-SAC-1010 0620A-ZSE-1190 0620A-ZST-1010 Area D/E/F (1-Story)
HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)
0620A-RMM-1040 HVAC Coordination - Area D/E/F (Low Roof) 0620A-MPH-1420 Plumbing Coordination - Area D/E/F (Low Roof) 0620A-SAC-1020 Fire Protection Coordination - Area D/E/F (Low Roof) 0620A-ZSE-1290 Electrical Coordination - Area D/E/F (Low Roof) 0620A-ZST-1020 Tech Coordination - Area D/E/F (Low Roof) Site Preparation/ Rou Rough-in Site Preparation All Areas 0620A-CTI-1010 0620A-CTI-1030 0620A-CTI-1050 0620A-CTI-1070 Site Rough-in All Areas 0620A-CTI-1060 0620A-CTI-1080 0620A-MPH-1330 0620A-MPH-1410
Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)
Storm Sewers Sanitary Sewers Site Water Line Site Gas Line
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 2 of 25
1 1 1 199 199 79 79 30 30 30 30 30 76 76 30 30 30 30 30 76 76 30 30 30 30 30 106 76 76 30 30 30 30 30 76 76 30 30 30 30 30 191 33 33 33 5 3 9 6 169 169 169 25 10 10 10
06-05-14 09-16-14 09-30-14 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 10-11-13 10-25-13 11-08-13 11-22-13 01-28-14 01-28-14 01-28-14 02-19-14 03-05-14 03-19-14 04-02-14 03-11-14 03-11-14 03-11-14 04-02-14 04-16-14 05-01-14 05-15-14 10-31-13 10-31-13 10-31-13 10-31-13 11-22-13 12-09-13 12-23-13 01-08-14 12-13-13 12-13-13 12-13-13 01-08-14 01-22-14 02-05-14 02-19-14 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 07-15-13 A 07-22-13 A 08-07-13 A 07-22-13 A 07-22-13 A 07-22-13 A 07-22-13 A 09-05-13 A 11-05-13 11-21-13
Finish
06-05-14 09-16-14 09-30-14 06-26-14 06-26-14 01-07-14 01-07-14 10-30-13 11-21-13 12-06-13 12-20-13 01-07-14 05-14-14 05-14-14 03-10-14 04-01-14 04-15-14 04-30-14 05-14-14 06-26-14 06-26-14 04-22-14 05-14-14 05-29-14 06-12-14 06-26-14 04-01-14 02-18-14 02-18-14 12-12-13 01-07-14 01-21-14 02-04-14 02-18-14 04-01-14 04-01-14 01-27-14 02-18-14 03-04-14 03-18-14 04-01-14 03-19-14 08-15-13 A 08-15-13 A 08-15-13 A 06-27-13 A 07-17-13 A 08-06-13 A 08-15-13 A 03-19-14 03-19-14 03-19-14 09-04-13 A 09-20-13 A 11-19-13 12-06-13
Late Start
06-17-14 09-25-14 11-10-14 10-23-13 10-23-13 10-23-13 10-23-13 10-23-13 01-10-14 01-24-14 02-07-14 02-21-14 02-07-14 02-07-14 02-07-14 07-14-14 07-28-14 08-11-14 08-25-14 05-19-14 05-19-14 05-19-14 08-25-14 09-09-14 09-23-14 10-07-14 11-12-13 11-12-13 11-12-13 11-12-13 02-21-14 03-07-14 03-21-14 04-04-14 12-26-13 12-26-13 12-26-13 05-30-14 06-13-14 06-27-14 07-14-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-14-13 11-14-13 11-14-13 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 04-14-14
Late Finish 06-17-14 09-25-14 11-10-14 11-17-14 11-17-14 04-03-14 04-03-14 11-11-13 02-20-14 03-06-14 03-20-14 04-03-14 10-06-14 10-06-14 03-20-14 08-22-14 09-08-14 09-22-14 10-06-14 11-17-14 11-17-14 06-30-14 10-06-14 10-20-14 11-03-14 11-17-14 08-22-14 05-16-14 05-16-14 12-24-13 04-03-14 04-17-14 05-02-14 05-16-14 08-22-14 08-22-14 02-06-14 07-11-14 07-25-14 08-08-14 08-22-14 05-05-15 11-14-13 11-14-13 11-14-13 10-21-13 11-14-13 11-14-13 11-14-13 05-05-15 05-05-15 05-05-15 03-27-14 03-27-14 04-11-14 05-02-14
Total Free Float Float 8 7 29 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 100 100 48 100 100 100 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 286
286 286 286
63 63
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A 0620A 0620A 0620A 0620A 0620A 0620A -
T/P T/P T/P T/P T/P T/P T/P
Remaining Work Critical Remaining Work
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site
HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)
HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)
HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)
HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)
HVAC Coordination - Area D/E/F (Low Roof) Plumbing Coordination - Area D/E/F (Low Roof) Fire Protection Coordination - Area D/E/F (Low Roof) Electrical Coordination - Area D/E/F (Low Roof) Tech Coordination - Area D/E/F (Low Roof)
Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)
0 0 0
0 4
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
Storm Sewers Sanitary Sewers Site Water Line Site Gas Line
J
F
2016 M A M J
Activity ID
0620A-ZSE-1250 0620A-CTI-1090 Building Structure Academic Area First Floor Area D (1st Flr) 0620A-CTT-1040 0620A-CTT-1070 0620A-CTT-1110 0620A-CTT-1130 0620A-CTT-1140 0620A-MPH-1130 0620A-MPH-1200 0620A-MPH-1230 0620A-ZSE-3370 0620A-ZSE-1080 0620A-GEO-1090 0620A-GEO-1110 0620A-MPH-1160 0620A-TFC-3020 0620A-CTT-1380 0620A-ZSE-1330 0620A-CTT-1390 0620A-ZSE-1360 0620A-CVS-1050 0620A-CVS-1080 0620A-ZSE-1470 0620A-ALL-1090 0620A-CTT-1650 Area E (1st Flr) 0620A-CTT-1020 0620A-CTT-1030 0620A-CTT-1080 0620A-CTT-1100 0620A-CTT-1150 0620A-MPH-1110 0620A-MPH-1120 0620A-MPH-1140 0620A-ZSE-1050 0620A-ZSE-1060 0620A-GEO-1080 0620A-GEO-1100 0620A-MPH-1100 0620A-TFC-3010 0620A-CTT-1360 0620A-ZSE-1210 0620A-CTT-1370 0620A-ZSE-1280 0620A-CVS-1030 0620A-CVS-1040 0620A-ZSE-1380 0620A-CTT-1570 Area F (1st Flr) 0620A-CTT-1000 0620A-CTT-1010 0620A-CTT-1050 0620A-CTT-1060
Activity Name
Orig Start Dur
Utility Ductbank Finish Earthwork
Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr) Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr) Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 3 of 25
10 15 347 347 261 208 4 2 4 2 8 5 1 3 7 3 2 5 2 5 7 7 12 12 15 5 5 0 5 241 4 4 3 3 10 5 1 3 7 7 2 5 2 5 7 7 15 15 15 5 5 5 261 4 2 4 3
12-13-13 02-21-14 07-25-13 A 07-25-13 A 07-25-13 A 08-15-13 A 08-15-13 A 08-21-13 A 09-02-13 A 09-09-13 A 09-09-13 A 09-30-13 A 10-04-13 A 10-04-13 A 10-11-13 10-21-13 10-25-13 10-29-13 11-06-13 11-06-13 11-14-13 11-14-13 11-26-13 11-26-13 01-17-14 02-26-14 02-26-14 06-04-14 08-01-13 A 08-01-13 A 08-08-13 A 08-22-13 A 08-27-13 A 09-09-13 A 09-23-13 A 09-27-13 A 09-27-13 A 10-22-13 10-25-13 11-06-13 11-08-13 11-18-13 11-18-13 12-23-13 12-23-13 01-17-14 01-17-14 03-07-14 04-03-14 04-03-14 07-07-14 07-25-13 A 07-25-13 A 07-29-13 A 08-13-13 A 08-19-13 A
Finish
01-20-14 03-19-14 12-01-14 12-01-14 07-30-14 06-10-14 09-03-13 A 08-30-13 A 09-06-13 A 09-10-13 A 09-13-13 A 10-04-13 A 10-04-13 A 10-08-13 A 10-22-13 10-23-13 10-28-13 11-05-13 11-07-13 11-13-13 11-25-13 11-25-13 12-13-13 12-13-13 02-25-14 03-06-14 03-06-14 05-09-14 06-10-14 07-14-14 08-08-13 A 08-15-13 A 08-26-13 A 08-30-13 A 09-09-13 A 09-27-13 A 09-27-13 A 10-01-13 A 10-31-13 11-05-13 11-07-13 11-15-13 11-19-13 11-25-13 01-16-14 01-16-14 02-25-14 02-25-14 04-02-14 04-10-14 04-10-14 07-14-14 07-30-14 08-05-13 A 08-06-13 A 08-16-13 A 08-21-13 A
Late Start
05-05-14 04-09-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-21-13 10-29-13 11-01-13 11-06-13 11-14-13 11-14-13 11-22-13 11-22-13 12-05-13 12-05-13 02-26-14 03-26-14 06-24-14 06-24-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-08-13 11-13-13 11-26-13 12-02-13 12-09-13 12-09-13 01-13-14 01-13-14 01-28-14 01-28-14 03-25-14 05-28-14 07-30-14 07-30-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13
Late Finish 05-20-14 05-05-15 03-17-15 03-17-15 09-12-14 07-02-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-30-13 10-31-13 11-05-13 11-13-13 11-15-13 11-21-13 12-04-13 12-04-13 01-10-14 01-10-14 03-25-14 04-02-14 07-02-14 06-17-14 07-02-14 08-07-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-19-13 11-22-13 11-27-13 12-06-13 12-10-13 12-13-13 01-27-14 01-27-14 03-06-14 03-06-14 04-17-14 06-05-14 08-07-14 08-07-14 09-12-14 10-21-13 10-21-13 10-21-13 10-21-13
Total Free Float Float 59 198 74 74 31 16
5 5 5 5 5 5 5 5 5 5 15 15 64 26 12 18
11 11 12 12 12 12 5 5 5 5 9 29 64 14 31
15 187 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 15 19 5 0
0 0 0 0 0 2 0 0 0 0 0 5 5 5 0
Calendar 2013 J Jul A S O N D 0620A - Prec 0620A - T/P
Remaining Work Critical Remaining Work
2014 F M A M J Jul A S O N D Utility Ductbank Finish Earthwork
J
2015 F M A M J Jul A S O N D
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec
Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr)
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr)
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
F
2016 M A M J
Activity ID
0620A-CTT-1090 0620A-MPH-1000 0620A-MPH-2370 0620A-MPH-1080 0620A-MPH-1090 0620A-GEO-1240 0620A-ZSE-1030 0620A-ZSE-1040 0620A-GEO-1060 0620A-GEO-1070 0620A-MPH-1020 0620A-TFC-3000 0620A-CTT-1300 0620A-ZSE-1160 0620A-CTT-1330 0620A-ZSE-1180 0620A-CVS-1010 0620A-ZSE-1310 0620A-CVS-1020 0620A-CTT-1470 Second Floor Area G (2nd Flr) 0620A-MPH-1480 0620A-ZSE-1480 0620A-TFC-3090 0620A-CTT-1490 0620A-ZSE-1530 0620A-CTT-1550 0620A-ZSE-1560 0620A-CVS-1140 0620A-CVS-1160 0620A-ZSE-1710 0620A-CTT-2110 0620A-ALL-1100 Area H (2nd Flr) 0620A-MPH-1460 0620A-ZSE-1390 0620A-TFC-3060 0620A-CTT-1420 0620A-ZSE-1450 0620A-CTT-1460 0620A-ZSE-1490 0620A-CVS-1110 0620A-CVS-1130 0620A-ZSE-1600 0620A-CTT-1950 Area I (2nd Flr) 0620A-MPH-1440 0620A-ZSE-1340 0620A-TFC-3040 0620A-CTT-1400 0620A-ZSE-1400 0620A-CTT-1410 0620A-ZSE-1420 0620A-CVS-1070 0620A-ZSE-1520 0620A-CVS-1090
Activity Name
Orig Start Dur
Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)
Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 4 of 25
7 4 2 1 3 1 7 5 2 5 2 5 5 5 15 15 10 3 5 5 176 176 2 5 5 7 7 10 10 15 5 5 5 0 140 2 8 5 8 8 10 10 15 5 5 5 138 2 5 5 5 5 10 10 10 3 5
08-26-13 A 10-14-13* 10-21-13* 10-22-13 10-22-13 10-23-13 10-31-13 11-06-13 11-14-13 11-18-13 11-26-13 11-26-13 02-26-14 02-26-14 03-07-14 03-07-14 04-03-14 04-22-14 04-22-14 07-23-14 02-26-14 02-26-14 02-26-14 02-26-14 03-07-14 04-03-14 04-03-14 04-15-14 04-15-14 05-06-14 06-04-14 06-04-14 08-29-14 04-03-14 04-03-14 04-03-14 04-17-14 05-06-14 05-06-14 05-20-14 05-20-14 06-09-14 07-07-14 07-07-14 10-14-14 04-22-14 04-22-14 04-22-14 05-02-14 06-09-14 06-09-14 06-18-14 06-18-14 07-07-14 07-23-14 07-23-14
Finish
08-29-13 A 10-18-13 10-22-13 10-22-13 10-25-13 10-23-13 11-11-13 11-13-13 11-15-13 11-25-13 11-27-13 12-04-13 03-06-14 03-06-14 04-02-14 04-02-14 04-18-14 04-25-14 04-29-14 07-30-14 11-04-14 11-04-14 02-27-14 03-06-14 03-17-14 04-14-14 04-14-14 05-05-14 05-05-14 06-02-14 06-10-14 06-10-14 09-08-14 11-04-14 10-21-14 04-04-14 04-15-14 04-25-14 05-19-14 05-19-14 06-06-14 06-06-14 07-03-14 07-14-14 07-14-14 10-21-14 11-04-14 04-23-14 04-29-14 05-09-14 06-17-14 06-17-14 07-03-14 07-03-14 07-22-14 07-28-14 07-30-14
Late Start
10-21-13 10-25-13 10-31-13 11-19-13 11-19-13 11-05-13 11-19-13 11-25-13 12-10-13 12-12-13 02-18-14 02-26-14 03-07-14 03-07-14 03-18-14 03-18-14 05-09-14 09-09-14 06-06-14 09-05-14 03-26-14 03-26-14 03-28-14 03-26-14 04-03-14 04-11-14 04-11-14 04-25-14 04-25-14 05-19-14 06-17-14 09-19-14 10-10-14 04-18-14 04-29-14 04-18-14 05-06-14 05-15-14 05-15-14 05-30-14 05-30-14 06-19-14 12-02-14 09-29-14 11-07-14 05-30-14 06-04-14 05-30-14 06-09-14 06-18-14 06-18-14 06-25-14 06-25-14 08-11-14 10-08-14 12-09-14
Late Finish 10-21-13 10-30-13 11-01-13 11-19-13 11-22-13 11-05-13 12-02-13 12-03-13 12-11-13 01-08-14 02-21-14 03-06-14 03-17-14 03-17-14 04-10-14 04-10-14 05-27-14 09-12-14 06-13-14 09-12-14 12-15-14 12-15-14 03-31-14 04-02-14 04-10-14 04-23-14 04-23-14 05-14-14 05-14-14 06-13-14 06-23-14 09-26-14 10-17-14 12-15-14 12-08-14 05-02-14 05-05-14 05-14-14 05-28-14 05-28-14 06-17-14 06-17-14 07-16-14 12-08-14 10-06-14 11-14-14 12-15-14 06-05-14 06-06-14 06-17-14 06-24-14 06-24-14 07-14-14 07-14-14 08-26-14 10-10-14 12-15-14
Total Free Float Float
7 7 17 17 7 11 11 15 15 30 15 5 5 5 5 19 77 24 25 28 28 17 15 15 5 5 5 5 7 7 61 23 28 33 14 9 9 5 5 5 5 6 85 48 15 28 22 20 20 5 5 5 5 20 43 80
0 0 0 6 2 0 0 0 0 0 9 0 0 0 0 0 19 5 17 0 0 2 0 10 0 0 0 0 0 0 9 16 0 0 5 0 4 0 0 0 0 0 5 5 3 0 2 0 0 0 0 0 0 0 7 55
Calendar
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec
0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
2013 2014 2015 J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)
Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)
J
F
2016 M A M J
Activity ID
0620A-CTT-1680 Third Floor Area G (3rd Flr) 0620A-MPH-1570 0620A-ZSE-1720 0620A-TFC-3130 0620A-CTT-1820 0620A-ZSE-1810 0620A-CTT-1880 0620A-ZSE-1870 0620A-CVS-1190 0620A-ZSE-2040 0620A-CTT-2130 0620A-CTT-2150 0620A-CTT-2180 0620A-ALL-1160 Area H (3rd Flr) 0620A-MPH-1520 0620A-ZSE-1610 0620A-TFC-3120 0620A-CTT-1640 0620A-ZSE-1690 0620A-CTT-1770 0620A-ZSE-1780 0620A-CVS-1180 0620A-ZSE-1940 0620A-CTT-1970 0620A-CTT-2000 0620A-CTT-2010 Area I (3rd Flr) 0620A-MPH-1490 0620A-ZSE-1500 0620A-TFC-3100 0620A-CTT-1560 0620A-ZSE-1590 0620A-CTT-1600 0620A-ZSE-1650 0620A-CVS-1150 0620A-ZSE-1740 0620A-CTT-1700 0620A-CTT-1710 0620A-CTT-1750 One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1180 0620A-CTT-1230 0620A-ZSE-1020 0620A-CVS-1000 0620A-CTT-1310 0620A-CTT-1320 0620A-CTT-1340 0620A-ZSE-1110 0620A-GEO-1130 0620A-GEO-1150 0620A-TFC-3050 0620A-ALL-1080
Activity Name
Orig Start Dur
Temp Enclosure (as needed) - Area I (2nd Flr)
Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)
Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 5 of 25
5 126 114 2 5 5 7 7 10 10 15 5 5 5 5 0 98 2 8 5 15 15 10 10 15 5 5 5 5 92 2 5 5 5 5 8 8 10 3 5 5 5 311 145 145 2 15 15 8 5 5 5 3 3 7 5 0
10-28-14 06-04-14 06-04-14 06-04-14 06-04-14 06-12-14 07-07-14 07-07-14 07-18-14 07-18-14 08-05-14 08-29-14 08-29-14 09-05-14 11-05-14 07-07-14 07-07-14 07-07-14 07-21-14 08-05-14 08-05-14 08-29-14 08-29-14 09-18-14 10-14-14 10-14-14 10-20-14 11-13-14 07-23-14 07-23-14 07-23-14 07-31-14 09-18-14 09-18-14 09-26-14 09-26-14 10-10-14 10-28-14 10-28-14 10-31-14 11-21-14 08-01-13 A 09-13-13 A 09-13-13 A 09-13-13 A 09-25-13 A 09-25-13 A 10-22-13 11-05-13 11-05-13 11-08-13 01-03-14 01-10-14 01-29-14 03-05-14*
Finish
11-04-14 12-01-14 11-12-14 06-05-14 06-10-14 06-19-14 07-17-14 07-17-14 08-04-14 08-04-14 08-28-14 09-08-14 09-08-14 09-12-14 11-12-14 11-07-14 11-20-14 07-08-14 07-18-14 07-28-14 08-28-14 08-28-14 09-17-14 09-17-14 10-13-14 10-21-14 10-21-14 10-27-14 11-20-14 12-01-14 07-25-14 07-30-14 08-08-14 09-25-14 09-25-14 10-09-14 10-09-14 10-27-14 10-30-14 11-04-14 11-07-14 12-01-14 11-13-14 03-20-14 03-20-14 09-18-13 A 10-21-13 10-21-13 11-01-13 11-11-13 11-11-13 11-15-13 01-09-14 01-16-14 02-21-14 03-11-14 03-11-14
Late Start
12-09-14 06-17-14 06-17-14 06-19-14 06-17-14 06-24-14 07-16-14 07-16-14 07-28-14 07-28-14 09-09-14 10-13-14 10-06-14 10-10-14 12-17-14 07-17-14 07-25-14 07-17-14 07-30-14 08-14-14 08-14-14 09-09-14 09-09-14 09-29-14 10-27-14 11-04-14 11-07-14 01-28-15 08-27-14 08-29-14 08-27-14 09-05-14 09-26-14 09-26-14 10-14-14 10-14-14 10-28-14 11-13-14 12-04-14 12-09-14 03-06-15 10-23-13 11-18-13 11-18-13 11-18-13 11-25-13 11-25-13 03-10-14 04-04-14 03-31-14 04-04-14 03-24-14 03-27-14 04-02-14 04-14-14
Late Finish 12-15-14 03-17-15 01-12-15 06-20-14 06-23-14 07-02-14 07-25-14 07-25-14 08-12-14 08-12-14 10-03-14 10-20-14 10-13-14 10-17-14 01-12-15 12-19-14 02-10-15 07-28-14 07-29-14 08-07-14 09-08-14 09-08-14 09-25-14 09-25-14 10-23-14 10-31-14 11-10-14 11-14-14 02-10-15 03-17-15 09-03-14 09-04-14 09-12-14 10-03-14 10-03-14 10-27-14 10-27-14 11-12-14 11-17-14 12-10-14 12-15-14 03-17-15 02-17-15 12-12-14 12-12-14 11-18-13 12-04-13 12-04-13 03-24-14 04-11-14 04-07-14 04-11-14 03-26-14 03-31-14 04-11-14 04-22-14 12-12-14
Total Free Float Float 25 74 40 9 7 7 5 5 5 5 20 24 20 20 26 29 55 11 6 6 5 5 5 5 6 7 12 12 32 74 22 20 20 5 5 10 10 10 10 22 22 43 65 186 186
0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0 35 0 0 0
26 26 61 68 46 46 34 34 28 23 193
0 0 0 45 0 23 0 6 5 0 167
Calendar 2013 J Jul A S O N D 0620A - Prec
0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec
0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Temp Enclosure (as needed) - Area I (2nd Flr)
J
F
2016 M A M J
Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)
Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)
Activity ID
0620A-ZSE-1430 Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1120 0620A-CTT-1160 0620A-CTT-1170 0620A-MPH-1060 0620A-MPH-1240 0620A-MPH-1260 0620A-CTT-1350 0620A-ZSE-1200 0620A-ZSE-1070 0620A-ZSE-1140 0620A-GEO-1120 0620A-GEO-1140 0620A-MPH-1170 0620A-TFC-3030 0620A-CVS-1060 0620A-CTT-1440 0620A-CTT-1450 0620A-TFC-3110 0620A-CTT-1500 0620A-ZSE-1540 Area B (Low Roof) 0620A-CTT-1200 0620A-CTT-1220 0620A-CTT-1260 0620A-MPH-1190 0620A-MPH-1280 0620A-MPH-1290 0620A-ZSE-1150 0620A-ZSE-1230 0620A-GEO-1160 0620A-GEO-1180 0620A-MPH-1220 0620A-TFC-3070 0620A-CTT-1430 0620A-ZSE-1460 0620A-CVS-1100 0620A-CTT-1510 0620A-CTT-1530 0620A-CTT-1660 0620A-ZSE-1630 Area C (Low Roof) 0620A-CTT-1190 0620A-CTT-1240 0620A-MPH-1270 0620A-CTT-1280 0620A-MPH-1350 0620A-MPH-1360 0620A-ZSE-1220 0620A-ZSE-1270 0620A-GEO-1170 0620A-GEO-1190 0620A-MPH-1310 0620A-TFC-3080 0620A-CTT-1480
Activity Name
Orig Start Dur
Temp Power - Area B (Gym)
Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 6 of 25
5 227 185 6 5 5 7 1 3 30 30 5 5 3 7 2 5 20 10 10 5 5 10 190 4 4 5 3 1 2 5 10 3 7 2 5 10 10 8 5 5 5 10 214 3 3 10 5 1 3 5 5 3 7 2 5 20
03-14-14 09-04-13 A 09-04-13 A 09-04-13 A 09-10-13 A 09-12-13 A 10-29-13 11-07-13 11-07-13 11-22-13 11-22-13 12-02-13 12-10-13 01-03-14 01-16-14 01-29-14 02-21-14 03-05-14 03-31-14 04-04-14 04-23-14 04-23-14 05-05-14 09-19-13 A 09-19-13 A 09-23-13 A 10-21-13 10-23-13 10-28-13 10-28-13 11-21-13 11-22-13 12-10-13 12-13-13 01-16-14 03-10-14 03-24-14 03-24-14 04-09-14 04-23-14 05-05-14 05-06-14 05-22-14 09-18-13 A 09-18-13 A 09-30-13 A 10-07-13 A 10-11-13 10-22-13 10-22-13 11-13-13 11-14-13 11-22-13 11-27-13 12-10-13 03-17-14 04-09-14
Finish
03-20-14 07-21-14 05-20-14 09-13-13 A 09-20-13 A 11-01-13 11-07-13 11-07-13 11-11-13 03-20-14 03-20-14 12-06-13 12-23-13 01-09-14 01-28-14 02-06-14 02-27-14 04-07-14 04-15-14 04-22-14 05-02-14 05-02-14 05-20-14 06-09-14 09-20-13 A 09-27-13 A 10-28-13 10-28-13 10-28-13 10-29-13 11-27-13 12-09-13 12-12-13 01-13-14 01-17-14 03-18-14 04-07-14 04-07-14 04-22-14 05-02-14 05-12-14 05-14-14 06-09-14 07-21-14 09-27-13 A 10-04-13 A 10-21-13 10-18-13 10-22-13 10-25-13 11-19-13 11-21-13 11-26-13 12-09-13 12-11-13 03-24-14 05-15-14
Late Start
05-08-14 11-18-13 11-18-13 11-18-13 11-18-13 01-20-14 02-18-14 09-26-14 09-26-14 12-05-13 12-05-13 01-20-14 01-21-14 02-06-14 02-13-14 02-28-14 03-06-14 03-18-14 04-11-14 04-17-14 05-08-14 06-10-14 05-16-14 11-18-13 11-18-13 11-18-13 12-03-13 12-05-13 12-09-13 12-09-13 12-10-13 12-11-13 01-17-14 01-24-14 02-26-14 04-18-14 04-29-14 05-12-14 06-23-14 07-08-14 08-08-14 07-14-14 07-10-14 11-18-13 11-18-13 11-18-13 11-18-13 11-18-13 11-27-13 11-27-13 12-03-13 12-04-13 12-23-13 01-09-14 02-24-14 05-08-14 05-19-14
Late Finish 05-15-14 10-03-14 09-30-14 11-18-13 11-18-13 01-27-14 02-28-14 09-26-14 09-30-14 04-02-14 04-02-14 01-28-14 01-29-14 02-10-14 02-27-14 03-05-14 03-14-14 04-18-14 04-29-14 05-06-14 05-15-14 06-18-14 06-04-14 08-15-14 11-18-13 11-18-13 12-09-13 12-09-13 12-09-13 12-10-13 12-23-13 01-16-14 01-21-14 02-10-14 02-27-14 04-28-14 05-16-14 05-28-14 07-07-14 07-16-14 08-15-14 07-21-14 07-25-14 10-03-14 11-18-13 11-18-13 11-26-13 11-25-13 11-27-13 12-03-13 12-09-13 12-10-13 01-08-14 01-21-14 02-25-14 05-15-14 06-23-14
Total Free Float Float 30 53 92
37 47 162 162 7 7 18 13 13 11 11 7 7 7 7 7 25 7 48
25 25 25 25 11 11 11 11 16 23 21 27 40 40 53 37 26 53
22 22 22 22 11 11 14 14 24 29 21
0 0 0
0 0 0 2 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0
0 0 0 5 0 0 0 0 5 0 0 0 0 3 10 0 0 0
0 0 0 0 0 0 0 0 8 9 0
Calendar 2013 J Jul A S O N D 0620A - Prec
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D Temp Power - Area B (Gym)
J
2015 F M A M J Jul A S O N D
Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)
J
F
2016 M A M J
Activity ID
Activity Name
Orig Start Dur
0620A-ZSE-1510 Elec at Brng Masonry - Area C (Low Roof) 0620A-CTT-1520 Set Precast at Mech Rm - Area C (Low Roof) 0620A-CVS-1120 Roof Structural Steel/ Metal Deck - Area C (Low Roof) 0620A-CTT-1610 Temp Enclosure (as needed) - Area C (Low Roof) 0620A-CTT-1620 Roof Blocking - Area C (Low Roof) 0620A-ZSE-1680 Temp Power - Area C (Low Roof) 0620A-CTT-1790 Roofing Dry-in - Area C (Low Roof) 0620A-ALL-1110 Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Sto Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-1210 Foundations - Area C (Aux Gym) 0620A-CTT-1580 Bearing Masonry - Area C (Aux Gym) 0620A-ZSE-1620 Elec at Brng Masonry - Area C (Aux Gym) 0620A-ZSE-1700 Underground Conduit - Area C (Aux Gym) 0620A-CVS-1170 Roof Structural Steel/ Metal Deck - Area C (Aux Gym) 0620A-GEO-1200 Prep for Venting - Area C (Aux Gym) 0620A-CTT-1720 Temp Enclosure (as needed) - Area C (Aux Gym) 0620A-CTT-1730 Roof Blocking - Area C (Aux Gym) 0620A-GEO-1210 Geo-Seal/ Vapor Vent - Area C (Aux Gym) 0620A-CTT-1860 Roofing Dry-in - Area C (Aux Gym) 0620A-TFC-3140 Prep/ Pour SOG - Area C (Aux Gym) 0620A-ALL-1130 Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) 0620A-ZSE-1890 Temp Power - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-1250 Foundations - Area D/E/F (Low Roof) 0620A-CTT-1270 Masonry to Grade - Area D/E/F (Low Roof) 0620A-MPH-2340 Underground Plumbing - Area D/E/F (Low Roof) 0620A-MPH-2350 Underground Testing/ Inspection - Area D/E/F (Low Roof) 0620A-MPH-2360 Backfill Underground Plumbing - Area D/E/F (Low Roof) 0620A-CTT-1290 Backfill Foundations - Area D/E/F (Low Roof) 0620A-MPH-1320 Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1390 Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1400 Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-ZSE-1260 Underground Conduit (Seq 1) - Area D/E/F (Low Roof) 0620A-CTT-1670 Bearing Masonry - Area D/E/F (Low Roof) 0620A-ZSE-1730 Elec at Brng Masonry - Area D/E/F (Low Roof) 0620A-CVS-1200 Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) 0620A-ZSE-1320 Underground Conduit (Seq 2) - Area D/E/F (Low Roof) 0620A-GEO-1220 Prep for Venting - Area D/E/F (Low Roof) 0620A-CTT-2210 Temp Enclosure (as needed) - Area D/E/F (Low Roof) 0620A-CTT-2230 Roof Blocking - Area D/E/F (Low Roof) 0620A-GEO-1230 Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) 0620A-CTT-2260 Roofing Dry-in - Area D/E/F (Low Roof) 0620A-MPH-1370 FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) 0620A-TFC-3150 Prep/ Pour SOG - Area D/E/F (Low Roof) 0620A-ALL-1180 Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low R 0620A-ZSE-2140 Temp Power - Area D/E/F (Low Roof) Building Shell Academic Area First Floor Area D (1st Flr) 0620A-CTT-2100 Masonry Veneer - Area D (1st Flr) 0620A-GSC-1420 Curtain Wall/ Windows - Area D (1st Flr) 0620A-GSC-1540 Entrances - Area D (1st Flr) 0620A-CTT-2350 Misc Shell Finishes - Area D (1st Flr) Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 7 of 25
