OFCC Monthly Status Report, 11/2013

Page 1

Monthly Status Report November 2013

Program Executive Summary

Program Executive Summary The third quarter of 2013 focused on the completion of interior finishes and site improvements at Segment 5 schools Almira, Orchard and Miles and the occupancy of Dunbar. In addition, the CMR’s site work, foundations and masonry at John Marshall and Max Hayes and the CMR mobilization at Cleveland School of the Arts. Also, completed demolition at select Segment 5 and 6 buildings as well as preparing to bid/award additional demolition at select Segment 6 buildings. CMSD and the OFCC did continue to discuss the program’s Master Plan and Build Out Strategy. The fourth quarter of 2013 will continue to focus on the owner occupancy of Segment 5 PK-8 schools Almira, Orchard and Miles. CMR sitework, slab on grade, masonry, concrete, steel and roofing will continue at Max Hayes and John Marshall. CMR sitework, foundations and concrete will continue at Cleveland School of Arts. Select Segment 5 and 6 existing building demolition did conclude and additional Segment 6 buildings will be in the bid/award phase. CMSD will continue to conduct community meetings to discuss the program’s Master Plan and Build Out Strategy along with continued focus meetings with the OFCC. As always, the goal is to provide improved educational opportunities for the children of Cleveland.

Table of Contents Section 1 2 3 4

Description Program Executive Summary Segment Overview Project Status Exhibits

1


SEGMENT 1

Monthly Status Report November 2013 Segment Overview Segment Overview

Highlights Number of Buildings 4 – High Schools 4 – K-8’s Warm, Safe, Dry Program

Design Phase 0

Construction Phase 0

Completed 4

0

0

4

Complete

Summary

Monthly Status Report March 2012

Segment Closeout documents issued to OSFC in May 2011. Audit to finalize in 2013.

SEGMENT 2 Highlights Number of Buildings 1 - High School 6 – K-8’s

Design Phase 0

Construction Phase 0

Completed 1

0

0

6

Summary Segment closeout documents issued to OSFC in April 2011. Audit to finalize in 2013.

SEGMENT 3

1

Highlights

Overview

Number of Buildings 9 – K-8s

Design Phase 0

Construction Phase 0

Completed 9

Summary Segment closeout documents issued to OSFC in September 2011. Audit to finalize in 2013.

2


SEGMENT 4

1 Monthly Status Report November 2013

Highlights

Overview

Number of Buildings 9 - K-8’s

Design Phase 0

Construction Phase 0

Completed 9

0

0

9

Design Phase 0

Construction Phase 3

Completed 0

5 – K-8’s

0

0

5

Demolition

0

1

7

Demolition

Segment Overview

Summary Segment 4 demolition closeout is complete.

SEGMENT 5 Highlights Number of Buildings 4 High Schools

Summary All buildings in this Segment are slated to be LEED Silver and all of the elementary schools have made Design submissions to GBCI. PK-8 schools Orchard, Almira and Miles have completed city inspections and are preparing for an early December occupancy. Dunbar and Alcott are owner occupied. John Marshall’s CMR has sitework, concrete and masonry ongoing. Max Hayes’ CMR has sitework, concrete slabs, masonry, steel and roofing ongoing. Cleveland School of the Arts’ CMR has completed site remediation and caissons. Grade beams and site utilities are ongoing.

3


SEGMENT 6

Monthly Status Report November 2013 Segment Overview

Highlights Number of Buildings 3 – K-8’s Demolition

Design Phase 0

Construction Phase 0

Completed 0

0

1

5

Summary Select Segment 6 abatement and demolition projects are completing. Additional buildings will be in the bid/award phase during the next 1-2 months.

4


Cleveland Metropolitan School District

Monthly Status Report – November 2013

Section 2 - Project Status

Segment 1 – ALL SCHOOLS Segment 2 – ALL SCHOOLS Segment 3 – ALL SCHOOLS Segment 4 – Close-out phase facility Current Status

All projects in CMSD/OSFC Closeout Phase.

5


Cleveland Metropolitan School District

Monthly Status Report – November 2013

Section 2 - Project Status

Segment 5 – Louisa May Alcott

Segment 5 – Almira

Scope Current Phase Current Activity

New Construction / Renovation Construction Owner Occupancy Phase 1, Phase 2 Owner Occupancy, and Close-Out

Scope Current Phase Current Activity

New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

March ‘12 / April ‘12 April 2012 April 2012 August 2012 (Phase 1) December 2012 (Phase 2)

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

March ’12 / May ‘12 May 2012 May 2012 November 2013

Highlights    

Renovated K-5 School Enrollment – 225 students (revised) Square footage – 30,649 (revised per SD documents) LEED Silver, GBCI Registration No. 1000007955

Highlights    

New PK-8 School Enrollment – 450 students Square footage – 64,297 (revised per SD documents) LEED Silver, GBCI Registration No. 1000006671

Current Status Current Status All areas are owner occupied. Closeout did complete in June 2013.

Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.

.

6


Cleveland Metropolitan School District

Monthly Status Report – November 2013

Section 2 - Project Status

Segment 5 – Miles Elementary

Segment 5 – Orchard School of Science

Scope Current Phase Current Activity

New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy

Scope Current Phase Current Activity

New Construction Construction Interior finishes, MEP trim, technology, life safety inspections. Prepare for Owner Occupancy

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

April ’12 / June ‘12 July 2012 July 2012 November 2013

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

March ’12 / May ‘12 May 2012 May 2012 November 2013

Highlights   

New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006082

Highlights    

New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006521

Current Status

Current Status

Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.

Final finishes, MEP trim, technology and Life Safety Inspections are completing to allow an early December 2013 occupancy and start of school. The focus for December 2013 will be closeout, punchlist and training.

7


Cleveland Metropolitan School District

Monthly Status Report – November 2013

Section 2 - Project Status

Segment 5 – Paul Laurence Dunbar

Segment 5 – Cleveland School of the Arts

Scope Current Phase Current Activity

New Construction Construction Owner Occupany, punchout and closeout

Scope Current Phase Current Activity

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

March ‘12 / May ‘12 May 2012 May 2012 August 2013

New Construction Construction City Permit Review Bid/Award, sitework/demolition, Structural concrete, caissons and grade beams

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

August/October ‘12 June 2013 June 2013 Fall 2014

Highlights    

New PK-8 School Enrollment – 450 students Square footage – 63,282 LEED Silver, GBCI Registration No. 1000006522

Highlights    

New 6-12 School (revised) Enrollment – 775 students (revised) Square footage – 122,727 (revised) LEED Silver, GBCI Registration No. 1000009154

Current Status Current Status Dunbar achieved occupancy from the City and classes began on 8-1913. The Grand Opening was conducted on 8-29-13. Final punchout and closeout is continuing.

Site utilities storm and sanitary are ongoing. Caissons are complete and grade beams are continuing. Structural concrete retaining walls are ongoing as well as under slab MEP rough-ins. The focus for December 2013 will be complete grade beams, start masonry, continue site utilities and prepare for structural steel framing.

8


Cleveland Metropolitan School District

Monthly Status Report – November 2013

Section 2 - Project Status

Segment 5 – John Marshall High School

Segment 5 – Max Hayes Vocational High School

Scope Current Phase Current Activity

New Construction Construction Bearing masonry, slab on grade, MEP under slab rough-in and site utilities

Scope Current Phase Current Activity

New Construction Construction Bearing masonry, slab on grade, under slab MEP rough-in, steel, roofing and site utilities

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

Feb ‘13/May ‘13 May 2013 June 2013 Aug 2015

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

Nov ’12 / Jan ‘13 Jan 2013 June 2013 Aug 2015

Highlights    

New High School Enrollment – 1,260 students Square footage – Revised – 207,182 LEED Silver, GBCI Registration No. 1000006524

Highlights    

New High School Enrollment – TBD Square footage – 169,894 LEED Silver, GBCI No. 1000009177

Current Status Current Status Bearing masonry walls are ongoing in gym and dining areas. Under slab MEP rough-in is underway and slab on grade concrete placement is ongoing. The focus for December 2013 will be complete bearing masonry at gym and dining, continue MEP under slab rough-ins and placement of slab on grade in classroom areas.

Bearing masonry walls are complete in the gym and ongoing in the dining, classroom and high bay areas. Structural steel is ongoing in the gym and dining areas. Slab on deck is ongoing in classroom wing. The focus for December 2013 will be continue bearing masonry in the classroom and high bay areas, continue MEP in wall and under slab rough-ins. Also complete structural steel and decking in gym and dining and start roofing.

9


Cleveland Metropolitan School District

Monthly Status Report – November 2013 Segment 5 – Forest Hill Parkway Scope Current Phase Current Activity

Demolition Construction Closeout

Scheduled Bid & Award – March 2013 Scheduled Construction – March 2013 Start – April 2013 Scheduled Completion – September 2013 Highlights   

Enrollment – 350 Students Square footage – 52,850 New PK-8 School

Current Status Closeout underway.

Section 2 - Project Status Segment 5 – West Side Relief High School Scope Current Phase Current Activity

New Construction TBD TBD

Scheduled Bid & Award Scheduled Construction Start Scheduled Occupancy

TBD TBD TBD TBD

Highlights   

New High School Enrollment – 600 students Square footage – 100,200

Current Status CMSD is still finalizing project status.

END OF SEGMENT 5

10


District IRN 43786

SEGMENT SUMMARY COST REPORT All Projects/ Segment 01 District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

FUNDING Project

Original Project Agmt Budget

Description

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

Pending Changes

12/2/2013 1 of 1

STATUS Potential Costs

Projected Committment

(Est. to Compl.)

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Budget vs Est

Proj Budget vs Proj Commitment

Billed to Date

Pct Compl

TYPICAL GROUP TOTALS

$18,838,239.00

$0.00 $146,586,712.00 $134,692,133.00 $5,147,590.00 $139,839,723.00 $138,201,959.21$13,099,608.41 $151,301,567.62

$0.00

$0.00

$151,301,567.62

$6,746,989.00

($4,124,840.27)

$0.00

$7,310,441.73

$7,980,018.00

$0.00

$7,980,018.00

$7,695,512.06 ($297,845.33)

$7,397,666.73

$0.00

($87,225.00)

$7,310,441.73

($669,576.27)

$0.00

$7,310,351.34 99%

($6,362,955.63)

$0.00

$6,428,455.37

$6,994,564.00

$0.00

$6,994,564.00

$6,747,532.83

($46,130.45)

$6,701,402.38

$0.00

($272,947.01)

$6,428,455.37

($566,108.63)

$0.00

$6,428,041.37 96%

($6,129,988.37)

$0.00

$5,158,825.63

$10,434,776.00

$0.00 $10,434,776.00

$5,565,463.70 ($266,311.35)

$5,299,152.35

$0.00

($140,326.72)

$5,158,825.63

($5,275,950.37)

($0.00)

$5,154,867.75 97%

$8,110,173.00

($4,537,000.96)

$0.00

$3,573,172.04

$3,696,904.00

$0.00

$3,696,904.00

$3,858,712.81 ($193,197.33)

$3,665,515.48

$0.00

($92,343.44)

$3,573,172.04

($123,731.96)

$0.00

$3,569,656.73 97%

$11,487,610.00

($6,391,288.70)

$0.00

$5,096,321.30

$4,344,236.00

$0.00

$4,344,236.00

$5,005,503.87

$224,917.20

$5,230,421.07

$0.00

($130,599.77)

$5,099,821.30

$752,085.30

($3,500.00)

$5,099,570.80 97%

($1,515,275.09)

$0.00

$9,895,505.91

$11,506,016.00

$10,279,823.44 ($406,961.46)

$9,872,861.98

$0.00

$22,643.93

$9,895,505.91

($1,610,510.09)

$0.00

$9,894,635.91 100%

$6,898,752.00

($3,735,149.28)

$0.00

$3,163,602.72

$4,874,471.00

$0.00

$4,874,471.00

$2,859,416.07

$278,723.33

$3,138,139.40

$0.00

$29,533.32

$3,167,672.72

($1,710,868.28)

($4,070.00)

$3,167,672.72 101%

$8,586,467.00

($2,908,496.98)

$0.00

$5,677,970.02

$5,263,276.00

$0.00

$5,263,276.00

$5,386,101.35

$233,658.90

$5,619,760.25

$0.00

$58,209.77

$5,677,970.02

$414,694.02

$0.00

$5,677,842.09 101%

GROUP TOTALS

$9,142,514.00

($896,849.09)

$0.00

$8,245,664.91

$9,022,810.00

$0.00

$9,022,810.00

$8,000,999.02($1,172,460.80)

$6,828,538.22

$0.00

$284,437.79

$7,112,976.01

($777,145.09)

$1,132,688.90

$7,118,451.43 104%

GROUP TOTALS

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$1,381,854.21

$1,330,338.44

$0.00

$0.00

$1,330,338.44

$0.00

($1,330,338.44)

$1,330,288.44 100%

$0.00 $201,136,671.63 $198,809,204.00 $5,147,590.00 $203,956,794.00 $194,982,878.57$11,402,485.35 $206,385,363.92

$0.00

($328,617.13)

$206,056,746.79

($2,820,122.37)

WARM, SAFE, DRY

$12,791,411.00

Group 03

GROUP TOTALS

WARM, SAFE, DRY

$11,435,282.00

Group 02

GROUP TOTALS

WARM, SAFE, DRY

$11,288,814.00

Group 04

GROUP TOTALS

WARM, SAFE, DRY

Group 05

GROUP TOTALS

WARM, SAFE, DRY

Group 06

GROUP TOTALS

WARM, SAFE, DRY

$11,410,781.00

Group 08

GROUP TOTALS

WARM, SAFE, DRY

$0.00 $11,506,016.00

Group 07

GROUP TOTALS

WARM, SAFE, DRY

($4,714,855.62) $151,303,680.68 100%

Group 01

GROUP TOTALS

WARM, SAFE, DRY

$127,748,473.00

Group 09

LFI

SEGMENT PROJECT TOTALS

$218,900,277.00 ($17,763,605.37)

($51,515.77)

PROJECT REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget or vs Projected Commitment)

($4,920,075.16) $206,055,059.26 100%

($4,920,075.16)

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI). 3. The costs shown above does not include the remaining Swing Space Allowance in the amount of $3,958,587 noted in the signed Project Agreement for Segment 1. 4. The costs shown above does not include the Conditional Approval scope of work in the amount of $18,880,604 noted in the signed Project Agreement for Segment 1. 5. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.

Expedition速

Report M_COST_01_00-1b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 01 District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#144 001P1East High SchoolGym Replacement/Addition

001P1

$6,221,336.00

$0.00

$0.00

$6,221,336.00

$6,278,995.00

$276,276.00

$6,555,271.00

$6,331,760.15

$311,876.90

$6,643,637.05

$0.00

$0.00

$6,643,637.05

($333,935.00)

($422,301.05)

$6,643,140.05 100%

Totals

$7,990,764.00

$0.00

$0.00

$7,990,764.00

$9,377,994.00

$0.00

$9,377,994.00

$6,849,464.69

$523,171.61

$7,372,636.30

$0.00

$0.00

$7,372,636.30 ($1,387,230.00)

$618,127.70

$7,372,636.30 100%

John Hay Renovation John Hay Renovation Totals

$25,826,668.00

$8,922,539.00

$0.00 $34,749,207.00

$30,204,007.00 $1,092,572.00 $31,296,579.00

$31,407,279.84

$5,267,435.31 $36,674,715.15

$0.00

$0.00 $36,674,715.15

$14,058,662.00

$2,551,287.00

$0.00 $16,609,949.00

$14,013,138.00 $1,908,759.00 $15,921,897.00

$15,280,126.28

$1,878,941.21 $17,159,067.49

$0.00

$0.00 $17,159,067.49

$333,646.60

$0.00

$0.00

Gym Replacement/Addition

Totals

OPU#514 002P2Lakeside/SuccessTech Lakeside Phase II Renovation

002P2

Lakeside Phase II Renovation

OPU#284 003P1John Hay HS

003P1

$3,452,628.00 ($1,925,508.15) $36,674,706.67 100%

OPU#016 004P1A.J. Rickoff

004P1

A.J. Rickoff New K-8 A.J. Rickoff New K-8 Totals

$688,052.00

($549,118.49) $17,158,713.09 100%

OPU#016 004X1A.J. Rickoff

004X1

A.J. Rickoff-UG Debris Remov A.J. Rickoff-UG Debris Removal Totals

$0.00

$333,647.00

$0.00

$333,647.00

$307,500.00

Totals

$35,733,623.00

$994,472.00

$0.00 $36,728,095.00

Totals

$12,573,930.00

$2,041,283.00

Miles Park New K-8 Miles Park New K-8 Totals

$14,095,938.00 $10,201,144.00

$0.00

$307,500.00

$345,848.69

($12,202.09)

$333,646.60

$26,147.00

$36,092,249.00

$23,108.00 $36,115,357.00

$35,770,857.75

$2,163,626.69 $37,934,484.44

$0.00 $14,615,213.00

$12,790,874.00

$447,824.00 $13,238,698.00

$13,712,349.43

$2,425,983.00

$0.00 $16,521,921.00

$14,266,975.00

$740,434.00 $15,007,409.00

$1,569,028.00

$0.00 $11,770,172.00

$10,143,855.00

$658,617.00 $10,802,472.00

$0.40

$333,646.60 100%

$0.00

($299,246.98) $37,635,237.46

$612,738.00

($907,142.46) $37,937,457.68 100%

$1,705,501.92 $15,417,851.35

$0.00

$0.00 $15,417,851.35

$1,376,515.00

($802,638.35) $15,417,851.32 100%

$16,016,521.05

$721,113.35 $16,737,634.40

$0.00

$0.00 $16,737,634.40

$1,514,512.00

($215,713.40) $16,737,634.23 100%

$11,379,050.87

$657,433.73 $12,036,484.60

$0.00

$299,246.98 $12,335,731.58

$967,700.00

($565,559.58) $12,036,484.50 100%

OPU#271 005P1John Adams HS New John Adams HS

005P1

New John Adams HS

OPU#027 006P1Memorial

006P1

New Memorial K-8 New Memorial K-8

OPU#269 008P1Miles Park K-8

008P1

OPU#485 009P1Riverside ES

009P1

Riverside K-8

Riverside K-8

Totals

OPU#572 126P1Warner Road School Warner Abatement & Demolit

126P1

Warner Abatement & Demolition

$361,122.00

Totals

$0.00

$0.00

$361,122.00

$361,122.00

$0.00

$361,122.00

$304,193.61

$41,468.99

$345,662.60

$0.00

$685,286.00

$855,424.00

$0.00

$855,424.00

$804,506.85

($158,759.21)

$645,747.64

$0.00 $146,586,712.00 $134,692,133.00 $5,147,590.00$139,839,723.00 $138,201,959.21 $13,099,608.41 $151,301,567.62

$0.00

$0.00

$345,662.60

$0.00

$0.00

$645,747.64

$0.00

$0.00 $151,301,567.62

$0.00

$15,459.40

$345,662.60 100%

($170,138.00)

$39,538.36

$645,747.64 100%

OPU#634 128P1Woodhill-Quincy Woodhill-Quincy Demolition

128P1

Woodhill-Quincy Demolition

$685,286.00 $0.00 Totals $127,748,473.00 $18,838,239.00

GROUP TOTALS

WARM, SAFE, DRY

$6,746,989.00 ($4,714,855.62) $151,303,680.68 100%

Group 01

OPU#065 ESCaptainRenovated/Keeper 021W1Captain Arthur Roth Arthur Roth WSD

021W1 WSD Captain Arthur Roth

$510,945.00

$436,560.96

$0.00

$947,505.96

$1,041,994.00

$0.00

$1,041,994.00

$971,880.11

($20,490.39)

$951,389.72

$0.00

($3,883.76)

$947,505.96

($94,488.04)

$0.00

$947,505.96 100%

$643,941.00

$737,905.81

$0.00

$1,381,846.81

$1,576,633.00

$0.00

$1,576,633.00

$1,415,299.44

($28,527.86)

$1,386,771.58

$0.00

($4,924.77)

$1,381,846.81

($194,786.19)

$0.00

$1,381,846.41 100%

$1,646,035.00

($494,019.46)

$0.00

$1,152,015.54

$1,132,964.00

$0.00

$1,132,964.00

$1,212,950.19

($48,426.39)

$1,164,523.80

$0.00

($12,508.26)

$1,152,015.54

$19,051.54

$0.00

$1,151,925.34 99%

$1,525,969.00 ($1,080,744.82)

$0.00

$445,224.18

$475,845.00

$0.00

$475,845.00

$469,312.70

($12,407.31)

$456,905.39

$0.00

($11,681.21)

$445,224.18

($30,620.82)

($0.00)

$445,224.18 97%

$2,343,917.00

($411,720.23)

$0.00

$1,932,196.77

$2,199,080.00

$0.00

$2,199,080.00

$2,039,145.79

($89,069.21)

$1,950,076.58

$0.00

($17,879.81)

$1,932,196.77

($266,883.23)

$0.00

$1,937,287.84 99%

$1,457,186.00 ($622,544.21) Totals WSD South Renovated/Keeper $3,307,289.00 ($2,690,278.32) Totals

$0.00

$834,641.79

$931,256.00

$0.00

$931,256.00

$860,242.19

($14,453.64)

$845,788.55

$0.00

($11,146.76)

$834,641.79

($96,614.21)

($0.00)

$829,550.93 98%

$0.00

$617,010.68

$622,246.00

$0.00

$622,246.00

$726,681.64

($84,470.53)

$642,211.11

$0.00

($25,200.43)

$617,010.68

($5,235.32)

$0.00

$617,010.68 96%

Totals

Renovated/Keeper WSD Iowa-Maple 044W1 WSD Iowa-Maple Totals

OPU#270 044W1Iowa-Maple ES

Renovated/Keeper OPU#482 ES Robert H 070W1Robert H JamisonWSD Jamison

070W1 WSD Robert H Jamison

Totals

OPU#172 094W1Franklin D Roosevelt WSDMS FranklinRenovated/Keeper D Roosevelt

094W1 WSD Franklin D Roosevelt

Totals

OPU#615 MS WhitneyRenovated/Keeper 104W1Whitney M YoungWSD M Young

104W1 WSD Whitney M Young

Totals

Renovated/Keeper OPU#285 HS 113W1John F Kennedy WSD John F Kennedy

113W1 WSD John F Kennedy OPU#512 125W1South HS

125W1 WSD South

Renovated/Keeper OPU#587 587W1Washing Park HCWSD - Washington Park

587W1 WSD - Washington Park

WARM, SAFE, DRY

$0.00

Totals

GROUP TOTALS

$0.00

$11,435,282.00 ($4,124,840.27)

$0.00 $0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$7,310,441.73

$7,980,018.00

$0.00

$7,980,018.00

$7,695,512.06

($297,845.33)

$7,397,666.73

$0.00

($87,225.00)

$7,310,441.73

($669,576.27)

$0.00

$7,310,351.34 99%

$0.00

Group 02

Renovated/Keeper WSD East High 001W2 WSD East High $1,637,557.00 Totals

OPU#144 001W2East High

($693,744.55)

$0.00

$943,812.45

$1,182,837.00

$0.00

$1,182,837.00

$932,808.44

$45,957.99

$978,766.43

$0.00

($34,953.98)

$943,812.45

($239,024.55)

$0.00

$943,812.45 96%

$567,807.00

$48,395.55

$0.00

$616,202.55

$662,696.00

$0.00

$662,696.00

$634,193.24

($5,880.89)

$628,312.35

$0.00

($12,109.80)

$616,202.55

($46,493.45)

$0.00

$616,202.55 98%

$573,070.00

$36,906.55

$0.00

$609,976.55

$542,742.00

$0.00

$542,742.00

$629,149.63

($6,943.74)

$622,205.89

$0.00

($12,229.34)

$609,976.55

$67,234.55

$0.00

$609,976.55 98%

Renovated/Keeper WSD Sunbeam 073W2 WSD Sunbeam $1,804,199.00 Totals

$404,139.87

$0.00

$2,208,338.87

$2,269,893.00

$0.00

$2,269,893.00

$2,235,375.72

$11,489.03

$2,246,864.75

$0.00

($38,525.88)

$2,208,338.87

($61,554.13)

($0.00)

$2,207,924.87 98%

$789,110.00

($430,937.77)

$0.00

$358,172.23

$317,118.00

$0.00

$317,118.00

$379,617.49

($4,611.75)

$375,005.74

$0.00

($16,833.51)

$358,172.23

$41,054.23

$0.00

$358,172.23 96%

$773,991.00

($500,249.42)

$0.00

$273,741.58

$326,133.00

$0.00

$326,133.00

$322,850.17

($32,587.78)

$290,262.39

$0.00

($16,520.81)

$273,741.58

($52,391.42)

($0.00)

$273,741.58 94%

OPU#081 025W2Charles Orr Academy WSD CharlesRenovated/Keeper Orr

025W2 WSD Charles Orr

Totals

Renovated/Keeper OPU#350 056W2Mary McLeod Bethune Bethune WSD ES Mary McLeod

056W2 WSD Mary McLeod Bethune

Totals

OPU#532 073W2Sunbeam ES

Renovated/Keeper WSD Wade Park 077W2 WSD Wade Park Totals

OPU#556 077W2Wade Park ES

OPU#233 096W2Harry E Davis MSWSD Harry E Renovated/Keeper Davis

096W2 WSD Harry E Davis

Totals

Renovated/Keeper OPU#801 of Arts 107W2Cleveland SchoolWSD Cleveland School of Art Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

WARM, SAFE, DRY

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

Group 02

Renovated/Keeper OPU#801 of Arts 107W2Cleveland SchoolWSD Cleveland School of Art

107W2 WSD Cleveland School of Arts

$652,837.00

Totals

($529,378.98)

$0.00

$123,458.02

$169,390.00

$0.00

$169,390.00

$142,448.51

($5,038.87)

$137,409.64

$0.00

($13,951.62)

$123,458.02

($45,931.98)

$0.00

$123,458.02 90%

$4,383,219.00 ($3,571,200.06)

$0.00

$812,018.94

$844,359.00

$0.00

$844,359.00

$942,536.16

($37,004.89)

$905,531.27

$0.00

($93,512.33)

$812,018.94

($32,340.06)

$0.00

$812,018.94 90%

$0.00

$247,643.22

$331,624.00

$0.00

$331,624.00

$273,352.21

($5,258.46)

$268,093.75

$0.00

($20,450.53)

$247,643.22

($83,980.78)

($0.00)

$247,643.22 92%

Renovated/Keeper OPU#161 108W2East Technical HS WSD East Technical

108W2 WSD East Technical

Totals

Renovated/Keeper OPU#355 118W2Martin L King Jr MS/HS WSD Martin Luther King Jr.

118W2 WSD Martin Luther King Jr.

Totals

$959,046.00

($711,402.78)

$650,575.00

($415,484.04)

Renovated/Keeper OPU#347 123W2Mary B Martin ES/MS WSD Mary B Martin

123W2 WSD Mary B Martin

Totals GROUP TOTALS

WARM, SAFE, DRY OPU#012 013W3Almira ES

013W3 WSD Almira OPU#068 022W3Case ES

$0.00 $0.00

$235,090.96

$347,772.00

$0.00

$347,772.00

$255,201.26

($6,251.09)

$248,950.17

$0.00

($13,859.21)

$235,090.96

($112,681.04)

($0.00)

$235,090.96 94%

$6,428,455.37

$6,994,564.00

$0.00

$6,994,564.00

$6,747,532.83

($46,130.45)

$6,701,402.38

$0.00

($272,947.01)

$6,428,455.37

($566,108.63)

$0.00

$6,428,041.37 96%

Group 03 WSD Almira Renovated/Keeper Totals WSD Case

Renovated/Keeper

WSD Clark

Renovated/Keeper

022W3 WSD Case OPU#088 026W3Clark ES

$12,791,411.00 ($6,362,955.63)

Totals

026W3 WSD Clark

Totals

$683,084.00

($496,337.86)

$0.00

$186,746.14

$247,152.00

$0.00

$247,152.00

$210,782.92

($15,541.31)

$195,241.61

$0.00

($8,495.47)

$186,746.14

($60,405.86)

$0.00

$186,545.96 96%

$703,016.00

($536,283.86)

$0.00

$166,732.14

$315,001.00

$0.00

$315,001.00

$190,402.24

($14,947.92)

$175,454.32

$0.00

($8,722.18)

$166,732.14

($148,268.86)

$0.00

$166,732.14 95%

$425,256.00

($103,278.81)

$0.00

$321,977.19

$623,023.00

$0.00

$623,023.00

$354,847.81

($27,603.17)

$327,244.64

$0.00

($5,267.45)

$321,977.19

($301,045.81)

($0.00)

$322,152.19 98%

$396,988.00

$54,869.60

$0.00

$451,857.60

$604,056.00

$0.00

$604,056.00

$475,212.74

($18,441.30)

$456,771.44

$0.00

($4,913.84)

$451,857.60

($152,198.40)

$0.00

$451,857.60 99%

$983,579.00

($14,372.35)

$0.00

$969,206.65

$1,558,214.00

$0.00

$1,558,214.00

$993,590.50

($12,142.98)

$981,447.52

$0.00

($12,240.87)

$969,206.65

($589,007.35)

$0.00

$967,608.82 99%

$877,445.00

($660,579.81)

$0.00

$216,865.19

$388,806.00

$0.00

$388,806.00

$280,050.20

($52,263.51)

$227,786.69

$0.00

($10,921.50)

$216,865.19

($171,940.81)

($0.00)

$214,670.01 94%

$406,763.00

($256,618.17)

$0.00

$150,144.83

$226,131.00

$0.00

$226,131.00

$179,534.11

($24,314.53)

$155,219.58

$0.00

($5,074.75)

$150,144.83

($75,986.17)

$0.00

$150,144.83 97%

$992,413.00

($123,844.45)

$0.00

$868,568.55

$2,059,374.00

$0.00

$2,059,374.00

$891,558.13

($10,621.31)

$880,936.82

$0.00

($12,368.27)

$868,568.55 ($1,190,805.45)

$0.00

$868,446.09 99%

$414,019.00

$3,020.57

$0.00

$417,039.57

$751,581.00

$0.00

$751,581.00

$422,075.35

$94.85

$422,170.20

$0.00

($5,130.63)

$417,039.57

($334,541.43)

$0.00

$417,039.57 99%

$1,355,652.00 ($1,013,144.89)

$0.00

$342,507.11

$638,436.00

$0.00

$638,436.00

$376,621.38

($17,273.14)

$359,348.24

$0.00

($16,841.13)

$342,507.11

($295,928.89)

$0.00

$342,507.10 95%

$0.00

$658,167.31

$946,959.00

$0.00

$946,959.00

$698,886.18

($28,910.50)

$669,975.68

$0.00

($11,808.37)

$658,167.31

($288,791.69)

$0.00

$658,167.31 98%

$0.00

$2,076,043.00

$491,902.14

($44,346.53)

$447,555.61

$0.00

($38,542.26)

$409,013.35 ($1,667,029.65)

($0.00)

$408,996.13 91%

$0.00 $10,434,776.00

$5,565,463.70

($266,311.35)

$5,299,152.35

$0.00

($140,326.72)

$5,158,825.63 ($5,275,950.37)

($0.00)

$5,154,867.75 97%

Renovated/Keeper OPU#340 ES Louisa May 052W3Louisa May AlcottWSD Alcott

052W3 WSD Louisa May Alcott

Totals

Renovated/Keeper OPU#354 055W3Marion-Sterling ES WSD Marion-Sterling

055W3 WSD Marion-Sterling

Totals

OPU#415 064W3Newton D Baker ES WSD Newton Renovated/Keeper D Baker

064W3 WSD Newton D Baker

Totals

Renovated/Keeper WSD Scranton 071W3 WSD Scranton Totals

OPU#500 071W3Scranton ES OPU#596 081W3Waverly ES

WSD WaverlyRenovated/Keeper

081W3 WSD Waverly

Totals WSD Willow Renovated/Keeper 084W3 WSD Willow Totals

OPU#605 084W3Willow ES

OPU#279 MSJoseph Renovated/Keeper 097W3Joseph M Gallagher M Gallagher WSD

097W3 WSD Joseph M Gallagher

Totals

Renovated/Keeper OPU#804 HS Health Careers 110W3Health Careers Ctr WSD Ctr

110W3 WSD Health Careers Ctr

$950,442.00

Totals

($292,274.69)

OPU#090 ES Clara E.Renovated/Keeper 119W3Clara E. Westropp WSD Westropp

119W3 WSD Clara E. Westropp

WARM, SAFE, DRY

$3,100,157.00 ($2,691,143.65)

Totals

GROUP TOTALS

$11,288,814.00 ($6,129,988.37)

$0.00 $0.00

$409,013.35

$2,076,043.00

$5,158,825.63

$10,434,776.00

Group 04

Non-Keeper OPU#636 ES Buckeye-Woodland 019W4Buckeye-Woodland WSD

019W4 WSD Buckeye-Woodland

Totals

$489,508.00

($419,794.43)

$0.00

$69,713.57

$90,006.00

$0.00

$90,006.00

$80,433.04

($5,165.22)

$75,267.82

$0.00

($5,554.25)

$69,713.57

($20,292.43)

$0.00

$69,713.57 93%

$466,641.00

($202,756.75)

$0.00

$263,884.25

$389,195.00

$0.00

$389,195.00

$305,602.06

($36,387.61)

$269,214.45

$0.00

($5,330.20)

$263,884.25

($125,310.75)

$0.00

$263,884.25 98%

$174,525.00

($39,576.37)

$0.00

$134,948.63

$133,972.00

$0.00

$133,972.00

$140,902.02

($3,957.44)

$136,944.58

$0.00

($1,995.95)

$134,948.63

$976.63

$0.00

$134,948.63 99%

$194,027.00

($35,322.99)

$0.00

$158,704.01

$196,553.00

$0.00

$196,553.00

$161,347.86

($424.03)

$160,923.83

$0.00

($2,219.82)

$158,704.01

($37,848.99)

$0.00

$158,704.01 99%

$133,952.00

($82,175.65)

$0.00

$51,776.35

$0.00

$0.00

$0.00

$49,086.19

$4,222.24

$53,308.43

$0.00

($1,532.08)

$51,776.35

$51,776.35

($0.00)

$51,776.35 97%

$562,609.00

($276,418.69)

$0.00

$286,190.31

$337,117.00

$0.00

$337,117.00

$318,886.38

($26,303.51)

$292,582.87

$0.00

($6,392.56)

$286,190.31

($50,926.69)

$0.00

$286,190.31 98%

$268,498.00

($108,223.39)

$0.00

$160,274.61

$83,945.00

$0.00

$83,945.00

$171,373.34

($8,038.53)

$163,334.81

$0.00

($3,060.20)

$160,274.61

$76,329.61

($0.00)

$160,274.61 98%

$510,520.00

($192,828.81)

$0.00

$317,691.19

$263,427.00

$0.00

$263,427.00

$346,187.95

($22,662.57)

$323,525.38

$0.00

($5,834.19)

$317,691.19

$54,264.19

$0.00

$317,670.63 98%

$525,211.00

($216,661.07)

$0.00

$308,549.93

$260,601.00

$0.00

$260,601.00

$329,446.87

($14,935.07)

$314,511.80

$0.00

($5,961.87)

$308,549.93

$47,948.93

($0.00)

$308,549.93 98%

Non-Keeper OPU#077 ES 023W4Charles Dickens WSD Charles Dickens

023W4 WSD Charles Dickens

Totals

Non-Keeper OPU#079 024W4Charles H. Lake ES WSD Charles H. Lake

024W4 WSD Charles H. Lake OPU#107 028W4Cranwood ES

WSD Cranwood 028W4 WSD Cranwood

Totals Non-Keeper

Totals

Non-Keeper OPU#109 ES Daniel E. Morgan 029W4Daniel E. MorganWSD

029W4 WSD Daniel E. Morgan OPU#148 032W4East Clark ES

WSD East Clark 032W4 WSD East Clark

Totals Non-Keeper

Totals

Non-Keeper OPU#168 035W4Euclid Park ES WSD Euclid Park ES

035W4 WSD Euclid Park ES OPU#200 039W4Giddings ES

WSD Giddings 039W4 WSD Giddings

Totals Non-Keeper

Totals

Non-Keeper OPU#252 ES 041W4H.W. Longfellow WSD HW Longfellow

041W4 WSD HW Longfellow

Totals

Non-Keeper OPU#229 ES Hannah Gibbons 042W4Hannah GibbonsWSD Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

WARM, SAFE, DRY

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 3 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

Group 04

Non-Keeper OPU#229 ES Hannah Gibbons 042W4Hannah GibbonsWSD

042W4 WSD Hannah Gibbons

Totals

$133,596.00

($113,671.03)

$0.00

$19,924.97

$14,547.00

$0.00

$14,547.00

$22,591.81

($1,157.76)

$21,434.05

$0.00

($1,509.08)

$19,924.97

$5,377.97

$0.00

$19,924.97 93%

$147,875.00

($51,485.52)

$0.00

$96,389.48

$111,440.00

$0.00

$111,440.00

$103,607.93

($5,519.78)

$98,088.15

$0.00

($1,698.67)

$96,389.48

($15,050.52)

($0.00)

$96,389.48 98%

$205,517.00

($49,082.48)

$0.00

$156,434.52

$212,414.00

$0.00

$212,414.00

$151,893.87

$6,898.97

$158,792.84

$0.00

($2,358.32)

$156,434.52

($55,979.48)

$0.00

$152,940.77 96%

$1,274,115.00 ($1,123,875.11)

$0.00

$150,239.89

$84,000.00

$0.00

$84,000.00

$178,922.84

($14,175.07)

$164,747.77

$0.00

($14,507.88)

$150,239.89

$66,239.89

$0.00

$150,239.89 91%

Non-Keeper OPU#094 045W4J.D. Rockefeller ES WSD JD Rockefeller

045W4 WSD JD Rockefeller

Totals

OPU#339 051W4Louis Pasteur ESWSD Louis PasteurNon-Keeper

051W4 WSD Louis Pasteur OPU#396 062W4Mound ES

Totals Non-Keeper

WSD Mound

062W4 WSD Mound

Totals

OPU#452 067W4Paul Revere ES WSD Paul Revere Non-Keeper

067W4 WSD Paul Revere

Totals

$874,627.00

($446,513.69)

$0.00

$428,113.31

$536,115.00

$0.00

$536,115.00

$463,613.06

($25,522.02)

$438,091.04

$0.00

($9,977.73)

$428,113.31

($108,001.69)

$0.00

$428,113.31 98%

$493,631.00

($204,634.55)

$0.00

$288,996.45

$308,156.00

$0.00

$308,156.00

$321,918.60

($27,316.73)

$294,601.87

$0.00

($5,605.42)

$288,996.45

($19,159.55)

($0.00)

$288,995.45 98%

$859,731.00

($449,094.42)

$0.00

$410,636.58

$431,404.00

$0.00

$431,404.00

$412,363.00

$8,065.63

$420,428.63

$0.00

($9,792.05)

$410,636.58

($20,767.42)

$0.00

$410,636.58 98%

$795,590.00

($524,886.01)

OPU#486 069W4Robert Fulton ESWSD Robert FultonNon-Keeper

069W4 WSD Robert Fulton

Totals

OPU#005 087W4Albert B. Hart MSWSD A.B. Hart

087W4 WSD A.B. Hart

Non-Keeper

Totals

OPU#411 100W4Nathan Hale MS WSD Nathan Hale Non-Keeper

100W4 WSD Nathan Hale

Totals GROUP TOTALS

WARM, SAFE, DRY

$8,110,173.00 ($4,537,000.96)

$0.00 $0.00

$270,703.99

$244,012.00

$0.00

$244,012.00

$300,535.99

($20,818.83)

$279,717.16

$0.00

($9,013.17)

$270,703.99

$26,691.99

$0.00

$270,703.99 97%

$3,573,172.04

$3,696,904.00

$0.00

$3,696,904.00

$3,858,712.81

($193,197.33)

$3,665,515.48

$0.00

($92,343.44)

$3,573,172.04

($123,731.96)

$0.00

$3,569,656.73 97%

Group 05

Renovated/Keeper WSD Buhrer ES 020W5 WSD Buhrer ES Totals

OPU#064 020W5Buhrer ES

$773,468.00

($439,903.05)

$0.00

$333,564.95

$295,955.00

$0.00

$295,955.00

$327,167.68

$15,641.12

$342,808.80

$0.00

($9,243.85)

$333,564.95

$37,609.95

$0.00

$333,564.95 97%

$611,003.00

($507,841.04)

$0.00

$103,161.96

$36,430.00

$0.00

$36,430.00

$113,114.21

($2,671.81)

$110,442.40

$0.00

($7,280.44)

$103,161.96

$66,731.96

($0.00)

$103,161.96 93%

$536,317.00

$713,504.76

$0.00

$1,249,821.76

$1,488,812.00

$0.00

$1,488,812.00

$1,061,793.81

$194,416.60

$1,256,210.41

$0.00

($6,388.65)

$1,249,821.76

($238,990.24)

$0.00

$1,249,821.76 99%

$597,704.00

($419,030.07)

$0.00

$178,673.93

$176,105.00

$0.00

$176,105.00

$177,944.69

$7,876.45

$185,821.14

$0.00

($7,147.21)

$178,673.93

$2,568.93

$0.00

$182,549.43 98%

$882,889.00

($531,699.92)

$0.00

$351,189.08

$333,096.00

$0.00

$333,096.00

$359,073.40

$2,619.19

$361,692.59

$0.00

($10,503.51)

$351,189.08

$18,093.08

$0.00

$351,189.08 97%

$996,180.00

($632,326.87)

$0.00

$363,853.13

$275,352.00

$0.00

$275,352.00

$376,258.55

($512.56)

$375,745.99

$0.00

($11,892.86)

$363,853.13

$88,501.13

$0.00

$363,853.13 97%

$2,745,683.00 ($1,903,826.63)

$0.00

$841,856.37

$600,537.00

$0.00

$600,537.00

$886,324.47

($11,711.53)

$874,612.94

$0.00

($32,756.57)

$841,856.37

$241,319.37

($0.00)

$841,856.37 96%

$1,638,493.00 ($1,061,051.04)

$0.00

$577,441.96

$145,234.00

$0.00

$145,234.00

$536,552.24

$54,034.74

$590,586.98

$0.00

($13,145.02)

$577,441.96

$432,207.96

$0.00

$573,315.96 97%

$1,907,826.00 ($1,539,360.20)

$0.00

$368,465.80

$307,708.00

$0.00

$307,708.00

$405,957.21

($11,250.32)

$394,706.89

$0.00

($22,741.09)

$371,965.80

$60,757.80

($3,500.00)

$371,965.80 94%

Renovated/Keeper OPU#353 K-5 Marion C. 054W5Marion C. SelzterWSD Seltzer ES

054W5 WSD Marion C. Seltzer ES

Totals

OPU#436 K-5 OrchardRenovated/Keeper 065W5Orchard Science WSD

065W5 WSD Orchard

Totals

Renovated/Keeper OPU#592 080W5Watterson-Lake K-5 WSD Watterson-Lake ES

080W5 WSD Watterson-Lake ES

Totals

Renovated/Keeper OPU#328 MS Luis Munoz 098W5Luis Munoz MarinWSD Marin

098W5 WSD Luis Munoz Marin

Totals

Renovated/Keeper OPU#275 112W5Jane Addams 9-12 WSD Jane Addams

112W5 WSD Jane Addams

Totals

Renovated/Keeper OPU#292 114W5John Marshall HSWSD John Marshall

114W5 WSD John Marshall

Totals

OPU#330 115W5Lincoln West HS WSD Lincoln Renovated/Keeper West

115W5 WSD Lincoln West

Totals

Renovated/Keeper OPU#349 116W5Max S Hayes 9-12WSD Max S Hayes

116W5 WSD Max S Hayes

Totals

OPU#227 117W5Halle Cleveland Lrng WSDCtr Halle

Renovated/Keeper

117W5 WSD Halle

$798,047.00

Totals GROUP TOTALS

WARM, SAFE, DRY

($69,754.64)

$11,487,610.00 ($6,391,288.70)

$0.00 $0.00

$728,292.36

$685,007.00

$0.00

$685,007.00

$761,317.61

($23,524.68)

$737,792.93

$0.00

($9,500.57)

$728,292.36

$43,285.36

($0.00)

$728,292.36 99%

$5,096,321.30

$4,344,236.00

$0.00

$4,344,236.00

$5,005,503.87

$224,917.20

$5,230,421.07

$0.00

($130,599.77)

$5,099,821.30

$752,085.30

($3,500.00)

$5,099,570.80 97%

Group 06

Non-Keeper OPU#004 ES 010W6Adlai Stevenson WSD Adlai Stevenson

010W6 WSD Adlai Stevenson

Totals

$139,527.00

($42,767.58)

$0.00

$96,759.42

$82,905.00

$0.00

$82,905.00

$107,200.70

($10,696.87)

$96,503.83

$0.00

$255.59

$96,759.42

$13,854.42

($0.00)

$96,759.42 100%

$1,014,622.00

($431,204.61)

$0.00

$583,417.39

$949,806.00

$0.00

$949,806.00

$593,688.44

($12,271.17)

$581,417.27

$0.00

$2,000.12

$583,417.39

($366,388.61)

$0.00

$583,417.39 100%

$405,597.00

($1,673.96)

$0.00

$403,923.04

$367,855.00

$0.00

$367,855.00

$414,616.97

($11,464.51)

$403,152.46

$0.00

$770.58

$403,923.04

$36,068.04

$0.00

$403,923.04 100%

$195,012.00

($91,929.88)

$0.00

$103,082.12

$101,639.00

$0.00

$101,639.00

$110,813.40

($8,125.34)

$102,688.06

$0.00

$394.06

$103,082.12

$1,443.12

($0.00)

$103,082.12 100%

$253,030.00

$15,498.46

$0.00

$268,528.46

$153,461.00

$0.00

$153,461.00

$271,243.78

($3,237.08)

$268,006.70

$0.00

$521.76

$268,528.46

$115,067.46

($0.00)

$268,528.46 100%

$521,466.00

($200,713.99)

$0.00

$320,752.01

$363,478.00

$0.00

$363,478.00

$329,386.64

($9,669.56)

$319,717.08

$0.00

$1,034.93

$320,752.01

($42,725.99)

$0.00

$320,752.01 100%

$830,968.00

($548,295.32)

$0.00

$282,672.68

$262,186.00

$0.00

$262,186.00

$298,410.77

($17,369.25)

$281,041.52

$0.00

$1,631.16

$282,672.68

$20,486.68

$0.00

$282,672.68 101%

Renovated/Keeper OPU#036 ES Benjamin 016W6Benjamin Franklin Franklin WSD

016W6 WSD Benjamin Franklin OPU#058 018W6Brooklawn ES

018W6 WSD Brooklawn OPU#104 027W6Corlett ES

Totals

Renovated/Keeper WSD Brooklawn

WSD Corlett

027W6 WSD Corlett

Totals Non-Keeper

Totals

Non-Keeper OPU#165 Academy 033W6Emile B. deSauzeWSD Emile B. deSauze

033W6 WSD Emile B. deSauze

Totals

OPU#297 048W6Kenneth W. Clement WSD KennethRenovated/Keeper W. Clement

048W6 WSD Kenneth W. Clement

Totals

Renovated/Keeper OPU#376 060W6MilesStandish/MWhite WSD ES Miles Standish

060W6 WSD Miles Standish

Totals

Non-Keeper OPU#388 ES Moses Cleveland 061W6Moses ClevelandWSD Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

WARM, SAFE, DRY

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 4 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

Group 06

Non-Keeper OPU#388 ES Moses Cleveland 061W6Moses ClevelandWSD

061W6 WSD Moses Cleveland

Totals

$1,393,283.00

$370,095.98

$0.00

$1,763,378.98

$1,642,277.00

$0.00

$1,642,277.00

$1,774,853.91

($14,238.08)

$1,760,615.83

$0.00

$2,763.15

$1,763,378.98

$121,101.98

$0.00

$1,762,508.98 100%

$691,469.00

$677,747.83

$0.00

$1,369,216.83

$1,035,305.00

$0.00

$1,035,305.00

$1,379,546.54

($11,703.28)

$1,367,843.26

$0.00

$1,373.57

$1,369,216.83

$333,911.83

$0.00

$1,369,216.83 100%

$1,522,466.00

($249,973.72)

$0.00

$1,272,492.28

$3,035,471.00

$0.00

$3,035,471.00

$1,602,723.20

($333,233.66)

$1,269,489.54

$0.00

$3,002.74

$1,272,492.28 ($1,762,978.72)

$0.00

$1,272,492.28 100%

$1,833,937.00 ($1,223,579.79)

$0.00

$610,357.21

$687,767.00

$0.00

$687,767.00

$601,319.53

$5,413.51

$606,733.04

$0.00

$3,624.17

$610,357.21

($77,409.79)

($0.00)

$610,357.21 101%

$1,783,279.00

($15,151.93)

$0.00

$1,768,127.07

$1,717,379.00

$0.00

$1,717,379.00

$1,749,843.87

$14,728.95

$1,764,572.82

$0.00

$3,554.25

$1,768,127.07

$50,748.07

$0.00

$1,768,127.07 100%

$826,125.00

$226,673.42

$0.00

$1,106,487.00

$1,046,175.69

$4,904.88

$1,051,080.57

$0.00

$1,717.85

$1,052,798.42

($53,688.58)

$0.00

$1,052,798.42 100%

$0.00 $11,506,016.00

$10,279,823.44

($406,961.46)

$9,872,861.98

$0.00

$22,643.93

$9,895,505.91 ($1,610,510.09)

$0.00

$9,894,635.91 100%

Renovated/Keeper OPU#343 MS Margaret 099W6Margaret SpellacyWSD Spellacy MS

099W6 WSD Margaret Spellacy MS

Totals

Renovated/Keeper OPU#616 105W6Wilbur Wright MSWSD Wilbur Wright

105W6 WSD Wilbur Wright OPU#220 109W6Glenville HS

Totals

WSD GlenvilleRenovated/Keeper

109W6 WSD Glenville

Totals

Renovated/Keeper OPU#273 HS James F. 111W6James F. RhodesWSD Rhodes

111W6 WSD James F. Rhodes

Totals

Renovated/Keeper OPU#171 ES Forest Hill 121W6Forest Hill Parkway WSD Parkway

121W6 WSD Forest Hill Parkway

Totals

GROUP TOTALS

WARM, SAFE, DRY

$11,410,781.00 ($1,515,275.09)

$0.00 $0.00

$1,052,798.42

$1,106,487.00

$9,895,505.91

$11,506,016.00

Group 07

OPU#485 009W7Riverside ES

WSD Riverside 009W7 WSD Riverside

Non-Keeper

Totals

$400,627.00

($400,627.00)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$316,528.00

($193,780.29)

$0.00

$122,747.71

$217,280.00

$0.00

$217,280.00

$118,716.93

$2,283.57

$121,000.50

$0.00

$1,747.21

$122,747.71

($94,532.29)

$0.00

$122,747.71 101%

$130,530.00

($12,289.33)

$0.00

$118,240.67

$236,481.00

$0.00

$236,481.00

$106,766.01

$9,747.62

$116,513.63

$0.00

$1,727.04

$118,240.67

($118,240.33)

$0.00

$118,240.67 101%

$50,403.00

$23,290.82

$0.00

$73,693.82

$178,719.00

$0.00

$178,719.00

$57,665.62

$14,298.70

$71,964.32

$0.00

$1,729.50

$73,693.82

($105,025.18)

$0.00

$73,693.82 102%

$272,800.00

($224,136.86)

$0.00

$48,663.14

$56,347.00

$0.00

$56,347.00

$49,291.94

($2,347.48)

$46,944.46

$0.00

$1,718.68

$48,663.14

($7,683.86)

$0.00

$48,663.14 104%

$449,260.00

($389,154.28)

$0.00

$60,105.72

$44,493.00

$0.00

$44,493.00

$61,171.19

($2,796.76)

$58,374.43

$0.00

$1,731.29

$60,105.72

$15,612.72

$0.00

$60,105.72 103%

$264,576.00

($152,339.60)

$0.00

$112,236.40

$49,803.00

$0.00

$49,803.00

$65,989.49

$44,493.82

$110,483.31

$0.00

$1,753.09

$112,236.40

$62,433.40

$0.00

$112,236.40 102%

$126,099.00

($126,099.00)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$384,446.00

($84,024.65)

$0.00

$300,421.35

$426,979.00

$0.00

$426,979.00

$298,988.52

($291.82)

$298,696.70

$0.00

$1,724.65

$300,421.35

($126,557.65)

($0.00)

$300,421.35 101%

$215,918.00

($61,235.92)

$0.00

$154,682.08

$220,529.00

$0.00

$220,529.00

$152,567.26

$377.66

$152,944.92

$0.00

$1,737.16

$154,682.08

($65,846.92)

$0.00

$154,682.08 101%

$434,181.00

$19,738.40

$0.00

$453,919.40

$546,647.00

$0.00

$546,647.00

$512,031.56

($59,833.66)

$452,197.90

$0.00

$1,721.50

$453,919.40

($92,727.60)

$0.00

$453,919.40 100%

$219,632.00

($96,934.34)

$0.00

$122,697.66

$153,683.00

$0.00

$153,683.00

$113,244.97

$7,727.82

$120,972.79

$0.00

$1,724.87

$122,697.66

($30,985.34)

($0.00)

$122,697.66 101%

$481,565.00

($313,390.55)

$0.00

$168,174.45

$364,498.00

$0.00

$364,498.00

$148,747.30

$17,686.51

$166,433.81

$0.00

$1,740.64

$168,174.45

($196,323.55)

$0.00

$168,174.45 101%

$640,763.00

($511,022.43)

$0.00

$129,740.57

$251,503.00

$0.00

$251,503.00

$122,027.63

$5,958.14

$127,985.77

$0.00

$1,754.80

$129,740.57

($121,762.43)

$0.00

$129,740.57 101%

$595,655.00

($420,958.91)

$0.00

$174,696.09

$146,886.00

$0.00

$146,886.00

$140,714.46

$32,253.74

$172,968.20

$0.00

$1,727.89

$174,696.09

$27,810.09

$0.00

$174,696.09 101%

$417,156.00

$8,716.47

$0.00

$425,872.47

$478,521.00

$0.00

$478,521.00

$247,196.96

$176,921.32

$424,118.28

$0.00

$1,754.19

$425,872.47

($52,648.53)

$0.00

$425,872.47 100%

$767,244.00

($451,358.37)

$0.00

$315,885.63

$690,307.00

$0.00

$690,307.00

$323,174.89

($4,958.67)

$318,216.22

$0.00

$1,739.41

$319,955.63

($374,421.37)

($4,070.00)

$319,955.63 101%

$598,908.00

($245,126.26)

$0.00

$353,781.74

$765,628.00

$0.00

$765,628.00

$314,832.67

$37,211.16

$352,043.83

$0.00

$1,737.91

$353,781.74

($411,846.26)

$0.00

$353,781.74 100%

$132,461.00

($104,417.18)

$28,043.82

$46,167.00

$0.00

$46,167.00

$26,288.67

($8.34)

$26,280.33

$0.00

$1,763.49

$28,043.82

($18,123.18)

$0.00

$28,043.82 107%

$3,163,602.72

$4,874,471.00

$0.00

$4,874,471.00

$2,859,416.07

$278,723.33

$3,138,139.40

$0.00

$29,533.32

$3,167,672.72 ($1,710,868.28)

($4,070.00)

$3,167,672.72 101%

OPU#023 015W7Artemus Ward ESWSD Artimus WardNon-Keeper

015W7 WSD Artimus Ward OPU#112 030W7Denison ES

Totals

WSD Denison

030W7 WSD Denison

Non-Keeper

Totals

Non-Keeper OPU#130 ES Douglas MacArthur 031W7Douglas MacArthur WSD

031W7 WSD Douglas MacArthur

Totals WSD Garfield ES Non-Keeper 037W7 WSD Garfield ES Totals

OPU#188 037W7Garfield ES

OPU#338 050W7Louis Agassiz ESWSD Louis AgassizNon-Keeper

050W7 WSD Louis Agassiz

Totals

WSD McKinley ES Non-Keeper 057W7 WSD McKinley ES Totals

OPU#352 057W7McKinley ES

Non-Keeper OPU#451 066W7Paul L. Dunbar ES WSD Paul L. Dunbar

066W7 WSD Paul L. Dunbar OPU#487 068W7R.G. Jones ES

Totals

Non-Keeper WSD R.G. Jones Elementary

068W7 WSD R.G. Jones Elementary

Totals WSD Tremont ES Non-Keeper 074W7 WSD Tremont ES Totals

OPU#544 074W7Tremont ES

OPU#550 076W7Valley View ES WSD Valley View Non-Keeper

076W7 WSD Valley View OPU#560 078W7Walton ES

Totals

WSD Walton

078W7 WSD Walton

Non-Keeper

Totals

Non-Keeper OPU#622 ES 082W7WSD William C. Bryant WSD William Cullen Bryant

082W7 WSD William Cullen Bryant

Totals

Non-Keeper OPU#621 ES William R. Harper 083W7William R. HarperWSD

083W7 WSD William R. Harper

Totals

Non-Keeper OPU#080 MS Charles A. Mooney 092W7Charles A. Mooney WSD

092W7 WSD Charles A. Mooney

Totals

Non-Keeper OPU#412 101W7Nathaniel Hawthorne WSDES Nathaniel Hawthorne

101W7 WSD Nathaniel Hawthorne

Totals

Non-Keeper OPU#536 MS Thomas Jefferson 103W7Thomas Jefferson WSD

103W7 WSD Thomas Jefferson OPU#624 106W7Wilson MS

WSD Wilson

106W7 WSD Wilson

Totals Non-Keeper

Totals

Non-Keeper OPU#224 K-8 H. Barbara Booker 122W7H. Barbara Booker WSD

122W7 WSD H. Barbara Booker

Totals

GROUP TOTALS

WARM, SAFE, DRY

$6,898,752.00 ($3,735,149.28)

$0.00 $0.00

Group 08

Renovated/Keeper OPU#096 6-8 007W8Collinwood CompuTech WSD Collinwood CompuTech Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

WARM, SAFE, DRY

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

Current Estimate

COMMITTED Original Committment

Approved Changes

Revised Committment

12/2/2013 5 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

Group 08

Renovated/Keeper OPU#096 6-8 007W8Collinwood CompuTech WSD Collinwood CompuTech

007W8 WSD Collinwood CompuTech

$3,344,196.00 ($2,523,777.63)

Totals

$0.00

$820,418.37

$484,458.00

$0.00

$484,458.00

$781,413.89

$16,232.69

$797,646.58

$0.00

$22,771.79

$820,418.37

$335,960.37

$0.00

$820,290.44 103%

Renovated/Keeper OPU#010 BellAlexander ES 011W8Alexander Graham WSD Graham Bell

011W8 WSD Alexander Graham Bell

Totals

$785,112.00

($142,085.36)

$0.00

$643,026.64

$412,375.00

$0.00

$412,375.00

$589,428.26

$48,310.54

$637,738.80

$0.00

$5,287.84

$643,026.64

$230,651.64

$0.00

$643,026.64 101%

$246,818.00

($106,304.72)

$0.00

$140,513.28

$182,585.00

$0.00

$182,585.00

$133,023.89

$5,848.39

$138,872.28

$0.00

$1,641.00

$140,513.28

($42,071.72)

($0.00)

$140,513.28 101%

$474,908.00

($67,327.18)

$0.00

$407,580.82

$516,563.00

$0.00

$516,563.00

$351,579.40

$52,795.15

$404,374.55

$0.00

$3,206.27

$407,580.82

($108,982.18)

$0.00

$407,580.82 101%

$984,395.00

($139,799.30)

$0.00

$844,595.70

$655,736.00

$0.00

$655,736.00

$835,610.52

$2,355.47

$837,965.99

$0.00

$6,629.71

$844,595.70

$188,859.70

($0.00)

$844,604.50 101%

$517,101.00

$314,960.32

$0.00

$832,061.32

$652,474.00

$0.00

$652,474.00

$830,449.55

($1,871.83)

$828,577.72

$0.00

$3,483.60

$832,061.32

$179,587.32

($0.00)

$832,061.32 100%

$522,215.00

($215,247.90)

$0.00

$306,967.10

$286,794.00

$0.00

$286,794.00

$283,700.42

$19,746.29

$303,446.71

$0.00

$3,520.39

$306,967.10

$20,173.10

($0.00)

$306,967.10 101%

$816,063.00

$336,894.69

$0.00

$1,152,957.69

$1,530,356.00

$0.00

$1,530,356.00

$1,072,463.88

$74,999.34

$1,147,463.22

$0.00

$5,494.47

$1,152,957.69

($377,398.31)

$0.00

$1,152,957.69 100%

$592,097.00

($241,805.49)

$0.00

$350,291.51

$295,223.00

$0.00

$295,223.00

$336,426.09

$9,834.47

$346,260.56

$0.00

$4,030.95

$350,291.51

$55,068.51

$0.00

$350,291.51 101%

$303,562.00

($124,004.41)

$0.00

$179,557.59

$246,712.00

$0.00

$246,712.00

$172,005.45

$5,408.39

$177,413.84

$0.00

$2,143.75

$179,557.59

($67,154.41)

($0.00)

$179,548.79 101%

$5,677,970.02

$5,263,276.00

$0.00

$5,263,276.00

$5,386,101.35

$233,658.90

$5,619,760.25

$0.00

$58,209.77

$5,677,970.02

$414,694.02

$0.00

$5,677,842.09 101%

OPU#021 014W8Anton Grdina ESWSD Anton GrdinaNon-Keeper

014W8 WSD Anton Grdina OPU#041 017W8Bolton ES

Totals

WSD Bolton Renovated/Keeper

017W8 WSD Bolton

Totals

Renovated/Keeper OPU#225 040W8Gracemount ES WSD Gracemount

040W8 WSD Gracemount

Totals

OPU#294 046W8John W. Raper ES WSD John W.Renovated/Keeper Raper

046W8 WSD John W. Raper OPU#548 075W8Union ES

075W8 WSD Union

Totals WSD Union Renovated/Keeper Totals

OPU#078 093W8Charles Eliot K-8WSD CharlesRenovated/Keeper W. Eliot

093W8 WSD Charles W. Eliot OPU#124 120W8Dike Pre-K - 8

WSD Dike

Totals Renovated/Keeper

120W8 WSD Dike

Totals

Renovated/Keeper OPU#020 124W8Jesse Owens Academy WSD Jesse Owens Academy

124W8 WSD Jesse Owens Academy

Totals

GROUP TOTALS

WARM, SAFE, DRY

$8,586,467.00 ($2,908,496.98)

$0.00

Group 09

Non-Keeper OPU#016 ES Andrew J Rickoff 004W9Andrew J. RickoffWSD

004W9 WSD Andrew J Rickoff

Totals

$419,836.00

$59,676.46

$0.00

$479,512.46

$552,614.00

$0.00

$552,614.00

$458,736.38

$7,492.62

$466,229.00

$0.00

$13,283.46

$479,512.46

($73,101.54)

$0.00

$471,992.97 101%

$404,205.00

($151,101.94)

$0.00

$253,103.06

$223,831.00

$0.00

$223,831.00

$243,822.35

($3,496.11)

$240,326.24

$0.00

$12,796.60

$253,122.84

$29,272.06

($19.78)

$250,580.87 104%

$495,697.00

$912.33

$0.00

$496,609.33

$598,761.00

$0.00

$598,761.00

$477,048.23

$3,871.94

$480,920.17

$0.00

$15,689.16

$496,609.33

($102,151.67)

($0.00)

$485,377.81 101%

$208,648.00

($51,184.02)

$0.00

$157,463.98

$165,062.00

$0.00

$165,062.00

$152,676.06

($1,803.42)

$150,872.64

$0.00

$6,591.34

$157,463.98

($7,598.02)

($0.00)

$156,112.50 103%

$270,839.00

($92,190.65)

$0.00

$178,648.35

$221,169.00

$0.00

$221,169.00

$171,402.99

($914.58)

$170,488.41

$0.00

$8,559.94

$179,048.35

($42,520.65)

($400.00)

$176,396.12 103%

$924,843.00

($88,737.90)

$0.00

$836,105.10

$858,048.00

$0.00

$858,048.00

$769,501.62

$37,264.53

$806,766.15

$0.00

$29,338.95

$836,105.10

($21,942.90)

$0.00

$798,302.93 99%

$584,236.00

($151,565.68)

$0.00

$432,670.32

$463,811.00

$0.00

$463,811.00

$397,879.46

$16,682.93

$414,562.39

$0.00

$18,507.93

$433,070.32

($31,140.68)

($400.00)

$426,757.81 103%

$199,861.00

($69,395.18)

$0.00

$130,465.82

$110,998.00

$0.00

$110,998.00

$125,831.16

($1,732.23)

$124,098.93

$0.00

$6,366.89

$130,465.82

$19,467.82

$0.00

$129,897.90 105%

$220,495.00

($46,336.94)

$0.00

$174,158.06

$177,377.00

$0.00

$177,377.00

$158,723.78

$8,463.76

$167,187.54

$0.00

$6,970.52

$174,158.06

($3,218.94)

$0.00

$173,775.61 104%

$752,456.00

($240,041.11)

$0.00

$512,414.89

$574,884.00

$0.00

$574,884.00

$489,263.99

($287.18)

$488,976.81

$0.00

$23,838.08

$512,814.89

($62,469.11)

($400.00)

$503,448.47 103%

$291,853.00

($244,335.36)

$0.00

$47,517.64

$193,204.00

$0.00

$193,204.00

$201,285.45

($162,994.31)

$38,291.14

$0.00

$9,226.50

$47,517.64

($145,686.36)

$0.00

$199,406.62 521%

$480,010.00

$13,439.65

$0.00

$493,449.65

$510,919.00

$0.00

$510,919.00

$467,684.08

$10,560.31

$478,244.39

$0.00

$15,205.26

$493,449.65

($17,469.35)

$0.00

$485,191.95 101%

$138,025.00

$61,324.94

$0.00

$199,349.94

$286,257.00

$0.00

$286,257.00

$354,639.97

$38,642.54

$393,282.51

$0.00

$4,375.31

$397,657.82

($86,907.06)

($198,307.88)

$397,191.45 101%

$141,699.00

$15,223.52

$0.00

$156,922.52

$171,153.00

$0.00

$171,153.00

$148,476.59

$4,355.89

$152,832.48

$0.00

$4,490.04

$157,322.52

($14,230.48)

($400.00)

$154,858.99 101%

$837,122.00

$280,796.82

$0.00

$1,117,918.82

$1,166,184.00

$0.00

$1,166,184.00

$1,017,868.63 ($1,259,520.01)

($241,651.38)

$0.00

$26,555.11

($215,096.27)

($48,265.18) $1,333,015.09

($221,283.04) 92%

$604,663.00

$57,896.81

$0.00

$662,559.81

$552,832.00

$0.00

$552,832.00

$648,663.63

$0.00

$13,896.18

$662,559.81

Non-Keeper OPU#003 ES Alfred A. Benesch 012W9Alfred A. Benesch WSD

012W9 WSD Alfred A. Benesch

Totals

Non-Keeper OPU#164 ESEmpire CompuTech 034W9Empire CompuTech WSD

034W9 WSD Empire CompuTech OPU#184 036W9Fullerton ES

WSD Fullerton 036W9 WSD Fullerton

Totals Non-Keeper

Totals

Non-Keeper OPU#198 ES George W. Carver 038W9George W. CarverWSD

038W9 WSD George W. Carver

Totals

OPU#240 043W9Harvey Rice ES WSD Harvey Rice Non-Keeper

043W9 WSD Harvey Rice

Totals

Non-Keeper OPU#295 ES Joseph F. Landis 047W9Joseph F. LandisWSD

047W9 WSD Joseph F. Landis OPU#301 049W9Kentucky ES

WSD Kentucky 049W9 WSD Kentucky

Totals Non-Keeper

Totals

Non-Keeper OPU#345 ES Margaret A. Ireland 053W9Margaret A. Ireland WSD

053W9 WSD Margaret A. Ireland OPU#368 058W9Miles ES

WSD Miles

058W9 WSD Miles OPU#372 059W9Miles Park ES

WSD Miles Park 059W9 WSD Miles Park

Totals Non-Keeper

Totals Non-Keeper

Totals

Non-Keeper OPU#400 063W9Mount Auburn ESWSD Mount Auburn

063W9 WSD Mount Auburn

Totals

Non-Keeper OPU#525 ES Stephen E. Howe 072W9Stephen E. HoweWSD

072W9 WSD Stephen E. Howe

Totals

Non-Keeper OPU#638 086W9Woodland Hills ES WSD Woodland Hills ES

086W9 WSD Woodland Hills ES

Totals

Non-Keeper OPU#009 MSAlexander Hamilton 088W9Alexander Hamilton WSD

088W9 WSD Alexander Hamilton OPU#024 089W9Audubon K-8

WSD Audubon 089W9 WSD Audubon

Totals Non-Keeper

Totals

$584,765.29

$63,898.34

$109,727.81

$0.00

$647,672.41 100%

OPU#066 090W9Carl F. Shuler MSWSD Carl F. ShulerNon-Keeper Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

WARM, SAFE, DRY

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 6 of 6

STATUS

Pending Changes

Potential Costs

Projected Committment

Phase Estimate Variance

Est. to Compl.

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

Group 09

OPU#066 090W9Carl F. Shuler MSWSD Carl F. ShulerNon-Keeper

090W9 WSD Carl F. Shuler OPU#076 091W9Central MS

Totals

WSD Central

091W9 WSD Central

$268,625.00

$6,362.03

$0.00

$274,987.03

$260,965.00

$0.00

$260,965.00

$220,292.43

$46,567.47

$266,859.90

$0.00

$8,527.13

$275,387.03

$14,022.03

($400.00)

$268,064.64 100%

$333,183.00

($161,104.14)

$0.00

$172,078.86

$137,170.00

$0.00

$137,170.00

$164,440.40

($2,879.14)

$161,561.26

$0.00

$10,517.60

$172,078.86

$34,908.86

($0.00)

$170,957.88 106%

$407,735.00

($70,574.62)

$0.00

$337,160.38

$308,218.00

$0.00

$308,218.00

$325,428.65

($1,188.61)

$324,240.04

$0.00

$12,920.34

$337,160.38

$28,942.38

$0.00

$336,103.41 104%

$635,273.00

($11,789.10)

$0.00

$623,483.90

$830,129.00

$0.00

$830,129.00

$619,701.80

($16,358.21)

$603,343.59

$0.00

$20,140.31

$623,483.90

($206,645.10)

($0.00)

$607,000.66 101%

$523,210.00

($14,125.01)

$0.00

$509,084.99

$659,224.00

$0.00

$659,224.00

$451,529.71

$40,912.67

$492,442.38

$0.00

$16,641.14

$509,083.52

($150,139.01)

$1.47

$500,643.47 102%

$8,245,664.91

$9,022,810.00

$0.00

$9,022,810.00

$8,000,999.02 ($1,172,460.80)

$6,828,538.22

$0.00

$284,437.79

$7,112,976.01

($777,145.09) $1,132,688.90

$7,118,451.43 104%

$0.00

$0.00

$0.00

$0.00

$723,849.68

$0.00

$0.00

$723,849.68

$0.00

($723,849.68)

$0.00

$0.00

$0.00

$0.00

$651,660.53

($45,171.77)

$606,488.76

$0.00

$0.00

$606,488.76

$0.00

($606,488.76)

$606,438.76 100%

$0.00

$0.00

$0.00

$0.00

$1,381,854.21

($51,515.77)

$1,330,338.44

$0.00

$0.00

$1,330,338.44

$0.00 ($1,330,338.44)

$1,330,288.44 100%

$0.00 $201,136,671.63 $198,809,204.00 $5,147,590.00 $203,956,794.00 $194,982,878.57 $11,402,485.35 $206,385,363.92

$0.00

Non-Keeper

Totals

Non-Keeper OPU#802 095W9Garrett Morgan MS WSD Garrett Morgan

095W9 WSD Garrett Morgan

Totals

OPU#448 102W9Patrick Henry MSWSD Patrick HenryNon-Keeper

102W9 WSD Patrick Henry

Totals

Non-Keeper OPU#428 127W9Oliver H. Perry ESWSD Oliver H. Perry

127W9 WSD Oliver H. Perry

Totals GROUP TOTALS

$9,142,514.00

($896,849.09)

$0.00

LFI OPU#271 005X1John Adams HS John Adams HS Site Remedia

005X1

John Adams HS Site Remediation Totals

$0.00

$0.00

$0.00

$730,193.68

($6,344.00)

$723,849.68 100%

OPU#027 006X1Memorial

006X1

Memorial LFI Building Demol Memorial LFI Building Demolition Totals GROUP TOTALS

$0.00 $0.00

$0.00 $0.00

SEGMENT PROJECT TOTALS $218,900,277.00 ($17,763,605.37)

$0.00 $0.00

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

($328,617.13) $206,056,746.79 ($2,820,122.37) ($4,920,075.16) $206,055,059.26 100%

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($4,920,075.16)

3. The costs shown above does not include the remaining Swing Space Allowance in the amount of $3,958,587 noted in the signed Project Agreement for Segment 1. 4. The costs shown above does not include the Conditional Approval scope of work in the amount of $18,880,604 noted in the signed Project Agreement for Segment 1. 5. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.

Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS All Projects/ Segment 01/ WSD District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

Project

FUNDING

Description

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - RENOVATED/KEEPER BUILDINGS OPU#065 ESCaptain Renovated/Keeper 021W1Captain Arthur Roth WSD Arthur Roth Totals

$510,945.00

$436,560.96

$0.00

$947,505.96

$1,041,994.00

$0.00

$1,041,994.00

$971,880.11

($20,490.39)

$951,389.72

$0.00

($3,883.76)

$947,505.96

$94,488.04

$0.00

$947,505.96

Renovated/Keeper WSD Iowa-Maple 044W1 WSD Iowa-Maple Totals

$643,941.00

$737,905.81

$0.00

$1,381,846.81

$1,576,633.00

$0.00

$1,576,633.00

$1,415,299.44

($28,527.86)

$1,386,771.58

$0.00

($4,924.77)

$1,381,846.81

$194,786.19

$0.00

$1,381,846.41

$1,646,035.00

($494,019.46)

$0.00

$1,152,015.54

$1,132,964.00

$0.00

$1,132,964.00

$1,212,950.19

($48,426.39)

$1,164,523.80

$0.00

($12,508.26)

$1,152,015.54

($19,051.54)

$0.00

$1,151,925.34

$1,525,969.00 ($1,080,744.82)

$0.00

$445,224.18

$475,845.00

$0.00

$475,845.00

$469,312.70

($12,407.31)

$456,905.39

$0.00

($11,681.21)

$445,224.18

$30,620.82

($0.00)

$445,224.18

$2,343,917.00

($411,720.23)

$0.00

$1,932,196.77

$2,199,080.00

$0.00

$2,199,080.00

$2,039,145.79

($89,069.21)

$1,950,076.58

$0.00

($17,879.81)

$1,932,196.77

$266,883.23

$0.00

$1,937,287.84

$1,457,186.00

($622,544.21)

$0.00

$834,641.79

$931,256.00

$0.00

$931,256.00

$860,242.19

($14,453.64)

$845,788.55

$0.00

($11,146.76)

$834,641.79

$96,614.21

($0.00)

$829,550.93

$3,307,289.00 ($2,690,278.32)

$0.00

$617,010.68

$622,246.00

$0.00

$622,246.00

$726,681.64

($84,470.53)

$642,211.11

$0.00

($25,200.43)

$617,010.68

$5,235.32

$0.00

$617,010.68

021W1 WSD Captain Arthur Roth OPU#270 044W1Iowa-Maple ES

OPU#482 ES Robert Renovated/Keeper 070W1Robert H JamisonWSD H Jamison

070W1 WSD Robert H Jamison

Totals

OPU#172 Renovated/Keeper 094W1Franklin D Roosevelt WSDMS Franklin D Roosevelt

094W1 WSD Franklin D Roosevelt

Totals

OPU#615 MS Whitney Renovated/Keeper 104W1Whitney M YoungWSD M Young

104W1 WSD Whitney M Young

Totals

OPU#285 113W1John F Kennedy HS WSD John Renovated/Keeper F Kennedy

113W1 WSD John F Kennedy OPU#512 125W1South HS

Totals

WSD SouthRenovated/Keeper

125W1 WSD South

Totals

OPU#587 Renovated/Keeper 587W1Washing Park HCWSD - Washington Park Totals

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Renovated/Keeper WSD East High 001W2 WSD East High Totals

$1,637,557.00

($693,744.55)

$0.00

$943,812.45

$1,182,837.00

$0.00

$1,182,837.00

$932,808.44

$45,957.99

$978,766.43

$0.00

($34,953.98)

$943,812.45

$239,024.55

$0.00

$943,812.45

$567,807.00

$48,395.55

$0.00

$616,202.55

$662,696.00

$0.00

$662,696.00

$634,193.24

($5,880.89)

$628,312.35

$0.00

($12,109.80)

$616,202.55

$46,493.45

$0.00

$616,202.55

Totals

$573,070.00

$36,906.55

$0.00

$609,976.55

$542,742.00

$0.00

$542,742.00

$629,149.63

($6,943.74)

$622,205.89

$0.00

($12,229.34)

$609,976.55

($67,234.55)

$0.00

$609,976.55

Renovated/Keeper WSD Sunbeam 073W2 WSD Sunbeam Totals

$1,804,199.00

$404,139.87

$0.00

$2,208,338.87

$2,269,893.00

$0.00

$2,269,893.00

$2,235,375.72

$11,489.03

$2,246,864.75

$0.00

($38,525.88)

$2,208,338.87

$61,554.13

($0.00)

$2,207,924.87

$789,110.00

($430,937.77)

$0.00

$358,172.23

$317,118.00

$0.00

$317,118.00

$379,617.49

($4,611.75)

$375,005.74

$0.00

($16,833.51)

$358,172.23

($41,054.23)

$0.00

$358,172.23

$773,991.00

($500,249.42)

$0.00

$273,741.58

$326,133.00

$0.00

$326,133.00

$322,850.17

($32,587.78)

$290,262.39

$0.00

($16,520.81)

$273,741.58

$52,391.42

($0.00)

$273,741.58

$652,837.00

($529,378.98)

$0.00

$123,458.02

$169,390.00

$0.00

$169,390.00

$142,448.51

($5,038.87)

$137,409.64

$0.00

($13,951.62)

$123,458.02

$45,931.98

$0.00

$123,458.02

$4,383,219.00 ($3,571,200.06)

$0.00

$812,018.94

$844,359.00

$0.00

$844,359.00

$942,536.16

($37,004.89)

$905,531.27

$0.00

($93,512.33)

$812,018.94

$32,340.06

$0.00

$812,018.94

587W1 WSD - Washington Park OPU#144 001W2East High

OPU#081 Renovated/Keeper 025W2Charles Orr Academy WSD Charles Orr

025W2 WSD Charles Orr

Totals

OPU#350 056W2Mary McLeod Bethune McLeod Bethun WSD ES Mary Renovated/Keeper

056W2 WSD Mary McLeod Bethune OPU#532 073W2Sunbeam ES

OPU#556 077W2Wade Park ES

WSD WadeRenovated/Keeper Park 077W2 WSD Wade Park Totals

OPU#233 096W2Harry E Davis MSWSD HarryRenovated/Keeper E Davis

096W2 WSD Harry E Davis

Totals

OPU#801 of Arts Renovated/Keeper 107W2Cleveland SchoolWSD Cleveland School of

107W2 WSD Cleveland School of Arts

Totals

OPU#161 Renovated/Keeper 108W2East Technical HSWSD East Technical

108W2 WSD East Technical

Totals

OPU#355 Renovated/Keeper 118W2Martin L King Jr MS/HS WSD Martin Luther King J

118W2 WSD Martin Luther King Jr.

Totals

$959,046.00

($711,402.78)

$0.00

$247,643.22

$331,624.00

$0.00

$331,624.00

$273,352.21

($5,258.46)

$268,093.75

$0.00

($20,450.53)

$247,643.22

$83,980.78

($0.00)

$247,643.22

$650,575.00

($415,484.04)

$0.00

$235,090.96

$347,772.00

$0.00

$347,772.00

$255,201.26

($6,251.09)

$248,950.17

$0.00

($13,859.21)

$235,090.96

$112,681.04

($0.00)

$235,090.96

$683,084.00

($496,337.86)

$0.00

$186,746.14

$247,152.00

$0.00

$247,152.00

$210,782.92

($15,541.31)

$195,241.61

$0.00

($8,495.47)

$186,746.14

$60,405.86

$0.00

$186,545.96

$703,016.00

($536,283.86)

$0.00

$166,732.14

$315,001.00

$0.00

$315,001.00

$190,402.24

($14,947.92)

$175,454.32

$0.00

($8,722.18)

$166,732.14

$148,268.86

$0.00

$166,732.14

$425,256.00

($103,278.81)

$0.00

$321,977.19

$623,023.00

$0.00

$623,023.00

$354,847.81

($27,603.17)

$327,244.64

$0.00

($5,267.45)

$321,977.19

$301,045.81

($0.00)

$322,152.19

OPU#347 123W2Mary B Martin ES/MS B Martin WSD Mary Renovated/Keeper

123W2 WSD Mary B Martin OPU#012 013W3Almira ES

013W3 WSD Almira OPU#068 022W3Case ES

022W3 WSD Case OPU#088 026W3Clark ES

026W3 WSD Clark

Totals

Renovated/Keeper WSD Almira Totals

WSD Case Renovated/Keeper Totals

WSD ClarkRenovated/Keeper Totals

OPU#340 ES Louisa Renovated/Keeper 052W3Louisa May AlcottWSD May Alcott

Expedition 速

Report M_COST_01_00-7b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193

Project

Date: Page:

FUNDING

Description

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - RENOVATED/KEEPER BUILDINGS OPU#340 ES Louisa Renovated/Keeper 052W3Louisa May AlcottWSD May Alcott

$396,988.00

$54,869.60

$0.00

$451,857.60

$604,056.00

$0.00

$604,056.00

$475,212.74

($18,441.30)

$456,771.44

$0.00

($4,913.84)

$451,857.60

$152,198.40

$0.00

$451,857.60

$983,579.00

($14,372.35)

$0.00

$969,206.65

$1,558,214.00

$0.00

$1,558,214.00

$993,590.50

($12,142.98)

$981,447.52

$0.00

($12,240.87)

$969,206.65

$589,007.35

$0.00

$967,608.82

Totals

$877,445.00

($660,579.81)

$0.00

$216,865.19

$388,806.00

$0.00

$388,806.00

$280,050.20

($52,263.51)

$227,786.69

$0.00

($10,921.50)

$216,865.19

$171,940.81

($0.00)

$214,670.01

Renovated/Keeper WSD Scranton 071W3 WSD Scranton Totals

$406,763.00

($256,618.17)

$0.00

$150,144.83

$226,131.00

$0.00

$226,131.00

$179,534.11

($24,314.53)

$155,219.58

$0.00

($5,074.75)

$150,144.83

$75,986.17

$0.00

$150,144.83

$992,413.00

($123,844.45)

$0.00

$868,568.55

$2,059,374.00

$0.00

$2,059,374.00

$891,558.13

($10,621.31)

$880,936.82

$0.00

($12,368.27)

$868,568.55

$1,190,805.45

$0.00

$868,446.09

$414,019.00

$3,020.57

$0.00

$417,039.57

$751,581.00

$0.00

$751,581.00

$422,075.35

$94.85

$422,170.20

$0.00

($5,130.63)

$417,039.57

$334,541.43

$0.00

$417,039.57

$1,355,652.00 ($1,013,144.89)

$0.00

$342,507.11

$638,436.00

$0.00

$638,436.00

$376,621.38

($17,273.14)

$359,348.24

$0.00

($16,841.13)

$342,507.11

$295,928.89

$0.00

$342,507.10

($292,274.69)

$0.00

$658,167.31

$946,959.00

$0.00

$946,959.00

$698,886.18

($28,910.50)

$669,975.68

$0.00

($11,808.37)

$658,167.31

$288,791.69

$0.00

$658,167.31

$3,100,157.00 ($2,691,143.65)

$0.00

$409,013.35

$2,076,043.00

$0.00

$2,076,043.00

$491,902.14

($44,346.53)

$447,555.61

$0.00

($38,542.26)

$409,013.35

$1,667,029.65

($0.00)

$408,996.13

052W3 WSD Louisa May Alcott

Totals

OPU#354 Renovated/Keeper 055W3Marion-Sterling ES WSD Marion-Sterling

055W3 WSD Marion-Sterling

Totals

OPU#415 Renovated/Keeper 064W3Newton D Baker ES WSD Newton D Baker

064W3 WSD Newton D Baker OPU#500 071W3Scranton ES

OPU#596 081W3Waverly ES

Renovated/Keeper WSD Waverly

081W3 WSD Waverly OPU#605 084W3Willow ES

Totals Renovated/Keeper WSD Willow

084W3 WSD Willow

Totals

OPU#279 MSJoseph Renovated/Keeper 097W3Joseph M Gallagher WSD M Gallagher

097W3 WSD Joseph M Gallagher

Totals

OPU#804 HS Health Renovated/Keeper 110W3Health Careers Ctr WSD Careers Ctr

110W3 WSD Health Careers Ctr

Totals

$950,442.00

OPU#090 ES ClaraRenovated/Keeper 119W3Clara E. WestroppWSD E. Westropp

119W3 WSD Clara E. Westropp

Totals

OPU#064 020W5Buhrer ES

Renovated/Keeper WSD Buhrer ES 020W5 WSD Buhrer ES Totals

$773,468.00

($439,903.05)

$0.00

$333,564.95

$295,955.00

$0.00

$295,955.00

$327,167.68

$15,641.12

$342,808.80

$0.00

($9,243.85)

$333,564.95

($37,609.95)

$0.00

$333,564.95

$611,003.00

($507,841.04)

$0.00

$103,161.96

$36,430.00

$0.00

$36,430.00

$113,114.21

($2,671.81)

$110,442.40

$0.00

($7,280.44)

$103,161.96

($66,731.96)

($0.00)

$103,161.96

$536,317.00

$713,504.76

$0.00

$1,249,821.76

$1,488,812.00

$0.00

$1,488,812.00

$1,061,793.81

$194,416.60

$1,256,210.41

$0.00

($6,388.65)

$1,249,821.76

$238,990.24

$0.00

$1,249,821.76

$597,704.00

($419,030.07)

$0.00

$178,673.93

$176,105.00

$0.00

$176,105.00

$177,944.69

$7,876.45

$185,821.14

$0.00

($7,147.21)

$178,673.93

($2,568.93)

$0.00

$182,549.43

$882,889.00

($531,699.92)

$0.00

$351,189.08

$333,096.00

$0.00

$333,096.00

$359,073.40

$2,619.19

$361,692.59

$0.00

($10,503.51)

$351,189.08

($18,093.08)

$0.00

$351,189.08

$996,180.00

($632,326.87)

$0.00

$363,853.13

$275,352.00

$0.00

$275,352.00

$376,258.55

($512.56)

$375,745.99

$0.00

($11,892.86)

$363,853.13

($88,501.13)

$0.00

$363,853.13

$2,745,683.00 ($1,903,826.63)

$0.00

$841,856.37

$600,537.00

$0.00

$600,537.00

$886,324.47

($11,711.53)

$874,612.94

$0.00

($32,756.57)

$841,856.37

($241,319.37)

($0.00)

$841,856.37

$1,638,493.00 ($1,061,051.04)

$0.00

$577,441.96

$145,234.00

$0.00

$145,234.00

$536,552.24

$54,034.74

$590,586.98

$0.00

($13,145.02)

$577,441.96

($432,207.96)

$0.00

$573,315.96

$1,907,826.00 ($1,539,360.20)

$0.00

$368,465.80

$307,708.00

$0.00

$307,708.00

$405,957.21

($11,250.32)

$394,706.89

$0.00

($22,741.09)

$371,965.80

($64,257.80)

($3,500.00)

$371,965.80

OPU#353 K-5 Marion Renovated/Keeper 054W5Marion C. SelzterWSD C. Seltzer ES

054W5 WSD Marion C. Seltzer ES

Totals

OPU#436 K-5 Orchard Renovated/Keeper 065W5Orchard Science WSD

065W5 WSD Orchard

Totals

OPU#592 Renovated/Keeper 080W5Watterson-Lake K-5 WSD Watterson-Lake ES

080W5 WSD Watterson-Lake ES

Totals

OPU#328 MS Luis Munoz Renovated/Keeper 098W5Luis Munoz MarinWSD Marin

098W5 WSD Luis Munoz Marin

Totals

OPU#275 112W5Jane Addams 9-12 WSD Jane Renovated/Keeper Addams

112W5 WSD Jane Addams

Totals

OPU#292 114W5John Marshall HSWSD John Renovated/Keeper Marshall

114W5 WSD John Marshall

Totals

OPU#330 Renovated/Keeper 115W5Lincoln West HS WSD Lincoln West

115W5 WSD Lincoln West

Totals

OPU#349 116W5Max S Hayes 9-12WSD Max SRenovated/Keeper Hayes

116W5 WSD Max S Hayes

Totals

OPU#227 Ctr 117W5Halle Cleveland Lrng WSD Halle Renovated/Keeper

$798,047.00

($69,754.64)

$0.00

$728,292.36

$685,007.00

$0.00

$685,007.00

$761,317.61

($23,524.68)

$737,792.93

$0.00

($9,500.57)

$728,292.36

($43,285.36)

($0.00)

$728,292.36

Totals

$1,014,622.00

($431,204.61)

$0.00

$583,417.39

$949,806.00

$0.00

$949,806.00

$593,688.44

($12,271.17)

$581,417.27

$0.00

$2,000.12

$583,417.39

$366,388.61

$0.00

$583,417.39

Renovated/Keeper WSD Brooklawn 018W6 WSD Brooklawn Totals

$405,597.00

($1,673.96)

$0.00

$403,923.04

$367,855.00

$0.00

$367,855.00

$414,616.97

($11,464.51)

$403,152.46

$0.00

$770.58

$403,923.04

($36,068.04)

$0.00

$403,923.04

117W5 WSD Halle

Totals

OPU#036 ES Benjamin Renovated/Keeper 016W6Benjamin FranklinWSD Franklin

016W6 WSD Benjamin Franklin OPU#058 018W6Brooklawn ES

OPU#297 Renovated/Keeper 048W6Kenneth W. Clement WSD Kenneth W. Clement

Expedition 速

Report M_COST_01_00-7b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193

Project

Date: Page:

FUNDING

Description

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 3 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - RENOVATED/KEEPER BUILDINGS OPU#297 Renovated/Keeper 048W6Kenneth W. Clement WSD Kenneth W. Clement

048W6 WSD Kenneth W. Clement

Totals

$521,466.00

($200,713.99)

$0.00

$320,752.01

$363,478.00

$0.00

$363,478.00

$329,386.64

($9,669.56)

$319,717.08

$0.00

$1,034.93

$320,752.01

$42,725.99

$0.00

$320,752.01

$830,968.00

($548,295.32)

$0.00

$282,672.68

$262,186.00

$0.00

$262,186.00

$298,410.77

($17,369.25)

$281,041.52

$0.00

$1,631.16

$282,672.68

($20,486.68)

$0.00

$282,672.68

$691,469.00

$677,747.83

$0.00

$1,369,216.83

$1,035,305.00

$0.00

$1,035,305.00

$1,379,546.54

($11,703.28)

$1,367,843.26

$0.00

$1,373.57

$1,369,216.83

($333,911.83)

$0.00

$1,369,216.83

$1,522,466.00

($249,973.72)

$0.00

$1,272,492.28

$3,035,471.00

$0.00

$3,035,471.00

$1,602,723.20

($333,233.66)

$1,269,489.54

$0.00

$3,002.74

$1,272,492.28

$1,762,978.72

$0.00

$1,272,492.28

$1,833,937.00 ($1,223,579.79)

$0.00

$610,357.21

$687,767.00

$0.00

$687,767.00

$601,319.53

$5,413.51

$606,733.04

$0.00

$3,624.17

$610,357.21

$77,409.79

($0.00)

$610,357.21

$1,783,279.00

($15,151.93)

$0.00

$1,768,127.07

$1,717,379.00

$0.00

$1,717,379.00

$1,749,843.87

$14,728.95

$1,764,572.82

$0.00

$3,554.25

$1,768,127.07

($50,748.07)

$0.00

$1,768,127.07

$826,125.00

$226,673.42

$0.00

$1,052,798.42

$1,106,487.00

$0.00

$1,106,487.00

$1,046,175.69

$4,904.88

$1,051,080.57

$0.00

$1,717.85

$1,052,798.42

$53,688.58

$0.00

$1,052,798.42

$3,344,196.00 ($2,523,777.63)

$0.00

$820,418.37

$484,458.00

$0.00

$484,458.00

$781,413.89

$16,232.69

$797,646.58

$0.00

$22,771.79

$820,418.37

($335,960.37)

$0.00

$820,290.44

OPU#376 060W6MilesStandish/MWhite WSD ES MilesRenovated/Keeper Standish

060W6 WSD Miles Standish

Totals

OPU#343 MS Margaret Renovated/Keeper 099W6Margaret SpellacyWSD Spellacy M

099W6 WSD Margaret Spellacy MS

Totals

OPU#616 Renovated/Keeper 105W6Wilbur Wright MSWSD Wilbur Wright

105W6 WSD Wilbur Wright

Totals

OPU#220 109W6Glenville HS

Renovated/Keeper WSD Glenville 109W6 WSD Glenville Totals

OPU#273 HS James Renovated/Keeper 111W6James F. RhodesWSD F. Rhodes

111W6 WSD James F. Rhodes

Totals

OPU#171 ES Forest Renovated/Keeper 121W6Forest Hill Parkway WSD Hill Parkway

121W6 WSD Forest Hill Parkway

Totals

OPU#096 6-8 Renovated/Keeper 007W8Collinwood CompuTech WSD Collinwood CompuT

007W8 WSD Collinwood CompuTech

Totals

OPU#010 Bell Alexander ES Renovated/Keeper 011W8Alexander Graham WSD Graham B

011W8 WSD Alexander Graham Bell OPU#041 017W8Bolton ES

Totals

$785,112.00

($142,085.36)

$0.00

$643,026.64

$412,375.00

$0.00

$412,375.00

$589,428.26

$48,310.54

$637,738.80

$0.00

$5,287.84

$643,026.64

($230,651.64)

$0.00

$643,026.64

$474,908.00

($67,327.18)

$0.00

$407,580.82

$516,563.00

$0.00

$516,563.00

$351,579.40

$52,795.15

$404,374.55

$0.00

$3,206.27

$407,580.82

$108,982.18

$0.00

$407,580.82

$984,395.00

($139,799.30)

$0.00

$844,595.70

$655,736.00

$0.00

$655,736.00

$835,610.52

$2,355.47

$837,965.99

$0.00

$6,629.71

$844,595.70

($188,859.70)

($0.00)

$844,604.50

$517,101.00

$314,960.32

$0.00

$832,061.32

$652,474.00

$0.00

$652,474.00

$830,449.55

($1,871.83)

$828,577.72

$0.00

$3,483.60

$832,061.32

($179,587.32)

($0.00)

$832,061.32

$522,215.00

($215,247.90)

$0.00

$306,967.10

$286,794.00

$0.00

$286,794.00

$283,700.42

$19,746.29

$303,446.71

$0.00

$3,520.39

$306,967.10

($20,173.10)

($0.00)

$306,967.10

$816,063.00

$336,894.69

$0.00

$1,152,957.69

$1,530,356.00

$0.00

$1,530,356.00

$1,072,463.88

$74,999.34

$1,147,463.22

$0.00

$5,494.47

$1,152,957.69

$377,398.31

$0.00

$1,152,957.69

$592,097.00

($241,805.49)

$0.00

$350,291.51

$295,223.00

$0.00

$295,223.00

$336,426.09

$9,834.47

$346,260.56

$0.00

$4,030.95

$350,291.51

($55,068.51)

$0.00

$350,291.51

$303,562.00

($124,004.41)

$0.00

$179,557.59

$246,712.00

$0.00

$246,712.00

$172,005.45

$5,408.39

$177,413.84

$0.00

$2,143.75

$179,557.59

$67,154.41

($0.00)

$179,548.79

$0.00 $37,195,257.70

$44,360,019.00

$0.00 $44,360,019.00

$38,282,801.57

($528,223.51) $37,754,578.06

$0.00

($555,820.36)

$37,198,757.70

$7,161,261.30

($3,500.00)

$37,193,917.00

Renovated/Keeper WSD Bolton

017W8 WSD Bolton

Totals

OPU#225 Renovated/Keeper 040W8Gracemount ES WSD Gracemount

040W8 WSD Gracemount

Totals

OPU#294 046W8John W. Raper ESWSD John Renovated/Keeper W. Raper

046W8 WSD John W. Raper OPU#548 075W8Union ES

Totals

WSD UnionRenovated/Keeper

075W8 WSD Union

Totals

OPU#078 Renovated/Keeper 093W8Charles Eliot K-8 WSD Charles W. Eliot

093W8 WSD Charles W. Eliot OPU#124 120W8Dike Pre-K - 8

Totals

WSD Dike Renovated/Keeper

120W8 WSD Dike

Totals

OPU#020 124W8Jesse Owens Academy WSD JesseRenovated/Keeper Owens Academ

124W8 WSD Jesse Owens Academy

Totals

TYPE TOTALS

$64,772,695.00 ($27,577,437.30)

WSD - NON-KEEPER BUILDINGS OPU#636 ES Buckeye-Woodland Non-Keeper 019W4Buckeye-Woodland WSD

$489,508.00

($419,794.43)

$0.00

$69,713.57

$90,006.00

$0.00

$90,006.00

$80,433.04

($5,165.22)

$75,267.82

$0.00

($5,554.25)

$69,713.57

$20,292.43

$0.00

$69,713.57

$466,641.00

($202,756.75)

$0.00

$263,884.25

$389,195.00

$0.00

$389,195.00

$305,602.06

($36,387.61)

$269,214.45

$0.00

($5,330.20)

$263,884.25

$125,310.75

$0.00

$263,884.25

Totals

$174,525.00

($39,576.37)

$0.00

$134,948.63

$133,972.00

$0.00

$133,972.00

$140,902.02

($3,957.44)

$136,944.58

$0.00

($1,995.95)

$134,948.63

($976.63)

$0.00

$134,948.63

WSD Cranwood Non-Keeper 028W4 WSD Cranwood Totals

$194,027.00

($35,322.99)

$0.00

$158,704.01

$196,553.00

$0.00

$196,553.00

$161,347.86

($424.03)

$160,923.83

$0.00

($2,219.82)

$158,704.01

$37,848.99

$0.00

$158,704.01

019W4 WSD Buckeye-Woodland

Totals

OPU#077 Non-Keeper 023W4Charles Dickens ES WSD Charles Dickens

023W4 WSD Charles Dickens

Totals

OPU#079 024W4Charles H. Lake ES WSD Charles H. Non-Keeper Lake

024W4 WSD Charles H. Lake OPU#107 028W4Cranwood ES

OPU#109 ES Daniel E. Morgan Non-Keeper 029W4Daniel E. MorganWSD

Expedition 速

Report M_COST_01_00-7b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193

FUNDING

Description

Project

Date: Page:

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 4 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - NON-KEEPER BUILDINGS OPU#109 ES Daniel E. Morgan Non-Keeper 029W4Daniel E. MorganWSD Totals

$133,952.00

($82,175.65)

$0.00

$51,776.35

$0.00

$0.00

$0.00

$49,086.19

$4,222.24

$53,308.43

$0.00

($1,532.08)

$51,776.35

($51,776.35)

($0.00)

$51,776.35

WSD East Clark Non-Keeper 032W4 WSD East Clark Totals

$562,609.00

($276,418.69)

$0.00

$286,190.31

$337,117.00

$0.00

$337,117.00

$318,886.38

($26,303.51)

$292,582.87

$0.00

($6,392.56)

$286,190.31

$50,926.69

$0.00

$286,190.31

$268,498.00

($108,223.39)

$0.00

$160,274.61

$83,945.00

$0.00

$83,945.00

$171,373.34

($8,038.53)

$163,334.81

$0.00

($3,060.20)

$160,274.61

($76,329.61)

($0.00)

$160,274.61

$510,520.00

($192,828.81)

$0.00

$317,691.19

$263,427.00

$0.00

$263,427.00

$346,187.95

($22,662.57)

$323,525.38

$0.00

($5,834.19)

$317,691.19

($54,264.19)

$0.00

$317,670.63

$525,211.00

($216,661.07)

$0.00

$308,549.93

$260,601.00

$0.00

$260,601.00

$329,446.87

($14,935.07)

$314,511.80

$0.00

($5,961.87)

$308,549.93

($47,948.93)

($0.00)

$308,549.93

$133,596.00

($113,671.03)

$0.00

$19,924.97

$14,547.00

$0.00

$14,547.00

$22,591.81

($1,157.76)

$21,434.05

$0.00

($1,509.08)

$19,924.97

($5,377.97)

$0.00

$19,924.97

$147,875.00

($51,485.52)

$0.00

$96,389.48

$111,440.00

$0.00

$111,440.00

$103,607.93

($5,519.78)

$98,088.15

$0.00

($1,698.67)

$96,389.48

$15,050.52

($0.00)

$96,389.48

$205,517.00

($49,082.48)

$0.00

$156,434.52

$212,414.00

$0.00

$212,414.00

$151,893.87

$6,898.97

$158,792.84

$0.00

($2,358.32)

$156,434.52

$55,979.48

$0.00

$152,940.77

$1,274,115.00 ($1,123,875.11)

$0.00

$150,239.89

$84,000.00

$0.00

$84,000.00

$178,922.84

($14,175.07)

$164,747.77

$0.00

($14,507.88)

$150,239.89

($66,239.89)

$0.00

$150,239.89

029W4 WSD Daniel E. Morgan OPU#148 032W4East Clark ES

OPU#168 035W4Euclid Park ES

WSD Euclid ParkNon-Keeper ES 035W4 WSD Euclid Park ES Totals

OPU#200 039W4Giddings ES

WSD Giddings Non-Keeper 039W4 WSD Giddings Totals

OPU#252 Non-Keeper 041W4H.W. Longfellow ES WSD HW Longfellow

041W4 WSD HW Longfellow

Totals

OPU#229 ES Hannah Gibbons Non-Keeper 042W4Hannah Gibbons WSD

042W4 WSD Hannah Gibbons

Totals

OPU#094 Non-Keeper 045W4J.D. Rockefeller ES WSD JD Rockefeller

045W4 WSD JD Rockefeller

Totals

OPU#339 Non-Keeper 051W4Louis Pasteur ESWSD Louis Pasteur

051W4 WSD Louis Pasteur OPU#396 062W4Mound ES

WSD Mound

062W4 WSD Mound

Totals Non-Keeper Totals

OPU#452 Non-Keeper 067W4Paul Revere ES WSD Paul Revere

$874,627.00

($446,513.69)

$0.00

$428,113.31

$536,115.00

$0.00

$536,115.00

$463,613.06

($25,522.02)

$438,091.04

$0.00

($9,977.73)

$428,113.31

$108,001.69

$0.00

$428,113.31

$493,631.00

($204,634.55)

$0.00

$288,996.45

$308,156.00

$0.00

$308,156.00

$321,918.60

($27,316.73)

$294,601.87

$0.00

($5,605.42)

$288,996.45

$19,159.55

($0.00)

$288,995.45

$859,731.00

($449,094.42)

$0.00

$410,636.58

$431,404.00

$0.00

$431,404.00

$412,363.00

$8,065.63

$420,428.63

$0.00

($9,792.05)

$410,636.58

$20,767.42

$0.00

$410,636.58

$795,590.00

($524,886.01)

$0.00

$270,703.99

$244,012.00

$0.00

$244,012.00

$300,535.99

($20,818.83)

$279,717.16

$0.00

($9,013.17)

$270,703.99

($26,691.99)

$0.00

$270,703.99

$139,527.00

($42,767.58)

$0.00

$96,759.42

$82,905.00

$0.00

$82,905.00

$107,200.70

($10,696.87)

$96,503.83

$0.00

$255.59

$96,759.42

($13,854.42)

($0.00)

$96,759.42

$195,012.00

($91,929.88)

$0.00

$103,082.12

$101,639.00

$0.00

$101,639.00

$110,813.40

($8,125.34)

$102,688.06

$0.00

$394.06

$103,082.12

($1,443.12)

($0.00)

$103,082.12

$253,030.00

$15,498.46

$0.00

$268,528.46

$153,461.00

$0.00

$153,461.00

$271,243.78

($3,237.08)

$268,006.70

$0.00

$521.76

$268,528.46

($115,067.46)

($0.00)

$268,528.46

Totals

$1,393,283.00

$370,095.98

$0.00

$1,763,378.98

$1,642,277.00

$0.00

$1,642,277.00

$1,774,853.91

($14,238.08)

$1,760,615.83

$0.00

$2,763.15

$1,763,378.98

($121,101.98)

$0.00

$1,762,508.98

WSD Riverside Non-Keeper 009W7 WSD Riverside Totals

$400,627.00

($400,627.00)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$316,528.00

($193,780.29)

$0.00

$122,747.71

$217,280.00

$0.00

$217,280.00

$118,716.93

$2,283.57

$121,000.50

$0.00

$1,747.21

$122,747.71

$94,532.29

$0.00

$122,747.71

$130,530.00

($12,289.33)

$0.00

$118,240.67

$236,481.00

$0.00

$236,481.00

$106,766.01

$9,747.62

$116,513.63

$0.00

$1,727.04

$118,240.67

$118,240.33

$0.00

$118,240.67

$50,403.00

$23,290.82

$0.00

$73,693.82

$178,719.00

$0.00

$178,719.00

$57,665.62

$14,298.70

$71,964.32

$0.00

$1,729.50

$73,693.82

$105,025.18

$0.00

$73,693.82

067W4 WSD Paul Revere

Totals

OPU#486 Non-Keeper 069W4Robert Fulton ESWSD Robert Fulton

069W4 WSD Robert Fulton OPU#005 087W4Albert B. Hart MSWSD A.B. Hart

087W4 WSD A.B. Hart

Totals Non-Keeper Totals

OPU#411 Non-Keeper 100W4Nathan Hale MS WSD Nathan Hale

100W4 WSD Nathan Hale

Totals

OPU#004 Non-Keeper 010W6Adlai Stevenson ES WSD Adlai Stevenson

010W6 WSD Adlai Stevenson OPU#104 027W6Corlett ES

WSD Corlett

027W6 WSD Corlett

Totals Non-Keeper Totals

OPU#165 Academy Non-Keeper 033W6Emile B. deSauzeWSD Emile B. deSauze

033W6 WSD Emile B. deSauze

Totals

OPU#388 ES Moses Cleveland Non-Keeper 061W6Moses ClevelandWSD

061W6 WSD Moses Cleveland OPU#485 009W7Riverside ES

OPU#023 Non-Keeper 015W7Artemus Ward ESWSD Artimus Ward

015W7 WSD Artimus Ward OPU#112 030W7Denison ES

WSD Denison

030W7 WSD Denison

Totals Non-Keeper Totals

OPU#130 ES Douglas MacArthur Non-Keeper 031W7Douglas MacArthur WSD

031W7 WSD Douglas MacArthur OPU#188 037W7Garfield ES

Expedition 速

Totals

WSD Garfield ESNon-Keeper

Report M_COST_01_00-7b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193

Project

Date: Page:

FUNDING

Description

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 5 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - NON-KEEPER BUILDINGS OPU#188 037W7Garfield ES

WSD Garfield ESNon-Keeper 037W7 WSD Garfield ES Totals

$272,800.00

($224,136.86)

$0.00

$48,663.14

$56,347.00

$0.00

$56,347.00

$49,291.94

($2,347.48)

$46,944.46

$0.00

$1,718.68

$48,663.14

$7,683.86

$0.00

$48,663.14

Totals

$449,260.00

($389,154.28)

$0.00

$60,105.72

$44,493.00

$0.00

$44,493.00

$61,171.19

($2,796.76)

$58,374.43

$0.00

$1,731.29

$60,105.72

($15,612.72)

$0.00

$60,105.72

Non-Keeper WSD McKinley ES 057W7 WSD McKinley ES Totals

$264,576.00

($152,339.60)

$0.00

$112,236.40

$49,803.00

$0.00

$49,803.00

$65,989.49

$44,493.82

$110,483.31

$0.00

$1,753.09

$112,236.40

($62,433.40)

$0.00

$112,236.40

Totals

$126,099.00

($126,099.00)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

WSD R.G. JonesNon-Keeper Elementa 068W7 WSD R.G. Jones Elementary Totals

$384,446.00

($84,024.65)

$0.00

$300,421.35

$426,979.00

$0.00

$426,979.00

$298,988.52

($291.82)

$298,696.70

$0.00

$1,724.65

$300,421.35

$126,557.65

($0.00)

$300,421.35

$215,918.00

($61,235.92)

$0.00

$154,682.08

$220,529.00

$0.00

$220,529.00

$152,567.26

$377.66

$152,944.92

$0.00

$1,737.16

$154,682.08

$65,846.92

$0.00

$154,682.08

$434,181.00

$19,738.40

$0.00

$453,919.40

$546,647.00

$0.00

$546,647.00

$512,031.56

($59,833.66)

$452,197.90

$0.00

$1,721.50

$453,919.40

$92,727.60

$0.00

$453,919.40

$219,632.00

($96,934.34)

$0.00

$122,697.66

$153,683.00

$0.00

$153,683.00

$113,244.97

$7,727.82

$120,972.79

$0.00

$1,724.87

$122,697.66

$30,985.34

($0.00)

$122,697.66

$481,565.00

($313,390.55)

$0.00

$168,174.45

$364,498.00

$0.00

$364,498.00

$148,747.30

$17,686.51

$166,433.81

$0.00

$1,740.64

$168,174.45

$196,323.55

$0.00

$168,174.45

$640,763.00

($511,022.43)

$0.00

$129,740.57

$251,503.00

$0.00

$251,503.00

$122,027.63

$5,958.14

$127,985.77

$0.00

$1,754.80

$129,740.57

$121,762.43

$0.00

$129,740.57

$595,655.00

($420,958.91)

$0.00

$174,696.09

$146,886.00

$0.00

$146,886.00

$140,714.46

$32,253.74

$172,968.20

$0.00

$1,727.89

$174,696.09

($27,810.09)

$0.00

$174,696.09

$417,156.00

$8,716.47

$0.00

$425,872.47

$478,521.00

$0.00

$478,521.00

$247,196.96

$176,921.32

$424,118.28

$0.00

$1,754.19

$425,872.47

$52,648.53

$0.00

$425,872.47

$767,244.00

($451,358.37)

$0.00

$315,885.63

$690,307.00

$0.00

$690,307.00

$323,174.89

($4,958.67)

$318,216.22

$0.00

$1,739.41

$319,955.63

$370,351.37

($4,070.00)

$319,955.63

$598,908.00

($245,126.26)

$0.00

$353,781.74

$765,628.00

$0.00

$765,628.00

$314,832.67

$37,211.16

$352,043.83

$0.00

$1,737.91

$353,781.74

$411,846.26

$0.00

$353,781.74

$132,461.00

($104,417.18)

$0.00

$28,043.82

$46,167.00

$0.00

$46,167.00

$26,288.67

($8.34)

$26,280.33

$0.00

$1,763.49

$28,043.82

$18,123.18

$0.00

$28,043.82

$246,818.00

($106,304.72)

$0.00

$140,513.28

$182,585.00

$0.00

$182,585.00

$133,023.89

$5,848.39

$138,872.28

$0.00

$1,641.00

$140,513.28

$42,071.72

($0.00)

$140,513.28

$419,836.00

$59,676.46

$0.00

$479,512.46

$552,614.00

$0.00

$552,614.00

$458,736.38

$7,492.62

$466,229.00

$0.00

$13,283.46

$479,512.46

$73,101.54

$0.00

$471,992.97

$404,205.00

($151,101.94)

$0.00

$253,103.06

$223,831.00

$0.00

$223,831.00

$243,822.35

($3,496.11)

$240,326.24

$0.00

$12,796.60

$253,122.84

($29,291.84)

($19.78)

$250,580.87

Totals

$495,697.00

$912.33

$0.00

$496,609.33

$598,761.00

$0.00

$598,761.00

$477,048.23

$3,871.94

$480,920.17

$0.00

$15,689.16

$496,609.33

$102,151.67

($0.00)

$485,377.81

WSD Fullerton Non-Keeper 036W9 WSD Fullerton Totals

$208,648.00

($51,184.02)

$0.00

$157,463.98

$165,062.00

$0.00

$165,062.00

$152,676.06

($1,803.42)

$150,872.64

$0.00

$6,591.34

$157,463.98

$7,598.02

($0.00)

$156,112.50

$270,839.00

($92,190.65)

$0.00

$178,648.35

$221,169.00

$0.00

$221,169.00

$171,402.99

($914.58)

$170,488.41

$0.00

$8,559.94

$179,048.35

$42,120.65

($400.00)

$176,396.12

OPU#338 Non-Keeper 050W7Louis Agassiz ESWSD Louis Agassiz

050W7 WSD Louis Agassiz OPU#352 057W7McKinley ES

OPU#451 Non-Keeper 066W7Paul L. Dunbar ESWSD Paul L. Dunbar

066W7 WSD Paul L. Dunbar OPU#487 068W7R.G. Jones ES

OPU#544 074W7Tremont ES

WSD Tremont ESNon-Keeper 074W7 WSD Tremont ES Totals

OPU#550 076W7Valley View ES

WSD Valley ViewNon-Keeper 076W7 WSD Valley View Totals

OPU#560 078W7Walton ES

WSD Walton

078W7 WSD Walton

Non-Keeper Totals

OPU#622 ES Non-Keeper 082W7WSD William C. Bryant WSD William Cullen Bryan

082W7 WSD William Cullen Bryant

Totals

OPU#621 ES William R. Harper Non-Keeper 083W7William R. HarperWSD

083W7 WSD William R. Harper

Totals

OPU#080 MS Charles A. Non-Keeper 092W7Charles A. Mooney WSD Mooney

092W7 WSD Charles A. Mooney

Totals

OPU#412 Non-Keeper 101W7Nathaniel Hawthorne WSDESNathaniel Hawthorne

101W7 WSD Nathaniel Hawthorne

Totals

OPU#536 MS Thomas Jefferson Non-Keeper 103W7Thomas JeffersonWSD

103W7 WSD Thomas Jefferson OPU#624 106W7Wilson MS

WSD Wilson

106W7 WSD Wilson

Totals Non-Keeper Totals

OPU#224 K-8 H. Barbara Non-Keeper 122W7H. Barbara Booker WSD Booker

122W7 WSD H. Barbara Booker

Totals

OPU#021 Non-Keeper 014W8Anton Grdina ES WSD Anton Grdina

014W8 WSD Anton Grdina

Totals

OPU#016 ES Andrew J Rickoff Non-Keeper 004W9Andrew J. RickoffWSD

004W9 WSD Andrew J Rickoff

Totals

OPU#003 ES Alfred A. Benesch Non-Keeper 012W9Alfred A. BeneschWSD

012W9 WSD Alfred A. Benesch

Totals

OPU#164 ESEmpire CompuTech Non-Keeper 034W9Empire CompuTech WSD

034W9 WSD Empire CompuTech OPU#184 036W9Fullerton ES

OPU#198 ES George W. Non-Keeper 038W9George W. CarverWSD Carver

038W9 WSD George W. Carver

Totals

OPU#240 Non-Keeper 043W9Harvey Rice ES WSD Harvey Rice

Expedition 速

Report M_COST_01_00-7b


District IRN 43786

SEGMENT WSD - GROUPED BY RENOVATED and NON-KEEPER BUILDINGS District: Cleveland Metropolitan Schools OSFC Proj No. 193

Project

Date: Page:

FUNDING

Description

Original Proj Agreement Budget

Approved NOI Changes

PHASE ESTIMATE

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 6 of 6

STATUS

Pending Changes

Potential Costs

Projected Commitment

Est. to Compl.

Projected Variance

Projected Remaining Proj Agmt Funds

Cost to Date

Proj Budget vs Proj Committed

Billed to Date

WSD - NON-KEEPER BUILDINGS OPU#240 Non-Keeper 043W9Harvey Rice ES WSD Harvey Rice

$924,843.00

($88,737.90)

$0.00

$836,105.10

$858,048.00

$0.00

$858,048.00

$769,501.62

$37,264.53

$806,766.15

$0.00

$29,338.95

$836,105.10

$21,942.90

$0.00

$798,302.93

Totals

$584,236.00

($151,565.68)

$0.00

$432,670.32

$463,811.00

$0.00

$463,811.00

$397,879.46

$16,682.93

$414,562.39

$0.00

$18,507.93

$433,070.32

$30,740.68

($400.00)

$426,757.81

WSD Kentucky Non-Keeper 049W9 WSD Kentucky Totals

$199,861.00

($69,395.18)

$0.00

$130,465.82

$110,998.00

$0.00

$110,998.00

$125,831.16

($1,732.23)

$124,098.93

$0.00

$6,366.89

$130,465.82

($19,467.82)

$0.00

$129,897.90

$220,495.00

($46,336.94)

$0.00

$174,158.06

$177,377.00

$0.00

$177,377.00

$158,723.78

$8,463.76

$167,187.54

$0.00

$6,970.52

$174,158.06

$3,218.94

$0.00

$173,775.61

Totals

$752,456.00

($240,041.11)

$0.00

$512,414.89

$574,884.00

$0.00

$574,884.00

$489,263.99

($287.18)

$488,976.81

$0.00

$23,838.08

$512,814.89

$62,069.11

($400.00)

$503,448.47

WSD Miles Park Non-Keeper 059W9 WSD Miles Park Totals

$291,853.00

($244,335.36)

$0.00

$47,517.64

$193,204.00

$0.00

$193,204.00

$201,285.45

($162,994.31)

$38,291.14

$0.00

$9,226.50

$47,517.64

$145,686.36

$0.00

$199,406.62

$480,010.00

$13,439.65

$0.00

$493,449.65

$510,919.00

$0.00

$510,919.00

$467,684.08

$10,560.31

$478,244.39

$0.00

$15,205.26

$493,449.65

$17,469.35

$0.00

$485,191.95

$138,025.00

$61,324.94

$0.00

$199,349.94

$286,257.00

$0.00

$286,257.00

$354,639.97

$38,642.54

$393,282.51

$0.00

$4,375.31

$397,657.82

($111,400.82)

($198,307.88)

$397,191.45

$141,699.00

$15,223.52

$0.00

$156,922.52

$171,153.00

$0.00

$171,153.00

$148,476.59

$4,355.89

$152,832.48

$0.00

$4,490.04

$157,322.52

$13,830.48

($400.00)

$154,858.99

Totals

$837,122.00

$280,796.82

$0.00

$1,117,918.82

$1,166,184.00

$0.00

$1,166,184.00

$1,017,868.63 ($1,259,520.01)

($241,651.38)

$0.00

$26,555.11

($215,096.27)

$1,381,280.27

$1,333,015.09

($221,283.04)

WSD Audubon Non-Keeper 089W9 WSD Audubon Totals

$604,663.00

$57,896.81

$0.00

$662,559.81

$552,832.00

$0.00

$552,832.00

$584,765.29

$63,898.34

$648,663.63

$0.00

$13,896.18

$662,559.81

($109,727.81)

$0.00

$647,672.41

$268,625.00

$6,362.03

$0.00

$274,987.03

$260,965.00

$0.00

$260,965.00

$220,292.43

$46,567.47

$266,859.90

$0.00

$8,527.13

$275,387.03

($14,422.03)

($400.00)

$268,064.64

$333,183.00

($161,104.14)

$0.00

$172,078.86

$137,170.00

$0.00

$137,170.00

$164,440.40

($2,879.14)

$161,561.26

$0.00

$10,517.60

$172,078.86

($34,908.86)

($0.00)

$170,957.88

$407,735.00

($70,574.62)

$0.00

$337,160.38

$308,218.00

$0.00

$308,218.00

$325,428.65

($1,188.61)

$324,240.04

$0.00

$12,920.34

$337,160.38

($28,942.38)

$0.00

$336,103.41

$635,273.00

($11,789.10)

$0.00

$623,483.90

$830,129.00

$0.00

$830,129.00

$619,701.80

($16,358.21)

$603,343.59

$0.00

$20,140.31

$623,483.90

$206,645.10

($0.00)

$607,000.66

$523,210.00

($14,125.01)

$0.00

$509,084.99

$659,224.00

$0.00

$659,224.00

$451,529.71

$40,912.67

$492,442.38

$0.00

$16,641.14

$509,083.52

$150,140.48

$1.47

$500,643.47

$16,226,083.03

$3,530,968.97

$1,128,618.90

$16,227,173.14

$53,424,840.73 $10,692,230.27

$1,125,118.90

$53,421,090.14

043W9 WSD Harvey Rice

Totals

OPU#295 ES Joseph F. Landis Non-Keeper 047W9Joseph F. LandisWSD

047W9 WSD Joseph F. Landis OPU#301 049W9Kentucky ES

OPU#345 ES Margaret A.Non-Keeper 053W9Margaret A. Ireland Ireland WSD

053W9 WSD Margaret A. Ireland OPU#368 058W9Miles ES

Totals Non-Keeper

WSD Miles

058W9 WSD Miles OPU#372 059W9Miles Park ES

OPU#400 Non-Keeper 063W9Mount Auburn ESWSD Mount Auburn

063W9 WSD Mount Auburn

Totals

OPU#525 ES Stephen E. Non-Keeper 072W9Stephen E. HoweWSD Howe

072W9 WSD Stephen E. Howe

Totals

OPU#638 Non-Keeper 086W9Woodland Hills ES WSD Woodland Hills ES

086W9 WSD Woodland Hills ES

Totals

OPU#009 MSAlexander Hamilton Non-Keeper 088W9Alexander Hamilton WSD

088W9 WSD Alexander Hamilton OPU#024 089W9Audubon K-8

OPU#066 Non-Keeper 090W9Carl F. Shuler MSWSD Carl F. Shuler

090W9 WSD Carl F. Shuler OPU#076 091W9Central MS

Totals

WSD Central

091W9 WSD Central

Non-Keeper Totals

OPU#802 Non-Keeper 095W9Garrett Morgan MS WSD Garrett Morgan

095W9 WSD Garrett Morgan

Totals

OPU#448 Non-Keeper 102W9Patrick Henry MSWSD Patrick Henry

102W9 WSD Patrick Henry

Totals

OPU#428 Non-Keeper 127W9Oliver H. Perry ESWSD Oliver H. Perry

127W9 WSD Oliver H. Perry

Totals

TYPE TOTALS

$26,379,109.00 ($9,024,407.07)

$0.00 $17,354,701.93

$19,757,052.00

$0.00 $19,757,052.00

$17,116,263.58 ($1,117,383.78) $15,998,879.80

$0.00

$227,203.23

WSD PROJECT TOTALS

$91,151,804.00 ($36,601,844.37)

$0.00

$64,117,071.00

$0.00 $64,117,071.00

$55,399,065.15 ($1,645,607.29) $53,753,457.86

$0.00

($328,617.13)

$54,549,959.63

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

$1,125,118.90

The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project.

1. The unused WSD CM FEE dollars were transferred to the TYPICAL projects to account for the CM FEE overruns within the Typical projects MAINTAINING THE CURRENT CM CONTRACT VALUE. The Budget per building will be adjusted to accommodate this change maintaining the current CM Contract Value.

Expedition 速

Report M_COST_01_00-7b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 02/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 1

STATUS

Pending Changes

Potential Costs

Projected Committment

Phase Estimate Variance

Est. to Compl.

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#372 008P2Mile Park ES

008P2

Miles Park K-8 Demolition Miles Park K-8 Demolition Totals

$0.00

$412,803.88

$10,521,067.82

$0.00

$412,803.88

$750,000.00

$0.00

$750,000.00

$380,466.67

$2,710,638.60

$0.00 $13,231,706.42

$12,345,840.00

$734,727.00 $13,080,567.00

$8,725,568.70

$1,631,221.18

$0.00 $10,356,789.88

$9,516,639.00

$97,727.00

$8,233,832.62

$1,636,714.59

$0.00

$9,870,547.21

$9,514,121.00

$0.00

Totals

$11,995,657.43

$3,359,931.56

$0.00 $15,355,588.99

$12,941,699.70

Totals

$10,163,223.35($10,122,942.11)

$62,337.21

$442,803.88

$0.00

$0.00

$442,803.88

($337,196.12)

($30,000.00)

$442,803.88 100%

$12,684,385.47

$912,697.69 $13,597,083.16

$0.00

$0.00 $13,597,083.16

$151,139.42

($365,376.74) $13,595,950.39 100%

$9,614,366.00

$9,739,242.88

$737,727.03 $10,476,969.91

$0.00

$0.00 $10,476,969.91

$742,423.88

($120,180.03) $10,476,970.51 100%

$9,514,121.00

$8,903,088.20

$936,903.56

$9,839,991.76

$0.00

$0.00

$9,839,991.76

$356,426.21

$669,541.00 $13,611,240.70

$13,985,726.46

$1,560,765.34 $15,546,491.80

$0.00

$0.00 $15,546,491.80

$1,744,348.29

$40,278.11

$0.00

$0.00

$40,278.11

$40,281.24

$3,515,805.69 $16,196,012.34

$0.00

$0.00 $16,196,012.34

$1,714,434.99

OPU#109 ES 029P1Daniel E. MorganDaniel Morgan New K-8

029P1

Daniel Morgan New K-8

Totals

OPU#229 ES 042P1Hannah GibbonsHannah Gibbons New K-8

042P1

Hannah Gibbons New K-8

Totals

OPU#350 ES M. Bethune Renovation/ 056P1Mary M. BethuneMary

056P1

Mary M. Bethune Renovation/Add Totals

$30,555.45

$9,820,549.66 100%

OPU#572 059P1Warner New K-8 Warner New K-8

059P1

Warner New K-8

($190,902.81) $15,543,391.33 100%

OPU#396 062P1Mound K-8

062P1

Mound New K-8 Mound New K-8

$0.00

$40,281.24

$0.00

$0.00 $15,454,616.99

$13,740,182.00

$0.00

$0.00

$40,278.11

$0.00 $13,740,182.00

$12,680,206.65

$0.00

$3.13

$40,277.67 100%

OPU#172 MS D. Roosevelt Renova 094P1Franklin D. Roosevelt Franklin

094P1

Franklin D. Roosevelt Renovation Totals

$11,890,993.50

$3,563,623.49

($741,395.35) $16,193,356.44 100%

OPU#028 ES/MS Relief New K-8 103P1Thomas Jefferson Westside

103P1

Westside Relief New K-8

Totals

$14,581,231.17($14,407,505.37)

$0.00

$173,725.80

$0.00

Totals

$12,073,275.97($11,845,934.67)

$0.00

$227,341.30

$0.00 $24,888,506.05

$0.00

$0.00

$173,722.67

$0.00

$173,722.67

$0.00

$0.00

$173,722.67

$173,725.80

$3.13

$173,722.07 100%

$14,867,619.00

$0.00 $14,867,619.00

$1,191,684.24

($646,129.85)

$545,554.39

$0.00

$0.00

$545,554.39 ($14,640,277.70)

($318,213.09)

$540,523.78 99%

$22,030,822.00

$250,000.00 $22,280,822.00

$21,977,793.72

$3,025,076.86 $25,002,870.58

$0.00

$0.00 $25,002,870.58

OPU#624 106P1Willson ES/MS

106P1

Willson New K-8 Willson New K-8

OPU#273 HS 111P1James F. RhodesJames F. Rhodes Renovation

111P1

James F. Rhodes Renovation

Totals

$18,778,238.29

$6,110,267.76

$2,607,684.05

($114,364.53) $24,999,628.58 100%

OPU#030 HS 114P1West Side Relief West Side Relief New HS

114P1

West Side Relief New HS

Totals

$38,581,969.92($38,054,175.46)

$0.00

$527,794.46

$0.00

$0.00

$0.00

$927,776.83

$0.00

$927,776.83

$0.00

$0.00

$927,776.83

$527,794.46

($399,982.37)

$927,776.42 100%

$24,619,783.27($23,797,296.36)

$0.00

$822,486.91

$0.00

$0.00

$0.00

$822,483.78

$0.00

$822,483.78

$0.00

$0.00

$822,483.78

$822,486.91

$3.13

$822,482.86 100%

$0.00

$9,063,521.34

$8,251,302.00

$111,412.00

$8,362,714.00

$8,284,875.84

$735,924.59

$9,020,800.43

$0.00

$0.00

$9,020,800.43

$700,807.34

$42,720.91

$9,020,799.48 100%

$91,791,731.52 $10,841,108.12 $102,632,839.64

$0.00

$0.00 $102,632,839.64 ($5,395,921.23) ($2,207,129.17) $102,598,233.07 100%

OPU#349 116P1Max S.Hayes Vocational Max S. HS Hayes Renovation

116P1

Max S. Hayes Renovation

Totals

OPU#347 123P1Mary B. Martin ES/MS Mary B. Martin Renovation

123P1

Mary B. Martin Renovation

$8,237,988.86 $825,532.48 Totals $178,402,830.90($77,977,120.43)

GROUP TOTALS

$0.00 $100,425,710.47 $103,958,224.70 $1,863,407.00$105,821,631.70

LFI OPU#624 106X1Willson MS

106X1

Willson - LFI Demolition Phas Willson - LFI Demolition Phase 1 Totals GROUP TOTALS

$0.00 $0.00

$0.00 $0.00

SEGMENT PROJECT TOTALS $178,402,830.90 ($77,977,120.43)

$0.00

$0.00

$0.00

$0.00

$0.00

$247,044.41

$68,815.97

$315,860.38

$0.00

$0.00

$315,860.38

$0.00

($315,860.38)

$315,860.38 100%

$0.00

$0.00

$0.00

$0.00

$247,044.41

$68,815.97

$315,860.38

$0.00

$0.00

$315,860.38

$0.00

($315,860.38)

$315,860.38 100%

$0.00 $100,425,710.47 $103,958,224.70 $1,863,407.00 $105,821,631.70 $92,038,775.93 $10,909,924.09 $102,948,700.02

$0.00

$0.00 $102,948,700.02 ($5,395,921.23) ($2,522,989.55) $102,914,093.45 100%

$0.00

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

Expedition速

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($2,522,989.55)

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 03/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#023 015P1Artemus Ward ESArtemus Ward New K-8

015P1

$11,439,192.26

$2,029,618.33

$250,380.58

$104,470.42

Totals

$9,773,213.22

$3,528,948.77

Buhrer Abate/Demo Buhrer Abate/Demo Totals

$204,693.20

$288,338.78

$11,454,443.79

$2,295,551.53

Artemus Ward New K-8

Totals

$0.00 $13,468,810.59

$14,126,234.91

$0.00 $14,126,234.91

$13,068,156.77

$639,252.72 $13,707,409.49

$0.00

$0.00 $13,707,409.49

($657,424.32)

($41,241.00)

$354,851.00

$0.00

$0.00

$354,851.00

($78,847.36)

$448,359.28 $13,238,742.68

$0.00

$0.00 $13,238,742.68

$753,281.12

$492,829.48

$0.00

$0.00

$492,829.48

($30,632.15)

$556,964.06 $14,226,325.02

$0.00

$0.00 $14,226,325.02

($522,734.90)

$480,616.35

$0.00

$0.00

$480,616.35

($67,161.58)

$932,280.68 $14,926,899.88

$0.00

$0.00 $14,926,899.88

$419,236.99

$305,007.46

$0.00

$0.00

$305,007.46

($38,359.70)

$1,322,805.30 $15,892,384.24

$0.00

$0.00 $15,892,384.24

($130,194.24)

$525,887.00

$0.00

$0.00

$525,887.00

($58,539.40)

$707,466.10 $13,561,068.06

$0.00

$0.00 $13,561,068.06

($537,232.44)

($53,067.39)

$292,487.61

$0.00

$0.00

$292,487.61

($60,079.11)

$654,221.78 $15,062,015.86

$0.00

$0.00 $15,062,015.86

($357,072.66)

($238,598.90) $13,707,401.30 100%

OPU#023 015P2Artemus Ward

015P2

Artemus Ward Abate/Demo Artemus Ward Abate/Demo Totals

$0.00

$354,851.00

$433,698.36

$0.00 $13,302,161.99

$12,548,880.87

$0.00

$433,698.36

$396,092.00

$0.00 $12,548,880.87

$12,790,383.40

$0.00

$354,851.00 100%

OPU#064 020P1Buhrer ES

020P1

Buhrer New K-8 Buhrer New K-8

$63,419.31 $13,238,742.68 100%

OPU#064 020P2Buhrer ES

020P2

$0.00

$493,031.98

$523,664.13

$0.00 $13,749,995.32

$14,272,730.22

$0.00

$523,664.13

$501,945.00

$0.00 $14,272,730.22

$13,669,360.96

($9,115.52)

$202.50

$492,829.48 100%

OPU#148 032P1East Clark ES

032P1

East Clark New K-8 East Clark New K-8 Totals

($476,329.70) $14,226,256.98 100%

OPU#148 032P2East Clark ES

032P2

East Clark Abate/Demo East Clark Abate/Demo Totals

$2,437,933.40 ($1,971,828.40)

$0.00

$466,105.00

$533,266.58 $14,160,346.86

$0.00

$533,266.58

$462,446.35

$0.00 $14,160,346.86

$13,994,619.20

$18,170.00

($14,511.35)

$480,616.35 100%

OPU#188 037P1Garfield ES

037P1

Garfield New K-8 Garfield New K-8

Totals

$10,986,186.85

$3,593,397.00

$0.00 $14,579,583.85

Garfield Abate/Demo Garfield Abate/Demo Totals

$624,133.11

($321,701.56)

$0.00

$302,431.55

$340,791.25

$11,433,030.34

$4,231,766.02

$0.00 $15,664,796.36

$15,794,990.60

($347,316.03) $14,926,898.51 100%

OPU#188 037P2Garfield ES

037P2

$0.00

$340,791.25

$310,950.00

$0.00 $15,794,990.60

$14,569,578.94

($5,942.54)

($2,575.91)

$305,007.46 100%

OPU#240 043P1Harvey Rice ES Harvey Rice New K-8

043P1

Harvey Rice New K-8

Totals

($227,587.88) $15,889,931.83 100%

OPU#240 043P2Harvey Rice ES Harvey Rice Abate/Demo

043P2

Harvey Rice Abate/Demo

$2,250,550.18 ($1,726,143.18)

Totals

$0.00

$524,407.00

$582,946.40

$0.00 $13,299,988.93

$13,837,221.37

$0.00

$582,946.40

$582,887.00

$0.00 $13,837,221.37

$12,853,601.96

($57,000.00)

($1,480.00)

$525,887.00 100%

OPU#487 Lng ES New K-8 068P1R.G. Jones Foreign R.G. Jones

068P1

$11,454,443.79

$1,845,545.14

Totals

$309,913.26

($17,425.65)

Wade Park New K-8 Wade Park New K-8 Totals

$12,123,854.99

$2,563,295.17

$349,210.99

$103,078.12

$0.00

$452,289.11

$498,479.40

$0.00

$498,479.40

$475,253.00

($22,963.89)

$452,289.11

$0.00

$0.00

$452,289.11

($46,190.29)

($0.00)

$452,289.11 100%

$13,472,218.19($13,100,643.35)

$0.00

$371,574.84

$0.00

$0.00

$0.00

$964,830.57

($593,223.00)

$371,607.57

$0.00

$0.00

$371,607.57

$371,574.84

($32.73)

$371,605.86 100%

$0.00

$17,500.00

$0.00

$0.00

$0.00

$17,500.00

$0.00

$17,500.00

$0.00

$0.00

$17,500.00

$17,500.00

$0.00

$17,500.00 100%

$0.00 $14,977,716.98

$15,307,504.90

$0.00 $15,307,504.90

$14,396,606.52

$661,012.73 $15,057,619.25

$0.00

$0.00 $15,057,619.25

($329,787.92)

$353,391.79

$1,424,099.29

$0.00

$0.00

$2,070,630.05 $15,796,615.53

$0.00

$0.00 $15,796,615.53 ($1,597,374.37) ($1,473,222.35) $15,809,808.72 100%

($350,776.26)

$230,470.17

$0.00

$0.00

$230,470.17

$66,221.06

$265,566.34

$230,470.17 100%

$2,281,226.65 ($1,103,856.10)

$1,177,370.55

$0.00

$0.00

$1,177,370.55

$668,653.00

($508,717.55)

$1,177,370.55 100%

$6,127,368.79 $137,594,095.60

$0.00

$0.00 $137,594,095.60 ($2,143,944.81) ($3,902,441.92) $137,586,545.93 100%

$0.00

$0.00

R.G. Jones New K-8

Totals

($261,079.13) $13,561,068.06 100%

OPU#487 Lang ES Abate/Demo 068P2RG Jones Foreign RG Jones

068P2

RG Jones Abate/Demo

$0.00

$292,487.61

$352,566.72

$0.00 $14,687,150.16

$15,044,222.82

$0.00

$352,566.72

$345,555.00

$0.00 $15,044,222.82

$14,407,794.08

$0.00

$292,477.61 100%

OPU#556 077P1Wade Park ES

077P1

($374,865.70) $15,062,015.75 100%

OPU#556 077P2Wade Park ES

077P2

Wade Park Abate/Demo Wade Park Abate/Demo Totals

OPU#080 ES 092P1Charles A. Mooney Charles A. Mooney New K-8

092P1

Charles A. Mooney New K-8

Totals

OPU#080 092P2Charles Mooney ES Charles Mooney Abate/Demo

092P2

Charles Mooney Abate/Demo

$1,273,290.13 ($1,255,790.13)

Totals

OPU#448 102P1Patrick Henry MSPatrick Henry New K-8

102P1

Patrick Henry New K-8

Totals

$11,454,443.79

$3,523,273.19

$835,370.95

$363,317.77

($79,902.27) $15,047,362.22 100%

OPU#448 102P2Patrick Henry MSPatrick Henry Abate/Demo

102P2

Patrick Henry Abate/Demo

Totals

$0.00

$1,198,688.72

$1,127,470.10

$0.00

$1,127,470.10

$1,070,707.50

$0.00 $14,323,393.18

$0.00 $14,323,393.18

$15,920,767.55

$0.00 $15,920,767.55

$13,725,985.48

$0.00

$0.00

$496,036.51

$429,815.45

$0.00

$429,815.45

$0.00

$668,653.00

$0.00

$0.00

$0.00

$1,424,099.29

$71,218.62

($225,410.57)

$1,416,155.29 99%

OPU#624 106P2Willson MS

106P2

Willson New K-8 Willson New K-8

Totals

OPU#624 106P3Willson MS

106P3

Willson Abate/Demo Willson Abate/Demo Totals

$496,036.51

$581,246.43

OPU#030 114P2Westside Relief HS Westside Relief New HS

114P2

Westside Relief New HS

Totals $36,152,160.00($35,483,507.00) $148,278,663.02($14,587,009.34)

GROUP TOTALS

$0.00 $133,691,653.68 $135,835,598.49

$0.00$135,835,598.49 $131,466,726.81

LFI OPU#624 106X2Willsom MS

106X2

Willson LFI Demolition Ph 2 Willson LFI Demolition Ph 2 Totals

OPU# 106X3

Expedition速

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$26,700.00

$0.00

$26,700.00

$26,700.00

$0.00

($26,700.00)

$26,700.00 100%

Willson LFI Additional Parkin

Report M_COST_01_00-2b


District IRN

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Phase Estimate Variance

Est. to Compl.