20 5 10 5 5 5 5 0 232 232 2 20 20 2 8 3 5 5 7 5 5 0 5 278 278 4 4 5 1 3 5 5 1 3 5 15 15 15 6 3 5 10 7 10 2 5 0 6 188 141 136 123 5 34 19 5 110
04-09-14 04-28-14 05-14-14 06-02-14 06-02-14 06-10-14 07-14-14 09-19-13 A 09-19-13 A 09-19-13 A 05-16-14 05-16-14 06-23-14 06-23-14 07-08-14 07-08-14 07-08-14 07-14-14 07-28-14 08-05-14 08-14-14 08-01-13 A 08-01-13 A 08-01-13 A 08-13-13 A 10-07-13 A 10-11-13 10-11-13 11-01-13 11-08-13 11-15-13 11-15-13 12-09-13 08-19-14 08-19-14 09-15-14 09-26-14 10-08-14 10-10-14 10-10-14 10-13-14 10-16-14 10-24-14 10-28-14 11-05-14 07-22-14 09-26-14 09-26-14 09-26-14 09-26-14 11-17-14 02-24-15 03-13-15 10-23-14
Finish
05-15-14 05-06-14 05-30-14 06-09-14 06-09-14 06-18-14 07-21-14 07-21-14 08-20-14 08-20-14 09-27-13 A 06-20-14 06-20-14 06-24-14 07-07-14 07-11-14 07-16-14 07-16-14 07-23-14 08-04-14 08-12-14 08-12-14 08-20-14 11-13-14 11-13-14 09-03-13 A 09-10-13 A 10-11-13 10-11-13 10-16-13 11-11-13 11-15-13 11-15-13 11-19-13 12-13-13 09-12-14 09-12-14 10-09-14 10-06-14 10-10-14 10-17-14 10-27-14 10-23-14 10-30-14 10-27-14 11-04-14 11-04-14 11-13-14 04-16-15 04-16-15 04-09-15 03-20-15 10-03-14 01-06-15 03-20-15 03-19-15 03-30-15
Late Start
05-30-14 06-06-14 07-29-14 09-08-14 08-15-14 09-08-14 08-28-14 07-07-14 07-07-14 07-07-14 07-07-14 07-07-14 09-11-14 08-11-14 09-15-14 09-23-14 08-25-14 09-19-14 09-23-14 10-01-14 11-04-14 10-23-13 10-23-13 11-18-13 09-17-14 10-23-13 11-14-13 11-14-13 09-22-14 09-25-14 10-01-14 10-01-14 10-06-14 09-17-14 09-17-14 10-13-14 10-08-14 10-17-14 12-10-14 11-26-14 10-23-14 12-03-14 11-04-14 11-06-14 11-14-14 09-08-14 10-06-14 10-06-14 10-06-14 10-06-14 12-05-14 03-13-15 03-31-15 10-30-14
Late Finish 07-03-14 06-13-14 08-14-14 09-15-14 08-22-14 09-15-14 09-05-14 10-03-14 11-10-14 11-10-14 07-07-14 08-08-14 08-08-14 09-12-14 08-22-14 09-18-14 09-30-14 08-29-14 09-30-14 09-30-14 10-09-14 10-09-14 11-10-14 02-17-15 02-17-15 11-18-13 09-17-14 10-23-13 11-14-13 11-18-13 09-29-14 10-01-14 10-01-14 10-06-14 10-13-14 10-10-14 10-10-14 11-05-14 10-16-14 10-21-14 12-16-14 12-11-14 10-31-14 12-16-14 11-05-14 11-13-14 02-17-15 11-24-14 05-06-15 05-06-15 05-06-15 04-09-15 10-13-14 01-23-15 04-09-15 04-08-15 04-17-15
Total Free Float Float 27 21 42 55 42 50 27 53 57 57
0 0 0 15 15 0 0 0 0 0
27 27 45 27 39 44 27 39 33 33 41 47 65 65
0 0 6 0 0 11 0 6 0 0 0 19 0 0
7 20 20 161 160 160 160 149 16 16 16 6 6 36 28 6 28 6 6 72 6 14 14 19 13 5 13 13 11 13
0 0 3 1 0 0 154 143 0 0 0 0 0 10 0 0 2 0 0 6 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days
0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P Work Days 0620A - Prec
0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days 0620A - Prec
0620A - T/P Work Days Work Days 0620A - Prec
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Elec at Brng Masonry - Area C (Low Roof) Set Precast at Mech Rm - Area C (Low Roof) Roof Structural Steel/ Metal Deck - Area C (Low Roof) Temp Enclosure (as needed) - Area C (Low Roof) Roof Blocking - Area C (Low Roof) Temp Power - Area C (Low Roof) Roofing Dry-in - Area C (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Story)
2016 M A M J
Foundations - Area C (Aux Gym) Bearing Masonry - Area C (Aux Gym) Elec at Brng Masonry - Area C (Aux Gym) Underground Conduit - Area C (Aux Gym) Roof Structural Steel/ Metal Deck - Area C (Aux Gym) Prep for Venting - Area C (Aux Gym) Temp Enclosure (as needed) - Area C (Aux Gym) Roof Blocking - Area C (Aux Gym) Geo-Seal/ Vapor Vent - Area C (Aux Gym) Roofing Dry-in - Area C (Aux Gym) Prep/ Pour SOG - Area C (Aux Gym) Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) Temp Power - Area C (Aux Gym)
Foundations - Area D/E/F (Low Roof) Masonry to Grade - Area D/E/F (Low Roof) Underground Plumbing - Area D/E/F (Low Roof) Underground Testing/ Inspection - Area D/E/F (Low Roof) Backfill Underground Plumbing - Area D/E/F (Low Roof) Backfill Foundations - Area D/E/F (Low Roof) Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Conduit (Seq 1) - Area D/E/F (Low Roof) Bearing Masonry - Area D/E/F (Low Roof) Elec at Brng Masonry - Area D/E/F (Low Roof) Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) Underground Conduit (Seq 2) - Area D/E/F (Low Roof) Prep for Venting - Area D/E/F (Low Roof) Temp Enclosure (as needed) - Area D/E/F (Low Roof) Roof Blocking - Area D/E/F (Low Roof) Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) Roofing Dry-in - Area D/E/F (Low Roof) FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) Prep/ Pour SOG - Area D/E/F (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low Roof) Temp Power - Area D/E/F (Low Roof)
Masonry Veneer - Area D (1st Flr) Curtain Wall/ Windows - Area D (1st Flr) Entrances - Area D (1st Flr) Misc Shell Finishes - Area D (1st Flr)
Activity ID
Activity Name
0620A-CTT-1960 Masonry Veneer - Area E (1st Flr) 0620A-GSC-1300 Curtain Wall/ Windows - Area E (1st Flr) 0620A-GSC-1340 Entrances - Area E (1st Flr) 0620A-CTT-2290 Misc Shell Finishes - Area E (1st Flr) Area F (1st Flr) 0620A-CTT-1690 Masonry Veneer - Area F (1st Flr) 0620A-GSC-1060 Curtain Wall/ Windows - Area F (1st Flr) 0620A-GSC-3220 Entrances - Area F (1st Flr) 0620A-CTT-2240 Misc Shell Finishes - Area F (1st Flr) Second Floor Area G (2nd Flr) 0620A-CTT-2190 Masonry Veneer - Area G (2nd Flr) 0620A-GSC-1440 Curtain Wall/ Windows - Area G (2nd Flr) 0620A-CTT-2360 Misc Shell Finishes - Area G (2nd Flr) Area H (2nd Flr) 0620A-CTT-2020 Masonry Veneer - Area H (2nd Flr) 0620A-GSC-1320 Curtain Wall/ Windows - Area H (2nd Flr) 0620A-CTT-2320 Misc Shell Finishes - Area H (2nd Flr) Area I (2nd Flr) 0620A-CTT-1760 Masonry Veneer - Area I (2nd Flr) 0620A-GSC-1070 Curtain Wall/ Windows - Area I (2nd Flr) 0620A-CTT-2270 Misc Shell Finishes - Area I (2nd Flr) Third Floor Area G (3rd Flr) 0620A-CTT-2250 Masonry Veneer - Area G (3rd Flr) 0620A-CTT-2300 Roofing Finishes - Area G (3rd Flr) 0620A-GSC-1470 Curtain Wall/ Windows - Area G (3rd Flr) 0620A-ALL-1190 Full Building Enclosure - Academic Area 0620A-CTT-2370 Misc Shell Finishes - Area G (3rd Flr) Area H (3rd Flr) 0620A-CTT-2060 Masonry Veneer - Area H (3rd Flr) 0620A-GSC-1330 Curtain Wall/ Windows - Area H (3rd Flr) 0620A-CTT-2120 Roofing Finishes - Area H (3rd Flr) 0620A-CTT-2330 Misc Shell Finishes - Area H (3rd Flr) Area I (3rd Flr) 0620A-CTT-1800 Masonry Veneer - Area I (3rd Flr) 0620A-CTT-1870 Roofing Finishes - Area I (3rd Flr) 0620A-GSC-1090 Curtain Wall/ Windows - Area I (3rd Flr) 0620A-CTT-2280 Misc Shell Finishes - Area I (3rd Flr) One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1810 Metal Wall Panels - Area B (Gym) 0620A-CTT-1890 Roofing Finishes - Area B (Gym) 0620A-GSC-1110 Curtain Wall/ Windows - Area B (Gym) 0620A-CTT-1910 Misc Shell Finishes - Area B (Gym) Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1840 Masonry Veneer - Area A (Low Roof) 0620A-GSC-1140 Curtain Wall/ Windows - Area A (Low Roof) 0620A-CTT-1940 Roofing Finishes - Area A (Low Roof) 0620A-CTT-1990 Misc Shell Finishes - Area A (Low Roof) 0620A-GSC-1180 Entrances - Area A (Low Roof) Area B (Low Roof) 0620A-CTT-1900 Masonry Veneer - Area B (Low Roof) 0620A-GSC-1190 Curtain Wall/ Windows - Area B (Low Roof) 0620A-CTT-2040 Misc Shell Finishes - Area B (Low Roof) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 8 of 25
Orig Start Dur 5 14 6 5 100 5 14 2 5 132 119 5 34 5 107 5 14 5 96 5 14 5 129 115 5 5 34 0 5 104 5 14 5 5 93 5 5 14 5 168 54 54 10 5 4 5 41 33 10 5 10 5 5 22 5 2 5
10-23-14 11-17-14 03-23-15 03-24-15 11-17-14 11-17-14 12-29-14 03-31-15 04-01-15 10-06-14 10-06-14 10-06-14 12-11-14 03-17-15 10-30-14 10-30-14 11-26-14 03-26-15 11-25-14 11-25-14 01-08-15 04-07-15 10-14-14 10-14-14 10-14-14 12-04-14 01-07-15 03-19-15 11-07-14 11-07-14 12-08-14 12-11-14 03-30-15 12-04-14 12-04-14 01-02-15 01-16-15 04-09-15 07-22-14 07-22-14 07-22-14 07-22-14 08-08-14 09-25-14 09-29-14 09-15-14 09-15-14 09-15-14 10-01-14 10-01-14 10-08-14 10-23-14 10-01-14 10-01-14 10-10-14 10-16-14
Finish
10-29-14 12-05-14 03-30-15 03-30-15 04-09-15 11-24-14 01-16-15 04-01-15 04-09-15 04-13-15 03-24-15 10-13-14 01-29-15 03-24-15 04-01-15 11-06-14 12-16-14 04-01-15 04-13-15 12-03-14 01-27-15 04-13-15 04-16-15 03-26-15 10-21-14 12-10-14 02-23-15 02-23-15 03-26-15 04-07-15 11-14-14 12-26-14 12-17-14 04-07-15 04-16-15 12-10-14 01-15-15 02-04-15 04-16-15 03-18-15 10-06-14 10-06-14 08-07-14 08-15-14 09-30-14* 10-06-14 11-10-14 10-29-14 09-30-14 10-07-14 10-17-14 10-14-14 10-29-14 10-30-14 10-09-14 10-13-14 10-23-14
Late Start
10-30-14 12-01-14 04-10-15 04-10-15 11-25-14 11-25-14 01-12-15 05-05-15 04-21-15 10-14-14 10-14-14 10-14-14 12-31-14 04-02-15 11-07-14 11-07-14 12-10-14 04-15-15 12-04-14 12-04-14 01-21-15 04-24-15 10-23-14 10-23-14 10-23-14 03-30-15 01-26-15 04-08-15 11-17-14 11-17-14 12-19-14 04-20-15 04-17-15 12-11-14 12-11-14 04-28-15 01-29-15 04-28-15 09-08-14 09-08-14 09-08-14 09-08-14 02-25-15 09-25-14 03-17-15 10-23-14 10-23-14 10-23-14 11-11-14 03-05-15 03-25-15 12-01-14 11-07-14 11-07-14 11-21-14 04-01-15
Late Finish 11-06-14 12-18-14 04-17-15 04-17-15 05-06-15 12-03-14 01-29-15 05-06-15 04-28-15 05-01-15 04-10-15 10-21-14 02-17-15 04-10-15 04-21-15 11-14-14 12-30-14 04-21-15 05-01-15 12-10-14 02-09-15 05-01-15 05-06-15 04-15-15 10-29-14 04-07-15 03-12-15 04-13-15 04-15-15 04-27-15 11-24-14 01-09-15 04-27-15 04-24-15 05-06-15 12-17-14 05-06-15 02-17-15 05-06-15 05-06-15 03-24-15 03-24-15 09-23-14 03-04-15 09-30-14 03-24-15 04-17-15 03-31-15 11-06-14 11-17-14 03-24-15 03-31-15 12-05-14 04-09-15 11-14-14 11-24-14 04-09-15
Total Free Float Float 5 9 13 11 19 5 9 24 11 14 12 5 13 11 13 5 9 11 14 5 9 11 14 13 5 48 13 34 11 14 5 9 55 11 14 5 55 9 11 34 118 118 27 98 0 79 110 106 22 29 72 79 26 111 22 30 79
0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 44 0 0 0 0 0 0 26 0 0 0 0 0 0 0 0 0 0 0 2 6
Calendar 2013 J Jul A S O N D 0620A - T/P Work Days Work Days 0620A - Prec 0620A - T/P Work Days Work Days 0620A - Prec
Remaining Work Critical Remaining Work
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Masonry Veneer - Area E (1st Flr) Curtain Wall/ Windows - Area E (1st Flr) Entrances - Area E (1st Flr) Misc Shell Finishes - Area E (1st Flr) Masonry Veneer - Area F (1st Flr) Curtain Wall/ Windows - Area F (1st Flr) Entrances - Area F (1st Flr) Misc Shell Finishes - Area F (1st Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area G (2nd Flr) Curtain Wall/ Windows - Area G (2nd Flr) Misc Shell Finishes - Area G (2nd Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area H (2nd Flr) Curtain Wall/ Windows - Area H (2nd Flr) Misc Shell Finishes - Area H (2nd Flr)
0620A - T/P Work Days 0620A - Prec
Masonry Veneer - Area I (2nd Flr) Curtain Wall/ Windows - Area I (2nd Flr) Misc Shell Finishes - Area I (2nd Flr)
0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec
Masonry Veneer - Area G (3rd Flr) Roofing Finishes - Area G (3rd Flr) Curtain Wall/ Windows - Area G (3rd Flr) Full Building Enclosure - Academic Area Misc Shell Finishes - Area G (3rd Flr)
0620A - T/P Work Days 0620A - Prec 0620A - Prec
Masonry Veneer - Area H (3rd Flr) Curtain Wall/ Windows - Area H (3rd Flr) Roofing Finishes - Area H (3rd Flr) Misc Shell Finishes - Area H (3rd Flr)
0620A - T/P 0620A - Prec Work Days 0620A - Prec
Masonry Veneer - Area I (3rd Flr) Roofing Finishes - Area I (3rd Flr) Curtain Wall/ Windows - Area I (3rd Flr) Misc Shell Finishes - Area I (3rd Flr)
0620A - T/P 0620A - Prec Work Days 0620A - Prec
0620A - T/P Work Days 0620A - Prec 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec
Milestone Actual Work
J
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
Metal Wall Panels - Area B (Gym) Roofing Finishes - Area B (Gym) Curtain Wall/ Windows - Area B (Gym) Misc Shell Finishes - Area B (Gym)
Masonry Veneer - Area A (Low Roof) Curtain Wall/ Windows - Area A (Low Roof) Roofing Finishes - Area A (Low Roof) Misc Shell Finishes - Area A (Low Roof) Entrances - Area A (Low Roof) Masonry Veneer - Area B (Low Roof) Curtain Wall/ Windows - Area B (Low Roof) Misc Shell Finishes - Area B (Low Roof)
2016 M A M J
Activity ID
Activity Name
Orig Start Dur
0620A-CTT-2050 Roofing Finishes - Area B (Low Roof) 0620A-GSC-1210 Entrances - Area B (Low Roof) Area C (Low Roof) 0620A-CTT-1980 Masonry Veneer - Area C (Low Roof) 0620A-GSC-1220 Curtain Wall/ Windows - Area C (Low Roof) 0620A-CTT-2090 Roofing Finishes - Area C (Low Roof) 0620A-GSC-1240 Entrances - Area C (Low Roof) 0620A-CTT-2080 Misc Shell Finishes - Area C (Low Roof) 0620A-ALL-1150 Full Building Enclosure - Areas A/B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-2030 Masonry Veneer - Area C (Aux Gym) 0620A-ALL-1140 Full Building Enclosure - Area C (Aux Gym) 0620A-GSC-1270 Entrances - Area C (Aux Gym) 0620A-CTT-2170 Roofing Finishes - Area C (Aux Gym) 0620A-CTT-2140 Misc Shell Finishes - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2220 Masonry Veneer - Area D/E/F (Low Roof) 0620A-CTT-2340 Roofing Finishes - Area D/E/F (Low Roof) 0620A-GSC-1530 Curtain Wall/ Windows - Area D/E/F (Low Roof) 0620A-ALL-1200 Full Building Enclosure - Area D/E/F (Low Roof) 0620A-CTT-2380 Misc Shell Finishes - Area D/E/F (Low Roof) 0620A-GSC-1640 Entrances - Area D/E/F (Low Roof) Interior Rough-in Academic Area First Floor Area D (1st Flr) 0620A-CTT-1920 Non-Bearing Masonry Rough-in - Area D (1st Flr) 0620A-ZSE-1920 Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) 0620A-MPH-1630 Plumbing Chase Rough-in - Area D (1st Flr) 0620A-RMM-1280 HVAC Ductwork Rough-in - Area D (1st Flr) 0620A-RMM-1300 HVAC Piping Rough-in - Area D (1st Flr) 0620A-MPH-1690 Plumbing Rough-in - Area D (1st Flr) 0620A-ZSE-1950 Switchgear - Area D (1st Flr) 0620A-ZSE-1990 Conduit - Overhead - Area D (1st Flr) 0620A-RMM-1350 HVAC Controls Rough-in - Area D (1st Flr) 0620A-SAC-1130 Fire Protection Rough-in - Area D (1st Flr) 0620A-ZSE-2110 Pull Electrical Wires - Area D (1st Flr) 0620A-RMM-1380 HVAC Insulation - Area D (1st Flr) 0620A-SAC-1140 Fire Protection Above Ceiling Finalization - Area D (1st Flr) 0620A-ZSE-2240 Cable Tray - Area D (1st Flr) 0620A-ZSE-2250 Electrical Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1280 Metal Studs - Area D (1st Flr) 0620A-RMM-1500 HVAC System Testing - Area D (1st Flr) 0620A-RMM-1510 HVAC Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1350 Block Filler - Area D (1st Flr) 0620A-MPH-1900 Plumbing Insulation - Area D (1st Flr) 0620A-GSC-1480 Gypsum Board - Area D (1st Flr) 0620A-MPH-1910 Plumbing Above Ceiling Finalization - Area D (1st Flr) 0620A-ZST-1210 Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) 0620A-ZST-1270 Tech Cabling Rough-in (In-Class) - Area D (1st Flr) 0620A-ZST-1280 Tech Above Ceiling Finalization - Area D (1st Flr) 0620A-ALL-1210 Interior Rough-in Substantially Complete - 1st Flr Area E (1st Flr) 0620A-RMM-1230 Set Large Mech Equipment - Area E (1st Flr) 0620A-MPH-1560 Plumbing Chase Rough-in - Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 9 of 25
5 1 22 5 3 5 2 5 0 22 22 5 0 2 5 5 99 99 10 10 10 0 5 20 306 306 226 112 15 15 5 25 25 15 1 10 10 12 14 20 5 5 5 5 5 5 5 8 15 5 10 7 5 0 226 1 5
10-20-14 10-30-14 10-10-14 10-10-14 10-20-14 10-28-14 10-31-14 11-04-14 10-20-14 10-20-14 10-20-14 11-04-14 11-05-14 11-12-14 10-28-14 10-28-14 10-28-14 11-13-14 02-05-15 02-19-15 02-19-15 02-25-14 02-25-14 02-25-14 06-13-14 06-13-14 06-13-14 06-20-14 06-20-14 06-27-14 07-07-14 07-10-14 07-14-14 07-28-14 07-28-14 07-28-14 08-04-14 08-06-14 08-15-14 08-15-14 08-19-14 09-02-14 09-02-14 09-15-14 09-15-14 09-15-14 09-18-14 09-29-14 10-13-14 10-15-14 02-25-14 02-25-14 07-29-14
Finish
10-27-14 10-30-14 11-10-14 10-17-14 10-22-14 11-04-14 11-03-14 11-10-14 11-05-14 11-18-14 11-18-14 10-27-14 10-27-14 11-05-14 11-12-14 11-18-14 03-18-15 03-18-15 11-12-14 12-01-14 02-18-15 02-18-15 02-25-15 03-18-15 05-08-15 05-08-15 01-15-15 11-19-14 07-03-14 07-03-14 06-26-14 07-25-14 08-01-14 07-25-14 07-10-14 07-25-14 08-08-14 08-12-14 08-14-14 08-29-14 08-12-14 08-21-14 08-21-14 08-25-14 09-08-14 09-08-14 09-19-14 09-24-14 10-03-14 09-24-14 10-10-14 10-21-14 10-21-14 11-19-14 01-15-15 02-25-14 08-04-14
Late Start
03-25-15 12-08-14 11-17-14 11-17-14 11-25-14 04-01-15 12-09-14 04-10-15 11-25-14 11-25-14 11-25-14 12-11-14 04-10-15 04-20-15 12-04-14 12-04-14 12-04-14 04-20-15 02-18-15 04-28-15 04-09-15 03-24-14 03-24-14 03-24-14 07-03-14 09-02-14 09-02-14 09-09-14 07-03-14 07-11-14 09-26-14 10-13-14 10-14-14 12-18-14 11-05-14 10-28-14 11-21-14 12-26-14 11-17-14 12-26-14 11-03-14 12-26-14 12-26-14 12-04-14 11-28-14 11-10-14 12-26-14 11-24-14 12-09-14 12-26-14 03-24-14 03-24-14 09-30-14
Late Finish 03-31-15 12-08-14 04-17-15 11-24-14 11-28-14 04-09-15 12-10-14 04-17-15 12-12-14 04-27-15 04-27-15 12-03-14 01-06-15 12-12-14 04-17-15 04-27-15 05-06-15 05-06-15 12-17-14 05-06-15 03-03-15 03-03-15 05-06-15 05-06-15 07-17-15 07-17-15 07-13-15 01-02-15 09-22-14 09-22-14 09-15-14 08-07-14 08-14-14 10-16-14 10-13-14 10-27-14 01-02-15 11-20-14 11-14-14 12-19-14 01-02-15 11-21-14 01-02-15 11-07-14 01-02-15 01-02-15 12-10-14 12-09-14 12-01-14 01-02-15 12-08-14 12-17-14 01-02-15 01-02-15 07-13-15 03-24-14 10-06-14
Total Free Float Float 72 26 110 22 26 72 26 73 26 110 110 22 48 26 72 73 34 34 22 72 9 9 39 34 49 49 125 29 55 55 55 9 9 58 66 65 101 71 65 78 99 65 92 53 81 81 57 53 40 69 40 40 50 29 125 19 44
0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 34 0 0 0 61 0 0 28 20 0 0 0 0 13 13 0 0 0 0 1 0 16 0 0 0 24 0 14 0 0 11 0 0 0 26 0 0 2 16 0 7 4
Calendar 2013 J Jul A S O N D 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec Work Days 0620A - Prec Work Days
0620A - T/P Work Days Work Days 0620A - Prec 0620A - Prec
0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Roofing Finishes - Area B (Low Roof) Entrances - Area B (Low Roof)
J
F
2016 M A M J
Masonry Veneer - Area C (Low Roof) Curtain Wall/ Windows - Area C (Low Roof) Roofing Finishes - Area C (Low Roof) Entrances - Area C (Low Roof) Misc Shell Finishes - Area C (Low Roof) Full Building Enclosure - Areas A/B/C (1-Story)
Masonry Veneer - Area C (Aux Gym) Full Building Enclosure - Area C (Aux Gym) Entrances - Area C (Aux Gym) Roofing Finishes - Area C (Aux Gym) Misc Shell Finishes - Area C (Aux Gym)
Masonry Veneer - Area D/E/F (Low Roof) Roofing Finishes - Area D/E/F (Low Roof) Curtain Wall/ Windows - Area D/E/F (Low Roof) Full Building Enclosure - Area D/E/F (Low Roof) Misc Shell Finishes - Area D/E/F (Low Roof) Entrances - Area D/E/F (Low Roof)
Non-Bearing Masonry Rough-in - Area D (1st Flr) Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) Plumbing Chase Rough-in - Area D (1st Flr) HVAC Ductwork Rough-in - Area D (1st Flr) HVAC Piping Rough-in - Area D (1st Flr) Plumbing Rough-in - Area D (1st Flr) Switchgear - Area D (1st Flr) Conduit - Overhead - Area D (1st Flr) HVAC Controls Rough-in - Area D (1st Flr) Fire Protection Rough-in - Area D (1st Flr) Pull Electrical Wires - Area D (1st Flr) HVAC Insulation - Area D (1st Flr) Fire Protection Above Ceiling Finalization - Area D (1st Flr) Cable Tray - Area D (1st Flr) Electrical Above Ceiling Finalization - Area D (1st Flr) Metal Studs - Area D (1st Flr) HVAC System Testing - Area D (1st Flr) HVAC Above Ceiling Finalization - Area D (1st Flr) Block Filler - Area D (1st Flr) Plumbing Insulation - Area D (1st Flr) Gypsum Board - Area D (1st Flr) Plumbing Above Ceiling Finalization - Area D (1st Flr) Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) Tech Cabling Rough-in (In-Class) - Area D (1st Flr) Tech Above Ceiling Finalization - Area D (1st Flr) Interior Rough-in Substantially Complete - 1st Flr Set Large Mech Equipment - Area E (1st Flr) Plumbing Chase Rough-in - Area E (1st Flr)
Activity ID