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

LFI OPU# 106X3

106X3

Willson LFI Additional Parkin Willson LFI Additional Parking Totals GROUP TOTALS

$0.00 $0.00

$0.00 $0.00

SEGMENT PROJECT TOTALS $148,278,663.02 ($14,587,009.34)

$0.00 $0.00

$0.00

$0.00

$0.00

$0.00

$139,291.60

$20,842.15

$160,133.75

$0.00

$0.00

$160,133.75

$0.00

($160,133.75)

$160,133.75 100%

$0.00

$0.00

$0.00

$0.00

$165,991.60

$20,842.15

$186,833.75

$0.00

$0.00

$186,833.75

$0.00

($186,833.75)

$186,833.75 100%

$6,148,210.94 $137,780,929.35

$0.00

$0.00 $137,780,929.35 ($2,143,944.81) ($4,089,275.67) $137,773,379.68 100%

$0.00 $133,691,653.68 $135,835,598.49

$0.00 $135,835,598.49 $131,632,718.41

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

Expedition速

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($4,089,275.67)

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 04/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#004 010P1Adlai Stevenson Adlai Stevenson New K-8

010P1

Adlai Stevenson New K-8

Totals

$10,434,104.98

$4,441,671.44

$0.00 $14,875,776.42

$14,021,525.81

$0.00 $14,021,525.81

$14,534,499.24

$972,254.70 $15,506,753.94

$0.00

$0.00 $15,506,753.94

$854,250.61

($630,977.52) $15,410,337.66 99%

OPU#004 010P2Adlai Stevenson Adlai Stevenson Abate/Demo

010P2

Adlai Stevenson Abate/Demo

$371,104.82

$44,538.39

$415,643.21

$0.00

$14,916,357.84

$225,412.80

$0.00 $15,141,770.64

$18,980,068.00

$437,521.79

$239,417.06

$0.00

$12,128,122.48

$1,017,763.81

Totals

$0.00

$0.00

$0.00

$358,598.89

$0.00 $18,980,068.00

$16,345,463.16

($168,719.28)

$189,879.61

$0.00

$1,441,289.40 $17,786,752.56

$0.00

$52,500.00

$242,379.61

$415,643.21

$173,263.60

$185,807.91 98%

OPU#021 014P1Anton Grdina ESAnton Grdina New K-8

014P1

Anton Grdina New K-8

Totals

$0.00 $17,786,752.56 ($3,838,297.36) ($2,644,981.92) $17,676,714.21 99%

OPU#021 014P2Anton Grdina ESAnton Grdina Abate/Demo

014P2

Anton Grdina Abate/Demo

Totals

$676,938.85

$0.00

$0.00 $13,145,886.29

$14,147,925.00

$0.00

$0.00

$589,394.06

$0.00 $14,147,925.00

$13,364,973.93

($61,741.88)

$527,652.18

$0.00

$3,049.85

$530,702.03

$676,938.85

$146,236.82

$516,227.18 98%

$862,011.25 $14,226,985.18

$0.00

$0.00 $14,226,985.18 ($1,002,038.71) ($1,081,098.89) $14,191,143.89 100%

OPU#077 ES 023P1Charles Dickens Charles Dickens New K-8

023P1

Charles Dickens New K-8

Totals

OPU#077 ES 023P2Charles Dickens Charles Dickens Abate/Demo

023P2

Charles Dickens Abate/Demo

$366,864.13

$97,643.12

$0.00

$464,507.25

$0.00

$0.00

$0.00

$10,434,104.98 ($9,302,827.10)

$0.00

$1,131,277.88

$0.00

$0.00

$0.00

Totals

$695,613.46

$34,700.00

$730,313.46

$0.00

$0.00

$730,313.46

$464,507.25

($265,806.21)

$730,313.46 100%

$2,547,168.36 ($1,110,706.24)

$1,436,462.12

$0.00

($641,230.76)

$795,231.36

$1,131,277.88

$336,046.52

$1,184,431.27 82%

OPU#079 024P1Charles H Lake ES Charles H Lake New K-8

024P1

Charles H Lake New K-8

Totals

OPU#079 024P2Charles H Lake ES Charles H Lake Abate/Demo

024P2

Totals

$405,732.26

$82,747.96

$0.00

$488,480.22

$0.00

$0.00

$0.00

$505,775.09

$0.00

$505,775.09

$0.00

($17,294.87)

$488,480.22

$488,480.22

$0.00

$492,239.72 97%

Corlett Abate/Demo Corlett Abate/Demo Totals

$306,983.81

$373,876.17

$0.00

$680,859.98

$0.00

$0.00

$0.00

$569,412.06

$142,706.76

$712,118.82

$0.00

($26,538.84)

$685,579.98

$680,859.98

($4,720.00)

$684,459.39 96%

$10,454,887.01

$2,568,118.85

$0.00 $13,023,005.86

$12,751,693.00

$0.00 $12,751,693.00

$13,156,904.30

$1,038,219.82 $14,195,124.12

$0.00

$0.00 $14,195,124.12

$271,312.86 ($1,172,118.26) $14,200,453.13 100%

$1,408,711.57

($863,006.88)

$0.00

$545,704.69

$0.00

$545,704.69

$0.00

$0.00

$545,704.69

$12,128,122.48

$2,197,363.13

$0.00 $14,325,485.61

$15,477,075.00

$637,195.30 $14,116,729.04

$0.00

$0.00 $14,116,729.04 ($1,151,589.39)

$208,756.57 $14,130,403.45 100%

Charles H Lake Abate/Demo

OPU#104 027P2Corlett ES

027P2

OPU#168 035P1Euclid Park ES Euclid Park New K-8

035P1

Euclid Park New K-8

Totals

OPU#168 035P2Euclid Park ES Euclid Park Abate/Demo

035P2

Euclid Park Abate/Demo

Totals

$0.00

$0.00

$512,665.71

$0.00 $15,477,075.00

$13,479,533.74

$33,038.98

$545,704.69

$0.00

$545,688.52 100%

OPU#038 ES 038P1George W CarverGeorge W Carver New K-8

038P1

George W Carver New K-8

Totals

OPU#198 ES 038P2George W CarverGeorge W Carver Abate/Demo

038P2

$445,447.70

$39,201.49

$0.00

$484,649.19

$0.00

$0.00

$0.00

$345,594.69

$168,655.97

$514,250.66

$0.00

$0.00

$514,250.66

$484,649.19

($29,601.47)

$513,949.84 100%

Totals

$531,655.19

$442,928.69

$0.00

$974,583.88

$0.00

$0.00

$0.00

$726,311.99

$300,612.97

$1,026,924.96

$0.00

($10,859.10)

$1,016,065.86

$974,583.88

($41,481.98)

$1,010,869.98 98%

Totals

$12,128,122.48

$1,698,779.82

$0.00 $13,826,902.30

$15,761,397.58

$0.00 $15,761,397.58

$12,841,029.04

$475,640.40 $13,316,669.44

$0.00

Mound Abate/Demo Mound Abate/Demo Totals

$229,816.50

$192,028.67

Totals

$12,128,122.48

$2,487,546.94

Totals

$11,463,972.02($11,164,777.52)

$0.00

$299,194.50

$0.00

$0.00

$0.00

$1,438,196.60

($576,896.00)

$861,300.60

$0.00

($562,105.81)

$299,194.79

$299,194.50

($0.29)

Audubon Abate/Demo Audubon Abate/Demo Totals

$4,460,027.67 ($4,460,027.67)

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00 $12,156,111.19

$14,241,019.00

$0.00 $14,241,019.00

$12,372,949.27

$978,374.22 $13,351,323.49

$0.00

$0.00 $13,351,323.49 ($2,084,907.81) ($1,195,212.30) $13,289,809.97 100%

$215,824.65

$692,543.93

$0.00

$0.00

$1,765,072.48 $17,571,014.26

$0.00

$0.00 $17,571,014.26 ($3,714,521.72)

George W Carver Abate/Demo

Totals

OPU#388 061P2Moses ClevelandMoses Cleveland Abate/Demo

061P2

Moses Cleveland Abate/Demo

OPU#396 062P2Mound ES

062P2

Mound New K-8 Mound New K-8

$0.00 $13,316,669.44 ($1,934,495.28)

$510,232.86 $13,313,707.11 100%

OPU#396 062P3Mound ES

062P3

$0.00

$421,845.17

$0.00

$0.00 $14,615,669.42

$12,542,121.00

$0.00

$0.00

$466,736.80

$0.00 $12,542,121.00

$14,043,407.48

$21,703.01

$488,439.81

$0.00

$799,122.54 $14,842,530.02

$0.00

$1,601.98

$490,041.79

$421,845.17

$0.00 $14,842,530.02

$2,073,548.42

($68,196.62)

$473,368.11 97%

OPU#482 MS 070P1Robert H JamisonRobert H Jamison New K-8

070P1

Robert H Jamison New K-8

($226,860.60) $14,710,308.05 99%

OPU#024 089P1Audubon MS

089P1

Audubon New K-8 Audubon New K-8

$299,194.50 35%

OPU#024 089P2Audubon MS

089P2

$0.00

OPU#411 100P1Nathan Hale MS Nathan Hale New K-8

100P1

Nathan Hale New K-8

Totals

$10,434,104.98

$1,722,006.21

$569,595.39

$106,081.56

OPU#411 100P2Nathan Hale MS Nathan Hale Abate/Demo

100P2

Nathan Hale Abate/Demo

Totals

$0.00

$675,676.95

$0.00

$0.00 $16,820,961.41

$20,535,483.13

$0.00

$0.00

$476,719.28

$0.00 $20,535,483.13

$15,805,941.78

$692,543.93

$675,676.95

($16,866.98)

$692,529.71 100%

OPU#536 MS 103P2Thomas Jefferson Thomas Jefferson New K-8

103P2

Thomas Jefferson New K-8

Totals

$18,228,032.77 ($1,407,071.36)

($750,052.85) $17,502,349.39 100%

OPU#536 MS 103P3Thomas Jefferson Thomas Jefferson Abate/Dem

Expedition速

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Phase Estimate Variance

Est. to Compl.

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#536 MS 103P3Thomas Jefferson Thomas Jefferson Abate/Dem

103P3

Thomas Jefferson Abate/Demo

$952,102.29 $606,621.87 Totals $145,363,617.62 ($8,613,962.55)

GROUP TOTALS

SEGMENT PROJECT TOTALS $145,363,617.62 ($8,613,962.55)

$0.00

$1,558,724.16

$0.00

$0.00

$0.00

$828,166.98

$1,653,791.22

$0.00

$0.00

$1,653,791.22

$1,558,724.16

($95,067.06)

$1,651,291.22 100%

$0.00$138,458,307.52 $136,002,513.17

$8,796,526.03 $144,799,039.20

$0.00 ($1,200,877.55) $143,598,161.65 ($1,708,652.45) ($6,848,506.58) $143,405,597.67 99%

$0.00 $136,749,655.07 $138,458,307.52

$0.00 $138,458,307.52 $136,002,513.17

$8,796,526.03 $144,799,039.20

$0.00 ($1,200,877.55) $143,598,161.65 ($1,708,652.45) ($6,848,506.58) $143,405,597.67 99%

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

Expedition速

$825,624.24

$0.00 $136,749,655.07 $138,458,307.52

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($6,848,506.58)

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 05/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#010 Bell ES Graham Bell Abate 011P1Alexander Graham Alexander

011P1

$0.00

$373,927.00

$373,927.00

$0.00

$13,819,792.33

$0.00

$0.00 $13,819,792.33

$15,208,332.00

$1,756,237.88

$0.00

$0.00

$1,756,237.88

$0.00

$0.00

$0.00

$723,591.67

($66,777.42)

$656,814.25

$0.00

$0.00

$656,814.25

$4,902,995.00

$836,600.83

$0.00

$5,739,595.83

$5,988,862.00

$0.00

$5,988,862.00

$6,350,049.79

$291,703.37

$6,641,753.16

$0.00

$50,362.11

$6,692,115.27

Totals

$13,819,792.33

($143,018.00)

$0.00 $13,676,774.33

$14,971,603.00

$0.00 $14,972,378.74

$16,721,966.48

$407,238.86 $17,129,205.34

$0.00

Totals

$822,935.95

$0.00

$0.00

$822,935.95

$0.00

($57,954.48)

$644,203.52

$0.00

$13,819,792.33

$0.00

$0.00 $13,819,792.33

$15,343,204.00

$336,067.96 $15,793,047.33

$69,981.02

$400,409.02

$0.00

$0.00

$400,409.02

$0.00

$13,819,792.33

$0.00

$0.00 $13,819,792.33

$14,683,492.00

$0.00

$0.00

Alexander Graham Bell Abate/DemTotals

$0.00

$0.00

$0.00

$496,125.69

$0.00 $15,208,332.00

$14,953,469.65

$271.93

$496,397.62

$0.00

$594,751.60 $15,548,221.25

$3,153.32

$323.76

$496,721.38

$373,927.00

($122,794.38)

$407,741.89 82%

OPU#012 013P1Almira ES

013P1

Almira New PreK-8 Almira New PreK-8 Totals

$87,918.53 $15,639,293.10 ($1,388,539.67) ($1,819,500.77) $14,584,389.16 94%

OPU#012 013P2Almira ES

013P2

Almira Abate/Demo Almira Abate/Demo Totals

$1,756,237.88 $1,099,423.63

$656,814.25 100%

OPU#340 ES 052P1Louisa May AlcottLouisa May Alcott Renovation

052P1

Louisa May Alcott Renovation K-5 Totals

($249,266.17)

($952,519.44)

$6,383,443.60 96%

OPU#368 058P1Miles ES

058P1

Miles New PreK-8 Miles New PreK-8

$126,810.62 $17,256,015.96 ($1,295,604.41) ($3,579,241.63) $12,581,636.65 73%

OPU#368 058P2Miles ES

058P2

Miles Abate/Demo Miles Abate/Demo

$0.00

$0.00

$702,158.00

$0.00 $15,343,204.00

$15,456,979.37

$10,402.57

$654,606.09

$822,935.95

$168,329.86

$644,203.52 100%

OPU#436 ScienceSchool New PK-8 065P1Orchard School of Orchard

065P1

Orchard School New PK-8

Totals

$80,791.53 $15,943,819.88 ($1,523,411.67) ($2,124,027.55) $13,644,675.37 86%

OPU#436 SciencePark Abate/Demo 065P2Orchard School of Orchard

065P2

Orchard Park Abate/Demo

Totals

$0.00

$0.00

$514,786.66

$0.00 $14,683,492.00

$15,227,591.60

$41,723.40

$556,510.06

$0.00

$606,509.13 $15,834,100.73

$100,968.58

$0.00

$556,510.06

$400,409.02

($156,101.04)

$556,510.06 100%

OPU#451 ES 066P1Paul Laurence Dunbar Paul Laurence Dunbar PreK-8

066P1

Paul Laurence Dunbar PreK-8

Totals

$64,581.53 $15,999,650.84

($863,699.67) ($2,179,858.51) $14,971,606.91 95%

OPU#451 ES 066P2Paul Laurence Dunbar Paul Laurence Dunbar Abate/

066P2

$288,388.92

Paul Laurence Dunbar Abate/Dem Totals

$288,388.92

$0.00

$0.00 $26,252,144.53

$31,518,397.00

$0.00

$0.00

$456,746.67

($92,651.56)

$364,095.11

$0.00 $31,518,397.00

$3,326,774.37

$414,139.13

$0.00

$0.00

$364,095.11

$288,388.92

($75,706.19)

$364,095.11 100%

$3,740,913.50

$0.00 $28,249,449.69 $31,990,363.19 ($5,266,252.47) ($5,738,218.66)

$2,660,705.36 71%

OPU#801 Arts HS 107P1Cleveland Sch ofCleveland School of Arts New

107P1

Cleveland School of Arts New K-1 Totals

$29,175,112.53 ($2,922,968.00)

OPU#801 of Arts 107P2Cleveland SchoolCleveland School of Arts Aba

107P2

$1,968,266.36

$0.00

$0.00

$1,968,266.36

$0.00

$0.00

$0.00

$1,532,214.00

$134,130.26

$1,666,344.26

$0.00

$0.00

$1,666,344.26

$1,968,266.36

$301,922.10

$1,666,344.26 100%

$11,883,629.38($11,883,629.38)

$0.00

$0.00

$0.00

$0.00

$0.00

$1,046,507.46

($714,538.00)

$331,969.46

$12,223.75

$0.00

$344,193.21

$0.00

($344,193.21)

$314,151.87 95%

$0.00

$0.00

$477,845.69

$0.00

$0.00

$0.00

$378,711.95

($68,512.10)

$310,199.85

$0.00

$0.00

$310,199.85

$477,845.69

$167,645.84

$289,909.02 93%

$17,541,711.93($17,541,711.93)

$0.00

$0.00

$0.00

$0.00

$0.00

$847,238.84

($586,106.20)

$261,132.64

$0.00

$0.00

$261,132.64

$0.00

($261,132.64)

$261,132.64 100%

$0.00

$1,172,419.30

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$1,172,419.30

$1,172,419.30

$1,172,419.30

$0.00

$0.00 $43,129,499.56

$45,809,482.00

$0.00 $45,809,482.00

$4,823,762.90

$474,093.00

$5,297,855.90

$0.00 $40,460,100.18 $45,757,956.08 ($2,679,982.44) ($2,628,456.52)

$3,675,787.31 69%

($861,911.42)

$2,511,522.42 100%

Cleveland School of Arts Abate/D Totals

OPU#171 ES/MS 121P1Forest Hill Parkway Forest Hill Parkway New PreK

121P1

Forest Hill Parkway New PreK-8

Totals

OPU#171 121P2Forest Hills Parkwary Forest Hill Parkway Abate/De

121P2

Forest Hill Parkway Abate/Demo

$477,845.69

Totals

OPU#080 129P1Charles Mooney ES Charles Mooney New PK-8

129P1

Charles Mooney New PK-8

Totals

OPU#080 129P2Charles Mooney ES Charles Mooney Abate/Demo

129P2

Charles Mooney Abate/Demo

$1,172,419.30

Totals

$0.00

$0.00

OPU#292 130P1John Marshall HSJohn Marshall New 9-12

130P1

John Marshall New 9-12

Totals

$47,380,879.56 ($4,251,380.00)

OPU#292 130P2John Marshall HSJohn Marshall Abate/Demo

130P2

$0.00

$1,649,611.00

$0.00

$1,649,611.00

$0.00

$0.00

$0.00

$1,839,469.06

$672,053.36

$2,511,522.42

$0.00

$0.00

$2,511,522.42

Totals

$0.00

$994,875.00

$0.00

$994,875.00

$0.00

$0.00

$0.00

$4,880,554.59

$1,298,677.47

$6,179,232.06

$0.00

$0.00

$6,179,232.06

$994,875.00 ($5,184,357.06)

$5,270,757.81 85%

Max Hayes New 9-12 Max Hayes New 9-12 Totals

$35,896,791.80

$0.00

$0.00 $35,896,791.80

$43,665,232.75

$0.00 $43,665,232.75

$1,723,705.00

$2,092,907.69

$3,816,612.69

$0.00 $39,438,260.49 $43,254,873.18 ($7,768,440.95) ($7,358,081.38)

$2,404,446.79 63%

$0.00 $21,661,236.00

$0.00

$108,043.00

$1,955,824.58

John Marshall Abate/Demo

Totals

$1,649,611.00

OPU#066 130P3CarlSchuler/058 Brooklawn John Marshall SS CarlSchule

130P3

John Marshall SS CarlSchuler

OPU#349 131P1Max Hayes HS

131P1

OPU# HS 132P1West Side Reilef West Side Relief New 9-12

132P1

West Side Relief New 9-12

$0.00 Totals $21,661,236.00 $230,608,028.64($32,887,693.48)

GROUP TOTALS

$0.00 $197,720,335.16 $187,188,604.75

$0.00

$0.00

$1,847,781.58

$0.00$187,189,380.49

$93,850,185.33

$5,885,770.40 $99,735,955.73

$0.00 $20,220,610.29 $22,176,434.87 $21,661,236.00

($515,198.87)

$843,354.80 43%

$186,326.67 $129,962,030.60 $229,884,313.00 $10,530,954.67$32,163,977.84) $84,693,228.80 85%

LFI OPU#349 131X1Max Hayes HS

131X1

Max Hayes LFI Clark Ave Max Hayes LFI Clark Ave Totals

OPU#349 131X2Max Hayes HS

Expedition速

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$53,698.71

($5,866.40)

$47,832.31

$0.00

$0.00

$47,832.31

$0.00

($47,832.31)

$47,859.31 100%

Max Hayes LFI Walworth Ave

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

LFI OPU#349 131X2Max Hayes HS

131X2

Max Hayes LFI Walworth Ave Max Hayes LFI Walworth Ave Totals GROUP TOTALS

$0.00 $0.00

$0.00 $0.00

SEGMENT PROJECT TOTALS $230,608,028.64 ($32,887,693.48)

$0.00 $0.00

$0.00

$0.00

$0.00

$0.00

$444,425.00

$77,803.19

$522,228.19

$0.00

$0.00

$522,228.19

$0.00

($522,228.19)

$500,925.82 96%

$0.00

$0.00

$0.00

$0.00

$498,123.71

$71,936.79

$570,060.50

$0.00

$0.00

$570,060.50

$0.00

($570,060.50)

$548,785.13 96%

$0.00 $197,720,335.16 $187,188,604.75

$0.00 $187,189,380.49 $94,348,309.04

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

Expedition速

$5,957,707.19 $100,306,016.23

$186,326.67 $129,962,030.60 $230,454,373.50 $10,530,954.67$32,734,038.34) $85,242,013.93 85%

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($32,734,038.34)

Report M_COST_01_00-2b


District IRN 43786

SEGMENT PROJECT COST REPORT All Projects/ Segment 06/ Typical District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

*Some information not displayed due to security restrictions.

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 1 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU#636 ES 019P1Buckeye-Woodland New PK-8 Buckeye-Woodland

019P1

Buckeye-Woodland New PK-8

Totals

$14,169,635.00

$0.00

$0.00 $14,169,635.00

$0.00

$0.00

$0.00

$759,040.00

$0.00

$759,040.00

$0.00 $13,231,480.25 $13,990,520.25 $14,169,635.00

$179,114.75

$0.00

$201,600.00

$0.00

$0.00

$0.00 $13,231,480.25 $13,925,767.25 $14,169,635.00

$243,867.75

$0.00

0%

OPU#636 ES 019P2Buckeye-Woodland Abate/De Buckeye-Woodland

019P2

Totals

$201,600.00

$0.00

$0.00

$201,600.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Totals

$14,169,635.00

$0.00

$0.00 $14,169,635.00

$0.00

$0.00

$0.00

$694,287.00

$0.00

$694,287.00

Totals

$325,714.13

$0.00

$0.00

$325,714.13

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$325,714.13

$325,714.13

$325,714.13

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Totals

$14,169,635.00

$0.00

$0.00 $14,169,635.00

$0.00

$0.00

$0.00

$665,128.00

$0.00

$665,128.00

$0.00 $13,231,480.25 $13,896,608.25 $14,169,635.00

$273,026.75

$0.00

Totals

$1,569,275.19

$0.00

$0.00

$1,569,275.19

$0.00

$0.00

$0.00

$68,629.27

$0.00

$68,629.27

$0.00

$1,367,394.01

$1,436,023.28

$1,569,275.19

$133,251.91

Giddings Abate/Demo Giddings Abate/Demo Totals

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$361,154.82

$0.00

$0.00

$361,154.82

$0.00

$0.00

$0.00

$459,454.80

($7,023.83)

$452,430.97

$0.00

$2,857.19

$455,288.16

$361,154.82

($94,133.34)

$439,067.96 97%

$378,194.46

$0.00

$0.00

$378,194.46

$0.00

$0.00

$0.00

$65,753.24

$0.00

$65,753.24

$0.00

$329,669.91

$395,423.15

$378,194.46

($17,228.69)

$10,319.24 16%

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$369,225.05

$0.00

$0.00

$369,225.05

$0.00

$0.00

$0.00

$597,416.73

($89,442.00)

$507,974.73

$0.00

$2,921.04

$510,895.77

$369,225.05

($141,670.72)

$474,081.40 93%

$276,520.70

$0.00

$0.00

$276,520.70

$0.00

$0.00

$0.00

$48,763.00

$0.00

$48,763.00

$0.00

$259,114.81

$307,877.81

$276,520.70

($31,357.11)

$0.00

$378,065.75

$0.00

$0.00

$378,065.75

$0.00

$0.00

$0.00

$582,603.60

($118,844.16)

$463,759.44

$0.00

$2,990.97

$466,750.41

$378,065.75

($88,684.66)

$443,637.61 96%

Totals

$364,859.50

$0.00

$0.00

$364,859.50

$0.00

$0.00

$0.00

$51,016.00

$0.00

$51,016.00

$0.00

$341,893.01

$392,909.01

$364,859.50

($28,049.51)

$0.00

Robert Fulton Abate/Demo Robert Fulton Abate/Demo Totals

$495,205.53

$0.00

$0.00

$495,205.53

$0.00

$0.00

$0.00

$66,105.29

$0.00

$66,105.29

$0.00

$431,666.39

$497,771.68

$495,205.53

($2,566.15)

$11,246.29 17%

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Totals

$266,534.47

$0.00

$0.00

$266,534.47

$0.00

$0.00

$0.00

$613,216.86

$0.00

$613,216.86

$0.00

$2,452.43

$615,669.29

$266,534.47

($349,134.82)

Union Abate/Demo Union Abate/Demo Totals

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$789,816.28

$0.00

$0.00

$789,816.28

$0.00

$0.00

$0.00

$934,513.37

$66,315.62

$1,000,828.99

$0.00

$6,427.75

$1,007,256.74

$789,816.28

($217,440.46)

$826,902.26 83%

$515,508.42

$0.00

$0.00

$515,508.42

$0.00

$0.00

$0.00

$1,045,673.53

($89,664.60)

$956,008.93

$0.00

$6,346.39

$962,355.32

$515,508.42

($446,846.90)

$938,597.70 98%

$3,379,297.29

$0.00

$0.00

$3,379,297.29

$0.00

$0.00

$0.00

$51,016.00

$0.00

$51,016.00

$0.00

$3,166,583.75

$3,217,599.75

$3,379,297.29

$161,697.54

Buckeye-Woodland Abate/Demo

$0.00

$201,600.00

$201,600.00

OPU#068 022P1Case ES

022P1

Case New PK-8 Case New PK-8

0%

OPU#068 022P2Case ES

022P2

Case Abate/Demo Case Abate/Demo

OPU#165 033P1Emile B. deSauzeEmile B. deSauze Abate/Dem

033P1

Emile B. deSauze Abate/Demo

Totals

OPU#164 ES 034P1Empire Computech New PK-8 Empire/Glenville

034P1

Empire/Glenville New PK-8

0%

OPU#164 ES Abate/Demo 034P2Empire Computech Empire

034P2

Empire Abate/Demo

$7,834.27 11%

OPU#200 039P1Giddings ES

039P1

$0.00

OPU#225 040P1Gracemount ES Gracemount Abate/Demo

040P1

Gracemount Abate/Demo

Totals

OPU#252 ES Longfellow Abate/Demo 041P1H.W. Longfellow H.W.

041P1

H.W. Longfellow Abate/Demo

Totals

OPU#094 045P1J.D. Rockefeller ES J.D. Rockefeller Abate/Demo

045P1

J.D. Rockefeller Abate/Demo

Totals

$0.00

OPU#294 046P1John W Raper ESJohn W Raper Abate/Demo

046P1

John W Raper Abate/Demo

Totals

OPU#295 ES 047P1Joseph F. LandisJoseph F. Landis Abate/Demo

047P1

Joseph F. Landis Abate/Demo

Totals

0%

OPU#339 051P1Louis Pasteur ESLouis Pasteur Abate/Demo

051P1

Louis Pasteur Abate/Demo

Totals

OPU#400 063P1Mount Auburn ESMount Auburn Abate/Demo

063P1

Mount Auburn Abate/Demo

0%

OPU#486 069P1Robert Fulton

069P1

OPU#482 ES H. Jamison Abate/Dem 070P2Robert H. Jasmison Robert

070P2

Robert H. Jamison Abate/Demo

Totals

$0.00

OPU#525 ES 072P1Stephen E. HoweStephen E Howe Abate/Demo

072P1

Stephen E Howe Abate/Demo

$116,763.36 19%

OPU#548 075P1Union ES

075P1

$0.00

OPU#005 087P1Albert B Hart MS Albert B Hart Abate/Demo

087P1

Albert B Hart Abate/Demo

Totals

OPU#009 088P1Alexander Hamilton Alexander Hamilton Abate/De

088P1

Alexander Hamilton Abate/Demo Totals

OPU#024 089P3Audubon MS

089P3

Audubon Abate/Demo Audubon Abate/Demo Totals

$0.00

OPU# 124P1Jesse Owens Academy Jesse CLC Owens Academy Abate

Expedition速

Report M_COST_01_00-2b

0%


District IRN 43786

SEGMENT PROJECT COST REPORT District: Cleveland Metropolitan Schools OSFC Proj No. 193

Date: Page:

PHASE ESTIMATE

FUNDING Project

Description

Original Project Agmt Budget

Approved NOI/AMD Changes

Pending NOI Changes

Projected Budget

Project Estimate

Estimate Adjustments

COMMITTED

Current Estimate

Original Committment

Approved Changes

Revised Committment

12/2/2013 2 of 2

STATUS

Pending Changes

Potential Costs

Projected Committment

Est. to Compl.

Phase Estimate Variance

Projected Remaining Cost to Pct Date Compl Proj Agmt Funds Proj Budget vs Proj Commitment

Billed to Date

TYPICAL OPU# 124P1Jesse Owens Academy Jesse CLC Owens Academy Abate

124P1

Jesse Owens Academy Abate/DemTotals GROUP TOTALS SEGMENT PROJECT TOTALS

$251,344.78 $52,431,221.37

$52,431,221.37

$251,344.78

$0.00

$0.00

$0.00

$66,793.21

$0.00

$66,793.21

$251,344.78

($33,907.75)

$43,961.47 66%

$0.00

$0.00

$0.00

$0.00

$52,431,221.37

$0.00

$0.00

$0.00

$6,769,409.90

($238,658.97)

$6,530,750.93

$0.00 $46,360,531.85 $52,891,282.78 $52,431,221.37

($460,061.41)

$3,312,411.56 51%

$0.00

$0.00

$52,431,221.37

$0.00

$0.00

$0.00

$6,769,409.90

($238,658.97)

$6,530,750.93

$0.00 $46,360,531.85 $52,891,282.78 $52,431,221.37

($460,061.41)

$3,312,411.56 51%

Notes: 1. The amounts shown above within the Budget/Estimate section of this cost report are being reported in accordance with the applicable approved phase submission for the project's scope of work. The costs shown within the Committed section are compared to the costs shown in the Budget/Estimate section to determine the net amount of remaining contingency for the project. Moreover, the contingency amounts shown above are the values detailed in the applicable approved phase submission for the project's scope of work. 2. The costs shown above does not include CMSD's funding/budget amounts or proposed funding/budget amounts for Locally Funded Initiatives (LFI).

Expedition速

$0.00

$218,459.32

$285,252.53

PROJECTED REMAINING CONTINGENCY OR PROJECT AGREEMENT FUNDS (Projected Budget vs Projected Committment)

($460,061.41)

Report M_COST_01_00-2b


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

2012 AUG

JUL

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Bid & Award

0130001005

Bid Opening

0

12APR12A

0

100

0130001010

Bid Evaluation and Award

22

12APR12A

11MAY12A

0

100

0130001015

NTP - BP 061,210,220,230,260,270,300,310,329

0

23MAY12A

0

100

0130001075

Site Mobilization - BP 310 Site Work

10

05JUN12A

08JUN12A

0

100

0130001090

Construction Kick-off Meeting

1

05JUN12A

05JUN12A

0

100

0130001025

Prime Contractors Submit Schedules

5

16JUL12A

20SEP12A

0

100

0130001020

Site Mobilization - BP 061 General Trades

5

23JUL12A

25JUL12A

0

100

0130001060

Site Mobilization - BP 260 Electrical

5

03AUG12A

24AUG12A

0

100

0130001030

Schedule Meeting(s) to Review Schedule

5

09AUG12A

09AUG12A

0

100

0130001035

Prime Contractors/CM Final Review Schedule

5

10AUG12A

17AUG12A

0

100

0130001050

Site Mobilization - BP 220 Plumbing

5

13AUG12A

13AUG12A

0

100

0130001040

Contractors Sign Off - Project Baseline Schedule

0

14SEP12A

0

100

0130001055

Site Mobilization - BP 230 HVAC

5

17JAN13A

17JAN13A

0

100

0130001045

Site Mobilization - BP 210 Fire Protection

5

30JAN13A

30JAN13A

0

100

0130001065

Site Mobilization - BP 270 Technology

5

20MAY13A

20MAY13A

0

100

0130001070

Site Mobilization - BP 300 Site Concrete

1

22JUL13A

22JUL13A

0

100

Bid Opening Bid Evaluation and Award NTP - BP 061,210,220,230,260,270,300,310,329 Site Mobilization - BP 310 Site Work Construction Kick-off Meeting Prime Contractors Submit Schedules Site Mobilization - BP 061 General Trades Site Mobilization - BP 260 Electrical Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Site Mobilization - BP 220 Plumbing Contractors Sign Off - Project Baseline Schedule Site Mobilization - BP 230 HVAC Site Mobilization - BP 210 Fire Protection Site Mobilization - BP 270 Technology Site Mobilization - BP 300 Site Concrete

0130001080

Site Mobilization - BP 329 Landscaping

5

16SEP13*

20SEP13

5

0

Site Mobilization - BP 329 Landscaping

0130001085

Site Mobilization - BP 121 FF & E

5

16SEP13*

20SEP13

5

0

Site Mobilization - BP 121 FF & E

Submittals & Approvals

Site Submittals

0130002025

Site Submittals

5

11MAY12A

24JUN13A

0

100

0130002080

Review and Approval Site Submittal

5

14MAY12A

01AUG13A

0

100

0130002005

Submittal Plumbing

8

08JUN12A

01OCT12A

0

100

0130002030

Submittal Concrete/Rebar

5

12JUN12A

13JUN12A

0

100

0130002075

Review and Approval Plumbing Submittal

15

12JUN12A

30NOV12A

0

100

0130002085

Review and Approval Concrete & Rebar

5

15JUN12A

02JUL12A

0

100

Review and Approval Concrete & Rebar

0130002010

Submittal HVAC Equipment

14

18JUN12A

02JUL12A

0

100

Submittal HVAC Equipment

0130002020

Submittal Electrical

20

18JUN12A

03OCT12A

0

100

0130002050

Submittal Fire Alarm

20

18JUN12A

26OCT12A

0

100

0130002115

Review and Approve HVAC Submittal

15

19JUN12A

07SEP12A

0

100

0130002130

Review & App Electric Submittal

15

20JUN12A

17OCT12A

0

100

0130002035

Submittal Block and Mortar

10

26JUN12A

27JUN12A

0

100

Submittal Block and Mortar

0130002040

Submittal CMU Veneer and Mortar

10

26JUN12A

29JUN12A

0

100

Submittal CMU Veneer and Mortar

0130002090

Review and Approval Block and Mortar

0

29JUN12A

27JUL12A

0

100

0130002060

Submittal HM Frame

20

01JUL12A

01AUG12A

0

100

0130002100

Review and Approval CMU Veneer and Mortar

15

02JUL12A

13JUL12A

0

100

0130002045

Submittal Structural Steel/Joists/Deck

45

19JUL12A

23JUL12A

0

100

0130002110

Review and Approval Structural Steel/Joists/Deck

45

24JUL12A

13SEP12A

0

100

0130002120

Review and Approval HM Frames

15

02AUG12A

24SEP12A

0

100

0130002015

Coordination Drawing Meetings HVAC/E/P/FP/GTC

45

15AUG12A

19OCT12A

0

100

0130002135

City Review & Approval Fire Protection Submittal

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

20

10SEP12A

01OCT12A

0

Review and Approval Site Submittal Submittal Plumbing Submittal Concrete/Rebar Review and Approval Plumbing Submittal

Submittal Electrical Submittal Fire Alarm Review and Approve HVAC Submittal Review & App Electric Submittal

Review and Approval Block and Mortar Submittal HM Frame Review and Approval CMU Veneer and Mortar Submittal Structural Steel/Joists/Deck Review and Approval Structural Steel/Joists/Deck Review and Approval HM Frames Coordination Drawing Meetings HVAC/E/P/FP/GTC City Review & Approval Fire Protection Submittal

100

Early Bar Progress Bar Critical Activity

AL12 - MonthlyRpt - 11x17

Sheet 1 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

2012 AUG

JUL

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Review and Approval Roofing Submittal

0130001125

Review and Approval Roofing Submittal

15

02OCT12A

17OCT12A

0

100

0130002055

Submittal Roofing

20

02OCT12A

02OCT12A

0

100

Submittal Roofing

0130002070

Submittal / Shop Drawings Fire Protection

35

03OCT12A

03OCT12A

0

100

Submittal / Shop Drawings Fire Protection

0130002140

Review and Approval Fire Protection Submittal

15

03OCT12A

26OCT12A

0

100

Review and Approval Fire Protection Submittal Review Coordination Drawings and Sign-Off

0130002150

Review Coordination Drawings and Sign-Off

15

23OCT12A

23OCT12A

0

100

0130002065

Submittal Windows and Curtain Wall

40

26OCT12A

28DEC12A

0

100

0130002160

Review & App Fire Alarm Submittal

15

26OCT12A

21NOV12A

0

100

0130002145

Review and Approve Windows and Curtain Wall

15

28DEC12A

28MAR13A

0

100

0130003010

Delivery of Site Materials

10

13JUN12A

03JUL12A

0

100

0130003025

Fabrication and Delivery - CMU Veneer

35

16JUL12A

08MAY13A

0

100

0130003015

Fabrication and Deliver Concrete Steel/Rebar

5

23JUL12A

29MAR13A

0

100

0130003020

Fabrication and Delivery - CMU Units

5

02AUG12A

04JAN13A

0

100

0130003005

Delivery of Plumbing Material

5

06AUG12A

02NOV12A

0

100

0130003040

Fab & Deliver HVAC Units

60

10SEP12A

01MAY13A

0

100

0130003050

Fabrication and Delivery - HM Frames

30

12SEP12A

05APR13A

0

100

0130003030

Fabrication and Deliver - Structural Steel

40

18SEP12A

17JAN13A

0

100

Fabrication and Deliver - Structural Steel

0130003035

Fabrication and Delivery Steel Joists Deck-Roof

60

18SEP12A

17JAN13A

0

100

Fabrication and Delivery Steel Joists Deck-Roof

0130003045

Fabrication and Delivery - Roofing Materials

40

18OCT12A

29MAR13A

0

100

0130003055

Fabrication and Delivery -Windows & Curtain Wall

80

01APR13A

06SEP13

4

95

0135004030

Rough Grade / Building Pad

5

13JUN12A

13JUL12A

0

100

Rough Grade / Building Pad

0135004005

North Parking Lot Storm Sewer

15

18JUN12A

06JUL12A

0

100

North Parking Lot Storm Sewer

0135004015

Sanitary Sewer

5

25JUN12A

06JUL12A

0

100

Sanitary Sewer

0135004070

South Storm Sewer

3

26JUN12A

06JUL12A

0

100

South Storm Sewer

0135004035

Water & Fire Line

10

06JUL12A

25JUL12A

0

100

Water & Fire Line

0135004020

Access Roads / Laydown / Parking

15

12JUL12A

24JUL12A

0

100

Access Roads / Laydown / Parking

0135004040

Electrical Duct Banks

10

12SEP12A

29OCT12A

0

100

Submittal Windows and Curtain Wall Review & App Fire Alarm Submittal Review and Approve Windows and Curtain Wall

Fab & Deliver

Delivery of Site Materials Fabrication and Delivery - CMU Veneer Fabrication and Deliver Concrete Steel/Rebar Fabrication and Delivery - CMU Units Delivery of Plumbing Material Fab & Deliver HVAC Units Fabrication and Delivery - HM Frames

Fabrication and Delivery - Roofing Materials Fabrication and Delivery -Windows & Curtain Wall

Construction Sitework

Electrical Duct Banks Set Transformer Vault

0135004045

Set Transformer Vault

2

01OCT12A

01OCT12A

0

100

0131104030

Generator Enclosure Concrete & Masonry

15

24MAY13A

17SEP13

11

27

0135004050

Set Permanent Transformer

3

17JUN13A

17JUN13A

0

100

Set Permanent Transformer

0135004060

Energize Transformer

1

18JUN13A

18JUN13A

0

100

Energize Transformer

0135004085

Finish Grading

5

15JUL13A

03SEP13

1

80

0135004190

Site Lighting Conduit

2

15JUL13A

16JUL13A

0

100

0135004115

Site Concrete - North

7

22JUL13A

14AUG13A

0

100

0135004150

Ornamental Fence Posts @ West

3

24JUL13A

03SEP13

1

67

Ornamental Fence Posts @ West

0135004160

Site Concrete - West

7

24JUL13A

03SEP13

1

86

Site Concrete - West

0135004135

Site Concrete - East

8

14AUG13A

05SEP13

3

63

Site Concrete - East

0135004055

Exterior Building Light Fixtures

10

03SEP13

16SEP13

10

0

0135004200

Light Pole Bases

3

03SEP13

05SEP13

3

0

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Generator Enclosure Concrete & Masonry

Finish Grading Site Lighting Conduit Site Concrete - North

Exterior Building Light Fixtures Light Pole Bases AL12 - MonthlyRpt - 11x17

Sheet 2 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

0135004100

Site Concrete - South

3

04SEP13

06SEP13

3

0

Site Concrete - South

0135004170

Playground Asphalt

1

04SEP13

04SEP13

1

0

Playground Asphalt

0135004180

Playground Structure

10

05SEP13

18SEP13

10

0

0135004110

Light Poles & Wiring

4

06SEP13

11SEP13

4

0

0135004120

Paving and Striping

4

12SEP13

17SEP13

4

0

Paving and Striping

0135004125

Site Fencing

10

18SEP13

01OCT13

10

0

Site Fencing

0135004140

Soft Surface

5

19SEP13

25SEP13

5

0

0135004130

Landscaping

5

02OCT13

08OCT13

5

0

0131104005

Foundations Area A

15

23JUL12A

12SEP12A

0

100

0131104010

Rough-in Plumbing U/G - Area A

17

06AUG12A

05SEP12A

0

100

0131104025

Masonry Bearing Walls Area A

25

06AUG12A

21NOV12A

0

100

Masonry Bearing Walls Area A

0131104020

In-wall Electrical Rough-in Area A First Floor

25

22AUG12A

21NOV12A

0

100

In-wall Electrical Rough-in Area A First Floor

0131104305

In Wall Plumbing Rough In

25

04SEP12A

21NOV12A

0

100

In Wall Plumbing Rough In

0131104035

Rough-in Electric U/G - Area A

15

05SEP12A

31OCT12A

0

100

0131104055

Door Frames Area A First Floor

20

17SEP12A

21NOV12A

0

100

0131104040

Plumbing Slab Prep

3

05OCT12A

25OCT12A

0

100

Plumbing Slab Prep

0131104045

Place Slab on Grade Area A

10

08OCT12A

26OCT12A

0

100

Place Slab on Grade Area A

0131104050

Complete In-wall Electrical Rough-in Area A

20

11OCT12A

04FEB13A

0

100

Complete In-wall Electrical Rough-in Area A

0131104060

Interior Masonry Walls Area A First Floor

20

11OCT12A

04FEB13A

0

100

Interior Masonry Walls Area A First Floor

0131104110

Rough-in HVAC Ductwork - Area A First Floor

30

03JAN13A

31MAY13A

0

100

0131104125

Rough-in HVAC Piping - Area A First Floor

30

14JAN13A

21JUN13A

0

100

Rough-in HVAC Piping - Area A First Floor

0131104085

Overhead Rough-in Elec & FA - Area First Floor

35

15JAN13A

21JUN13A

0

100

Overhead Rough-in Elec & FA - Area First Floor

0131104100

E.C. / Rough-in Tech Area A - First Floor

30

15JAN13A

21JUN13A

0

100

E.C. / Rough-in Tech Area A - First Floor

0131104115

Overhead Rough-in Plumbing - Area A First Floor

30

21JAN13A

17MAY13A

0

100

0131104120

Rough-in Fire Prot - Area A First Floor

20

31JAN13A

19JUN13A

0

100

0131104075

Metal Studs Area A First Floor

10

18FEB13A

22FEB13A

0

100

0131104295

Electrical Rough-in - Stud Walls

10

18FEB13A

10APR13A

0

100

0131104140

Rough-in HVAC Insulation - Area A First Floor

30

26MAR13A

14JUN13A

0

100

DEC

Playground Structure Light Poles & Wiring

Soft Surface Landscaping

Area A First Floor Foundations Area A Rough-in Plumbing U/G - Area A

Rough-in Electric U/G - Area A Door Frames Area A First Floor

Rough-in HVAC Ductwork - Area A First Floor

Overhead Rough-in Plumbing - Area A First Floor Rough-in Fire Prot - Area A First Floor Metal Studs Area A First Floor Electrical Rough-in - Stud Walls Rough-in HVAC Insulation - Area A First Floor Stair A,B

0131104135

Stair A,B

10

01APR13A

17APR13A

0

100

0131104065

CMU Veneer Area A First Floor

15

05APR13A

24MAY13A

0

100

0131104150

Stair Concrete Pan Fill - A,B

10

12APR13A

19APR13A

0

100

0131104160

Drywall & Tape Area A First Floor

15

01MAY13A

26JUN13A

0

100

0131104155

Standpipe / Hose Cabinet

3

15MAY13A

07AUG13A

0

100

0131104170

Technology Contractor Rough-in - First Floor

15

20MAY13A

19JUL13A

0

100

Technology Contractor Rough-in - First Floor

0131104165

Prime Paint Area A First Floor

20

22MAY13A

19JUL13A

0

100

Prime Paint Area A First Floor

0131104175

Ceiling Grid Area A First Floor

20

28MAY13A

03JUL13A

0

100

CMU Veneer Area A First Floor Stair Concrete Pan Fill - A,B Drywall & Tape Area A First Floor Standpipe / Hose Cabinet

Ceiling Grid Area A First Floor Frost Slabs

0131104070

Frost Slabs

5

17JUN13A

27JUN13A

0

100

0131104190

Lights in Grid - Area A - First Floor

10

19JUN13A

16AUG13A

0

100

0131104185

HVAC Finishes - Area A First Floor

10

24JUN13A

01AUG13A

0

100

HVAC Finishes - Area A First Floor

0131104180

Fire Prot Finishes - Area A First Floor

10

02JUL13A

01AUG13A

0

100

Fire Prot Finishes - Area A First Floor

0131104195

Finish Paint Area A First Floor

20

08JUL13A

04SEP13

2

90

0131104230

Technology Finishes Area A - First Floor

10

10JUL13A

03SEP13

1

90

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Lights in Grid - Area A - First Floor

Finish Paint Area A First Floor Technology Finishes Area A - First Floor

AL12 - MonthlyRpt - 11x17

Sheet 3 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Ceramic Floor Tile Area A First Floor

0131104225

Ceramic Floor Tile Area A First Floor

20

11JUL13A

18JUL13A

0

100

0131104215

Millwork Area A First Floor

20

16JUL13A

04SEP13

2

90

0131104210

Electric & FA Finishes - Area A First Floor

15

17JUL13A

03SEP13

1

93

Electric & FA Finishes - Area A First Floor

0131104240

Plumbing Finishes - Area A First Floor

20

18JUL13A

09SEP13

5

75

Plumbing Finishes - Area A First Floor

0131104220

VCT / VET Area A First Floor

20

22JUL13A

06SEP13

4

80

VCT / VET Area A First Floor

0131104145

Elevator

20

07AUG13A

05SEP13

3

85

Elevator

0131104205

Ceiling Pads Area A First Floor

10

28AUG13A

13SEP13

9

10

0131104200

Above Ceiling Inspections Complete

0

03SEP13

0131104245

Carpet Area A First Floor

20

05SEP13

0131104255

Toilet Partitions Area A First Floor

10

0131104090

Set Windows Area A First Floor

15

Millwork Area A First Floor

Ceiling Pads Area A First Floor Above Ceiling Inspections Complete

0

0

02OCT13

20

0

05SEP13

18SEP13

10

0

09SEP13

27SEP13

15

0

Set Windows Area A First Floor

Carpet Area A First Floor Toilet Partitions Area A First Floor

0131104260

Doors & Hardware Area A First Floor

10

19SEP13

02OCT13

10

0

Doors & Hardware Area A First Floor

0131104265

Marker / Tack Boards Area A First Floor

10

19SEP13

02OCT13

10

0

Marker / Tack Boards Area A First Floor

0131104280

Toilet Accessories Area A First Floor

5

19SEP13

25SEP13

5

0

Toilet Accessories Area A First Floor

0131104270

Projection Screens Area A First Floor

5

26SEP13

02OCT13

5

0

0131104275

Signage Area A First Floor

5

26SEP13

02OCT13

5

0

0131104105

Building Final Area Enclosure

0

0131104285

FF & E Area A First Floor

3

27SEP13

0

0

03OCT13

07OCT13

3

0

Projection Screens Area A First Floor Signage Area A First Floor Building Final Area Enclosure FF & E Area A First Floor

Second Floor Mechanical Room 0132134015

Wall Electrical Rough-in

15

01APR13A

19APR13A

0

100

Wall Electrical Rough-in

0132134005

Set HVAC Equipment

10

15APR13A

17APR13A

0

100

Set HVAC Equipment

0132134035

HVAC Rough-in - Ductwork

15

22APR13A

02JUL13A

0

100

HVAC Rough-in - Ductwork

0132134040

HVAC Rough-in - Piping

15

23APR13A

12JUL13A

0

100

HVAC Rough-in - Piping

0132134020

Overhead Elec. & Fire Alarm Rough-in

30

22MAY13A

16AUG13A

0

100

0132134025

Fire Protection Rough-in

5

24MAY13A

07JUN13A

0

100

0132134055

Fire Protection Finishes

5

02JUL13A

12JUL13A

0

100

0132134045

HVAC Rough-in - Insulation

15

14AUG13A

05SEP13

3

80

0132134030

Lighting

5

16AUG13A

20AUG13A

0

100

0132134060

Electric & Fire Alarm Finishes

25

16AUG13A

05SEP13

3

88

Electric & Fire Alarm Finishes HVAC Finishes

Overhead Elec. & Fire Alarm Rough-in Fire Protection Rough-in Fire Protection Finishes HVAC Rough-in - Insulation Lighting

0132134065

HVAC Finishes

10

20AUG13A

04SEP13

2

80

0131204010

Structural Steel & Metal Decking

10

25OCT12A

30NOV12A

0

100

0131204035

Electrical Rough-in on Metal Deck

5

26NOV12A

05DEC12A

0

100

Electrical Rough-in on Metal Deck

0131204045

Slab on Metal Deck

2

03DEC12A

07DEC12A

0

100

Slab on Metal Deck

0131204020

In-wall Electrical Rough-in Area A Second Floor

10

10DEC12A

29MAR13A

0

100

0131204025

Masonry Bearing Walls Area A

10

10DEC12A

08JAN13A

0

100

0131204055

Door Frames Area A Second Floor

15

10DEC12A

04MAR13A

0

100

0131204130

In Wall Plumbing Rough In

10

10DEC12A

24MAY13A

0

100

0131204060

Interior Masonry Walls Area A Second Floor

10

25JAN13A

30MAY13A

0

100

0131204110

Rough-in HVAC Ductwork - Area A Second Floor

30

28JAN13A

13JUN13A

0

100

Rough-in HVAC Ductwork - Area A Second Floor

0131204125

Rough-in HVAC Piping - Area A Second Floor

30

06FEB13A

13JUN13A

0

100

Rough-in HVAC Piping - Area A Second Floor

0131204115

Overhead Rough-in Plumbing - Area A Second Floor

20

07FEB13A

24JUN13A

0

100

0131204075

Metal Studs Area A Second Floor

10

18FEB13A

26APR13A

0

100

0131204100

E.C. / Rough-in Tech Area A - Second Floor

30

18FEB13A

27MAY13A

0

100

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Structural Steel & Metal Decking

In-wall Electrical Rough-in Area A Second Floor Masonry Bearing Walls Area A Door Frames Area A Second Floor In Wall Plumbing Rough In Interior Masonry Walls Area A Second Floor

Overhead Rough-in Plumbing - Area A Second Floor Metal Studs Area A Second Floor E.C. / Rough-in Tech Area A - Second Floor

AL12 - MonthlyRpt - 11x17

Sheet 4 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Complete In-wall Electrical Rough-in Area A

0131204050

Complete In-wall Electrical Rough-in Area A

15

01APR13A

16MAY13A

0

100

0131204085

Overhead Rough-in Elec & FA - Area Second Floor

35

08APR13A

10JUL13A

0

100

0131204070

Equipment Pads

5

11APR13A

12APR13A

0

100

0131204120

Rough-in Fire Prot - Area A Second Floor

20

18APR13A

14JUN13A

0

100

0131204160

Drywall & Tape Area A Second Floor

15

09MAY13A

15JUL13A

0

100

0131204065

CMU Veneer Area A Second Floor

20

13MAY13A

25JUN13A

0

100

0131204150

Technology Contractor Rough-in - Second Floor

15

22MAY13A

05JUL13A

0

100

0131204175

Ceiling Grid Area A Second Floor

20

10JUN13A

01JUL13A

0

100

Ceiling Grid Area A Second Floor

0131204165

Prime Paint Area A Second Floor

20

11JUN13A

01JUL13A

0

100

Prime Paint Area A Second Floor

0131204140

Rough-in HVAC Insulation Area A - Second Floor

30

12JUN13A

03JUL13A

0

100

Rough-in HVAC Insulation Area A - Second Floor

0131204155

Standpipe / Hose Cabinet

3

14JUN13A

20JUN13A

0

100

0131204190

Lights in Grid - Area A - Second Floor

10

20JUN13A

03JUL13A

0

100

0131204185

HVAC Finishes - Area A Second Floor

10

26JUN13A

12JUL13A

0

100

0131204180

Fire Prot Finishes - Area A Second Floor

10

08JUL13A

02AUG13A

0

100

0131204210

Electric & FA Finishes - Area A Second Floor

15

10JUL13A

03SEP13

1

93

0131204205

Ceiling Pads Area A Second Floor

10

15JUL13A

12SEP13

8

20

0131204230

Technology Finishes Area A - Second Floor

10

17JUL13A

03SEP13

1

90

0131204225

Ceramic Floor Tile Area A Second Floor

20

19JUL13A

05AUG13A

0

100

0131204195

Finish Paint Area A Second Floor

20

23JUL13A

03SEP13

1

95

Finish Paint Area A Second Floor

0131204215

Millwork Area A Second Floor

20

31JUL13A

05SEP13

3

85

Millwork Area A Second Floor

0131204220

VCT / VET Area A Second Floor

20

05AUG13A

11SEP13

7

65

0131204240

Plumbing Finishes - Area A Second Floor

10

07AUG13A

10SEP13

5

50

0131204200

Above Ceiling Inspections Complete

0

03SEP13

0

0

0131204250

Lockers Area A Second Floor

10

03SEP13

10

0

16SEP13

Overhead Rough-in Elec & FA - Area Second Floor Equipment Pads Rough-in Fire Prot - Area A Second Floor Drywall & Tape Area A Second Floor CMU Veneer Area A Second Floor Technology Contractor Rough-in - Second Floor

Standpipe / Hose Cabinet Lights in Grid - Area A - Second Floor HVAC Finishes - Area A Second Floor Fire Prot Finishes - Area A Second Floor Electric & FA Finishes - Area A Second Floor Ceiling Pads Area A Second Floor Technology Finishes Area A - Second Floor Ceramic Floor Tile Area A Second Floor

VCT / VET Area A Second Floor Plumbing Finishes - Area A Second Floor Above Ceiling Inspections Complete Lockers Area A Second Floor

0131204260

Doors & Hardware Area A Second Floor

10

03SEP13

16SEP13

10

0

Doors & Hardware Area A Second Floor

0131204265

Marker / Tack Boards Area A Second Floor

10

03SEP13

16SEP13

10

0

Marker / Tack Boards Area A Second Floor

0131204255

Toilet Partitions Area A Second Floor

10

04SEP13

17SEP13

10

0

Toilet Partitions Area A Second Floor Projection Screens Area A Second Floor

0131204270

Projection Screens Area A Second Floor

5

12SEP13

18SEP13

5

0

0131204275

Signage Area A Second Floor

5

12SEP13

18SEP13

5

0

0131204090

Set Windows Area A Second Floor

15

16SEP13

04OCT13

15

0

Set Windows Area A Second Floor

0131204280

Toilet Accessories Area A Second Floor

4

16SEP13

19SEP13

4

0

Toilet Accessories Area A Second Floor

0131204285

FF&E Area A Second Floor

3

03OCT13

07OCT13

3

0

FF&E Area A Second Floor

0131204105

Building Final Area Enclosure

0

04OCT13

0

0

Building Final Area Enclosure

0131304010

Structural Steel & Metal Deck

7

07JAN13A

21JAN13A

0

100

0131304020

Ext Masonry In-wall Elect R/I Area A 3rd Flr

20

14JAN13A

25JAN13A

0

100

Ext Masonry In-wall Elect R/I Area A 3rd Flr

0131304025

Exterior Masonry Bearing Walls Area A 3rd Floor

15

14JAN13A

25JAN13A

0

100

Exterior Masonry Bearing Walls Area A 3rd Floor

0131304030

Electrical Rough-in on Metal Deck

5

28JAN13A

07FEB13A

0

100

0131304150

Slab On Metal Deck

4

11FEB13A

15FEB13A

0

100

0131304050

Interior Masonry Bearing Walls

15

22FEB13A

14MAR13A

0

100

0131304055

Door Frames Area A Third Floor

20

22FEB13A

19APR13A

0

100

0131304060

Interior Masonry Walls Area A Third Floor

10

22FEB13A

31MAY13A

0

100

0131304145

In Wall Plumbing Rough-in - Area A Third Floor

28

22FEB13A

24MAY13A

0

100

0131304295

Interior Bearing Masonry In-wall Elect. R/I

15

22FEB13A

14MAR13A

0

100

Signage Area A Second Floor

Third Floor

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Structural Steel & Metal Deck

Electrical Rough-in on Metal Deck Slab On Metal Deck Interior Masonry Bearing Walls Door Frames Area A Third Floor Interior Masonry Walls Area A Third Floor In Wall Plumbing Rough-in - Area A Third Floor Interior Bearing Masonry In-wall Elect. R/I AL12 - MonthlyRpt - 11x17

Sheet 5 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

Roof Structural Steel & Deck

0131304040

Roof Structural Steel & Deck

20

12MAR13A

27MAR13A

0

100

0131304110

Rough-in HVAC Ductwork - Area A Third Floor

30

27MAR13A

14JUN13A

0

100

Rough-in HVAC Ductwork - Area A Third Floor

0131304125

Rough-in HVAC Piping - Area A Third Floor

30

27MAR13A

25JUN13A

0

100

Rough-in HVAC Piping - Area A Third Floor

0131304080

Roofing

10

02APR13A

06APR13A

0

100

0131304075

Metal Studs Area A Third Floor

10

03APR13A

10APR13A

0

100

0131304135

Complete In Wall Electrical Rough In Area A

15

06APR13A

16MAY13A

0

100

0131304130

Area A - Temporary Building Enclosure Complete

0

06APR13A

0

100

Area A - Temporary Building Enclosure Complete

0131304070

Equipment Pads

5

11APR13A

12APR13A

0

100

Equipment Pads

0131304115

Overhead Rough-in Plumbing - Area A Third Floor

28

22APR13A

25JUN13A

0

100

0131304085

Overhead Rough-in Elec & FA - Area Third Floor

30

24APR13A

25JUL13A

0

100

0131304100

E.C. / Rough-in Tech Area A - Third Floor

30

24APR13A

21JUN13A

0

100

0131304065

CMU Veneer Area A Third Floor

20

08MAY13A

24JUN13A

0

100

0131304160

Drywall & Tape Area A Third Floor

15

17MAY13A

10JUL13A

0

100

Drywall & Tape Area A Third Floor

0131304120

Rough-in Fire Prot - Area A Third Floor

20

10JUN13A

03JUL13A

0

100

Rough-in Fire Prot - Area A Third Floor

0131304170

Technology Contractor Rough-in - Third Floor

15

10JUN13A

10JUL13A

0

100

0131304165

Prime Paint Area A Third Floor

20

12JUN13A

16AUG13A

0

100

0131304155

Standpipe / Hose Cabinet

3

14JUN13A

20JUN13A

0

100

0131304175

Ceiling Grid Area A Third Floor

20

18JUN13A

01JUL13A

0

100

0131304140

Rough-in HVAC Insulation - Area A Third Floor

30

24JUN13A

17JUL13A

0

100

0131304190

Lights in Grid - Area A - Third Floor

5

08JUL13A

24JUL13A

0

100

0131304185

HVAC Finishes - Area A Third Floor

10

12JUL13A

18JUL13A

0

100

0131304180

Fire Prot Finishes - Area A Third Floor

10

15JUL13A

02AUG13A

0

100

0131304205

Ceiling Pads Area A Third Floor

10

16JUL13A

13SEP13

9

10

Roofing Metal Studs Area A Third Floor Complete In Wall Electrical Rough In Area A

Overhead Rough-in Plumbing - Area A Third Floor

Overhead Rough-in Elec & FA - Area Third Floor E.C. / Rough-in Tech Area A - Third Floor CMU Veneer Area A Third Floor

Technology Contractor Rough-in - Third Floor Prime Paint Area A Third Floor Standpipe / Hose Cabinet Ceiling Grid Area A Third Floor Rough-in HVAC Insulation - Area A Third Floor Lights in Grid - Area A - Third Floor HVAC Finishes - Area A Third Floor Fire Prot Finishes - Area A Third Floor Ceiling Pads Area A Third Floor Electric & FA Finishes - Area A Third Floor

0131304210

Electric & FA Finishes - Area A Third Floor

15

17JUL13A

03SEP13

1

93

0131304225

Ceramic Floor Tile Area A Third Floor

15

19JUL13A

26JUL13A

0

100

0131304195

Finish Paint Area A Third Floor

20

29JUL13A

23AUG13A

0

100

0131304230

Technology Finishes Area A - Third Floor

10

05AUG13A

03SEP13

1

90

Technology Finishes Area A - Third Floor

0131304240

Plumbing Finishes - Area A Third Floor

10

05AUG13A

04SEP13

1

90

Plumbing Finishes - Area A Third Floor

0131304215

Millwork Area A Third Floor

20

16AUG13A

23SEP13

15

25

0131304200

Above Ceiling Inspections Complete

0

03SEP13

0

0

0131304220

VCT / VET Area A Third Floor

20

03SEP13

30SEP13

20

0

0131304090

Set Windows Area A Third Floor

15

23SEP13

11OCT13

15

0

Set Windows Area A Third Floor

0131304255

Toilet Partitions Area A Third Floor

5

24SEP13

30SEP13

5

0

Toilet Partitions Area A Third Floor

0131304260

Doors & Hardware Area A Third Floor

10

24SEP13

07OCT13

10

0

Doors & Hardware Area A Third Floor

0131304280

Toilet Accessories Area A Third Floor

5

24SEP13

30SEP13

5

0

Toilet Accessories Area A Third Floor

Ceramic Floor Tile Area A Third Floor Finish Paint Area A Third Floor

Millwork Area A Third Floor Above Ceiling Inspections Complete VCT / VET Area A Third Floor

0131304265

Marker / Tack Boards Area A Third Floor

5

01OCT13

07OCT13

5

0

Marker / Tack Boards Area A Third Floor

0131304270

Projection Screens Area A Third Floor

2

01OCT13

02OCT13

2

0

Projection Screens Area A Third Floor

0131304275

Signage Area A Third Floor

5

01OCT13

07OCT13

5

0

Signage Area A Third Floor

0131304285

FF & E Area A Third Floor

3

01OCT13

03OCT13

3

0

0131304105

Building Final Area Enclosure

0

11OCT13

0

DEC

FF & E Area A Third Floor Building Final Area Enclosure

0

Area B

gym west ab error

First Floor Gymnasium 0132114115

Load Bearing Masonry

20

31AUG12A

24NOV12A

0

100

0132114120

Structural Steel & Deck

4

19DEC12A

28DEC12A

0

100

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Load Bearing Masonry Structural Steel & Deck

AL12 - MonthlyRpt - 11x17

Sheet 6 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Gymnasium Plumbing Rough-in Roof Drains

0132114135

Plumbing Rough-in Roof Drains

10

16JAN13A

20MAY13A

0

100

0132114130

Roofing

10

17JAN13A

15MAR13A

0

100

0132114150

Gymnasium Temporary Enclosure Complete

0

15MAR13A

0

100

0132114010

Slab on Grade

5

28MAR13A

0

100

Slab on Grade Underground Electrical Rough-in

19MAR13A

0132114005

Underground Electrical Rough-in

10

26MAR13A

27MAR13A

0

100

0132114140

CMU Veneer - East, South, West

20

03APR13A

20JUN13A

0

100

0132114025

Fire Protection Rough-in

10

08APR13A

03MAY13A

0

100

0132114015

Overhead Elec. & Fire Alarm Rough-in

25

16APR13A

03JUN13A

0

100

Roofing Gymnasium Temporary Enclosure Complete

CMU Veneer - East, South, West Fire Protection Rough-in Overhead Elec. & Fire Alarm Rough-in Fire Protection Finishes

0132114055

Fire Protection Finishes

5

01MAY13A

03MAY13A

0

100

0132114030

HVAC Rough-in - Ductwork

15

13MAY13A

31MAY13A

0

100

0132114050

Finish Painting

5

20MAY13A

01JUL13A

0

100

0132114125

CMU Veneer - North

10

10JUN13A

20JUN13A

0

100

0132114160

Technology Contractor Rough-in - Gym

5

01JUL13A

16AUG13A

0

100

0132114060

HVAC Finishes

10

08JUL13A

12JUL13A

0

100

0132114075

Gym Equipment

10

08JUL13A

30AUG13A

0

100

0132114065

Electric & Fire Alarm Finishes

5

05AUG13A

16AUG13A

0

100

Electric & Fire Alarm Finishes

0132114035

Gym Lighting

5

09AUG13A

16AUG13A

0

100

Gym Lighting

0132114085

Stage Equipment

10

03SEP13

16SEP13

10

0

0132114145

HVAC Operable

0

03SEP13*

0

0

0132114170

Gym Windows

5

09SEP13

13SEP13

5

0

0132114095

Gym Flooring

25

16SEP13

18OCT13

25

0

0132114090

Stage Lighting

5

17SEP13

23SEP13

5

0

0132114100

Gym Bleachers

10

21OCT13

01NOV13

10

0

0132114105

Stage Flooring

5

21OCT13

25OCT13

5

0

HVAC Rough-in - Ductwork Finish Painting CMU Veneer - North Technology Contractor Rough-in - Gym HVAC Finishes Gym Equipment

Stage Equipment HVAC Operable Gym Windows Gym Flooring Stage Lighting Gym Bleachers Stage Flooring

0132104270

Proj Screen @ Stage

5

28OCT13

01NOV13

5

0

Proj Screen @ Stage

0132114110

Operable Partition

5

28OCT13

01NOV13

5

0

Operable Partition

0132124095

Underslab Plumbing Rough-in

10

07SEP12A

13SEP12A

0

100

0132124075

Plumbing Slab Prep

3

13SEP12A

17SEP12A

0

100

0132124125

Load Bearing Masonry

1

05NOV12A

04DEC12A

0

100

0132124090

Underslab Electrical Rough-in

5

07NOV12A

12NOV12A

0

100

Underslab Electrical Rough-in

0132124085

Slab on Grade

5

13NOV12A

13NOV12A

0

100

Slab on Grade

0132124135

Structural Steel & Metal Deck

5

05DEC12A

18DEC12A

0

100

0132124105

In Wall Plumbing Rough-in

20

12FEB13A

24MAY13A

0

100

0132124145

Roofing

5

13FEB13A

15FEB13A

0

100

0132124115

Overhead Plumbing Rough-in

20

18FEB13A

12JUL13A

0

100

0132124030

HVAC Rough-in

10

26FEB13A

20JUN13A

0

100

Kitchen

0132124065

Fire Protection Rough-in

10

12APR13A

17MAY13A

0

100

0132124035

Electrical Rough-in

10

22APR13A

09SEP13

5

50

0132124155

Prime Paint

5

29JUL13A

01AUG13A

0

100

0132124025

Finish Paint

5

12AUG13A

03SEP13

1

80

0132124045

HVAC Finishes

5

19AUG13A

26AUG13A

0

100

0132124020

Security Grille

5

03SEP13*

09SEP13

5

0

0132124080

Plumbing Finishes

10

04SEP13

17SEP13

10

0

0132124100

Above Ceiling Inspections Complete

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

0

09SEP13

0

Underslab Plumbing Rough-in Plumbing Slab Prep Load Bearing Masonry

Structural Steel & Metal Deck In Wall Plumbing Rough-in Roofing Overhead Plumbing Rough-in HVAC Rough-in Fire Protection Rough-in Electrical Rough-in Prime Paint Finish Paint HVAC Finishes Security Grille Plumbing Finishes Above Ceiling Inspections Complete

0

Early Bar Progress Bar Critical Activity

AL12 - MonthlyRpt - 11x17

Sheet 7 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Kitchen Install Kitchen Tile

0132124015

Install Kitchen Tile

10

10SEP13

23SEP13

10

0

0132124040

Electrical Finishes

5

10SEP13

16SEP13

5

0

Electrical Finishes

0132124050

Ceiling Grid

5

24SEP13

26SEP13

3

40

Ceiling Grid

0132124055

Lights in Grid

5

27SEP13

03OCT13

5

0

Lights in Grid

0132124070

Fire Protection Finishes

5

27SEP13

03OCT13

5

0

Fire Protection Finishes

0132124060

Ceiling Pads

2

04OCT13

07OCT13

2

0

0132124010

Install Kitchen Equipment

5

08OCT13

14OCT13

5

0

Install Kitchen Equipment

10

0

Kitchen Equipment Hook-ups

0

100

0132124005

Kitchen Equipment Hook-ups

10

15OCT13

28OCT13

0132104005

Foundations Area B

15

06AUG12A

0132104010

Rough-in Plumbing U/G - Area B

12

03SEP12A

13SEP12A

0

100

0132104025

Masonry Bearing Walls Area B

50

04SEP12A

15MAR13A

0

100

0132104035

Rough-in Electric U/G - Area B

20

12OCT12A

12APR13A

0

100

Ceiling Pads

Area B

0132104040

Structural Steel & Deck - Roof & Mechanical Room

15

11JAN13A

15MAR13A

0

100

0132104020

In-wall Elec & FA Rough-in Area B First Floor

50

18JAN13A

29MAY13A

0

100

0132104110

Rough-in HVAC Ductwork - Area B First Floor

20

01MAR13A

12JUL13A

0

100

0132104125

Rough-in HVAC Piping - Area B First Floor

20

12MAR13A

12JUL13A

0

100

0132104085

Overhead Rough-in Elec & FA - Area B First Floor

20

15MAR13A

04SEP13

2

90

0132104115

Overhead Rough-in Plumbing - Area B First Floor

30

15MAR13A

03JUL13A

0

100

0132104130

In Wall Plumbing Rough-in

20

15MAR13A

29MAY13A

0

100

0132104140

Rough-in HVAC Insulation - Area B First Floor

20

03APR13A

03SEP13

1

95

0132104080

Roofing Area B

10

04APR13A

06APR13A

0

100

0132104065

CMU Veneer

20

05APR13A

28JUN13A

0

100

0132104300

Area B Temporary Enclosure Complete

0

06APR13A

0

100

0132104135

Stair C

5

15APR13A

0

100

08APR13A

Foundations Area B Rough-in Plumbing U/G - Area B Masonry Bearing Walls Area B Rough-in Electric U/G - Area B Structural Steel & Deck - Roof & Mechanical Room In-wall Elec & FA Rough-in Area B First Floor Rough-in HVAC Ductwork - Area B First Floor Rough-in HVAC Piping - Area B First Floor Overhead Rough-in Elec & FA - Area B First Floor Overhead Rough-in Plumbing - Area B First Floor In Wall Plumbing Rough-in Rough-in HVAC Insulation - Area B First Floor Roofing Area B CMU Veneer Area B Temporary Enclosure Complete Stair C Plumbing Slab Prep

0132104030

Plumbing Slab Prep

2

11APR13A

12APR13A

0

100

0132104295

Fire Protection Riser

10

12APR13A

26JUL13A

0

100

0132104120

Rough-in Fire Prot - Area B First Floor

20

15APR13A

24MAY13A

0

100

0132104150

Stair Pan Concrete Fill

5

15APR13A

15APR13A

0

100

Stair Pan Concrete Fill

0132104045

Place SOG Area B Stud.Dining/Gall./Vest.

8

17APR13A

17APR13A

0

100

Place SOG Area B Stud.Dining/Gall./Vest.

0132104055

Door Frames Area B First Floor in Metal Studs

10

22APR13A

28JUN13A

0

100

0132104075

Metal Studs Area B First Floor

10

22APR13A

07JUN13A

0

100

0132104160

Drywall & Tape Area B First Floor

15

07MAY13A

26AUG13A

0

100

0132104060

Interior Masonry Area B First Floor

10

23MAY13A

29MAY13A

0

100

0132104100

EC Rough-in Tech Area B - First Floor

20

30MAY13A

01JUL13A

0

100

0132104175

Ceiling Grid Area B First Floor

20

12JUN13A

27AUG13A

0

100

0132104165

Prime Paint Area B First Floor

20

14JUN13A

18SEP13

12

40

0132104070

Frost Slabs

5

17JUN13A

21JUN13A

0

100

0132104170

Technology Contractor Rough-in / Area B

15

26JUN13A

03SEP13

1

93

0132104185

HVAC Finishes - Area B First Floor

10

28JUN13A

04SEP13

1

90

0132104180

Fire Prot Finishes - Area B First Floor

10

03JUL13A

03SEP13

1

90

0132104225

Ceramic Floor Tile Area B First Floor

20

29JUL13A

02AUG13A

0

100

0132104195

Finish Paint Area B First Floor

20

07AUG13A

16SEP13

10

50

0132104240

Plumbing Finishes - Area B First Floor

15

12AUG13A

16SEP13

10

33

0132104190

Lights in Grid - Area B - First Floor

20

19AUG13A

30SEP13

20

0

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

Fire Protection Riser Rough-in Fire Prot - Area B First Floor

Door Frames Area B First Floor in Metal Studs Metal Studs Area B First Floor Drywall & Tape Area B First Floor Interior Masonry Area B First Floor EC Rough-in Tech Area B - First Floor Ceiling Grid Area B First Floor Prime Paint Area B First Floor Frost Slabs Technology Contractor Rough-in / Area B HVAC Finishes - Area B First Floor Fire Prot Finishes - Area B First Floor Ceramic Floor Tile Area B First Floor Finish Paint Area B First Floor Plumbing Finishes - Area B First Floor Lights in Grid - Area B - First Floor AL12 - MonthlyRpt - 11x17

Sheet 8 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Area B 0132104210

Electric & FA Finishes - Area B First Floor

20

19AUG13A

25SEP13

15

25

Electric & FA Finishes - Area B First Floor

0132104230

Technology Finishes Area B - First Floor

20

20AUG13A

17SEP13

10

50

Technology Finishes Area B - First Floor

0132104215

Millwork Area B First Floor

10

03SEP13

16SEP13

10

0

Millwork Area B First Floor

0132104220

VCT / VET Area B First Floor

20

03SEP13

30SEP13

20

0

VCT / VET Area B First Floor

0132104090

Set Windows Area B First Floor

20

09SEP13

04OCT13

20

0

Set Windows Area B First Floor

0132104235

Acoustic Panels Area B First Floor

10

17SEP13

30SEP13

10

0

0132104275

Signage Area B First Floor

5

17SEP13

23SEP13

5

0

0132104245

Carpet Area B First Floor

10

24SEP13

07OCT13

10

0

0132104200

Above Ceiling Inspections Complete

0

01OCT13

0132104205

Ceiling Pads Area B First Floor

15

01OCT13

0132104250

Lockers Area B First Floor

10

01OCT13

Acoustic Panels Area B First Floor Signage Area B First Floor Carpet Area B First Floor Above Ceiling Inspections Complete

0

0

21OCT13

15

0

14OCT13

10

0

Lockers Area B First Floor

Ceiling Pads Area B First Floor

0132104255

Toilet Partitions Area B First Floor

10

01OCT13

14OCT13

10

0

Toilet Partitions Area B First Floor

0132104260

Doors & Hardware Area B First Floor

10

01OCT13

14OCT13

10

0

Doors & Hardware Area B First Floor

0132104265

Marker / Tack Boards Area B First Floor

10

01OCT13

14OCT13

10

0

Marker / Tack Boards Area B First Floor

0132104280

Toilet Accessories Area B First Floor

10

03OCT13

16OCT13

10

0

Toilet Accessories Area B First Floor

0132104285

FF & E Area B First Floor

3

03OCT13

07OCT13

3

0

0132104105

Building Area Final Enclosure

0

04OCT13

0

0

FF & E Area B First Floor Building Area Final Enclosure

Second Floor Mechanical Room Area B SOD 2nd Floor

0132234075

Area B SOD 2nd Floor

1

19DEC12A

19DEC12A

0

100

0132234085

Area B 2nd Floor Mech Rm CMU

5

26DEC12A

08JAN13A

0

100

Area B 2nd Floor Mech Rm CMU

0132234015

Wall Electrical Rough-in

15

31DEC12A

08JAN13A

0

100

Wall Electrical Rough-in

0132234095

Area B Roof Steel Mech Rm.

3

11JAN13A

18JAN13A

0

100

0132234105

Area B Mech Rm Roof

4

13FEB13A

13FEB13A

0

100

0132234115

Set Switch Gear

1

26FEB13A

26FEB13A

0

100

0132234005

Set HVAC Equipment

10

02APR13A

12APR13A

0

100

0132234035

HVAC Rough-in - Ductwork

15

06JUN13A

19AUG13A

0

100

0132234040

HVAC Rough-in - Piping

15

11JUN13A

16AUG13A

0

100

0132234065

HVAC Finishes

10

02JUL13A

05JUL13A

0

100

0132234055

Fire Protection Finishes

5

05JUL13A

10JUL13A

0

100

0132234020

Overhead Elec. & Fire Alarm Rough-in

30

12JUL13A

10SEP13

6

80

0132234025

Fire Protection Rough-in

5

15JUL13A

18JUL13A

0

100

0132234045

HVAC Rough-in - Insulation

15

19AUG13A

05SEP13

3

80

0132234030

Lighting

5

11SEP13

17SEP13

5

0

0132234060

Electric & Fire Alarm Finishes

10

0130007005

Operation & Maintenance Manuals Submitted

0

0130007010

Contractor Punchlist

10

0130007015

HVAC Controls Check-out and Balancing

0130007120

LEED Air Testing

11SEP13

24SEP13

10

0

16SEP13

0

0

29OCT13

11NOV13

10

0

10

29OCT13

11NOV13

10

0

1

02NOV13

02NOV13

1

0

Area B Roof Steel Mech Rm. Area B Mech Rm Roof Set Switch Gear Set HVAC Equipment HVAC Rough-in - Ductwork HVAC Rough-in - Piping HVAC Finishes Fire Protection Finishes Overhead Elec. & Fire Alarm Rough-in Fire Protection Rough-in HVAC Rough-in - Insulation Lighting Electric & Fire Alarm Finishes

Close-Out

Operation & Maintenance Manuals Submitted Contractor Punchlist HVAC Controls Check-out and Balancing LEED Air Testing

0130007020

Final Inspections / Testing

5

05NOV13

11NOV13

5

0

Final Inspections / Testing

0130007025

Initial Architect's Punchlist

5

05NOV13

11NOV13

5

0

Initial Architect's Punchlist

0130007030

Fire Alarm Programming & Testing

5

05NOV13

11NOV13

5

0

Fire Alarm Programming & Testing

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Early Bar Progress Bar Critical Activity

AL12 - MonthlyRpt - 11x17

Sheet 9 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

07NOV13

13NOV13

5

0

Demonstration & Training

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

0130007085

Demonstration & Training

5

0130007040

Final Inspections Complete

0

11NOV13

0

0

Final Inspections Complete

0130007075

Certificate of Occupancy

0

11NOV13

0

0

Certificate of Occupancy

0130007035

JACE Interface Check-out

5

12NOV13

18NOV13

5

0

JACE Interface Check-out

0130007050

Architect's Final Punch List

5

12NOV13

18NOV13

5

0

Architect's Final Punch List

0130007055

As-Built Documents Submitted

5

12NOV13

18NOV13

5

0

As-Built Documents Submitted

0130007080

Owner Move In

5

12NOV13

18NOV13

5

0

0130007090

Close-out Documents / Add'l Training

45

0130007100

Owner Move-in Complete

0

0130007060

Project Team - Controls Check-out

5

0130007065

Building Commissioning

5

13JAN14

45

0

18NOV13

0

0

Owner Move-in Complete

19NOV13

25NOV13

5

0

26NOV13

02DEC13

5

0

0130007070

MEP Commissioning Complete

0

02DEC13

0

0

0130007105

Contract Close-out

0

13JAN14

0

0

Start Date Finish Date Data Date Run Date

01FEB12 13JAN14 02SEP13 03SEP13 11:21

Owner Move In Close-out Documents / Add'l Training

12NOV13

Early Bar Progress Bar Critical Activity

Project Team - Controls Check-out Building Commissioning MEP Commissioning Complete

AL12 - MonthlyRpt - 11x17

Sheet 10 of 10

Almira PK-8 Cleveland Metropolitan School District Construction Schedule Update # 12 - September 3, 2013

Š Primavera Systems, Inc.

DEC

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

0580001005 Bid Opening

0

26APR12A

0580001010 Bid Evaluation and Award

23

26APR12A

0580001015 NTP - BP

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Bid & Award

Bid Opening

100

0 26APR1

29JUN12A

100

0 26APR1 29JUN12

0

29JUN12A

100

0

29JUN12

0580001090 Construction Kick-off Meeting

0

12JUL12A

100

0

12JUL12

0580001025 Prime Contractors Submit Schedules

10

23JUL12A

10AUG12A

100

0 23JUL1210AUG12

0580001075 Site Mobilization - BP 310 Site Work

10

30JUL12A

03AUG12A

100

0 30JUL1203AUG12

0580001030 Schedule Meeting(s) to Review

10

23AUG12A 20SEP12A

100

0 23AUG120SEP12

0580001020 Site Mobilization - BP 061 General

10

27AUG12A 07SEP12A

100

0 27AUG107SEP12

Site Mobilization - BP 061 General Trades

0580001060 Site Mobilization - BP 260 Electrical

10

10SEP12A

20SEP12A

100

0 10SEP1 20SEP12

Site Mobilization - BP 260 Electrical

0580001065 Site Mobilization - BP 270 Technology

10

10SEP12A

21SEP12A

100

0 10SEP1 21SEP12

Site Mobilization - BP 270 Technology

0580001035 Prime Contractors/CM Final Review

5

12SEP12A

19SEP12A

100

0 12SEP1 19SEP12

Prime Contractors/CM Final Review Schedule

0580001040 Contractors Sign Off - Project Baseline

0

20SEP12A

100

0

0580001050 Site Mobilization - BP 220 Plumbing

10

21SEP12A 05OCT12A

100

0 21SEP1 05OCT12

0580001055 Site Mobilization - BP 230 HVAC

10

28JAN13A

30JAN13A

100

0 28JAN1330JAN13

0580001045 Site Mobilization - BP 210 Fire

3

07FEB13A

14FEB13A

100

0 07FEB1 14FEB13

0580001070 Site Mobilization - BP 300 Site

10

17JUL13A

23JUL13A

100

0580001085 Site Mobilization - BP 121 FF & E

10

30SEP13

11OCT13

0

10

0580001080 Site Mobilization - BP 329 Landscaping 10

08OCT13

21OCT13

0

10

02JUL12A

31JUL12A

100

Bid Evaluation and Award NTP - BP 061,210,220,230,260,270,300,310,329 Construction Kick-off Meeting Prime Contractors Submit Schedules Site Mobilization - BP 310 Site Work Schedule Meeting(s) to Review Schedule

Contractors Sign Off - Project Baseline Schedule

20SEP12

Site Mobilization - BP 220 Plumbing Site Mobilization - BP 230 HVAC Site Mobilization - BP 210 Fire Protection Site Mobilization - BP 300 Site Concrete

0 17JUL1323JUL13

Site Mobilization - BP 121 FF & E Site Mobilization - BP 329 Landscaping

Submittals & Approvals

0580002010 Submittal HVAC Equipment

20

0 02JUL1231JUL12

Submittal HVAC Equipment Submittal Roofing

0580002055 Submittal Roofing

20

02JUL12A

30JUL12A

100

0 02JUL1230JUL12

0580002025 Site Submittals

4

09JUL12A

23JUL12A

100

0 09JUL1223JUL12

0580002030 Submittal Concrete/Rebar

10

10JUL12A

12JUL12A

100

0 10JUL1212JUL12

0580002040 Submittal Brick and Mortar

10

13JUL12A

20JUL12A

100

0 13JUL1220JUL12

0580002045 Submittal Structural Steel/Joists/Deck

45

16JUL12A

24AUG12A

100

0 16JUL1224AUG12

0580002085 Review and Approval Concrete &

5

16JUL12A

20JUL12A

100

0 16JUL1220JUL12

0580002035 Submittal Block and Mortar

10

20JUL12A

27JUL12A

100

0 20JUL1227JUL12

0580002090 Review and Approval Block and Mortar

15

20JUL12A

22AUG12A

100

0 20JUL1222AUG12

0580002080 Review and Approval Site Submittal

5

25JUL12A

31JUL12A

100

0 25JUL1231JUL12

0580002015 Coordination Drawing Meetings

45

27JUL12A

19OCT12A

100

0 27JUL1219OCT12

Site Submittals Submittal Concrete/Rebar Submittal Brick and Mortar Submittal Structural Steel/Joists/Deck Review and Approval Concrete & Rebar Submittal Block and Mortar Review and Approval Block and Mortar Review and Approval Site Submittal Coordination Drawing Meetings HVAC/E/P/FP/GTC Review and Approval Brick and Mortar

0580002100 Review and Approval Brick and Mortar

15

30JUL12A

24AUG12A

100

0 30JUL1224AUG12

0580001125 Review and Approval Roofing

15

31JUL12A

18DEC12A

100

0 31JUL1218DEC12

0580002095 Submittal - Precast Concrete Plank

20

31JUL12A

01AUG12A

100

0 31JUL1201AUG12

0580002105 Review and Approve Precast Concrete

15

06AUG12A 19SEP12A

100

0 06AUG119SEP12

0580002060 Submittal HM Frame

20

13AUG12A 04SEP12A

100

0 13AUG104SEP12

0580002065 Submittal Windows and Curtain Wall

40

13AUG12A 27NOV12A

100

0 13AUG127NOV12

0580002110 Review and Approval Structural

45

24AUG12A 18SEP12A

100

0 24AUG118SEP12

0580002020 Submittal Electrical and Fire Alarm

25

27AUG12A 14SEP12A

100

0 27AUG114SEP12

0580002145 Review and Approve Windows and

15

27AUG12A 04FEB13A

100

0 27AUG104FEB13

0580002005 Submittal Plumbing

10

28AUG12A 28SEP12A

100

0 28AUG128SEP12

0580002070 Submittal / Shop Drawings Fire

35

03SEP12A 03OCT12A

100

0 03SEP1 03OCT12

0580002120 Review and Approval HM Frames

15

04SEP12A

25SEP12A

100

0 04SEP1 25SEP12

Review and Approval HM Frames

0580002135 City Review & Approval Fire Protection

20

06SEP12A

27SEP12A

100

0 06SEP1 27SEP12

City Review & Approval Fire Protection Submittal

0580002130 Review & App Electric and Fire Alarm

15

17SEP12A 11DEC12A

100

0 17SEP1 11DEC12

0580002075 Review and Approval Plumbing

15

28SEP12A 28NOV12A

100

0 28SEP1 28NOV12

Review and Approval Plumbing Submittal

0580002115 Review and Approve HVAC Submittal

15

28SEP12A 07DEC12A

100

0 28SEP1 07DEC12

Review and Approve HVAC Submittal

0580002140 Review and Approval Fire Submittal

15

05OCT12A 19OCT12A

100

0 05OCT119OCT12

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Review and Approval Roofing Submittal Submittal - Precast Concrete Plank Review and Approve Precast Concrete Plank Submittal HM Frame Submittal Windows and Curtain Wall Review and Approval Structural Steel/Joists/Deck Submittal Electrical and Fire Alarm Review and Approve Windows and Curtain Wall Submittal Plumbing Submittal / Shop Drawings Fire Protection

Review & App Electric and Fire Alarm Submittal

Review and Approval Fire Submittal Miles K-8 P58

Sheet 1 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

0580002150 Review Coordination Drawings and

15

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

21NOV12A 06DEC12A

100

0 21NOV106DEC12

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Review Coordination Drawings and Sign-Off

Fab & Deliver

0580003015 Fabrication and Deliver Concrete

6

30JUL12A

24AUG12A

100

0 30JUL1224AUG12

Fabrication and Deliver Concrete Steel/Rebar

0580003010 Delivery of Site Materials

10

20AUG12A 24AUG12A

100

0 20AUG124AUG12

Delivery of Site Materials

0580003020 Fabrication and Delivery - CMU Units

16

10SEP12A

14SEP12A

100

0 10SEP1 14SEP12

0580003065 Fabrication & Delivery of Precast

30

24SEP12A 30NOV12A

100

0 24SEP1 30NOV12

0580003050 Fabrication and Delivery - HM Frames

30

26SEP12A

04JAN13A

100

0 26SEP1 04JAN13

Fabrication and Delivery - HM Frames

0580003030 Fabrication and Deliver - Structural

40

02OCT12A

04JAN13A

100

0 02OCT104JAN13

Fabrication and Deliver - Structural Steel

0580003035 Fabrication and Delivery Steel Joists

60

02OCT12A

04JAN13A

100

0 02OCT104JAN13

0580003005 Delivery of Plumbing Material

5

03OCT12A 17OCT12A

100

0 03OCT117OCT12

0580003025 Fabrication and Delivery - Brick

35

15OCT12A 29MAR13A

100

0 15OCT129MAR13

0580003045 Fabrication and Delivery - Roofing

60

19DEC12A 11MAR13A

100

0 19DEC111MAR13

0580003040 Fab & Deliver HVAC Units

60

16JAN13A

22APR13A

100

0 16JAN1322APR13

0580003055 Fabrication and Delivery -Windows &

80

12FEB13A 24MAY13A

100

0 12FEB1 24MAY13

0585004030 Rough Grade / Building Pad

5

23JUL12A

24AUG12A

100

0 23JUL1224AUG12

0585004005 South Parking Lot Storm Sewer

15

01AUG12A 02AUG13A

100

0 01AUG102AUG13

0585004070 North Storm Sewer

10

03SEP12A

14SEP12A

100

0 03SEP1 14SEP12

0585004015 Sanitary Sewer

5

11SEP12A

18SEP12A

100

0 11SEP1 18SEP12

Sanitary Sewer

0585004020 Access Roads / Laydown / Parking

10

13SEP12A

20SEP12A

100

0 13SEP1 20SEP12

Access Roads / Laydown / Parking

0585004035 Water & Fire Line

10

13SEP12A

21SEP12A

100

0 13SEP1 21SEP12

Water & Fire Line

0585004040 Electrical Duct Banks

10

25FEB13A 01MAR13A

100

0 25FEB1 01MAR13

0585004045 Set Transformer Vault

2

18MAR13A 19MAR13A

100

0 18MAR119MAR13

0581104030 Generator & Chiller Concrete Pad

15

01JUL13A

03JUL13A

100

0 01JUL1303JUL13

0585004085 Finish Grading

5

08JUL13A

26SEP13

20

4 08JUL13

0585004105 Site Improvements

45

08JUL13A

18OCT13

56

20 08JUL13

Fabrication and Delivery - CMU Units Fabrication & Delivery of Precast Concrete Plank

Fabrication and Delivery Steel Joists Deck-Roof Delivery of Plumbing Material Fabrication and Delivery - Brick Fabrication and Delivery - Roofing Materials Fab & Deliver HVAC Units Fabrication and Delivery -Windows & Curtain Wall

Construction Sitework

Rough Grade / Building Pad 07SEP12

South Parking Lot Storm Sewer

01AUG13 North Storm Sewer

Electrical Duct Banks Set Transformer Vault Generator & Chiller Concrete Pad 09AUG13

Finish Grading

16AUG13

Site Improvements

0585004050 Set Transformer / Energize

5

12JUL13A

16JUL13A

100

0 12JUL1316JUL13

0585004135 Retaining Walll

10

12JUL13A

26JUL13A

100

0 12JUL1326JUL13

0585004100 Curbs

15

23JUL13A

09AUG13A

100

0 23JUL1309AUG13

0585004095 Bio Retention Basin

10

30JUL13A

02AUG13A

100

0 30JUL1302AUG13

0585004115 Sidewalks

15

02AUG13A

27SEP13

67

0585004120 Paving and Striping

10

23SEP13

04OCT13

0

10

0585004110 Light Poles & Wiring

15

07OCT13

25OCT13

0

15

0585004140 Playground Structures

15

07OCT13

25OCT13

0

15

0585004130 Landscaping

10

08OCT13

21OCT13

0

10

0585004055 Exterior Building Light Fixtures

10

09OCT13

22OCT13

0

10

0585004125 Site Fencing

10

09OCT13

22OCT13

0

10

Set Transformer / Energize Retaining Walll Curbs Bio Retention Basin Sidewalks

5 02AUG1

Paving and Striping Light Poles & Wiring Playground Structures Landscaping Exterior Building Light Fixtures Site Fencing

Area C First Floor 0583104005 Foundations

15

27AUG12A 14SEP12A

100

0 27AUG114SEP12

0583104015 Masonry & In-wall Rough-in

55

18SEP12A

07FEB13A

100

0 18SEP1 07FEB13

0583104025 Masonry Bearing Walls

20

18SEP12A 29NOV12A

100

0 18SEP1 29NOV12

0583104050 Complete In-wall Electrical Rough-in

20

01OCT12A 21FEB13A

100

0 01OCT121FEB13

0583104020 In-wall Electrical Rough-in

20

05OCT12A 29NOV12A

100

0 05OCT129NOV12

0583104010 Rough-in Plumbing U/G

15

08OCT12A 19OCT12A

100

0 08OCT119OCT12

0583104095 Complete MEP Rough-in - In wall &

136

08OCT12A 28FEB13A

100

0 08OCT128FEB13

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Foundations Masonry & In-wall Rough-in 21SEP12

Masonry Bearing Walls

06NOV12

Complete In-wall Electrical Rough-in In-wall Electrical Rough-in Rough-in Plumbing U/G Complete MEP Rough-in - In wall & Overhead Miles K-8 P58

Sheet 2 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

2014 JAN F

Rough-in Electric U/G

0583104035 Rough-in Electric U/G

10

18OCT12A 26OCT12A

100

0 18OCT126OCT12

0583104045 Place Slab on Grade

10

29OCT12A 07NOV12A

100

0 29OCT107NOV12

0583104115 Rough-in Plumbing

40

05DEC12A 15MAR13A

100

0 05DEC115MAR13

0583104055 Door Frames

20

20DEC12A

24JAN13A

100

0 20DEC124JAN13

0583104060 Interior Masonry Walls

20

24DEC12A 07FEB13A

100

0 24DEC107FEB13

0583104085 Overhead Rough-in Elec & FA

35

21JAN13A

08APR13A

100

0 21JAN1308APR13

0583104110 Rough-in HVAC Ductwork

30

28JAN13A 08MAR13A

100

0 28JAN1308MAR13

0583104120 Rough-in Fire Prot

20

07FEB13A

15FEB13A

100

0 07FEB1 15FEB13

Rough-in Fire Prot

0583104075 Metal Studs

10

14FEB13A

28FEB13A

100

0 14FEB1 28FEB13

Metal Studs

0583104295 Electrical Rough-in - Stud Walls

10

19FEB13A 22MAR13A

100

0 19FEB1 22MAR13

0583104125 Rough-in HVAC Piping

30

06MAR13A 17APR13A

100

0 06MAR117APR13

0583104130 Equipment Pads

5

13MAR13A 15MAR13A

100

0 13MAR115MAR13

0583104135 Stair B,C

10

18MAR13A 22MAR13A

100

0 18MAR122MAR13

0583104150 Stair Concrete Pan Fill

10

04APR13A 05APR13A

100

0 04APR1 05APR13

0583104065 Brick Veneer

10

17APR13A 30APR13A

100

0 17APR1 30APR13

0583104140 Rough-in HVAC Insulation

30

13MAY13A 23AUG13A

100

0 13MAY123AUG13

0583104090 Set Windows

15

04JUN13A

24JUN13A

100

0 04JUN1 24JUN13

0583104100 Rough-in Tech Wire

30

10JUN13A

28JUN13A

100

0 10JUN1 28JUN13

0583104155 Standpipe / Hose Cabinet

3

10JUN13A

13JUN13A

100

0 10JUN1 13JUN13

0583104105 Building Final Area Enclosure

0

24JUN13A

100

0

0583104070 Frost Slabs

5

27JUN13A

01JUL13A

100

0 27JUN1 01JUL13

0583104160 Drywall & Tape

15

10JUL13A

31JUL13A

100

0 10JUL1331JUL13

0583104165 Prime Paint

20

05AUG13A 30AUG13A

100

0583104170 Finishes

70

05AUG13A

01NOV13

57

0583104145 Elevator

20

08AUG13A 06SEP13A

100

0 08AUG106SEP13

0583104185 HVAC Finishes

10

02SEP13A

100

0 02SEP1 13SEP13

HVAC Finishes Ceiling Grid

13SEP13A

DEC

Place Slab on Grade Rough-in Plumbing Door Frames 04JAN13

Interior Masonry Walls

22JAN13

Overhead Rough-in Elec & FA Rough-in HVAC Ductwork

Electrical Rough-in - Stud Walls Rough-in HVAC Piping Equipment Pads Stair B,C Stair Concrete Pan Fill Brick Veneer Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Standpipe / Hose Cabinet Building Final Area Enclosure

24JUN13

Frost Slabs Drywall & Tape Prime Paint

0 05AUG130AUG13

Finishes

30 05AUG1 Elevator

0583104175 Ceiling Grid

20

03SEP13A

11SEP13A

100

0 03SEP1 11SEP13

0583104190 Lights in Grid

10

06SEP13A

18SEP13A

100

0 06SEP1 18SEP13

Lights in Grid

0583104225 Ceramic Floor Tile

20

16SEP13A

19SEP13A

100

0 16SEP1 19SEP13

Ceramic Floor Tile

0583104180 Fire Prot Finishes

10

23SEP13

04OCT13

0

10

0583104215 Millwork

20

23SEP13

18OCT13

0

20

Fire Prot Finishes Millwork Doors & Hardware

0583104260 Doors & Hardware

10

23SEP13

04OCT13

0

10

0583104195 Finish Paint

20

30SEP13

25OCT13

0

20

0583104220 VCT / VET

15

30SEP13

18OCT13

0

15

0583104240 Plumbing Finishes

20

30SEP13

25OCT13

0

20

0583104200 Above Ceiling Inspections Complete

0

03OCT13

0

0

0583104235 Acoustic Panels

5

04OCT13

10OCT13

0

5

Acoustic Panels

0583104205 Ceiling Pads

10

07OCT13

18OCT13

0

10

Ceiling Pads

0583104210 Electric & FA Finishes

15

07OCT13

25OCT13

0

15

Electric & FA Finishes

0583104245 Carpet

10

11OCT13

24OCT13

0

10

Carpet

0583104230 Technology Finishes

10

15OCT13

28OCT13

0

10

0583104265 Marker / Tack Boards

10

21OCT13

01NOV13

0

10

0583104270 Projection Screens

5

21OCT13

25OCT13

0

5

Projection Screens

0583104275 Signage

5

21OCT13

25OCT13

0

5

Signage

0583104255 Toilet Partitions

10

28OCT13

08NOV13

0

10

Toilet Partitions

0583104280 Toilet Accessories

5

28OCT13

01NOV13

0

5

Toilet Accessories

0583104285 FF & E

3

28OCT13

30OCT13

0

3

FF & E

Finish Paint VCT / VET Plumbing Finishes Above Ceiling Inspections Complete

Technology Finishes Marker / Tack Boards

Second Floor 0583204010 Precast Concrete Deck& Topping

5

03DEC12A 06DEC12A

100

0 03DEC106DEC12

0583204015 Masonry & In-wall Rough-in

40

10DEC12A 11APR13A

100

0 10DEC111APR13

0583204020 In-wall Electrical Rough-in

20

10DEC12A

11JAN13A

100

0 10DEC111JAN13

0583204025 Masonry Bearing Walls

20

10DEC12A

12JAN13A

100

0 10DEC112JAN13

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Precast Concrete Deck& Topping Masonry & In-wall Rough-in In-wall Electrical Rough-in 20DEC12 Miles K-8 P58

Masonry Bearing Walls

07JAN13 Sheet 3 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

0583204055 Door Frames

20

10DEC12A 04APR13A

100

0 10DEC104APR13

0583204095 Complete MEP Rough-in - In wall &

109

10DEC12A

09JUL13A

100

0 10DEC109JUL13

0583204085 Overhead Rough-in Elec & FA

35

18FEB13A

06JUN13A

100

0 18FEB1 06JUN13

0583204110 Rough-in HVAC Ductwork

30

25FEB13A

18JUL13A

100

0 25FEB1 18JUL13

0583204075 Metal Studs

0

04MAR13A 18APR13A

100

0 04MAR118APR13

0583204120 Fire Protection Rough-in

20

04MAR13A 15MAR13A

100

0 04MAR115MAR13

0583204115 Rough-in Plumbing

30

12MAR13A 07JUN13A

100

0 12MAR107JUN13

0583204050 Complete In-wall Electrical Rough-in

15

20MAR13A 07JUN13A

100

0 20MAR107JUN13

0583204060 Interior Masonry Walls

10

20MAR13A 12APR13A

100

0 20MAR112APR13

0583204125 Rough-in HVAC Piping

30

16APR13A

100

0 16APR1 12JUL13

12JUL13A

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Door Frames Complete MEP Rough-in - In wall & Overhead Overhead Rough-in Elec & FA Rough-in HVAC Ductwork Metal Studs Fire Protection Rough-in Rough-in Plumbing Complete In-wall Electrical Rough-in Interior Masonry Walls Rough-in HVAC Piping Brick Veneer

0583204065 Brick Veneer

10

24APR13A 27MAY13A

100

0 24APR1 27MAY13

0583204140 Rough-in HVAC Insulation

30

27MAY13A 20AUG13A

100

0 27MAY120AUG13

0583204090 Set Windows

15

03JUN13A

12JUL13A

100

0 03JUN1 12JUL13

0583204100 Rough-in Tech Wire

30

03JUN13A

12JUL13A

100

0 03JUN1 12JUL13

0583204155 Standpipe / Hose Cabinet

3

12JUN13A

13JUN13A

100

0 12JUN1 13JUN13

0583204105 Building Final Area Enclosure

0

12JUL13A

100

0

0583204160 Drywall & Tape

15

15JUL13A

16AUG13A

100

0 15JUL1316AUG13

Drywall & Tape

0583204165 Prime Paint

20

29JUL13A

23AUG13A

100

0 29JUL1323AUG13

Prime Paint

0583204170 Finishes

83

29JUL13A

01NOV13

64

0583204175 Ceiling Grid

20

26AUG13A 26AUG13A

100

0 26AUG126AUG13

0583204185 HVAC Finishes

10

02SEP13A

09SEP13A

100

0 02SEP1 09SEP13

HVAC Finishes

0583204190 Lights in Grid

10

03SEP13A

11SEP13A

100

0 03SEP1 11SEP13

Lights in Grid

0583204215 Millwork

20

09SEP13A

19SEP13A

100

0 09SEP1 19SEP13

0583204225 Ceramic Floor Tile

10

09SEP13A

13SEP13A

100

0 09SEP1 13SEP13

0583204180 Fire Prot Finishes

10

11SEP13A

17SEP13A

100

0583204220 VCT / VET

15

19SEP13A

09OCT13

13

0583204195 Finish Paint

20

23SEP13

18OCT13

0

20

0583204250 Lockers

10

26SEP13

09OCT13

0

10

Lockers

0583204260 Doors & Hardware

10

26SEP13

09OCT13

0

10

Doors & Hardware

0583204210 Electric & FA Finishes

15

30SEP13

18OCT13

0

15

0583204200 Above Ceiling Inspections Complete

0

01OCT13

0

0

0583204205 Ceiling Pads

10

02OCT13

15OCT13

0

10

0583204265 Marker / Tack Boards

5

10OCT13

16OCT13

0

5

0583204275 Signage

5

16OCT13

22OCT13

0

5

0583204230 Technology Finishes

10

21OCT13

01NOV13

0

10

0583204235 Acoustic Panels

5

21OCT13

25OCT13

0

5

0583204240 Plumbing Finishes

10

21OCT13

01NOV13

0

10

0583204255 Toilet Partitions

10

24OCT13

06NOV13

0

10

Toilet Partitions

0583204280 Toilet Accessories

4

24OCT13

29OCT13

0

4

Toilet Accessories

0583204245 Carpet

10

28OCT13

08NOV13

0

10

0583204270 Projection Screens

5

01NOV13

07NOV13

0

5

Projection Screens

0583204285 FF & E

3

01NOV13

05NOV13

0

3

FF & E

Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Standpipe / Hose Cabinet Building Final Area Enclosure

12JUL13

Finishes

30 29JUL13 Ceiling Grid

Millwork Ceramic Floor Tile Fire Prot Finishes

0 11SEP1 17SEP13

VCT / VET

13 19SEP1

Finish Paint

Electric & FA Finishes Above Ceiling Inspections Complete Ceiling Pads Marker / Tack Boards Signage Technology Finishes Acoustic Panels Plumbing Finishes

Carpet

Third Floor 0583304010 Precast Concrete Deck & Topping

5

28JAN13A

13FEB13A

100

0 28JAN1313FEB13

0583304015 Masonry & In-wall Rough-in

126

26FEB13A

14JUN13A

100

0 26FEB1 14JUN13

0583304020 In-wall Electrical Rough-in

50

26FEB13A

21JUN13A

100

0 26FEB1 21JUN13

0583304025 Masonry Bearing Walls

20

26FEB13A

04APR13A

100

0 26FEB1 04APR13

0583304095 Complete MEP Rough-in - In wall &

90

04MAR13A 21JUN13A

100

0 04MAR121JUN13

0583304055 Door Frames

20

01APR13A

14JUN13A

100

0 01APR1 14JUN13

0583304085 Overhead Rough-in Elec & FA

30

01APR13A

11JUL13A

100

0 01APR1 11JUL13

0583304040 Roof Structural Steel & Deck

20

08APR13A 19APR13A

100

0 08APR1 19APR13

0583304080 Roofing

20

25APR13A 15MAY13A

100

0 25APR1 15MAY13

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Precast Concrete Deck & Topping Masonry & In-wall Rough-in In-wall Electrical Rough-in Masonry Bearing Walls Complete MEP Rough-in - In wall & Overhead Door Frames Overhead Rough-in Elec & FA Roof Structural Steel & Deck Roofing Miles K-8 P58

Sheet 4 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

0583304115 Rough-in Plumbing

30

29APR13A

14JUN13A

100

0 29APR1 14JUN13

0583304125 Rough-in HVAC Piping

30

03MAY13A 17MAY13A

100

0 03MAY117MAY13

0583304050 Complete In-wall Electrical Rough-in

15

06MAY13A 21JUN13A

100

0 06MAY121JUN13

0583304065 Brick Veneer

10

06MAY13A 05JUN13A

100

0 06MAY105JUN13

0583304075 Metal Studs

10

06MAY13A 22MAY13A

100

0 06MAY122MAY13

0583304100 Rough-in Tech Wire

30

24MAY13A 14JUN13A

100

0 24MAY114JUN13

0583304090 Set Windows

15

05JUN13A

18JUN13A

100

0 05JUN1 18JUN13

0583304130 Area C - Temporary Building Enclosure

0

07JUN13A

100

0

0583304120 Rough-in Fire Prot

15

10JUN13A

21JUN13A

100

0 10JUN1 21JUN13

0583304155 Standpipe / Hose Cabinet

3

11JUN13A

14JUN13A

100

0 11JUN1 14JUN13

0583304060 Interior Masonry Walls

10

17JUN13A

21JUN13A

100

0 17JUN1 21JUN13

0583304140 Rough-in HVAC Insulation

30

24JUN13A 23AUG13A

100

0 24JUN1 23AUG13

0583304110 Rough-in HVAC Ductwork

30

01JUL13A

05JUL13A

100

0 01JUL1305JUL13

Rough-in HVAC Ductwork Building Final Area Enclosure

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

Rough-in Plumbing Rough-in HVAC Piping Complete In-wall Electrical Rough-in Brick Veneer Metal Studs Rough-in Tech Wire Set Windows Area C - Temporary Building Enclosure Complete

07JUN13

Rough-in Fire Prot Standpipe / Hose Cabinet Interior Masonry Walls Rough-in HVAC Insulation

0583304105 Building Final Area Enclosure

0

01JUL13A

100

0

0583304160 Drywall & Tape

15

10JUL13A

19JUL13A

100

0 10JUL1319JUL13

0583304165 Prime Paint

20

22JUL13A

16AUG13A

100

0 22JUL1316AUG13

0583304170 Finishes

60

22JUL13A

15NOV13

0583304175 Ceiling Grid

20

19AUG13A 23AUG13A

100

0 19AUG123AUG13

0583304215 Millwork

20

26AUG13A 06SEP13A

100

0 26AUG106SEP13

Millwork

0583304190 Lights in Grid

5

28AUG13A 30AUG13A

100

0 28AUG130AUG13

Lights in Grid

0583304185 HVAC Finishes

10

04SEP13A

19SEP13A

100

0 04SEP1 19SEP13

0583304210 Electric & FA Finishes

15

05SEP13A

11OCT13

0

0583304220 VCT / VET

10

09SEP13A

18SEP13A

100

0 09SEP1 18SEP13

VCT / VET

0583304225 Ceramic Floor Tile

15

09SEP13A

17SEP13A

100

0 09SEP1 17SEP13

Ceramic Floor Tile

0583304180 Fire Prot Finishes

10

19SEP13A

04OCT13

0

10 19SEP1

Fire Prot Finishes

0583304240 Plumbing Finishes

10

19SEP13A

02OCT13

20

8 19SEP1

Plumbing Finishes

0583304250 Lockers

10

23SEP13

04OCT13

0

10

0583304195 Finish Paint

20

25SEP13

22OCT13

0

20

Finish Paint

0583304260 Doors & Hardware

10

30SEP13

11OCT13

0

10

Doors & Hardware

0583304200 Above Ceiling Inspections Complete

0

02OCT13

0583304205 Ceiling Pads

10

07OCT13

18OCT13

33

01JUL13

Drywall & Tape Prime Paint Finishes

40 22JUL13 Ceiling Grid

HVAC Finishes Electric & FA Finishes

15 05SEP1

0

0

0

10

2014 JAN F

Lockers

Above Ceiling Inspections Complete Ceiling Pads Marker / Tack Boards

0583304265 Marker / Tack Boards

5

09OCT13

15OCT13

0

5

0583304230 Technology Finishes

10

16OCT13

29OCT13

0

10

0583304270 Projection Screens

2

16OCT13

17OCT13

0

2

0583304235 Acoustic Panels

5

23OCT13

29OCT13

0

5

Acoustic Panels

0583304255 Toilet Partitions

5

23OCT13

29OCT13

0

5

Toilet Partitions

0583304245 Carpet

10

25OCT13

07NOV13

0

10

Carpet

0583304275 Signage

5

25OCT13

31OCT13

0

5

Signage

0583304280 Toilet Accessories

5

25OCT13

31OCT13

0

5

Toilet Accessories

0583304285 FF & E

3

04NOV13

06NOV13

0

3

Technology Finishes Projection Screens

FF & E

Area B First Floor Gymnasium 0582114115 Load Bearing Masonry

20

11OCT12A 11FEB13A

100

0 11OCT111FEB13

0582114120 Structural Steel & Deck

10

11DEC12A 14FEB13A

100

0 11DEC114FEB13

0582114005 Underground Electrical Rough-in

10

14JAN13A

18JAN13A

100

0 14JAN1318JAN13

0582114130 Roofing

10

18MAR13A 04APR13A

100

0 18MAR104APR13

0582114010 Slab on Grade

5

01APR13A 08APR13A

100

0 01APR1 08APR13

0582114020 Interior MEP Rough-in

55

15APR13A

100

0 15APR1 05JUL13

05JUL13A

0582114025 Fire Protection Rough-in

10

15APR13A 18APR13A

100

0 15APR1 18APR13

0582114140 Brick Veneer

20

15APR13A 09MAY13A

100

0 15APR1 09MAY13

0582114015 Overhead Elec. & Fire Alarm Rough-in

25

17APR13A 29APR13A

100

0 17APR1 29APR13

0582114030 HVAC Rough-in - Ductwork

15

29APR13A

100

0 29APR1 05JUL13

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

05JUL13A

Early Bar Progress Bar Critical Activity

13NOV12

Load Bearing Masonry

07FEB13

Structural Steel & Deck Underground Electrical Rough-in Roofing Slab on Grade Interior MEP Rough-in Fire Protection Rough-in Brick Veneer Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Ductwork Miles K-8 P58

Sheet 5 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Gymnasium Gymnasium Temporary Enclosure Complete

0582114150 Gymnasium Temporary Enclosure

0

09MAY13A

100

0

09MAY13

0582114040 HVAC Rough-in - Piping

10

27MAY13A 06JUN13A

100

0 27MAY106JUN13

0582114055 Fire Protection Finishes

5

27MAY13A 31MAY13A

100

0 27MAY131MAY13

0582114035 Gym Lighting

5

10JUN13A

14JUN13A

100

0 10JUN1 14JUN13

0582114045 HVAC Rough-in - Insulation

10

17JUN13A

28JUN13A

100

0 17JUN1 28JUN13

HVAC Rough-in - Insulation

0582114135 Rouhg-in Tech Wire

20

01JUL13A

12JUL13A

100

0 01JUL1312JUL13

Rouhg-in Tech Wire

0582114050 Finish Painting

5

08JUL13A

19JUL13A

100

0 08JUL1319JUL13

Finish Painting

0582114080 Finishes

60

08JUL13A

25OCT13

58

0582114075 Gym Equipment

10

15JUL13A

24JUL13A

100

0 15JUL1324JUL13

0582114060 HVAC Finishes

10

09SEP13A

13SEP13A

100

0 09SEP1 13SEP13

0582114070 Interior MEP Finishes

15

09SEP13A

27SEP13

67

0582114065 Electric & Fire Alarm Finishes

5

23SEP13

27SEP13

0582114125 Technology Finish

5

23SEP13

27SEP13

0582114085 Stage Equipment

10

26SEP13

0582114090 Stage Lighting

5

0582114095 Gym Flooring

HVAC Rough-in - Piping Fire Protection Finishes Gym Lighting

Finishes

25 08JUL13 Gym Equipment

HVAC Finishes

5 09SEP1

Interior MEP Finishes

0

5

Electric & Fire Alarm Finishes

0

5

Technology Finish

09OCT13

0

10

03OCT13

09OCT13

0

5

25

03OCT13

06NOV13

0

25

0582104270 Proj Screen @ Stage

5

09OCT13

15OCT13

0

5

0582114105 Stage Flooring

10

18OCT13

31OCT13

0

10

0582114110 Operable Partition

5

24OCT13

30OCT13

0

5

Operable Partition

0582114100 Gym Bleachers

10

29OCT13

11NOV13

0

10

Gym Bleachers

Stage Equipment Stage Lighting Gym Flooring Proj Screen @ Stage Stage Flooring

Mechanical Room 0582134015 Wall Electrical Rough-in

15

22OCT12A 29NOV12A

0582134010 MEP Rough-in & Finishes

102

22APR13A

0582134020 Overhead Elec. & Fire Alarm Rough-in

30

22APR13A 17MAY13A

100

0 22APR1 17MAY13

0582134035 HVAC Rough-in - Ductwork

15

06MAY13A 16AUG13A

100

0 06MAY116AUG13

0582134005 Set HVAC Equipment

10

13JUN13A

26JUN13A

100

0 13JUN1 26JUN13

0582134040 HVAC Rough-in - Piping

15

27JUN13A

17SEP13A

100

0 27JUN1 17SEP13

01NOV13

100 71

Wall Electrical Rough-in

0 22OCT129NOV12

MEP Rough-in & Finishes

30 22APR1 Overhead Elec. & Fire Alarm Rough-in

HVAC Rough-in - Ductwork Set HVAC Equipment HVAC Rough-in - Piping

0 29JUL1320AUG13

Fire Protection Rough-in

0 26AUG106SEP13

HVAC Finishes

0582134025 Fire Protection Rough-in

5

29JUL13A

20AUG13A

100

0582134065 HVAC Finishes

10

26AUG13A 06SEP13A

100

0582134045 HVAC Rough-in - Insulation

15

09SEP13A

04OCT13

33

0582134055 Fire Protection Finishes

5

27SEP13

03OCT13

0

5

0582134060 Electric & Fire Alarm Finishes

25

04OCT13

07NOV13

0

25

0582134075 Prime Paint

3

07OCT13

09OCT13

0

3

0582134050 Finish Painting

10

10OCT13

23OCT13

0

10

0582134030 Lighting

5

24OCT13

30OCT13

0

5

HVAC Rough-in - Insulation

10 09SEP1

Fire Protection Finishes Electric & Fire Alarm Finishes Prime Paint Finish Painting Lighting

Area B Foundations

0582104005 Foundations

15

13SEP12A 08OCT12A

100

0 13SEP1 08OCT12

0582104010 Rough-in Plumbing U/G

20

19OCT12A 09NOV12A

100

0 19OCT109NOV12

Rough-in Plumbing U/G

0582104035 Rough-in Electric U/G

10

31OCT12A 16NOV12A

100

0 31OCT116NOV12

Rough-in Electric U/G

0582104045 Place Slab on Grade

5

16NOV12A 20NOV12A

100

0 16NOV120NOV12

Place Slab on Grade

0582104015 Masonry & In-wall Rough-ins

47

03DEC12A 08MAR13A

100

0 03DEC108MAR13

0582104020 In-wall Elec & FA Rough-in

20

03DEC12A 26MAR13A

100

0 03DEC126MAR13

0582104025 Masonry Bearing Walls

20

03DEC12A

16JAN13A

100

0 03DEC116JAN13

0582104040 Structural Steel & Deck

15

28JAN13A

05FEB13A

100

0 28JAN1305FEB13

0582104115 Rough-in Plumbing

20

04FEB13A 15MAR13A

100

0 04FEB1 15MAR13

0582104060 Interior Masonry

15

11FEB13A 08MAR13A

100

0 11FEB1 08MAR13

0582104095 MEP Rough-in

60

18FEB13A 17MAY13A

100

0 18FEB1 17MAY13

0582104120 Rough-in Fire Prot

20

18FEB13A 01MAR13A

100

0 18FEB1 01MAR13

Rough-in Fire Prot

0582104295 Fire Protection Rough - in

10

18FEB13A

28FEB13A

100

0 18FEB1 28FEB13

Fire Protection Rough - in

0582104050 Complete In-wall Rough-in

10

11MAR13A 26MAR13A

100

0 11MAR126MAR13

Complete In-wall Rough-in

0582104075 Metal Studs

10

18MAR13A 26MAR13A

100

0 18MAR126MAR13

Metal Studs

0582104110 Rough-in HVAC Ductwork

20

18MAR13A 15APR13A

100

0 18MAR115APR13

0582104135 Stair D

5

18MAR13A 22MAR13A

100

0 18MAR122MAR13

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Masonry & In-wall Rough-ins In-wall Elec & FA Rough-in 07DEC12

Masonry Bearing Walls

10JAN13

Structural Steel & Deck Rough-in Plumbing Interior Masonry MEP Rough-in

Rough-in HVAC Ductwork Stair D Miles K-8 P58

Sheet 6 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Area B 0582104055 Door Frames in Metal Studs

10

20MAR13A 29MAR13A

100

0 20MAR129MAR13

0582104085 Overhead Rough-in Elec & FA

20

01APR13A 03MAY13A

100

0 01APR1 03MAY13

0582104125 Rough-in HVAC Piping

20

01APR13A 18APR13A

100

0 01APR1 18APR13

Door Frames in Metal Studs Overhead Rough-in Elec & FA Rough-in HVAC Piping Stair Pan Concrete Fill

0582104150 Stair Pan Concrete Fill

5

04APR13A 05APR13A

100

0 04APR1 05APR13

0582104065 Brick Veneer

10

13MAY13A 28MAY13A

100

0 13MAY128MAY13

Brick Veneer

0582104080 Roofing

20

17MAY13A 29MAY13A

100

0 17MAY129MAY13

Roofing

0582104140 Rough-in HVAC Insulation

20

03JUN13A

06SEP13A

100

0 03JUN1 06SEP13

0582104155 Standpipe / Hose Cabinet

3

03JUN13A

06JUN13A

100

0 03JUN1 06JUN13

0582104090 Set Windows

20

12JUN13A

21JUN13A

100

0 12JUN1 21JUN13

0582104105 Building Area Final Enclosure

0

21JUN13A

100

0

21JUN13

Building Area Final Enclosure

0582104300 Area B Temporary Enclosure Complete

0

21JUN13A

100

0

21JUN13

Area B Temporary Enclosure Complete

0582104100 Rough-in Tech Wire

20

24JUN13A

19JUL13A

100

0 24JUN1 19JUL13

0582104070 Frost Slabs

5

27JUN13A

01JUL13A

100

0 27JUN1 01JUL13

0582104160 Drywall & Tape

15

01JUL13A

30AUG13A

100

0 01JUL1330AUG13

Drywall & Tape

0582104165 Prime Paint

20

29JUL13A

06SEP13A

100

0 29JUL1306SEP13

Prime Paint

0582104170 Finishes

60

29JUL13A

25OCT13

58

25 29JUL13

0582104290 Fire System Manifold

5

12AUG13A

27SEP13

0

5 12AUG1

0582104175 Ceiling Grid

15

09SEP13A

13SEP13A

100

0 09SEP1 13SEP13

Ceiling Grid

0582104185 HVAC Finishes

10

09SEP13A

13SEP13A

100

0 09SEP1 13SEP13

HVAC Finishes

0582104190 Lights in Grid

15

11SEP13A

18SEP13A

100

0 11SEP1 18SEP13

Lights in Grid

0582104180 Fire Prot Finishes

10

19SEP13A

04OCT13

0

10 19SEP1

0582104195 Finish Paint

20

23SEP13

18OCT13

0

20

0582104215 Millwork

10

30SEP13

11OCT13

0

10

0582104220 VCT / VET

10

30SEP13

11OCT13

0

10

0582104200 Above Ceiling Inspections Complete

0

07OCT13

0

0

0582104205 Ceiling Pads

15

07OCT13

25OCT13

0

15

0582104210 Electric & FA Finishes

20

07OCT13

01NOV13

0

20

0582104225 Ceramic Floor Tile

10

07OCT13

18OCT13

0

10

Ceramic Floor Tile

0582104235 Acoustic Panels

10

09OCT13

22OCT13

0

10

Acoustic Panels

0582104230 Technology Finishes

20

14OCT13

08NOV13

0

20

0582104240 Plumbing Finishes

10

14OCT13

25OCT13

0

10

Plumbing Finishes

0582104250 Lockers

10

14OCT13

25OCT13

0

10

Lockers

0582104260 Doors & Hardware

10

14OCT13

25OCT13

0

10

Doors & Hardware

0582104245 Carpet

10

18OCT13

31OCT13

0

10

Carpet

0582104255 Toilet Partitions

10

21OCT13

01NOV13

0

10

Toilet Partitions

0582104265 Marker / Tack Boards

10

21OCT13

01NOV13

0

10

0582104275 Signage

5

21OCT13

25OCT13

0

5

0582104280 Toilet Accessories

5

28OCT13

01NOV13

0

5

0582104285 FF & E

3

05NOV13

07NOV13

0

3

Rough-in HVAC Insulation Standpipe / Hose Cabinet Set Windows

Rough-in Tech Wire Frost Slabs

Finishes Fire System Manifold

Fire Prot Finishes Finish Paint Millwork VCT / VET Above Ceiling Inspections Complete Ceiling Pads Electric & FA Finishes