0620A-CTT-1830 0620A-ZSE-1820 0620A-RMM-1150 0620A-ZSE-1860 0620A-RMM-1170 0620A-MPH-1600 0620A-ZSE-1960 0620A-GSC-1230 0620A-RMM-1370 0620A-ZSE-2020 0620A-RMM-1270 0620A-SAC-1070 0620A-RMM-1290 0620A-ZSE-2090 0620A-ZSE-2100 0620A-SAC-1090 0620A-RMM-1330 0620A-RMM-1340 0620A-RMM-1560 0620A-ZST-1150 0620A-ZST-1180 0620A-ZST-1190 0620A-GSC-1250 0620A-MPH-1840 0620A-GSC-1430 0620A-MPH-1860 0620A-RMM-1710 0620A-ZSE-2390 0620A-RMM-2000 Area F (1st Flr) 0620A-MPH-1500 0620A-CTT-1740 0620A-ZSE-1760 0620A-ZSE-1800 0620A-RMM-1110 0620A-GSC-1160 0620A-RMM-1120 0620A-MPH-1510 0620A-ZSE-1850 0620A-RMM-1130 0620A-SAC-1050 0620A-ZSE-1970 0620A-RMM-1140 0620A-SAC-1060 0620A-ZSE-3380 0620A-ZSE-1980 0620A-ZST-1050 0620A-RMM-1210 0620A-RMM-1220 0620A-MPH-1800 0620A-GSC-1360 0620A-MPH-1810 0620A-ZST-1110 0620A-GSC-1200 0620A-ZST-1120 Second Floor Area G (2nd Flr)
Activity Name
Orig Start Dur
Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 10 of 25
15 15 25 5 25 15 8 10 20 9 10 15 10 5 5 5 5 5 20 4 5 3 5 8 15 5 10 17 10 82 5 10 10 4 25 7 25 15 18 7 13 11 17 5 5 3 10 5 5 8 10 5 7 5 5 175 136
07-29-14 07-29-14 07-29-14 08-05-14 08-05-14 08-12-14 08-19-14 08-26-14 08-27-14 08-29-14 09-03-14 09-03-14 09-10-14 09-12-14 09-12-14 09-17-14 09-24-14 09-24-14 10-07-14 10-22-14 10-24-14 10-28-14 10-28-14 10-28-14 10-28-14 10-31-14 11-04-14 11-04-14 01-02-15 08-11-14 08-11-14 08-19-14 08-19-14 08-26-14 09-03-14 09-10-14 09-10-14 09-17-14 09-17-14 10-08-14 10-08-14 10-13-14 10-15-14 10-20-14 10-28-14 10-30-14 11-04-14 11-07-14 11-07-14 11-10-14 11-11-14 11-13-14 11-25-14 11-26-14 11-28-14 06-06-14 06-26-14
Finish
08-18-14 08-18-14 09-02-14 08-11-14 09-09-14 09-02-14 08-28-14 09-09-14 09-24-14 09-11-14 09-16-14 09-23-14 09-23-14 09-18-14 09-18-14 09-23-14 09-30-14 09-30-14 11-03-14 10-27-14 10-30-14 10-30-14 11-03-14 11-06-14 11-17-14 11-06-14 11-17-14 11-26-14 01-15-15 12-04-14 08-15-14 09-02-14 09-02-14 08-29-14 10-07-14 09-18-14 10-14-14 10-07-14 10-10-14 10-16-14 10-24-14 10-27-14 11-06-14 10-24-14 11-03-14 11-03-14 11-17-14 11-13-14 11-13-14 11-19-14 11-24-14 11-19-14 12-04-14 12-03-14 12-04-14 02-12-15 01-08-15
Late Start
09-23-14 09-23-14 08-08-14 10-21-14 08-15-14 10-17-14 10-29-14 11-26-14 10-14-14 11-21-14 01-07-15 11-21-14 12-22-14 12-11-14 01-14-15 01-14-15 01-14-15 01-14-15 01-29-15 12-18-14 01-14-15 12-24-14 12-26-14 12-10-14 12-11-14 01-14-15 05-22-15 06-19-15 06-08-15 09-15-14 10-28-14 10-21-14 10-21-14 10-28-14 09-15-14 12-18-14 09-22-14 11-07-14 11-10-14 01-28-15 12-15-14 12-05-14 01-07-15 01-30-15 12-22-14 02-03-15 12-30-14 01-30-15 01-30-15 12-22-14 12-30-14 01-30-15 01-14-15 01-28-15 01-30-15 06-18-14 10-20-14
Late Finish 10-13-14 10-13-14 09-12-14 10-27-14 09-19-14 11-06-14 11-07-14 12-10-14 11-10-14 12-04-14 01-20-15 12-12-14 01-06-15 12-17-14 01-20-15 01-20-15 01-20-15 01-20-15 02-25-15 12-23-14 01-20-15 12-29-14 01-02-15 12-19-14 01-02-15 01-20-15 06-05-15 07-13-15 06-19-15 02-05-15 11-03-14 11-03-14 11-03-14 10-31-14 10-17-14 12-29-14 10-24-14 11-28-14 12-04-14 02-05-15 01-02-15 12-19-14 01-29-15 02-05-15 12-29-14 02-05-15 01-13-15 02-05-15 02-05-15 01-02-15 01-13-15 02-05-15 01-22-15 02-03-15 02-05-15 07-17-15 02-23-15
Total Free Float Float 39 39 8 54 8 47 50 65 33 59 87 57 72 63 85 82 77 77 79 40 55 40 41 30 31 50 139 158 109 43 55 44 44 44 8 70 8 37 38 77 47 38 57 71 38 65 38 57 57 29 33 53 33 42 43 109 32
0 0 0 5 0 0 0 0 0 0 10 0 0 0 29 18 0 27 0 0 19 0 0 0 0 4 30 23 0 0 11 0 0 6 0 0 0 0 0 13 0 0 0 9 0 17 5 0 0 0 0 4 0 0 18 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)
Activity ID
0620A-MPH-1670 0620A-CTT-1930 0620A-ZSE-1930 0620A-GSC-1620 0620A-GSC-1520 0620A-RMM-1630 0620A-RMM-1690 0620A-MPH-1950 0620A-SAC-1240 0620A-ZSE-2410 0620A-RMM-1790 0620A-SAC-1270 0620A-RMM-1830 0620A-RMM-1810 0620A-RMM-1820 0620A-GSC-1730 0620A-MPH-1980 0620A-ZSE-2600 0620A-MPH-2050 0620A-ZSE-2620 0620A-ZSE-2680 0620A-ZST-1530 0620A-ZST-1630 0620A-ZST-1650 0620A-ALL-1230 Area H (2nd Flr) 0620A-RMM-1250 0620A-MPH-1650 0620A-CTT-1850 0620A-ZSE-1840 0620A-GSC-1550 0620A-GSC-1460 0620A-RMM-1720 0620A-RMM-1450 0620A-RMM-1530 0620A-MPH-1850 0620A-SAC-1180 0620A-ZSE-2290 0620A-MPH-1960 0620A-GSC-1630 0620A-RMM-1900 0620A-MPH-1970 0620A-RMM-1620 0620A-SAC-1220 0620A-RMM-1680 0620A-ZSE-2380 0620A-RMM-1740 0620A-RMM-1760 0620A-ZSE-2750 0620A-RMM-1990 0620A-ZST-1390 0620A-RMM-2110 0620A-ZST-1460 0620A-ZST-1470 0620A-ZSE-2500 0620A-ZSE-2520 Area I (2nd Flr)
Activity Name
Orig Start Dur
Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 11 of 25
5 15 15 10 5 20 20 5 12 17 10 5 10 5 5 15 5 9 5 5 6 10 7 5 0 168 1 5 15 15 10 5 20 20 20 5 15 16 5 15 20 5 10 5 10 14 5 5 4 10 7 10 5 5 6 5 130
06-26-14 07-11-14 07-11-14 09-19-14 09-22-14 10-08-14 10-15-14 10-22-14 10-29-14 10-29-14 11-05-14 11-07-14 11-12-14 11-14-14 11-14-14 11-18-14 11-20-14 11-21-14 11-26-14 11-28-14 12-05-14 12-15-14 12-30-14 01-02-15 06-06-14 06-06-14 07-29-14 08-01-14 08-01-14 10-03-14 11-04-14 11-04-14 11-05-14 11-12-14 11-19-14 11-26-14 11-26-14 11-28-14 12-01-14 12-03-14 12-04-14 12-04-14 12-11-14 12-11-14 12-19-14 12-26-14 12-26-14 01-02-15 01-02-15 01-12-15 01-16-15 01-21-15 01-21-15 01-27-15 01-28-15 08-11-14
Finish
07-02-14 07-31-14 07-31-14 10-02-14 09-26-14 11-04-14 11-11-14 10-28-14 11-13-14 11-20-14 11-18-14 11-13-14 11-25-14 11-20-14 11-20-14 12-09-14 11-26-14 12-04-14 12-03-14 12-04-14 12-12-14 12-29-14 01-08-15 01-08-15 01-08-15 02-03-15 06-06-14 08-04-14 08-21-14 08-21-14 10-16-14 11-10-14 12-02-14 12-03-14 12-10-14 11-25-14 12-17-14 12-18-14 12-04-14 12-19-14 12-31-14 12-10-14 12-17-14 12-17-14 12-24-14 01-09-15 01-02-15 01-02-15 01-07-15 01-15-15 01-20-15 01-29-15 01-27-15 01-27-15 02-03-15 02-03-15 02-12-15
Late Start
11-04-14 11-14-14 11-14-14 01-05-15 12-11-14 10-20-14 10-27-14 12-01-14 01-16-15 12-08-14 02-10-15 02-17-15 02-03-15 02-17-15 02-17-15 01-22-15 01-29-15 01-02-15 02-17-15 02-17-15 01-15-15 01-23-15 02-06-15 02-17-15 06-18-14 06-18-14 11-11-14 12-08-14 12-08-14 01-19-15 01-07-15 02-26-15 11-17-14 11-24-14 12-29-14 02-03-15 01-06-15 02-05-15 02-03-15 03-26-15 03-05-15 03-09-15 03-05-15 02-25-15 01-28-15 03-25-15 03-25-15 07-14-15 06-08-15 02-17-15 06-22-15 02-26-15 03-05-15 03-24-15 03-25-15 11-18-14
Late Finish 11-10-14 12-05-14 12-05-14 01-16-15 12-17-14 11-14-14 11-21-14 12-05-14 02-02-15 12-31-14 02-23-15 02-23-15 02-16-15 02-23-15 02-23-15 02-11-15 02-04-15 01-14-15 02-23-15 02-23-15 01-22-15 02-05-15 02-16-15 02-23-15 02-23-15 07-17-15 06-18-14 11-17-14 12-29-14 12-29-14 01-30-15 01-13-15 03-25-15 12-15-14 12-22-14 01-05-15 02-23-15 01-27-15 02-11-15 02-23-15 04-23-15 03-11-15 03-20-15 03-11-15 03-10-15 02-16-15 03-31-15 03-31-15 07-17-15 06-19-15 02-25-15 07-03-15 03-04-15 03-11-15 03-31-15 03-31-15 04-08-15
Total Free Float Float 91 89 89 73 57 8 8 27 54 27 66 69 56 64 64 44 47 27 56 55 27 27 27 32 32 116 8 74 89 89 73 43 79 8 8 26 46 26 47 44 79 63 65 58 52 26 62 62 135 109 26 109 26 31 40 40 38
17 0 0 0 0 0 0 0 0 0 2 18 0 0 23 0 0 0 0 23 0 0 0 0 19 0 0 4 0 0 0 1 0 0 0 0 0 0 4 0 0 13 10 13 0 0 0 15 98 0 0 30 0 7 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)
Activity ID
0620A-MPH-1640 0620A-CTT-1780 0620A-ZSE-1790 0620A-GSC-1450 0620A-GSC-1410 0620A-RMM-1360 0620A-RMM-1390 0620A-GSC-1590 0620A-MPH-1760 0620A-ZSE-2070 0620A-MPH-1930 0620A-SAC-1150 0620A-MPH-1940 0620A-RMM-1440 0620A-SAC-1160 0620A-ZSE-2270 0620A-RMM-1520 0620A-ZSE-2310 0620A-RMM-1570 0620A-RMM-1580 0620A-ZST-1310 0620A-ZSE-2300 0620A-ZST-1340 0620A-ZST-1350 Third Floor Area G (3rd Flr) 0620A-CTT-2310 0620A-ZSE-2230 0620A-MPH-1780 0620A-MPH-1820 0620A-GSC-1690 0620A-GSC-1920 0620A-GSC-2030 0620A-RMM-2100 0620A-RMM-2130 0620A-MPH-2160 0620A-ZSE-2880 0620A-MPH-2170 0620A-MPH-2180 0620A-RMM-2190 0620A-SAC-1420 0620A-RMM-2210 0620A-SAC-1450 0620A-ZSE-3040 0620A-RMM-2250 0620A-RMM-2260 0620A-ZSE-3120 0620A-ZSE-3130 0620A-ZST-2180 0620A-ZST-2210 0620A-ZST-2220 0620A-ALL-1300 Area H (3rd Flr) 0620A-RMM-1260 0620A-MPH-1750 0620A-CTT-2160 0620A-ZSE-2080
Activity Name
Orig Start Dur
Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)
Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 12 of 25
5 10 10 7 5 20 20 10 5 5 8 13 5 7 5 7 10 4 5 5 7 5 5 5 174 149 15 15 10 5 5 10 15 20 20 10 17 5 5 10 12 10 5 9 5 5 6 5 10 7 5 0 152 1 10 15 15
08-11-14 08-22-14 08-22-14 10-17-14 12-04-14 12-04-14 12-11-14 12-15-14 12-18-14 12-26-14 12-26-14 12-26-14 12-31-14 01-05-15 01-08-15 01-12-15 01-12-15 01-21-15 01-26-15 01-26-15 01-28-15 02-04-15 02-06-15 02-06-15 09-03-14 09-03-14 09-03-14 09-03-14 09-09-14 09-23-14 09-29-14 11-19-14 12-22-14 01-05-15 01-12-15 01-19-15 01-26-15 02-02-15 02-02-15 02-02-15 02-02-15 02-09-15 02-11-15 02-18-15 02-23-15 02-23-15 03-03-15 03-04-15 03-11-15 03-25-15 03-27-15 09-17-14 09-17-14 10-22-14 10-22-14 10-22-14
Finish
08-15-14 09-05-14 09-05-14 10-27-14 12-10-14 01-02-15 01-09-15 12-29-14 12-24-14 01-02-15 01-07-15 01-14-15 01-07-15 01-13-15 01-14-15 01-20-15 01-23-15 01-26-15 01-30-15 01-30-15 02-05-15 02-10-15 02-12-15 02-12-15 05-08-15 04-02-15 09-23-14 09-23-14 09-22-14 09-29-14 10-03-14 12-03-14 01-13-15 01-30-15 02-06-15 01-30-15 02-17-15 02-06-15 02-06-15 02-13-15 02-17-15 02-20-15 02-17-15 03-02-15 02-27-15 02-27-15 03-10-15 03-10-15 03-24-15 04-02-15 04-02-15 04-02-15 04-22-15 09-17-14 11-04-14 11-11-14 11-11-14
Late Start
11-18-14 12-30-14 12-30-14 02-02-15 02-06-15 12-16-14 12-23-14 02-27-15 01-22-15 01-29-15 02-12-15 03-06-15 03-23-15 03-23-15 03-23-15 02-19-15 03-11-15 03-18-15 04-01-15 04-01-15 03-05-15 04-01-15 03-16-15 03-23-15 09-26-14 10-21-14 11-26-14 11-26-14 10-21-14 12-30-14 12-18-14 02-18-15 03-06-15 01-15-15 01-22-15 01-29-15 02-05-15 03-25-15 04-09-15 04-01-15 03-25-15 03-25-15 04-09-15 03-02-15 04-09-15 04-09-15 03-13-15 04-09-15 03-23-15 04-07-15 04-09-15 09-26-14 09-26-14 11-04-14 12-22-14 12-22-14
Late Finish 11-24-14 01-13-15 01-13-15 02-10-15 02-12-15 01-14-15 01-21-15 03-12-15 01-28-15 02-04-15 02-23-15 03-24-15 03-27-15 03-31-15 03-27-15 02-27-15 03-24-15 03-23-15 04-08-15 04-08-15 03-13-15 04-08-15 03-20-15 03-27-15 07-17-15 04-15-15 12-17-14 12-17-14 11-03-14 01-06-15 12-24-14 03-03-15 03-26-15 02-11-15 02-18-15 02-11-15 02-27-15 03-31-15 04-15-15 04-15-15 04-10-15 04-08-15 04-15-15 03-12-15 04-15-15 04-15-15 03-20-15 04-15-15 04-03-15 04-15-15 04-15-15 04-15-15 07-17-15 09-26-14 11-17-14 01-13-15 01-13-15
Total Free Float Float 70 89 89 73 44 8 8 52 23 23 33 49 57 55 52 28 42 40 47 47 26 40 26 31 49 8 60 60 30 68 57 62 52 8 8 8 8 37 47 42 37 32 40 8 32 32 8 25 8 8 8 8 61 7 9 42 42
14 29 29 11 0 0 0 0 0 5 0 0 17 13 19 0 0 0 0 15 0 15 0 18 0 0 3 3 0 26 16 0 0 0 0 0 0 0 15 10 0 0 18 0 0 15 0 13 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)
Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)
Activity ID
0620A-ZSE-2120 0620A-ZSE-2170 0620A-MPH-1770 0620A-GSC-1600 0620A-GSC-1820 0620A-RMM-2010 0620A-GSC-1930 0620A-RMM-2150 0620A-RMM-1940 0620A-RMM-1970 0620A-MPH-2090 0620A-ZSE-2770 0620A-RMM-2240 0620A-MPH-2140 0620A-MPH-2150 0620A-RMM-2090 0620A-SAC-1360 0620A-RMM-2120 0620A-RMM-2290 0620A-ZSE-2980 0620A-ZSE-2820 0620A-SAC-1380 0620A-RMM-2170 0620A-RMM-2180 0620A-ZSE-2930 0620A-ZST-1870 0620A-ZST-1980 0620A-ZST-1990 Area I (3rd Flr) 0620A-MPH-1730 0620A-MPH-1660 0620A-CTT-2070 0620A-ZSE-2000 0620A-ZSE-2030 0620A-GSC-1580 0620A-GSC-1720 0620A-GSC-1860 0620A-RMM-1800 0620A-MPH-2020 0620A-RMM-1840 0620A-ZSE-2590 0620A-MPH-2040 0620A-MPH-2070 0620A-SAC-1320 0620A-RMM-1930 0620A-SAC-1330 0620A-ZSE-2690 0620A-RMM-1960 0620A-ZSE-2710 0620A-RMM-2030 0620A-RMM-2050 0620A-ZST-1710 0620A-ZST-1750 0620A-ZST-1770 One Story Areas Area B (Gym) Area B.1 (Gym)
Activity Name
Orig Start Dur
Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Flr) HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd Flr) Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr) Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 13 of 25
Finish
Late Start
Late Finish
Total Free Float Float
Calendar 2013 J Jul A S O N D
4 2 5 5 10 20 15 20 20
10-29-14 11-04-14 11-05-14 11-12-14 12-04-14 01-02-15 01-05-15 01-30-15 02-02-15
11-03-14 11-05-14 11-11-14 11-18-14 12-17-14 01-29-15 01-23-15 02-26-15 02-27-15
02-19-15 02-25-15 01-07-15 01-14-15 03-04-15 04-24-15 03-18-15 05-22-15 02-12-15
02-24-15 02-26-15 01-13-15 01-20-15 03-17-15 05-21-15 04-08-15 06-19-15 03-11-15
78 78 42 42 62 79 52 79 8
0 9 0 0 0 0 0 0 0
Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days
20 10 14 10 5 5 10 15 10 10 12 16 5 5 5 5 7 5 5 129 10 5 10 10 4 5 7 10 20 10 20 7 5 5 13 7 5 7 10 5 5 5 7 5 5 283 131 131
02-09-15 02-16-15 02-23-15 02-27-15 03-02-15 03-02-15 03-02-15 03-02-15 03-09-15 03-13-15 03-13-15 03-13-15 03-16-15 03-23-15 03-23-15 03-30-15 04-07-15 04-16-15 04-16-15 11-05-14 11-05-14 11-12-14 11-12-14 11-12-14 11-19-14 12-11-14 12-18-14 01-19-15 03-02-15 03-09-15 03-09-15 03-16-15 03-23-15 03-23-15 03-23-15 03-30-15 04-02-15 04-07-15 04-07-15 04-09-15 04-21-15 04-21-15 04-23-15 05-04-15 05-04-15 03-21-14 03-21-14 03-21-14
03-06-15 02-27-15 03-12-15 03-12-15 03-06-15 03-06-15 03-13-15 03-20-15 03-20-15 03-26-15 03-30-15 04-03-15 03-20-15 03-27-15 03-27-15 04-03-15 04-15-15 04-22-15 04-22-15 05-08-15 11-18-14 11-18-14 11-25-14 11-25-14 11-24-14 12-17-14 12-29-14 01-30-15 03-27-15 03-20-15 04-03-15 03-24-15 03-27-15 03-27-15 04-09-15 04-08-15 04-09-15 04-15-15 04-20-15 04-15-15 04-27-15 04-27-15 05-01-15 05-08-15 05-08-15 05-01-15 09-25-14 09-25-14
02-19-15 02-26-15 03-05-15 06-22-15 04-01-15 05-07-15 04-21-15 04-13-15 04-14-15 07-06-15 04-21-15 03-25-15 04-28-15 04-28-15 04-28-15 04-28-15 04-17-15 04-28-15 04-28-15 11-18-14 11-18-14 02-06-15 01-30-15 01-30-15 02-27-15 02-13-15 03-23-15 04-01-15 03-18-15 03-25-15 04-01-15 04-15-15 04-09-15 05-14-15 05-04-15 05-12-15 05-14-15 04-24-15 04-30-15 05-14-15 05-14-15 05-14-15 05-05-15 05-14-15 05-14-15 05-19-14 05-19-14 05-19-14
03-18-15 03-11-15 03-24-15 07-03-15 04-08-15 05-13-15 05-04-15 05-01-15 04-27-15 07-17-15 05-06-15 04-16-15 05-04-15 05-04-15 05-04-15 05-04-15 04-27-15 05-04-15 05-04-15 05-20-15 12-02-14 02-12-15 02-12-15 02-12-15 03-04-15 02-19-15 03-31-15 04-15-15 04-15-15 04-08-15 04-29-15 04-23-15 04-15-15 05-20-15 05-20-15 05-20-15 05-20-15 05-04-15 05-13-15 05-20-15 05-20-15 05-20-15 05-13-15 05-20-15 05-20-15 06-05-15 02-13-15 02-13-15
8 8 8 79 22 47 35 29 25 79 26 8 30 25 25 20 8 8 8 8 9 59 54 54 69 44 65 52 12 12 17 21 12 37 29 30 29 13 17 25 17 17 8 8 8 24 98 98
0 0 0 0 0 10 10 0 0 71 12 0 8 0 15 2 0 0 0 0 2 5 0 0 0 31 13 44 0 0 0 8 0 29 0 13 21 0 0 17 0 9 0 0 0 0 0 0
Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Fl HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd F Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)
Activity ID
0620A-MPH-1470 0620A-RMM-1080 0620A-RMM-1090 0620A-RMM-1100 0620A-SAC-1080 0620A-MPH-1700 0620A-GSC-1150 0620A-ZSE-2010 0620A-SAC-1110 0620A-ZSE-2160 0620A-ZSE-2190 0620A-RMM-1490 0620A-ZST-1080 0620A-ZST-1090 0620A-ALL-1170 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-3230 0620A-CTT-1540 0620A-ZSE-1550 0620A-ZSE-1580 0620A-MPH-1530 0620A-MPH-1540 0620A-SSI-1000 0620A-RMM-1160 0620A-RMM-1180 0620A-MPH-1610 0620A-ZSE-1770 0620A-GSC-1030 0620A-GSC-1040 0620A-MPH-1680 0620A-ZSE-1900 0620A-ZSE-1910 0620A-SAC-1100 0620A-MPH-1720 0620A-RMM-1400 0620A-ZSE-2050 0620A-ZSE-2060 0620A-RMM-1430 0620A-SAC-1120 0620A-ZSE-2180 0620A-ZSE-2220 0620A-ZST-1100 0620A-ZST-1130 0620A-GSC-1170 0620A-ZST-1170 0620A-RMM-1650 0620A-RMM-1660 0620A-SSI-1010 Area B (Low Roof) 0620A-RMM-1190 0620A-GSC-3240 0620A-CTT-1590 0620A-ZSE-1640 0620A-ZSE-1660 0620A-MPH-1550 0620A-MPH-1580
Activity Name
Orig Start Dur
Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)
Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 14 of 25
10 12 3 5 15 5 5 17 5 5 4 5 1 1 0 191 137 10 15 15 16 5 10 3 60 60 25 24 5 10 12 20 23 36 5 15 10 12 30 5 3 5 5 5 15 5 5 5 5 183 1 9 10 10 20 5 10
03-21-14 04-04-14 04-23-14 04-28-14 07-10-14 07-29-14 08-19-14 08-26-14 09-08-14 09-18-14 09-19-14 09-19-14 09-25-14 09-25-14 04-07-14 04-23-14 04-23-14 05-07-14 05-07-14 05-14-14 05-21-14 05-29-14 06-03-14 06-05-14 06-12-14 06-19-14 06-26-14 07-22-14 07-22-14 07-25-14 07-31-14 07-31-14 07-31-14 08-05-14 08-29-14 09-03-14 09-03-14 09-08-14 09-15-14 09-19-14 09-25-14 09-26-14 10-03-14 10-08-14 10-10-14 10-20-14 10-20-14 10-29-14 04-07-14 04-07-14 05-15-14 05-29-14 05-29-14 06-06-14 06-10-14 06-17-14
Finish
04-03-14 04-22-14 04-25-14 05-02-14 07-30-14 08-04-14 08-25-14 09-18-14 09-12-14 09-24-14 09-24-14 09-25-14 09-25-14 09-25-14 09-25-14 01-07-15 11-04-14 05-06-14 05-28-14 05-28-14 06-05-14 05-28-14 06-11-14 06-05-14 08-28-14 09-05-14 07-24-14 07-30-14 07-28-14 08-04-14 08-11-14 08-27-14 09-02-14 09-19-14 08-11-14 09-19-14 09-16-14 09-18-14 10-17-14 09-19-14 09-23-14 10-01-14 10-02-14 10-09-14 10-28-14 10-16-14 10-24-14 10-24-14 11-04-14 12-24-14 04-07-14 05-28-14 06-11-14 06-11-14 07-03-14 06-16-14 06-30-14
Late Start
05-19-14 06-03-14 11-12-14 11-25-14 08-08-14 12-03-14 11-19-14 10-24-14 12-03-14 12-03-14 11-18-14 12-03-14 11-24-14 12-09-14 05-29-14 05-29-14 05-29-14 06-26-14 06-26-14 07-03-14 06-05-14 06-12-14 12-10-14 06-19-14 06-26-14 07-21-14 07-28-14 10-22-14 10-06-14 12-01-14 10-03-14 09-30-14 08-29-14 12-10-14 11-17-14 12-03-14 10-31-14 10-20-14 12-10-14 11-20-14 12-10-14 11-25-14 12-03-14 11-18-14 12-10-14 12-10-14 12-10-14 12-10-14 06-16-14 06-16-14 07-22-14 08-04-14 08-04-14 09-10-14 07-28-14 08-04-14
Late Finish 06-02-14 06-18-14 11-14-14 12-02-14 08-28-14 12-09-14 11-25-14 11-17-14 12-09-14 12-09-14 11-21-14 12-09-14 11-24-14 12-09-14 02-13-15 06-05-15 12-16-14 06-11-14 07-17-14 07-17-14 07-25-14 06-11-14 06-25-14 12-12-14 09-12-14 09-19-14 08-22-14 08-28-14 10-28-14 10-17-14 12-16-14 10-30-14 10-30-14 10-20-14 12-16-14 12-08-14 12-16-14 11-17-14 12-01-14 12-16-14 11-24-14 12-16-14 12-02-14 12-09-14 12-09-14 12-16-14 12-16-14 12-16-14 12-16-14 06-01-15 06-16-14 08-01-14 08-15-14 08-15-14 10-07-14 08-01-14 08-15-14
Total Free Float Float 40 40 142 148 21 89 65 42 61 53 42 52 42 52 98 105 29 25 35 35 35 10 10 133 10 10 21 21 65 53 89 45 42 21 89 55 64 42 30 61 44 53 42 42 29 42 36 36 29 109 48 46 46 46 66 33 33
0 0 0 96 0 0 0 0 0 0 0 0 0 0 88 0 0 0 0 0 0 0 0 107 0 0 0 0 0 0 0 3 0 0 3 5 11 0 0 28 2 6 0 0 0 5 0 5 3 0 1 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)
Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)
F
2016 M A M J
Activity ID
0620A-RMM-1200 0620A-GSC-1050 0620A-RMM-1320 0620A-GSC-1080 0620A-RMM-1410 0620A-RMM-1420 0620A-MPH-1790 0620A-ZSE-2200 0620A-ZSE-2150 0620A-RMM-1480 0620A-RMM-1540 0620A-ZSE-2280 0620A-MPH-1880 0620A-SAC-1170 0620A-MPH-1890 0620A-ZSE-2320 0620A-ZSE-2330 0620A-ZST-1200 0620A-RMM-1670 0620A-GSC-1260 0620A-ZST-1230 0620A-ZST-1240 0620A-SAC-1190 0620A-RMM-1730 0620A-RMM-1750 0620A-RMM-1850 Area C (Low Roof) 0620A-RMM-1240 0620A-CTT-1630 0620A-ZSE-1670 0620A-MPH-1590 0620A-MPH-1620 0620A-ZSE-1750 0620A-GSC-3250 0620A-RMM-1310 0620A-GSC-1100 0620A-GSC-1120 0620A-RMM-1470 0620A-RMM-1550 0620A-RMM-1590 0620A-MPH-1920 0620A-ZSE-2370 0620A-RMM-1640 0620A-GSC-1310 0620A-ZSE-2430 0620A-MPH-1990 0620A-ZSE-2490 0620A-MPH-2010 0620A-ZSE-2510 0620A-ZST-1360 0620A-RMM-1870 0620A-SAC-1280 0620A-ZST-1410 0620A-ZST-1420 0620A-RMM-1910 0620A-RMM-1980 0620A-SAC-1290
Activity Name
Orig Start Dur
HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 15 of 25
20 5 40 5 20 20 15 8 5 20 10 8 7 23 5 5 3 5 10 10 5 5 5 5 5 20 170 1 20 20 5 10 3 1 20 10 5 8 40 40 20 11 4 5 10 10 5 5 4 5 10 26 5 5 20 4 5
07-01-14 07-29-14 07-30-14 08-05-14 08-29-14 09-08-14 09-15-14 09-22-14 09-25-14 09-25-14 09-29-14 10-02-14 10-06-14 10-06-14 10-08-14 10-10-14 10-14-14 10-17-14 10-20-14 10-22-14 10-24-14 10-24-14 10-30-14 11-03-14 11-03-14 11-26-14 05-07-14 05-07-14 06-12-14 06-12-14 06-19-14 07-01-14 07-07-14 07-22-14 07-30-14 08-05-14 08-12-14 09-25-14 09-29-14 10-06-14 10-13-14 10-20-14 10-23-14 11-03-14 11-04-14 11-10-14 11-17-14 11-17-14 11-18-14 11-24-14 11-24-14 11-28-14 12-02-14 12-02-14 12-02-14 12-26-14 12-30-14
Finish
07-29-14 08-04-14 09-24-14 08-11-14 09-26-14 10-03-14 10-03-14 10-01-14 10-01-14 10-22-14 10-10-14 10-13-14 10-14-14 11-05-14 10-14-14 10-16-14 10-16-14 10-23-14 10-31-14 11-04-14 10-30-14 10-30-14 11-05-14 11-07-14 11-07-14 12-24-14 01-07-15 05-07-14 07-10-14 07-10-14 06-25-14 07-15-14 07-09-14 07-22-14 08-26-14 08-18-14 08-18-14 10-06-14 11-21-14 12-01-14 11-07-14 11-03-14 10-28-14 11-07-14 11-17-14 11-21-14 11-21-14 11-21-14 11-21-14 12-01-14 12-08-14 01-06-15 12-08-14 12-08-14 12-30-14 12-31-14 01-06-15
Late Start
08-18-14 10-29-14 09-25-14 10-20-14 09-15-14 09-22-14 09-30-14 11-17-14 11-20-14 04-20-15 12-09-14 11-28-14 12-24-14 10-21-14 12-29-14 12-29-14 12-16-14 12-19-14 12-02-14 12-17-14 12-29-14 12-29-14 12-29-14 12-29-14 12-29-14 05-04-15 06-17-14 06-17-14 09-29-14 09-29-14 09-19-14 09-26-14 10-08-14 09-15-14 09-16-14 11-05-14 10-27-14 01-19-15 10-13-14 10-20-14 11-14-14 12-02-14 05-18-15 01-13-15 12-17-14 01-08-15 01-15-15 01-15-15 01-02-15 01-08-15 12-31-14 12-15-14 01-15-15 01-15-15 12-16-14 06-02-15 01-15-15