Technology Finishes

Marker / Tack Boards Signage Toilet Accessories FF & E

Area A First Floor Kitchen Underslab Plumbing Rough-in

0581124095 Underslab Plumbing Rough-in

8

12NOV12A 26NOV12A

100

0 12NOV126NOV12

0581124090 Underslab Electrical Rough-in

8

16NOV12A 03DEC12A

100

0 16NOV103DEC12

0581124085 Slab on Grade

5

04DEC12A 12DEC12A

100

0 04DEC112DEC12

0581124065 Fire Protection Rough-in

10

14MAY13A 20MAY13A

100

0 14MAY120MAY13

0581124075 MEP Rough-in

20

14MAY13A 28JUN13A

100

0 14MAY128JUN13

MEP Rough-in

0581124035 Electrical Rough-in

10

17JUN13A

28JUN13A

100

0 17JUN1 28JUN13

Electrical Rough-in

0581124030 HVAC Rough-in

10

12AUG13A 30AUG13A

100

0 12AUG130AUG13

0581124105 Finishes

63

12AUG13A

0581124020 Security Grille

5

0581124025 Finish Paint

5

0581124050 Ceiling Grid

5

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

Underslab Electrical Rough-in Slab on Grade Fire Protection Rough-in

HVAC Rough-in Finishes

29OCT13

57

27 12AUG1

23SEP13

27SEP13

0

5

Security Grille

25SEP13

01OCT13

0

5

Finish Paint

25SEP13

01OCT13

0

5

Ceiling Grid Early Bar Progress Bar Critical Activity

Miles K-8 P58

Sheet 7 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

0581124040 Electrical Finishes

5

30SEP13

04OCT13

0

5

Electrical Finishes

0581124070 Fire Protection Finishes

3

30SEP13

02OCT13

0

3

Fire Protection Finishes

0581124080 Plumbing Finishes

5

30SEP13

04OCT13

0

5

Plumbing Finishes

0581124015 Install Kitchen Tile

10

02OCT13

15OCT13

0

10

0581124055 Lights in Grid

5

02OCT13

08OCT13

0

5

0581124100 Above Ceiling Inspections Complete

0

03OCT13

0

0

0581124045 HVAC Finishes

5

07OCT13

11OCT13

0

5

HVAC Finishes

0581124060 Ceiling Pads

5

07OCT13

11OCT13

0

5

Ceiling Pads

0581124010 Install Kitchen Equipment

10

16OCT13

29OCT13

0

10

0581124005 Kitchen Equipment Hook-ups

15

21OCT13

08NOV13

0

15

0581104005 Foundations

15

20SEP12A 01OCT12A

100

0 20SEP1 01OCT12

0581104010 Rough-in Plumbing U/G

10

09NOV12A 15NOV12A

100

0 09NOV115NOV12

0581104035 Rough-in Electric U/G

15

13NOV12A 03DEC12A

100

0 13NOV103DEC12

0581104015 Masonry & In-wall Rough-in

30

03DEC12A 05APR13A

100

0 03DEC105APR13

23JAN13

11FEB13

0581104020 In-wall Electrical Rough-in

30

03DEC12A 05APR13A

100

0 03DEC105APR13

23JAN13

11FEB13

0581104025 Masonry Bearing Walls

30

03DEC12A 06MAR13A

100

0 03DEC106MAR13

23JAN13

11FEB13

0581104050 Complete In-wall Electrical Rough-in

30

03DEC12A 16MAY13A

100

0 03DEC116MAY13

23JAN13

11FEB13

0581104095 Complete MEP Rough-in - In wall &

110

03DEC12A 14JUN13A

100

0 03DEC114JUN13

0581104045 Place Slab on Grade

10

04DEC12A 12DEC12A

100

0 04DEC112DEC12

0581104055 Door Frames

20

14JAN13A

12APR13A

100

0 14JAN1312APR13

0581104135 Structural Steel & Deck

15

04MAR13A 28MAR13A

100

0 04MAR128MAR13

0581104060 Interior Masonry Walls

20

25MAR13A 05APR13A

100

0 25MAR105APR13

0581104075 Metal Studs

10

03APR13A 11APR13A

100

0581104170 Finishes

80

03APR13A

0581104295 Electrical Rough-in - Stud Walls

10

15APR13A 16MAY13A

100

0 15APR1 16MAY13

0581104115 Rough-in Plumbing

30

22APR13A

100

0 22APR1 21JUN13

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Kitchen

Install Kitchen Tile Lights in Grid Above Ceiling Inspections Complete

Install Kitchen Equipment Kitchen Equipment Hook-ups

Area A

30OCT13 21JUN13A

65

Foundations Rough-in Plumbing U/G Rough-in Electric U/G Masonry & In-wall Rough-in In-wall Electrical Rough-in Masonry Bearing Walls Complete In-wall Electrical Rough-in Complete MEP Rough-in - In wall & Overhead Place Slab on Grade Door Frames Structural Steel & Deck Interior Masonry Walls Metal Studs

0 03APR1 11APR13

Finishes

28 03APR1 Electrical Rough-in - Stud Walls Rough-in Plumbing Rough-in Fire Prot

0581104120 Rough-in Fire Prot

20

22APR13A 03MAY13A

100

0 22APR1 03MAY13

0581104085 Overhead Rough-in Elec & FA

30

29APR13A 17MAY13A

100

0 29APR1 17MAY13

Overhead Rough-in Elec & FA

0581104065 Brick Veneer

10

14MAY13A 18JUN13A

100

0 14MAY118JUN13

Brick Veneer

0581104110 Rough-in HVAC Ductwork

30

20MAY13A 28JUN13A

100

0 20MAY128JUN13

0581104125 Rough-in HVAC Piping

30

20MAY13A

100

0 20MAY105JUL13

05JUL13A

0581104130 Roofing

10

27MAY13A 05JUN13A

100

0 27MAY105JUN13

0581104155 Standpipe / Hose Cabinet

3

27MAY13A 30MAY13A

100

0 27MAY130MAY13

0581104140 Rough-in HVAC Insulation

30

10JUN13A

13SEP13A

100

0 10JUN1 13SEP13

0581104090 Set Windows

10

13JUN13A

12JUL13A

100

0 13JUN1 12JUL13

0581104100 Rough-in Tech Wire

30

24JUN13A

18JUL13A

100

0 24JUN1 18JUL13

02JUL13A

Rough-in HVAC Ductwork Rough-in HVAC Piping Roofing Standpipe / Hose Cabinet Rough-in HVAC Insulation Set Windows Rough-in Tech Wire Frost Slabs

0581104070 Frost Slabs

5

08JUL13A

100

0 02JUL1308JUL13

0581104105 Building Final Area Enclosure

0

12JUL13A

100

0

12JUL13

Building Final Area Enclosure

0581104160 Drywall & Tape

15

21AUG13A 04SEP13A

100

0 21AUG104SEP13

Drywall & Tape

0581104165 Prime Paint

15

05SEP13A

11SEP13A

100

0 05SEP1 11SEP13

Prime Paint

0581104175 Ceiling Grid

15

12SEP13A

11OCT13

0

Ceiling Grid

15 12SEP1

Ceramic Floor Tile

0581104225 Ceramic Floor Tile

10

19SEP13A

20SEP13A

100

0581104190 Lights in Grid

10

23SEP13

04OCT13

0

10

0581104210 Electric & FA Finishes

15

27SEP13

17OCT13

0

15

0581104195 Finish Paint

15

30SEP13

18OCT13

0

15

0581104200 Above Ceiling Inspections Complete

0

07OCT13

0

0

0581104215 Millwork

20

07OCT13

01NOV13

0

20

0581104235 Acoustic Panels

5

07OCT13

11OCT13

0

5

Acoustic Panels

0581104275 Signage

5

07OCT13

11OCT13

0

5

Signage

0581104265 Marker / Tack Boards

10

08OCT13

21OCT13

0

10

0581104180 Fire Prot Finishes

10

14OCT13

25OCT13

0

10

Fire Prot Finishes

0581104185 HVAC Finishes

10

14OCT13

25OCT13

0

10

HVAC Finishes

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

0 19SEP1 20SEP13

Lights in Grid Electric & FA Finishes Finish Paint Above Ceiling Inspections Complete Millwork

Marker / Tack Boards

Early Bar Progress Bar Critical Activity

Miles K-8 P58

Sheet 8 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

% Rem Actual Comp Dur Start

Actual Finish

Suspend Date

Resume Date

0581104220 VCT / VET

20

14OCT13

08NOV13

0

20

0581104230 Technology Finishes

10

14OCT13

25OCT13

0

10

Technology Finishes

0581104240 Plumbing Finishes

10

14OCT13

25OCT13

0

10

Plumbing Finishes

0581104245 Carpet

15

14OCT13

01NOV13

0

15

0581104270 Projection Screens

5

14OCT13

18OCT13

0

5

Projection Screens

0581104205 Ceiling Pads

10

15OCT13

28OCT13

0

10

Ceiling Pads

0581104255 Toilet Partitions

10

17OCT13

30OCT13

0

10

Toilet Partitions

0581104260 Doors & Hardware

10

21OCT13

01NOV13

0

10

Doors & Hardware

0581104280 Toilet Accessories

5

31OCT13

06NOV13

0

5

Toilet Accessories

0581104285 FF & E

3

31OCT13

04NOV13

0

3

FF & E

0580007110 Punchlist

20

11OCT13

07NOV13

0

20

0580007010 Contractor Punchlist

20

16OCT13

12NOV13

0

20

0580007060 Project Team - Controls Check-out

5

16OCT13

22OCT13

0

5

Project Team - Controls Check-out

0580007015 HVAC Controls Check-out and

15

17OCT13

06NOV13

0

15

HVAC Controls Check-out and Balancing

0580007035 JACE Interface Check-out

5

17OCT13

23OCT13

0

5

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

2013 JUL

AUG

SEP

OCT

NOV

DEC

2014 JAN F

Area A VCT / VET

Carpet

Close-Out

0580007055 As-Built Documents Submitted

5

21OCT13

25OCT13

0

5

0580007065 Building Commissioning

5

24OCT13

30OCT13

0

5

0580007005 Operation & Maintenance Manuals

0

25OCT13

0

0

Punchlist Contractor Punchlist

JACE Interface Check-out As-Built Documents Submitted Building Commissioning Operation & Maintenance Manuals Submitted Demonstration & Training

0580007085 Demonstration & Training

5

28OCT13

01NOV13

0

5

0580007025 Initial Architect's Punchlist/ Final

10

25OCT13

07NOV13

0

10

0580007090 Close-out Documents

45

30OCT13

31DEC13

0

45

Close-out Documents Final Inspections / Testing

Initial Architect's Punchlist/ Final Cleaning

0580007020 Final Inspections / Testing

5

31OCT13

06NOV13

0

5

0580007050 Architect's Punch List

5

05NOV13

11NOV13

0

5

0580007030 Fire Alarm Programming & Testing

5

05NOV13

11NOV13

0

5

0580007040 Final Inspections Complete

0

11NOV13

0

0

Final Inspections Complete MEP Commissioning Complete

0580007070 MEP Commissioning Complete

0

0580007120 LEED Air Testing

1

0580007075 Certificate of Occupancy

0

0580007080 Owner Move In

10

0580007100 Owner Move-in Complete

0

0580007105 Contract Close-out

0

Start Date Finish Date Data Date Run Date

26APR12 07JAN14 23SEP13 25SEP13 09:58

Š Primavera Systems, Inc.

11NOV13 13NOV13*

11NOV13

0

0

11NOV13

0

1

12NOV13

0

0

26NOV13

0

10

26NOV13

0

0

07JAN14

0

0

Architect's Punch List Fire Alarm Programming & Testing

LEED Air Testing Certificate of Occupancy Owner Move In Owner Move-in Complete Contract Close-out

Early Bar Progress Bar Critical Activity

Miles K-8 P58

Sheet 9 of 9

Miles New PK-8 Cleveland Municipal School District Update No. 12 September 23, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

2013 JUN

JUL

AUG

SEP

OCT

NOV

Bid & Award

Bid Opening

0650001005

Bid Opening

0

19APR12A

0

100

0650001010

Bid Evaluation and Award

25

19APR12A

23MAY12A

0

100

0650001095

Hold Bid

1

19APR12A

19APR12A

0

100

0650001015

NTP - BP 061,210,220,230,260,270,300,310,329

0

23MAY12A

0

100

0650001090

Construction Kick-off Meeting

1

31MAY12A

31MAY12A

0

100

0650001020

Site Mobilization - BP 061 General Trades

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 061 General Trades

0650001025

Prime Contractors Submit Schedules

10

01JUN12A

14JUN12A

0

100

Prime Contractors Submit Schedules

0650001045

Site Mobilization - BP 210 Fire Protection

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 210 Fire Protection

0650001050

Site Mobilization - BP 220 Plumbing

10

01JUN12A

14JUN12A

0

100

Bid Evaluation and Award Hold Bid NTP - BP 061,210,220,230,260,270,300,310,329 Construction Kick-off Meeting

Site Mobilization - BP 220 Plumbing Site Mobilization - BP 230 HVAC

0650001055

Site Mobilization - BP 230 HVAC

7

01JUN12A

11JUN12A

0

100

0650001060

Site Mobilization - BP 260 Electrical

10

01JUN12A

14JUN12A

0

100

0650001065

Site Mobilization - BP 270 Technology

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 270 Technology

0650001070

Site Mobilization - BP 300 Site Concrete

7

01JUN12A

11JUN12A

0

100

Site Mobilization - BP 300 Site Concrete

0650001075

Site Mobilization - BP 310 Site Work

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 310 Site Work

0650001080

Site Mobilization - BP 329 Landscaping

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 329 Landscaping

0650001085

Site Mobilization - BP 121 FF & E

10

01JUN12A

14JUN12A

0

100

Site Mobilization - BP 121 FF & E

0650001030

Schedule Meeting(s) to Review Schedule

10

15JUN12A

28JUN12A

0

100

0650001035

Prime Contractors/CM Final Review Schedule

45

03JUL12A

03SEP12A

0

100

0650001040

Contractors Sign Off - Project Baseline Schedule

0

21SEP12A

0

100

Site Mobilization - BP 260 Electrical

Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Contractors Sign Off - Project Baseline Schedule

Submittals & Approvals

Submittal Plumbing

0650002005

Submittal Plumbing

10

30APR12A

11MAY12A

0

100

0650002010

Submittal HVAC Equipment

20

30APR12A

25MAY12A

0

100

0650002015

Coordination Drawing Meetings HVAC/E/P/FP/GTC

45

30APR12A

29JUN12A

0

100

0650002020

Submittal Electrical & Fire Alarm

25

30APR12A

01JUN12A

0

100

0650002025

Site Submittals

5

30APR12A

04MAY12A

0

100

0650002035

Submittal Block and Mortar

10

30APR12A

11MAY12A

0

100

Submittal Block and Mortar

0650002040

Submittal Brick and Mortar

10

30APR12A

11MAY12A

0

100

Submittal Brick and Mortar

0650002045

Submittal Structural Steel/Joists/Deck

45

30APR12A

29JUN12A

0

100

0650002055

Submittal Roofing

20

30APR12A

25MAY12A

0

100

Submittal Roofing

0650002060

Submittal HM Frame

20

30APR12A

25MAY12A

0

100

Submittal HM Frame

0650002065

Submittal Windows and Curtain Wall

40

30APR12A

22JUN12A

0

100

0650002070

Submittal / Shop Drawings Fire Protection

35

30APR12A

15JUN12A

0

100

0650002125

Geopier Design Submittal for Record

25

30APR12A

01JUN12A

0

100

0650002075

Review and Approval Plumbing Submittal

15

07MAY12A

25MAY12A

0

100

0650002080

Review and Approval Site Submittal

5

07MAY12A

11MAY12A

0

100

0650002090

Review and Approval Block and Mortar

15

14MAY12A

01JUN12A

0

100

Review and Approval Block and Mortar

0650002100

Review and Approval Brick and Mortar

15

14MAY12A

01JUN12A

0

100

Review and Approval Brick and Mortar

0650002110

Review and Approval Structural Steel/Joists/Deck

45

21MAY12A

20JUL12A

0

100

0650001125

Review and Approval Roofing Submittal

15

28MAY12A

15JUN12A

0

100

Review and Approval Roofing Submittal

0650002115

Review and Approve HVAC Submittal

15

28MAY12A

15JUN12A

0

100

Review and Approve HVAC Submittal

0650002120

Review and Approval HM Frames

15

28MAY12A

15JUN12A

0

100

Review and Approval HM Frames

0650002130

Review & App Electric and Fire Alarm Submittal

15

04JUN12A

22JUN12A

0

100

0650002135

City Review & Approval Fire Protection Submittal

20

18JUN12A

13JUL12A

0

100

0650002140

Review and Approval Fire Submittal

15

18JUN12A

06JUL12A

0

100

0650002145

Review and Approve Windows and Curtain Wall

15

25JUN12A

13JUL12A

0

100

0650002095

Submittal - Precast Concrete Plank

20

26JUN12A

26JUN12A

0

100

0650002105

Review and Approve Precast Concrete Plank

15

26JUN12A

21AUG12A

0

100

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Submittal HVAC Equipment Coordination Drawing Meetings HVAC/E/P/FP/GTC Submittal Electrical & Fire Alarm Site Submittals

Submittal Structural Steel/Joists/Deck

Submittal Windows and Curtain Wall Submittal / Shop Drawings Fire Protection Geopier Design Submittal for Record Review and Approval Plumbing Submittal Review and Approval Site Submittal

Review and Approval Structural Steel/Joists/Deck

Review & App Electric and Fire Alarm Submittal City Review & Approval Fire Protection Submittal Review and Approval Fire Submittal Review and Approve Windows and Curtain Wall Submittal - Precast Concrete Plank Review and Approve Precast Concrete Plank O011 - MonthlyRpt - 11x17

Sheet 1 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

19JUL12A

19JUL12A

0

100

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Submittal Concrete/Rebar

0650002030

Submittal Concrete/Rebar

10

0650002085

Review and Approval Concrete & Rebar

5

19JUL12A

02AUG12A

0

100

0650002150

Review Coordination Drawings and Sign-Off

5

05NOV12A

05NOV12A

0

100

0650003005

Delivery of Plumbing Material

5

10MAY12A

16MAY12A

0

100

Delivery of Plumbing Material

0650003010

Delivery of Site Materials

10

14MAY12A

25MAY12A

0

100

Delivery of Site Materials

0650003015

Fabrication and Deliver Concrete Steel/Rebar

5

21MAY12A

25MAY12A

0

100

Fabrication and Deliver Concrete Steel/Rebar

0650003020

Fabrication and Delivery - CMU Units

5

04JUN12A

08JUN12A

0

100

Fabrication and Delivery - CMU Units

0650003025

Fabrication and Delivery - CMU

35

04JUN12A

20JUL12A

0

100

0650003030

Fabrication and Deliver - Structural Steel

40

11JUN12A

03AUG12A

0

100

0650003035

Fabrication and Delivery Steel Joists Deck-Roof

60

11JUN12A

31AUG12A

0

100

0650003040

Fab & Deliver HVAC Units

60

18JUN12A

07SEP12A

0

100

0650003045

Fabrication and Delivery - Roofing Materials

60

18JUN12A

07SEP12A

0

100

0650003050

Fabrication and Delivery - HM Frames

30

18JUN12A

27JUL12A

0

100

Fabrication and Delivery - HM Frames

0650003065

Fabrication & Delivery of Precast Concrete Plank

30

18JUN12A

27JUL12A

0

100

Fabrication & Delivery of Precast Concrete Plank

0650003055

Fabrication and Delivery -Windows & Curtain Wall

80

16JUL12A

16APR13A

0

100

Review and Approval Concrete & Rebar Review Coordination Drawings and Sign-Off

Fab & Deliver

Fabrication and Delivery - CMU Fabrication and Deliver - Structural Steel Fabrication and Delivery Steel Joists Deck-Roof Fab & Deliver HVAC Units Fabrication and Delivery - Roofing Materials

Fabrication and Delivery -Windows & Curtain Wall

Construction Sitework

0655004030

Rough Grade / Building Pad

5

13JUN12A

25APR12A

0

100

Rough Grade / Building Pad

0655004035

Water & Fire Line

10

20JUL12A

24JUL12A

0

100

Water & Fire Line

0655004015

Sanitary Sewer

5

25JUL12A

10AUG12A

0

100

Sanitary Sewer

0655004070

South Storm Sewer

10

25JUL12A

03AUG12A

0

100

South Storm Sewer

0655004005

North Parking Lot Storm Sewer

15

30JUL12A

03AUG12A

0

100

North Parking Lot Storm Sewer

0655004020

Access Roads / Laydown / Parking

10

08AUG12A

03SEP12A

0

100

0655004040

Electrical Duct Banks

10

28AUG12A

07SEP12A

0

100

0655004045

Set Transformer Vault

2

29AUG12A

30AUG12A

0

100

0655004050

Set Transformer

5

11FEB13A

12FEB13A

0

100

0651104030

Generator Enclosure Concrete & Masonry

15

15JUL13A

17JUL13A

0

100

0655004085

Finish Grading

5

15JUL13A

01AUG13A

0

100

0655004100

Curbs

15

15JUL13A

24SEP13

0

98

0655004115

Sidewalks

15

15JUL13A

24SEP13

0

98

0655004105

Site Improvements

45

01AUG13A

09OCT13

11

75

0655004110

Light Poles & Wiring

15

27AUG13A

30SEP13

4

75

Access Roads / Laydown / Parking Electrical Duct Banks Set Transformer Vault Set Transformer Generator Enclosure Concrete & Masonry Finish Grading Curbs Sidewalks Site Improvements Light Poles & Wiring

0655004055

Exterior Building Light Fixtures

5

25SEP13

01OCT13

5

0

Exterior Building Light Fixtures

0655004120

Paving and Striping

5

25SEP13

01OCT13

5

0

Paving and Striping

0655004125

Site Fencing

5

02OCT13

08OCT13

5

0

0655004130

Landscaping

5

07OCT13

11OCT13

5

0

0651104015

Masonry & In-wall Rough-in

30

17JUL12A

27AUG12A

0

100

0651104305

Geopiers

15

24JUL12A

01AUG12A

0

100

0651104005

Foundations Area A

15

13AUG12A

05SEP12A

0

100

0651104010

Rough-in Plumbing U/G - Area A

10

13AUG12A

11SEP12A

0

100

0651104025

Masonry Bearing Walls Area A

30

15AUG12A

10NOV12A

0

100

Masonry Bearing Walls Area A

0651104055

Door Frames Area A First Floor

20

15AUG12A

10NOV12A

0

100

Door Frames Area A First Floor

0651104020

In-wall Electrical Rough-in Area A First Floor

30

22AUG12A

16OCT12A

0

100

0651104035

Rough-in Electric U/G - Area A

15

22AUG12A

09OCT12A

0

100

Site Fencing Landscaping

Area A First Floor

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Masonry & In-wall Rough-in Geopiers Foundations Area A Rough-in Plumbing U/G - Area A

In-wall Electrical Rough-in Area A First Floor Rough-in Electric U/G - Area A O011 - MonthlyRpt - 11x17

Sheet 2 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor Place Slab on Grade Area A

0651104045

Place Slab on Grade Area A

10

21SEP12A

12OCT12A

0

100

0651104115

Rough-in Plumbing - Area A First Floor

40

09NOV12A

15MAR13A

0

100

0651104110

Rough-in HVAC Ductwork - Area A First Floor

30

15NOV12A

18JUL13A

0

100

0651104060

Interior Masonry Walls Area A First Floor

20

03DEC12A

21FEB13A

0

100

0651104130

Equipment Pads

5

10DEC12A

10DEC12A

0

100

0651104120

Rough-in Fire Prot - Area A First Floor

20

19DEC12A

18JAN13A

0

100

Rough-in Fire Prot - Area A First Floor

0651104125

Rough-in HVAC Piping - Area A First Floor

30

19DEC12A

17JAN13A

0

100

Rough-in HVAC Piping - Area A First Floor

0651104050

Complete In-wall Electrical Rough-in Area A

20

21JAN13A

21FEB13A

0

100

0651104085

Overhead Rough-in Elec & FA - Area First Floor

35

21JAN13A

19SEP13A

0

100

0651104135

Stair B,C

10

21JAN13A

06MAR13A

0

100

Stair B,C

0651104150

Stair Concrete Pan Fill

10

06MAR13A

06MAR13A

0

100

Stair Concrete Pan Fill

0651104075

Metal Studs Area A First Floor

7

01APR13A

13MAY13A

0

100

0651104140

Rough-in HVAC Insulation - Area A First Floor

30

06APR13A

01AUG13A

0

100

Rough-in HVAC Insulation - Area A First Floor

0651104155

Standpipe / Hose Cabinet

3

08APR13A

16SEP13A

0

100

Standpipe / Hose Cabinet

0651104295

Electrical Rough-in - Stud Walls

7

08APR13A

14JUN13A

0

100

0651104100

Rough-in Tech Area A - First Floor

30

15APR13A

27MAY13A

0

100

0651104065

CMU Veneer Area A First Floor

15

30APR13A

24SEP13

0

98

0651104090

Set Windows Area A First Floor

20

15JUL13A

15AUG13A

0

100

0651104160

Drywall & Tape Area A First Floor

12

01AUG13A

09SEP13A

0

100

0651104165

Prime Paint Area A First Floor

10

05AUG13A

09SEP13A

0

100

0651104070

Frost Slabs

5

07AUG13A

13AUG13A

0

100

Rough-in Plumbing - Area A First Floor Rough-in HVAC Ductwork - Area A First Floor Interior Masonry Walls Area A First Floor Equipment Pads

Complete In-wall Electrical Rough-in Area A Overhead Rough-in Elec & FA - Area First Floor

Metal Studs Area A First Floor

Electrical Rough-in - Stud Walls Rough-in Tech Area A - First Floor CMU Veneer Area A First Floor Set Windows Area A First Floor Drywall & Tape Area A First Floor Prime Paint Area A First Floor Frost Slabs Ceiling Grid Area A First Floor

0651104175

Ceiling Grid Area A First Floor

20

08AUG13A

17SEP13A

0

100

0651104195

Finish Paint Area A First Floor

10

12AUG13A

26SEP13

2

80

0651104180

Fire Prot Finishes - Area A First Floor

10

14AUG13A

27SEP13

3

75

0651104145

Elevator

20

26AUG13A

27SEP13

3

85

0651104215

Millwork Area A First Floor

20

10SEP13A

30SEP13

4

80

Millwork Area A First Floor

0651104260

Doors & Hardware Area A First Floor

10

10SEP13A

25SEP13

1

90

Doors & Hardware Area A First Floor

0651104105

Building Final Area Enclosure

0

10SEP13A

0

100

0651104225

Ceramic Floor Tile Area A First Floor

20

11SEP13A

17SEP13A

0

100

0651104185

HVAC Finishes - Area A First Floor

10

13SEP13A

24SEP13

0

98

0651104285

FF & E Area A First Floor

3

16SEP13A

24SEP13

0

85

0651104190

Lights in Grid - Area A - First Floor

10

20SEP13A

0651104200

Above Ceiling Inspections Complete

0

25SEP13

0651104205

Ceiling Pads Area A First Floor

5

25SEP13

0651104210

Electric & FA Finishes - Area A First Floor

5

25SEP13

0651104220

VCT / VET Area A First Floor

5

25SEP13

Finish Paint Area A First Floor Fire Prot Finishes - Area A First Floor Elevator

Building Final Area Enclosure Ceramic Floor Tile Area A First Floor HVAC Finishes - Area A First Floor FF & E Area A First Floor

5

50

Lights in Grid - Area A - First Floor

0

0

Above Ceiling Inspections Complete

01OCT13

5

0

Ceiling Pads Area A First Floor

01OCT13

5

0

Electric & FA Finishes - Area A First Floor

01OCT13

5

0

VCT / VET Area A First Floor

01OCT13

0651104230

Technology Finishes Area A - First Floor

5

25SEP13

01OCT13

5

0

Technology Finishes Area A - First Floor

0651104235

Acoustic Panels Area A First Floor

5

25SEP13

01OCT13

5

0

Acoustic Panels Area A First Floor

0651104245

Carpet Area A First Floor

10

25SEP13

08OCT13

10

0

0651104240

Plumbing Finishes - Area A First Floor

10

27SEP13

10OCT13

10

0

0651104255

Toilet Partitions Area A First Floor

5

02OCT13

08OCT13

5

0

Toilet Partitions Area A First Floor

Carpet Area A First Floor Plumbing Finishes - Area A First Floor

0651104265

Marker / Tack Boards Area A First Floor

5

02OCT13

08OCT13

5

0

Marker / Tack Boards Area A First Floor

0651104270

Projection Screens Area A First Floor

5

02OCT13

08OCT13

5

0

Projection Screens Area A First Floor

0651104275

Signage Area A First Floor

5

02OCT13

08OCT13

5

0

Signage Area A First Floor

0651104280

Toilet Accessories Area A Third Floor

5

02OCT13

08OCT13

5

0

Toilet Accessories Area A Third Floor

0651204010

Precast Concrete Deck

1

01NOV12A

08NOV12A

0

100

0651204015

Masonry & In-wall Rough-in

5

10NOV12A

01DEC12A

0

100

Masonry & In-wall Rough-in

0651204025

Masonry Bearing Walls Area A

5

10NOV12A

01DEC12A

0

100

Masonry Bearing Walls Area A

0651204055

Door Frames Area A Second Floor

20

20NOV12A

04FEB13A

0

100

0651204060

Interior Masonry Walls Area A Second Floor

10

23NOV12A

14JUN13A

0

100

0651204070

Equipment Pads

5

17DEC12A

18DEC12A

0

100

0651204120

Rough-in Fire Prot - Area A Second Floor

20

15JAN13A

25JAN13A

0

100

Second Floor

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Precast Concrete Deck

Door Frames Area A Second Floor Interior Masonry Walls Area A Second Floor Equipment Pads Rough-in Fire Prot - Area A Second Floor O011 - MonthlyRpt - 11x17

Sheet 3 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

17JAN13A

31JAN13A

0

100

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Second Floor 0651204125

Rough-in HVAC Piping - Area A Second Floor

30

0651204085

Overhead Rough-in Elec & FA - Area Second Floor

35

28JAN13A

23MAY13A

0

100

0651204020

In-wall Electrical Rough-in Area A Second Floor

2

18FEB13A

15JUL13A

0

100

0651204050

Complete In-wall Electrical Rough-in Area A

15

18FEB13A

10JUN13A

0

100

0651204110

Rough-in HVAC Ductwork - Area A Second Floor

30

18MAR13A

15JUL13A

0

100

0651204115

Rough-in Plumbing - Area A Second Floor

30

20MAR13A

21MAY13A

0

100

0651204095

Complete MEP Rough-in - In wall & Overhead

70

25MAR13A

28MAY13A

0

100

0651204140

Rough-in HVAC Insulation - Area A Second Floor

30

08APR13A

01AUG13A

0

100

0651204155

Standpipe / Hose Cabinet

3

08APR13A

15JUL13A

0

100

0651204100

Rough-in Tech Area A - Second Floor

30

15APR13A

23JUL13A

0

100

Rough-in HVAC Piping - Area A Second Floor Overhead Rough-in Elec & FA - Area Second Floor In-wall Electrical Rough-in Area A Second Floor Complete In-wall Electrical Rough-in Area A Rough-in HVAC Ductwork - Area A Second Floor Rough-in Plumbing - Area A Second Floor Complete MEP Rough-in - In wall & Overhead Rough-in HVAC Insulation - Area A Second Floor Standpipe / Hose Cabinet Rough-in Tech Area A - Second Floor Metal Studs Area A Second Floor

0651204075

Metal Studs Area A Second Floor

10

22APR13A

11JUN13A

0

100

0651204065

CMU Veneer Area A Second Floor

20

06MAY13A

22JUL13A

0

100

0651204160

Drywall & Tape Area A Second Floor

15

12JUN13A

09SEP13A

0

100

Drywall & Tape Area A Second Floor

0651204165

Prime Paint Area A Second Floor

20

12JUN13A

10SEP13A

0

100

Prime Paint Area A Second Floor

0651204175

Ceiling Grid Area A Second Floor

17

17JUL13A

24SEP13

0

98

0651204090

Set Windows Area A Second Floor

10

22JUL13A

12AUG13A

0

100

CMU Veneer Area A Second Floor

Ceiling Grid Area A Second Floor Set Windows Area A Second Floor

0651204180

Fire Prot Finishes - Area A Second Floor

10

05AUG13A

24SEP13

0

98

Fire Prot Finishes - Area A Second Floor

0651204195

Finish Paint Area A Second Floor

10

05AUG13A

26SEP13

2

85

Finish Paint Area A Second Floor

0651204185

HVAC Finishes - Area A Second Floor

10

12AUG13A

24SEP13

0

98

HVAC Finishes - Area A Second Floor

0651204250

Lockers Area A Second Floor

10

13AUG13A

14AUG13A

0

100

0651204215

Millwork Area A Second Floor

10

19AUG13A

09SEP13A

0

100

0651204265

Marker / Tack Boards Area A Second Floor

10

29AUG13A

25SEP13

1

95

0651204190

Lights in Grid - Area A - Second Floor

10

06SEP13A

24SEP13

0

98

0651204220

VCT / VET Area A Second Floor

20

09SEP13A

24SEP13

0

98

VCT / VET Area A Second Floor

0651204260

Doors & Hardware Area A Second Floor

10

09SEP13A

25SEP13

1

95

Doors & Hardware Area A Second Floor

0651204210

Electric & FA Finishes - Area A Second Floor

15

10SEP13A

30SEP13

4

75

Electric & FA Finishes - Area A Second Floor

0651204225

Ceramic Floor Tile Area A Second Floor

20

11SEP13A

17SEP13A

0

100

Ceramic Floor Tile Area A Second Floor

0651204200

Above Ceiling Inspections Complete

0

16SEP13A

0

100

Above Ceiling Inspections Complete

0651204205

Ceiling Pads Area A Second Floor

5

16SEP13A

30SEP13

4

30

Ceiling Pads Area A Second Floor

0651204230

Technology Finishes Area A - Second Floor

10

16SEP13A

27SEP13

3

75

Technology Finishes Area A - Second Floor

0651204240

Plumbing Finishes - Area A Second Floor

20

16SEP13A

01OCT13

5

75

Plumbing Finishes - Area A Second Floor

0651204285

FF & E Area A Second Floor

3

16SEP13A

25SEP13

1

60

FF & E Area A Second Floor Building Final Area Enclosure

0651204105

Building Final Area Enclosure

0

18SEP13A

0

100

0651204270

Projection Screens Area A Second Floor

5

20SEP13A

01OCT13

5

10

0651204235

Acoustic Panels Area A Second Floor

5

25SEP13

01OCT13

5

0

0651204245

Carpet Area A Second Floor

15

25SEP13

15OCT13

15

0

Lockers Area A Second Floor Millwork Area A Second Floor Marker / Tack Boards Area A Second Floor Lights in Grid - Area A - Second Floor

Projection Screens Area A Second Floor Acoustic Panels Area A Second Floor Carpet Area A Second Floor Toilet Partitions Area A Second Floor

0651204255

Toilet Partitions Area A Second Floor

10

27SEP13

10OCT13

10

0

0651204280

Toilet Accessories Area A Second Floor

4

03OCT13

08OCT13

4

0

Toilet Accessories Area A Second Floor

0651204275

Signage Area A Second Floor

5

04OCT13

10OCT13

5

0

Signage Area A Second Floor

Third Floor Precast Concrete Deck

0651304010

Precast Concrete Deck

5

03DEC12A

06DEC12A

0

100

0651304015

Masonry & In-wall Rough-in

15

10DEC12A

12FEB13A

0

100

Masonry & In-wall Rough-in

0651304020

In-wall Electrical Rough-in Area A Third Floor

15

10DEC12A

12FEB13A

0

100

In-wall Electrical Rough-in Area A Third Floor

0651304025

Masonry Bearing Walls Area A Third Floor

15

10DEC12A

12FEB13A

0

100

Masonry Bearing Walls Area A Third Floor

0651304060

Interior Masonry Walls Area A Third Floor

10

07JAN13A

13JUN13A

0

100

0651304055

Door Frames Area A Third Floor

20

12JAN13A

12FEB13A

0

100

0651304070

Equipment Pads

5

15JAN13A

16JAN13A

0

100

0651304040

Roof Structural Steel & Deck

20

15FEB13A

28MAR13A

0

100

0651304080

Roofing

11

05MAR13A

28MAR13A

0

100

0651304085

Overhead Rough-in Elec & FA - Area Third Floor

30

18MAR13A

20SEP13A

0

100

0651304125

Rough-in HVAC Piping - Area A Third Floor

30

20MAR13A

07JUN13A

0

100

0651304095

Complete MEP Rough-in - In wall & Overhead

20

21MAR13A

07JUN13A

0

100

0651304130

Area A - Temporary Building Enclosure Complete

0

28MAR13A

0

100

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Interior Masonry Walls Area A Third Floor Door Frames Area A Third Floor Equipment Pads Roof Structural Steel & Deck Roofing Overhead Rough-in Elec & FA - Area Third Floor Rough-in HVAC Piping - Area A Third Floor Complete MEP Rough-in - In wall & Overhead Area A - Temporary Building Enclosure Complete O011 - MonthlyRpt - 11x17

Sheet 4 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

20SEP13A

0

100

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Third Floor 0651304110

Rough-in HVAC Ductwork - Area A Third Floor

30

01APR13A

0651304115

Rough-in Plumbing - Area A Third Floor

30

01APR13A

14JUN13A

0

100

0651304120

Rough-in Fire Prot - Area A Third Floor

20

01APR13A

17MAY13A

0

100

0651304140

Rough-in HVAC Insulation - Area A Third Floor

30

08APR13A

01AUG13A

0

100

0651304155

Standpipe / Hose Cabinet

3

11APR13A

15JUL13A

0

100

0651304100

Rough-in Tech Area A - Third Floor

30

15APR13A

13SEP13A

0

100

0651304075

Metal Studs Area A Third Floor

10

01MAY13A

14JUN13A

0

100

0651304065

CMU Veneer Area A Third Floor

20

14MAY13A

25JUL13A

0

100

0651304050

Complete In-wall Electrical Rough-in Area A

15

03JUN13A

13AUG13A

0

100

0651304165

Prime Paint Area A Third Floor

15

11JUN13A

01AUG13A

0

100

0651304160

Drywall & Tape Area A Third Floor

15

24JUN13A

28JUN13A

0

100

0651304175

Ceiling Grid Area A Third Floor

15

15JUL13A

24SEP13

0

98

0651304090

Set Windows Area A Third Floor

10

23JUL13A

01AUG13A

0

100

0651304215

Millwork Area A Third Floor

20

26JUL13A

26SEP13

2

90

0651304180

Fire Prot Finishes - Area A Third Floor

10

29JUL13A

24SEP13

0

98

0651304190

Lights in Grid - Area A - Third Floor

5

05AUG13A

24SEP13

0

98

0651304195

Finish Paint Area A Third Floor

10

05AUG13A

24SEP13

0

98

Rough-in HVAC Ductwork - Area A Third Floor Rough-in Plumbing - Area A Third Floor Rough-in Fire Prot - Area A Third Floor Rough-in HVAC Insulation - Area A Third Floor Standpipe / Hose Cabinet Rough-in Tech Area A - Third Floor Metal Studs Area A Third Floor CMU Veneer Area A Third Floor Complete In-wall Electrical Rough-in Area A Prime Paint Area A Third Floor Drywall & Tape Area A Third Floor Ceiling Grid Area A Third Floor Set Windows Area A Third Floor Millwork Area A Third Floor Fire Prot Finishes - Area A Third Floor Lights in Grid - Area A - Third Floor Finish Paint Area A Third Floor HVAC Finishes - Area A Third Floor

0651304185

HVAC Finishes - Area A Third Floor

10

07AUG13A

24SEP13

0

98

0651304210

Electric & FA Finishes - Area A Third Floor

15

12AUG13A

26SEP13

2

90

Electric & FA Finishes - Area A Third Floor

0651304240

Plumbing Finishes - Area A Third Floor

15

12AUG13A

26SEP13

2

90

Plumbing Finishes - Area A Third Floor

0651304265

Marker / Tack Boards Area A Third Floor

5

29AUG13A

30AUG13A

0

100

0651304220

VCT / VET Area A Third Floor

20

03SEP13A

24SEP13

0

98

VCT / VET Area A Third Floor

1

95

Doors & Hardware Area A Third Floor

0

100

Above Ceiling Inspections Complete

25SEP13

Marker / Tack Boards Area A Third Floor

0651304260

Doors & Hardware Area A Third Floor

10

04SEP13A

0651304200

Above Ceiling Inspections Complete

0

06SEP13A

0651304205

Ceiling Pads Area A Third Floor

10

09SEP13A

24SEP13

0

98

0651304225

Ceramic Floor Tile Area A Third Floor

15

11SEP13A

17SEP13A

0

100

Ceramic Floor Tile Area A Third Floor

0651304230

Technology Finishes Area A - Third Floor

10

12SEP13A

25SEP13

1

90

Technology Finishes Area A - Third Floor

0651304270

Projection Screens Area A Third Floor

2

16SEP13A

25SEP13

1

70

0651304285

FF & E Area A Third Floor

3

16SEP13A

0651304105

Building Final Area Enclosure

0

0651304235

Acoustic Panels Area A Third Floor

5

0651304245

Carpet Area A Third Floor

15

Ceiling Pads Area A Third Floor

Projection Screens Area A Third Floor

26SEP13

2

30

FF & E Area A Third Floor

18SEP13A

0

100

Building Final Area Enclosure

25SEP13

01OCT13

5

0

25SEP13

15OCT13

15

0

Carpet Area A Third Floor

Acoustic Panels Area A Third Floor

0651304255

Toilet Partitions Area A Third Floor

5

25SEP13

01OCT13

5

0

Toilet Partitions Area A Third Floor

0651304280

Toilet Accessories Area A Third Floor

5

25SEP13

01OCT13

5

0

Toilet Accessories Area A Third Floor

0651304275

Signage Area A Third Floor

5

02OCT13

08OCT13

5

0

0652114115

Load Bearing Masonry

20

23AUG12A

20NOV12A

0

100

0652114005

Underground Electrical Rough-in

10

11SEP12A

18DEC12A

0

100

0652114120

Structural Steel & Deck

15

27NOV12A

26DEC12A

0

100

0652114010

Slab on Grade

5

12DEC12A

16JAN13A

0

100

0652114130

Roofing

10

16JAN13A

19JAN13A

0

100

0652114025

Fire Protection Rough-in

10

28JAN13A

11MAR13A

0

100

Signage Area A Third Floor

Area B Gymnasium First Floor

0652114020

HVAC Piping Rough-in

20

0652114150

Gymnasium Temporary Enclosure Complete

0

0652114045

HVAC Rough-in - Insulation

10

0652114040

HVAC Rough-in - Ductwork

0652114015

14FEB13A

0

100

15FEB13A

0

100

01MAR13A

15JUL13A

0

100

10

04MAR13A

16AUG13A

0

100

Overhead Elec. & Fire Alarm Rough-in

25

22APR13A

17SEP13A

0

100

0652114035

Gym Lighting

5

22APR13A

06AUG13A

0

100

0652114140

CMU Veneer

20

01MAY13A

14JUN13A

0

100

0652114055

Fire Protection Finishes

5

05JUL13A

10JUL13A

0

100

0652114060

HVAC Finishes

10

22JUL13A

16AUG13A

0

100

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

04FEB13A

Early Bar Progress Bar Critical Activity

Load Bearing Masonry Underground Electrical Rough-in Structural Steel & Deck Slab on Grade Roofing Fire Protection Rough-in HVAC Piping Rough-in Gymnasium Temporary Enclosure Complete HVAC Rough-in - Insulation HVAC Rough-in - Ductwork Overhead Elec. & Fire Alarm Rough-in Gym Lighting CMU Veneer Fire Protection Finishes HVAC Finishes O011 - MonthlyRpt - 11x17

Sheet 5 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

13SEP13A

0

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor 0652114050

Finish Painting

4

26JUL13A

0652114110

Operable Partition

5

20AUG13A

27SEP13

3

50

0652114075

Gym Equipment

5

26AUG13A

27AUG13A

0

100

0652114070

Interior MEP Finishes

15

03SEP13A

09SEP13A

0

100

0652114065

Electric & Fire Alarm Finishes

5

04SEP13A

24SEP13

0

95

0652114085

Stage Equipment

5

11SEP13A

25SEP13

1

80

Finish Painting

100

Operable Partition Gym Equipment Interior MEP Finishes Electric & Fire Alarm Finishes Stage Equipment Proj Screen @ Stage

0652104270

Proj Screen @ Stage

5

25SEP13

01OCT13

5

0

0652114090

Stage Lighting

5

25SEP13

01OCT13

5

0

0652114095

Gym Flooring

15

25SEP13

15OCT13

15

0

0652114100

Gym Bleachers

5

25SEP13

01OCT13

5

0

0652114105

Stage Flooring

10

25SEP13

08OCT13

10

0

0652124095

Underslab Plumbing Rough-in

5

30AUG12A

14SEP12A

0

100

0652124090

Underslab Electrical Rough-in

5

11SEP12A

23OCT12A

0

100

0652124085

Slab on Grade

5

21NOV12A

26NOV12A

0

100

0652124075

MEP Rough-in

18

08JAN13A

08MAR13A

0

100

0652124030

HVAC Rough-in

10

14FEB13A

05AUG13A

0

100

0652124065

Fire Protection Rough-in

10

18FEB13A

22FEB13A

0

100

0652124035

Electrical Rough-in

10

25MAR13A

20AUG13A

0

100

Electrical Rough-in

0652124050

Ceiling Grid

5

19AUG13A

20AUG13A

0

100

Ceiling Grid

0652124015

Install Kitchen Tile

10

16SEP13A

17SEP13A

0

100

0652124010

Install Kitchen Equipment

10

19SEP13A

25SEP13

1

90

0652124100

Above Ceiling Inspections Complete

0

24SEP13

0

0

0652124005

Kitchen Equipment Hook-ups

15

25SEP13

15OCT13

15

0

0652124020

Security Grille

5

25SEP13

01OCT13

5

0

Security Grille

0652124025

Finish Paint

5

25SEP13

01OCT13

5

0

Finish Paint

0652124040

Electrical Finishes

5

25SEP13

01OCT13

5

0

Electrical Finishes

0652124045

HVAC Finishes

5

25SEP13

01OCT13

5

0

HVAC Finishes

0652124055

Lights in Grid

5

25SEP13

01OCT13

5

0

Lights in Grid

0652124060

Ceiling Pads

5

25SEP13

01OCT13

5

0

0652124070

Fire Protection Finishes

5

25SEP13

01OCT13

5

0

0652124080

Plumbing Finishes

5

25SEP13

01OCT13

5

0

17DEC12A

18DEC12A

0

100

Stage Lighting Gym Flooring Gym Bleachers Stage Flooring

Kitchen First Floor Underslab Plumbing Rough-in Underslab Electrical Rough-in Slab on Grade MEP Rough-in HVAC Rough-in Fire Protection Rough-in

Install Kitchen Tile Install Kitchen Equipment Above Ceiling Inspections Complete Kitchen Equipment Hook-ups

Ceiling Pads Fire Protection Finishes Plumbing Finishes

Mechanical Room First Floor Set HVAC Equipment

0652134005

Set HVAC Equipment

10

0652134015

Wall Electrical Rough-in

15

28JAN13A

01JUL13A

0

100

0652134020

Overhead Elec. & Fire Alarm Rough-in

30

15FEB13A

01OCT13

5

85

0652134025

Fire Protection Rough-in

5

21FEB13A

28JUN13A

0

100

Fire Protection Rough-in

0652134040

HVAC Rough-in - Piping

15

21FEB13A

01JUL13A

0

100

HVAC Rough-in - Piping

0652134075

Prime Paint

2

13JUN13A

25SEP13

1

50

0652134035

HVAC Rough-in - Ductwork

15

01JUL13A

15JUL13A

0

100

0652134045

HVAC Rough-in - Insulation

15

01JUL13A

24SEP13

0

98

0652134055

Fire Protection Finishes

5

24JUL13A

25SEP13

1

85

0652134065

HVAC Finishes

10

16SEP13A

25SEP13

1

90

0652134050

Finish Painting

5

25SEP13

01OCT13

5

0

0652134060

Electric & Fire Alarm Finishes

15

25SEP13

15OCT13

15

0

0652134030

Lighting

5

26SEP13

02OCT13

5

0

0652234005

Set HVAC Equipment

10

17DEC12A

18DEC12A

0

100

0652234015

Wall Electrical Rough-in

15

28JAN13A

20AUG13A

0

100

Wall Electrical Rough-in Overhead Elec. & Fire Alarm Rough-in

Prime Paint HVAC Rough-in - Ductwork HVAC Rough-in - Insulation Fire Protection Finishes HVAC Finishes Finish Painting Electric & Fire Alarm Finishes Lighting

Second Floor

0652234040

HVAC Rough-in - Piping

15

04FEB13A

17JUL13A

0

100

0652234020

Overhead Elec. & Fire Alarm Rough-in

30

15APR13A

26SEP13

2

95

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Set HVAC Equipment Wall Electrical Rough-in HVAC Rough-in - Piping Overhead Elec. & Fire Alarm Rough-in O011 - MonthlyRpt - 11x17

Sheet 6 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Second Floor Fire Protection Rough-in

0652234025

Fire Protection Rough-in

5

24JUN13A

28JUN13A

0

100

0652234035

HVAC Rough-in - Ductwork

15

13JUL13A

28AUG13A

0

100

0652234055

Fire Protection Finishes

5

16JUL13A

24SEP13

0

95

Fire Protection Finishes

0652234045

HVAC Rough-in - Insulation

15

20JUL13A

24SEP13

0

98

HVAC Rough-in - Insulation

0652234060

Electric & Fire Alarm Finishes

10

03SEP13A

04OCT13

8

20

0652234065

HVAC Finishes

10

10SEP13A

20SEP13A

0

100

0652234030

Lighting

5

25SEP13

01OCT13

5

0

Lighting

0652234050

Finish Painting

5

25SEP13

01OCT13

5

0

Finish Painting

0652104145

Geopiers

15

02AUG12A

09AUG12A

0

100

0652104005

Foundations Area B

15

13AUG12A

03SEP12A

0

100

0652104025

Masonry Bearing Walls Area B

10

15AUG12A

04DEC12A

0

100

0652104010

Rough-in Plumbing U/G - Area B

20

20AUG12A

28SEP12A

0

100

0652104020

In-wall Elec & FA Rough-in Area B First Floor

50

23AUG12A

08MAR13A

0

100

0652104035

Rough-in Electric U/G - Area B

20

23AUG12A

12MAR13A

0

100

0652104045

Place Slab on Grade Area B

5

17OCT12A

12MAR13A

0

100

0652104130

Precast Concrete Deck @ Second Floor Mech Room

1

16NOV12A

18NOV12A

0

100

0652104040

Structural Steel & Deck

15

28NOV12A

28JAN13A

0

100

0652104115

Rough-in Plumbing - Area B First Floor

20

03DEC12A

29MAR13A

0

100

0652104060

Interior Masonry Area B First Floor

15

18DEC12A

15MAR13A

0

100

0652104080

Roofing Area B

10

17JAN13A

21JUN13A

0

100

0652104135

Stair D

5

21JAN13A

21JAN13A

0

100

0652104120

Rough-in Fire Prot - Area B First Floor

20

30JAN13A

15FEB13A

0

100

0652104125

Rough-in HVAC Piping - Area B First Floor

20

15FEB13A

01MAR13A

0

100

0652104110

Rough-in HVAC Ductwork - Area B First Floor

20

18FEB13A

18SEP13A

0

100

0652104300

Area B Temporary Enclosure Complete

0

01MAR13A

0

100

0652104150

Stair D Pan Concrete Fill

5

15MAR13A

15MAR13A

0

100

0652104075

Metal Studs Area B First Floor

10

18MAR13A

16APR13A

0

100

HVAC Rough-in - Ductwork

Electric & Fire Alarm Finishes HVAC Finishes

Area B First Floor Geopiers Foundations Area B Masonry Bearing Walls Area B Rough-in Plumbing U/G - Area B In-wall Elec & FA Rough-in Area B First Floor Rough-in Electric U/G - Area B Place Slab on Grade Area B Precast Concrete Deck @ Second Floor Mech Room Structural Steel & Deck Rough-in Plumbing - Area B First Floor Interior Masonry Area B First Floor Roofing Area B Stair D Rough-in Fire Prot - Area B First Floor Rough-in HVAC Piping - Area B First Floor Rough-in HVAC Ductwork - Area B First Floor Area B Temporary Enclosure Complete Stair D Pan Concrete Fill Metal Studs Area B First Floor

0652104085

Overhead Rough-in Elec & FA - Area B First Floor

20

18MAR13A

25SEP13

1

95

Overhead Rough-in Elec & FA - Area B First Floor

0652104140

Rough-in HVAC Insulation - Area B First Floor

20

19MAR13A

25SEP13

1

95

Rough-in HVAC Insulation - Area B First Floor

0652104050

Complete In-wall Rough-in Area B

10

29MAR13A

16APR13A

0

100

0652104100

Rough-in Tech Area B - First Floor

20

15APR13A

25SEP13

1

95

0652104155

Standpipe / Hose Cabinet

3

15APR13A

01MAY13A

0

100

0652104065

CMU Veneer

20

16APR13A

22JUL13A

0

100

0652104090

Set Windows Area B First Floor

10

15JUL13A

11SEP13A

0

100

0652104070

Frost Slabs

5

16JUL13A

13AUG13A

0

100

0652104290

Fire Pump

5

23JUL13A

25SEP13

1

90

Complete In-wall Rough-in Area B Rough-in Tech Area B - First Floor Standpipe / Hose Cabinet CMU Veneer Set Windows Area B First Floor Frost Slabs Fire Pump

0652104165

Prime Paint Area B First Floor

20

07AUG13A

25SEP13

1

95

Prime Paint Area B First Floor

0652104160

Drywall & Tape Area B First Floor

15

12AUG13A

13SEP13A

0

100

Drywall & Tape Area B First Floor

0652104295

Fire Protection Riser

10

12AUG13A

26SEP13

2

85

0652104055

Door Frames Area B First Floor in Metal Studs

10

13AUG13A

15AUG13A

0

100

Door Frames Area B First Floor in Metal Studs

0652104190

Lights in Grid - Area B - First Floor

20

14AUG13A

30SEP13

4

80

Lights in Grid - Area B - First Floor

0652104195

Finish Paint Area B First Floor

15

04SEP13A

01OCT13

5

67

0652104175

Ceiling Grid Area B First Floor

10

09SEP13A

26SEP13

2

85

0652104260

Doors & Hardware Area B First Floor

10

11SEP13A

25SEP13

1

90

0652104180

Fire Prot Finishes - Area B First Floor

10

16SEP13A

07OCT13

9

15

0652104185

HVAC Finishes - Area B First Floor

10

16SEP13A

25SEP13

1

90

HVAC Finishes - Area B First Floor

Doors & Hardware Area B First Floor Fire Prot Finishes - Area B First Floor

0

100

18SEP13A

0

100

Building Area Final Enclosure

0

0

8

0

Ceiling Pads Area B First Floor

5

0

Millwork Area B First Floor

20

Building Area Final Enclosure

0

0652104200

Above Ceiling Inspections Complete

0

25SEP13

0652104205

Ceiling Pads Area B First Floor

8

25SEP13

04OCT13

0652104215

Millwork Area B First Floor

5

25SEP13

01OCT13

Š Primavera Systems, Inc.

Ceiling Grid Area B First Floor

19SEP13A

Ceramic Floor Tile Area B First Floor

0652104105

19APR12 20DEC13 25SEP13 27SEP13 13:36

Finish Paint Area B First Floor

Ceramic Floor Tile Area B First Floor

0652104225

Start Date Finish Date Data Date Run Date

16SEP13A

Fire Protection Riser

Early Bar Progress Bar Critical Activity

Above Ceiling Inspections Complete

O011 - MonthlyRpt - 11x17

Sheet 7 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

10

25SEP13

08OCT13

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor 0652104220

VCT / VET Area B First Floor

10

0

VCT / VET Area B First Floor Technology Finishes Area B - First Floor

0652104230

Technology Finishes Area B - First Floor

10

25SEP13

08OCT13

10

0

0652104235

Acoustic Panels Area B First Floor

10

25SEP13

08OCT13

10

0

Acoustic Panels Area B First Floor

0652104240

Plumbing Finishes - Area B First Floor

10

25SEP13

08OCT13

10

0

Plumbing Finishes - Area B First Floor

0652104250

Lockers Area B First Floor

10

25SEP13

08OCT13

10

0

Lockers Area B First Floor

0652104255

Toilet Partitions Area B First Floor

10

25SEP13

08OCT13

10

0

Toilet Partitions Area B First Floor

0652104275

Signage Area B First Floor

5

25SEP13

01OCT13

5

0

Signage Area B First Floor

0652104210

Electric & FA Finishes - Area B First Floor

10

26SEP13

09OCT13

10

0

Electric & FA Finishes - Area B First Floor

0652104265

Marker / Tack Boards Area B First Floor

5

26SEP13

02OCT13

5

0

Marker / Tack Boards Area B First Floor

0652104280

Toilet Accessories Area B First Floor

10

26SEP13

09OCT13

10

0

Toilet Accessories Area B First Floor

0652104245

Carpet Area B First Floor

5

07OCT13

11OCT13

5

0

Carpet Area B First Floor

0652104285

FF & E Area B First Floor

3

07OCT13

09OCT13

3

0

FF & E Area B First Floor

Close-Out

Operation & Maintenance Manuals Submitted

0650007005

Operation & Maintenance Manuals Submitted

0

24SEP13

0

0

0650007010

Contractor Punchlist

20

25SEP13

22OCT13

20

0

0650007015

HVAC Controls Check-out and Balancing

15

25SEP13

15OCT13

15

0

0650007110

Punchlist

20

25SEP13

22OCT13

20

0

0650007020

Final Inspections / Testing

5

30SEP13

04OCT13

5

0

0650007040

Final Inspections Complete

0

04OCT13

0

0

0650007030

Fire Alarm Programming & Testing

5

07OCT13

11OCT13

5

0

0650007035

JACE Interface Check-out

5

16OCT13

22OCT13

5

0

JACE Interface Check-out

Contractor Punchlist HVAC Controls Check-out and Balancing Punchlist Final Inspections / Testing Final Inspections Complete Fire Alarm Programming & Testing

22OCT13

5

0

As-Built Documents Submitted

18OCT13

0

0

Certificate of Occupancy

21OCT13

01NOV13

10

0

Architect's Punchlist

21OCT13

20DEC13

45

0

Close-out Documents

5

22OCT13

28OCT13

5

0

Project Team - Controls Check-out

Building Commissioning

5

22OCT13

28OCT13

5

0

Building Commissioning

0650007120

LEED Air Testing

1

22OCT13

22OCT13

1

0

LEED Air Testing

0650007070

MEP Commissioning Complete

0

28OCT13

0

0

0650007085

Demonstration & Training

5

05NOV13

11NOV13

5

0

0650007080

Owner Move In

7

26NOV13

04DEC13

7

0

0650007100

Owner Move-in Complete

0

04DEC13

0

0

0650007105

Contract Close-out

0

20DEC13

0

0

0650007055

As-Built Documents Submitted

5

0650007075

Certificate of Occupancy

0

0650007025

Architect's Punchlist

10

0650007090

Close-out Documents

45

0650007060

Project Team - Controls Check-out

0650007065

Start Date Finish Date Data Date Run Date

19APR12 20DEC13 25SEP13 27SEP13 13:36

Š Primavera Systems, Inc.