Late Finish 09-15-14 11-04-14 11-19-14 10-24-14 10-10-14 10-17-14 10-20-14 11-26-14 11-26-14 05-15-15 12-22-14 12-09-14 01-05-15 11-20-14 01-05-15 01-05-15 12-18-14 12-26-14 12-15-14 12-31-14 01-05-15 01-05-15 01-05-15 01-05-15 01-05-15 06-01-15 06-05-15 06-17-14 10-24-14 10-24-14 09-25-14 10-09-14 10-10-14 09-15-14 10-13-14 11-18-14 10-31-14 01-28-15 12-08-14 12-15-14 12-12-14 12-16-14 05-21-15 01-19-15 12-31-14 01-21-15 01-21-15 01-21-15 01-07-15 01-14-15 01-14-15 01-21-15 01-21-15 01-21-15 01-14-15 06-05-15 01-21-15
Total Free Float Float 33 65 40 53 10 10 11 40 40 143 50 40 56 11 56 54 44 44 30 39 44 44 40 38 38 109 105 28 75 75 64 61 66 38 33 65 53 79 10 10 24 30 143 48 30 40 40 40 30 30 25 11 30 30 10 109 11
0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 0 0 0 0 0 0 18 10 0 12 0 0 4 0 0 0 20 0 5 0 0 0 0 0 0 0 0 4 9 0 0 30 30 0 0 15 0 0 0 0 0 1
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)
Activity ID
Activity Name
Orig Start Dur
0620A-RMM-2020 HVAC System Testing - Area C (Low Roof) 0620A-RMM-2040 HVAC Above Ceiling Finalization - Area C (Low Roof) 0620A-ALL-1220 Interior Rough-in Substantially Complete - Area A /B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-MPH-1710 Storm Drain Rough-in - Area C (Aux Gym) 0620A-MPH-1740 Plumbing Above Ceiling Finalization - Area C (Aux Gym) 0620A-GSC-1130 Block Filler - Area C (Aux Gym) 0620A-RMM-1460 HVAC Ductwork Rough-in - Area C (Aux Gym) 0620A-ZSE-2260 Conduit - Overhead - Area C (Aux Gym) 0620A-RMM-1610 HVAC Controls Rough-in - Area C (Aux Gym) 0620A-ZSE-2340 Pull Electrical Wires - Area C (Aux Gym) 0620A-ZSE-2360 Electrical Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1260 Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) 0620A-SAC-1200 Fire Protection Rough-in - Area C (Aux Gym) 0620A-SAC-1210 Fire Protection Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1450 Tech Above Ceiling Finalization - Area C (Aux Gym) 0620A-RMM-2070 HVAC System Testing - Area C (Aux Gym) 0620A-RMM-2080 HVAC Above Ceiling Finalization - Area C (Aux Gym) 0620A-ALL-1240 Interior Rough-in Substantially Complete - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2200 Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2130 Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1390 Metal Studs - Area D/E/F (Low Roof) 0620A-MPH-1830 Plumbing Chase Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1510 Gypsum Board - Area D/E/F (Low Roof) 0620A-GSC-1400 Block Filler - Area D/E/F (Low Roof) 0620A-MPH-1870 Storm Drain Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2210 Switchgear - Area D/E/F (Low Roof) 0620A-RMM-1880 HVAC Ductwork Rough-in - Area D/E/F (Low Roof) 0620A-RMM-1920 HVAC Piping Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2080 Plumbing Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2730 Conduit - Overhead - Area D/E/F (Low Roof) 0620A-MPH-2120 Plumbing Insulation - Area D/E/F (Low Roof) 0620A-SAC-1430 Fire Protection Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2130 Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZSE-2790 Pull Electrical Wires - Area D/E/F (Low Roof) 0620A-ZSE-2830 Cable Tray - Area D/E/F (Low Roof) 0620A-ZSE-2860 Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1800 Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) 0620A-ZST-1840 Tech Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1850 Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) 0620A-RMM-2270 HVAC Controls Rough-in - Area D/E/F (Low Roof) 0620A-RMM-2280 HVAC Insulation - Area D/E/F (Low Roof) 0620A-SAC-1460 Fire Protection Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-RMM-2330 HVAC System Testing - Area D/E/F (Low Roof) 0620A-RMM-2340 HVAC Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ALL-1310 Interior Rough-in Substantially Complete - Area D/E/F (Low Roof) Interior Finishes Academic Area First Floor Area D (1st Flr) 0620A-ZST-1160 Tech Rm Build-out and Backbone - Area D (1st Flr) 0620A-GSC-1770 Paint - Area D (1st Flr) 0620A-GSC-1800 Ceiling Grid - Area D (1st Flr) 0620A-ZSE-2560 Light Fixtures - Area D (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 16 of 25
5 5 0 107 107 7 5 5 8 7 5 5 5 1 15 5 5 5 5 0 124 124 5 5 5 5 5 5 10 6 65 65 15 12 7 54 5 13 7 5 6 5 4 10 27 5 5 5 0 208 202 135 135 5 12 12 8
12-31-14 12-31-14 08-13-14 08-13-14 08-13-14 08-15-14 08-26-14 09-25-14 10-07-14 10-13-14 10-16-14 10-17-14 10-31-14 11-06-14 11-20-14 12-09-14 01-08-15 01-08-15 11-05-14 11-05-14 11-05-14 11-05-14 11-12-14 11-14-14 11-19-14 11-19-14 11-21-14 11-25-14 12-08-14 12-15-14 12-22-14 12-30-14 01-14-15 01-14-15 01-16-15 01-16-15 02-04-15 02-06-15 02-13-15 02-20-15 02-23-15 03-11-15 03-18-15 03-24-15 04-27-15 04-27-15 09-22-14 09-22-14 09-22-14 09-22-14 09-22-14 12-11-14 12-15-14 12-23-14
Finish
01-07-15 01-07-15 01-07-15 01-14-15 01-14-15 08-21-14 08-21-14 09-02-14 10-06-14 10-15-14 10-17-14 10-22-14 10-23-14 10-31-14 11-26-14 11-26-14 12-15-14 01-14-15 01-14-15 01-14-15 05-01-15 05-01-15 11-11-14 11-11-14 11-18-14 11-20-14 11-25-14 11-25-14 12-05-14 12-03-14 03-10-15 03-17-15 01-13-15 01-15-15 01-22-15 03-30-15 01-22-15 02-03-15 02-12-15 02-12-15 02-20-15 02-26-15 02-26-15 03-24-15 04-24-15 03-30-15 05-01-15 05-01-15 05-01-15 07-15-15 07-07-15 04-01-15 04-01-15 09-26-14 12-29-14 12-31-14 01-05-15
Late Start
01-15-15 01-15-15 10-10-14 10-10-14 10-10-14 12-19-14 11-26-14 11-11-14 12-01-14 12-23-14 12-10-14 01-08-15 01-07-15 11-21-14 01-08-15 04-29-15 02-18-15 02-18-15 11-25-14 11-25-14 01-14-15 01-14-15 02-11-15 11-25-14 02-25-15 01-21-15 12-03-14 03-05-15 12-17-14 12-24-14 02-04-15 03-13-15 05-04-15 02-25-15 05-06-15 03-31-15 04-20-15 05-06-15 04-29-15 05-06-15 05-07-15 04-29-15 03-27-15 05-06-15 05-06-15 05-06-15 11-17-14 11-17-14 11-17-14 11-17-14 11-17-14 12-31-14 01-05-15 02-09-15
Late Finish 01-21-15 01-21-15 01-21-15 05-05-15 05-05-15 10-20-14 12-26-14 12-03-14 11-20-14 12-09-14 12-30-14 12-16-14 01-14-15 01-07-15 12-12-14 01-14-15 05-05-15 02-24-15 02-24-15 02-24-15 05-12-15 05-12-15 01-20-15 01-20-15 02-17-15 12-02-14 03-03-15 01-27-15 12-16-14 03-12-15 03-19-15 03-26-15 02-24-15 03-30-15 05-12-15 05-12-15 05-12-15 04-17-15 04-28-15 05-12-15 05-06-15 05-12-15 05-12-15 05-12-15 05-05-15 05-12-15 05-12-15 05-12-15 05-12-15 07-24-15 07-17-15 07-10-15 07-10-15 11-21-14 01-16-15 01-20-15 02-18-15
Total Free Float Float 10 10 10 78 78 41 88 65 33 38 50 38 56 45 11 32 98 29 29 29 7 7 47 47 62 7 67 42 7 69 7 7 30 52 77 30 77 52 52 62 52 52 52 34 7 30 7 7 7 7 8 70 70 40 13 13 32
0 0 0 0 0 0 32 8 0 0 25 1 16 15 0 21 46 0 0 19 0 0 0 0 0 0 58 0 0 17 0 0 0 0 0 0 70 0 0 55 0 45 0 27 0 23 0 0 0 0 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J HVAC System Testing - Area C (Low Roof) HVAC Above Ceiling Finalization - Area C (Low Roof) Interior Rough-in Substantially Complete - Area A /B/C (1-Story)
Storm Drain Rough-in - Area C (Aux Gym) Plumbing Above Ceiling Finalization - Area C (Aux Gym) Block Filler - Area C (Aux Gym) HVAC Ductwork Rough-in - Area C (Aux Gym) Conduit - Overhead - Area C (Aux Gym) HVAC Controls Rough-in - Area C (Aux Gym) Pull Electrical Wires - Area C (Aux Gym) Electrical Above Ceiling Finalization - Area C (Aux Gym) Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) Fire Protection Rough-in - Area C (Aux Gym) Fire Protection Above Ceiling Finalization - Area C (Aux Gym) Tech Above Ceiling Finalization - Area C (Aux Gym) HVAC System Testing - Area C (Aux Gym) HVAC Above Ceiling Finalization - Area C (Aux Gym) Interior Rough-in Substantially Complete - Area C (Aux Gym)
Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) Metal Studs - Area D/E/F (Low Roof) Plumbing Chase Rough-in - Area D/E/F (Low Roof) Gypsum Board - Area D/E/F (Low Roof) Block Filler - Area D/E/F (Low Roof) Storm Drain Rough-in - Area D/E/F (Low Roof) Switchgear - Area D/E/F (Low Roof) HVAC Ductwork Rough-in - Area D/E/F (Low Roof) HVAC Piping Rough-in - Area D/E/F (Low Roof) Plumbing Rough-in - Area D/E/F (Low Roof) Conduit - Overhead - Area D/E/F (Low Roof) Plumbing Insulation - Area D/E/F (Low Roof) Fire Protection Rough-in - Area D/E/F (Low Roof) Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) Pull Electrical Wires - Area D/E/F (Low Roof) Cable Tray - Area D/E/F (Low Roof) Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) Tech Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) HVAC Controls Rough-in - Area D/E/F (Low Roof) HVAC Insulation - Area D/E/F (Low Roof) Fire Protection Above Ceiling Finalization - Area D/E/F (L HVAC System Testing - Area D/E/F (Low Roof) HVAC Above Ceiling Finalization - Area D/E/F (Low Interior Rough-in Substantially Complete - Area D/E/
Tech Rm Build-out and Backbone - Area D (1st Flr) Paint - Area D (1st Flr) Ceiling Grid - Area D (1st Flr) Light Fixtures - Area D (1st Flr)
Activity ID
0620A-RMM-1890 0620A-GSC-1910 0620A-ZST-1370 0620A-SAC-1310 0620A-ZSE-2630 0620A-GSC-1980 0620A-ZSE-2670 0620A-FEC-1040 0620A-GSC-2080 0620A-ZSE-2720 0620A-GSC-2090 0620A-ZST-1520 0620A-MPH-2100 0620A-ZST-1580 0620A-GSC-2190 0620A-GSC-2210 0620A-ZST-1680 0620A-GSC-2240 0620A-GSC-2250 0620A-ZST-1740 0620A-ZST-1820 0620A-GSC-2570 0620A-GSC-2220 0620A-ALL-1280 Area E (1st Flr) 0620A-GSC-1670 0620A-GSC-1700 0620A-ZSE-2440 0620A-RMM-1780 0620A-ZST-1300 0620A-GSC-1760 0620A-SAC-1260 0620A-ZSE-2480 0620A-GSC-1840 0620A-ZSE-2550 0620A-FEC-1020 0620A-ZSE-2570 0620A-GSC-1900 0620A-ZST-1400 0620A-GSC-1940 0620A-ZST-1430 0620A-MPH-2060 0620A-ZST-1720 0620A-GSC-2000 0620A-GSC-2040 0620A-GSC-2060 0620A-GSC-2070 0620A-ZST-1790 0620A-GSC-2050 Area F (1st Flr) 0620A-ZST-1070 0620A-GSC-1560 0620A-GSC-1570 0620A-ZSE-2350 0620A-RMM-1700 0620A-GSC-1660 0620A-ZST-1250
Activity Name
Orig Start Dur
HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr) Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 17 of 25
6 10 10 3 3 10 5 8 15 1 5 5 10 5 10 3 5 5 6 5 10 10 5 0 57 12 12 7 6 5 10 3 4 10 3 8 1 15 2 5 2 10 2 10 3 4 6 4 5 94 5 12 12 10 6 8 10
12-26-14 12-30-14 12-30-14 12-31-14 01-06-15 01-06-15 01-09-15 01-12-15 01-14-15 01-16-15 01-20-15 01-20-15 01-20-15 01-27-15 01-28-15 02-03-15 02-03-15 02-04-15 02-04-15 02-10-15 02-17-15 03-03-15 03-06-15 12-30-14 12-30-14 01-02-15 01-13-15 01-14-15 01-16-15 01-16-15 01-19-15 01-22-15 01-22-15 01-28-15 01-28-15 02-02-15 02-04-15 02-05-15 02-05-15 02-09-15 02-10-15 02-17-15 02-18-15 02-24-15 02-25-15 02-25-15 03-03-15 03-13-15 11-18-14 11-18-14 01-16-15 01-20-15 01-26-15 01-30-15 02-03-15 02-03-15
Finish
01-05-15 01-13-15 01-13-15 01-05-15 01-08-15 01-19-15 01-15-15 01-21-15 02-03-15 01-16-15 01-26-15 01-26-15 02-02-15 02-02-15 02-10-15 02-05-15 02-09-15 02-10-15 02-11-15 02-16-15 03-02-15 03-16-15 03-12-15 04-01-15 03-19-15 01-15-15 01-19-15 01-21-15 01-21-15 01-22-15 01-29-15 01-21-15 01-27-15 02-04-15 01-30-15 02-06-15 02-02-15 02-24-15 02-06-15 02-11-15 02-10-15 02-23-15 02-18-15 03-03-15 02-26-15 03-02-15 03-04-15 03-06-15 03-19-15 04-01-15 11-24-14 02-02-15 02-04-15 02-06-15 02-06-15 02-12-15 02-16-15
Late Start
02-06-15 02-18-15 03-24-15 02-11-15 05-15-15 02-16-15 06-10-15 03-04-15 03-18-15 07-07-15 03-26-15 04-09-15 04-28-15 04-16-15 04-30-15 05-21-15 04-23-15 06-15-15 05-04-15 04-30-15 05-07-15 06-29-15 06-08-15 01-19-15 01-19-15 01-21-15 02-19-15 02-20-15 04-08-15 03-04-15 02-25-15 05-20-15 03-02-15 06-17-15 03-16-15 07-08-15 04-09-15 04-27-15 04-08-15 05-04-15 05-12-15 05-18-15 05-14-15 05-27-15 06-22-15 05-12-15 05-21-15 06-15-15 01-07-15 01-07-15 02-04-15 02-06-15 03-02-15 03-06-15 03-18-15 04-15-15
Late Finish 02-13-15 03-03-15 04-07-15 02-13-15 05-19-15 02-27-15 06-16-15 03-13-15 04-08-15 07-07-15 04-01-15 04-15-15 05-11-15 04-22-15 05-13-15 05-26-15 04-29-15 06-19-15 05-11-15 05-06-15 05-20-15 07-10-15 06-12-15 07-10-15 07-08-15 02-03-15 02-05-15 02-27-15 02-27-15 04-14-15 03-17-15 02-27-15 05-26-15 03-13-15 06-19-15 03-25-15 07-08-15 04-29-15 04-28-15 04-14-15 05-05-15 05-26-15 05-19-15 05-28-15 05-29-15 06-25-15 05-19-15 05-27-15 06-19-15 07-09-15 01-13-15 02-19-15 02-23-15 03-13-15 03-13-15 03-27-15 04-28-15
Total Free Float Float 29 35 59 29 92 29 106 37 45 120 47 56 69 56 65 76 56 91 62 56 56 82 64 70 77 13 13 27 27 57 33 27 83 27 98 33 110 45 56 43 59 64 63 60 64 81 53 56 64 69 33 13 13 25 25 31 50
0 0 2 0 0 0 0 0 0 10 2 0 0 0 5 12 0 10 9 0 0 12 0 0 0 0 0 0 0 7 2 0 0 0 0 2 15 0 0 5 4 0 8 1 0 6 4 8 4 0 0 0 0 0 0 4 2
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
2015 J F M A M J Jul A S O N D J HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr)
Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)
F
2016 M A M J
Activity ID
0620A-SAC-1230 0620A-GSC-1710 0620A-ZSE-2400 0620A-FEC-1000 0620A-ZSE-2450 0620A-GSC-1750 0620A-ZST-1290 0620A-ZSE-2460 0620A-GSC-1740 0620A-ZST-1330 0620A-MPH-2000 0620A-ZST-1600 0620A-GSC-1850 0620A-GSC-1870 0620A-GSC-1880 0620A-ZST-1670 0620A-ZST-1730 Second Floor Area G (2nd Flr) 0620A-GSC-2100 0620A-GSC-2280 0620A-ZSE-2850 0620A-RMM-2160 0620A-GSC-2260 0620A-ZST-1660 0620A-SAC-1390 0620A-ZSE-2900 0620A-GSC-2380 0620A-ZSE-2950 0620A-FEC-1080 0620A-GSC-2580 0620A-GSC-2400 0620A-ZSE-2970 0620A-GSC-2820 0620A-ZST-1920 0620A-MPH-2260 0620A-ZST-2050 0620A-ZST-2070 0620A-GSC-2930 0620A-GSC-2940 0620A-GSC-2950 0620A-GSC-2960 0620A-ZST-2140 0620A-GSC-2910 0620A-ALL-1320 Area H (2nd Flr) 0620A-ZST-1690 0620A-GSC-1950 0620A-GSC-2110 0620A-ZSE-2800 0620A-RMM-2060 0620A-ZST-1550 0620A-GSC-2180 0620A-SAC-1350 0620A-ZSE-2840 0620A-GSC-2320 0620A-FEC-1060
Activity Name
Orig Start Dur
Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)
Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 18 of 25
3 8 8 8 3 5 5 1 10 5 8 5 8 3 6 5 10 119 80 12 12 7 6 10 10 3 3 10 3 8 10 5 1 15 5 10 3 5 3 4 5 6 10 10 0 111 10 12 12 9 6 7 10 3 7 10 8
02-04-15 02-09-15 02-09-15 02-11-15 02-19-15 02-19-15 02-19-15 02-24-15 02-25-15 02-26-15 03-03-15 03-05-15 03-05-15 03-11-15 03-11-15 03-12-15 03-19-15 12-08-14 02-03-15 02-03-15 02-05-15 02-16-15 02-17-15 02-19-15 02-19-15 02-20-15 02-25-15 02-25-15 03-02-15 03-03-15 03-03-15 03-04-15 03-05-15 03-05-15 03-11-15 03-12-15 03-18-15 03-23-15 03-26-15 03-26-15 03-26-15 03-26-15 04-02-15 04-17-15 12-08-14 12-08-14 02-19-15 02-23-15 02-26-15 03-05-15 03-09-15 03-09-15 03-10-15 03-11-15 03-13-15 03-19-15
Finish
02-06-15 02-18-15 02-18-15 02-20-15 02-23-15 02-25-15 02-25-15 02-24-15 03-10-15 03-04-15 03-12-15 03-11-15 03-16-15 03-13-15 03-18-15 03-18-15 04-01-15 05-27-15 05-27-15 02-18-15 02-20-15 02-24-15 02-24-15 03-04-15 03-04-15 02-24-15 02-27-15 03-10-15 03-04-15 03-12-15 03-16-15 03-10-15 03-05-15 03-25-15 03-17-15 03-25-15 03-20-15 03-27-15 03-30-15 03-31-15 04-01-15 04-02-15 04-16-15 04-30-15 05-27-15 05-14-15 12-19-14 03-06-15 03-10-15 03-10-15 03-12-15 03-17-15 03-20-15 03-12-15 03-19-15 03-26-15 03-30-15
Late Start
03-11-15 03-16-15 05-27-15 03-26-15 06-22-15 04-15-15 04-29-15 07-09-15 04-30-15 05-06-15 05-29-15 05-13-15 05-29-15 06-26-15 05-20-15 05-20-15 05-28-15 02-20-15 02-20-15 02-20-15 02-24-15 03-17-15 03-18-15 03-30-15 05-08-15 03-23-15 06-08-15 03-26-15 06-25-15 04-08-15 07-06-15 04-22-15 07-10-15 04-14-15 05-22-15 05-14-15 06-01-15 06-04-15 06-22-15 06-30-15 06-22-15 05-29-15 06-11-15 06-03-15 03-10-15 06-08-15 03-10-15 03-12-15 03-27-15 04-01-15 06-01-15 04-21-15 04-07-15 06-11-15 04-10-15 04-20-15
Late Finish 03-13-15 03-25-15 06-05-15 04-07-15 06-24-15 04-21-15 05-05-15 07-09-15 05-13-15 05-12-15 06-09-15 05-19-15 06-09-15 06-30-15 05-28-15 05-27-15 06-10-15 07-17-15 07-17-15 03-09-15 03-11-15 03-25-15 03-25-15 04-13-15 05-21-15 03-25-15 06-10-15 04-09-15 06-29-15 04-17-15 07-17-15 04-28-15 07-10-15 05-04-15 05-29-15 05-28-15 06-03-15 06-10-15 06-24-15 07-03-15 06-26-15 06-05-15 06-24-15 06-16-15 07-17-15 07-17-15 06-19-15 03-25-15 03-27-15 04-09-15 04-09-15 06-09-15 05-04-15 04-09-15 06-19-15 04-23-15 04-29-15
Total Free Float Float 25 25 75 31 85 38 48 95 45 48 61 48 59 75 49 48 48 37 37 13 13 21 21 27 55 21 71 21 81 25 87 34 89 27 51 44 51 51 60 66 60 44 48 32 37 45 126 13 13 21 19 58 30 19 64 19 21
0 0 0 6 0 4 0 6 0 0 39 0 12 13 5 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 50 7 13 0 0 0 0 3 0 11 9 9 0 0 0 0 17 0 0 0 0 5 2 0 0 0 2
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D J Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)
F
Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)
2016 M A M J
Activity ID
0620A-ZSE-2890 0620A-ZSE-2920 0620A-GSC-2660 0620A-GSC-2370 0620A-ZST-1810 0620A-MPH-2240 0620A-ZST-1860 0620A-ZST-1910 0620A-GSC-2780 0620A-GSC-2790 0620A-GSC-2800 0620A-GSC-2810 0620A-ZST-2060 0620A-ZST-2150 0620A-GSC-2760 Area I (2nd Flr) 0620A-GSC-1810 0620A-GSC-1960 0620A-ZSE-2660 0620A-RMM-1950 0620A-ZST-1500 0620A-GSC-2010 0620A-SAC-1340 0620A-ZSE-2740 0620A-GSC-2160 0620A-FEC-1050 0620A-ZSE-2760 0620A-ZSE-2780 0620A-GSC-2200 0620A-ZST-1620 0620A-GSC-2520 0620A-ZST-1700 0620A-ZST-1780 0620A-MPH-2200 0620A-ZST-1930 0620A-GSC-2640 0620A-GSC-2650 0620A-GSC-2700 Third Floor Area G (3rd Flr) 0620A-GSC-2590 0620A-GSC-2270 0620A-ZST-2160 0620A-GSC-2830 0620A-GSC-2740 0620A-ZSE-3210 0620A-RMM-2350 0620A-SAC-1500 0620A-ZSE-3220 0620A-GSC-2970 0620A-ZSE-3240 0620A-ZSE-3250 0620A-FEC-1130 0620A-GSC-3020 0620A-GSC-3040 0620A-ZST-2280 0620A-MPH-2290
Activity Name
Orig Start Dur
Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr)
3 1 15 5 5 10 3 3 3 5 6 6 7 10 10 56 12 12 10 6 7 8 3 5 8 8 3 1 5 5 12 3 3 8 7 3 6 8 89 89 10 12 10 12 10 7 6 3 2 10 2 1 8 15 5 5 10
Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)
Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 19 of 25
03-20-15 03-25-15 03-26-15 03-27-15 03-27-15 04-01-15 04-03-15 04-09-15 04-16-15 04-16-15 04-17-15 04-17-15 04-17-15 04-28-15 05-01-15 03-09-15 03-09-15 03-11-15 03-17-15 03-23-15 03-25-15 03-25-15 03-26-15 03-31-15 03-31-15 04-02-15 04-08-15 04-13-15 04-13-15 04-13-15 04-17-15 04-20-15 04-23-15 04-23-15 04-28-15 05-05-15 05-05-15 05-15-15 03-03-15 03-03-15 03-03-15 03-12-15 03-30-15 04-03-15 04-10-15 04-15-15 04-16-15 04-21-15 04-24-15 04-24-15 04-28-15 04-30-15 04-30-15 05-04-15 05-08-15 05-08-15 05-08-15
Finish
03-24-15 03-25-15 04-16-15 04-02-15 04-02-15 04-15-15 04-08-15 04-13-15 04-20-15 04-22-15 04-24-15 04-24-15 04-27-15 05-11-15 05-14-15 05-27-15 03-24-15 03-26-15 03-30-15 03-30-15 04-02-15 04-03-15 03-30-15 04-07-15 04-10-15 04-14-15 04-10-15 04-13-15 04-17-15 04-17-15 05-04-15 04-22-15 04-27-15 05-04-15 05-06-15 05-07-15 05-12-15 05-27-15 07-07-15 07-07-15 03-16-15 03-27-15 04-13-15 04-21-15 04-23-15 04-23-15 04-23-15 04-23-15 04-27-15 05-07-15 04-29-15 04-30-15 05-11-15 05-22-15 05-14-15 05-14-15 05-21-15
Late Start
06-30-15 07-13-15 05-05-15 05-08-15 06-10-15 05-29-15 06-17-15 06-22-15 06-29-15 06-29-15 06-08-15 07-06-15 06-25-15 07-06-15 06-17-15 03-26-15 03-26-15 03-30-15 04-10-15 04-16-15 06-15-15 05-14-15 04-21-15 06-22-15 04-24-15 04-30-15 07-03-15 07-14-15 05-15-15 06-24-15 05-27-15 07-01-15 07-06-15 06-12-15 07-09-15 07-14-15 06-16-15 07-01-15 04-14-15 04-14-15 06-10-15 04-14-15 05-12-15 04-16-15 04-30-15 04-27-15 04-28-15 05-01-15 06-29-15 05-06-15 07-08-15 07-15-15 05-12-15 05-14-15 05-22-15 05-27-15 06-10-15
Late Finish 07-02-15 07-13-15 05-26-15 05-14-15 06-16-15 06-11-15 06-19-15 06-24-15 07-01-15 07-03-15 06-15-15 07-13-15 07-03-15 07-17-15 06-30-15 07-17-15 04-13-15 04-15-15 04-23-15 04-23-15 06-23-15 05-26-15 04-23-15 06-26-15 05-05-15 05-11-15 07-07-15 07-14-15 05-21-15 06-30-15 06-11-15 07-03-15 07-08-15 06-23-15 07-17-15 07-16-15 06-23-15 07-10-15 07-17-15 07-17-15 06-23-15 04-29-15 05-26-15 05-01-15 05-13-15 05-05-15 05-05-15 05-05-15 06-30-15 05-19-15 07-09-15 07-15-15 05-21-15 06-04-15 05-29-15 06-02-15 06-23-15
Total Free Float Float 70 76 27 29 51 40 51 51 51 51 35 55 48 48 32 37 13 13 17 17 56 35 17 57 17 19 61 65 24 51 27 51 51 35 51 49 29 32 8 8 69 22 30 8 14 8 8 8 45 8 50 53 8 8 10 12 22
0 11 0 5 0 0 0 3 0 18 6 6 0 11 0 0 0 0 0 0 5 8 0 0 0 8 0 12 7 0 0 0 0 16 14 13 8 0 0 0 48 0 2 0 0 0 0 0 0 0 0 16 0 0 2 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr) Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)
Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)
Activity ID
0620A-GSC-3070 0620A-ZST-2300 0620A-GSC-3100 0620A-GSC-3110 0620A-ZST-2320 0620A-GSC-3120 0620A-GSC-3130 0620A-ZST-2340 0620A-ALL-1380 Area H (3rd Flr) 0620A-GSC-2170 0620A-ZST-2100 0620A-GSC-2530 0620A-GSC-2610 0620A-ZSE-3150 0620A-RMM-2310 0620A-SAC-1480 0620A-ZSE-3170 0620A-GSC-2710 0620A-FEC-1120 0620A-ZSE-3190 0620A-ZSE-3200 0620A-GSC-2750 0620A-GSC-2770 0620A-ZST-2230 0620A-MPH-2250 0620A-ZST-2240 0620A-ZST-2250 0620A-GSC-2860 0620A-ZST-2260 0620A-GSC-2880 0620A-GSC-2890 0620A-GSC-2980 0620A-GSC-2990 Area I (3rd Flr) 0620A-GSC-1990 0620A-ZST-2000 0620A-GSC-2510 0620A-GSC-2340 0620A-ZSE-2940 0620A-RMM-2200 0620A-SAC-1440 0620A-ZSE-3010 0620A-GSC-2430 0620A-FEC-1090 0620A-ZSE-3060 0620A-ZSE-3090 0620A-GSC-2540 0620A-ZST-2090 0620A-GSC-2620 0620A-ZST-2130 0620A-MPH-2220 0620A-ZST-2170 0620A-GSC-2670 0620A-ZST-2190 0620A-GSC-2720 0620A-GSC-2730
Activity Name
Orig Start Dur
Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr
3 3 10 5 5 4 6 10 0 67 12 7 12 10 9 6 3 5 10 8 3 1 15 5 5 10 3 3 10 7 6 6 3 5 58 12 7 8 12 10 6 3 5 8 8 2 1 5 5 10 3 8 3 8 7 3 6
Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 20 of 25
05-15-15 05-15-15 05-18-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 03-30-15 03-30-15 04-16-15 04-23-15 04-24-15 04-30-15 05-05-15 05-08-15 05-13-15 05-13-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 05-28-15 06-01-15 06-04-15 06-09-15 06-09-15 06-12-15 06-16-15 06-16-15 06-26-15 06-26-15 04-16-15 04-16-15 05-04-15 05-08-15 05-11-15 05-15-15 05-21-15 05-27-15 06-01-15 06-01-15 06-03-15 06-08-15 06-10-15 06-11-15 06-11-15 06-16-15 06-18-15 06-22-15 06-23-15 06-24-15 06-26-15 06-30-15 06-30-15
Finish
05-19-15 05-19-15 06-01-15 05-26-15 05-27-15 05-29-15 06-02-15 06-10-15 07-07-15 07-02-15 04-15-15 04-24-15 05-08-15 05-07-15 05-12-15 05-12-15 05-12-15 05-19-15 05-27-15 05-29-15 05-22-15 05-26-15 06-15-15 06-03-15 06-03-15 06-12-15 06-08-15 06-11-15 06-22-15 06-22-15 06-23-15 06-23-15 06-30-15 07-02-15 07-07-15 05-01-15 05-12-15 05-19-15 05-27-15 05-29-15 05-29-15 05-29-15 06-05-15 06-10-15 06-12-15 06-09-15 06-10-15 06-17-15 06-17-15 06-29-15 06-22-15 07-01-15 06-25-15 07-03-15 07-06-15 07-02-15 07-07-15
Late Start
07-03-15 06-03-15 06-10-15 07-06-15 06-08-15 07-01-15 06-24-15 06-15-15 05-01-15 05-01-15 06-03-15 05-05-15 05-21-15 05-14-15 05-19-15 05-22-15 07-01-15 05-28-15 06-03-15 07-10-15 07-16-15 06-05-15 06-15-15 06-12-15 06-24-15 06-19-15 06-24-15 06-24-15 06-29-15 07-02-15 07-07-15 07-13-15 07-13-15 05-19-15 05-19-15 06-12-15 06-16-15 05-21-15 05-28-15 06-03-15 06-08-15 07-08-15 06-11-15 06-24-15 07-15-15 07-17-15 06-29-15 06-23-15 06-26-15 06-30-15 07-08-15 07-03-15 07-08-15 07-08-15 07-15-15 07-10-15
Late Finish 07-07-15 06-05-15 06-23-15 07-10-15 06-12-15 07-06-15 07-01-15 06-26-15 07-17-15 07-17-15 05-18-15 06-11-15 05-20-15 06-04-15 05-27-15 05-27-15 05-27-15 07-07-15 06-10-15 06-12-15 07-14-15 07-16-15 06-25-15 06-19-15 06-18-15 07-07-15 06-23-15 06-26-15 07-07-15 07-07-15 07-09-15 07-14-15 07-15-15 07-17-15 07-17-15 06-04-15 06-22-15 06-25-15 06-08-15 06-10-15 06-10-15 06-10-15 07-14-15 06-22-15 07-03-15 07-16-15 07-17-15 07-03-15 06-29-15 07-09-15 07-02-15 07-17-15 07-07-15 07-17-15 07-16-15 07-17-15 07-17-15
Total Free Float Float 34 12 16 33 12 26 21 12 8 11 23 33 8 19 10 10 10 34 10 10 36 37 8 12 11 17 11 11 11 11 12 15 11 11 8 23 28 26 8 8 8 8 27 8 15 27 27 12 8 8 8 12 8 10 8 11 8
2 0 5 22 0 11 9 1 0 0 0 5 0 0 0 0 0 0 0 2 0 10 0 4 0 5 0 0 1 3 4 4 0 0 0 0 20 18 0 0 0 0 0 0 7 0 19 4 0 0 0 4 0 2 0 3 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)
Activity ID
One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-SAC-1400 0620A-GSC-2360 0620A-ZSE-2990 0620A-RMM-2220 0620A-ZSE-3000 0620A-ZSE-3030 0620A-GSC-2450 0620A-ZSE-3070 0620A-ZSE-3110 0620A-ZSE-3160 0620A-ZST-1880 0620A-ZST-1900 0620A-ZST-1940 0620A-ZST-2020 0620A-ZST-2080 0620A-GSC-2410 0620A-GSC-2560 0620A-GSC-2680 0620A-GSC-2840 0620A-GSC-2870 0620A-GSC-3030 0620A-ZSE-3390 0620A-ALL-1340 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-1290 0620A-GSC-1680 0620A-RMM-1770 0620A-ZSE-2420 0620A-SAC-1250 0620A-ZST-1060 0620A-GSC-1370 0620A-ZSE-2470 0620A-GSC-1830 0620A-ZSE-2530 0620A-FEC-1010 0620A-GSC-1890 0620A-ZSE-2580 0620A-ZST-1380 0620A-ZST-1440 0620A-ZSE-2650 0620A-ZST-1490 0620A-MPH-2030 0620A-ZST-1540 0620A-GSC-2120 0620A-GSC-2130 0620A-SSI-1020 0620A-GSC-2150 0620A-ZST-1560 0620A-ZST-1610 0620A-SSI-1030 0620A-GSC-2020 0620A-GSC-3210 Area B (Low Roof)
Activity Name
Orig Start Dur
Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)
Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 21 of 25
175 107 107 3 7 4 5 1 5 8 1 8 3 1 1 1 1 1 5 5 27 5 15 2 4 0 85 85 12 12 6 8 6 5 10 3 10 5 8 18 6 4 5 18 5 13 3 5 6 7 20 5 5 3 5 10 53
11-06-14 01-28-15 01-28-15 01-28-15 02-02-15 02-11-15 02-11-15 02-17-15 02-18-15 02-18-15 02-25-15 03-02-15 03-12-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 03-26-15 04-02-15 04-10-15 05-19-15 06-03-15 06-24-15 06-24-15 11-06-14 11-06-14 11-06-14 11-10-14 11-18-14 11-18-14 11-20-14 11-24-14 11-24-14 12-01-14 12-01-14 12-04-14 12-05-14 12-09-14 12-11-14 12-15-14 12-19-14 12-19-14 12-29-14 01-05-15 01-06-15 01-06-15 01-06-15 01-06-15 01-06-15 01-09-15 01-16-15 01-22-15 01-22-15 02-24-15 11-24-14
Finish
07-15-15 06-29-15 06-29-15 01-30-15 02-10-15 02-16-15 02-17-15 02-17-15 02-24-15 02-27-15 02-25-15 03-11-15 03-16-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 04-01-15 04-09-15 05-18-15 05-26-15 06-23-15 06-25-15 06-29-15 06-29-15 03-09-15 03-09-15 11-21-14 11-25-14 11-25-14 11-28-14 11-28-14 12-01-14 12-08-14 12-03-14 12-12-14 12-10-14 12-16-14 01-05-15 12-18-14 12-18-14 12-26-14 01-15-15 01-05-15 01-21-15 01-08-15 01-12-15 01-13-15 01-14-15 02-02-15 01-15-15 01-22-15 01-26-15 01-28-15 03-09-15 02-09-15
Late Start
12-15-14 02-11-15 02-11-15 02-11-15 02-16-15 03-23-15 03-19-15 03-27-15 03-30-15 03-26-15 04-07-15 04-08-15 04-20-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-09-15 04-16-15 04-23-15 06-02-15 06-16-15 07-09-15 07-07-15 12-15-14 12-15-14 12-15-14 12-17-14 01-06-15 12-29-14 01-06-15 02-27-15 01-08-15 01-09-15 01-14-15 01-14-15 01-20-15 01-22-15 01-21-15 03-06-15 03-12-15 01-29-15 03-19-15 04-09-15 03-26-15 06-16-15 06-10-15 04-10-15 02-25-15 03-31-15 06-22-15 07-01-15 05-22-15 04-09-15 01-02-15
Late Finish 07-24-15 07-10-15 07-10-15 02-13-15 02-24-15 03-26-15 03-25-15 03-27-15 04-03-15 04-07-15 04-07-15 04-17-15 04-22-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-15-15 04-22-15 06-01-15 06-08-15 07-06-15 07-10-15 07-10-15 07-10-15 07-03-15 07-03-15 12-31-14 01-05-15 01-13-15 01-08-15 01-13-15 03-05-15 01-21-15 01-13-15 01-27-15 01-20-15 01-29-15 02-16-15 01-28-15 03-11-15 03-18-15 02-23-15 03-25-15 04-27-15 03-30-15 06-22-15 06-17-15 04-20-15 03-24-15 04-07-15 06-26-15 07-03-15 05-29-15 04-22-15 07-03-15
Total Free Float Float 7 9 9 10 10 28 26 28 28 26 28 26 26 18 18 18 18 18 9 9 9 9 9 11 9 9 82 82 26 26 32 27 30 66 30 27 30 27 30 30 27 57 57 27 57 67 57 113 109 67 36 57 109 112 85 31 102
0 0 0 0 0 0 0 0 0 0 1 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 13 12 0 0 0 3 30 21 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 F M A M J Jul A S O N D
J
F
2016 M A M J
Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)
Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)
Activity ID
0620A-GSC-1380 0620A-GSC-1780 0620A-ZSE-2540 0620A-RMM-1860 0620A-SAC-1300 0620A-GSC-1490 0620A-ZST-1140 0620A-ZSE-2610 0620A-GSC-1970 0620A-ZSE-2640 0620A-FEC-1030 0620A-ZSE-2700 0620A-ZST-1480 0620A-ZST-1510 0620A-GSC-2140 0620A-ZST-1570 0620A-ZST-1590 0620A-ZST-1640 0620A-MPH-2110 0620A-ZST-1760 0620A-GSC-2290 0620A-GSC-2300 0620A-GSC-2310 Area C (Low Roof) 0620A-GSC-1500 0620A-ZST-1220 0620A-GSC-1610 0620A-GSC-2230 0620A-ZSE-2810 0620A-RMM-2140 0620A-SAC-1370 0620A-ZSE-2870 0620A-GSC-2330 0620A-FEC-1070 0620A-GSC-2350 0620A-ZSE-2910 0620A-ZSE-2960 0620A-ZST-1830 0620A-MPH-2190 0620A-GSC-2390 0620A-ZST-1890 0620A-ZST-1960 0620A-GSC-2460 0620A-ZST-2030 0620A-GSC-2470 0620A-GSC-2480 0620A-GSC-2490 0620A-GSC-2500 0620A-ALL-1260 Area C (Aux Gym) Area C (Aux Gym) 0620A-SAC-1410 0620A-GSC-2420 0620A-ZSE-3020 0620A-RMM-2230 0620A-ZSE-3050 0620A-ZSE-3080
Activity Name
Orig Start Dur
Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)
Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 22 of 25
12 12 9 6 4 5 5 1 6 5 8 2 4 5 18 5 3 5 2 5 2 6 5 61 12 5 10 12 9 6 4 5 8 8 18 3 1 4 10 10 5 3 10 5 3 5 3 6 0 104 104 4 5 4 5 1 2
11-24-14 11-26-14 12-04-14 12-09-14 12-11-14 12-11-14 12-11-14 12-17-14 12-17-14 12-18-14 12-19-14 12-26-14 12-26-14 01-02-15 01-06-15 01-09-15 01-16-15 01-21-15 01-22-15 01-28-15 01-30-15 01-30-15 02-03-15 12-11-14 12-11-14 12-30-14 12-30-14 01-08-15 01-16-15 01-20-15 01-22-15 01-29-15 01-29-15 02-02-15 02-04-15 02-05-15 02-10-15 02-10-15 02-10-15 02-10-15 02-16-15 02-23-15 02-23-15 02-26-15 02-27-15 02-27-15 03-02-15 03-02-15 02-02-15 02-02-15 02-02-15 02-11-15 02-18-15 02-18-15 02-24-15 02-25-15
Finish
12-10-14 12-12-14 12-16-14 12-16-14 12-16-14 12-17-14 12-17-14 12-17-14 12-24-14 12-24-14 12-31-14 12-29-14 12-31-14 01-08-15 01-29-15 01-15-15 01-20-15 01-27-15 01-23-15 02-03-15 02-02-15 02-06-15 02-09-15 03-09-15 12-29-14 01-06-15 01-13-15 01-23-15 01-28-15 01-27-15 01-27-15 02-04-15 02-09-15 02-11-15 02-27-15 02-09-15 02-10-15 02-13-15 02-23-15 02-23-15 02-20-15 02-25-15 03-06-15 03-04-15 03-03-15 03-05-15 03-04-15 03-09-15 03-09-15 06-29-15 06-29-15 02-05-15 02-17-15 02-23-15 02-24-15 02-24-15 02-26-15
Late Start
01-02-15 01-06-15 01-16-15 03-03-15 01-30-15 02-10-15 03-06-15 03-17-15 02-11-15 03-18-15 02-13-15 04-01-15 03-13-15 03-19-15 02-17-15 03-26-15 04-02-15 04-08-15 04-28-15 06-29-15 06-23-15 06-18-15 03-25-15 01-20-15 01-20-15 03-20-15 02-27-15 01-22-15 02-24-15 03-11-15 02-05-15 03-18-15 03-09-15 03-11-15 03-13-15 03-25-15 04-03-15 03-27-15 04-30-15 03-19-15 04-02-15 04-10-15 04-01-15 04-15-15 06-01-15 06-01-15 06-25-15 06-26-15 02-19-15 02-19-15 02-19-15 02-25-15 05-19-15 05-15-15 06-04-15 06-05-15
Late Finish 01-19-15 01-21-15 01-28-15 03-10-15 02-04-15 02-16-15 03-12-15 03-17-15 02-18-15 03-24-15 02-24-15 04-02-15 03-18-15 03-25-15 03-12-15 04-01-15 04-07-15 04-14-15 04-29-15 07-03-15 06-24-15 06-25-15 03-31-15 07-03-15 02-04-15 03-26-15 03-12-15 02-06-15 03-06-15 03-18-15 02-10-15 03-24-15 03-18-15 03-20-15 04-08-15 03-27-15 04-03-15 04-01-15 05-13-15 04-01-15 04-09-15 04-14-15 04-15-15 04-21-15 06-03-15 06-05-15 06-29-15 07-03-15 07-03-15 07-17-15 07-17-15 02-24-15 03-03-15 05-22-15 05-21-15 06-04-15 06-08-15
Total Free Float Float 26 26 29 58 34 41 59 62 38 62 38 67 54 54 30 54 54 54 67 106 100 97 36 82 26 57 42 10 27 36 10 34 27 27 27 34 38 33 56 27 33 33 27 33 64 64 81 82 82 14 14 13 10 63 61 70 70
0 0 0 22 0 7 5 0 0 0 8 29 0 0 0 0 0 0 11 24 19 15 9 0 0 24 15 0 0 10 0 0 0 0 0 0 10 0 3 0 0 0 1 3 0 0 3 0 0 0 0 3 0 0 54 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
2015 2016 J F M A M J Jul A S O N D J F M A M J Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)
Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)
Activity ID
Activity Name
Orig Start Dur
0620A-ZSE-3100 Lighting Controls - Area C (Aux Gym) 0620A-GSC-2550 Gym Equipment - Area C (Aux Gym) 0620A-ZST-1950 Tech Terminations - Area C (Aux Gym) 0620A-ZST-1970 Paging Devices - Area C (Aux Gym) 0620A-ZST-2010 Security Devices - Area C (Aux Gym) 0620A-ZST-2040 Tech Devices - Area C (Aux Gym) 0620A-ZST-2110 A/V Devices - Area C (Aux Gym) 0620A-GSC-2440 Misc Finishes - Area C (Aux Gym) 0620A-GSC-2630 Specialties - Area C (Aux Gym) 0620A-GSC-2850 Gym Flooring - Area C (Aux Gym) 0620A-GSC-2920 Gym Floor Striping - Area C (Aux Gym) 0620A-GSC-3000 Doors/ Hardware - Area C (Aux Gym) 0620A-ALL-1330 Substantial Completion - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-GSC-1650 Paint - Area D/E/F (Low Roof) 0620A-ZST-1320 Tech Terminations - Area D/E/F (Low Roof) 0620A-GSC-1790 Misc Finishes - Area D/E/F (Low Roof) 0620A-GSC-2900 Ceiling Grid - Area D/E/F (Low Roof) 0620A-ZSE-3230 Light Fixtures - Area D/E/F (Low Roof) 0620A-RMM-2360 HVAC Ceiling Finishes - Area D/E/F (Low Roof) 0620A-SAC-1510 Fire Protection Heads - Area D/E/F (Low Roof) 0620A-ZSE-3280 Wiring Devices - Area D/E/F (Low Roof) 0620A-GSC-3060 Ceiling Pads - Area D/E/F (Low Roof) 0620A-FEC-1160 Casework - Area D/E/F (Low Roof) 0620A-ZSE-3300 Fire Alarm System - Area D/E/F (Low Roof) 0620A-GSC-3090 Flooring - Area D/E/F (Low Roof) 0620A-ZSE-3320 Lighting Controls - Area D/E/F (Low Roof) 0620A-MPH-2310 Plumbing Fixtures - Area D/E/F (Low Roof) 0620A-ZST-2330 Paging Devices - Area D/E/F (Low Roof) 0620A-GSC-3140 Toilet Partitions - Area D/E/F (Low Roof) 0620A-ZST-2350 Security Devices - Area D/E/F (Low Roof) 0620A-ZST-2360 Tech Devices - Area D/E/F (Low Roof) 0620A-GSC-3170 Specialties - Area D/E/F (Low Roof) 0620A-GSC-3150 Toilet Accessories - Area D/E/F (Low Roof) 0620A-ZST-2380 A/V Devices - Area D/E/F (Low Roof) 0620A-GSC-3180 Doors/ Hardware - Area D/E/F (Low Roof) 0620A-GSC-3190 Furnishings - Area D/E/F (Low Roof) 0620A-ALL-1430 Substantial Completion - Area D/E/F (Low Roof) Site Finishes Site Finishes Entire Site
1 5 1 1 1 1 1 5 5 15 5 2 0 103 103 15 6 10 15 9 10 9 5 10 12 3 25 1 10 3 3 3 3 10 5 6 6 6 0 63 63 63 63 10 20 15 10 15 5 5 5 5 0 95 11 11 11
0620A-NCP-1000 Finish Grading - All 0620A-NCP-1010 Curbs/ Walks - All 0620A-NCP-1020 Pavement - All 0620A-NCP-1030 Seeding/ Planting - All 0620A-ZSE-3270 Site Lighting Rough-in 0620A-NCP-1040 Misc Finishes - All 0620A-NCP-1050 Specialties - All 0620A-ZSE-3330 Light Poles 0620A-ZSE-3350 Emergency Generator 0620A-ALL-1390 Site Substantial Completion Punch List/ Commissioning Commiss Entire Project All Areas
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 23 of 25
02-27-15 03-02-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-02-15 04-10-15 05-19-15 06-10-15 06-26-15 02-19-15 02-19-15 02-19-15 03-12-15 03-12-15 05-04-15 05-12-15 05-13-15 05-14-15 05-26-15 05-28-15 06-01-15 06-02-15 06-03-15 06-05-15 06-09-15 06-18-15 06-23-15 06-23-15 06-26-15 07-01-15 07-03-15 07-07-15 07-08-15 07-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-16-15 05-05-15 05-13-15 05-21-15 06-03-15 06-03-15 06-19-15 06-29-15 03-10-15 07-07-15 07-07-15 07-07-15
Finish
02-27-15 03-06-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-09-15 04-16-15 06-09-15 06-16-15 06-29-15 06-29-15 07-15-15 07-15-15 03-11-15 03-19-15 03-25-15 05-22-15 05-22-15 05-27-15 05-27-15 06-01-15 06-10-15 06-16-15 06-04-15 07-07-15 06-05-15 06-22-15 06-22-15 06-25-15 06-25-15 06-30-15 07-14-15 07-09-15 07-14-15 07-15-15 07-15-15 07-15-15 07-06-15 07-06-15 07-06-15 07-06-15 04-23-15 05-19-15 06-02-15 06-02-15 06-18-15 06-10-15 06-10-15 06-26-15 07-06-15 07-06-15 07-22-15 07-21-15 07-21-15 07-21-15
Late Start
06-09-15 06-03-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-23-15 05-27-15 06-10-15 07-01-15 07-15-15 03-04-15 03-04-15 03-04-15 04-08-15 03-25-15 05-13-15 05-26-15 05-22-15 05-26-15 07-14-15 06-08-15 06-10-15 07-21-15 06-12-15 07-24-15 06-24-15 07-06-15 07-08-15 07-09-15 07-14-15 07-13-15 07-20-15 07-17-15 07-17-15 07-17-15 04-27-15 04-27-15 04-27-15 04-27-15 04-27-15 05-06-15 06-22-15 07-08-15 06-12-15 07-20-15 07-20-15 07-08-15 07-20-15 07-06-15 07-17-15 07-17-15 07-17-15
Late Finish 06-09-15 06-09-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-29-15 06-02-15 06-30-15 07-07-15 07-16-15 07-17-15 07-24-15 07-24-15 03-24-15 04-15-15 04-08-15 06-03-15 06-05-15 06-05-15 06-05-15 07-20-15 06-19-15 06-25-15 07-23-15 07-16-15 07-24-15 07-07-15 07-08-15 07-10-15 07-13-15 07-16-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 05-13-15 06-11-15 07-16-15 07-24-15 07-07-15 07-24-15 07-24-15 07-16-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15
Total Free Float Float 70 65 34 43 47 49 50 14 32 15 15 13 14 7 7 9 18 9 7 9 7 7 35 7 7 35 7 35 11 12 11 12 12 8 11 8 7 7 7 14 14 14 14 11 11 26 31 11 26 26 11 11 14 7 8 8 8
55 50 0 0 0 0 35 0 0 0 2 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 4 1 4 1 0 0 0 0 0 0 0 0 0 0 20 0 15 15 0 0 0 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec Work Days Work Days Work Days Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Lighting Controls - Area C (Aux Gym) Gym Equipment - Area C (Aux Gym) Tech Terminations - Area C (Aux Gym) Paging Devices - Area C (Aux Gym) Security Devices - Area C (Aux Gym) Tech Devices - Area C (Aux Gym) A/V Devices - Area C (Aux Gym) Misc Finishes - Area C (Aux Gym) Specialties - Area C (Aux Gym) Gym Flooring - Area C (Aux Gym) Gym Floor Striping - Area C (Aux Gym) Doors/ Hardware - Area C (Aux Gym) Substantial Completion - Area C (Aux Gym)
Paint - Area D/E/F (Low Roof) Tech Terminations - Area D/E/F (Low Roof) Misc Finishes - Area D/E/F (Low Roof) Ceiling Grid - Area D/E/F (Low Roof) Light Fixtures - Area D/E/F (Low Roof) HVAC Ceiling Finishes - Area D/E/F (Low Roof) Fire Protection Heads - Area D/E/F (Low Roof) Wiring Devices - Area D/E/F (Low Roof) Ceiling Pads - Area D/E/F (Low Roof) Casework - Area D/E/F (Low Roof) Fire Alarm System - Area D/E/F (Low Roof) Flooring - Area D/E/F (Low Roof) Lighting Controls - Area D/E/F (Low Roof) Plumbing Fixtures - Area D/E/F (Low Roof) Paging Devices - Area D/E/F (Low Roof) Toilet Partitions - Area D/E/F (Low Roof) Security Devices - Area D/E/F (Low Roof) Tech Devices - Area D/E/F (Low Roof) Specialties - Area D/E/F (Low Roof) Toilet Accessories - Area D/E/F (Low Roof) A/V Devices - Area D/E/F (Low Roof) Doors/ Hardware - Area D/E/F (Low Roof) Furnishings - Area D/E/F (Low Roof) Substantial Completion - Area D/E/F (Low
Finish Grading - All Curbs/ Walks - All Pavement - All Seeding/ Planting - All Site Lighting Rough-in Misc Finishes - All Specialties - All Light Poles Emergency Generator Site Substantial Completion
Activity ID
0620A-ZSE-3400 0620A-RMM-2410 0620A-ZSE-3410 0620A-ZSE-3420 Academic Area First Floor
Activity Name
Orig Start Dur
Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections
0620A-RMM-2320 0620A-ZSE-3180 0620A-ZST-2200 0620A-MPH-2230 0620A-SAC-1490 0620A-GSC-2690 0620A-CTT-2400 0620A-FEC-1110 0620A-ALL-1290 Second Floor
HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr
0620A-RMM-2370 0620A-ZSE-3260 0620A-ZST-2270 0620A-MPH-2270 0620A-SAC-1520 0620A-GSC-3010 0620A-CTT-2410 0620A-FEC-1140 0620A-ALL-1350 Third Floor
HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd Flr CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr
0620A-RMM-2400 0620A-ZSE-3340 0620A-ZST-2370 0620A-MPH-2320 0620A-SAC-1550 0620A-GSC-3160 0620A-CTT-2440 0620A-FEC-1180 0620A-ALL-1400 One Story Areas Area B (Gym)
HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning - 3rd Flr CT Taylor Punch List/ Commissioning - 3rd Flr Casework Punch List/ Commissioning - 3rd Flr Final Completion - 3rd Flr
0620A-RMM-2380 0620A-ZSE-3290 0620A-ZST-2290 0620A-MPH-2280 0620A-SAC-1530 0620A-GSC-3050 0620A-CTT-2420 0620A-FEC-1150 0620A-ALL-1360 Area A/B/C (1-Story) 0620A-SSI-1040 0620A-RMM-2300 0620A-ZSE-3140 0620A-ZST-2120 0620A-MPH-2210
HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - Area B (Gym) CT Taylor Punch List/ Commissioning - Area B (Gym) Casework Punch List/ Commissioning - Area B (Gym) Final Completion - Area B (Gym)
Kitchen Equipment Punch List/ Commissioning - Area A/B/C (1-Stor HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 24 of 25
5 10 5 1 77 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 10 10 5 5 5 5 5 5 5 5 0 95 5 5 5 5 5 5 5 5 5 5 0 5 5 3 5 5 5 5
07-07-15 07-08-15 07-14-15 07-21-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 03-10-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15
Finish
07-13-15 07-21-15* 07-20-15 07-21-15 07-21-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 07-21-15 07-21-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-21-15 07-22-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 03-16-15 03-16-15 03-12-15 03-16-15 03-16-15 03-16-15 03-16-15
Late Start
07-17-15 07-20-15 07-24-15 07-31-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-06-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-06-15 07-06-15 07-29-15 07-06-15 07-06-15 07-06-15 07-06-15
Late Finish 07-23-15 07-31-15 07-30-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-31-15 07-10-15 07-10-15 07-10-15 07-10-15
Total Free Float Float 8 8 8 8 8 80 80 70 70 70 70 70 70 70 70 80 42 42 37 37 37 37 37 37 37 37 42 8 8 13 13 13 13 13 13 13 13 8 7 19 19 9 9 9 9 9 9 9 9 19 97 97 99 82 82 82 82
0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 0 42 0 0 5 5 5 5 5 5 5 5 8 0 0 0 0 0 0 0 0 0 0 0 19 0 0 2 0 0 0 0
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections
HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr
HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd F CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr
HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - 3rd Casework Punch List/ Commissioning - 3r Final Completion - 3rd Flr
HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Area Casework Punch List/ Commissioning - Are Final Completion - Area B (Gym)
Kitchen Equipment Punch List/ Commissioning - Area A/B/ HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)
Activity ID
Activity Name
Orig Start Dur
0620A-SAC-1470 0620A-GSC-2600 0620A-CTT-2390 0620A-FEC-1100 0620A-ALL-1270 Area C (Aux Gym)
Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-Story) CT Taylor Punch List/ Commissioning - Area A/B/C (1-Story) Casework Punch List/ Commissioning - Area A/B/C (1-Story) Final Completion - Area A/B/C (1-Story)
0620A-RMM-2390 0620A-ZSE-3310 0620A-ZST-2310 0620A-MPH-2300 0620A-SAC-1540 0620A-GSC-3080 0620A-CTT-2430 0620A-FEC-1170 0620A-ALL-1370 Area D/E/F (1-Story)
HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux Gym) Greenspace Punch List/ Commissioning - Area C (Gym) CT Taylor Punch List/ Commissioning - Area C (Gym) Casework Punch List/ Commissioning - Area C (Gym) Final Completion - Area C (Gym)
0620A-RMM-2420 0620A-ZSE-3360 0620A-ZST-2390 0620A-MPH-2330 0620A-SAC-1560 0620A-GSC-3200 0620A-CTT-2450 0620A-FEC-1190 0620A-ALL-1440 Site Finishes Entire Site 0620A-NCP-1060 0620A-ALL-1410
HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story) Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story) Fire Protection Punch List - Area D/E/F (Low Roof) Greenspace Punch List/ Commissioning - Area D/E/F (1-Story) CT Taylor Punch List/ Commissioning - Area D/E/F (1-Story) Casework Punch List/ Commissioning - Area D/E/F (1-Story) Final Completion - Area D/E/F (1-Story)