16OCT13

Early Bar Progress Bar Critical Activity

MEP Commissioning Complete Demonstration & Training Owner Move In

O011 - MonthlyRpt - 11x17

Sheet 8 of 8

Orchard New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 September 25, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

2012 AUG

JUL

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

2013 JUN

JUL

AUG

SEP

OCT

NOV

Bid & Award

0660001005

Bid Opening

0

19APR12A

0660001010

Bid Evaluation and Award

32

19APR12A

0660001015

NTP - BP

0

0660001090

Construction Kick-off Meeting

0

31MAY12A

0660001020

Site Mobilization - BP 061 General Trades

10

06JUN12A

0660001025

Prime Contractors Submit Schedules

11

0660001045

Site Mobilization - BP 210 Fire Protection

10

0660001050

Site Mobilization - BP 220 Plumbing

0660001055

Bid Opening

0

100

23MAY12A

0

100

23MAY12A

0

100

0

100

20JUN12A

0

100

Site Mobilization - BP 061 General Trades

06JUN12A

20JUN12A

0

100

Prime Contractors Submit Schedules

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 210 Fire Protection

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 220 Plumbing

Site Mobilization - BP 230 HVAC

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 230 HVAC

0660001060

Site Mobilization - BP 260 Electrical

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 260 Electrical

0660001065

Site Mobilization - BP 270 Technology

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 270 Technology

0660001070

Site Mobilization - BP 300 Site Concrete

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 300 Site Concrete

0660001080

Site Mobilization - BP 329 Landscaping

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 329 Landscaping

0660001085

Site Mobilization - BP 121 FF & E

10

06JUN12A

20JUN12A

0

100

Site Mobilization - BP 121 FF & E

0660001075

Site Mobilization - BP 310 Site Work

10

18JUN12A

20JUN12A

0

100

Site Mobilization - BP 310 Site Work

0660001030

Schedule Meeting(s) to Review Schedule

10

26JUN12A

20JUL12A

0

100

0660001035

Prime Contractors/CM Final Review Schedule

5

10SEP12A

17SEP12A

0

100

0660001040

Contractors Sign Off - Project Baseline Schedule

0

15OCT12A

0

100

Bid Evaluation and Award NTP - BP Construction Kick-off Meeting

Schedule Meeting(s) to Review Schedule Prime Contractors/CM Final Review Schedule Contractors Sign Off - Project Baseline Schedule

Submittals & Approvals

0660002025

Site Submittals

5

14JUN12A

14JUN12A

0

100

Site Submittals

0660002080

Review and Approval Site Submittal

5

14JUN12A

14JUN12A

0

100

Review and Approval Site Submittal

0660002015

Coordination Drawing Meetings HVAC/E/P/FP/GTC

45

18JUN12A

16NOV12A

0

100

0660002035

Submittal Block and Mortar

10

03JUL12A

03JUL12A

0

100

0660002090

Review and Approval Block and Mortar

15

03JUL12A

30JUL12A

0

100

0660002005

Submittal Plumbing

10

06JUL12A

06JUL12A

0

100

Submittal Plumbing

0660002010

Submittal HVAC Equipment

20

06JUL12A

06JUL12A

0

100

Submittal HVAC Equipment

0660002030

Submittal Concrete/Rebar

10

06JUL12A

06JUL12A

0

100

Submittal Concrete/Rebar

0660002075

Review and Approval Plumbing Submittal

15

06JUL12A

30JUL12A

0

100

0660002115

Review and Approve HVAC Submittal

15

06JUL12A

30JUL12A

0

100

0660002020

Submittal Electrical & Fire Alarm

25

13JUL12A

13JUL12A

0

100

0660002130

Review & App Electric and Fire Alarm Submittal

15

13JUL12A

03AUG12A

0

100

0660002135

City Review & Approval Fire Protection Submittal

20

13JUL12A

10AUG12A

0

100

0660002045

Submittal Structural Steel/Joists/Deck

45

17JUL12A

17JUL12A

0

100

0660002110

Review and Approval Structural Steel/Joists/Deck

45

17JUL12A

03AUG12A

0

100

0660002125

Geopier Design Submittal for Record

25

17JUL12A

17JUL12A

0

100

0660002085

Review and Approval Concrete & Rebar

5

18JUL12A

03AUG12A

0

100

0660002145

Review and Approve Windows and Curtain Wall

15

18JUL12A

09AUG12A

0

100

0660002040

Submittal Brick and Mortar

10

20JUL12A

20JUL12A

0

100

0660002100

Review and Approval Brick and Mortar

15

20JUL12A

09AUG12A

0

100

0660002060

Submittal HM Frame

20

26JUL12A

26JUL12A

0

100

0660002065

Submittal Windows and Curtain Wall

40

03AUG12A

03AUG12A

0

100

0660002120

Review and Approval HM Frames

15

09AUG12A

15AUG12A

0

100

Review and Approval HM Frames

0660002095

Submittal - Precast Concrete Plank

20

10AUG12A

10AUG12A

0

100

Submittal - Precast Concrete Plank

0660002105

Review and Approve Precast Concrete Plank

15

10AUG12A

21AUG12A

0

100

0660002140

Review and Approval Fire Submittal

15

13AUG12A

12OCT12A

0

100

Review and Approval Fire Submittal

0660001125

Review and Approval Roofing Submittal

15

30AUG12A

12OCT12A

0

100

Review and Approval Roofing Submittal

0660002055

Submittal Roofing

20

30AUG12A

30AUG12A

0

100

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Coordination Drawing Meetings HVAC/E/P/FP/GTC Submittal Block and Mortar Review and Approval Block and Mortar

Review and Approval Plumbing Submittal Review and Approve HVAC Submittal Submittal Electrical & Fire Alarm Review & App Electric and Fire Alarm Submittal City Review & Approval Fire Protection Submittal Submittal Structural Steel/Joists/Deck Review and Approval Structural Steel/Joists/Deck Geopier Design Submittal for Record Review and Approval Concrete & Rebar Review and Approve Windows and Curtain Wall Submittal Brick and Mortar Review and Approval Brick and Mortar Submittal HM Frame Submittal Windows and Curtain Wall

Review and Approve Precast Concrete Plank

Submittal Roofing D011 - MonthlyRpt - 11x17

Sheet 1 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

0660002070

Submittal / Shop Drawings Fire Protection

35

20SEP12A

24SEP12A

0

100

0660002150

Review Coordination Drawings and Sign-Off

1

19NOV12A

19NOV12A

0

100

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Submittal / Shop Drawings Fire Protection Review Coordination Drawings and Sign-Off

Fab & Deliver

Fabrication and Deliver Concrete Steel/Rebar

0660003015

Fabrication and Deliver Concrete Steel/Rebar

5

13JUL12A

19JUL12A

0

100

0660003025

Fabrication and Delivery - CMU

35

31JUL12A

01AUG12A

0

100

0660003005

Delivery of Plumbing Material

5

03AUG12A

07SEP12A

0

100

0660003010

Delivery of Site Materials

10

06AUG12A

10AUG12A

0

100

0660003030

Fabrication and Deliver - Structural Steel

40

23AUG12A

21SEP12A

0

100

Fabrication and Deliver - Structural Steel

0660003050

Fabrication and Delivery - HM Frames

30

17SEP12A

01OCT12A

0

100

Fabrication and Delivery - HM Frames

0660003035

Fabrication and Delivery Steel Joists Deck-Roof

14

18SEP12A

05OCT12A

0

100

Fabrication and Delivery Steel Joists Deck-Roof

0660003045

Fabrication and Delivery - Roofing Materials

10

01OCT12A

16OCT12A

0

100

Fabrication and Delivery - Roofing Materials

0660003040

Fab & Deliver HVAC Units

6

15OCT12A

26OCT12A

0

100

Fab & Deliver HVAC Units

0660003065

Fabrication & Delivery of Precast Concrete Plank

10

15OCT12A

24OCT12A

0

100

Fabrication & Delivery of Precast Concrete Plank

0660003055

Fabrication and Delivery -Windows & Curtain Wall

65

16NOV12A

09AUG13A

0

100

0665004030

Rough Grade / Building Pad

5

19JUN12A

02JUL12A

0

100

0665004020

Access Roads / Laydown / Parking

10

25JUN12A

03OCT12A

0

100

0665004070

South Storm Sewer

10

29AUG12A

04SEP12A

0

100

0665004005

North Parking Lot & East Site Storm Sewer

15

04SEP12A

10SEP12A

0

100

0665004015

Sanitary Sewer

5

04SEP12A

06SEP12A

0

100

0665004040

Electrical Duct Banks

10

04SEP12A

05SEP12A

0

100

Electrical Duct Banks Set Transformer Vault

Fabrication and Delivery - CMU Delivery of Plumbing Material Delivery of Site Materials

Fabrication and Delivery -Windows & Curtain Wall

Construction Sitework

Rough Grade / Building Pad Access Roads / Laydown / Parking South Storm Sewer North Parking Lot & East Site Storm Sewer Sanitary Sewer

0665004045

Set Transformer Vault

2

04SEP12A

04SEP12A

0

100

0665004035

Water & Fire Line

10

19SEP12A

25SEP12A

0

100

0665004050

Set Transformer / Energize

5

01FEB13A

01FEB13A

0

100

0661104030

Generator Enclosure Concrete & Masonry

15

10MAY13A

29MAY13A

0

100

0665004100

Curbs

15

17JUN13A

15JUL13A

0

100

0665004110

Light Poles & Wiring

15

20JUN13A

22JUL13A

0

100

0665004055

Exterior Building Light Fixtures

10

24JUN13A

08JUL13A

0

100

0665004085

Finish Grading

5

24JUN13A

27JUN13A

0

100

0665004115

Sidewalks

15

28JUN13A

15JUL13A

0

100

0665004120

Paving and Striping

5

18JUL13A

27JUL13A

0

100

0665004130

Landscaping

10

29JUL13A

09AUG13A

0

100

Landscaping

0665004125

Site Fencing

10

02AUG13A

09AUG13A

0

100

Site Fencing

0661104305

Geopiers

15

29JUN12A

11JUL12A

0

100

0661104005

Foundation

15

17JUL12A

26JUL12A

0

100

Foundation

0661104070

Frost Slabs

6

17JUL12A

26JUL12A

0

100

Frost Slabs

0661104145

Foundation Insulation

15

17JUL12A

26JUL12A

0

100

Foundation Insulation

0661104035

Electric Underground Rough-in

5

01AUG12A

15AUG12A

0

100

0661104315

Masonry Foundation

3

01AUG12A

06AUG12A

0

100

0661104010

Plumbing Underground

10

03AUG12A

13AUG12A

0

100

0661104015

MEP Masonry Rough-in

30

03AUG12A

19OCT12A

0

100

Water & Fire Line Set Transformer / Energize Generator Enclosure Concrete & Masonry Curbs Light Poles & Wiring Exterior Building Light Fixtures Finish Grading Sidewalks Paving and Striping

Area A First Floor Geopiers

Electric Underground Rough-in Masonry Foundation Plumbing Underground MEP Masonry Rough-in Place Slab on Grade Prep

0661104045

Place Slab on Grade Prep

5

11SEP12A

01OCT12A

0

100

0661104020

In-wall Electrical Rough-in

30

12SEP12A

19OCT12A

0

100

In-wall Electrical Rough-in

0661104025

Masonry Bearing Walls

15

12SEP12A

19OCT12A

0

100

Masonry Bearing Walls

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

D011 - MonthlyRpt - 11x17

Sheet 2 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor Door Frames

0661104055

Door Frames

5

19SEP12A

11OCT12A

0

100

0661104365

Slab on Grade

5

19SEP12A

03OCT12A

0

100

0661104115

Sanitary Rough-in Plumbing

1

20SEP12A

20OCT12A

0

100

0661104080

MEP Interior Masonry Rough-in

20

25SEP12A

08JAN13A

0

100

0661104060

Interior Masonry Walls

15

24OCT12A

18DEC12A

0

100

0661104325

Plumbing Above Ceiling

15

16NOV12A

28JAN13A

0

100

0661104125

Rough-in HVAC Piping/Mains/Branches/Boxes

20

20DEC12A

24JAN13A

0

100

0661104110

Rough-in HVAC Ductwork/FPB

15

21DEC12A

18JUL13A

0

100

0661104135

Stairs

10

03JAN13A

04JAN13A

0

100

0661104120

Rough-in Fire Prot

20

14JAN13A

18JAN13A

0

100

Rough-in Fire Prot

0661104075

Metal Studs

10

15JAN13A

28JAN13A

0

100

Metal Studs

0661104085

Overhead Rough-in Elec & FA

35

17JAN13A

03JUL13A

0

100

0661104150

Stair Concrete Pan Fill

10

21JAN13A

30JAN13A

0

100

0661104295

Electrical Rough-in - Stud Walls

10

29JAN13A

08FEB13A

0

100

0661104140

HVAC Insulation

30

30JAN13A

02JUL13A

0

100

0661104165

Prime Paint

20

08APR13A

30MAY13A

0

100

0661104065

CMU Veneer

15

09APR13A

28MAY13A

0

100

CMU Veneer

0661104335

Plumbing Insulation/Testing

10

10APR13A

10APR13A

0

100

Plumbing Insulation/Testing

0661104155

Standpipe / Hose Cabinet

3

11APR13A

15JUL13A

0

100

0661104345

Plumbing Inspections

0

11APR13A

0

100

0661104355

Exterior Framing

5

26APR13A

02MAY13A

0

100

0661104300

Temperature Controls

15

01MAY13A

10SEP13

1

95

0661104160

Drywall & Tape

15

08MAY13A

20MAY13A

0

100

Drywall & Tape

0661104195

Finish Paint

20

13MAY13A

30MAY13A

0

100

Finish Paint

0661104185

HVAC Finishes

10

20MAY13A

24JUN13A

0

100

HVAC Finishes

0661104180

Fire Prot Finishes

10

22MAY13A

14JUN13A

0

100

Fire Prot Finishes

0661104360

Storefronts

5

22MAY13A

02AUG13A

0

100

0661104175

Ceiling Grid

20

28MAY13A

07JUN13A

0

100

0661104190

Lights in Grid

10

06JUN13A

31JUL13A

0

100

0661104370

Curtainwall

4

07JUN13A

10JUN13A

0

100

0661104240

Plumbing Finishes

20

10JUN13A

19JUL13A

0

100

Plumbing Finishes Technology Finishes

0661104230

Technology Finishes

10

11JUN13A

15JUL13A

0

100

0661104205

Ceiling Pads

10

18JUN13A

26JUL13A

0

100

0661104210

Electric & FA Finishes

15

25JUN13A

17JUL13A

0

100

0661104320

Unit Heater/AC-1/CU-1 Set

5

25JUN13A

09AUG13A

0

100

0661104225

Ceramic Floor Tile

20

01JUL13A

13AUG13A

0

100

Slab on Grade Sanitary Rough-in Plumbing MEP Interior Masonry Rough-in Interior Masonry Walls Plumbing Above Ceiling Rough-in HVAC Piping/Mains/Branches/Boxes Rough-in HVAC Ductwork/FPB Stairs

Overhead Rough-in Elec & FA Stair Concrete Pan Fill Electrical Rough-in - Stud Walls HVAC Insulation Prime Paint

Standpipe / Hose Cabinet Plumbing Inspections Exterior Framing Temperature Controls

Storefronts Ceiling Grid Lights in Grid Curtainwall

Ceiling Pads Electric & FA Finishes Unit Heater/AC-1/CU-1 Set Ceramic Floor Tile Millwork

0661104215

Millwork

20

03JUL13A

02AUG13A

0

100

0661104100

Rough-in Tech T-116

30

16JUL13A

26JUL13A

0

100

0661104200

Above Ceiling Inspections Complete

0

16JUL13A

0

100

0661104270

Projection Screens

5

23JUL13A

29JUL13A

0

100

Projection Screens

0661104290

Final Cleaning

5

24JUL13A

13AUG13A

0

100

Final Cleaning

0661104260

Doors & Hardware

10

26JUL13A

13AUG13A

0

100

Doors & Hardware

0661104220

VCT / VET

10

29JUL13A

09AUG13A

0

100

0661104285

FF & E

3

29JUL13A

03AUG13A

0

100

FF & E

0661104235

Acoustic Panels

5

01AUG13A

02AUG13A

0

100

Acoustic Panels

0661104245

Carpet

20

01AUG13A

09AUG13A

0

100

Carpet

0661104255

Toilet Partitions

10

01AUG13A

09AUG13A

0

100

Toilet Partitions

0661104380

Glazing - Curtainwall

2

02AUG13A

16AUG13A

0

100

0661104280

Toilet Accessories

5

05AUG13A

13AUG13A

0

100

0661104275

Signage

5

07AUG13A

08AUG13A

0

100

0661104090

Set Windows

20

09AUG13A

15AUG13A

0

100

0661104105

Building Final Area Enclosure

0

16AUG13A

0

100

0661104265

Marker / Tack Boards

0

100

Start Date Finish Date Data Date Run Date

10 19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

23AUG13A

27AUG13A

Early Bar Progress Bar Critical Activity

Rough-in Tech T-116 Above Ceiling Inspections Complete

VCT / VET

Glazing - Curtainwall Toilet Accessories Signage Set Windows Building Final Area Enclosure Marker / Tack Boards D011 - MonthlyRpt - 11x17

Sheet 3 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Balancing

5

03SEP13A

12SEP13

3

50

0661204010

Precast Concrete Deck

2

24OCT12A

28OCT12A

0

100

0661204020

In-wall Electrical Rough-in

1

29OCT12A

24JUN13A

0

100

0661204025

Masonry Bearing Walls

5

29OCT12A

11DEC12A

0

100

0661204115

Rough-in Plumbing Walls

8

29OCT12A

16JUL13A

0

100

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor 0661104310

Balancing

Second Floor

0661204055

Door Frames

5

28NOV12A

18MAR13A

0

100

0661204060

Interior Masonry Walls

10

28NOV12A

13FEB13A

0

100

0661204135

Roof Structural Steel & Deck

5

11DEC12A

20DEC12A

0

100

0661204385

Roofing

7

08JAN13A

12JAN13A

0

100

0661204125

Rough-in HVAC Piping/Mains/Branches/FPB

20

10JAN13A

13MAY13A

0

100

Precast Concrete Deck In-wall Electrical Rough-in Masonry Bearing Walls Rough-in Plumbing Walls Door Frames Interior Masonry Walls Roof Structural Steel & Deck Roofing Rough-in HVAC Piping/Mains/Branches/FPB Temporary Enclosure

0661204295

Temporary Enclosure

0

12JAN13A

0

100

0661204030

Precast Concrete Topping

5

16JAN13A

23JAN13A

0

100

0661204075

Metal Studs

10

29JAN13A

31JAN13A

0

100

0661204345

Plumbing Above Ceiling Piping

9

29JAN13A

13MAR13A

0

100

0661204110

Rough-in HVAC Ductwork/FPB

30

01FEB13A

08APR13A

0

100

0661204085

Overhead Rough-in Elec & FA

35

11FEB13A

28JUN13A

0

100

0661204120

Rough-in Fire Prot

20

19FEB13A

22FEB13A

0

100

0661204140

Rough-in HVAC Insulation

30

19FEB13A

25JUN13A

0

100

0661204155

Standpipe / Hose Cabinet

3

05APR13A

15JUL13A

0

100

0661204035

Dampproofing

5

08APR13A

04MAY13A

0

100

0661204065

CMU Veneer

20

09APR13A

29MAY13A

0

100

0661204355

Plumbing Insulation/Testing

5

11APR13A

22JUL13A

0

100

Plumbing Insulation/Testing

0661204100

Rough-in Tech

30

15APR13A

23JUL13A

0

100

Rough-in Tech

0661204150

Temperature Control

10

02MAY13A

16SEP13

5

50

0661204165

Prime Paint

53

03MAY13A

16JUL13A

0

100

0661204320

Refrigeration/AC Condensate

5

08MAY13A

31JUL13A

0

100

Precast Concrete Topping Metal Studs Plumbing Above Ceiling Piping Rough-in HVAC Ductwork/FPB Overhead Rough-in Elec & FA Rough-in Fire Prot Rough-in HVAC Insulation Standpipe / Hose Cabinet Dampproofing CMU Veneer

Temperature Control Prime Paint Refrigeration/AC Condensate Drywall & Tape

0661204160

Drywall & Tape

15

13MAY13A

24JUN13A

0

100

0661204175

Ceiling Grid

20

07JUN13A

14JUN13A

0

100

Ceiling Grid

0661204190

Lights in Grid

10

10JUN13A

10JUN13A

0

100

Lights in Grid

0661204210

Electric & FA Finishes

15

15JUN13A

02AUG13A

0

100

0661204180

Fire Prot Finishes

10

17JUN13A

24JUN13A

0

100

Fire Prot Finishes

0661204215

Millwork

20

17JUN13A

25JUL13A

0

100

Millwork

0661204185

HVAC Finishes

10

25JUN13A

27JUN13A

0

100

0661204205

Ceiling Pads

10

25JUN13A

25JUL13A

0

100

Ceiling Pads

0661204220

VCT / VET

5

25JUN13A

24JUL13A

0

100

VCT / VET

0661204310

Exhaust Fans/ACU-3/CU-3

5

25JUN13A

01JUL13A

0

100

0661204195

Finish Paint

20

26JUN13A

05JUL13A

0

100

0661204225

Ceramic Floor Tile

20

08JUL13A

18JUL13A

0

100

Ceramic Floor Tile

0661204200

Above Ceiling Inspections Complete

0

16JUL13A

0

100

Above Ceiling Inspections Complete

0661204240

Plumbing Finishes

20

16JUL13A

09AUG13A

0

100

0661204245

Carpet

20

16JUL13A

26JUL13A

0

100

Carpet

0661204325

Plumbing Above Ground

8

16JUL13A

25JUL13A

0

100

Plumbing Above Ground

0661204250

Lockers

10

24JUL13A

13AUG13A

0

100

0661204260

Doors & Hardware

10

26JUL13A

13AUG13A

0

100

0661204285

FF & E

3

29JUL13A

03AUG13A

0

100

0661204270

Projection Screens

5

30JUL13A

05AUG13A

0

100

Electric & FA Finishes

HVAC Finishes

Exhaust Fans/ACU-3/CU-3 Finish Paint

Plumbing Finishes

Lockers Doors & Hardware FF & E Projection Screens Acoustic Panels

0661204235

Acoustic Panels

5

01AUG13A

02AUG13A

0

100

0661204255

Toilet Partitions

10

01AUG13A

09AUG13A

0

100

Toilet Partitions

0661204280

Toilet Accessories

4

01AUG13A

09AUG13A

0

100

Toilet Accessories

0661204230

Technology Finishes

10

02AUG13A

13AUG13A

0

100

0661204275

Signage

5

07AUG13A

08AUG13A

0

100

0661204090

Set Windows

3

09AUG13A

13AUG13A

0

100

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Technology Finishes Signage Set Windows D011 - MonthlyRpt - 11x17

Sheet 4 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Second Floor 0661204105

Building Final Area Enclosure

0

0661204265

Marker / Tack Boards

10

0661204300

Balancing

10

0662114125

Interior/Exterior Masonry Gym

15

0662114115

Load Bearing Masonry

20

Building Final Area Enclosure

13AUG13A

0

100

23AUG13A

27AUG13A

0

100

Marker / Tack Boards

03SEP13A

12SEP13

3

50

Balancing

17AUG12A

14SEP12A

0

100

22AUG12A

01OCT12A

0

100

Area B Gymnasium First Floor Interior/Exterior Masonry Gym Load Bearing Masonry Underground Plumbing Rough-in Locker Room

0662114135

Underground Plumbing Rough-in Locker Room

5

05SEP12A

18SEP12A

0

100

0662114120

Structural Steel & Deck

15

01OCT12A

05OCT12A

0

100

0662114005

Underground Electrical Rough-in

10

08OCT12A

17OCT12A

0

100

0662114130

Roofing

10

16OCT12A

22OCT12A

0

100

0662114010

Slab on Grade

5

18OCT12A

29OCT12A

0

100

0662114030

HVAC Rough-in - Ductwork/TB Boxes

5

10DEC12A

25JUN13A

0

100

0662114025

Fire Protection Rough-in

10

07JAN13A

14JAN13A

0

100

0662114035

Gym Lighting

1

08JAN13A

18JAN13A

0

100

Gym Lighting

0662114150

Gymnasium Temporary Enclosure Complete

0

17JAN13A

0

100

Gymnasium Temporary Enclosure Complete

0662114015

Overhead Elec. & Fire Alarm Rough-in

25

15FEB13A

25JUN13A

0

100

0662114040

HVAC Rough-in - Piping/Mains/Branches

5

05MAR13A

08MAR13A

0

100

0662114045

HVAC Rough-in - Insulation

5

29MAR13A

20MAY13A

0

100

HVAC Rough-in - Insulation

0662114140

CMU Veneer

20

01MAY13A

20MAY13A

0

100

CMU Veneer

0662114145

Temperture Controls

5

08MAY13A

20MAY13A

0

100

Temperture Controls

0662114060

HVAC Finishes

5

10MAY13A

13JUN13A

0

100

0662114055

Fire Protection Finishes

5

20MAY13A

14JUN13A

0

100

Structural Steel & Deck Underground Electrical Rough-in Roofing Slab on Grade HVAC Rough-in - Ductwork/TB Boxes Fire Protection Rough-in

Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Piping/Mains/Branches

HVAC Finishes Fire Protection Finishes Stage Lighting

0662114090

Stage Lighting

5

20MAY13A

24MAY13A

0

100

0662114050

Finish Painting

5

21MAY13A

14JUN13A

0

100

0662114075

Gym Equipment

10

17JUN13A

20JUN13A

0

100

0662114085

Stage Equipment

10

20JUN13A

22JUL13A

0

100

Stage Equipment

0662114110

Operable Partition

5

20JUN13A

18JUL13A

0

100

Operable Partition

0662114095

Gym Flooring

20

24JUN13A

17JUL13A

0

100

Gym Flooring

0662114065

Electric & Fire Alarm Finishes

5

25JUN13A

09AUG13A

0

100

0662114105

Stage Flooring

10

16JUL13A

01AUG13A

0

100

Stage Flooring

0662104270

Proj Screen @ Stage

5

18JUL13A

24JUL13A

0

100

Proj Screen @ Stage

0662114100

Gym Bleachers

10

30JUL13A

01AUG13A

0

100

Gym Bleachers

0662114155

Balancing

5

03SEP13A

12SEP13

3

50

0662124095

Underslab Plumbing Rough-in

5

15OCT12A

19OCT12A

0

100

Underslab Plumbing Rough-in

0662124090

Underslab Electrical Rough-in

5

17OCT12A

22OCT12A

0

100

Underslab Electrical Rough-in

0662124085

Slab on Grade Prep

2

22OCT12A

25OCT12A

0

100

Slab on Grade Prep

0662124125

Slab on Grade

3

26OCT12A

26OCT12A

0

100

Slab on Grade

0662124030

HVAC Rough-in

10

11JAN13A

17JUN13A

0

100

0662124035

Electrical Rough-in

10

21FEB13A

12JUL13A

0

100

0662124065

Fire Protection Rough-in

10

15MAR13A

22MAR13A

0

100

0662104320

Kitchen Hood

1

01JUN13A

19JUN13A

0

100

0662124025

Finish Paint

1

03JUN13A

09AUG13A

0

100

Finish Painting Gym Equipment

Electric & Fire Alarm Finishes

Balancing

Kitchen First Floor

HVAC Rough-in Electrical Rough-in Fire Protection Rough-in Kitchen Hood Finish Paint HVAC Finishes

0662124045

HVAC Finishes

5

25JUN13A

01JUL13A

0

100

0662124005

Kitchen Equipment Hook-ups

15

16JUL13A

05AUG13A

0

100

0662124015

Install Kitchen Tile

10

16JUL13A

29JUL13A

0

100

0662124050

Ceiling Grid

5

16JUL13A

22JUL13A

0

100

Ceiling Grid

0662124055

Lights in Grid

5

16JUL13A

22JUL13A

0

100

Lights in Grid

0662124070

Fire Protection Finishes

5

16JUL13A

22JUL13A

0

100

Fire Protection Finishes

0662124080

Plumbing Finishes

5

16JUL13A

09AUG13A

0

100

Plumbing Finishes

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Kitchen Equipment Hook-ups Install Kitchen Tile

D011 - MonthlyRpt - 11x17

Sheet 5 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor 0662124100

Above Ceiling Inspections Complete

0

0662124060

Ceiling Pads

5

0662124020

Security Grille

5

0662124010

Install Kitchen Equipment

0662124040

Electrical Finishes

Above Ceiling Inspections Complete

15JUL13A

0

100

23JUL13A

29JUL13A

0

100

27JUL13A

03AUG13A

0

100

Security Grille

10

29JUL13A

02AUG13A

0

100

Install Kitchen Equipment

5

03AUG13A

07AUG13A

0

100

5

13DEC12A

14DEC12A

0

100

Set HVAC Equipment AHU-1/HRU-1/Exh Fans Set Boilers/Hydronic Equip/Unit Heaters

Ceiling Pads

Electrical Finishes

Mechanical Room - 200 Second Floor 0662234005

Set HVAC Equipment AHU-1/HRU-1/Exh Fans

0662234115

Set Boilers/Hydronic Equip/Unit Heaters

5

13DEC12A

14DEC12A

0

100

0662234035

HVAC Rough-in - Ductwork

15

27MAR13A

18JUL13A

0

100

0662234025

Fire Protection Rough-in

5

01APR13A

03APR13A

0

100

0662234040

HVAC Rough-in - Piping/Mains/Branches/Boxes

15

17APR13A

17JUL13A

0

100

0662234020

Overhead Elec. & Fire Alarm Rough-in

30

20MAY13A

02JUL13A

0

100

0662234045

HVAC Rough-in - Insulation

20

20MAY13A

19JUL13A

0

100

0662234015

Wall Electrical Rough-in

4

25JUN13A

28JUN13A

0

100

0662234065

HVAC Finishes

5

25JUN13A

09AUG13A

0

100

0662234030

Lights

5

16JUL13A

22JUL13A

0

100

Lights

0662234050

Finish Painting

5

16JUL13A

22JUL13A

0

100

Finish Painting

0662234055

Fire Protection Finishes

5

16JUL13A

22JUL13A

0

100

Fire Protection Finishes

0662234060

Electric & Fire Alarm Finishes

10

16JUL13A

29JUL13A

0

100

0662234070

Temperture Controls

45

03SEP13A

09SEP13

0

99

0662234080

Balancing

10

03SEP13A

12SEP13

3

70

HVAC Rough-in - Ductwork Fire Protection Rough-in HVAC Rough-in - Piping/Mains/Branches/Boxes Overhead Elec. & Fire Alarm Rough-in HVAC Rough-in - Insulation Wall Electrical Rough-in HVAC Finishes

Electric & Fire Alarm Finishes Temperture Controls Balancing

Mechanical Room - 211 Second Floor Set HVAC Equipment AHU-2/HRU-2/Exhaust Fans

0662234075

Set HVAC Equipment AHU-2/HRU-2/Exhaust Fans

5

28NOV12A

19DEC12A

0

100

0662234085

HVAC Rough-in - Ductwork

5

28MAR13A

25JUN13A

0

100

0662234120

Temperture Controls

35

01MAY13A

09SEP13

0

99

0662234095

HVAC Rough-in - Insulation

3

20MAY13A

17JUL13A

0

100

HVAC Rough-in - Insulation

0662234100

HVAC Rough-in - Piping/Mains/Branches

15

20MAY13A

28JUN13A

0

100

HVAC Rough-in - Piping/Mains/Branches

0662234105

HVAC Finishes

5

25JUN13A

16JUL13A

0

100

0662234090

Balancing

10

03SEP13A

09SEP13

0

99

0662104145

Geopiers

15

12JUL12A

23JUL12A

0

100

0662104005

Foundations/Insulation

15

27JUL12A

06AUG12A

0

100

0662104135

Masonry Sub Grade

5

06AUG12A

21AUG12A

0

100

0662104035

Electric Underground

5

16AUG12A

18OCT12A

0

100

HVAC Rough-in - Ductwork Temperture Controls

HVAC Finishes Balancing

Area B First Floor Geopiers Foundations/Insulation Masonry Sub Grade Electric Underground

0662104305

Plumbing Underground

20

17AUG12A

18SEP12A

0

100

Plumbing Underground

0662104095

Slab on Grade Prep

5

12SEP12A

19SEP12A

0

100

Slab on Grade Prep

0662104045

Place Slab on Grade

5

19SEP12A

12MAR13A

0

100

0662104025

Masonry Bearing Walls

2

20SEP12A

19MAR13A

0

100

0662104130

Precast Concrete Deck @ Second Floor Mech Room

1

26NOV12A

28NOV12A

0

100

0662104020

In-wall Elec & FA Rough-in

7

28NOV12A

16JAN13A

0

100

In-wall Elec & FA Rough-in

0662104115

Rough-in Plumbing Walls

10

28NOV12A

16JAN13A

0

100

Rough-in Plumbing Walls

0662114185

Masonry - Interior

6

28NOV12A

16JAN13A

0

100

Masonry - Interior

0662104055

Door Frames in Metal Studs

10

16JAN13A

28JAN13A

0

100

0662104075

Metal Studs

10

16JAN13A

28JAN13A

0

100

0662104365

Frames

10

16JAN13A

21JAN13A

0

100

0662104120

Rough-in Fire Prot

15

07FEB13A

05APR13A

0

100

0662104125

Rough-in HVAC Piping/Mains/Branches/TB Boxes

20

08FEB13A

28MAY13A

0

100

0662104085

Overhead Rough-in Elec & FA

20

14FEB13A

10JUN13A

0

100

0662104325

Plumbing Above Ceiling

5

19FEB13A

11APR13A

0

100

0661104250

Set AHU-3 Room 100J

1

05MAR13A

06MAR13A

0

100

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Place Slab on Grade Masonry Bearing Walls Precast Concrete Deck @ Second Floor Mech Room

Door Frames in Metal Studs Metal Studs Frames Rough-in Fire Prot Rough-in HVAC Piping/Mains/Branches/TB Boxes Overhead Rough-in Elec & FA Plumbing Above Ceiling Set AHU-3 Room 100J D011 - MonthlyRpt - 11x17

Sheet 6 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

First Floor Rough-in HVAC Ductwork/FPB

0662104110

Rough-in HVAC Ductwork/FPB

20

06MAR13A

15JUL13A

0

100

0662104335

Plumbing Insulation/Testing

10

18MAR13A

11APR13A

0

100

0662104155

Standpipe / Hose Cabinet

3

05APR13A

15JUL13A

0

100

0661104350

Refrigeration/AC Condensate

10

08APR13A

31JUL13A

0

100

0662104065

CMU Veneer

20

08APR13A

28MAY13A

0

100

0662104165

Prime Paint

20

29APR13A

22JUN13A

0

100

0662104310

Temperture Controls

40

07MAY13A

09SEP13

0

99

0662104160

Drywall & Tape

15

15MAY13A

31JUL13A

0

100

0662104195

Finish Paint

20

16MAY13A

06AUG13A

0

100

0662104100

Rough-in Tech

20

20MAY13A

13JUN13A

0

100

0661104340

Set Chiller

1

29MAY13A

29MAY13A

0

100

0662104360

Glazing - Curtainwall

2

07JUN13A

09AUG13A

0

100

0662104190

Lights in Grid

20

10JUN13A

25JUN13A

0

100

0662104215

Millwork

10

17JUN13A

28JUN13A

0

100

0662104220

VCT / VET

20

17JUN13A

24JUL13A

0

100

VCT / VET

0662104225

Ceramic Floor Tile

20

17JUN13A

12JUL13A

0

100

Ceramic Floor Tile

0662104175

Ceiling Grid

20

19JUN13A

16JUL13A

0

100

0661104330

Set AC-2/CU-2/Unit Heater/Exhaust Fan

5

25JUN13A

01JUL13A

0

100

0662104140

Rough-in HVAC Insulation

40

25JUN13A

29JUL13A

0

100

0662104185

HVAC Finishes

15

25JUN13A

18JUL13A

0

100

0662104210

Electric & FA Finishes

20

02JUL13A

22JUL13A

0

100

Plumbing Insulation/Testing Standpipe / Hose Cabinet Refrigeration/AC Condensate CMU Veneer Prime Paint Temperture Controls Drywall & Tape Finish Paint Rough-in Tech Set Chiller Glazing - Curtainwall Lights in Grid Millwork

Ceiling Grid Set AC-2/CU-2/Unit Heater/Exhaust Fan Rough-in HVAC Insulation HVAC Finishes Electric & FA Finishes Lockers

0662104250

Lockers

10

08JUL13A

19JUL13A

0

100

0662104146

Elevator

20

10JUL13A

23JUL13A

0

100

Elevator

0662104070

Frost Slabs

5

16JUL13A

22JUL13A

0

100

Frost Slabs

0662104180

Fire Prot Finishes

5

16JUL13A

22JUL13A

0

100

Fire Prot Finishes

0662104230

Technology Finishes

20

16JUL13A

26JUL13A

0

100

Technology Finishes

0662104240

Plumbing Finishes

10

16JUL13A

26JUL13A

0

100

Plumbing Finishes

0662104295

Fire Protection Riser

10

16JUL13A

29JUL13A

0

100

Fire Protection Riser

0662104315

Plumbing Above Ground

5

16JUL13A

22JUL13A

0

100

Plumbing Above Ground

0662104340

Storefronts

6

16JUL13A

02AUG13A

0

100

0662104205

Ceiling Pads

15

17JUL13A

26JUL13A

0

100

Ceiling Pads

0662104200

Above Ceiling Inspections Complete

0

23JUL13A

0

100

Above Ceiling Inspections Complete

0662104260

Doors & Hardware

10

26JUL13A

13AUG13A

0

100

0662104285

FF & E

3

29JUL13A

03AUG13A

0

100

FF & E

0662104235

Acoustic Panels

10

01AUG13A

02AUG13A

0

100

Acoustic Panels

0662104245

Carpet

10

01AUG13A

09AUG13A

0

100

Carpet

0662104255

Toilet Partitions

10

01AUG13A

09AUG13A

0

100

Toilet Partitions

0662104350

Glazing

2

02AUG13A

16AUG13A

0

100

0662104280

Toilet Accessories

10

05AUG13A

13AUG13A

0

100

0662104275

Signage

5

07AUG13A

08AUG13A

0

100

0662104090

Set Windows

20

09AUG13A

13AUG13A

0

100

0662104105

Building Area Final Enclosure

0

13AUG13A

0

100

0662104265

Marker / Tack Boards

10

23AUG13A

27AUG13A

0

100

0662104330

Balancing

5

03SEP13A

11SEP13

2

70

0662204010

Prescast Concrete Deck

5

26NOV12A

28NOV12A

0

100

0662204020

In-wall Electrical Rough-in

5

28NOV12A

26JUN13A

0

100

Storefronts

Doors & Hardware

Glazing Toilet Accessories Signage Set Windows Building Area Final Enclosure Marker / Tack Boards Balancing

Second Floor

0662204035

Masonry - Exterior Bearing

6

30NOV12A

22DEC12A

0

100

0662204070

Equipment Pads

5

12DEC12A

12DEC12A

0

100

0662204040

Roof Structural Steel & Deck

20

20DEC12A

16JAN13A

0

100

0662204125

Rough-in HVAC Piping

10

31JAN13A

08APR13A

0

100

0662204085

Overhead Rough-in Elec & FA

30

08FEB13A

24JUN13A

0

100

0662204080

Roofing

5

11FEB13A

08APR13A

0

100

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

Prescast Concrete Deck In-wall Electrical Rough-in Masonry - Exterior Bearing Equipment Pads Roof Structural Steel & Deck Rough-in HVAC Piping Overhead Rough-in Elec & FA Roofing D011 - MonthlyRpt - 11x17

Sheet 7 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

10

18FEB13A

22FEB13A

0

100

Sanitary Aboveground Precast Topping

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

NOV

Second Floor 0662204315

Sanitary Aboveground

0662204030

Precast Topping

5

20FEB13A

20FEB13A

0

100

0662204055

Door Frames

20

26FEB13A

28FEB13A

0

100

0662204050

Interior Masonry Walls

20

27FEB13A

07MAR13A

0

100

0662204075

Metal Studs

10

28FEB13A

01MAR13A

0

100

0662104150

Exhaust Fans/MAU/Unit Heaters

5

01MAR13A

25JUN13A

0

100

0662204140

Rough-in HVAC Insulation

3

07MAR13A

16JUL13A

0

100

0662204120

Rough-in Fire Prot

20

14MAR13A

12JUL13A

0

100

0662204325

Plumbing Above Ceiling Piping

10

18MAR13A

12APR13A

0

100

0662204110

Rough-in HVAC Ductwork

20

22MAR13A

24JUN13A

0

100

Door Frames Interior Masonry Walls Metal Studs Exhaust Fans/MAU/Unit Heaters Rough-in HVAC Insulation Rough-in Fire Prot Plumbing Above Ceiling Piping Rough-in HVAC Ductwork Dampproofing CMU

0662204135

Dampproofing CMU

5

04APR13A

08MAY13A

0

100

0662204155

Standpipe / Hose Cabinet

3

05APR13A

17JUL13A

0

100

0662204130

Area B - Temporary Building Enclosure Complete

0

09APR13A

0

100

0662204335

Plumbing Insulation/Testing

10

11APR13A

18JUL13A

0

100

0662204145

Temperture Controls

10

06MAY13A

09SEP13

0

99

0662204165

Prime Paint

20

06MAY13A

03JUN13A

0

100

0662204065

CMU Veneer

20

09MAY13A

24MAY13A

0

100

0662204160

Drywall & Tape

15

13MAY13A

0

100

0662204100

Rough-in Tech

30

17MAY13A

20JUN13A

0

100

0662204195

Finish Paint

20

03JUN13A

09AUG13A

0

100

0662204175

Ceiling Grid

20

11JUN13A

15JUL13A

0

100

Ceiling Grid

0662204190

Lights in Grid

5

18JUN13A

15JUL13A

0

100

Lights in Grid

0662204210

Electric & FA Finishes

15

18JUN13A

16JUL13A

0

100

Electric & FA Finishes

0662204180

Fire Prot Finishes

10

20JUN13A

16JUL13A

0

100

0662204185

HVAC Finishes

10

20JUN13A

25JUN13A

0

100

0662204215

Millwork

20

01JUL13A

26JUL13A

0

100

0662204150

Storefronts

1

16JUL13A

02AUG13A

0

100

0662204200

Above Ceiling Inspections Complete

0

16JUL13A

0

100

0662204225

Ceramic Floor Tile

15

16JUL13A

26JUL13A

0

100

0662204230

Technology Finishes

10

16JUL13A

29JUL13A

0

100

0662204240

Plumbing Finishes

15

16JUL13A

26JUL13A

0

100

0662204300

Glazing - Storefronts

1

16JUL13A

16AUG13A

0

100

0662204310

Curtainwall

6

16JUL13A

16AUG13A

0

100

Curtainwall

0662204345

Plumbing Fixtures

6

16JUL13A

23JUL13A

0

100

Plumbing Fixtures

0662204205

Ceiling Pads

10

17JUL13A

23JUL13A

0

100

Ceiling Pads

0662204220

VCT / VET

20

18JUL13A

25JUL13A

0

100

VCT / VET

0662204250

Lockers

10

25JUL13A

31JUL13A

0

100

Lockers

0662204260

Doors & Hardware

10

26JUL13A

13AUG13A

0

100

0662204285

FF & E

3

29JUL13A

03AUG13A

0

100

FF & E

0662204235

Acoustic Panels

5

01AUG13A

02AUG13A

0

100

Acoustic Panels

0662204245

Carpet

15

01AUG13A

09AUG13A

0

100

Carpet

0662204255

Toilet Partitions

5

01AUG13A

09AUG13A

0

100

Toilet Partitions

0662204280

Toilet Accessories

5

05AUG13A

13AUG13A

0

100

0662204275

Signage

5

07AUG13A

08AUG13A

0

100

0662204090

Set Windows

15

09AUG13A

13AUG13A

0

100

0662204105

Building Final Area Enclosure

0

13AUG13A

0

100

0662204265

Marker / Tack Boards

5

23AUG13A

27AUG13A

0

100

0662204295

Balancing

3

03SEP13A

10SEP13

1

80

Balancing

Initial Architect's Punchlist

10

01AUG13A

13AUG13A

0

100

Initial Architect's Punchlist

Standpipe / Hose Cabinet Area B - Temporary Building Enclosure Complete Plumbing Insulation/Testing Temperture Controls Prime Paint CMU Veneer Drywall & Tape Rough-in Tech Finish Paint

Fire Prot Finishes HVAC Finishes Millwork Storefronts Above Ceiling Inspections Complete Ceramic Floor Tile Technology Finishes Plumbing Finishes Glazing - Storefronts

Doors & Hardware

Toilet Accessories Signage Set Windows Building Final Area Enclosure Marker / Tack Boards

Close-Out

0660007025 Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

D011 - MonthlyRpt - 11x17

Sheet 8 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Description

Orig Dur

Early Start

Early Finish

Rem % Dur Comp

Suspend Date

Resume Date

APR

MAY

JUN

JUL

2012 AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

2013 JUN

MAY

JUL

AUG

SEP

OCT

Architect's Punch List

0660007050

Architect's Punch List

5

01AUG13A

13AUG13A

0

100

0660007030

Fire Alarm Programming & Testing

5

05AUG13A

07AUG13A

0

100

0660007120

LEED Air Testing

1

12AUG13A

12AUG13A

0

100

LEED Air Testing

0660007080

Owner Move In

10

13AUG13A

15AUG13A

0

100

Owner Move In

0660007020

Final Inspections / Testing

5

16AUG13A

16AUG13A

0

100

Final Inspections / Testing

0660007100

Owner Move-in Complete

0

15AUG13A

0

100

0660007075

Temporary Certificate of Occupancy

0

16AUG13A

0

100

0660007110

Punchlist

19

19AUG13A

16SEP13

5

75

0660007085

Demonstration & Training

5

26AUG13A

16SEP13

5

10

0660007005

Operation & Maintenance Manuals Submitted

0

09SEP13

0

0

0660007040

Final Inspections Complete

0

09SEP13

0

0

Fire Alarm Programming & Testing

Owner Move-in Complete Temporary Certificate of Occupancy Punchlist Demonstration & Training Operation & Maintenance Manuals Submitted Final Inspections Complete

0660007015

HVAC Controls Check-out and Balancing

15

10SEP13

30SEP13

15

0

HVAC Controls Check-out and Balancing

0660007055

As-Built Documents Submitted

5

10SEP13

16SEP13

5

0

As-Built Documents Submitted

0660007090

Close-out Documents

39

17SEP13

08NOV13

39

0

0660007035

JACE Interface Check-out

5

01OCT13

07OCT13

5

0

0660007060

Project Team - Controls Check-out

5

08OCT13

14OCT13

5

0

0660007065

Building Commissioning

5

15OCT13

21OCT13

5

0

0660007070

MEP Commissioning Complete

0

21OCT13

0

0

0660007105

Contract Close-out

0

08NOV13

0

0

Start Date Finish Date Data Date Run Date

19APR12 08NOV13 10SEP13 10SEP13 10:09

Š Primavera Systems, Inc.

Early Bar Progress Bar Critical Activity

NOV

Close-out Documents JACE Interface Check-out Project Team - Controls Check-out Building Commissioning MEP Commissioning Complete Contract Close-out

D011 - MonthlyRpt - 11x17

Sheet 9 of 9

Dunbar New K-8 Cleveland MetropolitainSchool District Construction Schedule Update #11 Sept. 10, 2013

OHGR Team Date

Revision

Checked

Approved


Activity ID

Activity Name

Original Duration

Start

Finish

2013 Jun

Jul

2014 Aug

Sep

Oct

Nov

Dec

Jan

Feb Mar

Apr

May

Jun

Jul

2016

2015 Aug

Sep

Oct

Nov

Dec

Jan

Feb Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

CLEVELAND SCHOOL OF THE ARTS GMP SCHEDULE CONSTRUCTION SITEWORK

A1000

CONSTRUCTION FENCE

5

07-22-13*

07-26-13

CONSTRUCTION FENCE

A1080

SANITARY SEWER APPROVALS & FABRICATION

30

08-05-13*

09-16-13

A1010

MOBILIZE *08/26/13*

5

08-26-13*

08-30-13

A1020

SITE CLEARING

5

08-30-13

09-06-13

A1030

SITE DEMO (EXCLUDES SIDEWALKS & JOHN HAY LOT)

15

09-09-13

09-27-13

A1090

SANITARY SEWER RELOCATION

15

09-16-13

10-04-13

SANITARY SEWER RELOCATION

A1040

SITE GRADING (PAD)

30

09-23-13

11-01-13

SITE GRADING (PAD)

A1120

WATER SERVICE

10

09-23-13

10-04-13

A1100

TELECOM DUCT BANKS

15

10-07-13

10-25-13

TELECOM DUCT BANKS

A1130

ELEC DUCT BANKS

25

10-07-13

11-08-13

ELEC DUCT BANKS

A1140

STORM SEWER - EAST MAIN RUN

25

10-07-13

11-08-13

STORM SEWER - EAST MAIN RUN

A1110

MOVE TELE LINES

10

10-28-13

11-08-13

MOVE TELE LINES

A1060

SITE GRADING (SITE)

30

11-04-13

12-16-13

A1150

STORM SEWER - WEST MAIN RUN

20

11-11-13

12-09-13

A1470

GAS LINE

10

05-26-14*

06-09-14

A1430

JOHN HAY PARKING LOT (ALL WORK)

40

06-10-14*

08-05-14

JOHN HAY PARKING LOT (ALL WORK)

A1440

SITE CONC. OUTSIDE P.L.

40

06-10-14

08-05-14

SITE CONC. OUTSIDE P.L.

A1160

EXTEND SITE UTILITIES TO BUILDING (INTERMITTENT)

98

07-30-14*

12-15-14

A1450

SITE CONC / PAVING INSIDE P.L.

60

03-09-15*

05-29-15

A1460

LANDSCAPING

60

04-06-15

06-26-15

SANITARY SEWER APPROVALS & FABRICATION MOBILIZE *08/26/13* SITE CLEARING SITE DEMO (EXCLUDES SIDEWALKS & JOHN HAY LOT)

WATER SERVICE

SITE GRADING (SITE) STORM SEWER - WEST MAIN RUN GAS LINE

EXTEND SITE UTILITIES TO BUILDING (INTERMITTENT) SITE CONC / PAVING INSIDE P.L. LANDSCAPING

SHELL AND CORE GENERAL A1480

STEEL DESIGN CHANGE (ADMINISTRATIVE)

25

08-26-13*

09-30-13

A1490

STEEL SHOP DRAWINGS & FAB

95

09-30-13

02-12-14

A1070

CAISSONS

60

10-21-13

01-15-14

A1170

PILECAPS & GRADE BEAMS

60

11-11-13

02-05-14

07-31-13 16:52 CSA - W/O BASEMENT Sheet 1 of 2

STEEL DESIGN CHANGE (ADMINISTRATIVE) STEEL SHOP DRAWINGS & FAB CAISSONS PILECAPS & GRADE BEAMS

CLEVELAND SCHOOL OF THE ARTS SCHEDULE UPDATE 06-17-13

Dec Jan


Activity ID

Activity Name

Original Duration

Start

Finish

2013 Jun

Jul

2014 Aug

Sep

Oct

Nov

Dec

Jan

Feb Mar

Apr

May

Jun

Jul

2016

2015 Aug

Sep

A1180

LOAD BEARING CMU

65

11-25-13

02-25-14

A1190

MEP U/G UTIL

50

12-09-13

02-18-14

A1200

STRUCT. STEEL & MD

60

02-18-14

05-12-14

STRUCT. STEEL & MD

A1220

PERIMETER CMU

15

04-21-14*

05-09-14

PERIMETER CMU

A1210

SOMD

30

05-13-14

06-24-14

A1230

SLAB ON GRADE #2

20

05-13-14

06-10-14

A1240

EXT. FRAMING / SHEATHING

80

06-04-14

09-25-14

A1260

CURTAINWALLS & WINDOWS

117

07-02-14

12-15-14

A1250

ROOFING

60

07-31-14

10-23-14

A1270

BRICK VENEER

50

08-28-14

11-06-14

A1280

METAL PANELS

80

08-28-14

12-18-14

Oct

Nov

Dec

Jan

Feb Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec Jan

LOAD BEARING CMU MEP U/G UTIL

SOMD SLAB ON GRADE #2 EXT. FRAMING / SHEATHING CURTAINWALLS & WINDOWS ROOFING BRICK VENEER METAL PANELS

INTERIOR BUILDOUT GENERAL A1380

ROUGH INTERIOR

95

06-11-14

10-23-14

A1390

FINISH INTERIOR

177

10-24-14*

06-29-15

FINISH INTERIOR

A1400

PUNCHLIST

30

05-19-15

06-29-15

PUNCHLIST

A1420

CONSTRUCTION COMPLETION

06-29-15

CONSTRUCTION COMPLETION

A1410

OWNER CLOSEOUT / COMMISIONING

07-31-13 16:52 CSA - W/O BASEMENT Sheet 2 of 2

*05/01/15*

0 60

06-30-15

ROUGH INTERIOR

09-21-15

*05/01/15*

OWNER CLOSEOUT / COMMISIONING

CLEVELAND SCHOOL OF THE ARTS SCHEDULE UPDATE 06-17-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL PRE-CONSTRUCTION GENERAL GENERAL

PRCO-10

COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING

1 02-22-13 A

02-22-13 A

PRCO-15

REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD

1 03-04-13 A

03-04-13 A

PRCO-30

NOTIFY TDA OF VE CHANGES - CMSD

4 03-11-13 A

03-14-13 A

PRCO-20

CMSD TO APPROVE - CMSD

1 04-01-13 A

04-01-13 A

PRCO-40

CITY PERMIT REVIEW - SITE

46 04-08-13 A

06-11-13 A

CITY PERMIT REVIEW - SITE

PRCO-25

FINALIZE GMP & CONTRACT NEGOTIATION

1 04-26-13 A

04-26-13 A

FINALIZE GMP & CONTRACT NEGOTIATION

PRCO-35

COMPLETE SITE CONSTRUCTION DOCUMENTS

0

04-26-13 A

COMPLETE SITE CONSTRUCTION DOCUMENTS

PRCO-50

COMPLETE BUILDING CONSTRUCTION DOCUMENTS

0

05-31-13 A

PRCO-55

CITY PERMIT REVIEW - BUILDING

34 06-03-13 A

07-19-13 A

PRCO-60

BIDDING PROCESS

15 06-18-13 A

07-09-13 A

PRCO-75

BIDDING PROCESS / AWARD - FOOD SERVICES

11 08-12-13 A

08-23-13 A

PRCO-100

AMH - SCOPE AND AWARD

10 09-05-13 A

10-14-13 A

PRCO-70

BIDDING PROCESS / AWARD - FURNITURE

11 01-02-14*

01-16-14

COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD NOTIFY TDA OF VE CHANGES - CMSD CMSD TO APPROVE - CMSD

COMPLETE BUILDING CONSTRUCTION DOCUMENTS CITY PERMIT REVIEW - BUILDING BIDDING PROCESS BIDDING PROCESS / AWARD - FOOD SERVICES AMH - SCOPE AND AWARD BIDDING PROCESS / AWARD - FURNITURE

NOTICE TO PROCEED PRCO-80

NTP - SITE

0 05-24-13 A

PRCO-85

NTP - MASON, CONCRETE, STEEL, GENERAL

0 06-27-13 A

PRCO-90

NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION

0 07-10-13 A

PRCO-110

NTP - ROOFING, GLAZING

0 07-25-13 A

PRCO-95

NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING NTP - FOOD SERVICES

0 09-05-13 A

NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING

0 09-05-13 A

NTP - FOOD SERVICES

PRCO-105

NTP - SITE NTP - MASON, CONCRETE, STEEL, GENERAL NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION NTP - ROOFING, GLAZING

ISSUES / DELAYS

PRCO-115

BUILDING PERMIT - DELAY

10 07-08-13 A

07-19-13 A

BUILDING PERMIT - DELAY

SUB-125

LINTELS - A, B, C

10 07-08-13 A

07-19-13 A

LINTELS - A, B, C

SUB-150

BAR JOISTS - A

10 07-26-13 A

08-08-13 A

BAR JOISTS - A

SUB-155

BAR JOISTS - B

10 07-26-13 A

08-08-13 A

BAR JOISTS - B

SUB-160

BAR JOISTS - C

10 07-26-13 A

08-08-13 A

BAR JOISTS - C

SUB-100

STRUCTURAL STEEL - A

10 07-31-13 A

08-13-13 A

STEEL SUBMITTALS

11-21-13 13:04 MAX HAYES HS Sheet 1 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

STRUCTURAL STEEL - A

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-105

STRUCTURAL STEEL - B

10 08-06-13 A

08-19-13 A

STRUCTURAL STEEL - B

SUB-110

STRUCTURAL STEEL - C

10 08-06-13 A

08-19-13 A

STRUCTURAL STEEL - C

SUB-165

BAR JOISTS - D

10 08-06-13 A

08-19-13 A

BAR JOISTS - D

SUB-170

BAR JOISTS - E

10 08-06-13 A

08-19-13 A

BAR JOISTS - E

SUB-175

METAL STAIRS AND HANDRAIL

10 09-10-13 A

09-23-13 A

SUB-130

LINTELS - D AND E

10 10-08-13 A

10-21-13 A

SUB-115

STRUCTURAL STEEL - D

10 10-21-13 A

11-11-13 A

STRUCTURAL STEEL - D

SUB-120

STRUCTURAL STEEL - E

10 10-21-13 A

11-11-13 A

STRUCTURAL STEEL - E

APP-125

LINTELS - A, B, C

10 07-19-13 A

08-08-13 A

APP-150

BAR JOISTS - A

10 08-08-13 A

08-22-13 A

BAR JOISTS - A

APP-155

BAR JOISTS - B

10 08-08-13 A

08-22-13 A

BAR JOISTS - B

APP-160

BAR JOISTS - C

10 08-08-13 A

08-22-13 A

BAR JOISTS - C

APP-100

STRUCTURAL STEEL - A

10 08-13-13 A

08-21-13 A

STRUCTURAL STEEL - A

APP-105

STRUCTURAL STEEL - B

10 08-19-13 A

08-23-13 A

STRUCTURAL STEEL - B

APP-110

STRUCTURAL STEEL - C

10 08-19-13 A

08-23-13 A

STRUCTURAL STEEL - C

APP-165

BAR JOISTS - D

10 08-19-13 A

08-27-13 A

BAR JOISTS - D

APP-170

BAR JOISTS - E

10 08-19-13 A

08-27-13 A

BAR JOISTS - E

APP-175

METAL STAIRS AND HANDRAIL

10 09-23-13 A

10-28-13 A

METAL STAIRS AND HANDRAIL

APP-130

LINTELS - D AND E

10 10-21-13 A

10-25-13 A

LINTELS - D AND E

APP-115

STRUCTURAL STEEL - D

10 11-11-13 A

11-22-13

STRUCTURAL STEEL - D

APP-120

STRUCTURAL STEEL - E

10 11-11-13 A

11-22-13

STRUCTURAL STEEL - E

LEAD-125

LINTELS - A

10 08-08-13 A

08-12-13 A

LEAD-126

LINTELS - B

10 08-08-13 A

08-19-13 A

LEAD-127

LINTELS - C

10 08-08-13 A

09-26-13 A

LINTELS - C

LEAD-100

STRUCTURAL STEEL - A

25 08-21-13 A

09-30-13 A

STRUCTURAL STEEL - A

LEAD-150

BAR JOISTS - A

25 08-22-13 A

10-02-13 A

BAR JOISTS - A

LEAD-155

BAR JOISTS - B

25 08-22-13 A

10-01-13 A

BAR JOISTS - B

LEAD-160

BAR JOISTS - C

25 08-22-13 A

10-03-13 A

BAR JOISTS - C

LEAD-105

STRUCTURAL STEEL - B

19 08-23-13 A

08-28-13 A

LEAD-110

STRUCTURAL STEEL - C

19 08-23-13 A

09-26-13 A

LEAD-128

LINTELS - D

10 10-25-13 A

11-19-13

LINTELS - D

LEAD-129

LINTELS - E

10 10-25-13 A

11-19-13

LINTELS - E

METAL STAIRS AND HANDRAIL LINTELS - D AND E

APPROVALS

LINTELS - A, B, C

LEAD TIMES

11-21-13 13:04 MAX HAYES HS Sheet 2 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

LINTELS - A LINTELS - B

STRUCTURAL STEEL - B STRUCTURAL STEEL - C

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

LEAD-175

METAL STAIRS AND HANDRAIL - A / B

15 10-28-13 A

11-05-13 A

LEAD-165

BAR JOISTS - D

30 11-19-13

01-02-14

BAR JOISTS - D

LEAD-170

BAR JOISTS - E

30 11-19-13

01-02-14

BAR JOISTS - E

LEAD-115

STRUCTURAL STEEL - D

20 11-25-13

12-23-13

STRUCTURAL STEEL - D

LEAD-120

STRUCTURAL STEEL - E

20 11-25-13

12-23-13

STRUCTURAL STEEL - E

METAL STAIRS AND HANDRAIL - A / B

ROUGH CARPENTRY SUBMITTALS

SUB-405

H.M. FRAMES

10 08-01-13 A

08-14-13 A

H.M. FRAMES

SUB-410

WOOD DOORS

10 08-01-13 A

08-14-13 A

WOOD DOORS

SUB-420

FRP DOORS

10 08-26-13 A

09-11-13 A

SUB-415

HARDWARE

10 09-26-13 A

10-14-13 A

APP-405

H.M. FRAMES

10 08-14-13 A

09-05-13 A

H.M. FRAMES

APP-410

WOOD DOORS

10 08-14-13 A

09-05-13 A

WOOD DOORS

APP-420

FRP DOORS

10 09-12-13 A

10-07-13 A

APP-415

HARDWARE

10 10-14-13 A

11-18-13 A

LEAD-405

H.M. FRAMES

20 09-05-13 A

10-03-13 A

LEAD-410

WOOD DOORS

40 09-06-13 A

11-19-13

WOOD DOORS

LEAD-420

FRP DOORS

10 10-07-13 A

11-19-13

FRP DOORS

LEAD-415

HARDWARE

40 11-18-13 A

01-15-14

SUB-260

HOT WATER RADIATOR

10 07-15-13 A

07-26-13 A

HOT WATER RADIATOR

SUB-300

RADIANT HEATER

10 07-15-13 A

07-26-13 A

RADIANT HEATER

SUB-220

GRILLES AND DIFFUSERS

10 07-16-13 A

07-29-13 A

GRILLES AND DIFFUSERS

SUB-265

AIR CURTAIN (HAC)

10 07-16-13 A

07-29-13 A

AIR CURTAIN (HAC)

SUB-280

LOUVERS

10 07-16-13 A

07-29-13 A

LOUVERS

SUB-230

GRAVITY VENTILATOR

10 07-23-13 A

08-05-13 A

GRAVITY VENTILATOR

SUB-295

EXHAUST FAN

10 07-23-13 A

08-05-13 A

EXHAUST FAN

SUB-310

SUPPLY FAN

10 07-23-13 A

08-05-13 A

SUPPLY FAN

SUB-320

AIR HANDLING UNIT

10 07-23-13 A

08-05-13 A

AIR HANDLING UNIT

FRP DOORS HARDWARE

APPROVALS

FRP DOORS HARDWARE

LEAD TIMES

H.M. FRAMES

HARDWARE

HVAC SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 3 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-275

FAN POWERED VAV BOXES

10 07-24-13 A

08-06-13 A

FAN POWERED VAV BOXES

SUB-225

MECHANICAL PUMPS

10 07-25-13 A

08-07-13 A

MECHANICAL PUMPS

SUB-245

HOT WATER BOILERS

10 07-25-13 A

08-07-13 A

HOT WATER BOILERS

SUB-250

HOT WATER UNIT HEATER

10 07-25-13 A

08-07-13 A

HOT WATER UNIT HEATER

SUB-235

VAV BOXES

10 07-29-13 A

08-09-13 A

VAV BOXES

SUB-270

ROOFTOP UNIT HEATING AND VENTILLATION

10 07-29-13 A

08-09-13 A

ROOFTOP UNIT HEATING AND VENTILLATION

SUB-305

MAKE-UP AIR UNIT

10 07-29-13 A

08-09-13 A

MAKE-UP AIR UNIT

SUB-240

AIR CONDITIONING UNIT

10 08-02-13 A

08-16-13 A

AIR CONDITIONING UNIT

SUB-255

CABINET UNIT HEATER

10 08-02-13 A

08-16-13 A

CABINET UNIT HEATER

SUB-285

CHILLER

10 08-05-13 A

11-18-13 A

SUB-290

AIR COOLED CONDENSING UNIT

10 08-05-13 A

08-16-13 A

AIR COOLED CONDENSING UNIT

SUB-315

FAN COIL UNIT

10 08-05-13 A

08-16-13 A

FAN COIL UNIT

SUB-325

CONTROL THERMOSTATS

10 10-31-13 A

11-18-13 A

CONTROL THERMOSTATS

SUB-330

CONTROL VALVES

10 10-31-13 A

11-18-13 A

CONTROL VALVES

APP-260

HOT WATER RADIATOR

10 07-26-13 A

08-12-13 A

HOT WATER RADIATOR

APP-300

RADIANT HEATER

10 07-26-13 A

08-15-13 A

RADIANT HEATER

APP-220

GRILLES AND DIFFUSERS

10 07-29-13 A

08-06-13 A

GRILLES AND DIFFUSERS

APP-265

AIR CURTAIN (HAC)

10 07-29-13 A

08-05-13 A

AIR CURTAIN (HAC)

APP-280

LOUVERS

10 07-29-13 A

08-06-13 A

LOUVERS

APP-230

GRAVITY VENTILATOR

10 08-05-13 A

08-15-13 A

GRAVITY VENTILATOR

APP-295

EXHAUST FAN

10 08-05-13 A

08-12-13 A

EXHAUST FAN

APP-310

SUPPLY FAN

10 08-05-13 A

11-19-13

APP-320

AIR HANDLING UNIT

10 08-05-13 A

08-19-13 A

APP-275

FAN POWERED VAV BOXES

10 08-06-13 A

09-10-13 A

APP-225

MECHANICAL PUMPS

10 08-07-13 A

08-23-13 A

MECHANICAL PUMPS

APP-245

HOT WATER BOILERS

10 08-07-13 A

08-23-13 A

HOT WATER BOILERS

APP-250

HOT WATER UNIT HEATER

10 08-08-13 A

08-12-13 A

HOT WATER UNIT HEATER

APP-235

VAV BOXES

10 08-09-13 A

08-22-13 A

APP-305

MAKE-UP AIR UNIT

10 08-09-13 A

09-20-13 A

APP-270

ROOFTOP UNIT HEATING AND VENTILLATION

10 08-12-13 A

08-29-13 A

ROOFTOP UNIT HEATING AND VENTILLATION

APP-240

AIR CONDITIONING UNIT

10 08-16-13 A

08-28-13 A

AIR CONDITIONING UNIT

APP-255

CABINET UNIT HEATER

10 08-16-13 A

08-29-13 A

CABINET UNIT HEATER

APP-290

AIR COOLED CONDENSING UNIT

10 08-16-13 A

08-26-13 A

AIR COOLED CONDENSING UNIT

APP-315

FAN COIL UNIT

10 08-16-13 A

08-29-13 A

CHILLER

APPROVALS

11-21-13 13:05 MAX HAYES HS Sheet 4 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SUPPLY FAN AIR HANDLING UNIT FAN POWERED VAV BOXES

VAV BOXES MAKE-UP AIR UNIT

FAN COIL UNIT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APP-285

CHILLER

10 11-19-13

12-03-13

CHILLER

APP-325

CONTROL THERMOSTATS

10 11-19-13

12-03-13

CONTROL THERMOSTATS

APP-330

CONTROL VALVES

10 11-19-13

12-03-13

CONTROL VALVES

LEAD-265

AIR CURTAIN (HAC)

25 08-05-13 A

11-19-13

AIR CURTAIN (HAC)

LEAD-220

GRILLES AND DIFFUSERS

15 08-06-13 A

11-19-13

GRILLES AND DIFFUSERS

LEAD-280

LOUVERS

25 08-06-13 A

11-19-13

LOUVERS

LEAD-250

HOT WATER UNIT HEATER

25 08-12-13 A

11-19-13

HOT WATER UNIT HEATER

LEAD-260

HOT WATER RADIATOR

25 08-12-13 A

11-19-13

HOT WATER RADIATOR

LEAD-295

EXHAUST FAN

25 08-12-13 A

11-19-13

EXHAUST FAN

LEAD-230

GRAVITY VENTILATOR

15 08-15-13 A

11-19-13

GRAVITY VENTILATOR

LEAD-300

RADIANT HEATER

25 08-15-13 A

11-19-13

RADIANT HEATER

LEAD-320

AIR HANDLING UNIT

60 08-19-13 A

11-19-13

AIR HANDLING UNIT

LEAD-235

VAV BOXES

30 08-22-13 A

11-19-13

VAV BOXES

LEAD-225

MECHANICAL PUMPS

65 08-23-13 A

11-22-13

MECHANICAL PUMPS

LEAD-245

HOT WATER BOILERS

50 08-23-13 A

11-19-13

HOT WATER BOILERS

LEAD-290

AIR COOLED CONDENSING UNIT

40 08-26-13 A

11-19-13

AIR COOLED CONDENSING UNIT

LEAD-240

AIR CONDITIONING UNIT

60 08-28-13 A

11-20-13

AIR CONDITIONING UNIT

LEAD-255

CABINET UNIT HEATERS

25 08-29-13 A

11-19-13

CABINET UNIT HEATERS

LEAD-270

ROOFTOP UNIT HEATING AND VENTILLATION

60 08-29-13 A

11-21-13

ROOFTOP UNIT HEATING AND VENTILLATION

LEAD-315

FAN COIL UNIT

25 08-29-13 A

11-19-13

FAN COIL UNIT

LEAD-275

FAN POWERED VAV BOXES

25 09-10-13 A

11-19-13

FAN POWERED VAV BOXES

LEAD-305

MAKE-UP AIR UNIT

50 09-23-13 A

12-02-13

LEAD-310

SUPPLY FAN

25 11-20-13

12-26-13

LEAD-285

CHILLER

50 12-04-13

02-13-14

CHILLER

LEAD-325

CONTROL THERMOSTATS

15 12-04-13

12-24-13

CONTROL THERMOSTATS

LEAD-330

CONTROL VALVES

15 12-04-13

12-24-13

CONTROL VALVES

SUB-370

CABLE TRAY

10 08-02-13 A

08-16-13 A

CABLE TRAY

SUB-375

LIGHT FIXTURES

10 08-06-13 A

08-20-13 A

LIGHT FIXTURES

SUB-365

POWER DISTRIBUTION

10 09-09-13 A

09-20-13 A

SUB-360

FIRE ALARM DEVICES

10 10-08-13 A

10-21-13 A

SUB-380

IT DEVICES

10 11-19-13

12-03-13

LEAD TIMES

MAKE-UP AIR UNIT SUPPLY FAN

ELECTRICAL SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 5 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