Punch List/ Commissioning - Site Final Completion - Site
0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 25 of 25
5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 7 7 7 5 0
03-10-15 03-10-15 03-10-15 03-10-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-07-15 07-07-15 07-07-15 07-07-15
Finish
03-16-15 03-16-15 03-16-15 03-16-15 03-16-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-15-15 07-15-15 07-15-15 07-15-15 07-15-15
Late Start
07-06-15 07-06-15 07-06-15 07-06-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15
Late Finish 07-10-15 07-10-15 07-10-15 07-10-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15
Total Free Float Float 82 82 82 82 97 14 14 9 9 9 9 9 9 9 9 14 7 7 7 7 7 7 7 7 7 7 7 12 12 12 11 12
0 0 0 0 97 0 0 2 2 2 2 2 0 0 0 14 0 0 7 7 7 7 7 0 0 0 7 0 0 0 0 12
Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work
Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days
0620A - T/P Work Days
Milestone Actual Work Remaining Work Critical Remaining Work
Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)
J
2014 F M A M J Jul A S O N D
J
2015 2016 F M A M J Jul A S O N D J F M A M J Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-S CT Taylor Punch List/ Commissioning - Area A/B/C (1-Sto Casework Punch List/ Commissioning - Area A/B/C (1-Sto Final Completion - Area A/B/C (1-Story)
HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux G Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Are Casework Punch List/ Commissioning - Ar Final Completion - Area C (Gym)
HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story Fire Protection Punch List - Area D/E/F (L Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - Ar Casework Punch List/ Commissioning - A Final Completion - Area D/E/F (1-Story)
Punch List/ Commissioning - Site Final Completion - Site
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL PRE-CONSTRUCTION GENERAL GENERAL
PRCO-10
COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING
1 02-22-13 A
02-22-13 A
PRCO-15
REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD
1 03-04-13 A
03-04-13 A
PRCO-30
NOTIFY TDA OF VE CHANGES - CMSD
4 03-11-13 A
03-14-13 A
PRCO-20
CMSD TO APPROVE - CMSD
1 04-01-13 A
04-01-13 A
PRCO-40
CITY PERMIT REVIEW - SITE
46 04-08-13 A
06-11-13 A
CITY PERMIT REVIEW - SITE
PRCO-25
FINALIZE GMP & CONTRACT NEGOTIATION
1 04-26-13 A
04-26-13 A
FINALIZE GMP & CONTRACT NEGOTIATION
PRCO-35
COMPLETE SITE CONSTRUCTION DOCUMENTS
0
04-26-13 A
COMPLETE SITE CONSTRUCTION DOCUMENTS
PRCO-50
COMPLETE BUILDING CONSTRUCTION DOCUMENTS
0
05-31-13 A
PRCO-55
CITY PERMIT REVIEW - BUILDING
34 06-03-13 A
07-19-13 A
PRCO-60
BIDDING PROCESS
15 06-18-13 A
07-09-13 A
PRCO-75
BIDDING PROCESS / AWARD - FOOD SERVICES
11 08-12-13 A
08-23-13 A
PRCO-100
AMH - SCOPE AND AWARD
10 09-05-13 A
10-14-13 A
PRCO-70
BIDDING PROCESS / AWARD - FURNITURE
11 01-02-14*
01-16-14
COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD NOTIFY TDA OF VE CHANGES - CMSD CMSD TO APPROVE - CMSD
COMPLETE BUILDING CONSTRUCTION DOCUMENTS CITY PERMIT REVIEW - BUILDING BIDDING PROCESS BIDDING PROCESS / AWARD - FOOD SERVICES AMH - SCOPE AND AWARD BIDDING PROCESS / AWARD - FURNITURE
NOTICE TO PROCEED PRCO-80
NTP - SITE
0 05-24-13 A
PRCO-85
NTP - MASON, CONCRETE, STEEL, GENERAL
0 06-27-13 A
PRCO-90
NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION
0 07-10-13 A
PRCO-110
NTP - ROOFING, GLAZING
0 07-25-13 A
PRCO-95
NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING NTP - FOOD SERVICES
0 09-05-13 A
NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING
0 09-05-13 A
NTP - FOOD SERVICES
PRCO-105
NTP - SITE NTP - MASON, CONCRETE, STEEL, GENERAL NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION NTP - ROOFING, GLAZING
ISSUES / DELAYS
PRCO-115
BUILDING PERMIT - DELAY
10 07-08-13 A
07-19-13 A
BUILDING PERMIT - DELAY
SUB-125
LINTELS - A, B, C
10 07-08-13 A
07-19-13 A
LINTELS - A, B, C
SUB-150
BAR JOISTS - A
10 07-26-13 A
08-08-13 A
BAR JOISTS - A
SUB-155
BAR JOISTS - B
10 07-26-13 A
08-08-13 A
BAR JOISTS - B
SUB-160
BAR JOISTS - C
10 07-26-13 A
08-08-13 A
BAR JOISTS - C
SUB-100
STRUCTURAL STEEL - A
10 07-31-13 A
08-13-13 A
STEEL SUBMITTALS
11-21-13 13:04 MAX HAYES HS Sheet 1 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
STRUCTURAL STEEL - A
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-105
STRUCTURAL STEEL - B
10 08-06-13 A
08-19-13 A
STRUCTURAL STEEL - B
SUB-110
STRUCTURAL STEEL - C
10 08-06-13 A
08-19-13 A
STRUCTURAL STEEL - C
SUB-165
BAR JOISTS - D
10 08-06-13 A
08-19-13 A
BAR JOISTS - D
SUB-170
BAR JOISTS - E
10 08-06-13 A
08-19-13 A
BAR JOISTS - E
SUB-175
METAL STAIRS AND HANDRAIL
10 09-10-13 A
09-23-13 A
SUB-130
LINTELS - D AND E
10 10-08-13 A
10-21-13 A
SUB-115
STRUCTURAL STEEL - D
10 10-21-13 A
11-11-13 A
STRUCTURAL STEEL - D
SUB-120
STRUCTURAL STEEL - E
10 10-21-13 A
11-11-13 A
STRUCTURAL STEEL - E
APP-125
LINTELS - A, B, C
10 07-19-13 A
08-08-13 A
APP-150
BAR JOISTS - A
10 08-08-13 A
08-22-13 A
BAR JOISTS - A
APP-155
BAR JOISTS - B
10 08-08-13 A
08-22-13 A
BAR JOISTS - B
APP-160
BAR JOISTS - C
10 08-08-13 A
08-22-13 A
BAR JOISTS - C
APP-100
STRUCTURAL STEEL - A
10 08-13-13 A
08-21-13 A
STRUCTURAL STEEL - A
APP-105
STRUCTURAL STEEL - B
10 08-19-13 A
08-23-13 A
STRUCTURAL STEEL - B
APP-110
STRUCTURAL STEEL - C
10 08-19-13 A
08-23-13 A
STRUCTURAL STEEL - C
APP-165
BAR JOISTS - D
10 08-19-13 A
08-27-13 A
BAR JOISTS - D
APP-170
BAR JOISTS - E
10 08-19-13 A
08-27-13 A
BAR JOISTS - E
APP-175
METAL STAIRS AND HANDRAIL
10 09-23-13 A
10-28-13 A
METAL STAIRS AND HANDRAIL
APP-130
LINTELS - D AND E
10 10-21-13 A
10-25-13 A
LINTELS - D AND E
APP-115
STRUCTURAL STEEL - D
10 11-11-13 A
11-22-13
STRUCTURAL STEEL - D
APP-120
STRUCTURAL STEEL - E
10 11-11-13 A
11-22-13
STRUCTURAL STEEL - E
LEAD-125
LINTELS - A
10 08-08-13 A
08-12-13 A
LEAD-126
LINTELS - B
10 08-08-13 A
08-19-13 A
LEAD-127
LINTELS - C
10 08-08-13 A
09-26-13 A
LINTELS - C
LEAD-100
STRUCTURAL STEEL - A
25 08-21-13 A
09-30-13 A
STRUCTURAL STEEL - A
LEAD-150
BAR JOISTS - A
25 08-22-13 A
10-02-13 A
BAR JOISTS - A
LEAD-155
BAR JOISTS - B
25 08-22-13 A
10-01-13 A
BAR JOISTS - B
LEAD-160
BAR JOISTS - C
25 08-22-13 A
10-03-13 A
BAR JOISTS - C
LEAD-105
STRUCTURAL STEEL - B
19 08-23-13 A
08-28-13 A
LEAD-110
STRUCTURAL STEEL - C
19 08-23-13 A
09-26-13 A
LEAD-128
LINTELS - D
10 10-25-13 A
11-19-13
LINTELS - D
LEAD-129
LINTELS - E
10 10-25-13 A
11-19-13
LINTELS - E
METAL STAIRS AND HANDRAIL LINTELS - D AND E
APPROVALS
LINTELS - A, B, C
LEAD TIMES
11-21-13 13:04 MAX HAYES HS Sheet 2 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
LINTELS - A LINTELS - B
STRUCTURAL STEEL - B STRUCTURAL STEEL - C
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
LEAD-175
METAL STAIRS AND HANDRAIL - A / B
15 10-28-13 A
11-05-13 A
LEAD-165
BAR JOISTS - D
30 11-19-13
01-02-14
BAR JOISTS - D
LEAD-170
BAR JOISTS - E
30 11-19-13
01-02-14
BAR JOISTS - E
LEAD-115
STRUCTURAL STEEL - D
20 11-25-13
12-23-13
STRUCTURAL STEEL - D
LEAD-120
STRUCTURAL STEEL - E
20 11-25-13
12-23-13
STRUCTURAL STEEL - E
METAL STAIRS AND HANDRAIL - A / B
ROUGH CARPENTRY SUBMITTALS
SUB-405
H.M. FRAMES
10 08-01-13 A
08-14-13 A
H.M. FRAMES
SUB-410
WOOD DOORS
10 08-01-13 A
08-14-13 A
WOOD DOORS
SUB-420
FRP DOORS
10 08-26-13 A
09-11-13 A
SUB-415
HARDWARE
10 09-26-13 A
10-14-13 A
APP-405
H.M. FRAMES
10 08-14-13 A
09-05-13 A
H.M. FRAMES
APP-410
WOOD DOORS
10 08-14-13 A
09-05-13 A
WOOD DOORS
APP-420
FRP DOORS
10 09-12-13 A
10-07-13 A
APP-415
HARDWARE
10 10-14-13 A
11-18-13 A
LEAD-405
H.M. FRAMES
20 09-05-13 A
10-03-13 A
LEAD-410
WOOD DOORS
40 09-06-13 A
11-19-13
WOOD DOORS
LEAD-420
FRP DOORS
10 10-07-13 A
11-19-13
FRP DOORS
LEAD-415
HARDWARE
40 11-18-13 A
01-15-14
SUB-260
HOT WATER RADIATOR
10 07-15-13 A
07-26-13 A
HOT WATER RADIATOR
SUB-300
RADIANT HEATER
10 07-15-13 A
07-26-13 A
RADIANT HEATER
SUB-220
GRILLES AND DIFFUSERS
10 07-16-13 A
07-29-13 A
GRILLES AND DIFFUSERS
SUB-265
AIR CURTAIN (HAC)
10 07-16-13 A
07-29-13 A
AIR CURTAIN (HAC)
SUB-280
LOUVERS
10 07-16-13 A
07-29-13 A
LOUVERS
SUB-230
GRAVITY VENTILATOR
10 07-23-13 A
08-05-13 A
GRAVITY VENTILATOR
SUB-295
EXHAUST FAN
10 07-23-13 A
08-05-13 A
EXHAUST FAN
SUB-310
SUPPLY FAN
10 07-23-13 A
08-05-13 A
SUPPLY FAN
SUB-320
AIR HANDLING UNIT
10 07-23-13 A
08-05-13 A
AIR HANDLING UNIT
FRP DOORS HARDWARE
APPROVALS
FRP DOORS HARDWARE
LEAD TIMES
H.M. FRAMES
HARDWARE
HVAC SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 3 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-275
FAN POWERED VAV BOXES
10 07-24-13 A
08-06-13 A
FAN POWERED VAV BOXES
SUB-225
MECHANICAL PUMPS
10 07-25-13 A
08-07-13 A
MECHANICAL PUMPS
SUB-245
HOT WATER BOILERS
10 07-25-13 A
08-07-13 A
HOT WATER BOILERS
SUB-250
HOT WATER UNIT HEATER
10 07-25-13 A
08-07-13 A
HOT WATER UNIT HEATER
SUB-235
VAV BOXES
10 07-29-13 A
08-09-13 A
VAV BOXES
SUB-270
ROOFTOP UNIT HEATING AND VENTILLATION
10 07-29-13 A
08-09-13 A
ROOFTOP UNIT HEATING AND VENTILLATION
SUB-305
MAKE-UP AIR UNIT
10 07-29-13 A
08-09-13 A
MAKE-UP AIR UNIT
SUB-240
AIR CONDITIONING UNIT
10 08-02-13 A
08-16-13 A
AIR CONDITIONING UNIT
SUB-255
CABINET UNIT HEATER
10 08-02-13 A
08-16-13 A
CABINET UNIT HEATER
SUB-285
CHILLER
10 08-05-13 A
11-18-13 A
SUB-290
AIR COOLED CONDENSING UNIT
10 08-05-13 A
08-16-13 A
AIR COOLED CONDENSING UNIT
SUB-315
FAN COIL UNIT
10 08-05-13 A
08-16-13 A
FAN COIL UNIT
SUB-325
CONTROL THERMOSTATS
10 10-31-13 A
11-18-13 A
CONTROL THERMOSTATS
SUB-330
CONTROL VALVES
10 10-31-13 A
11-18-13 A
CONTROL VALVES
APP-260
HOT WATER RADIATOR
10 07-26-13 A
08-12-13 A
HOT WATER RADIATOR
APP-300
RADIANT HEATER
10 07-26-13 A
08-15-13 A
RADIANT HEATER
APP-220
GRILLES AND DIFFUSERS
10 07-29-13 A
08-06-13 A
GRILLES AND DIFFUSERS
APP-265
AIR CURTAIN (HAC)
10 07-29-13 A
08-05-13 A
AIR CURTAIN (HAC)
APP-280
LOUVERS
10 07-29-13 A
08-06-13 A
LOUVERS
APP-230
GRAVITY VENTILATOR
10 08-05-13 A
08-15-13 A
GRAVITY VENTILATOR
APP-295
EXHAUST FAN
10 08-05-13 A
08-12-13 A
EXHAUST FAN
APP-310
SUPPLY FAN
10 08-05-13 A
11-19-13
APP-320
AIR HANDLING UNIT
10 08-05-13 A
08-19-13 A
APP-275
FAN POWERED VAV BOXES
10 08-06-13 A
09-10-13 A
APP-225
MECHANICAL PUMPS
10 08-07-13 A
08-23-13 A
MECHANICAL PUMPS
APP-245
HOT WATER BOILERS
10 08-07-13 A
08-23-13 A
HOT WATER BOILERS
APP-250
HOT WATER UNIT HEATER
10 08-08-13 A
08-12-13 A
HOT WATER UNIT HEATER
APP-235
VAV BOXES
10 08-09-13 A
08-22-13 A
APP-305
MAKE-UP AIR UNIT
10 08-09-13 A
09-20-13 A
APP-270
ROOFTOP UNIT HEATING AND VENTILLATION
10 08-12-13 A
08-29-13 A
ROOFTOP UNIT HEATING AND VENTILLATION
APP-240
AIR CONDITIONING UNIT
10 08-16-13 A
08-28-13 A
AIR CONDITIONING UNIT
APP-255
CABINET UNIT HEATER
10 08-16-13 A
08-29-13 A
CABINET UNIT HEATER
APP-290
AIR COOLED CONDENSING UNIT
10 08-16-13 A
08-26-13 A
AIR COOLED CONDENSING UNIT
APP-315
FAN COIL UNIT
10 08-16-13 A
08-29-13 A
CHILLER
APPROVALS
11-21-13 13:05 MAX HAYES HS Sheet 4 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SUPPLY FAN AIR HANDLING UNIT FAN POWERED VAV BOXES
VAV BOXES MAKE-UP AIR UNIT
FAN COIL UNIT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APP-285
CHILLER
10 11-19-13
12-03-13
CHILLER
APP-325
CONTROL THERMOSTATS
10 11-19-13
12-03-13
CONTROL THERMOSTATS
APP-330
CONTROL VALVES
10 11-19-13
12-03-13
CONTROL VALVES
LEAD-265
AIR CURTAIN (HAC)
25 08-05-13 A
11-19-13
AIR CURTAIN (HAC)
LEAD-220
GRILLES AND DIFFUSERS
15 08-06-13 A
11-19-13
GRILLES AND DIFFUSERS
LEAD-280
LOUVERS
25 08-06-13 A
11-19-13
LOUVERS
LEAD-250
HOT WATER UNIT HEATER
25 08-12-13 A
11-19-13
HOT WATER UNIT HEATER
LEAD-260
HOT WATER RADIATOR
25 08-12-13 A
11-19-13
HOT WATER RADIATOR
LEAD-295
EXHAUST FAN
25 08-12-13 A
11-19-13
EXHAUST FAN
LEAD-230
GRAVITY VENTILATOR
15 08-15-13 A
11-19-13
GRAVITY VENTILATOR
LEAD-300
RADIANT HEATER
25 08-15-13 A
11-19-13
RADIANT HEATER
LEAD-320
AIR HANDLING UNIT
60 08-19-13 A
11-19-13
AIR HANDLING UNIT
LEAD-235
VAV BOXES
30 08-22-13 A
11-19-13
VAV BOXES
LEAD-225
MECHANICAL PUMPS
65 08-23-13 A
11-22-13
MECHANICAL PUMPS
LEAD-245
HOT WATER BOILERS
50 08-23-13 A
11-19-13
HOT WATER BOILERS
LEAD-290
AIR COOLED CONDENSING UNIT
40 08-26-13 A
11-19-13
AIR COOLED CONDENSING UNIT
LEAD-240
AIR CONDITIONING UNIT
60 08-28-13 A
11-20-13
AIR CONDITIONING UNIT
LEAD-255
CABINET UNIT HEATERS
25 08-29-13 A
11-19-13
CABINET UNIT HEATERS
LEAD-270
ROOFTOP UNIT HEATING AND VENTILLATION
60 08-29-13 A
11-21-13
ROOFTOP UNIT HEATING AND VENTILLATION
LEAD-315
FAN COIL UNIT
25 08-29-13 A
11-19-13
FAN COIL UNIT
LEAD-275
FAN POWERED VAV BOXES
25 09-10-13 A
11-19-13
FAN POWERED VAV BOXES
LEAD-305
MAKE-UP AIR UNIT
50 09-23-13 A
12-02-13
LEAD-310
SUPPLY FAN
25 11-20-13
12-26-13
LEAD-285
CHILLER
50 12-04-13
02-13-14
CHILLER
LEAD-325
CONTROL THERMOSTATS
15 12-04-13
12-24-13
CONTROL THERMOSTATS
LEAD-330
CONTROL VALVES
15 12-04-13
12-24-13
CONTROL VALVES
SUB-370
CABLE TRAY
10 08-02-13 A
08-16-13 A
CABLE TRAY
SUB-375
LIGHT FIXTURES
10 08-06-13 A
08-20-13 A
LIGHT FIXTURES
SUB-365
POWER DISTRIBUTION
10 09-09-13 A
09-20-13 A
SUB-360
FIRE ALARM DEVICES
10 10-08-13 A
10-21-13 A
SUB-380
IT DEVICES
10 11-19-13
12-03-13
LEAD TIMES
MAKE-UP AIR UNIT SUPPLY FAN
ELECTRICAL SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 5 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
POWER DISTRIBUTION FIRE ALARM DEVICES IT DEVICES
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APPROVALS
APP-370
CABLE TRAY
10 08-16-13 A
09-20-13 A
APP-375
LIGHT FIXTURES - EXTERIOR
10 08-20-13 A
09-06-13 A
APP-376
LIGHT FIXTURES - INTERIOR
10 08-20-13 A
10-03-13 A
APP-365
POWER DISTRIBUTION
10 09-20-13 A
11-19-13
POWER DISTRIBUTION
APP-360
FIRE ALARM DEVICES
10 10-21-13 A
11-19-13
FIRE ALARM DEVICES
APP-380
IT DEVICES
10 12-04-13
12-17-13
IT DEVICES
CABLE TRAY
LEAD-370
CABLE TRAY
30 09-23-13 A
11-19-13
LEAD-375
LIGHT FIXTURES
50 10-03-13 A
12-12-13
LEAD-360
FIRE ALARM DEVICES
40 11-20-13
01-17-14
LEAD-365
POWER DISTRIBUTION
60 11-20-13
02-14-14
POWER DISTRIBUTION
LEAD-380
IT DEVICES
40 12-18-13
02-13-14
IT DEVICES
LIGHT FIXTURES - EXTERIOR LIGHT FIXTURES - INTERIOR
LEAD TIMES
CABLE TRAY LIGHT FIXTURES FIRE ALARM DEVICES
FIRE PROTECTION SUBMITTALS
SUB-335
FIRE VALVE CABINET
10 11-04-13 A
11-15-13 A
FIRE VALVE CABINET
SUB-340
FIRE SPRINKLER PUMP
10 11-04-13 A
11-15-13 A
FIRE SPRINKLER PUMP
SUB-345
FIRE SPRINKLER JOCKEY PUMP
10 11-04-13 A
11-15-13 A
FIRE SPRINKLER JOCKEY PUMP
SUB-350
SIAMESE FIRE DEPARTMENT CONNECTION
10 11-04-13 A
11-19-13
APP-335
FIRE VALVE CABINET
10 11-15-13 A
11-29-13
FIRE VALVE CABINET
APP-340
FIRE SPRINKLER PUMP
10 11-15-13 A
11-29-13
FIRE SPRINKLER PUMP
APP-345
FIRE SPRINKLER JOCKEY PUMP
10 11-15-13 A
11-29-13
FIRE SPRINKLER JOCKEY PUMP
APP-350
SIAMESE FIRE DEPARTMENT CONNECTION
10 11-20-13
12-04-13
LEAD-335
FIRE VALVE CABINET
20 12-02-13
12-30-13
LEAD-340
FIRE SPRINKLER PUMP
40 12-02-13
01-28-14
FIRE SPRINKLER PUMP
LEAD-345
FIRE SPRINKLER JOCKEY PUMP
40 12-02-13
01-28-14
FIRE SPRINKLER JOCKEY PUMP
LEAD-350
SIAMESE FIRE DEPARTMENT CONNECTION
20 12-05-13
01-03-14
SIAMESE FIRE DEPARTMENT CONNECTION
APPROVALS
SIAMESE FIRE DEPARTMENT CONNECTION
LEAD TIMES
FIRE VALVE CABINET
SIAMESE FIRE DEPARTMENT CONNECTION
CARPENTRY SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 6 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-355
ELEVATOR
10 07-19-13 A
08-01-13 A
ELEVATOR
SUB-510
FIRE EXTINGUISHER AND CABINETS
10 07-22-13 A
08-02-13 A
FIRE EXTINGUISHER AND CABINETS
SUB-525
TELESCOPING STANDS
10 09-11-13 A
09-25-13 A
SUB-440
WOOD GYM FLOOR
10 09-17-13 A
09-30-13 A
SUB-475
SCOREKEEPING SYSTEM
10 10-09-13 A
10-22-13 A
SUB-215
LAB FUME HOOD
10 11-19-13
12-03-13
LAB FUME HOOD
SUB-425
OVERHEAD COILING DOORS
10 11-19-13
12-03-13
OVERHEAD COILING DOORS
SUB-445
VOLLEYBALL POST AND NET
10 11-19-13
12-03-13
VOLLEYBALL POST AND NET
SUB-450
WINDOW ROLLER SHADES
10 11-19-13
12-03-13
WINDOW ROLLER SHADES
SUB-455
GYM DIVIDERS
10 11-19-13
12-03-13
GYM DIVIDERS
SUB-460
WIRE MESH PARTITIONS
10 11-19-13
12-03-13
WIRE MESH PARTITIONS
SUB-465
ART KILN
10 11-19-13
12-03-13
ART KILN
SUB-470
PROJECTION SCREENS
10 11-19-13
12-03-13
PROJECTION SCREENS
SUB-485
METAL LOCKERS
10 11-19-13
12-03-13
METAL LOCKERS
SUB-495
METAL STORAGE SHELVING
10 11-19-13
12-03-13
METAL STORAGE SHELVING
SUB-500
TOILET AND SHOWER COMPARTMENTS
10 11-19-13
12-03-13
TOILET AND SHOWER COMPARTMENTS
SUB-505
SIGNAGE
10 11-19-13
12-03-13
SIGNAGE
SUB-515
LAB CASEWORK
10 11-19-13
12-03-13
LAB CASEWORK
SUB-520
P-LAM CASEWORK
10 11-19-13
12-03-13
P-LAM CASEWORK
SUB-490
SITE FURNISHINGS
10 01-17-14
01-30-14
APP-355
ELEVATOR
10 08-01-13 A
08-23-13 A
ELEVATOR
APP-510
FIRE EXTINGUISHER AND CABINETS
10 08-02-13 A
08-22-13 A
FIRE EXTINGUISHER AND CABINETS
APP-525
TELESCOPING STANDS
10 09-25-13 A
11-08-13 A
TELESCOPING STANDS
APP-440
WOOD GYM FLOOR
10 09-30-13 A
11-08-13 A
WOOD GYM FLOOR
APP-475
SCOREKEEPING SYSTEM
10 10-22-13 A
11-19-13
SCOREKEEPING SYSTEM
APP-215
LAB FUME HOOD
10 12-04-13
12-17-13
LAB FUME HOOD
APP-425
OVERHEAD COILING DOORS
10 12-04-13
12-17-13
OVERHEAD COILING DOORS
APP-445
VOLLEYBALL POST AND NET
10 12-04-13
12-17-13
VOLLEYBALL POST AND NET
APP-450
WINDOW ROLLER SHADES
10 12-04-13
12-17-13
WINDOW ROLLER SHADES
APP-455
GYM DIVIDERS
10 12-04-13
12-17-13
GYM DIVIDERS
APP-460
WIRE MESH PARTITIONS
10 12-04-13
12-17-13
WIRE MESH PARTITIONS
APP-465
ART KILN
10 12-04-13
12-17-13
ART KILN
APP-470
PROJECTION SCREENS
10 12-04-13
12-17-13
PROJECTION SCREENS
TELESCOPING STANDS WOOD GYM FLOOR SCOREKEEPING SYSTEM
SITE FURNISHINGS
APPROVALS
11-21-13 13:05 MAX HAYES HS Sheet 7 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APP-485
METAL LOCKERS
10 12-04-13
12-17-13
METAL LOCKERS
APP-495
METAL STORAGE SHELVING
10 12-04-13
12-17-13
METAL STORAGE SHELVING
APP-500
TOILET AND SHOWER COMPARTMENTS
10 12-04-13
12-17-13
TOILET AND SHOWER COMPARTMENTS
APP-505
SIGNAGE
10 12-04-13
12-17-13
SIGNAGE
APP-515
LAB CASEWORK
10 12-04-13
12-17-13
LAB CASEWORK
APP-520
P-LAM CASEWORK
10 12-04-13
12-17-13
P-LAM CASEWORK
APP-490
SITE FURNISHINGS
10 01-31-14
02-13-14
LEAD-510
FIRE EXTINGUISHER AND CABINETS
20 08-22-13 A
11-19-13
FIRE EXTINGUISHER AND CABINETS
LEAD-355
ELEVATOR
50 08-26-13 A
11-19-13
ELEVATOR
LEAD-440
WOOD GYM FLOOR
20 11-08-13 A
12-06-13
LEAD-525
TELESCOPING STANDS
40 11-08-13 A
01-07-14
LEAD-475
SCOREKEEPING SYSTEM
20 11-20-13
12-18-13
LEAD-215
LAB FUME HOOD
50 12-18-13
02-27-14
LEAD-425
OVERHEAD COILING DOORS
30 12-18-13
01-30-14
LEAD-445
VOLLEYBALL POST AND NET
20 12-18-13
01-16-14
VOLLEYBALL POST AND NET
LEAD-450
WINDOW ROLLER SHADES
20 12-18-13
01-16-14
WINDOW ROLLER SHADES
LEAD-455
GYM DIVIDERS
40 12-18-13
02-13-14
GYM DIVIDERS
LEAD-460
WIRE MESH PARTITIONS
20 12-18-13
01-16-14
WIRE MESH PARTITIONS
LEAD-465
ART KILN
10 12-18-13
01-02-14
LEAD-470
PROJECTION SCREENS
20 12-18-13
01-16-14
LEAD-485
METAL LOCKERS
30 12-18-13
01-30-14
LEAD-495
METAL STORAGE SHELVING
20 12-18-13
01-16-14
LEAD-500
TOILET AND SHOWER COMPARTMENTS
30 12-18-13
01-30-14
TOILET AND SHOWER COMPARTMENTS
LEAD-505
SIGNAGE
30 12-18-13
01-30-14
SIGNAGE
LEAD-515
LAB CASEWORK
40 12-18-13
02-13-14
LAB CASEWORK
LEAD-520
P-LAM CASEWORK
40 12-18-13
02-13-14
P-LAM CASEWORK
LEAD-490
SITE FURNISHINGS
20 02-14-14
03-13-14
SUB-190
DOMESTIC WATER HEATER
10 07-10-13 A
07-24-13 A
SUB-200
PLUMBING PUMPS
10 07-29-13 A
08-09-13 A
SUB-180
PLUMBING FIXTURES
10 08-06-13 A
08-19-13 A
PLUMBING FIXTURES
SUB-195
STORAGE TANK
10 08-07-13 A
08-20-13 A
STORAGE TANK
SITE FURNISHINGS
LEAD TIMES
WOOD GYM FLOOR TELESCOPING STANDS SCOREKEEPING SYSTEM LAB FUME HOOD OVERHEAD COILING DOORS
ART KILN PROJECTION SCREENS METAL LOCKERS METAL STORAGE SHELVING
SITE FURNISHINGS
PLUMBING SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 8 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
DOMESTIC WATER HEATER PLUMBING PUMPS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SUB-185
AIR COMPRESSOR (AC)
10 08-14-13 A
08-27-13 A
AIR COMPRESSOR (AC)
SUB-205
GAS REGULATOR
10 09-18-13 A
10-01-13 A
GAS REGULATOR
APP-190
DOMESTIC WATER HEATER
10 07-24-13 A
08-19-13 A
DOMESTIC WATER HEATER
APP-200
PLUMBING PUMPS
10 08-09-13 A
08-19-13 A
PLUMBING PUMPS
APP-180
PLUMBING FIXTURES
10 08-19-13 A
08-28-13 A
PLUMBING FIXTURES
APP-195
STORAGE TANK
10 08-21-13 A
08-27-13 A
STORAGE TANK
APP-185
AIR COMPRESSOR (AC)
10 08-27-13 A
10-09-13 A
APP-205
GAS REGULATOR
10 10-01-13 A
10-03-13 A
LEAD-190
DOMESTIC WATER HEATER
10 08-19-13 A
11-19-13
DOMESTIC WATER HEATER
LEAD-200
PLUMBING PUMPS
20 08-19-13 A
11-19-13
PLUMBING PUMPS
LEAD-195
STORAGE TANK
10 08-27-13 A
11-19-13
STORAGE TANK
LEAD-180
PLUMBING FIXTURES
20 08-28-13 A
11-19-13
PLUMBING FIXTURES
LEAD-205
GAS REGULATOR
10 10-03-13 A
11-19-13
GAS REGULATOR
LEAD-185
AIR COMPRESSOR (AC)
20 10-09-13 A
11-19-13
AIR COMPRESSOR (AC)
SUB-545
FRX PLYWOOD SHEATHING
10 09-03-13 A
09-11-13 A
SUB-550
COLD FORM FRAMING ENGINEERING
10 09-30-13 A
10-11-13 A
SUB-535
ACT
10 11-19-13
12-02-13
ACT
SUB-540
SOUND ABSORBING PANELS
10 11-19-13
12-02-13
SOUND ABSORBING PANELS
APP-545
FRX PLYWOOD SHEATHING
10 09-11-13 A
10-01-13 A
APP-550
COLD FORM FRAMING ENGINEERING
10 10-11-13 A
11-19-13
APP-535
ACT
10 12-03-13
12-16-13
ACT
APP-540
SOUND ABSORBING PANELS
10 12-03-13
12-16-13
SOUND ABSORBING PANELS
APPROVALS
AIR COMPRESSOR (AC) GAS REGULATOR
LEAD TIMES
DRYWALL SUBMITTALS
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING
APPROVALS
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING
LEAD TIMES
LEAD-545
FRX PLYWOOD SHEATHING
LEAD-550
COLD FORM FRAMING ENGINEERING
15 11-20-13
12-10-13
LEAD-535
ACT
15 12-17-13
01-06-14
11-21-13 13:05 MAX HAYES HS Sheet 9 of 26
6 10-01-13 A
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
11-11-13 A
FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING ACT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID LEAD-540
Activity Name
Original Start Duration
Finish
2013
2014
SOUND ABSORBING PANELS
25 12-17-13
01-20-14
SOUND ABSORBING PANELS
SUB-395
PRE-CAST PLANKS
10 07-11-13 A
07-24-13 A
SUB-385
FACE BRICK
10 07-17-13 A
07-30-13 A
SUB-390
PRE-CAST STONE
10 08-07-13 A
08-20-13 A
APP-395
PRE-CAST PLANKS
10 07-24-13 A
08-01-13 A
PRE-CAST PLANKS
APP-385
FACE BRICK
10 07-30-13 A
08-21-13 A
FACE BRICK
APP-390
PRE-CAST STONE
10 08-20-13 A
09-12-13 A
LEAD-395
PRE-CAST PLANKS
15 08-01-13 A
10-17-13 A
LEAD-385
FACE BRICK
20 08-21-13 A
11-19-13
FACE BRICK
LEAD-390
PRE-CAST STONE
40 09-12-13 A
11-19-13
PRE-CAST STONE
SUB-436
ROOF COPING
10 08-27-13 A
09-09-13 A
SUB-400
ROOF HATCH
10 09-09-13 A
09-20-13 A
ROOF HATCH
APP-436
ROOF COPING
10 09-09-13 A
09-23-13 A
ROOF COPING
APP-400
ROOF HATCH
10 09-20-13 A
09-27-13 A
ROOF HATCH
LEAD-436
ROOF COPING
30 09-23-13 A
11-19-13
ROOF COPING
LEAD-400
ROOF HATCH
10 09-27-13 A
11-19-13
ROOF HATCH
SUB-435
SKY LIGHTS
10 09-16-13 A
09-20-13 A
SKY LIGHTS
SUB-530
WINDOWS
10 09-16-13 A
09-24-13 A
WINDOWS
SUB-430
ALUMINUM FRAMED STOREFRONT
10 10-03-13 A
10-16-13 A
MASON SUBMITTALS
PRE-CAST PLANKS FACE BRICK PRE-CAST STONE
APPROVALS
PRE-CAST STONE
LEAD TIMES
PRE-CAST PLANKS
ROOF SUBMITTALS
ROOF COPING
APPROVALS
LEAD TIMES
GLASS SUBMITTALS
11-21-13 13:05 MAX HAYES HS Sheet 10 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
ALUMINUM FRAMED STOREFRONT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
APPROVALS
APP-435
SKY LIGHTS
10 09-20-13 A
10-22-13 A
APP-530
WINDOWS
10 09-24-13 A
10-10-13 A
APP-430
ALUMINUM FRAMED STOREFRONT
10 10-16-13 A
10-25-13 A
SKY LIGHTS
LEAD-530
WINDOWS
50 10-10-13 A
12-19-13
LEAD-435
SKY LIGHTS
30 10-22-13 A
12-03-13
LEAD-430
ALUMINUM FRAMED STOREFRONT
10 10-25-13 A
11-19-13
SUB-565
CARPET
10 11-18-13 A
11-29-13
CARPET
SUB-555
CERAMIC TILE
10 11-18-13 A
11-29-13
CERAMIC TILE
SUB-560
SHEET VINYL
10 11-18-13 A
11-29-13
SHEET VINYL
SUB-570
RUBBER FLOORING
10 11-18-13 A
11-29-13
RUBBER FLOORING
SUB-575
VCT
10 11-18-13 A
11-29-13
VCT
SUB-580
RUBBER BASE
10 11-18-13 A
11-29-13
RUBBER BASE
APP-555
CERAMIC TILE
10 12-02-13
12-13-13
CERAMIC TILE
APP-560
SHEET VINYL
10 12-02-13
12-13-13
SHEET VINYL
APP-565
CARPET
10 12-02-13
12-13-13
CARPET
APP-570
RUBBER FLOORING
10 12-02-13
12-13-13
RUBBER FLOORING
APP-575
VCT
10 12-02-13
12-13-13
VCT
APP-580
RUBBER BASE
10 12-02-13
12-13-13
RUBBER BASE
LEAD-555
CERAMIC TILE
30 12-16-13
01-24-14
CERAMIC TILE
LEAD-560
SHEET VINYL
30 12-16-13
01-24-14
SHEET VINYL
LEAD-565
CARPET
30 12-16-13
01-24-14
CARPET
LEAD-570
RUBBER FLOORING
30 12-16-13
01-24-14
RUBBER FLOORING
LEAD-575
VCT
30 12-16-13
01-24-14
VCT
LEAD-580
RUBBER BASE
30 12-16-13
01-24-14
RUBBER BASE
WINDOWS ALUMINUM FRAMED STOREFRONT
LEAD TIMES
WINDOWS SKY LIGHTS ALUMINUM FRAMED STOREFRONT
FLOORING SUBMITTALS
APPROVALS
LEAD TIMES
F, F & E - TBD
11-21-13 13:05 MAX HAYES HS Sheet 11 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SUBMITTALS
SUB-480
FF&E
10 11-19-13
12-03-13
FF&E
10 12-04-13
12-17-13
FF&E
10 12-18-13
01-02-14
KITCHEN EQUIPMENT
10 09-19-13 A
10-14-13 A
KITCHEN EQUIPMENT
10 10-14-13 A
11-14-13 A
KITCHEN EQUIPMENT
80 11-14-13 A
03-10-14
FF&E
APPROVALS
APP-480
FF&E
LEAD TIMES
LEAD-480
FF&E
KITCHEN EQUIPMENT SUBMITTALS
SUB-210
KITCHEN EQUIPMENT
APPROVALS
APP-210
KITCHEN EQUIPMENT
LEAD TIMES
LEAD-210
KITCHEN EQUIPMENT
CONSTRUCTION GENERAL MILESTONES
MILE-1030
PERMANENT WATER
0
01-15-14*
MILE-1020
PERMANENT ELECTRICAL
0
04-01-14*
MILE-1010
CASEWORK AVAILABLE - A / B / C
0
05-01-14*
CASEWORK AVAILABLE - A / B / C
MILE-1040
CONDITIONED AIR - A, B, C
0
05-01-14*
CONDITIONED AIR - A, B, C
0
12-17-13*
0
01-13-14*
*05/01/14*
PERMANENT WATER PERMANENT ELECTRICAL *05/01/14*
TEMPORARY ENCLOSURE MILESTONES MILE-1075
TEMPORARY ENCLOSURE - B GYM
*12/31/13*
MILE-1055
TEMPORARY ENCLOSURE - B REMAINING
MILE-1050
TEMPORARY ENCLOSURE - A
*12/31/13*
0
01-20-14*
TEMPORARY ENCLOSURE - A
MILE-1060
TEMPORARY ENCLOSURE - C
*12/31/13*
0
01-22-14*
TEMPORARY ENCLOSURE - C
MILE-1065
TARGET TEMPORARY ENCLOSURE - D
0
05-16-14*
MILE-1070
TARGET TEMPORARY ENCLOSURE - E
0
06-09-14*
0
07-30-14*
*12/31/13*
*09/18/14* *10/31/14*
TEMPORARY ENCLOSURE - B GYM
*12/31/13*
TEMPORARY ENCLOSURE - B REMAINING
*12/31/13*
*12/31/13* *12/31/13*
TARGET TEMPORARY ENCLOSURE - D
*09/18/14*
TARGET TEMPORARY ENCLOSURE - E
*10/31/14*
TARGET COMPLETION MILESTONES MILE-B400
11-21-13 13:05 MAX HAYES HS Sheet 12 of 26
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*06/18/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MILE-B200
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*
0
08-20-14*
MILE-A100
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*
0
08-25-14*
MILE-A200
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*
0
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2
MILE-B100
TARGET COMPLETION MILESTONE - BUILDING B - GYM *9/11/14*
0
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING B - GYM
MILE-B300
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*
0
09-23-14*
MILE-B500
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
0
12-17-14*
MILE-B600
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
0
12-24-14*
MILE-D200
TARGET COMPLETION MILESTONE - BUILDING D *06/24/15* REVISED *03/06/15*
0
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING D
MILE-E300
TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*
ORIGINAL
0
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING E
MILE-C100
TARGET COMPLETION MILESTONE - BUILDING C
*03/19/15*
0
03-05-15*
ORIGINAL
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1
15 06-10-13 A
06-28-13 A
SITE-15
CLEAR SITE & SITE SETUP
10 06-10-13 A
06-21-13 A
SITE-20
SITE DEMO
20 06-24-13 A
07-22-13 A
SITE-25
CONTRACTUAL SOIL REMEDIATION
30 06-24-13 A
07-31-13 A
SITE-115
CUT & FILL SITE TO GRADE
20 07-09-13 A
11-29-13
SITE-190
U/G SANITARY SEWERS
SITE-35
MOBILIZE - FENCING, SWPPP CLEAR SITE & SITE SETUP SITE DEMO CONTRACTUAL SOIL REMEDIATION CUT & FILL SITE TO GRADE
NON-GMP SOIL REMEDIATION
25 07-22-13 A
08-07-13 A
SHNC-95
TEMP. ROAD ON SITE
30 07-29-13 A
11-29-13
TEMP. ROAD ON SITE
SITE-110
U/G STORM SEWERS
30 08-16-13 A
11-29-13
U/G STORM SEWERS
SITE-155
U/G UTILITIES TO BUILDING
30 09-13-13 A
12-13-13
SITE-120
FINISH PAVING & STRIPING
20 10-20-14
11-14-14
U/G SANITARY SEWERS NON-GMP SOIL REMEDIATION
U/G UTILITIES TO BUILDING FINISH PAVING & STRIPING
BUILDING SITE
SITE-70
9 06-24-13 A
07-05-13 A
EXCAVATE / FILL A TO GRADE
EXCAVATE B TO GRADE
10 07-08-13 A
07-19-13 A
EXCAVATE B TO GRADE
SITE-80
EXCAVATE / FILL C TO GRADE
10 07-22-13 A
07-31-13 A
SITE-85
EXCAVATE / FILL D TO GRADE
10 08-02-13 A
08-16-13 A
EXCAVATE / FILL D TO GRADE
SITE-90
EXCAVATE / FILL E TO GRADE
10 08-02-13 A
08-16-13 A
EXCAVATE / FILL E TO GRADE
EXCAVATE / FILL C TO GRADE
SOUTH SITE
11-21-13 13:05 MAX HAYES HS Sheet 13 of 26
*10/20/14*
TARGET COMPLETION MILESTONE - BUILDING C
07-17-13 A
EXCAVATE / FILL A TO GRADE
*9/11/14*
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
2 07-16-13 A
SITE-75
*10/16/14*
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
GENERAL
MOBILIZE - FENCING, SWPPP
*09/15/14*
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS
SITE
SITE-10
*08/22/14*
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
ORIGINAL *06/24/15* ORIGINAL *07/01/15* *03/19/15*
REVIS
REVISE
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
SITE-30
EXCAVATE & STONE - PARKING LOT
24 06-24-13 A
11-15-13 A
SITE-130
CREATE DETENTION SYSTEM
15 08-05-13 A
10-25-13 A
SITE-175
COMPLETE CPP AND CEI ACCESS
SITE-41
EXCAVATE & STONE - PARKING LOT CREATE DETENTION SYSTEM
9 09-03-13 A
11-22-13
RELOCATE CPP
30 09-23-13 A
11-29-13
SITE-180
INSTALL CEI DUCTBANK
10 10-28-13 A
11-22-13
SITE-185
OBTAIN EASEMENT - CEI DUCTBANK
52 11-14-13 A
01-24-14
SITE-40
RELOCATE CEI
10 01-27-14
02-07-14
SITE-135
PAVING STONE AND ASPHALT BASE COURSE
15 08-15-14
09-08-14
SITE-140
LANDSCAPING
10 09-02-14*
09-15-14
LANDSCAPING
SITE-170
PERMIABLE PAVERS
10 09-02-14*
09-15-14
PERMIABLE PAVERS
COMPLETE CPP AND CEI ACCESS
SITE-50
NORTH RETAINING WALL
10 08-05-13 A
08-09-13 A
SITE-165
LANDSCAPING
10 09-02-14
09-15-14
SITE-160
PAVING STONE AND ASPHALT BASE COURSE
15 09-08-14*
09-29-14
SITE-150
INSTALL PERM. FENCING
10 01-06-15
01-19-15
SITE-60
INSTALL RETAINING WALL
20 08-26-13 A
08-30-13 A
SITE-166
LANDSCAPING
10 09-16-14
09-29-14
SITE-167
PAVING STONE AND ASPHALT BASE COURSE
15 09-29-14
10-17-14*
RELOCATE CPP INSTALL CEI DUCTBANK OBTAIN EASEMENT - CEI DUCTBANK RELOCATE CEI PAVING STONE AND ASPHALT BASE COURSE
NORTH SITE
NORTH RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE INSTALL PERM. FENCING
EAST SITE
INSTALL RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE
WALWORTH SITE
SITE-101
DOMINION GAS ENGINEERING AND CAP EXISTING
30 08-12-13 A
09-12-13 A
SITE-100
LIGHT WT. FILL
10 09-23-13 A
10-04-13 A
LIGHT WT. FILL
SITE-105
DEMO ROADWAY
10 09-23-13 A
09-27-13 A
DEMO ROADWAY
SITE-116
TEMP CAP 16" WATER MAIN
3 09-25-13 A
09-27-13 A
TEMP CAP 16" WATER MAIN
SITE-111
CLEVELAND WATER DEPT. WORK
5 09-30-13 A
10-04-13 A
SITE-95
RELOCATE GAS LINE
10 10-30-13 A
11-05-13 A
DOMINION GAS ENGINEERING AND CAP EXISTING
LANDSCAPING
10 09-16-14
09-29-14
CLEVELAND WATER DEPT. WORK RELOCATE GAS LINE
WEST SITE
SITE-169
LANDSCAPING
BUILDING A SHELL AND CORE
SHCA-10
11-21-13 13:05 MAX HAYES HS Sheet 14 of 26
FOOTINGS
9 07-30-13 A
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
08-19-13 A
FOOTINGS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
SHCA-15
U/G MEP
5 08-12-13 A
08-22-13 A
U/G MEP
SHCA-20
FOUNDATION BLOCK
5 08-12-13 A
08-21-13 A
FOUNDATION BLOCK
SHCA-25
VAPOR SYSTEM & STONE
6 08-23-13 A
09-03-13 A
VAPOR SYSTEM & STONE
SHCA-30
POUR S.O.G.
3 09-04-13 A
09-06-13 A
POUR S.O.G.
SHCA-40
BLOCK TO 2ND FLR
15 09-09-13 A
10-01-13 A
SHCA-35
H.M. FRAMES - 1ST FLR
3 09-23-13 A
09-25-13 A
H.M. FRAMES - 1ST FLR
SHCA-95
STRUCTURAL STEEL
3 10-01-13 A
10-03-13 A
STRUCTURAL STEEL
SHCA-45
JOIST, DECK - 2ND FLR
5 10-03-13 A
10-15-13 A
JOIST, DECK - 2ND FLR
SHCA-100
POUR CONCRETE - 2ND FLR
2 10-16-13 A
10-18-13 A
POUR CONCRETE - 2ND FLR
SHCA-105
CURE CONCRETE - 2ND FLR
5 10-21-13 A
10-25-13 A
SHCA-50
H.M. FRAMES - 2ND FLR
3 10-28-13 A
11-19-13
H.M. FRAMES - 2ND FLR
SHCA-55
BLOCK TO ROOF
15 10-28-13 A
11-19-13
BLOCK TO ROOF
SHCA-60
JOIST & DECK - ROOF
10 11-15-13 A
12-02-13
SHCA-70
MASONRY VENEER REQUIRED FOR ENCLOSURE
15 11-20-13
12-11-13
MASONRY VENEER REQUIRED FOR ENCLOSURE
SHCA-110
ROOF BLOCKING
5 12-03-13
12-09-13
ROOF BLOCKING
SHCA-115
MEP CURBS & DRAINS
5 12-03-13
12-09-13
MEP CURBS & DRAINS
SHCA-75
ROOFING A
15 12-10-13
12-31-13
ROOFING A
SHCA-80
METAL PANELS
15 12-12-13
01-03-14
METAL PANELS
SHCA-120
MASONRY VENEER - REMAINING
15 12-12-13
01-01-14
MASONRY VENEER - REMAINING
SHCA-85
WINDOWS & CURTAIN WALL
20 12-20-13
01-20-14
SHCA-90
ROOFING TRIM
5 01-06-14
01-10-14
BLOCK TO 2ND FLR
CURE CONCRETE - 2ND FLR
JOIST & DECK - ROOF
WINDOWS & CURTAIN WALL ROOFING TRIM
INTERIOR BUILDOUT 1ST FLOOR INTA-112
OVERHEAD ELECTRICAL
40 10-21-13 A
12-16-13
OVERHEAD ELECTRICAL
INTA-113
OVERHEAD PLUMBING
40 10-21-13 A
12-16-13
OVERHEAD PLUMBING
INTA-110
OVERHEAD DUCTWORK
40 10-28-13 A
12-16-13
OVERHEAD DUCTWORK
INTA-114
OVERHEAD FIRE PROTECTION
10 11-19-13
12-03-13
INTA-115
INTERIOR FRAMING
20 12-17-13
01-15-14
INTA-111
OVERHEAD HVAC PIPING
40 12-26-13
02-20-14
INTA-120
ELECTRICAL IN WALL ROUGH-IN
20 01-16-14
02-12-14
ELECTRICAL IN WALL ROUGH-IN
INTA-121
PLUMBING IN WALL ROUGH-IN
20 01-16-14
02-12-14
PLUMBING IN WALL ROUGH-IN
INTA-125
HANG DRYWALL
10 02-13-14
02-26-14
INTA-126
TAPE AND FINISH
10 04-01-14*
04-14-14
INTA-200
ELEVATOR INSTALLATION
15 04-02-14
04-22-14
INTA-130
CERAMIC TILE
15 04-15-14
05-05-14
CERAMIC TILE
INTA-135
PRIME PAINT
15 04-15-14
05-05-14
PRIME PAINT
11-21-13 13:05 MAX HAYES HS Sheet 15 of 26
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
OVERHEAD FIRE PROTECTION INTERIOR FRAMING OVERHEAD HVAC PIPING
HANG DRYWALL TAPE AND FINISH ELEVATOR INSTALLATION
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTA-145
CLG GRID
15 04-29-14
05-19-14
CLG GRID
INTA-140
CASEWORK
15 05-02-14
05-22-14
CASEWORK
INTA-150
LIGHT FIXTURES
30 05-13-14
06-24-14
LIGHT FIXTURES
INTA-151
DIFFUSERS
30 05-13-14
06-24-14
DIFFUSERS
INTA-152
PLUMBING FINISHES
30 05-13-14
06-24-14
PLUMBING FINISHES
INTA-153
FIRE PROTECTION FINISHES
30 05-13-14
06-24-14
FIRE PROTECTION FINISHES
INTA-155
FINISH PAINT
30 05-28-14
07-09-14
INTA-160
SPECIALTY FLOORING
10 06-18-14
07-01-14
SPECIALTY FLOORING
INTA-165
DOORS & HARDWARE
15 06-18-14
07-09-14
DOORS & HARDWARE
INTA-170
CLG TILE
15 06-25-14
07-16-14
INTA-175
VCT & VINYL FLOORING
15 07-02-14
07-23-14
VCT & VINYL FLOORING
INTA-180
CARPET
10 07-10-14
07-23-14
CARPET
INTA-185
SPECIALTIES
10 07-24-14
08-06-14
INTA-190
PUNCHLIST
20 07-29-14
08-25-14
INTA-195
TESTING & INSPECTIONS
15 07-29-14
08-18-14
MILE-A105
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*
0
FINISH PAINT
CLG TILE
SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
08-25-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1
2ND FLOOR INTA-210
OVERHEAD DUCTWORK
40 12-03-13
01-29-14
OVERHEAD DUCTWORK
INTA-211
OVERHEAD HVAC PIPING
40 12-03-13
01-29-14
OVERHEAD HVAC PIPING
INTA-212
OVERHEAD ELECTRICAL
40 12-03-13
01-29-14
OVERHEAD ELECTRICAL
INTA-213
OVERHEAD PLUMBING
40 12-03-13
01-29-14
OVERHEAD PLUMBING
INTA-214
OVERHEAD FIRE PROTECTION
40 12-03-13
01-29-14
OVERHEAD FIRE PROTECTION
INTA-215
INTERIOR FRAMING
20 01-30-14
02-26-14
INTA-220
ELECTRICAL IN WALL ROUGH-IN
20 02-27-14
03-26-14
ELECTRICAL IN WALL ROUGH-IN
INTA-221
PLUMBING IN WALL ROUGH-IN
20 02-27-14
03-26-14
PLUMBING IN WALL ROUGH-IN
INTA-225
HANG DRYWALL
10 03-27-14
04-09-14
INTA-226
TAPE AND FINISH
10 04-15-14*
04-28-14
INTA-230
CERAMIC TILE
15 04-29-14
05-19-14
CERAMIC TILE
INTA-235
PRIME PAINT
15 04-29-14
05-19-14
PRIME PAINT
INTA-245
CLG GRID
15 05-13-14
06-03-14
CLG GRID
INTA-240
CASEWORK
15 05-23-14
06-13-14
INTA-250
LIGHT FIXTURES
30 05-28-14
07-09-14
LIGHT FIXTURES
INTA-251
DIFFUSERS
30 05-28-14
07-09-14
DIFFUSERS
INTA-252
PLUMBING FINISHES
30 05-28-14
07-09-14
PLUMBING FINISHES
INTA-253
FIRE PROTECTION FINISHES
30 05-28-14
07-09-14
FIRE PROTECTION FINISHES
INTA-255
FINISH PAINT
30 06-11-14
07-23-14
11-21-13 13:05 MAX HAYES HS Sheet 16 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
INTERIOR FRAMING
HANG DRYWALL TAPE AND FINISH
CASEWORK
FINISH PAINT
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*09/15/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTA-260
SPECIALTY FLOORING
10 07-02-14
07-16-14
SPECIALTY FLOORING
INTA-265
DOORS & HARDWARE
15 07-02-14
07-23-14
DOORS & HARDWARE
INTA-270
CLG TILE
15 07-10-14
07-30-14
INTA-275
VCT & VINYL FLOORING
15 07-17-14
08-06-14
VCT & VINYL FLOORING
INTA-280
CARPET
10 07-24-14
08-06-14
CARPET
INTA-285
SPECIALTIES
10 08-07-14
08-20-14
INTA-290
PUNCHLIST
20 08-12-14
09-09-14
INTA-295
TESTING & INSPECTIONS
15 08-12-14
09-02-14
MILE-A205
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*
0
CLG TILE
SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
09-09-14*
TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2
BUILDING B - GYM SHELL AND CORE
SHCB-100
FOOTINGS - GYM & REMAINING
10 08-08-13 A
08-23-13 A
SHCB-105
BLOCK TO ROOF
20 08-14-13 A
09-16-13 A
SHCB-110
ROOF JOIST & DECK
7 10-17-13 A
11-22-13
SHCB-126
VAPOR SYSTEM & STONE
3 11-01-13 A
11-08-13 A
VAPOR SYSTEM & STONE
SHCB-120
U/G MEP
2 11-04-13 A
11-05-13 A
U/G MEP
SHCB-135
POUR S.O.G.
3 11-12-13 A
11-14-13 A
SHCB-115
MASONRY ACCESS OPENING
5 11-15-13 A
11-20-13
SHCB-155
ROOF BLOCKING
5 11-19-13
11-25-13
ROOF BLOCKING
SHCB-160
MEP CURBS & DRAINS
5 11-19-13
11-25-13
MEP CURBS & DRAINS
SHCB-130
ROOFING
15 11-26-13
12-17-13
SHCB-145
ROOFING TRIM
5 12-18-13
12-24-13
SHCB-140
BRICK VENEER
15 03-31-14*
04-18-14
SHCB-150
METAL PANELS
15 04-21-14
05-09-14
FOOTINGS - GYM & REMAINING BLOCK TO ROOF ROOF JOIST & DECK
POUR S.O.G. MASONRY ACCESS OPENING
ROOFING ROOFING TRIM BRICK VENEER METAL PANELS
INTERIOR BUILDOUT
INTB-100
OVERHEAD DUCTWORK
30 12-18-13
01-30-14
OVERHEAD DUCTWORK
INTB-110
OVERHEAD ELECTRICAL
30 12-18-13
01-30-14
OVERHEAD ELECTRICAL
INTB-115
OVERHEAD PLUMBING
30 12-18-13
01-30-14
OVERHEAD PLUMBING
INTB-120
OVERHEAD FIRE PROTECTION
30 12-18-13
01-30-14
OVERHEAD FIRE PROTECTION
INTB-105
OVERHEAD HVAC PIPING
30 12-26-13
02-06-14
INTB-125
ELECTRICAL ROUGH-INS
20 01-31-14
02-27-14
ELECTRICAL ROUGH-INS
INTB-130
PLUMBING ROUGH-INS
20 01-31-14
02-27-14
PLUMBING ROUGH-INS
INTB-135
PRIME PAINT
15 02-28-14
03-20-14
INTB-140
DIFFUSERS
15 03-21-14
04-10-14
11-21-13 13:05 MAX HAYES HS Sheet 17 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
OVERHEAD HVAC PIPING
PRIME PAINT DIFFUSERS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*10/16/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-145
PLUMBING FINISHES
15 03-21-14
04-10-14
PLUMBING FINISHES
INTB-150
FIRE PROTECTION FINISHES
15 03-21-14
04-10-14
FIRE PROTECTION FINISHES
INTB-155
LIGHT FIXTURES
15 03-21-14
04-10-14
LIGHT FIXTURES
INTB-160
FINISH PAINT
15 04-11-14
05-01-14
FINISH PAINT
INTB-170
ACOUSTIC PANELS
5 05-02-14
05-08-14
INTB-175
ATHLETIC EQUIPMENT
30 05-09-14
06-20-14
INTB-165
DOORS & HARDWARE
10 05-23-14
06-06-14
INTB-180
WOOD GYM FLOORING
30 06-23-14
08-04-14
INTB-195
BLEACHERS
5 08-05-14
08-11-14
INTB-185
PUNCHLIST
20 08-12-14
09-09-14
INTB-190
TESTING & INSPECTIONS
15 08-12-14
09-02-14
MILE-B105
TARGET COMPLETION MILESTONE - BUILDING B - GYM *09/11/14*
0
09-09-14*
5 08-19-13 A
08-23-13 A
10 08-26-13 A
09-09-13 A
5 09-03-13 A
09-25-13 A
10 09-03-13 A
09-12-13 A
ACOUSTIC PANELS ATHLETIC EQUIPMENT DOORS & HARDWARE WOOD GYM FLOORING BLEACHERS PUNCHLIST TESTING & INSPECTIONS TARGET COMPLETION MILESTONE - BUILDING B - GYM
BUILDING B - REMAINING SHELL AND CORE
SHCB-200
FOUNDATION BLOCK TO GRADE
SHCB-205
U/G MEP IN LOCKER ROOMS
SHCB-215
VAPOR SYSTEM & STONE IN LOCKER ROOMS
SHCB-210
U/G MEP IN KITCHEN
SHCB-220
VAPOR SYSTEM & STONE IN KITCHEN
5 09-03-13 A
09-20-13 A
VAPOR SYSTEM & STONE IN KITCHEN
SHCB-310
U/G MEP IN MECH ROOMS
5 09-13-13 A
09-24-13 A
U/G MEP IN MECH ROOMS
SHCB-225
POUR S.O.G. - KITCHEN / DINING ROOMS
3 09-23-13 A
09-25-13 A
POUR S.O.G. - KITCHEN / DINING ROOMS
SHCB-226
POUR S.O.G. - LOCKER ROOMS
3 09-25-13 A
09-27-13 A
POUR S.O.G. - LOCKER ROOMS
SHCB-315
VAPOR SYSTEM & STONE IN MECH ROOMS
3 09-26-13 A
09-30-13 A
VAPOR SYSTEM & STONE IN MECH ROOMS
SHCB-235
BLOCK TO ROOF - KITCHEN / DINING ROOMS
20 09-30-13 A
10-28-13 A
SHCB-320
POUR S.O.G - MECH ROOM
5 10-02-13 A
10-08-13 A
SHCB-230
H.M. FRAMES
20 10-03-13 A
10-28-13 A
SHCB-240
BLOCK TO MEZZANINE
8 10-07-13 A
10-16-13 A
BLOCK TO MEZZANINE
SHCB-245
MEZZANINE PRECAST
2 10-17-13 A
10-18-13 A
MEZZANINE PRECAST
SHCB-255
BLOCK TO ROOF - LOCKER / MEZZ
9 10-21-13 A
11-01-13 A
SHCB-325
STRUCTURAL STEEL - KITCHEN
2 10-25-13 A
10-25-13 A
SHCB-250
ROOF JOISTS & DECK - KITCHEN
15 10-25-13 A
11-01-13 A
ROOF JOISTS & DECK - KITCHEN
SHCB-260
ROOF JOISTS & DECK - DINING
8 10-30-13 A
11-13-13 A
ROOF JOISTS & DECK - DINING
SHCB-265
ROOF JOISTS & DECK - LOCKER / MEZZ
15 11-04-13 A
12-05-13
SHCB-305
STAIRS TO MEZZANINE
10 11-04-13 A
11-15-13 A
STAIRS TO MEZZANINE
SHCB-256
MEZZANINE TOPPING
5 11-07-13 A
11-15-13 A
MEZZANINE TOPPING
11-21-13 13:05 MAX HAYES HS Sheet 18 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
FOUNDATION BLOCK TO GRADE U/G MEP IN LOCKER ROOMS VAPOR SYSTEM & STONE IN LOCKER ROOMS U/G MEP IN KITCHEN
BLOCK TO ROOF - KITCHEN / DINING ROOMS POUR S.O.G - MECH ROOM H.M. FRAMES
BLOCK TO ROOF - LOCKER / MEZZ STRUCTURAL STEEL - KITCHEN
ROOF JOISTS & DECK - LOCKER / MEZZ
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*09/11/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
SHCB-330
ROOF BLOCKING - KITCHEN
5 11-11-13 A
11-15-13 A
ROOF BLOCKING - KITCHEN
SHCB-340
MEP CURBS & DRAINS - KITCHEN
5 11-11-13 A
11-15-13 A
MEP CURBS & DRAINS - KITCHEN
SHCB-345
ROOF BLOCKING - DINING
5 11-14-13 A
11-22-13
ROOF BLOCKING - DINING
SHCB-350
MEP CURBS & DRAINS - DINING
5 11-14-13 A
11-22-13
MEP CURBS & DRAINS - DINING
SHCB-270
ROOFING - KITCHEN
10 11-18-13 A
12-02-13
SHCB-365
MECHANICAL HOUSEKEEPING PADS
5 11-19-13
11-25-13
MECHANICAL HOUSEKEEPING PADS
SHCB-280
MASONRY VENEER REQUIRED FOR ENCLOSURE
5 11-20-13
11-26-13
MASONRY VENEER REQUIRED FOR ENCLOSURE
SHCB-257
LOAD MEP EQUIPMENT TO MEZZ
7 11-26-13
12-05-13
SHCB-275
ROOFING - DINING
15 12-02-13
12-20-13
SHCB-355
ROOF BLOCKING - LOCKER / MEZZ
5 12-06-13
12-12-13
ROOF BLOCKING - LOCKER / MEZZ
SHCB-360
MEP CURBS & DRAINS - LOCKER / MEZZ
5 12-06-13
12-12-13
MEP CURBS & DRAINS - LOCKER / MEZZ
SHCB-285
ROOFING - LOCKER / MEZZ
15 12-13-13
01-06-14
SHCB-295
WINDOWS & C.W.