POWER DISTRIBUTION FIRE ALARM DEVICES IT DEVICES

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APPROVALS

APP-370

CABLE TRAY

10 08-16-13 A

09-20-13 A

APP-375

LIGHT FIXTURES - EXTERIOR

10 08-20-13 A

09-06-13 A

APP-376

LIGHT FIXTURES - INTERIOR

10 08-20-13 A

10-03-13 A

APP-365

POWER DISTRIBUTION

10 09-20-13 A

11-19-13

POWER DISTRIBUTION

APP-360

FIRE ALARM DEVICES

10 10-21-13 A

11-19-13

FIRE ALARM DEVICES

APP-380

IT DEVICES

10 12-04-13

12-17-13

IT DEVICES

CABLE TRAY

LEAD-370

CABLE TRAY

30 09-23-13 A

11-19-13

LEAD-375

LIGHT FIXTURES

50 10-03-13 A

12-12-13

LEAD-360

FIRE ALARM DEVICES

40 11-20-13

01-17-14

LEAD-365

POWER DISTRIBUTION

60 11-20-13

02-14-14

POWER DISTRIBUTION

LEAD-380

IT DEVICES

40 12-18-13

02-13-14

IT DEVICES

LIGHT FIXTURES - EXTERIOR LIGHT FIXTURES - INTERIOR

LEAD TIMES

CABLE TRAY LIGHT FIXTURES FIRE ALARM DEVICES

FIRE PROTECTION SUBMITTALS

SUB-335

FIRE VALVE CABINET

10 11-04-13 A

11-15-13 A

FIRE VALVE CABINET

SUB-340

FIRE SPRINKLER PUMP

10 11-04-13 A

11-15-13 A

FIRE SPRINKLER PUMP

SUB-345

FIRE SPRINKLER JOCKEY PUMP

10 11-04-13 A

11-15-13 A

FIRE SPRINKLER JOCKEY PUMP

SUB-350

SIAMESE FIRE DEPARTMENT CONNECTION

10 11-04-13 A

11-19-13

APP-335

FIRE VALVE CABINET

10 11-15-13 A

11-29-13

FIRE VALVE CABINET

APP-340

FIRE SPRINKLER PUMP

10 11-15-13 A

11-29-13

FIRE SPRINKLER PUMP

APP-345

FIRE SPRINKLER JOCKEY PUMP

10 11-15-13 A

11-29-13

FIRE SPRINKLER JOCKEY PUMP

APP-350

SIAMESE FIRE DEPARTMENT CONNECTION

10 11-20-13

12-04-13

LEAD-335

FIRE VALVE CABINET

20 12-02-13

12-30-13

LEAD-340

FIRE SPRINKLER PUMP

40 12-02-13

01-28-14

FIRE SPRINKLER PUMP

LEAD-345

FIRE SPRINKLER JOCKEY PUMP

40 12-02-13

01-28-14

FIRE SPRINKLER JOCKEY PUMP

LEAD-350

SIAMESE FIRE DEPARTMENT CONNECTION

20 12-05-13

01-03-14

SIAMESE FIRE DEPARTMENT CONNECTION

APPROVALS

SIAMESE FIRE DEPARTMENT CONNECTION

LEAD TIMES

FIRE VALVE CABINET

SIAMESE FIRE DEPARTMENT CONNECTION

CARPENTRY SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 6 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-355

ELEVATOR

10 07-19-13 A

08-01-13 A

ELEVATOR

SUB-510

FIRE EXTINGUISHER AND CABINETS

10 07-22-13 A

08-02-13 A

FIRE EXTINGUISHER AND CABINETS

SUB-525

TELESCOPING STANDS

10 09-11-13 A

09-25-13 A

SUB-440

WOOD GYM FLOOR

10 09-17-13 A

09-30-13 A

SUB-475

SCOREKEEPING SYSTEM

10 10-09-13 A

10-22-13 A

SUB-215

LAB FUME HOOD

10 11-19-13

12-03-13

LAB FUME HOOD

SUB-425

OVERHEAD COILING DOORS

10 11-19-13

12-03-13

OVERHEAD COILING DOORS

SUB-445

VOLLEYBALL POST AND NET

10 11-19-13

12-03-13

VOLLEYBALL POST AND NET

SUB-450

WINDOW ROLLER SHADES

10 11-19-13

12-03-13

WINDOW ROLLER SHADES

SUB-455

GYM DIVIDERS

10 11-19-13

12-03-13

GYM DIVIDERS

SUB-460

WIRE MESH PARTITIONS

10 11-19-13

12-03-13

WIRE MESH PARTITIONS

SUB-465

ART KILN

10 11-19-13

12-03-13

ART KILN

SUB-470

PROJECTION SCREENS

10 11-19-13

12-03-13

PROJECTION SCREENS

SUB-485

METAL LOCKERS

10 11-19-13

12-03-13

METAL LOCKERS

SUB-495

METAL STORAGE SHELVING

10 11-19-13

12-03-13

METAL STORAGE SHELVING

SUB-500

TOILET AND SHOWER COMPARTMENTS

10 11-19-13

12-03-13

TOILET AND SHOWER COMPARTMENTS

SUB-505

SIGNAGE

10 11-19-13

12-03-13

SIGNAGE

SUB-515

LAB CASEWORK

10 11-19-13

12-03-13

LAB CASEWORK

SUB-520

P-LAM CASEWORK

10 11-19-13

12-03-13

P-LAM CASEWORK

SUB-490

SITE FURNISHINGS

10 01-17-14

01-30-14

APP-355

ELEVATOR

10 08-01-13 A

08-23-13 A

ELEVATOR

APP-510

FIRE EXTINGUISHER AND CABINETS

10 08-02-13 A

08-22-13 A

FIRE EXTINGUISHER AND CABINETS

APP-525

TELESCOPING STANDS

10 09-25-13 A

11-08-13 A

TELESCOPING STANDS

APP-440

WOOD GYM FLOOR

10 09-30-13 A

11-08-13 A

WOOD GYM FLOOR

APP-475

SCOREKEEPING SYSTEM

10 10-22-13 A

11-19-13

SCOREKEEPING SYSTEM

APP-215

LAB FUME HOOD

10 12-04-13

12-17-13

LAB FUME HOOD

APP-425

OVERHEAD COILING DOORS

10 12-04-13

12-17-13

OVERHEAD COILING DOORS

APP-445

VOLLEYBALL POST AND NET

10 12-04-13

12-17-13

VOLLEYBALL POST AND NET

APP-450

WINDOW ROLLER SHADES

10 12-04-13

12-17-13

WINDOW ROLLER SHADES

APP-455

GYM DIVIDERS

10 12-04-13

12-17-13

GYM DIVIDERS

APP-460

WIRE MESH PARTITIONS

10 12-04-13

12-17-13

WIRE MESH PARTITIONS

APP-465

ART KILN

10 12-04-13

12-17-13

ART KILN

APP-470

PROJECTION SCREENS

10 12-04-13

12-17-13

PROJECTION SCREENS

TELESCOPING STANDS WOOD GYM FLOOR SCOREKEEPING SYSTEM

SITE FURNISHINGS

APPROVALS

11-21-13 13:05 MAX HAYES HS Sheet 7 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APP-485

METAL LOCKERS

10 12-04-13

12-17-13

METAL LOCKERS

APP-495

METAL STORAGE SHELVING

10 12-04-13

12-17-13

METAL STORAGE SHELVING

APP-500

TOILET AND SHOWER COMPARTMENTS

10 12-04-13

12-17-13

TOILET AND SHOWER COMPARTMENTS

APP-505

SIGNAGE

10 12-04-13

12-17-13

SIGNAGE

APP-515

LAB CASEWORK

10 12-04-13

12-17-13

LAB CASEWORK

APP-520

P-LAM CASEWORK

10 12-04-13

12-17-13

P-LAM CASEWORK

APP-490

SITE FURNISHINGS

10 01-31-14

02-13-14

LEAD-510

FIRE EXTINGUISHER AND CABINETS

20 08-22-13 A

11-19-13

FIRE EXTINGUISHER AND CABINETS

LEAD-355

ELEVATOR

50 08-26-13 A

11-19-13

ELEVATOR

LEAD-440

WOOD GYM FLOOR

20 11-08-13 A

12-06-13

LEAD-525

TELESCOPING STANDS

40 11-08-13 A

01-07-14

LEAD-475

SCOREKEEPING SYSTEM

20 11-20-13

12-18-13

LEAD-215

LAB FUME HOOD

50 12-18-13

02-27-14

LEAD-425

OVERHEAD COILING DOORS

30 12-18-13

01-30-14

LEAD-445

VOLLEYBALL POST AND NET

20 12-18-13

01-16-14

VOLLEYBALL POST AND NET

LEAD-450

WINDOW ROLLER SHADES

20 12-18-13

01-16-14

WINDOW ROLLER SHADES

LEAD-455

GYM DIVIDERS

40 12-18-13

02-13-14

GYM DIVIDERS

LEAD-460

WIRE MESH PARTITIONS

20 12-18-13

01-16-14

WIRE MESH PARTITIONS

LEAD-465

ART KILN

10 12-18-13

01-02-14

LEAD-470

PROJECTION SCREENS

20 12-18-13

01-16-14

LEAD-485

METAL LOCKERS

30 12-18-13

01-30-14

LEAD-495

METAL STORAGE SHELVING

20 12-18-13

01-16-14

LEAD-500

TOILET AND SHOWER COMPARTMENTS

30 12-18-13

01-30-14

TOILET AND SHOWER COMPARTMENTS

LEAD-505

SIGNAGE

30 12-18-13

01-30-14

SIGNAGE

LEAD-515

LAB CASEWORK

40 12-18-13

02-13-14

LAB CASEWORK

LEAD-520

P-LAM CASEWORK

40 12-18-13

02-13-14

P-LAM CASEWORK

LEAD-490

SITE FURNISHINGS

20 02-14-14

03-13-14

SUB-190

DOMESTIC WATER HEATER

10 07-10-13 A

07-24-13 A

SUB-200

PLUMBING PUMPS

10 07-29-13 A

08-09-13 A

SUB-180

PLUMBING FIXTURES

10 08-06-13 A

08-19-13 A

PLUMBING FIXTURES

SUB-195

STORAGE TANK

10 08-07-13 A

08-20-13 A

STORAGE TANK

SITE FURNISHINGS

LEAD TIMES

WOOD GYM FLOOR TELESCOPING STANDS SCOREKEEPING SYSTEM LAB FUME HOOD OVERHEAD COILING DOORS

ART KILN PROJECTION SCREENS METAL LOCKERS METAL STORAGE SHELVING

SITE FURNISHINGS

PLUMBING SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 8 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

DOMESTIC WATER HEATER PLUMBING PUMPS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-185

AIR COMPRESSOR (AC)

10 08-14-13 A

08-27-13 A

AIR COMPRESSOR (AC)

SUB-205

GAS REGULATOR

10 09-18-13 A

10-01-13 A

GAS REGULATOR

APP-190

DOMESTIC WATER HEATER

10 07-24-13 A

08-19-13 A

DOMESTIC WATER HEATER

APP-200

PLUMBING PUMPS

10 08-09-13 A

08-19-13 A

PLUMBING PUMPS

APP-180

PLUMBING FIXTURES

10 08-19-13 A

08-28-13 A

PLUMBING FIXTURES

APP-195

STORAGE TANK

10 08-21-13 A

08-27-13 A

STORAGE TANK

APP-185

AIR COMPRESSOR (AC)

10 08-27-13 A

10-09-13 A

APP-205

GAS REGULATOR

10 10-01-13 A

10-03-13 A

LEAD-190

DOMESTIC WATER HEATER

10 08-19-13 A

11-19-13

DOMESTIC WATER HEATER

LEAD-200

PLUMBING PUMPS

20 08-19-13 A

11-19-13

PLUMBING PUMPS

LEAD-195

STORAGE TANK

10 08-27-13 A

11-19-13

STORAGE TANK

LEAD-180

PLUMBING FIXTURES

20 08-28-13 A

11-19-13

PLUMBING FIXTURES

LEAD-205

GAS REGULATOR

10 10-03-13 A

11-19-13

GAS REGULATOR

LEAD-185

AIR COMPRESSOR (AC)

20 10-09-13 A

11-19-13

AIR COMPRESSOR (AC)

SUB-545

FRX PLYWOOD SHEATHING

10 09-03-13 A

09-11-13 A

SUB-550

COLD FORM FRAMING ENGINEERING

10 09-30-13 A

10-11-13 A

SUB-535

ACT

10 11-19-13

12-02-13

ACT

SUB-540

SOUND ABSORBING PANELS

10 11-19-13

12-02-13

SOUND ABSORBING PANELS

APP-545

FRX PLYWOOD SHEATHING

10 09-11-13 A

10-01-13 A

APP-550

COLD FORM FRAMING ENGINEERING

10 10-11-13 A

11-19-13

APP-535

ACT

10 12-03-13

12-16-13

ACT

APP-540

SOUND ABSORBING PANELS

10 12-03-13

12-16-13

SOUND ABSORBING PANELS

APPROVALS

AIR COMPRESSOR (AC) GAS REGULATOR

LEAD TIMES

DRYWALL SUBMITTALS

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING

APPROVALS

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING

LEAD TIMES

LEAD-545

FRX PLYWOOD SHEATHING

LEAD-550

COLD FORM FRAMING ENGINEERING

15 11-20-13

12-10-13

LEAD-535

ACT

15 12-17-13

01-06-14

11-21-13 13:05 MAX HAYES HS Sheet 9 of 26

6 10-01-13 A

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

11-11-13 A

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING ACT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID LEAD-540

Activity Name

Original Start Duration

Finish

2013

2014

SOUND ABSORBING PANELS

25 12-17-13

01-20-14

SOUND ABSORBING PANELS

SUB-395

PRE-CAST PLANKS

10 07-11-13 A

07-24-13 A

SUB-385

FACE BRICK

10 07-17-13 A

07-30-13 A

SUB-390

PRE-CAST STONE

10 08-07-13 A

08-20-13 A

APP-395

PRE-CAST PLANKS

10 07-24-13 A

08-01-13 A

PRE-CAST PLANKS

APP-385

FACE BRICK

10 07-30-13 A

08-21-13 A

FACE BRICK

APP-390

PRE-CAST STONE

10 08-20-13 A

09-12-13 A

LEAD-395

PRE-CAST PLANKS

15 08-01-13 A

10-17-13 A

LEAD-385

FACE BRICK

20 08-21-13 A

11-19-13

FACE BRICK

LEAD-390

PRE-CAST STONE

40 09-12-13 A

11-19-13

PRE-CAST STONE

SUB-436

ROOF COPING

10 08-27-13 A

09-09-13 A

SUB-400

ROOF HATCH

10 09-09-13 A

09-20-13 A

ROOF HATCH

APP-436

ROOF COPING

10 09-09-13 A

09-23-13 A

ROOF COPING

APP-400

ROOF HATCH

10 09-20-13 A

09-27-13 A

ROOF HATCH

LEAD-436

ROOF COPING

30 09-23-13 A

11-19-13

ROOF COPING

LEAD-400

ROOF HATCH

10 09-27-13 A

11-19-13

ROOF HATCH

SUB-435

SKY LIGHTS

10 09-16-13 A

09-20-13 A

SKY LIGHTS

SUB-530

WINDOWS

10 09-16-13 A

09-24-13 A

WINDOWS

SUB-430

ALUMINUM FRAMED STOREFRONT

10 10-03-13 A

10-16-13 A

MASON SUBMITTALS

PRE-CAST PLANKS FACE BRICK PRE-CAST STONE

APPROVALS

PRE-CAST STONE

LEAD TIMES

PRE-CAST PLANKS

ROOF SUBMITTALS

ROOF COPING

APPROVALS

LEAD TIMES

GLASS SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 10 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

ALUMINUM FRAMED STOREFRONT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APPROVALS

APP-435

SKY LIGHTS

10 09-20-13 A

10-22-13 A

APP-530

WINDOWS

10 09-24-13 A

10-10-13 A

APP-430

ALUMINUM FRAMED STOREFRONT

10 10-16-13 A

10-25-13 A

SKY LIGHTS

LEAD-530

WINDOWS

50 10-10-13 A

12-19-13

LEAD-435

SKY LIGHTS

30 10-22-13 A

12-03-13

LEAD-430

ALUMINUM FRAMED STOREFRONT

10 10-25-13 A

11-19-13

SUB-565

CARPET

10 11-18-13 A

11-29-13

CARPET

SUB-555

CERAMIC TILE

10 11-18-13 A

11-29-13

CERAMIC TILE

SUB-560

SHEET VINYL

10 11-18-13 A

11-29-13

SHEET VINYL

SUB-570

RUBBER FLOORING

10 11-18-13 A

11-29-13

RUBBER FLOORING

SUB-575

VCT

10 11-18-13 A

11-29-13

VCT

SUB-580

RUBBER BASE

10 11-18-13 A

11-29-13

RUBBER BASE

APP-555

CERAMIC TILE

10 12-02-13

12-13-13

CERAMIC TILE

APP-560

SHEET VINYL

10 12-02-13

12-13-13

SHEET VINYL

APP-565

CARPET

10 12-02-13

12-13-13

CARPET

APP-570

RUBBER FLOORING

10 12-02-13

12-13-13

RUBBER FLOORING

APP-575

VCT

10 12-02-13

12-13-13

VCT

APP-580

RUBBER BASE

10 12-02-13

12-13-13

RUBBER BASE

LEAD-555

CERAMIC TILE

30 12-16-13

01-24-14

CERAMIC TILE

LEAD-560

SHEET VINYL

30 12-16-13

01-24-14

SHEET VINYL

LEAD-565

CARPET

30 12-16-13

01-24-14

CARPET

LEAD-570

RUBBER FLOORING

30 12-16-13

01-24-14

RUBBER FLOORING

LEAD-575

VCT

30 12-16-13

01-24-14

VCT

LEAD-580

RUBBER BASE

30 12-16-13

01-24-14

RUBBER BASE

WINDOWS ALUMINUM FRAMED STOREFRONT

LEAD TIMES

WINDOWS SKY LIGHTS ALUMINUM FRAMED STOREFRONT

FLOORING SUBMITTALS

APPROVALS

LEAD TIMES

F, F & E - TBD

11-21-13 13:05 MAX HAYES HS Sheet 11 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SUBMITTALS

SUB-480

FF&E

10 11-19-13

12-03-13

FF&E

10 12-04-13

12-17-13

FF&E

10 12-18-13

01-02-14

KITCHEN EQUIPMENT

10 09-19-13 A

10-14-13 A

KITCHEN EQUIPMENT

10 10-14-13 A

11-14-13 A

KITCHEN EQUIPMENT

80 11-14-13 A

03-10-14

FF&E

APPROVALS

APP-480

FF&E

LEAD TIMES

LEAD-480

FF&E

KITCHEN EQUIPMENT SUBMITTALS

SUB-210

KITCHEN EQUIPMENT

APPROVALS

APP-210

KITCHEN EQUIPMENT

LEAD TIMES

LEAD-210

KITCHEN EQUIPMENT

CONSTRUCTION GENERAL MILESTONES

MILE-1030

PERMANENT WATER

0

01-15-14*

MILE-1020

PERMANENT ELECTRICAL

0

04-01-14*

MILE-1010

CASEWORK AVAILABLE - A / B / C

0

05-01-14*

CASEWORK AVAILABLE - A / B / C

MILE-1040

CONDITIONED AIR - A, B, C

0

05-01-14*

CONDITIONED AIR - A, B, C

0

12-17-13*

0

01-13-14*

*05/01/14*

PERMANENT WATER PERMANENT ELECTRICAL *05/01/14*

TEMPORARY ENCLOSURE MILESTONES MILE-1075

TEMPORARY ENCLOSURE - B GYM

*12/31/13*

MILE-1055

TEMPORARY ENCLOSURE - B REMAINING

MILE-1050

TEMPORARY ENCLOSURE - A

*12/31/13*

0

01-20-14*

TEMPORARY ENCLOSURE - A

MILE-1060

TEMPORARY ENCLOSURE - C

*12/31/13*

0

01-22-14*

TEMPORARY ENCLOSURE - C

MILE-1065

TARGET TEMPORARY ENCLOSURE - D

0

05-16-14*

MILE-1070

TARGET TEMPORARY ENCLOSURE - E

0

06-09-14*

0

07-30-14*

*12/31/13*

*09/18/14* *10/31/14*

TEMPORARY ENCLOSURE - B GYM

*12/31/13*

TEMPORARY ENCLOSURE - B REMAINING

*12/31/13*

*12/31/13* *12/31/13*

TARGET TEMPORARY ENCLOSURE - D

*09/18/14*

TARGET TEMPORARY ENCLOSURE - E

*10/31/14*

TARGET COMPLETION MILESTONES MILE-B400

11-21-13 13:05 MAX HAYES HS Sheet 12 of 26

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*06/18/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MILE-B200

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*

0

08-20-14*

MILE-A100

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*

0

08-25-14*

MILE-A200

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*

0

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2

MILE-B100

TARGET COMPLETION MILESTONE - BUILDING B - GYM *9/11/14*

0

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING B - GYM

MILE-B300

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*

0

09-23-14*

MILE-B500

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

0

12-17-14*

MILE-B600

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

0

12-24-14*

MILE-D200

TARGET COMPLETION MILESTONE - BUILDING D *06/24/15* REVISED *03/06/15*

0

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING D

MILE-E300

TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*

ORIGINAL

0

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING E

MILE-C100

TARGET COMPLETION MILESTONE - BUILDING C

*03/19/15*

0

03-05-15*

ORIGINAL

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1

15 06-10-13 A

06-28-13 A

SITE-15

CLEAR SITE & SITE SETUP

10 06-10-13 A

06-21-13 A

SITE-20

SITE DEMO

20 06-24-13 A

07-22-13 A

SITE-25

CONTRACTUAL SOIL REMEDIATION

30 06-24-13 A

07-31-13 A

SITE-115

CUT & FILL SITE TO GRADE

20 07-09-13 A

11-29-13

SITE-190

U/G SANITARY SEWERS

SITE-35

MOBILIZE - FENCING, SWPPP CLEAR SITE & SITE SETUP SITE DEMO CONTRACTUAL SOIL REMEDIATION CUT & FILL SITE TO GRADE

NON-GMP SOIL REMEDIATION

25 07-22-13 A

08-07-13 A

SHNC-95

TEMP. ROAD ON SITE

30 07-29-13 A

11-29-13

TEMP. ROAD ON SITE

SITE-110

U/G STORM SEWERS

30 08-16-13 A

11-29-13

U/G STORM SEWERS

SITE-155

U/G UTILITIES TO BUILDING

30 09-13-13 A

12-13-13

SITE-120

FINISH PAVING & STRIPING

20 10-20-14

11-14-14

U/G SANITARY SEWERS NON-GMP SOIL REMEDIATION

U/G UTILITIES TO BUILDING FINISH PAVING & STRIPING

BUILDING SITE

SITE-70

9 06-24-13 A

07-05-13 A

EXCAVATE / FILL A TO GRADE

EXCAVATE B TO GRADE

10 07-08-13 A

07-19-13 A

EXCAVATE B TO GRADE

SITE-80

EXCAVATE / FILL C TO GRADE

10 07-22-13 A

07-31-13 A

SITE-85

EXCAVATE / FILL D TO GRADE

10 08-02-13 A

08-16-13 A

EXCAVATE / FILL D TO GRADE

SITE-90

EXCAVATE / FILL E TO GRADE

10 08-02-13 A

08-16-13 A

EXCAVATE / FILL E TO GRADE

EXCAVATE / FILL C TO GRADE

SOUTH SITE

11-21-13 13:05 MAX HAYES HS Sheet 13 of 26

*10/20/14*

TARGET COMPLETION MILESTONE - BUILDING C

07-17-13 A

EXCAVATE / FILL A TO GRADE

*9/11/14*

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

2 07-16-13 A

SITE-75

*10/16/14*

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

GENERAL

MOBILIZE - FENCING, SWPPP

*09/15/14*

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS

SITE

SITE-10

*08/22/14*

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

ORIGINAL *06/24/15* ORIGINAL *07/01/15* *03/19/15*

REVIS

REVISE


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

SITE-30

EXCAVATE & STONE - PARKING LOT

24 06-24-13 A

11-15-13 A

SITE-130

CREATE DETENTION SYSTEM

15 08-05-13 A

10-25-13 A

SITE-175

COMPLETE CPP AND CEI ACCESS

SITE-41

EXCAVATE & STONE - PARKING LOT CREATE DETENTION SYSTEM

9 09-03-13 A

11-22-13

RELOCATE CPP

30 09-23-13 A

11-29-13

SITE-180

INSTALL CEI DUCTBANK

10 10-28-13 A

11-22-13

SITE-185

OBTAIN EASEMENT - CEI DUCTBANK

52 11-14-13 A

01-24-14

SITE-40

RELOCATE CEI

10 01-27-14

02-07-14

SITE-135

PAVING STONE AND ASPHALT BASE COURSE

15 08-15-14

09-08-14

SITE-140

LANDSCAPING

10 09-02-14*

09-15-14

LANDSCAPING

SITE-170

PERMIABLE PAVERS

10 09-02-14*

09-15-14

PERMIABLE PAVERS

COMPLETE CPP AND CEI ACCESS

SITE-50

NORTH RETAINING WALL

10 08-05-13 A

08-09-13 A

SITE-165

LANDSCAPING

10 09-02-14

09-15-14

SITE-160

PAVING STONE AND ASPHALT BASE COURSE

15 09-08-14*

09-29-14

SITE-150

INSTALL PERM. FENCING

10 01-06-15

01-19-15

SITE-60

INSTALL RETAINING WALL

20 08-26-13 A

08-30-13 A

SITE-166

LANDSCAPING

10 09-16-14

09-29-14

SITE-167

PAVING STONE AND ASPHALT BASE COURSE

15 09-29-14

10-17-14*

RELOCATE CPP INSTALL CEI DUCTBANK OBTAIN EASEMENT - CEI DUCTBANK RELOCATE CEI PAVING STONE AND ASPHALT BASE COURSE

NORTH SITE

NORTH RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE INSTALL PERM. FENCING

EAST SITE

INSTALL RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE

WALWORTH SITE

SITE-101

DOMINION GAS ENGINEERING AND CAP EXISTING

30 08-12-13 A

09-12-13 A

SITE-100

LIGHT WT. FILL

10 09-23-13 A

10-04-13 A

LIGHT WT. FILL

SITE-105

DEMO ROADWAY

10 09-23-13 A

09-27-13 A

DEMO ROADWAY

SITE-116

TEMP CAP 16" WATER MAIN

3 09-25-13 A

09-27-13 A

TEMP CAP 16" WATER MAIN

SITE-111

CLEVELAND WATER DEPT. WORK

5 09-30-13 A

10-04-13 A

SITE-95

RELOCATE GAS LINE

10 10-30-13 A

11-05-13 A

DOMINION GAS ENGINEERING AND CAP EXISTING

LANDSCAPING

10 09-16-14

09-29-14

CLEVELAND WATER DEPT. WORK RELOCATE GAS LINE

WEST SITE

SITE-169

LANDSCAPING

BUILDING A SHELL AND CORE

SHCA-10

11-21-13 13:05 MAX HAYES HS Sheet 14 of 26

FOOTINGS

9 07-30-13 A

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

08-19-13 A

FOOTINGS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SHCA-15

U/G MEP

5 08-12-13 A

08-22-13 A

U/G MEP

SHCA-20

FOUNDATION BLOCK

5 08-12-13 A

08-21-13 A

FOUNDATION BLOCK

SHCA-25

VAPOR SYSTEM & STONE

6 08-23-13 A

09-03-13 A

VAPOR SYSTEM & STONE

SHCA-30

POUR S.O.G.

3 09-04-13 A

09-06-13 A

POUR S.O.G.

SHCA-40

BLOCK TO 2ND FLR

15 09-09-13 A

10-01-13 A

SHCA-35

H.M. FRAMES - 1ST FLR

3 09-23-13 A

09-25-13 A

H.M. FRAMES - 1ST FLR

SHCA-95

STRUCTURAL STEEL

3 10-01-13 A

10-03-13 A

STRUCTURAL STEEL

SHCA-45

JOIST, DECK - 2ND FLR

5 10-03-13 A

10-15-13 A

JOIST, DECK - 2ND FLR

SHCA-100

POUR CONCRETE - 2ND FLR

2 10-16-13 A

10-18-13 A

POUR CONCRETE - 2ND FLR

SHCA-105

CURE CONCRETE - 2ND FLR

5 10-21-13 A

10-25-13 A

SHCA-50

H.M. FRAMES - 2ND FLR

3 10-28-13 A

11-19-13

H.M. FRAMES - 2ND FLR

SHCA-55

BLOCK TO ROOF

15 10-28-13 A

11-19-13

BLOCK TO ROOF

SHCA-60

JOIST & DECK - ROOF

10 11-15-13 A

12-02-13

SHCA-70

MASONRY VENEER REQUIRED FOR ENCLOSURE

15 11-20-13

12-11-13

MASONRY VENEER REQUIRED FOR ENCLOSURE

SHCA-110

ROOF BLOCKING

5 12-03-13

12-09-13

ROOF BLOCKING

SHCA-115

MEP CURBS & DRAINS

5 12-03-13

12-09-13

MEP CURBS & DRAINS

SHCA-75

ROOFING A

15 12-10-13

12-31-13

ROOFING A

SHCA-80

METAL PANELS

15 12-12-13

01-03-14

METAL PANELS

SHCA-120

MASONRY VENEER - REMAINING

15 12-12-13

01-01-14

MASONRY VENEER - REMAINING

SHCA-85

WINDOWS & CURTAIN WALL

20 12-20-13

01-20-14

SHCA-90

ROOFING TRIM

5 01-06-14

01-10-14

BLOCK TO 2ND FLR

CURE CONCRETE - 2ND FLR

JOIST & DECK - ROOF

WINDOWS & CURTAIN WALL ROOFING TRIM

INTERIOR BUILDOUT 1ST FLOOR INTA-112

OVERHEAD ELECTRICAL

40 10-21-13 A

12-16-13

OVERHEAD ELECTRICAL

INTA-113

OVERHEAD PLUMBING

40 10-21-13 A

12-16-13

OVERHEAD PLUMBING

INTA-110

OVERHEAD DUCTWORK

40 10-28-13 A

12-16-13

OVERHEAD DUCTWORK

INTA-114

OVERHEAD FIRE PROTECTION

10 11-19-13

12-03-13

INTA-115

INTERIOR FRAMING

20 12-17-13

01-15-14

INTA-111

OVERHEAD HVAC PIPING

40 12-26-13

02-20-14

INTA-120

ELECTRICAL IN WALL ROUGH-IN

20 01-16-14

02-12-14

ELECTRICAL IN WALL ROUGH-IN

INTA-121

PLUMBING IN WALL ROUGH-IN

20 01-16-14

02-12-14

PLUMBING IN WALL ROUGH-IN

INTA-125

HANG DRYWALL

10 02-13-14

02-26-14

INTA-126

TAPE AND FINISH

10 04-01-14*

04-14-14

INTA-200

ELEVATOR INSTALLATION

15 04-02-14

04-22-14

INTA-130

CERAMIC TILE

15 04-15-14

05-05-14

CERAMIC TILE

INTA-135

PRIME PAINT

15 04-15-14

05-05-14

PRIME PAINT

11-21-13 13:05 MAX HAYES HS Sheet 15 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

OVERHEAD FIRE PROTECTION INTERIOR FRAMING OVERHEAD HVAC PIPING

HANG DRYWALL TAPE AND FINISH ELEVATOR INSTALLATION

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTA-145

CLG GRID

15 04-29-14

05-19-14

CLG GRID

INTA-140

CASEWORK

15 05-02-14

05-22-14

CASEWORK

INTA-150

LIGHT FIXTURES

30 05-13-14

06-24-14

LIGHT FIXTURES

INTA-151

DIFFUSERS

30 05-13-14

06-24-14

DIFFUSERS

INTA-152

PLUMBING FINISHES

30 05-13-14

06-24-14

PLUMBING FINISHES

INTA-153

FIRE PROTECTION FINISHES

30 05-13-14

06-24-14

FIRE PROTECTION FINISHES

INTA-155

FINISH PAINT

30 05-28-14

07-09-14

INTA-160

SPECIALTY FLOORING

10 06-18-14

07-01-14

SPECIALTY FLOORING

INTA-165

DOORS & HARDWARE

15 06-18-14

07-09-14

DOORS & HARDWARE

INTA-170

CLG TILE

15 06-25-14

07-16-14

INTA-175

VCT & VINYL FLOORING

15 07-02-14

07-23-14

VCT & VINYL FLOORING

INTA-180

CARPET

10 07-10-14

07-23-14

CARPET

INTA-185

SPECIALTIES

10 07-24-14

08-06-14

INTA-190

PUNCHLIST

20 07-29-14

08-25-14

INTA-195

TESTING & INSPECTIONS

15 07-29-14

08-18-14

MILE-A105

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*

0

FINISH PAINT

CLG TILE

SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

08-25-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1

2ND FLOOR INTA-210

OVERHEAD DUCTWORK

40 12-03-13

01-29-14

OVERHEAD DUCTWORK

INTA-211

OVERHEAD HVAC PIPING

40 12-03-13

01-29-14

OVERHEAD HVAC PIPING

INTA-212

OVERHEAD ELECTRICAL

40 12-03-13

01-29-14

OVERHEAD ELECTRICAL

INTA-213

OVERHEAD PLUMBING

40 12-03-13

01-29-14

OVERHEAD PLUMBING

INTA-214

OVERHEAD FIRE PROTECTION

40 12-03-13

01-29-14

OVERHEAD FIRE PROTECTION

INTA-215

INTERIOR FRAMING

20 01-30-14

02-26-14

INTA-220

ELECTRICAL IN WALL ROUGH-IN

20 02-27-14

03-26-14

ELECTRICAL IN WALL ROUGH-IN

INTA-221

PLUMBING IN WALL ROUGH-IN

20 02-27-14

03-26-14

PLUMBING IN WALL ROUGH-IN

INTA-225

HANG DRYWALL

10 03-27-14

04-09-14

INTA-226

TAPE AND FINISH

10 04-15-14*

04-28-14

INTA-230

CERAMIC TILE

15 04-29-14

05-19-14

CERAMIC TILE

INTA-235

PRIME PAINT

15 04-29-14

05-19-14

PRIME PAINT

INTA-245

CLG GRID

15 05-13-14

06-03-14

CLG GRID

INTA-240

CASEWORK

15 05-23-14

06-13-14

INTA-250

LIGHT FIXTURES

30 05-28-14

07-09-14

LIGHT FIXTURES

INTA-251

DIFFUSERS

30 05-28-14

07-09-14

DIFFUSERS

INTA-252

PLUMBING FINISHES

30 05-28-14

07-09-14

PLUMBING FINISHES

INTA-253

FIRE PROTECTION FINISHES

30 05-28-14

07-09-14

FIRE PROTECTION FINISHES

INTA-255

FINISH PAINT

30 06-11-14

07-23-14

11-21-13 13:05 MAX HAYES HS Sheet 16 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

INTERIOR FRAMING

HANG DRYWALL TAPE AND FINISH

CASEWORK

FINISH PAINT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*09/15/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTA-260

SPECIALTY FLOORING

10 07-02-14

07-16-14

SPECIALTY FLOORING

INTA-265

DOORS & HARDWARE

15 07-02-14

07-23-14

DOORS & HARDWARE

INTA-270

CLG TILE

15 07-10-14

07-30-14

INTA-275

VCT & VINYL FLOORING

15 07-17-14

08-06-14

VCT & VINYL FLOORING

INTA-280

CARPET

10 07-24-14

08-06-14

CARPET

INTA-285

SPECIALTIES

10 08-07-14

08-20-14

INTA-290

PUNCHLIST

20 08-12-14

09-09-14

INTA-295

TESTING & INSPECTIONS

15 08-12-14

09-02-14

MILE-A205

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*

0

CLG TILE

SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2

BUILDING B - GYM SHELL AND CORE

SHCB-100

FOOTINGS - GYM & REMAINING

10 08-08-13 A

08-23-13 A

SHCB-105

BLOCK TO ROOF

20 08-14-13 A

09-16-13 A

SHCB-110

ROOF JOIST & DECK

7 10-17-13 A

11-22-13

SHCB-126

VAPOR SYSTEM & STONE

3 11-01-13 A

11-08-13 A

VAPOR SYSTEM & STONE

SHCB-120

U/G MEP

2 11-04-13 A

11-05-13 A

U/G MEP

SHCB-135

POUR S.O.G.

3 11-12-13 A

11-14-13 A

SHCB-115

MASONRY ACCESS OPENING

5 11-15-13 A

11-20-13

SHCB-155

ROOF BLOCKING

5 11-19-13

11-25-13

ROOF BLOCKING

SHCB-160

MEP CURBS & DRAINS

5 11-19-13

11-25-13

MEP CURBS & DRAINS

SHCB-130

ROOFING

15 11-26-13

12-17-13

SHCB-145

ROOFING TRIM

5 12-18-13

12-24-13

SHCB-140

BRICK VENEER

15 03-31-14*

04-18-14

SHCB-150

METAL PANELS

15 04-21-14

05-09-14

FOOTINGS - GYM & REMAINING BLOCK TO ROOF ROOF JOIST & DECK

POUR S.O.G. MASONRY ACCESS OPENING

ROOFING ROOFING TRIM BRICK VENEER METAL PANELS

INTERIOR BUILDOUT

INTB-100

OVERHEAD DUCTWORK

30 12-18-13

01-30-14

OVERHEAD DUCTWORK

INTB-110

OVERHEAD ELECTRICAL

30 12-18-13

01-30-14

OVERHEAD ELECTRICAL

INTB-115

OVERHEAD PLUMBING

30 12-18-13

01-30-14

OVERHEAD PLUMBING

INTB-120

OVERHEAD FIRE PROTECTION

30 12-18-13

01-30-14

OVERHEAD FIRE PROTECTION

INTB-105

OVERHEAD HVAC PIPING

30 12-26-13

02-06-14

INTB-125

ELECTRICAL ROUGH-INS

20 01-31-14

02-27-14

ELECTRICAL ROUGH-INS

INTB-130

PLUMBING ROUGH-INS

20 01-31-14

02-27-14

PLUMBING ROUGH-INS

INTB-135

PRIME PAINT

15 02-28-14

03-20-14

INTB-140

DIFFUSERS

15 03-21-14

04-10-14

11-21-13 13:05 MAX HAYES HS Sheet 17 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

OVERHEAD HVAC PIPING

PRIME PAINT DIFFUSERS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*10/16/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-145

PLUMBING FINISHES

15 03-21-14

04-10-14

PLUMBING FINISHES

INTB-150

FIRE PROTECTION FINISHES

15 03-21-14

04-10-14

FIRE PROTECTION FINISHES

INTB-155

LIGHT FIXTURES

15 03-21-14

04-10-14

LIGHT FIXTURES

INTB-160

FINISH PAINT

15 04-11-14

05-01-14

FINISH PAINT

INTB-170

ACOUSTIC PANELS

5 05-02-14

05-08-14

INTB-175

ATHLETIC EQUIPMENT

30 05-09-14

06-20-14

INTB-165

DOORS & HARDWARE

10 05-23-14

06-06-14

INTB-180

WOOD GYM FLOORING

30 06-23-14

08-04-14

INTB-195

BLEACHERS

5 08-05-14

08-11-14

INTB-185

PUNCHLIST

20 08-12-14

09-09-14

INTB-190

TESTING & INSPECTIONS

15 08-12-14

09-02-14

MILE-B105

TARGET COMPLETION MILESTONE - BUILDING B - GYM *09/11/14*

0

09-09-14*

5 08-19-13 A

08-23-13 A

10 08-26-13 A

09-09-13 A

5 09-03-13 A

09-25-13 A

10 09-03-13 A

09-12-13 A

ACOUSTIC PANELS ATHLETIC EQUIPMENT DOORS & HARDWARE WOOD GYM FLOORING BLEACHERS PUNCHLIST TESTING & INSPECTIONS TARGET COMPLETION MILESTONE - BUILDING B - GYM

BUILDING B - REMAINING SHELL AND CORE

SHCB-200

FOUNDATION BLOCK TO GRADE

SHCB-205

U/G MEP IN LOCKER ROOMS

SHCB-215

VAPOR SYSTEM & STONE IN LOCKER ROOMS

SHCB-210

U/G MEP IN KITCHEN

SHCB-220

VAPOR SYSTEM & STONE IN KITCHEN

5 09-03-13 A

09-20-13 A

VAPOR SYSTEM & STONE IN KITCHEN

SHCB-310

U/G MEP IN MECH ROOMS

5 09-13-13 A

09-24-13 A

U/G MEP IN MECH ROOMS

SHCB-225

POUR S.O.G. - KITCHEN / DINING ROOMS

3 09-23-13 A

09-25-13 A

POUR S.O.G. - KITCHEN / DINING ROOMS

SHCB-226

POUR S.O.G. - LOCKER ROOMS

3 09-25-13 A

09-27-13 A

POUR S.O.G. - LOCKER ROOMS

SHCB-315

VAPOR SYSTEM & STONE IN MECH ROOMS

3 09-26-13 A

09-30-13 A

VAPOR SYSTEM & STONE IN MECH ROOMS

SHCB-235

BLOCK TO ROOF - KITCHEN / DINING ROOMS

20 09-30-13 A

10-28-13 A

SHCB-320

POUR S.O.G - MECH ROOM

5 10-02-13 A

10-08-13 A

SHCB-230

H.M. FRAMES

20 10-03-13 A

10-28-13 A

SHCB-240

BLOCK TO MEZZANINE

8 10-07-13 A

10-16-13 A

BLOCK TO MEZZANINE

SHCB-245

MEZZANINE PRECAST

2 10-17-13 A

10-18-13 A

MEZZANINE PRECAST

SHCB-255

BLOCK TO ROOF - LOCKER / MEZZ

9 10-21-13 A

11-01-13 A

SHCB-325

STRUCTURAL STEEL - KITCHEN

2 10-25-13 A

10-25-13 A

SHCB-250

ROOF JOISTS & DECK - KITCHEN

15 10-25-13 A

11-01-13 A

ROOF JOISTS & DECK - KITCHEN

SHCB-260

ROOF JOISTS & DECK - DINING

8 10-30-13 A

11-13-13 A

ROOF JOISTS & DECK - DINING

SHCB-265

ROOF JOISTS & DECK - LOCKER / MEZZ

15 11-04-13 A

12-05-13

SHCB-305

STAIRS TO MEZZANINE

10 11-04-13 A

11-15-13 A

STAIRS TO MEZZANINE

SHCB-256

MEZZANINE TOPPING

5 11-07-13 A

11-15-13 A

MEZZANINE TOPPING

11-21-13 13:05 MAX HAYES HS Sheet 18 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

FOUNDATION BLOCK TO GRADE U/G MEP IN LOCKER ROOMS VAPOR SYSTEM & STONE IN LOCKER ROOMS U/G MEP IN KITCHEN

BLOCK TO ROOF - KITCHEN / DINING ROOMS POUR S.O.G - MECH ROOM H.M. FRAMES

BLOCK TO ROOF - LOCKER / MEZZ STRUCTURAL STEEL - KITCHEN

ROOF JOISTS & DECK - LOCKER / MEZZ

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*09/11/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SHCB-330

ROOF BLOCKING - KITCHEN

5 11-11-13 A

11-15-13 A

ROOF BLOCKING - KITCHEN

SHCB-340

MEP CURBS & DRAINS - KITCHEN

5 11-11-13 A

11-15-13 A

MEP CURBS & DRAINS - KITCHEN

SHCB-345

ROOF BLOCKING - DINING

5 11-14-13 A

11-22-13

ROOF BLOCKING - DINING

SHCB-350

MEP CURBS & DRAINS - DINING

5 11-14-13 A

11-22-13

MEP CURBS & DRAINS - DINING

SHCB-270

ROOFING - KITCHEN

10 11-18-13 A

12-02-13

SHCB-365

MECHANICAL HOUSEKEEPING PADS

5 11-19-13

11-25-13

MECHANICAL HOUSEKEEPING PADS

SHCB-280

MASONRY VENEER REQUIRED FOR ENCLOSURE

5 11-20-13

11-26-13

MASONRY VENEER REQUIRED FOR ENCLOSURE

SHCB-257

LOAD MEP EQUIPMENT TO MEZZ

7 11-26-13

12-05-13

SHCB-275

ROOFING - DINING

15 12-02-13

12-20-13

SHCB-355

ROOF BLOCKING - LOCKER / MEZZ

5 12-06-13

12-12-13

ROOF BLOCKING - LOCKER / MEZZ

SHCB-360

MEP CURBS & DRAINS - LOCKER / MEZZ

5 12-06-13

12-12-13

MEP CURBS & DRAINS - LOCKER / MEZZ

SHCB-285

ROOFING - LOCKER / MEZZ

15 12-13-13

01-06-14

SHCB-295

WINDOWS & C.W.

15 12-20-13

01-13-14

WINDOWS & C.W.

SHCB-300

ROOFING TRIM

5 01-07-14

01-13-14

ROOFING TRIM

SHCB-335

MASONRY VENEER - REMAINING

5 03-31-14*

04-04-14

SHCB-290

METAL PANELS

ROOFING - KITCHEN

LOAD MEP EQUIPMENT TO MEZZ ROOFING - DINING

ROOFING - LOCKER / MEZZ

MASONRY VENEER - REMAINING

15 04-07-14

04-25-14

METAL PANELS

INTERIOR BUILDOUT MEZZANINE INTB-402

PLUMBING EQUIPMENT / PIPING

80 01-07-14

04-28-14

PLUMBING EQUIPMENT / PIPING

INTB-400

ELECTRICAL EQUIPMENT / PIPING

80 01-07-14

04-28-14

ELECTRICAL EQUIPMENT / PIPING

INTB-401

MECHANICAL EQUIPMENT / PIPING

80 01-07-14

04-28-14

MECHANICAL EQUIPMENT / PIPING

INTB-405

ELECTRICAL ROUGH-INS

35 01-07-14

02-24-14

ELECTRICAL ROUGH-INS

INTB-406

PLUMBING ROUGH-INS

35 01-07-14

02-24-14

PLUMBING ROUGH-INS

INTB-410

PRIME PAINT

5 04-29-14

05-05-14

INTB-415

LIGHT FIXTURES

10 05-06-14

05-19-14

LIGHT FIXTURES

INTB-420

DIFFUSERS

10 05-06-14

05-19-14

DIFFUSERS

INTB-425

FINISH PAINT

10 05-20-14

06-03-14

INTB-430

DOORS & HARDWARE

5 06-04-14

06-10-14

DOORS & HARDWARE

INTB-440

SPECIALTIES

20 06-11-14

07-09-14

SPECIALTIES

INTB-445

PUNCHLIST

20 07-02-14

07-30-14

INTB-450

TESTING & INSPECTIONS

15 07-02-14

07-23-14

MILE-B405

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*

0

PRIME PAINT

FINISH PAINT

PUNCHLIST TESTING & INSPECTIONS

07-30-14*

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE

LOCKER ROOMS INTB-300

OVERHEAD DUCTWORK

15 12-06-13

12-27-13

OVERHEAD DUCTWORK

INTB-301

OVERHEAD HVAC PIPING

15 12-06-13

12-27-13

OVERHEAD HVAC PIPING

INTB-302

OVERHEAD ELECTRICAL

15 12-06-13

12-27-13

OVERHEAD ELECTRICAL

11-21-13 13:05 MAX HAYES HS Sheet 19 of 26

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*06/18/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-303

OVERHEAD PLUMBING

15 12-06-13

12-27-13

OVERHEAD PLUMBING

INTB-304

OVERHEAD FIRE PROTECTION

15 12-06-13

12-27-13

OVERHEAD FIRE PROTECTION

INTB-305

ELECTRICAL ROUGH-INS

15 12-30-13

01-20-14

ELECTRICAL ROUGH-INS

INTB-306

PLUMBING ROUGH-INS

15 12-30-13

01-20-14

PLUMBING ROUGH-INS

INTB-311

FRAME DRYWALL CEILING

10 01-14-14

01-27-14

INTB-310

DRYWALL CEILING

10 01-28-14

02-10-14

INTB-315

TAPE AND FINISH CEILING

10 04-01-14*

04-14-14

INTB-320

CERAMIC TILE

10 04-15-14

04-28-14

INTB-325

PRIME PAINT

5 04-15-14

04-21-14

INTB-330

PLUMBING FINISHES

10 04-15-14

04-28-14

PLUMBING FINISHES

INTB-335

FIRE PROTECTION FINISHES

10 04-15-14

04-28-14

FIRE PROTECTION FINISHES

INTB-340

CASEWORK

5 06-16-14

06-20-14

CASEWORK

INTB-345

FINISH PAINT

10 06-23-14

07-07-14

INTB-350

DOORS & HARDWARE

10 07-08-14

07-21-14

INTB-370

FLOORING

10 07-22-14

08-04-14

INTB-355

SPECIALTIES

20 08-05-14

09-02-14

INTB-360

PUNCHLIST

20 08-26-14

09-23-14

INTB-365

TESTING & INSPECTIONS

15 08-26-14

09-16-14

MILE-B305

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*

0

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

FRAME DRYWALL CEILING DRYWALL CEILING TAPE AND FINISH CEILING CERAMIC TILE PRIME PAINT

FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

09-23-14*

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS

*10/20/14*

MECHANICAL / ELECTRICAL ROOMS INTB-200

PLUMBING EQUIPMENT / PIPING

70 01-07-14

04-14-14

PLUMBING EQUIPMENT / PIPING

INTB-201

ELECTRICAL EQUIPMENT / PIPING

70 01-07-14

04-14-14

ELECTRICAL EQUIPMENT / PIPING

INTB-202

FIRE PUMP EQUIPMENT / PIPING

70 01-07-14

04-14-14

FIRE PUMP EQUIPMENT / PIPING

INTB-205

ELECTRICAL ROUGH-INS

10 04-15-14

04-28-14

ELECTRICAL ROUGH-INS

INTB-206

PLUMBING ROUGH-INS

10 04-15-14

04-28-14

PLUMBING ROUGH-INS

INTB-210

PRIME PAINT

5 04-29-14

05-05-14

INTB-215

LIGHT FIXTURES

10 05-06-14

05-19-14

LIGHT FIXTURES

INTB-220

DIFFUSERS

10 05-06-14

05-19-14

DIFFUSERS

INTB-225

FINISH PAINT

10 05-20-14

06-03-14

INTB-230

DOORS & HARDWARE

10 06-04-14

06-17-14

INTB-235

FLOORING

10 06-18-14

07-01-14

INTB-240

SPECIALTIES

20 07-02-14

07-30-14

INTB-245

PUNCHLIST

20 07-24-14

08-20-14

INTB-250

TESTING & INSPECTIONS

15 07-24-14

08-13-14

MILE-B205

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*

11-21-13 13:05 MAX HAYES HS Sheet 20 of 26

0

PRIME PAINT

FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

08-20-14*

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*08/22/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

KITCHEN INTB-500

OVERHEAD DUCTWORK

30 12-03-13

01-15-14

OVERHEAD DUCTWORK

INTB-501

OVERHEAD HVAC PIPING

30 12-03-13

01-15-14

OVERHEAD HVAC PIPING

INTB-502

OVERHEAD ELECTRICAL

30 12-03-13

01-15-14

OVERHEAD ELECTRICAL

INTB-503

OVERHEAD PLUMBING

30 12-03-13

01-15-14

OVERHEAD PLUMBING

INTB-504

OVERHEAD FIRE PROTECTION

30 12-03-13

01-15-14

OVERHEAD FIRE PROTECTION

INTB-505

ELECTRICAL ROUGH-INS

35 01-16-14

03-05-14

ELECTRICAL ROUGH-INS

INTB-506

PLUMBING ROUGH-INS

35 01-16-14

03-05-14

PLUMBING ROUGH-INS

INTB-507

KITCHEN EQUIPMENT ROUGH-INS

35 01-16-14

03-05-14

KITCHEN EQUIPMENT ROUGH-INS

INTB-510

PRIME PAINT

10 03-06-14

03-19-14

PRIME PAINT

INTB-520

CLG GRID

15 03-20-14

04-09-14

CLG GRID

INTB-525

PLUMBING FINISHES

15 04-10-14

04-30-14

PLUMBING FINISHES

INTB-530

FIRE PROTECTION FINISHES

15 04-10-14

04-30-14

FIRE PROTECTION FINISHES

INTB-535

LIGHT FIXTURES

15 04-10-14

04-30-14

LIGHT FIXTURES

INTB-540

DIFFUSERS

15 04-10-14

04-30-14

DIFFUSERS

INTB-515

CASEWORK

25 06-23-14

07-28-14

INTB-545

FINISH PAINT

10 07-29-14

08-11-14

INTB-550

CLG TILE

5 09-10-14

09-16-14

INTB-555

DOORS & HARDWARE

10 09-10-14

09-23-14

INTB-560

FLOORING

20 09-10-14

10-07-14

INTB-565

KITCHEN EQUIPMENT

30 10-08-14

11-18-14

INTB-570

SPECIALTIES

20 10-08-14

11-04-14

INTB-575

PUNCHLIST

20 11-19-14

12-17-14

INTB-580

TESTING & INSPECTIONS

15 11-19-14

12-10-14

MILE-B505

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

0

CASEWORK FINISH PAINT CLG TILE DOORS & HARDWARE FLOORING KITCHEN EQUIPMENT SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

12-17-14*

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN

STUDENT DINING INTB-600

OVERHEAD DUCTWORK

20 12-23-13

01-21-14

OVERHEAD DUCTWORK

INTB-602

OVERHEAD ELECTRICAL

20 12-23-13

01-21-14

OVERHEAD ELECTRICAL

INTB-603

OVERHEAD PLUMBING

20 12-23-13

01-21-14

OVERHEAD PLUMBING

INTB-604

OVERHEAD FIRE PROTECTION

20 12-23-13

01-21-14

OVERHEAD FIRE PROTECTION

INTB-601

OVERHEAD HVAC PIPING

20 12-26-13

01-23-14

OVERHEAD HVAC PIPING

INTB-605

ELECTRICAL ROUGH-INS

15 01-22-14

02-11-14

ELECTRICAL ROUGH-INS

INTB-606

PLUMBING ROUGH-INS

15 01-22-14

02-11-14

PLUMBING ROUGH-INS

INTB-610

PRIME PAINT

10 02-12-14

02-25-14

INTB-620

CLG GRID

10 02-26-14

03-11-14

INTB-625

PLUMBING FINISHES

10 03-12-14

03-25-14

11-21-13 13:05 MAX HAYES HS Sheet 21 of 26

PRIME PAINT CLG GRID PLUMBING FINISHES

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*01/13/15*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-630

FIRE PROTECTION FINISHES

10 03-12-14

03-25-14

FIRE PROTECTION FINISHES

INTB-635

LIGHT FIXTURES

10 03-12-14

03-25-14

LIGHT FIXTURES

INTB-640

DIFFUSERS

10 03-12-14

03-25-14

DIFFUSERS

INTB-615

CASEWORK

15 07-29-14

08-18-14

INTB-645

FINISH PAINT

10 08-19-14

09-02-14

INTB-650

CLG TILE

10 10-01-14

10-14-14

CLG TILE

INTB-655

DOORS & HARDWARE

10 10-01-14

10-14-14

DOORS & HARDWARE

INTB-660

FLOORING

20 10-01-14

10-28-14

INTB-665

SPECIALTIES

20 10-29-14

11-26-14

SPECIALTIES

INTB-680

ACOUSTIC PANELS

20 10-29-14

11-26-14

ACOUSTIC PANELS

INTB-670

PUNCHLIST

20 11-27-14

12-24-14

INTB-675

TESTING & INSPECTIONS

15 11-27-14

12-17-14

MILE-B605

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

0

CASEWORK FINISH PAINT

FLOORING

PUNCHLIST TESTING & INSPECTIONS

12-24-14*

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

BUILDING C SHELL AND CORE

SHCC-235

FOOTINGS

10 08-22-13 A

09-03-13 A

SHCC-240

U/G MEP

10 09-04-13 A

09-24-13 A

SHCC-245

FOUNDATION BLOCK

5 09-04-13 A

09-06-13 A

SHCC-250

VAPOR SYSTEM & STONE

11 09-16-13 A

09-27-13 A

SHCC-255

POUR S.O.G. / CURE

4 09-27-13 A

10-04-13 A

SHCC-260

H.M. FRAMES

5 10-21-13 A

11-22-13

H.M. FRAMES

SHCC-265

BLOCK TO ROOF

20 10-21-13 A

11-22-13

BLOCK TO ROOF

SHCC-270

ROOF JOIST & DECK

15 11-25-13

12-16-13

ROOF JOIST & DECK

SHCC-285

BRICK VENEER

15 11-25-13

12-16-13

BRICK VENEER

SHCC-290

METAL PANELS

15 12-17-13

01-08-14

SHCC-365

ROOF BLOCKING

5 12-17-13

12-23-13

ROOF BLOCKING

SHCC-370

MEP CURBS & DRAINS

5 12-17-13

12-23-13

MEP CURBS & DRAINS

SHCC-295

WINDOWS & C.W.

15 12-20-13

01-13-14

SHCC-280

ROOFING

15 01-02-14

01-22-14

SHCC-296

ROOFING TRIM

5 01-23-14

01-29-14

FOOTINGS U/G MEP FOUNDATION BLOCK VAPOR SYSTEM & STONE POUR S.O.G. / CURE

METAL PANELS

WINDOWS & C.W. ROOFING ROOFING TRIM

INTERIOR BUILDOUT

INTC-115

OVERHEAD DUCTWORK

40 01-23-14

03-19-14

OVERHEAD DUCTWORK

INTC-116

OVERHEAD HVAC PIPING

40 01-23-14

03-19-14

OVERHEAD HVAC PIPING

INTC-117

OVERHEAD ELECTRICAL

40 01-23-14

03-19-14

OVERHEAD ELECTRICAL

11-21-13 13:05 MAX HAYES HS Sheet 22 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTC-118

OVERHEAD PLUMBING

40 01-23-14

03-19-14

OVERHEAD PLUMBING

INTC-119

OVERHEAD FIRE PROTECTION

40 01-23-14

03-19-14

OVERHEAD FIRE PROTECTION

INTC-125

PLUMBING ROUGH-INS

35 03-20-14

05-07-14

PLUMBING ROUGH-INS

INTC-120

ELECTRICAL ROUGH-INS

35 03-20-14

05-07-14

ELECTRICAL ROUGH-INS

INTC-210

FRAME DRYWALL CEILING

5 05-08-14

05-14-14

FRAME DRYWALL CEILING

INTC-220

HANG DRYWALL CEILING

5 05-15-14

05-21-14

HANG DRYWALL CEILING

INTC-130

TAPE & FINISH CEILING

40 05-22-14*

07-18-14

INTC-135

CERAMIC TILE

30 05-30-14

07-11-14

CERAMIC TILE

INTC-140

PRIME PAINT

15 06-20-14

07-11-14

PRIME PAINT

INTC-150

CLG GRID

30 07-07-14

08-15-14

INTC-155

PLUMBING FINISHES

30 08-18-14

09-29-14

PLUMBING FINISHES

INTC-156

FIRE PROTECTION FINISHES

30 08-18-14

09-29-14

FIRE PROTECTION FINISHES

INTC-157

LIGHT FIXTURES

30 08-18-14

09-29-14

LIGHT FIXTURES

INTC-158

DIFFUSERS

30 08-18-14

09-29-14

DIFFUSERS

INTC-145

CASEWORK

25 08-19-14

09-23-14

INTC-160

FINISH PAINT

15 09-30-14

10-20-14

INTC-165

SPECIALTY FLOORING

30 10-21-14

12-02-14

SPECIALTY FLOORING

INTC-170

DOORS & HARDWARE

15 11-11-14

12-02-14

DOORS & HARDWARE

INTC-175

CLG TILE

20 11-11-14

12-09-14

INTC-180

VCT & VINYL FLOORING

20 11-26-14

12-23-14

INTC-185

CARPET

20 12-24-14

01-22-15

INTC-190

SPECIALTIES

20 01-09-15

02-05-15

INTC-195

PUNCHLIST

20 02-06-15

03-05-15

INTC-200

TESTING & INSPECTIONS

15 02-06-15

02-26-15

MILE-C105

TARGET COMPLETION MILESTONE - BUILDING C

*03/19/15*

0

TAPE & FINISH CEILING

CLG GRID

CASEWORK FINISH PAINT

CLG TILE VCT & VINYL FLOORING CARPET SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

03-05-15*

TARGET COMPLETION MILESTONE - BUILDING C

BUILDING D SHELL AND CORE

SHCD-305

FOOTINGS

SHCD-310

FOUNDATION BLOCK

SHCD-345

U/G MEP

SHCD-315

H.M. FRAMES - D WEST BOX

SHCD-320

10 09-04-13 A

09-17-13 A

5 09-18-13 A

09-27-13 A

FOOTINGS FOUNDATION BLOCK

10 09-18-13 A

04-03-14

5 11-04-13 A

12-06-13

H.M. FRAMES - D WEST BOX

BLOCK TO ROOF - D WEST BOX

20 11-04-13 A

12-06-13

BLOCK TO ROOF - D WEST BOX

SHCD-370

BLOCK TO ROOF - D REMAINING

15 12-09-13

12-30-13

BLOCK TO ROOF - D REMAINING

SHCD-321

STRUCTURAL STEEL - D WEST BOX

2 12-24-13

12-26-13

STRUCTURAL STEEL - D WEST BOX

SHCD-330

H.M. FRAMES - D REMAINING

5 12-24-13

12-30-13

H.M. FRAMES - D REMAINING

11-21-13 13:05 MAX HAYES HS Sheet 23 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

U/G MEP

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*03/19/15*


Activity ID

Activity Name

SHCD-325

ROOF JOIST & DECK - D WEST BOX

SHCD-385

Original Start Duration

Finish

2013

2014

2015

30 01-03-14

02-13-14

STRUCTURAL STEEL - D REMAINING

2 01-22-14

01-23-14

SHCD-390

ROOF JOIST & DECK - D REMAINING

30 01-24-14

03-06-14

SHCD-375

ROOF BLOCKING - D WEST BOX

5 02-14-14

02-20-14

ROOF BLOCKING - D WEST BOX

SHCD-380

MEP CURBS & DRAINS - D WEST BOX

5 02-14-14

02-20-14

MEP CURBS & DRAINS - D WEST BOX

SHCD-335

ROOFING - D WEST BOX

20 02-21-14

03-20-14

SHCD-395

ROOF BLOCKING - D REMAINING

5 03-07-14

03-13-14

SHCD-400

MEP CURBS & DRAINS - D REMAINING

5 03-14-14

03-20-14

SHCD-340

ROOFING TRIM - D WEST BOX

5 03-21-14

03-27-14

SHCD-405

ROOFING - D REMAINING

20 03-21-14

04-17-14

SHCD-415

VAPOR SYSTEM & STONE - D REMAINING

10 03-31-14*

04-11-14

VAPOR SYSTEM & STONE - D REMAINING

SHCD-350

VAPOR SYSTEM & STONE - D WEST BOX

10 04-04-14*

04-17-14

VAPOR SYSTEM & STONE - D WEST BOX

SHCD-355

BRICK VENEER

15 04-07-14

04-25-14

BRICK VENEER

SHCD-420

POUR S.O.G. - REMAINING

10 04-14-14

04-25-14

POUR S.O.G. - REMAINING

SHCD-360

POUR S.O.G. - D WEST BOX

10 04-18-14

05-01-14

POUR S.O.G. - D WEST BOX

SHCD-410

ROOFING TRIM - D REMAINING

5 04-18-14

04-24-14

ROOFING TRIM - D REMAINING

SHCD-425

WINDOWS & C.W. - D REMAINING

15 04-25-14

05-15-14

WINDOWS & C.W. - D REMAINING

SHCD-365

METAL PANELS

15 04-28-14

05-16-14

METAL PANELS

SHCD-369

WINDOWS & C.W. - D WEST BOX

15 04-28-14

05-16-14

WINDOWS & C.W. - D WEST BOX

ROOF JOIST & DECK - D WEST BOX

NON BEARING MASONRY WALLS

STRUCTURAL STEEL - D REMAINING ROOF JOIST & DECK - D REMAINING

ROOFING - D WEST BOX ROOF BLOCKING - D REMAINING MEP CURBS & DRAINS - D REMAINING ROOFING TRIM - D WEST BOX ROOFING - D REMAINING

INTERIOR BUILDOUT

INTD-105

NON BEARING MASONRY WALLS

10 05-02-14

05-15-14

INTD-110

OVERHEAD DUCTWORK

55 05-16-14

08-04-14

OVERHEAD DUCTWORK

INTD-111

OVERHEAD HVAC PIPING

55 05-16-14

08-04-14

OVERHEAD HVAC PIPING

INTD-112

OVERHEAD ELECTRICAL

55 05-16-14

08-04-14

OVERHEAD ELECTRICAL

INTD-113

OVERHEAD PLUMBING

55 05-16-14

08-04-14

OVERHEAD PLUMBING

INTD-114

OVERHEAD FIRE PROTECTION

55 05-16-14

08-04-14

OVERHEAD FIRE PROTECTION

INTD-125

ELECTRICAL ROUGH-INS

35 07-08-14

08-25-14

ELECTRICAL ROUGH-INS

INTD-126

PLUMBING ROUGH-INS

35 07-08-14

08-25-14

PLUMBING ROUGH-INS

INTD-130

FRAME DRYWALL CEILING

15 08-05-14

08-25-14

FRAME DRYWALL CEILING

INTD-131

HANG DRYWALL CEILING

15 08-26-14

09-16-14

INTD-132

TAPE AND FINISH CEILING

15 09-17-14

10-07-14

INTD-135

CERAMIC TILE

20 10-08-14

11-04-14

CERAMIC TILE

INTD-140

PRIME PAINT

20 10-08-14

11-04-14

PRIME PAINT

INTD-145

CASEWORK

15 10-22-14

11-11-14

CASEWORK

INTD-150

CLG GRID

30 10-22-14

12-03-14

11-21-13 13:05 MAX HAYES HS Sheet 24 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

HANG DRYWALL CEILING TAPE AND FINISH CEILING

CLG GRID

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTD-155

PLUMBING FINISHES

40 11-05-14

01-02-15

PLUMBING FINISHES

INTD-156

FIRE PROTECTION FINISHES

40 11-05-14

01-02-15

FIRE PROTECTION FINISHES

INTD-157

LIGHT FIXTURES

40 11-05-14

01-02-15

LIGHT FIXTURES

INTD-158

DIFFUSERS

40 11-05-14

01-02-15

DIFFUSERS

INTD-160

FINISH PAINT

30 11-19-14

01-02-15

FINISH PAINT

INTD-165

SEAL CONCRETE FLOORING

15 11-27-14

12-17-14

SEAL CONCRETE FLOORING

INTD-170

DOORS & HARDWARE

25 12-04-14

01-09-15

DOORS & HARDWARE

INTD-175

CLG TILE

15 12-11-14

01-02-15

INTD-180

VCT & VINYL FLOORING

15 12-26-14

01-16-15

INTD-190

INSTALL EQUIPMENT

30 01-05-15

02-13-15

INTD-195

PUNCHLIST

15 01-30-15

02-19-15

PUNCHLIST

INTD-200

TESTING & INSPECTIONS

15 01-30-15

02-19-15

TESTING & INSPECTIONS

MILE-D205

TARGET COMPLETION MILESTONE - BUILDING D ORIGINAL *06/24/15* REVISED *03/06/15*

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING D

0

CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT

BUILDING E SHELL AND CORE

SHCE-375

FOOTINGS

SHCE-380

10 09-18-13 A

11-25-13

FOUNDATION BLOCK

5 11-26-13

12-03-13

SHCE-385

H.M. FRAMES

5 12-09-13

12-13-13

SHCE-390

BLOCK TO ROOF

30 12-09-13

01-21-14

BLOCK TO ROOF

SHCE-391

STRUCTURAL STEEL

2 01-22-14

01-23-14

STRUCTURAL STEEL

SHCE-395

ROOF JOIST & DECK

30 01-24-14

03-06-14

ROOF JOIST & DECK

SHCE-445

ROOF BLOCKING

5 03-07-14

03-13-14

ROOF BLOCKING

SHCE-450

MEP CURBS & DRAINS

5 03-07-14

03-13-14

MEP CURBS & DRAINS

SHCE-410

ROOFING

20 03-14-14

04-10-14

SHCE-405

U/G MEP

10 04-11-14

04-24-14

SHCE-420

VAPOR SYSTEM & STONE

10 04-25-14

05-08-14

SHCE-415

BRICK VENEER

15 04-28-14

05-16-14

BRICK VENEER

SHCE-440

POUR S.O.G.