15 12-20-13
01-13-14
WINDOWS & C.W.
SHCB-300
ROOFING TRIM
5 01-07-14
01-13-14
ROOFING TRIM
SHCB-335
MASONRY VENEER - REMAINING
5 03-31-14*
04-04-14
SHCB-290
METAL PANELS
ROOFING - KITCHEN
LOAD MEP EQUIPMENT TO MEZZ ROOFING - DINING
ROOFING - LOCKER / MEZZ
MASONRY VENEER - REMAINING
15 04-07-14
04-25-14
METAL PANELS
INTERIOR BUILDOUT MEZZANINE INTB-402
PLUMBING EQUIPMENT / PIPING
80 01-07-14
04-28-14
PLUMBING EQUIPMENT / PIPING
INTB-400
ELECTRICAL EQUIPMENT / PIPING
80 01-07-14
04-28-14
ELECTRICAL EQUIPMENT / PIPING
INTB-401
MECHANICAL EQUIPMENT / PIPING
80 01-07-14
04-28-14
MECHANICAL EQUIPMENT / PIPING
INTB-405
ELECTRICAL ROUGH-INS
35 01-07-14
02-24-14
ELECTRICAL ROUGH-INS
INTB-406
PLUMBING ROUGH-INS
35 01-07-14
02-24-14
PLUMBING ROUGH-INS
INTB-410
PRIME PAINT
5 04-29-14
05-05-14
INTB-415
LIGHT FIXTURES
10 05-06-14
05-19-14
LIGHT FIXTURES
INTB-420
DIFFUSERS
10 05-06-14
05-19-14
DIFFUSERS
INTB-425
FINISH PAINT
10 05-20-14
06-03-14
INTB-430
DOORS & HARDWARE
5 06-04-14
06-10-14
DOORS & HARDWARE
INTB-440
SPECIALTIES
20 06-11-14
07-09-14
SPECIALTIES
INTB-445
PUNCHLIST
20 07-02-14
07-30-14
INTB-450
TESTING & INSPECTIONS
15 07-02-14
07-23-14
MILE-B405
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*
0
PRIME PAINT
FINISH PAINT
PUNCHLIST TESTING & INSPECTIONS
07-30-14*
TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE
LOCKER ROOMS INTB-300
OVERHEAD DUCTWORK
15 12-06-13
12-27-13
OVERHEAD DUCTWORK
INTB-301
OVERHEAD HVAC PIPING
15 12-06-13
12-27-13
OVERHEAD HVAC PIPING
INTB-302
OVERHEAD ELECTRICAL
15 12-06-13
12-27-13
OVERHEAD ELECTRICAL
11-21-13 13:05 MAX HAYES HS Sheet 19 of 26
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*06/18/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-303
OVERHEAD PLUMBING
15 12-06-13
12-27-13
OVERHEAD PLUMBING
INTB-304
OVERHEAD FIRE PROTECTION
15 12-06-13
12-27-13
OVERHEAD FIRE PROTECTION
INTB-305
ELECTRICAL ROUGH-INS
15 12-30-13
01-20-14
ELECTRICAL ROUGH-INS
INTB-306
PLUMBING ROUGH-INS
15 12-30-13
01-20-14
PLUMBING ROUGH-INS
INTB-311
FRAME DRYWALL CEILING
10 01-14-14
01-27-14
INTB-310
DRYWALL CEILING
10 01-28-14
02-10-14
INTB-315
TAPE AND FINISH CEILING
10 04-01-14*
04-14-14
INTB-320
CERAMIC TILE
10 04-15-14
04-28-14
INTB-325
PRIME PAINT
5 04-15-14
04-21-14
INTB-330
PLUMBING FINISHES
10 04-15-14
04-28-14
PLUMBING FINISHES
INTB-335
FIRE PROTECTION FINISHES
10 04-15-14
04-28-14
FIRE PROTECTION FINISHES
INTB-340
CASEWORK
5 06-16-14
06-20-14
CASEWORK
INTB-345
FINISH PAINT
10 06-23-14
07-07-14
INTB-350
DOORS & HARDWARE
10 07-08-14
07-21-14
INTB-370
FLOORING
10 07-22-14
08-04-14
INTB-355
SPECIALTIES
20 08-05-14
09-02-14
INTB-360
PUNCHLIST
20 08-26-14
09-23-14
INTB-365
TESTING & INSPECTIONS
15 08-26-14
09-16-14
MILE-B305
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*
0
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
FRAME DRYWALL CEILING DRYWALL CEILING TAPE AND FINISH CEILING CERAMIC TILE PRIME PAINT
FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
09-23-14*
TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS
*10/20/14*
MECHANICAL / ELECTRICAL ROOMS INTB-200
PLUMBING EQUIPMENT / PIPING
70 01-07-14
04-14-14
PLUMBING EQUIPMENT / PIPING
INTB-201
ELECTRICAL EQUIPMENT / PIPING
70 01-07-14
04-14-14
ELECTRICAL EQUIPMENT / PIPING
INTB-202
FIRE PUMP EQUIPMENT / PIPING
70 01-07-14
04-14-14
FIRE PUMP EQUIPMENT / PIPING
INTB-205
ELECTRICAL ROUGH-INS
10 04-15-14
04-28-14
ELECTRICAL ROUGH-INS
INTB-206
PLUMBING ROUGH-INS
10 04-15-14
04-28-14
PLUMBING ROUGH-INS
INTB-210
PRIME PAINT
5 04-29-14
05-05-14
INTB-215
LIGHT FIXTURES
10 05-06-14
05-19-14
LIGHT FIXTURES
INTB-220
DIFFUSERS
10 05-06-14
05-19-14
DIFFUSERS
INTB-225
FINISH PAINT
10 05-20-14
06-03-14
INTB-230
DOORS & HARDWARE
10 06-04-14
06-17-14
INTB-235
FLOORING
10 06-18-14
07-01-14
INTB-240
SPECIALTIES
20 07-02-14
07-30-14
INTB-245
PUNCHLIST
20 07-24-14
08-20-14
INTB-250
TESTING & INSPECTIONS
15 07-24-14
08-13-14
MILE-B205
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*
11-21-13 13:05 MAX HAYES HS Sheet 20 of 26
0
PRIME PAINT
FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
08-20-14*
TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*08/22/14*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
KITCHEN INTB-500
OVERHEAD DUCTWORK
30 12-03-13
01-15-14
OVERHEAD DUCTWORK
INTB-501
OVERHEAD HVAC PIPING
30 12-03-13
01-15-14
OVERHEAD HVAC PIPING
INTB-502
OVERHEAD ELECTRICAL
30 12-03-13
01-15-14
OVERHEAD ELECTRICAL
INTB-503
OVERHEAD PLUMBING
30 12-03-13
01-15-14
OVERHEAD PLUMBING
INTB-504
OVERHEAD FIRE PROTECTION
30 12-03-13
01-15-14
OVERHEAD FIRE PROTECTION
INTB-505
ELECTRICAL ROUGH-INS
35 01-16-14
03-05-14
ELECTRICAL ROUGH-INS
INTB-506
PLUMBING ROUGH-INS
35 01-16-14
03-05-14
PLUMBING ROUGH-INS
INTB-507
KITCHEN EQUIPMENT ROUGH-INS
35 01-16-14
03-05-14
KITCHEN EQUIPMENT ROUGH-INS
INTB-510
PRIME PAINT
10 03-06-14
03-19-14
PRIME PAINT
INTB-520
CLG GRID
15 03-20-14
04-09-14
CLG GRID
INTB-525
PLUMBING FINISHES
15 04-10-14
04-30-14
PLUMBING FINISHES
INTB-530
FIRE PROTECTION FINISHES
15 04-10-14
04-30-14
FIRE PROTECTION FINISHES
INTB-535
LIGHT FIXTURES
15 04-10-14
04-30-14
LIGHT FIXTURES
INTB-540
DIFFUSERS
15 04-10-14
04-30-14
DIFFUSERS
INTB-515
CASEWORK
25 06-23-14
07-28-14
INTB-545
FINISH PAINT
10 07-29-14
08-11-14
INTB-550
CLG TILE
5 09-10-14
09-16-14
INTB-555
DOORS & HARDWARE
10 09-10-14
09-23-14
INTB-560
FLOORING
20 09-10-14
10-07-14
INTB-565
KITCHEN EQUIPMENT
30 10-08-14
11-18-14
INTB-570
SPECIALTIES
20 10-08-14
11-04-14
INTB-575
PUNCHLIST
20 11-19-14
12-17-14
INTB-580
TESTING & INSPECTIONS
15 11-19-14
12-10-14
MILE-B505
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*
0
CASEWORK FINISH PAINT CLG TILE DOORS & HARDWARE FLOORING KITCHEN EQUIPMENT SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
12-17-14*
TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN
STUDENT DINING INTB-600
OVERHEAD DUCTWORK
20 12-23-13
01-21-14
OVERHEAD DUCTWORK
INTB-602
OVERHEAD ELECTRICAL
20 12-23-13
01-21-14
OVERHEAD ELECTRICAL
INTB-603
OVERHEAD PLUMBING
20 12-23-13
01-21-14
OVERHEAD PLUMBING
INTB-604
OVERHEAD FIRE PROTECTION
20 12-23-13
01-21-14
OVERHEAD FIRE PROTECTION
INTB-601
OVERHEAD HVAC PIPING
20 12-26-13
01-23-14
OVERHEAD HVAC PIPING
INTB-605
ELECTRICAL ROUGH-INS
15 01-22-14
02-11-14
ELECTRICAL ROUGH-INS
INTB-606
PLUMBING ROUGH-INS
15 01-22-14
02-11-14
PLUMBING ROUGH-INS
INTB-610
PRIME PAINT
10 02-12-14
02-25-14
INTB-620
CLG GRID
10 02-26-14
03-11-14
INTB-625
PLUMBING FINISHES
10 03-12-14
03-25-14
11-21-13 13:05 MAX HAYES HS Sheet 21 of 26
PRIME PAINT CLG GRID PLUMBING FINISHES
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*01/13/15*
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTB-630
FIRE PROTECTION FINISHES
10 03-12-14
03-25-14
FIRE PROTECTION FINISHES
INTB-635
LIGHT FIXTURES
10 03-12-14
03-25-14
LIGHT FIXTURES
INTB-640
DIFFUSERS
10 03-12-14
03-25-14
DIFFUSERS
INTB-615
CASEWORK
15 07-29-14
08-18-14
INTB-645
FINISH PAINT
10 08-19-14
09-02-14
INTB-650
CLG TILE
10 10-01-14
10-14-14
CLG TILE
INTB-655
DOORS & HARDWARE
10 10-01-14
10-14-14
DOORS & HARDWARE
INTB-660
FLOORING
20 10-01-14
10-28-14
INTB-665
SPECIALTIES
20 10-29-14
11-26-14
SPECIALTIES
INTB-680
ACOUSTIC PANELS
20 10-29-14
11-26-14
ACOUSTIC PANELS
INTB-670
PUNCHLIST
20 11-27-14
12-24-14
INTB-675
TESTING & INSPECTIONS
15 11-27-14
12-17-14
MILE-B605
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
0
CASEWORK FINISH PAINT
FLOORING
PUNCHLIST TESTING & INSPECTIONS
12-24-14*
TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*
BUILDING C SHELL AND CORE
SHCC-235
FOOTINGS
10 08-22-13 A
09-03-13 A
SHCC-240
U/G MEP
10 09-04-13 A
09-24-13 A
SHCC-245
FOUNDATION BLOCK
5 09-04-13 A
09-06-13 A
SHCC-250
VAPOR SYSTEM & STONE
11 09-16-13 A
09-27-13 A
SHCC-255
POUR S.O.G. / CURE
4 09-27-13 A
10-04-13 A
SHCC-260
H.M. FRAMES
5 10-21-13 A
11-22-13
H.M. FRAMES
SHCC-265
BLOCK TO ROOF
20 10-21-13 A
11-22-13
BLOCK TO ROOF
SHCC-270
ROOF JOIST & DECK
15 11-25-13
12-16-13
ROOF JOIST & DECK
SHCC-285
BRICK VENEER
15 11-25-13
12-16-13
BRICK VENEER
SHCC-290
METAL PANELS
15 12-17-13
01-08-14
SHCC-365
ROOF BLOCKING
5 12-17-13
12-23-13
ROOF BLOCKING
SHCC-370
MEP CURBS & DRAINS
5 12-17-13
12-23-13
MEP CURBS & DRAINS
SHCC-295
WINDOWS & C.W.
15 12-20-13
01-13-14
SHCC-280
ROOFING
15 01-02-14
01-22-14
SHCC-296
ROOFING TRIM
5 01-23-14
01-29-14
FOOTINGS U/G MEP FOUNDATION BLOCK VAPOR SYSTEM & STONE POUR S.O.G. / CURE
METAL PANELS
WINDOWS & C.W. ROOFING ROOFING TRIM
INTERIOR BUILDOUT
INTC-115
OVERHEAD DUCTWORK
40 01-23-14
03-19-14
OVERHEAD DUCTWORK
INTC-116
OVERHEAD HVAC PIPING
40 01-23-14
03-19-14
OVERHEAD HVAC PIPING
INTC-117
OVERHEAD ELECTRICAL
40 01-23-14
03-19-14
OVERHEAD ELECTRICAL
11-21-13 13:05 MAX HAYES HS Sheet 22 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTC-118
OVERHEAD PLUMBING
40 01-23-14
03-19-14
OVERHEAD PLUMBING
INTC-119
OVERHEAD FIRE PROTECTION
40 01-23-14
03-19-14
OVERHEAD FIRE PROTECTION
INTC-125
PLUMBING ROUGH-INS
35 03-20-14
05-07-14
PLUMBING ROUGH-INS
INTC-120
ELECTRICAL ROUGH-INS
35 03-20-14
05-07-14
ELECTRICAL ROUGH-INS
INTC-210
FRAME DRYWALL CEILING
5 05-08-14
05-14-14
FRAME DRYWALL CEILING
INTC-220
HANG DRYWALL CEILING
5 05-15-14
05-21-14
HANG DRYWALL CEILING
INTC-130
TAPE & FINISH CEILING
40 05-22-14*
07-18-14
INTC-135
CERAMIC TILE
30 05-30-14
07-11-14
CERAMIC TILE
INTC-140
PRIME PAINT
15 06-20-14
07-11-14
PRIME PAINT
INTC-150
CLG GRID
30 07-07-14
08-15-14
INTC-155
PLUMBING FINISHES
30 08-18-14
09-29-14
PLUMBING FINISHES
INTC-156
FIRE PROTECTION FINISHES
30 08-18-14
09-29-14
FIRE PROTECTION FINISHES
INTC-157
LIGHT FIXTURES
30 08-18-14
09-29-14
LIGHT FIXTURES
INTC-158
DIFFUSERS
30 08-18-14
09-29-14
DIFFUSERS
INTC-145
CASEWORK
25 08-19-14
09-23-14
INTC-160
FINISH PAINT
15 09-30-14
10-20-14
INTC-165
SPECIALTY FLOORING
30 10-21-14
12-02-14
SPECIALTY FLOORING
INTC-170
DOORS & HARDWARE
15 11-11-14
12-02-14
DOORS & HARDWARE
INTC-175
CLG TILE
20 11-11-14
12-09-14
INTC-180
VCT & VINYL FLOORING
20 11-26-14
12-23-14
INTC-185
CARPET
20 12-24-14
01-22-15
INTC-190
SPECIALTIES
20 01-09-15
02-05-15
INTC-195
PUNCHLIST
20 02-06-15
03-05-15
INTC-200
TESTING & INSPECTIONS
15 02-06-15
02-26-15
MILE-C105
TARGET COMPLETION MILESTONE - BUILDING C
*03/19/15*
0
TAPE & FINISH CEILING
CLG GRID
CASEWORK FINISH PAINT
CLG TILE VCT & VINYL FLOORING CARPET SPECIALTIES PUNCHLIST TESTING & INSPECTIONS
03-05-15*
TARGET COMPLETION MILESTONE - BUILDING C
BUILDING D SHELL AND CORE
SHCD-305
FOOTINGS
SHCD-310
FOUNDATION BLOCK
SHCD-345
U/G MEP
SHCD-315
H.M. FRAMES - D WEST BOX
SHCD-320
10 09-04-13 A
09-17-13 A
5 09-18-13 A
09-27-13 A
FOOTINGS FOUNDATION BLOCK
10 09-18-13 A
04-03-14
5 11-04-13 A
12-06-13
H.M. FRAMES - D WEST BOX
BLOCK TO ROOF - D WEST BOX
20 11-04-13 A
12-06-13
BLOCK TO ROOF - D WEST BOX
SHCD-370
BLOCK TO ROOF - D REMAINING
15 12-09-13
12-30-13
BLOCK TO ROOF - D REMAINING
SHCD-321
STRUCTURAL STEEL - D WEST BOX
2 12-24-13
12-26-13
STRUCTURAL STEEL - D WEST BOX
SHCD-330
H.M. FRAMES - D REMAINING
5 12-24-13
12-30-13
H.M. FRAMES - D REMAINING
11-21-13 13:05 MAX HAYES HS Sheet 23 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
U/G MEP
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*03/19/15*
Activity ID
Activity Name
SHCD-325
ROOF JOIST & DECK - D WEST BOX
SHCD-385
Original Start Duration
Finish
2013
2014
2015
30 01-03-14
02-13-14
STRUCTURAL STEEL - D REMAINING
2 01-22-14
01-23-14
SHCD-390
ROOF JOIST & DECK - D REMAINING
30 01-24-14
03-06-14
SHCD-375
ROOF BLOCKING - D WEST BOX
5 02-14-14
02-20-14
ROOF BLOCKING - D WEST BOX
SHCD-380
MEP CURBS & DRAINS - D WEST BOX
5 02-14-14
02-20-14
MEP CURBS & DRAINS - D WEST BOX
SHCD-335
ROOFING - D WEST BOX
20 02-21-14
03-20-14
SHCD-395
ROOF BLOCKING - D REMAINING
5 03-07-14
03-13-14
SHCD-400
MEP CURBS & DRAINS - D REMAINING
5 03-14-14
03-20-14
SHCD-340
ROOFING TRIM - D WEST BOX
5 03-21-14
03-27-14
SHCD-405
ROOFING - D REMAINING
20 03-21-14
04-17-14
SHCD-415
VAPOR SYSTEM & STONE - D REMAINING
10 03-31-14*
04-11-14
VAPOR SYSTEM & STONE - D REMAINING
SHCD-350
VAPOR SYSTEM & STONE - D WEST BOX
10 04-04-14*
04-17-14
VAPOR SYSTEM & STONE - D WEST BOX
SHCD-355
BRICK VENEER
15 04-07-14
04-25-14
BRICK VENEER
SHCD-420
POUR S.O.G. - REMAINING
10 04-14-14
04-25-14
POUR S.O.G. - REMAINING
SHCD-360
POUR S.O.G. - D WEST BOX
10 04-18-14
05-01-14
POUR S.O.G. - D WEST BOX
SHCD-410
ROOFING TRIM - D REMAINING
5 04-18-14
04-24-14
ROOFING TRIM - D REMAINING
SHCD-425
WINDOWS & C.W. - D REMAINING
15 04-25-14
05-15-14
WINDOWS & C.W. - D REMAINING
SHCD-365
METAL PANELS
15 04-28-14
05-16-14
METAL PANELS
SHCD-369
WINDOWS & C.W. - D WEST BOX
15 04-28-14
05-16-14
WINDOWS & C.W. - D WEST BOX
ROOF JOIST & DECK - D WEST BOX
NON BEARING MASONRY WALLS
STRUCTURAL STEEL - D REMAINING ROOF JOIST & DECK - D REMAINING
ROOFING - D WEST BOX ROOF BLOCKING - D REMAINING MEP CURBS & DRAINS - D REMAINING ROOFING TRIM - D WEST BOX ROOFING - D REMAINING
INTERIOR BUILDOUT
INTD-105
NON BEARING MASONRY WALLS
10 05-02-14
05-15-14
INTD-110
OVERHEAD DUCTWORK
55 05-16-14
08-04-14
OVERHEAD DUCTWORK
INTD-111
OVERHEAD HVAC PIPING
55 05-16-14
08-04-14
OVERHEAD HVAC PIPING
INTD-112
OVERHEAD ELECTRICAL
55 05-16-14
08-04-14
OVERHEAD ELECTRICAL
INTD-113
OVERHEAD PLUMBING
55 05-16-14
08-04-14
OVERHEAD PLUMBING
INTD-114
OVERHEAD FIRE PROTECTION
55 05-16-14
08-04-14
OVERHEAD FIRE PROTECTION
INTD-125
ELECTRICAL ROUGH-INS
35 07-08-14
08-25-14
ELECTRICAL ROUGH-INS
INTD-126
PLUMBING ROUGH-INS
35 07-08-14
08-25-14
PLUMBING ROUGH-INS
INTD-130
FRAME DRYWALL CEILING
15 08-05-14
08-25-14
FRAME DRYWALL CEILING
INTD-131
HANG DRYWALL CEILING
15 08-26-14
09-16-14
INTD-132
TAPE AND FINISH CEILING
15 09-17-14
10-07-14
INTD-135
CERAMIC TILE
20 10-08-14
11-04-14
CERAMIC TILE
INTD-140
PRIME PAINT
20 10-08-14
11-04-14
PRIME PAINT
INTD-145
CASEWORK
15 10-22-14
11-11-14
CASEWORK
INTD-150
CLG GRID
30 10-22-14
12-03-14
11-21-13 13:05 MAX HAYES HS Sheet 24 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
HANG DRYWALL CEILING TAPE AND FINISH CEILING
CLG GRID
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
INTD-155
PLUMBING FINISHES
40 11-05-14
01-02-15
PLUMBING FINISHES
INTD-156
FIRE PROTECTION FINISHES
40 11-05-14
01-02-15
FIRE PROTECTION FINISHES
INTD-157
LIGHT FIXTURES
40 11-05-14
01-02-15
LIGHT FIXTURES
INTD-158
DIFFUSERS
40 11-05-14
01-02-15
DIFFUSERS
INTD-160
FINISH PAINT
30 11-19-14
01-02-15
FINISH PAINT
INTD-165
SEAL CONCRETE FLOORING
15 11-27-14
12-17-14
SEAL CONCRETE FLOORING
INTD-170
DOORS & HARDWARE
25 12-04-14
01-09-15
DOORS & HARDWARE
INTD-175
CLG TILE
15 12-11-14
01-02-15
INTD-180
VCT & VINYL FLOORING
15 12-26-14
01-16-15
INTD-190
INSTALL EQUIPMENT
30 01-05-15
02-13-15
INTD-195
PUNCHLIST
15 01-30-15
02-19-15
PUNCHLIST
INTD-200
TESTING & INSPECTIONS
15 01-30-15
02-19-15
TESTING & INSPECTIONS
MILE-D205
TARGET COMPLETION MILESTONE - BUILDING D ORIGINAL *06/24/15* REVISED *03/06/15*
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING D
0
CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT
BUILDING E SHELL AND CORE
SHCE-375
FOOTINGS
SHCE-380
10 09-18-13 A
11-25-13
FOUNDATION BLOCK
5 11-26-13
12-03-13
SHCE-385
H.M. FRAMES
5 12-09-13
12-13-13
SHCE-390
BLOCK TO ROOF
30 12-09-13
01-21-14
BLOCK TO ROOF
SHCE-391
STRUCTURAL STEEL
2 01-22-14
01-23-14
STRUCTURAL STEEL
SHCE-395
ROOF JOIST & DECK
30 01-24-14
03-06-14
ROOF JOIST & DECK
SHCE-445
ROOF BLOCKING
5 03-07-14
03-13-14
ROOF BLOCKING
SHCE-450
MEP CURBS & DRAINS
5 03-07-14
03-13-14
MEP CURBS & DRAINS
SHCE-410
ROOFING
20 03-14-14
04-10-14
SHCE-405
U/G MEP
10 04-11-14
04-24-14
SHCE-420
VAPOR SYSTEM & STONE
10 04-25-14
05-08-14
SHCE-415
BRICK VENEER
15 04-28-14
05-16-14
BRICK VENEER
SHCE-440
POUR S.O.G.
10 05-09-14
05-22-14
POUR S.O.G.
SHCE-425
METAL PANELS
15 05-19-14
06-09-14
METAL PANELS
SHCE-430
WINDOWS & C.W.
15 05-19-14
06-09-14
WINDOWS & C.W.
SHCE-435
ROOFING TRIM
5 05-19-14
05-23-14
FOOTINGS FOUNDATION BLOCK H.M. FRAMES
ROOFING U/G MEP VAPOR SYSTEM & STONE
ROOFING TRIM
INTERIOR BUILDOUT
INTE-105
NON BEARING MASONRY WALLS
10 05-23-14
06-06-14
INTE-115
OVERHEAD DUCTWORK
40 06-09-14
08-04-14
11-21-13 13:05 MAX HAYES HS Sheet 25 of 26
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
NON BEARING MASONRY WALLS OVERHEAD DUCTWORK
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
ORIGINAL *06/24/15*
REV
Activity ID
Activity Name
Original Start Duration
Finish
2013
2014
2015
2016
Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
INTE-116
OVERHEAD HVAC PIPING
40 06-09-14
08-04-14
OVERHEAD HVAC PIPING
INTE-117
OVERHEAD ELECTRICAL
40 06-09-14
08-04-14
OVERHEAD ELECTRICAL
INTE-118
OVERHEAD PLUMBING
40 06-09-14
08-04-14
OVERHEAD PLUMBING
INTE-119
OVERHEAD FIRE PROTECTION
40 06-09-14
08-04-14
OVERHEAD FIRE PROTECTION
INTE-125
ELECTRICAL ROUGH-INS
35 07-08-14
08-25-14
ELECTRICAL ROUGH-INS
INTE-126
PLUMBING ROUGH-INS
35 07-08-14
08-25-14
PLUMBING ROUGH-INS
INTE-130
FRAME DRYWALL CEILING
15 08-05-14
08-25-14
FRAME DRYWALL CEILING
INTE-131
HANG DRYWALL CEILING
15 08-26-14
09-16-14
INTE-132
TAPE AND FINISH CEILING
15 09-17-14
10-07-14
INTE-135
CERAMIC TILE
20 10-08-14
11-04-14
CERAMIC TILE
INTE-140
PRIME PAINT
20 10-08-14
11-04-14
PRIME PAINT
INTE-150
CLG GRID
30 10-22-14
12-03-14
INTE-155
PLUMBING FINISHES
40 11-05-14
01-02-15
PLUMBING FINISHES
INTE-156
FIRE PROTECTION FINISHES
40 11-05-14
01-02-15
FIRE PROTECTION FINISHES
INTE-157
LIGHT FIXTURES
40 11-05-14
01-02-15
LIGHT FIXTURES
INTE-158
DIFFUSERS
40 11-05-14
01-02-15
DIFFUSERS
INTE-145
CASEWORK
15 11-12-14
12-03-14
INTE-160
FINISH PAINT
30 11-19-14
01-02-15
INTE-165
SEAL CONCRETE FLOOR
15 11-27-14
12-17-14
INTE-170
DOORS & HARDWARE
25 12-04-14
01-09-15
INTE-175
CLG TILE
15 12-11-14
01-02-15
INTE-180
VCT & VINYL FLOORING
20 12-18-14
01-16-15
INTE-190
INSTALL EQUIPMENT
30 01-05-15
02-13-15
INTE-195
PUNCHLIST
15 01-30-15
02-19-15
PUNCHLIST
INTE-200
TESTING & INSPECTIONS
15 01-30-15
02-19-15
TESTING & INSPECTIONS
MILE-E305
TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*
02-19-15*
TARGET COMPLETION MILESTONE - BUILDING E
ORIGINAL
0
HANG DRYWALL CEILING TAPE AND FINISH CEILING
CLG GRID
CASEWORK FINISH PAINT SEAL CONCRETE FLOOR DOORS & HARDWARE CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT
ORIGINAL *07/01/15*
REVISE
PROJECT COMPLETION PROJECT COMPLETION GENERAL
COMP-495
PROJECT COMPLETION ACTIVITIES
COMP-505
CONSTRUCTION COMPLETION
COMP-500
OWNER CLOSEOUT / COMMISSIONING / LEED
COMP-510
CERTIFICATE OF OCCUPANCY
11-21-13 13:05 MAX HAYES HS Sheet 26 of 26
*7/1/15*
*7/1/15*
43 01-06-15 0 65 07-01-15
03-05-15
PROJECT COMPLETION ACTIVITIES
03-05-15*
CONSTRUCTION COMPLETION
09-30-15
*7/1/15*
OWNER CLOSEOUT / COMMISSIONING / LEED
0 07-01-15*
CERTIFICATE OF OCCUPANCY
MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13
*7/1/15*