10 05-09-14

05-22-14

POUR S.O.G.

SHCE-425

METAL PANELS

15 05-19-14

06-09-14

METAL PANELS

SHCE-430

WINDOWS & C.W.

15 05-19-14

06-09-14

WINDOWS & C.W.

SHCE-435

ROOFING TRIM

5 05-19-14

05-23-14

FOOTINGS FOUNDATION BLOCK H.M. FRAMES

ROOFING U/G MEP VAPOR SYSTEM & STONE

ROOFING TRIM

INTERIOR BUILDOUT

INTE-105

NON BEARING MASONRY WALLS

10 05-23-14

06-06-14

INTE-115

OVERHEAD DUCTWORK

40 06-09-14

08-04-14

11-21-13 13:05 MAX HAYES HS Sheet 25 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

NON BEARING MASONRY WALLS OVERHEAD DUCTWORK

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

ORIGINAL *06/24/15*

REV


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

INTE-116

OVERHEAD HVAC PIPING

40 06-09-14

08-04-14

OVERHEAD HVAC PIPING

INTE-117

OVERHEAD ELECTRICAL

40 06-09-14

08-04-14

OVERHEAD ELECTRICAL

INTE-118

OVERHEAD PLUMBING

40 06-09-14

08-04-14

OVERHEAD PLUMBING

INTE-119

OVERHEAD FIRE PROTECTION

40 06-09-14

08-04-14

OVERHEAD FIRE PROTECTION

INTE-125

ELECTRICAL ROUGH-INS

35 07-08-14

08-25-14

ELECTRICAL ROUGH-INS

INTE-126

PLUMBING ROUGH-INS

35 07-08-14

08-25-14

PLUMBING ROUGH-INS

INTE-130

FRAME DRYWALL CEILING

15 08-05-14

08-25-14

FRAME DRYWALL CEILING

INTE-131

HANG DRYWALL CEILING

15 08-26-14

09-16-14

INTE-132

TAPE AND FINISH CEILING

15 09-17-14

10-07-14

INTE-135

CERAMIC TILE

20 10-08-14

11-04-14

CERAMIC TILE

INTE-140

PRIME PAINT

20 10-08-14

11-04-14

PRIME PAINT

INTE-150

CLG GRID

30 10-22-14

12-03-14

INTE-155

PLUMBING FINISHES

40 11-05-14

01-02-15

PLUMBING FINISHES

INTE-156

FIRE PROTECTION FINISHES

40 11-05-14

01-02-15

FIRE PROTECTION FINISHES

INTE-157

LIGHT FIXTURES

40 11-05-14

01-02-15

LIGHT FIXTURES

INTE-158

DIFFUSERS

40 11-05-14

01-02-15

DIFFUSERS

INTE-145

CASEWORK

15 11-12-14

12-03-14

INTE-160

FINISH PAINT

30 11-19-14

01-02-15

INTE-165

SEAL CONCRETE FLOOR

15 11-27-14

12-17-14

INTE-170

DOORS & HARDWARE

25 12-04-14

01-09-15

INTE-175

CLG TILE

15 12-11-14

01-02-15

INTE-180

VCT & VINYL FLOORING

20 12-18-14

01-16-15

INTE-190

INSTALL EQUIPMENT

30 01-05-15

02-13-15

INTE-195

PUNCHLIST

15 01-30-15

02-19-15

PUNCHLIST

INTE-200

TESTING & INSPECTIONS

15 01-30-15

02-19-15

TESTING & INSPECTIONS

MILE-E305

TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING E

ORIGINAL

0

HANG DRYWALL CEILING TAPE AND FINISH CEILING

CLG GRID

CASEWORK FINISH PAINT SEAL CONCRETE FLOOR DOORS & HARDWARE CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT

ORIGINAL *07/01/15*

REVISE

PROJECT COMPLETION PROJECT COMPLETION GENERAL

COMP-495

PROJECT COMPLETION ACTIVITIES

COMP-505

CONSTRUCTION COMPLETION

COMP-500

OWNER CLOSEOUT / COMMISSIONING / LEED

COMP-510

CERTIFICATE OF OCCUPANCY

11-21-13 13:05 MAX HAYES HS Sheet 26 of 26

*7/1/15*

*7/1/15*

43 01-06-15 0 65 07-01-15

03-05-15

PROJECT COMPLETION ACTIVITIES

03-05-15*

CONSTRUCTION COMPLETION

09-30-15

*7/1/15*

OWNER CLOSEOUT / COMMISSIONING / LEED

0 07-01-15*

CERTIFICATE OF OCCUPANCY

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*7/1/15*


Activity ID

Activity Name

Orig Start Dur

Milestones Entire Project All Areas 0620A-ALL-1000 0620A-ALL-1020 0620A-ALL-1030 0620A-ALL-1040 0620A-ALL-1050 0620A-ALL-1060 0620A-ALL-1070 0620A-ALL-1120 0620A-RMM-1600 0620A-ALL-1250 0620A-ALL-1420 0620A-ALL-1450 Site Mobilization Entire Project All Areas

Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy

0620A-ALL-1010 Site Mobilization Material Procurement Entire Project All Areas 0620A-CTI-1000 0620A-CTT-3000 0620A-CTT-3010 0620A-CTT-3020 0620A-CTT-3030 0620A-GSC-1000 0620A-CTT-3040 0620A-CTI-1020 0620A-GEO-1000 0620A-GEO-1010 0620A-CTT-3050 0620A-CTT-3060 0620A-CTT-3070 0620A-GSC-1010 0620A-CTT-3080 0620A-GEO-1020 0620A-GEO-1030 0620A-CTI-1040 0620A-RMM-1000 0620A-GEO-1040 0620A-GEO-1050 0620A-CTT-3090 0620A-CTT-3100 0620A-RMM-1010 0620A-ZSE-1000 0620A-ZSE-1010 0620A-CTT-3110 0620A-ZSE-1090 0620A-RMM-2430 0620A-RMM-1060 0620A-RMM-2440 0620A-ZSE-1570

Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 1 of 25

545 545 545 545 0 0 0 0 0 0 0 0 5 0 0 0 15 15 15 15 15 332 332 332 332 10 10 15 15 15 20 10 10 10 10 10 10 15 10 1 10 10 1 30 1 1 1 1 10 30 50 1 10 1 1 1 1

06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A

11-21-14

06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-25-13 A 06-25-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-10-13 A 07-17-13 A 07-17-13 A 07-17-13 A 07-22-13 A 07-22-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-03-13 A 09-16-13 A 09-16-13 A 10-21-13 11-14-13 02-24-14 04-07-14 05-06-14 05-13-14

Finish

07-31-15 07-31-15 07-31-15 07-31-15 06-11-13 A 06-18-13 A 07-01-13 A 07-22-13 A 09-11-13 A 09-23-13 A 10-25-13 10-23-14 11-28-14 04-16-15 07-15-15 07-31-15* 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 09-30-14 09-30-14 09-30-14 09-30-14 06-24-13 A 06-24-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-09-13 A 07-09-13 A 07-09-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-23-13 A 07-23-13 A 07-17-13 A 07-30-13 A 07-30-13 A 07-22-13 A 08-30-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-16-13 A 11-13-13* 12-12-13 10-21-13 11-27-13 02-24-14 04-07-14 05-06-14 05-13-14

Late Start

10-21-13 10-21-13 10-21-13 10-21-13

01-07-15

10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 02-04-14 03-03-14 02-25-14 03-10-14 03-21-14 06-16-14 06-16-14 07-02-14

Late Finish 07-31-15 07-31-15 07-31-15 07-31-15 10-21-13 10-21-13 11-01-13 10-21-13 10-21-13 10-21-13 11-01-13 11-05-14 01-13-15 05-06-15 07-24-15 07-31-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-10-14 11-10-14 11-10-14 11-10-14 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 03-07-14 05-02-14 02-25-14 03-21-14 03-21-14 06-16-14 06-16-14 07-02-14

Total Free Float Float 0 0 0 0

0 0 0 0

5 9 30 14 7 0

0 2 0 0 7 0 0 0 0 0

29 29 29 29

0 0 0 0

79 98 88 79 19 48 28 35

0 0 0 44 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D

J

F

2016 M A M J

Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy

Site Mobilization -

Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site


Activity ID

0620A-RMM-2450 0620A-RMM-2460 0620A-GSC-1020 Project Coordination Academic Area First Floor

Activity Name

Orig Start Dur

Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site

0620A-RMM-1020 0620A-MPH-1030 0620A-SAC-1000 0620A-ZSE-1100 0620A-ZST-1000 Second Floor

HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)

0620A-RMM-1050 0620A-MPH-1430 0620A-SAC-1030 0620A-ZSE-1350 0620A-ZST-1030 Third Floor

HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)

0620A-RMM-1070 0620A-MPH-1450 0620A-SAC-1040 0620A-ZSE-1370 0620A-ZST-1040 One Story Areas Area A/B/C (1-Story)

HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)

0620A-RMM-1030 0620A-MPH-1300 0620A-SAC-1010 0620A-ZSE-1190 0620A-ZST-1010 Area D/E/F (1-Story)

HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)

0620A-RMM-1040 HVAC Coordination - Area D/E/F (Low Roof) 0620A-MPH-1420 Plumbing Coordination - Area D/E/F (Low Roof) 0620A-SAC-1020 Fire Protection Coordination - Area D/E/F (Low Roof) 0620A-ZSE-1290 Electrical Coordination - Area D/E/F (Low Roof) 0620A-ZST-1020 Tech Coordination - Area D/E/F (Low Roof) Site Preparation/ Rou Rough-in Site Preparation All Areas 0620A-CTI-1010 0620A-CTI-1030 0620A-CTI-1050 0620A-CTI-1070 Site Rough-in All Areas 0620A-CTI-1060 0620A-CTI-1080 0620A-MPH-1330 0620A-MPH-1410

Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)

Storm Sewers Sanitary Sewers Site Water Line Site Gas Line

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 2 of 25

1 1 1 199 199 79 79 30 30 30 30 30 76 76 30 30 30 30 30 76 76 30 30 30 30 30 106 76 76 30 30 30 30 30 76 76 30 30 30 30 30 191 33 33 33 5 3 9 6 169 169 169 25 10 10 10

06-05-14 09-16-14 09-30-14 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 10-11-13 10-25-13 11-08-13 11-22-13 01-28-14 01-28-14 01-28-14 02-19-14 03-05-14 03-19-14 04-02-14 03-11-14 03-11-14 03-11-14 04-02-14 04-16-14 05-01-14 05-15-14 10-31-13 10-31-13 10-31-13 10-31-13 11-22-13 12-09-13 12-23-13 01-08-14 12-13-13 12-13-13 12-13-13 01-08-14 01-22-14 02-05-14 02-19-14 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 07-15-13 A 07-22-13 A 08-07-13 A 07-22-13 A 07-22-13 A 07-22-13 A 07-22-13 A 09-05-13 A 11-05-13 11-21-13

Finish

06-05-14 09-16-14 09-30-14 06-26-14 06-26-14 01-07-14 01-07-14 10-30-13 11-21-13 12-06-13 12-20-13 01-07-14 05-14-14 05-14-14 03-10-14 04-01-14 04-15-14 04-30-14 05-14-14 06-26-14 06-26-14 04-22-14 05-14-14 05-29-14 06-12-14 06-26-14 04-01-14 02-18-14 02-18-14 12-12-13 01-07-14 01-21-14 02-04-14 02-18-14 04-01-14 04-01-14 01-27-14 02-18-14 03-04-14 03-18-14 04-01-14 03-19-14 08-15-13 A 08-15-13 A 08-15-13 A 06-27-13 A 07-17-13 A 08-06-13 A 08-15-13 A 03-19-14 03-19-14 03-19-14 09-04-13 A 09-20-13 A 11-19-13 12-06-13

Late Start

06-17-14 09-25-14 11-10-14 10-23-13 10-23-13 10-23-13 10-23-13 10-23-13 01-10-14 01-24-14 02-07-14 02-21-14 02-07-14 02-07-14 02-07-14 07-14-14 07-28-14 08-11-14 08-25-14 05-19-14 05-19-14 05-19-14 08-25-14 09-09-14 09-23-14 10-07-14 11-12-13 11-12-13 11-12-13 11-12-13 02-21-14 03-07-14 03-21-14 04-04-14 12-26-13 12-26-13 12-26-13 05-30-14 06-13-14 06-27-14 07-14-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-14-13 11-14-13 11-14-13 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 04-14-14

Late Finish 06-17-14 09-25-14 11-10-14 11-17-14 11-17-14 04-03-14 04-03-14 11-11-13 02-20-14 03-06-14 03-20-14 04-03-14 10-06-14 10-06-14 03-20-14 08-22-14 09-08-14 09-22-14 10-06-14 11-17-14 11-17-14 06-30-14 10-06-14 10-20-14 11-03-14 11-17-14 08-22-14 05-16-14 05-16-14 12-24-13 04-03-14 04-17-14 05-02-14 05-16-14 08-22-14 08-22-14 02-06-14 07-11-14 07-25-14 08-08-14 08-22-14 05-05-15 11-14-13 11-14-13 11-14-13 10-21-13 11-14-13 11-14-13 11-14-13 05-05-15 05-05-15 05-05-15 03-27-14 03-27-14 04-11-14 05-02-14

Total Free Float Float 8 7 29 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 100 100 48 100 100 100 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 286

286 286 286

63 63

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A 0620A 0620A 0620A 0620A 0620A 0620A -

T/P T/P T/P T/P T/P T/P T/P

Remaining Work Critical Remaining Work

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site

HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)

HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)

HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)

HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)

HVAC Coordination - Area D/E/F (Low Roof) Plumbing Coordination - Area D/E/F (Low Roof) Fire Protection Coordination - Area D/E/F (Low Roof) Electrical Coordination - Area D/E/F (Low Roof) Tech Coordination - Area D/E/F (Low Roof)

Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)

0 0 0

0 4

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

Storm Sewers Sanitary Sewers Site Water Line Site Gas Line

J

F

2016 M A M J


Activity ID

0620A-ZSE-1250 0620A-CTI-1090 Building Structure Academic Area First Floor Area D (1st Flr) 0620A-CTT-1040 0620A-CTT-1070 0620A-CTT-1110 0620A-CTT-1130 0620A-CTT-1140 0620A-MPH-1130 0620A-MPH-1200 0620A-MPH-1230 0620A-ZSE-3370 0620A-ZSE-1080 0620A-GEO-1090 0620A-GEO-1110 0620A-MPH-1160 0620A-TFC-3020 0620A-CTT-1380 0620A-ZSE-1330 0620A-CTT-1390 0620A-ZSE-1360 0620A-CVS-1050 0620A-CVS-1080 0620A-ZSE-1470 0620A-ALL-1090 0620A-CTT-1650 Area E (1st Flr) 0620A-CTT-1020 0620A-CTT-1030 0620A-CTT-1080 0620A-CTT-1100 0620A-CTT-1150 0620A-MPH-1110 0620A-MPH-1120 0620A-MPH-1140 0620A-ZSE-1050 0620A-ZSE-1060 0620A-GEO-1080 0620A-GEO-1100 0620A-MPH-1100 0620A-TFC-3010 0620A-CTT-1360 0620A-ZSE-1210 0620A-CTT-1370 0620A-ZSE-1280 0620A-CVS-1030 0620A-CVS-1040 0620A-ZSE-1380 0620A-CTT-1570 Area F (1st Flr) 0620A-CTT-1000 0620A-CTT-1010 0620A-CTT-1050 0620A-CTT-1060

Activity Name

Orig Start Dur

Utility Ductbank Finish Earthwork

Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr) Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr) Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 3 of 25

10 15 347 347 261 208 4 2 4 2 8 5 1 3 7 3 2 5 2 5 7 7 12 12 15 5 5 0 5 241 4 4 3 3 10 5 1 3 7 7 2 5 2 5 7 7 15 15 15 5 5 5 261 4 2 4 3

12-13-13 02-21-14 07-25-13 A 07-25-13 A 07-25-13 A 08-15-13 A 08-15-13 A 08-21-13 A 09-02-13 A 09-09-13 A 09-09-13 A 09-30-13 A 10-04-13 A 10-04-13 A 10-11-13 10-21-13 10-25-13 10-29-13 11-06-13 11-06-13 11-14-13 11-14-13 11-26-13 11-26-13 01-17-14 02-26-14 02-26-14 06-04-14 08-01-13 A 08-01-13 A 08-08-13 A 08-22-13 A 08-27-13 A 09-09-13 A 09-23-13 A 09-27-13 A 09-27-13 A 10-22-13 10-25-13 11-06-13 11-08-13 11-18-13 11-18-13 12-23-13 12-23-13 01-17-14 01-17-14 03-07-14 04-03-14 04-03-14 07-07-14 07-25-13 A 07-25-13 A 07-29-13 A 08-13-13 A 08-19-13 A

Finish

01-20-14 03-19-14 12-01-14 12-01-14 07-30-14 06-10-14 09-03-13 A 08-30-13 A 09-06-13 A 09-10-13 A 09-13-13 A 10-04-13 A 10-04-13 A 10-08-13 A 10-22-13 10-23-13 10-28-13 11-05-13 11-07-13 11-13-13 11-25-13 11-25-13 12-13-13 12-13-13 02-25-14 03-06-14 03-06-14 05-09-14 06-10-14 07-14-14 08-08-13 A 08-15-13 A 08-26-13 A 08-30-13 A 09-09-13 A 09-27-13 A 09-27-13 A 10-01-13 A 10-31-13 11-05-13 11-07-13 11-15-13 11-19-13 11-25-13 01-16-14 01-16-14 02-25-14 02-25-14 04-02-14 04-10-14 04-10-14 07-14-14 07-30-14 08-05-13 A 08-06-13 A 08-16-13 A 08-21-13 A

Late Start

05-05-14 04-09-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-21-13 10-29-13 11-01-13 11-06-13 11-14-13 11-14-13 11-22-13 11-22-13 12-05-13 12-05-13 02-26-14 03-26-14 06-24-14 06-24-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-08-13 11-13-13 11-26-13 12-02-13 12-09-13 12-09-13 01-13-14 01-13-14 01-28-14 01-28-14 03-25-14 05-28-14 07-30-14 07-30-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13

Late Finish 05-20-14 05-05-15 03-17-15 03-17-15 09-12-14 07-02-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-30-13 10-31-13 11-05-13 11-13-13 11-15-13 11-21-13 12-04-13 12-04-13 01-10-14 01-10-14 03-25-14 04-02-14 07-02-14 06-17-14 07-02-14 08-07-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-19-13 11-22-13 11-27-13 12-06-13 12-10-13 12-13-13 01-27-14 01-27-14 03-06-14 03-06-14 04-17-14 06-05-14 08-07-14 08-07-14 09-12-14 10-21-13 10-21-13 10-21-13 10-21-13

Total Free Float Float 59 198 74 74 31 16

5 5 5 5 5 5 5 5 5 5 15 15 64 26 12 18

11 11 12 12 12 12 5 5 5 5 9 29 64 14 31

15 187 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 15 19 5 0

0 0 0 0 0 2 0 0 0 0 0 5 5 5 0

Calendar 2013 J Jul A S O N D 0620A - Prec 0620A - T/P

Remaining Work Critical Remaining Work

2014 F M A M J Jul A S O N D Utility Ductbank Finish Earthwork

J

2015 F M A M J Jul A S O N D

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec

Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr)

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr)

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

F

2016 M A M J


Activity ID

0620A-CTT-1090 0620A-MPH-1000 0620A-MPH-2370 0620A-MPH-1080 0620A-MPH-1090 0620A-GEO-1240 0620A-ZSE-1030 0620A-ZSE-1040 0620A-GEO-1060 0620A-GEO-1070 0620A-MPH-1020 0620A-TFC-3000 0620A-CTT-1300 0620A-ZSE-1160 0620A-CTT-1330 0620A-ZSE-1180 0620A-CVS-1010 0620A-ZSE-1310 0620A-CVS-1020 0620A-CTT-1470 Second Floor Area G (2nd Flr) 0620A-MPH-1480 0620A-ZSE-1480 0620A-TFC-3090 0620A-CTT-1490 0620A-ZSE-1530 0620A-CTT-1550 0620A-ZSE-1560 0620A-CVS-1140 0620A-CVS-1160 0620A-ZSE-1710 0620A-CTT-2110 0620A-ALL-1100 Area H (2nd Flr) 0620A-MPH-1460 0620A-ZSE-1390 0620A-TFC-3060 0620A-CTT-1420 0620A-ZSE-1450 0620A-CTT-1460 0620A-ZSE-1490 0620A-CVS-1110 0620A-CVS-1130 0620A-ZSE-1600 0620A-CTT-1950 Area I (2nd Flr) 0620A-MPH-1440 0620A-ZSE-1340 0620A-TFC-3040 0620A-CTT-1400 0620A-ZSE-1400 0620A-CTT-1410 0620A-ZSE-1420 0620A-CVS-1070 0620A-ZSE-1520 0620A-CVS-1090

Activity Name

Orig Start Dur

Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)

Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 4 of 25

7 4 2 1 3 1 7 5 2 5 2 5 5 5 15 15 10 3 5 5 176 176 2 5 5 7 7 10 10 15 5 5 5 0 140 2 8 5 8 8 10 10 15 5 5 5 138 2 5 5 5 5 10 10 10 3 5

08-26-13 A 10-14-13* 10-21-13* 10-22-13 10-22-13 10-23-13 10-31-13 11-06-13 11-14-13 11-18-13 11-26-13 11-26-13 02-26-14 02-26-14 03-07-14 03-07-14 04-03-14 04-22-14 04-22-14 07-23-14 02-26-14 02-26-14 02-26-14 02-26-14 03-07-14 04-03-14 04-03-14 04-15-14 04-15-14 05-06-14 06-04-14 06-04-14 08-29-14 04-03-14 04-03-14 04-03-14 04-17-14 05-06-14 05-06-14 05-20-14 05-20-14 06-09-14 07-07-14 07-07-14 10-14-14 04-22-14 04-22-14 04-22-14 05-02-14 06-09-14 06-09-14 06-18-14 06-18-14 07-07-14 07-23-14 07-23-14

Finish

08-29-13 A 10-18-13 10-22-13 10-22-13 10-25-13 10-23-13 11-11-13 11-13-13 11-15-13 11-25-13 11-27-13 12-04-13 03-06-14 03-06-14 04-02-14 04-02-14 04-18-14 04-25-14 04-29-14 07-30-14 11-04-14 11-04-14 02-27-14 03-06-14 03-17-14 04-14-14 04-14-14 05-05-14 05-05-14 06-02-14 06-10-14 06-10-14 09-08-14 11-04-14 10-21-14 04-04-14 04-15-14 04-25-14 05-19-14 05-19-14 06-06-14 06-06-14 07-03-14 07-14-14 07-14-14 10-21-14 11-04-14 04-23-14 04-29-14 05-09-14 06-17-14 06-17-14 07-03-14 07-03-14 07-22-14 07-28-14 07-30-14

Late Start

10-21-13 10-25-13 10-31-13 11-19-13 11-19-13 11-05-13 11-19-13 11-25-13 12-10-13 12-12-13 02-18-14 02-26-14 03-07-14 03-07-14 03-18-14 03-18-14 05-09-14 09-09-14 06-06-14 09-05-14 03-26-14 03-26-14 03-28-14 03-26-14 04-03-14 04-11-14 04-11-14 04-25-14 04-25-14 05-19-14 06-17-14 09-19-14 10-10-14 04-18-14 04-29-14 04-18-14 05-06-14 05-15-14 05-15-14 05-30-14 05-30-14 06-19-14 12-02-14 09-29-14 11-07-14 05-30-14 06-04-14 05-30-14 06-09-14 06-18-14 06-18-14 06-25-14 06-25-14 08-11-14 10-08-14 12-09-14

Late Finish 10-21-13 10-30-13 11-01-13 11-19-13 11-22-13 11-05-13 12-02-13 12-03-13 12-11-13 01-08-14 02-21-14 03-06-14 03-17-14 03-17-14 04-10-14 04-10-14 05-27-14 09-12-14 06-13-14 09-12-14 12-15-14 12-15-14 03-31-14 04-02-14 04-10-14 04-23-14 04-23-14 05-14-14 05-14-14 06-13-14 06-23-14 09-26-14 10-17-14 12-15-14 12-08-14 05-02-14 05-05-14 05-14-14 05-28-14 05-28-14 06-17-14 06-17-14 07-16-14 12-08-14 10-06-14 11-14-14 12-15-14 06-05-14 06-06-14 06-17-14 06-24-14 06-24-14 07-14-14 07-14-14 08-26-14 10-10-14 12-15-14

Total Free Float Float

7 7 17 17 7 11 11 15 15 30 15 5 5 5 5 19 77 24 25 28 28 17 15 15 5 5 5 5 7 7 61 23 28 33 14 9 9 5 5 5 5 6 85 48 15 28 22 20 20 5 5 5 5 20 43 80

0 0 0 6 2 0 0 0 0 0 9 0 0 0 0 0 19 5 17 0 0 2 0 10 0 0 0 0 0 0 9 16 0 0 5 0 4 0 0 0 0 0 5 5 3 0 2 0 0 0 0 0 0 0 7 55

Calendar

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

2013 2014 2015 J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)

Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)

J

F

2016 M A M J


Activity ID

0620A-CTT-1680 Third Floor Area G (3rd Flr) 0620A-MPH-1570 0620A-ZSE-1720 0620A-TFC-3130 0620A-CTT-1820 0620A-ZSE-1810 0620A-CTT-1880 0620A-ZSE-1870 0620A-CVS-1190 0620A-ZSE-2040 0620A-CTT-2130 0620A-CTT-2150 0620A-CTT-2180 0620A-ALL-1160 Area H (3rd Flr) 0620A-MPH-1520 0620A-ZSE-1610 0620A-TFC-3120 0620A-CTT-1640 0620A-ZSE-1690 0620A-CTT-1770 0620A-ZSE-1780 0620A-CVS-1180 0620A-ZSE-1940 0620A-CTT-1970 0620A-CTT-2000 0620A-CTT-2010 Area I (3rd Flr) 0620A-MPH-1490 0620A-ZSE-1500 0620A-TFC-3100 0620A-CTT-1560 0620A-ZSE-1590 0620A-CTT-1600 0620A-ZSE-1650 0620A-CVS-1150 0620A-ZSE-1740 0620A-CTT-1700 0620A-CTT-1710 0620A-CTT-1750 One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1180 0620A-CTT-1230 0620A-ZSE-1020 0620A-CVS-1000 0620A-CTT-1310 0620A-CTT-1320 0620A-CTT-1340 0620A-ZSE-1110 0620A-GEO-1130 0620A-GEO-1150 0620A-TFC-3050 0620A-ALL-1080

Activity Name

Orig Start Dur

Temp Enclosure (as needed) - Area I (2nd Flr)

Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)

Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 5 of 25

5 126 114 2 5 5 7 7 10 10 15 5 5 5 5 0 98 2 8 5 15 15 10 10 15 5 5 5 5 92 2 5 5 5 5 8 8 10 3 5 5 5 311 145 145 2 15 15 8 5 5 5 3 3 7 5 0

10-28-14 06-04-14 06-04-14 06-04-14 06-04-14 06-12-14 07-07-14 07-07-14 07-18-14 07-18-14 08-05-14 08-29-14 08-29-14 09-05-14 11-05-14 07-07-14 07-07-14 07-07-14 07-21-14 08-05-14 08-05-14 08-29-14 08-29-14 09-18-14 10-14-14 10-14-14 10-20-14 11-13-14 07-23-14 07-23-14 07-23-14 07-31-14 09-18-14 09-18-14 09-26-14 09-26-14 10-10-14 10-28-14 10-28-14 10-31-14 11-21-14 08-01-13 A 09-13-13 A 09-13-13 A 09-13-13 A 09-25-13 A 09-25-13 A 10-22-13 11-05-13 11-05-13 11-08-13 01-03-14 01-10-14 01-29-14 03-05-14*

Finish

11-04-14 12-01-14 11-12-14 06-05-14 06-10-14 06-19-14 07-17-14 07-17-14 08-04-14 08-04-14 08-28-14 09-08-14 09-08-14 09-12-14 11-12-14 11-07-14 11-20-14 07-08-14 07-18-14 07-28-14 08-28-14 08-28-14 09-17-14 09-17-14 10-13-14 10-21-14 10-21-14 10-27-14 11-20-14 12-01-14 07-25-14 07-30-14 08-08-14 09-25-14 09-25-14 10-09-14 10-09-14 10-27-14 10-30-14 11-04-14 11-07-14 12-01-14 11-13-14 03-20-14 03-20-14 09-18-13 A 10-21-13 10-21-13 11-01-13 11-11-13 11-11-13 11-15-13 01-09-14 01-16-14 02-21-14 03-11-14 03-11-14

Late Start

12-09-14 06-17-14 06-17-14 06-19-14 06-17-14 06-24-14 07-16-14 07-16-14 07-28-14 07-28-14 09-09-14 10-13-14 10-06-14 10-10-14 12-17-14 07-17-14 07-25-14 07-17-14 07-30-14 08-14-14 08-14-14 09-09-14 09-09-14 09-29-14 10-27-14 11-04-14 11-07-14 01-28-15 08-27-14 08-29-14 08-27-14 09-05-14 09-26-14 09-26-14 10-14-14 10-14-14 10-28-14 11-13-14 12-04-14 12-09-14 03-06-15 10-23-13 11-18-13 11-18-13 11-18-13 11-25-13 11-25-13 03-10-14 04-04-14 03-31-14 04-04-14 03-24-14 03-27-14 04-02-14 04-14-14

Late Finish 12-15-14 03-17-15 01-12-15 06-20-14 06-23-14 07-02-14 07-25-14 07-25-14 08-12-14 08-12-14 10-03-14 10-20-14 10-13-14 10-17-14 01-12-15 12-19-14 02-10-15 07-28-14 07-29-14 08-07-14 09-08-14 09-08-14 09-25-14 09-25-14 10-23-14 10-31-14 11-10-14 11-14-14 02-10-15 03-17-15 09-03-14 09-04-14 09-12-14 10-03-14 10-03-14 10-27-14 10-27-14 11-12-14 11-17-14 12-10-14 12-15-14 03-17-15 02-17-15 12-12-14 12-12-14 11-18-13 12-04-13 12-04-13 03-24-14 04-11-14 04-07-14 04-11-14 03-26-14 03-31-14 04-11-14 04-22-14 12-12-14

Total Free Float Float 25 74 40 9 7 7 5 5 5 5 20 24 20 20 26 29 55 11 6 6 5 5 5 5 6 7 12 12 32 74 22 20 20 5 5 10 10 10 10 22 22 43 65 186 186

0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0 35 0 0 0

26 26 61 68 46 46 34 34 28 23 193

0 0 0 45 0 23 0 6 5 0 167

Calendar 2013 J Jul A S O N D 0620A - Prec

0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec

0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Temp Enclosure (as needed) - Area I (2nd Flr)

J

F

2016 M A M J

Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)

Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)


Activity ID

0620A-ZSE-1430 Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1120 0620A-CTT-1160 0620A-CTT-1170 0620A-MPH-1060 0620A-MPH-1240 0620A-MPH-1260 0620A-CTT-1350 0620A-ZSE-1200 0620A-ZSE-1070 0620A-ZSE-1140 0620A-GEO-1120 0620A-GEO-1140 0620A-MPH-1170 0620A-TFC-3030 0620A-CVS-1060 0620A-CTT-1440 0620A-CTT-1450 0620A-TFC-3110 0620A-CTT-1500 0620A-ZSE-1540 Area B (Low Roof) 0620A-CTT-1200 0620A-CTT-1220 0620A-CTT-1260 0620A-MPH-1190 0620A-MPH-1280 0620A-MPH-1290 0620A-ZSE-1150 0620A-ZSE-1230 0620A-GEO-1160 0620A-GEO-1180 0620A-MPH-1220 0620A-TFC-3070 0620A-CTT-1430 0620A-ZSE-1460 0620A-CVS-1100 0620A-CTT-1510 0620A-CTT-1530 0620A-CTT-1660 0620A-ZSE-1630 Area C (Low Roof) 0620A-CTT-1190 0620A-CTT-1240 0620A-MPH-1270 0620A-CTT-1280 0620A-MPH-1350 0620A-MPH-1360 0620A-ZSE-1220 0620A-ZSE-1270 0620A-GEO-1170 0620A-GEO-1190 0620A-MPH-1310 0620A-TFC-3080 0620A-CTT-1480

Activity Name

Orig Start Dur

Temp Power - Area B (Gym)

Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 6 of 25

5 227 185 6 5 5 7 1 3 30 30 5 5 3 7 2 5 20 10 10 5 5 10 190 4 4 5 3 1 2 5 10 3 7 2 5 10 10 8 5 5 5 10 214 3 3 10 5 1 3 5 5 3 7 2 5 20

03-14-14 09-04-13 A 09-04-13 A 09-04-13 A 09-10-13 A 09-12-13 A 10-29-13 11-07-13 11-07-13 11-22-13 11-22-13 12-02-13 12-10-13 01-03-14 01-16-14 01-29-14 02-21-14 03-05-14 03-31-14 04-04-14 04-23-14 04-23-14 05-05-14 09-19-13 A 09-19-13 A 09-23-13 A 10-21-13 10-23-13 10-28-13 10-28-13 11-21-13 11-22-13 12-10-13 12-13-13 01-16-14 03-10-14 03-24-14 03-24-14 04-09-14 04-23-14 05-05-14 05-06-14 05-22-14 09-18-13 A 09-18-13 A 09-30-13 A 10-07-13 A 10-11-13 10-22-13 10-22-13 11-13-13 11-14-13 11-22-13 11-27-13 12-10-13 03-17-14 04-09-14

Finish

03-20-14 07-21-14 05-20-14 09-13-13 A 09-20-13 A 11-01-13 11-07-13 11-07-13 11-11-13 03-20-14 03-20-14 12-06-13 12-23-13 01-09-14 01-28-14 02-06-14 02-27-14 04-07-14 04-15-14 04-22-14 05-02-14 05-02-14 05-20-14 06-09-14 09-20-13 A 09-27-13 A 10-28-13 10-28-13 10-28-13 10-29-13 11-27-13 12-09-13 12-12-13 01-13-14 01-17-14 03-18-14 04-07-14 04-07-14 04-22-14 05-02-14 05-12-14 05-14-14 06-09-14 07-21-14 09-27-13 A 10-04-13 A 10-21-13 10-18-13 10-22-13 10-25-13 11-19-13 11-21-13 11-26-13 12-09-13 12-11-13 03-24-14 05-15-14

Late Start

05-08-14 11-18-13 11-18-13 11-18-13 11-18-13 01-20-14 02-18-14 09-26-14 09-26-14 12-05-13 12-05-13 01-20-14 01-21-14 02-06-14 02-13-14 02-28-14 03-06-14 03-18-14 04-11-14 04-17-14 05-08-14 06-10-14 05-16-14 11-18-13 11-18-13 11-18-13 12-03-13 12-05-13 12-09-13 12-09-13 12-10-13 12-11-13 01-17-14 01-24-14 02-26-14 04-18-14 04-29-14 05-12-14 06-23-14 07-08-14 08-08-14 07-14-14 07-10-14 11-18-13 11-18-13 11-18-13 11-18-13 11-18-13 11-27-13 11-27-13 12-03-13 12-04-13 12-23-13 01-09-14 02-24-14 05-08-14 05-19-14

Late Finish 05-15-14 10-03-14 09-30-14 11-18-13 11-18-13 01-27-14 02-28-14 09-26-14 09-30-14 04-02-14 04-02-14 01-28-14 01-29-14 02-10-14 02-27-14 03-05-14 03-14-14 04-18-14 04-29-14 05-06-14 05-15-14 06-18-14 06-04-14 08-15-14 11-18-13 11-18-13 12-09-13 12-09-13 12-09-13 12-10-13 12-23-13 01-16-14 01-21-14 02-10-14 02-27-14 04-28-14 05-16-14 05-28-14 07-07-14 07-16-14 08-15-14 07-21-14 07-25-14 10-03-14 11-18-13 11-18-13 11-26-13 11-25-13 11-27-13 12-03-13 12-09-13 12-10-13 01-08-14 01-21-14 02-25-14 05-15-14 06-23-14

Total Free Float Float 30 53 92

37 47 162 162 7 7 18 13 13 11 11 7 7 7 7 7 25 7 48

25 25 25 25 11 11 11 11 16 23 21 27 40 40 53 37 26 53

22 22 22 22 11 11 14 14 24 29 21

0 0 0

0 0 0 2 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0

0 0 0 5 0 0 0 0 5 0 0 0 0 3 10 0 0 0

0 0 0 0 0 0 0 0 8 9 0

Calendar 2013 J Jul A S O N D 0620A - Prec

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D Temp Power - Area B (Gym)

J

2015 F M A M J Jul A S O N D

Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)

J

F

2016 M A M J


Activity ID

Activity Name

Orig Start Dur

0620A-ZSE-1510 Elec at Brng Masonry - Area C (Low Roof) 0620A-CTT-1520 Set Precast at Mech Rm - Area C (Low Roof) 0620A-CVS-1120 Roof Structural Steel/ Metal Deck - Area C (Low Roof) 0620A-CTT-1610 Temp Enclosure (as needed) - Area C (Low Roof) 0620A-CTT-1620 Roof Blocking - Area C (Low Roof) 0620A-ZSE-1680 Temp Power - Area C (Low Roof) 0620A-CTT-1790 Roofing Dry-in - Area C (Low Roof) 0620A-ALL-1110 Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Sto Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-1210 Foundations - Area C (Aux Gym) 0620A-CTT-1580 Bearing Masonry - Area C (Aux Gym) 0620A-ZSE-1620 Elec at Brng Masonry - Area C (Aux Gym) 0620A-ZSE-1700 Underground Conduit - Area C (Aux Gym) 0620A-CVS-1170 Roof Structural Steel/ Metal Deck - Area C (Aux Gym) 0620A-GEO-1200 Prep for Venting - Area C (Aux Gym) 0620A-CTT-1720 Temp Enclosure (as needed) - Area C (Aux Gym) 0620A-CTT-1730 Roof Blocking - Area C (Aux Gym) 0620A-GEO-1210 Geo-Seal/ Vapor Vent - Area C (Aux Gym) 0620A-CTT-1860 Roofing Dry-in - Area C (Aux Gym) 0620A-TFC-3140 Prep/ Pour SOG - Area C (Aux Gym) 0620A-ALL-1130 Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) 0620A-ZSE-1890 Temp Power - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-1250 Foundations - Area D/E/F (Low Roof) 0620A-CTT-1270 Masonry to Grade - Area D/E/F (Low Roof) 0620A-MPH-2340 Underground Plumbing - Area D/E/F (Low Roof) 0620A-MPH-2350 Underground Testing/ Inspection - Area D/E/F (Low Roof) 0620A-MPH-2360 Backfill Underground Plumbing - Area D/E/F (Low Roof) 0620A-CTT-1290 Backfill Foundations - Area D/E/F (Low Roof) 0620A-MPH-1320 Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1390 Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1400 Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-ZSE-1260 Underground Conduit (Seq 1) - Area D/E/F (Low Roof) 0620A-CTT-1670 Bearing Masonry - Area D/E/F (Low Roof) 0620A-ZSE-1730 Elec at Brng Masonry - Area D/E/F (Low Roof) 0620A-CVS-1200 Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) 0620A-ZSE-1320 Underground Conduit (Seq 2) - Area D/E/F (Low Roof) 0620A-GEO-1220 Prep for Venting - Area D/E/F (Low Roof) 0620A-CTT-2210 Temp Enclosure (as needed) - Area D/E/F (Low Roof) 0620A-CTT-2230 Roof Blocking - Area D/E/F (Low Roof) 0620A-GEO-1230 Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) 0620A-CTT-2260 Roofing Dry-in - Area D/E/F (Low Roof) 0620A-MPH-1370 FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) 0620A-TFC-3150 Prep/ Pour SOG - Area D/E/F (Low Roof) 0620A-ALL-1180 Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low R 0620A-ZSE-2140 Temp Power - Area D/E/F (Low Roof) Building Shell Academic Area First Floor Area D (1st Flr) 0620A-CTT-2100 Masonry Veneer - Area D (1st Flr) 0620A-GSC-1420 Curtain Wall/ Windows - Area D (1st Flr) 0620A-GSC-1540 Entrances - Area D (1st Flr) 0620A-CTT-2350 Misc Shell Finishes - Area D (1st Flr) Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 7 of 25

20 5 10 5 5 5 5 0 232 232 2 20 20 2 8 3 5 5 7 5 5 0 5 278 278 4 4 5 1 3 5 5 1 3 5 15 15 15 6 3 5 10 7 10 2 5 0 6 188 141 136 123 5 34 19 5 110

04-09-14 04-28-14 05-14-14 06-02-14 06-02-14 06-10-14 07-14-14 09-19-13 A 09-19-13 A 09-19-13 A 05-16-14 05-16-14 06-23-14 06-23-14 07-08-14 07-08-14 07-08-14 07-14-14 07-28-14 08-05-14 08-14-14 08-01-13 A 08-01-13 A 08-01-13 A 08-13-13 A 10-07-13 A 10-11-13 10-11-13 11-01-13 11-08-13 11-15-13 11-15-13 12-09-13 08-19-14 08-19-14 09-15-14 09-26-14 10-08-14 10-10-14 10-10-14 10-13-14 10-16-14 10-24-14 10-28-14 11-05-14 07-22-14 09-26-14 09-26-14 09-26-14 09-26-14 11-17-14 02-24-15 03-13-15 10-23-14

Finish

05-15-14 05-06-14 05-30-14 06-09-14 06-09-14 06-18-14 07-21-14 07-21-14 08-20-14 08-20-14 09-27-13 A 06-20-14 06-20-14 06-24-14 07-07-14 07-11-14 07-16-14 07-16-14 07-23-14 08-04-14 08-12-14 08-12-14 08-20-14 11-13-14 11-13-14 09-03-13 A 09-10-13 A 10-11-13 10-11-13 10-16-13 11-11-13 11-15-13 11-15-13 11-19-13 12-13-13 09-12-14 09-12-14 10-09-14 10-06-14 10-10-14 10-17-14 10-27-14 10-23-14 10-30-14 10-27-14 11-04-14 11-04-14 11-13-14 04-16-15 04-16-15 04-09-15 03-20-15 10-03-14 01-06-15 03-20-15 03-19-15 03-30-15

Late Start

05-30-14 06-06-14 07-29-14 09-08-14 08-15-14 09-08-14 08-28-14 07-07-14 07-07-14 07-07-14 07-07-14 07-07-14 09-11-14 08-11-14 09-15-14 09-23-14 08-25-14 09-19-14 09-23-14 10-01-14 11-04-14 10-23-13 10-23-13 11-18-13 09-17-14 10-23-13 11-14-13 11-14-13 09-22-14 09-25-14 10-01-14 10-01-14 10-06-14 09-17-14 09-17-14 10-13-14 10-08-14 10-17-14 12-10-14 11-26-14 10-23-14 12-03-14 11-04-14 11-06-14 11-14-14 09-08-14 10-06-14 10-06-14 10-06-14 10-06-14 12-05-14 03-13-15 03-31-15 10-30-14

Late Finish 07-03-14 06-13-14 08-14-14 09-15-14 08-22-14 09-15-14 09-05-14 10-03-14 11-10-14 11-10-14 07-07-14 08-08-14 08-08-14 09-12-14 08-22-14 09-18-14 09-30-14 08-29-14 09-30-14 09-30-14 10-09-14 10-09-14 11-10-14 02-17-15 02-17-15 11-18-13 09-17-14 10-23-13 11-14-13 11-18-13 09-29-14 10-01-14 10-01-14 10-06-14 10-13-14 10-10-14 10-10-14 11-05-14 10-16-14 10-21-14 12-16-14 12-11-14 10-31-14 12-16-14 11-05-14 11-13-14 02-17-15 11-24-14 05-06-15 05-06-15 05-06-15 04-09-15 10-13-14 01-23-15 04-09-15 04-08-15 04-17-15

Total Free Float Float 27 21 42 55 42 50 27 53 57 57

0 0 0 15 15 0 0 0 0 0

27 27 45 27 39 44 27 39 33 33 41 47 65 65

0 0 6 0 0 11 0 6 0 0 0 19 0 0

7 20 20 161 160 160 160 149 16 16 16 6 6 36 28 6 28 6 6 72 6 14 14 19 13 5 13 13 11 13

0 0 3 1 0 0 154 143 0 0 0 0 0 10 0 0 2 0 0 6 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days

0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P Work Days 0620A - Prec

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days 0620A - Prec

0620A - T/P Work Days Work Days 0620A - Prec

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Elec at Brng Masonry - Area C (Low Roof) Set Precast at Mech Rm - Area C (Low Roof) Roof Structural Steel/ Metal Deck - Area C (Low Roof) Temp Enclosure (as needed) - Area C (Low Roof) Roof Blocking - Area C (Low Roof) Temp Power - Area C (Low Roof) Roofing Dry-in - Area C (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Story)

2016 M A M J

Foundations - Area C (Aux Gym) Bearing Masonry - Area C (Aux Gym) Elec at Brng Masonry - Area C (Aux Gym) Underground Conduit - Area C (Aux Gym) Roof Structural Steel/ Metal Deck - Area C (Aux Gym) Prep for Venting - Area C (Aux Gym) Temp Enclosure (as needed) - Area C (Aux Gym) Roof Blocking - Area C (Aux Gym) Geo-Seal/ Vapor Vent - Area C (Aux Gym) Roofing Dry-in - Area C (Aux Gym) Prep/ Pour SOG - Area C (Aux Gym) Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) Temp Power - Area C (Aux Gym)

Foundations - Area D/E/F (Low Roof) Masonry to Grade - Area D/E/F (Low Roof) Underground Plumbing - Area D/E/F (Low Roof) Underground Testing/ Inspection - Area D/E/F (Low Roof) Backfill Underground Plumbing - Area D/E/F (Low Roof) Backfill Foundations - Area D/E/F (Low Roof) Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Conduit (Seq 1) - Area D/E/F (Low Roof) Bearing Masonry - Area D/E/F (Low Roof) Elec at Brng Masonry - Area D/E/F (Low Roof) Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) Underground Conduit (Seq 2) - Area D/E/F (Low Roof) Prep for Venting - Area D/E/F (Low Roof) Temp Enclosure (as needed) - Area D/E/F (Low Roof) Roof Blocking - Area D/E/F (Low Roof) Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) Roofing Dry-in - Area D/E/F (Low Roof) FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) Prep/ Pour SOG - Area D/E/F (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low Roof) Temp Power - Area D/E/F (Low Roof)

Masonry Veneer - Area D (1st Flr) Curtain Wall/ Windows - Area D (1st Flr) Entrances - Area D (1st Flr) Misc Shell Finishes - Area D (1st Flr)


Activity ID

Activity Name

0620A-CTT-1960 Masonry Veneer - Area E (1st Flr) 0620A-GSC-1300 Curtain Wall/ Windows - Area E (1st Flr) 0620A-GSC-1340 Entrances - Area E (1st Flr) 0620A-CTT-2290 Misc Shell Finishes - Area E (1st Flr) Area F (1st Flr) 0620A-CTT-1690 Masonry Veneer - Area F (1st Flr) 0620A-GSC-1060 Curtain Wall/ Windows - Area F (1st Flr) 0620A-GSC-3220 Entrances - Area F (1st Flr) 0620A-CTT-2240 Misc Shell Finishes - Area F (1st Flr) Second Floor Area G (2nd Flr) 0620A-CTT-2190 Masonry Veneer - Area G (2nd Flr) 0620A-GSC-1440 Curtain Wall/ Windows - Area G (2nd Flr) 0620A-CTT-2360 Misc Shell Finishes - Area G (2nd Flr) Area H (2nd Flr) 0620A-CTT-2020 Masonry Veneer - Area H (2nd Flr) 0620A-GSC-1320 Curtain Wall/ Windows - Area H (2nd Flr) 0620A-CTT-2320 Misc Shell Finishes - Area H (2nd Flr) Area I (2nd Flr) 0620A-CTT-1760 Masonry Veneer - Area I (2nd Flr) 0620A-GSC-1070 Curtain Wall/ Windows - Area I (2nd Flr) 0620A-CTT-2270 Misc Shell Finishes - Area I (2nd Flr) Third Floor Area G (3rd Flr) 0620A-CTT-2250 Masonry Veneer - Area G (3rd Flr) 0620A-CTT-2300 Roofing Finishes - Area G (3rd Flr) 0620A-GSC-1470 Curtain Wall/ Windows - Area G (3rd Flr) 0620A-ALL-1190 Full Building Enclosure - Academic Area 0620A-CTT-2370 Misc Shell Finishes - Area G (3rd Flr) Area H (3rd Flr) 0620A-CTT-2060 Masonry Veneer - Area H (3rd Flr) 0620A-GSC-1330 Curtain Wall/ Windows - Area H (3rd Flr) 0620A-CTT-2120 Roofing Finishes - Area H (3rd Flr) 0620A-CTT-2330 Misc Shell Finishes - Area H (3rd Flr) Area I (3rd Flr) 0620A-CTT-1800 Masonry Veneer - Area I (3rd Flr) 0620A-CTT-1870 Roofing Finishes - Area I (3rd Flr) 0620A-GSC-1090 Curtain Wall/ Windows - Area I (3rd Flr) 0620A-CTT-2280 Misc Shell Finishes - Area I (3rd Flr) One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1810 Metal Wall Panels - Area B (Gym) 0620A-CTT-1890 Roofing Finishes - Area B (Gym) 0620A-GSC-1110 Curtain Wall/ Windows - Area B (Gym) 0620A-CTT-1910 Misc Shell Finishes - Area B (Gym) Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1840 Masonry Veneer - Area A (Low Roof) 0620A-GSC-1140 Curtain Wall/ Windows - Area A (Low Roof) 0620A-CTT-1940 Roofing Finishes - Area A (Low Roof) 0620A-CTT-1990 Misc Shell Finishes - Area A (Low Roof) 0620A-GSC-1180 Entrances - Area A (Low Roof) Area B (Low Roof) 0620A-CTT-1900 Masonry Veneer - Area B (Low Roof) 0620A-GSC-1190 Curtain Wall/ Windows - Area B (Low Roof) 0620A-CTT-2040 Misc Shell Finishes - Area B (Low Roof) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 8 of 25

Orig Start Dur 5 14 6 5 100 5 14 2 5 132 119 5 34 5 107 5 14 5 96 5 14 5 129 115 5 5 34 0 5 104 5 14 5 5 93 5 5 14 5 168 54 54 10 5 4 5 41 33 10 5 10 5 5 22 5 2 5

10-23-14 11-17-14 03-23-15 03-24-15 11-17-14 11-17-14 12-29-14 03-31-15 04-01-15 10-06-14 10-06-14 10-06-14 12-11-14 03-17-15 10-30-14 10-30-14 11-26-14 03-26-15 11-25-14 11-25-14 01-08-15 04-07-15 10-14-14 10-14-14 10-14-14 12-04-14 01-07-15 03-19-15 11-07-14 11-07-14 12-08-14 12-11-14 03-30-15 12-04-14 12-04-14 01-02-15 01-16-15 04-09-15 07-22-14 07-22-14 07-22-14 07-22-14 08-08-14 09-25-14 09-29-14 09-15-14 09-15-14 09-15-14 10-01-14 10-01-14 10-08-14 10-23-14 10-01-14 10-01-14 10-10-14 10-16-14

Finish

10-29-14 12-05-14 03-30-15 03-30-15 04-09-15 11-24-14 01-16-15 04-01-15 04-09-15 04-13-15 03-24-15 10-13-14 01-29-15 03-24-15 04-01-15 11-06-14 12-16-14 04-01-15 04-13-15 12-03-14 01-27-15 04-13-15 04-16-15 03-26-15 10-21-14 12-10-14 02-23-15 02-23-15 03-26-15 04-07-15 11-14-14 12-26-14 12-17-14 04-07-15 04-16-15 12-10-14 01-15-15 02-04-15 04-16-15 03-18-15 10-06-14 10-06-14 08-07-14 08-15-14 09-30-14* 10-06-14 11-10-14 10-29-14 09-30-14 10-07-14 10-17-14 10-14-14 10-29-14 10-30-14 10-09-14 10-13-14 10-23-14

Late Start

10-30-14 12-01-14 04-10-15 04-10-15 11-25-14 11-25-14 01-12-15 05-05-15 04-21-15 10-14-14 10-14-14 10-14-14 12-31-14 04-02-15 11-07-14 11-07-14 12-10-14 04-15-15 12-04-14 12-04-14 01-21-15 04-24-15 10-23-14 10-23-14 10-23-14 03-30-15 01-26-15 04-08-15 11-17-14 11-17-14 12-19-14 04-20-15 04-17-15 12-11-14 12-11-14 04-28-15 01-29-15 04-28-15 09-08-14 09-08-14 09-08-14 09-08-14 02-25-15 09-25-14 03-17-15 10-23-14 10-23-14 10-23-14 11-11-14 03-05-15 03-25-15 12-01-14 11-07-14 11-07-14 11-21-14 04-01-15

Late Finish 11-06-14 12-18-14 04-17-15 04-17-15 05-06-15 12-03-14 01-29-15 05-06-15 04-28-15 05-01-15 04-10-15 10-21-14 02-17-15 04-10-15 04-21-15 11-14-14 12-30-14 04-21-15 05-01-15 12-10-14 02-09-15 05-01-15 05-06-15 04-15-15 10-29-14 04-07-15 03-12-15 04-13-15 04-15-15 04-27-15 11-24-14 01-09-15 04-27-15 04-24-15 05-06-15 12-17-14 05-06-15 02-17-15 05-06-15 05-06-15 03-24-15 03-24-15 09-23-14 03-04-15 09-30-14 03-24-15 04-17-15 03-31-15 11-06-14 11-17-14 03-24-15 03-31-15 12-05-14 04-09-15 11-14-14 11-24-14 04-09-15

Total Free Float Float 5 9 13 11 19 5 9 24 11 14 12 5 13 11 13 5 9 11 14 5 9 11 14 13 5 48 13 34 11 14 5 9 55 11 14 5 55 9 11 34 118 118 27 98 0 79 110 106 22 29 72 79 26 111 22 30 79

0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 44 0 0 0 0 0 0 26 0 0 0 0 0 0 0 0 0 0 0 2 6

Calendar 2013 J Jul A S O N D 0620A - T/P Work Days Work Days 0620A - Prec 0620A - T/P Work Days Work Days 0620A - Prec

Remaining Work Critical Remaining Work

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Masonry Veneer - Area E (1st Flr) Curtain Wall/ Windows - Area E (1st Flr) Entrances - Area E (1st Flr) Misc Shell Finishes - Area E (1st Flr) Masonry Veneer - Area F (1st Flr) Curtain Wall/ Windows - Area F (1st Flr) Entrances - Area F (1st Flr) Misc Shell Finishes - Area F (1st Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area G (2nd Flr) Curtain Wall/ Windows - Area G (2nd Flr) Misc Shell Finishes - Area G (2nd Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area H (2nd Flr) Curtain Wall/ Windows - Area H (2nd Flr) Misc Shell Finishes - Area H (2nd Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area I (2nd Flr) Curtain Wall/ Windows - Area I (2nd Flr) Misc Shell Finishes - Area I (2nd Flr)

0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec

Masonry Veneer - Area G (3rd Flr) Roofing Finishes - Area G (3rd Flr) Curtain Wall/ Windows - Area G (3rd Flr) Full Building Enclosure - Academic Area Misc Shell Finishes - Area G (3rd Flr)

0620A - T/P Work Days 0620A - Prec 0620A - Prec

Masonry Veneer - Area H (3rd Flr) Curtain Wall/ Windows - Area H (3rd Flr) Roofing Finishes - Area H (3rd Flr) Misc Shell Finishes - Area H (3rd Flr)

0620A - T/P 0620A - Prec Work Days 0620A - Prec

Masonry Veneer - Area I (3rd Flr) Roofing Finishes - Area I (3rd Flr) Curtain Wall/ Windows - Area I (3rd Flr) Misc Shell Finishes - Area I (3rd Flr)

0620A - T/P 0620A - Prec Work Days 0620A - Prec

0620A - T/P Work Days 0620A - Prec 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

Metal Wall Panels - Area B (Gym) Roofing Finishes - Area B (Gym) Curtain Wall/ Windows - Area B (Gym) Misc Shell Finishes - Area B (Gym)

Masonry Veneer - Area A (Low Roof) Curtain Wall/ Windows - Area A (Low Roof) Roofing Finishes - Area A (Low Roof) Misc Shell Finishes - Area A (Low Roof) Entrances - Area A (Low Roof) Masonry Veneer - Area B (Low Roof) Curtain Wall/ Windows - Area B (Low Roof) Misc Shell Finishes - Area B (Low Roof)

2016 M A M J


Activity ID

Activity Name

Orig Start Dur

0620A-CTT-2050 Roofing Finishes - Area B (Low Roof) 0620A-GSC-1210 Entrances - Area B (Low Roof) Area C (Low Roof) 0620A-CTT-1980 Masonry Veneer - Area C (Low Roof) 0620A-GSC-1220 Curtain Wall/ Windows - Area C (Low Roof) 0620A-CTT-2090 Roofing Finishes - Area C (Low Roof) 0620A-GSC-1240 Entrances - Area C (Low Roof) 0620A-CTT-2080 Misc Shell Finishes - Area C (Low Roof) 0620A-ALL-1150 Full Building Enclosure - Areas A/B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-2030 Masonry Veneer - Area C (Aux Gym) 0620A-ALL-1140 Full Building Enclosure - Area C (Aux Gym) 0620A-GSC-1270 Entrances - Area C (Aux Gym) 0620A-CTT-2170 Roofing Finishes - Area C (Aux Gym) 0620A-CTT-2140 Misc Shell Finishes - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2220 Masonry Veneer - Area D/E/F (Low Roof) 0620A-CTT-2340 Roofing Finishes - Area D/E/F (Low Roof) 0620A-GSC-1530 Curtain Wall/ Windows - Area D/E/F (Low Roof) 0620A-ALL-1200 Full Building Enclosure - Area D/E/F (Low Roof) 0620A-CTT-2380 Misc Shell Finishes - Area D/E/F (Low Roof) 0620A-GSC-1640 Entrances - Area D/E/F (Low Roof) Interior Rough-in Academic Area First Floor Area D (1st Flr) 0620A-CTT-1920 Non-Bearing Masonry Rough-in - Area D (1st Flr) 0620A-ZSE-1920 Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) 0620A-MPH-1630 Plumbing Chase Rough-in - Area D (1st Flr) 0620A-RMM-1280 HVAC Ductwork Rough-in - Area D (1st Flr) 0620A-RMM-1300 HVAC Piping Rough-in - Area D (1st Flr) 0620A-MPH-1690 Plumbing Rough-in - Area D (1st Flr) 0620A-ZSE-1950 Switchgear - Area D (1st Flr) 0620A-ZSE-1990 Conduit - Overhead - Area D (1st Flr) 0620A-RMM-1350 HVAC Controls Rough-in - Area D (1st Flr) 0620A-SAC-1130 Fire Protection Rough-in - Area D (1st Flr) 0620A-ZSE-2110 Pull Electrical Wires - Area D (1st Flr) 0620A-RMM-1380 HVAC Insulation - Area D (1st Flr) 0620A-SAC-1140 Fire Protection Above Ceiling Finalization - Area D (1st Flr) 0620A-ZSE-2240 Cable Tray - Area D (1st Flr) 0620A-ZSE-2250 Electrical Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1280 Metal Studs - Area D (1st Flr) 0620A-RMM-1500 HVAC System Testing - Area D (1st Flr) 0620A-RMM-1510 HVAC Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1350 Block Filler - Area D (1st Flr) 0620A-MPH-1900 Plumbing Insulation - Area D (1st Flr) 0620A-GSC-1480 Gypsum Board - Area D (1st Flr) 0620A-MPH-1910 Plumbing Above Ceiling Finalization - Area D (1st Flr) 0620A-ZST-1210 Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) 0620A-ZST-1270 Tech Cabling Rough-in (In-Class) - Area D (1st Flr) 0620A-ZST-1280 Tech Above Ceiling Finalization - Area D (1st Flr) 0620A-ALL-1210 Interior Rough-in Substantially Complete - 1st Flr Area E (1st Flr) 0620A-RMM-1230 Set Large Mech Equipment - Area E (1st Flr) 0620A-MPH-1560 Plumbing Chase Rough-in - Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 9 of 25

5 1 22 5 3 5 2 5 0 22 22 5 0 2 5 5 99 99 10 10 10 0 5 20 306 306 226 112 15 15 5 25 25 15 1 10 10 12 14 20 5 5 5 5 5 5 5 8 15 5 10 7 5 0 226 1 5

10-20-14 10-30-14 10-10-14 10-10-14 10-20-14 10-28-14 10-31-14 11-04-14 10-20-14 10-20-14 10-20-14 11-04-14 11-05-14 11-12-14 10-28-14 10-28-14 10-28-14 11-13-14 02-05-15 02-19-15 02-19-15 02-25-14 02-25-14 02-25-14 06-13-14 06-13-14 06-13-14 06-20-14 06-20-14 06-27-14 07-07-14 07-10-14 07-14-14 07-28-14 07-28-14 07-28-14 08-04-14 08-06-14 08-15-14 08-15-14 08-19-14 09-02-14 09-02-14 09-15-14 09-15-14 09-15-14 09-18-14 09-29-14 10-13-14 10-15-14 02-25-14 02-25-14 07-29-14

Finish

10-27-14 10-30-14 11-10-14 10-17-14 10-22-14 11-04-14 11-03-14 11-10-14 11-05-14 11-18-14 11-18-14 10-27-14 10-27-14 11-05-14 11-12-14 11-18-14 03-18-15 03-18-15 11-12-14 12-01-14 02-18-15 02-18-15 02-25-15 03-18-15 05-08-15 05-08-15 01-15-15 11-19-14 07-03-14 07-03-14 06-26-14 07-25-14 08-01-14 07-25-14 07-10-14 07-25-14 08-08-14 08-12-14 08-14-14 08-29-14 08-12-14 08-21-14 08-21-14 08-25-14 09-08-14 09-08-14 09-19-14 09-24-14 10-03-14 09-24-14 10-10-14 10-21-14 10-21-14 11-19-14 01-15-15 02-25-14 08-04-14

Late Start

03-25-15 12-08-14 11-17-14 11-17-14 11-25-14 04-01-15 12-09-14 04-10-15 11-25-14 11-25-14 11-25-14 12-11-14 04-10-15 04-20-15 12-04-14 12-04-14 12-04-14 04-20-15 02-18-15 04-28-15 04-09-15 03-24-14 03-24-14 03-24-14 07-03-14 09-02-14 09-02-14 09-09-14 07-03-14 07-11-14 09-26-14 10-13-14 10-14-14 12-18-14 11-05-14 10-28-14 11-21-14 12-26-14 11-17-14 12-26-14 11-03-14 12-26-14 12-26-14 12-04-14 11-28-14 11-10-14 12-26-14 11-24-14 12-09-14 12-26-14 03-24-14 03-24-14 09-30-14

Late Finish 03-31-15 12-08-14 04-17-15 11-24-14 11-28-14 04-09-15 12-10-14 04-17-15 12-12-14 04-27-15 04-27-15 12-03-14 01-06-15 12-12-14 04-17-15 04-27-15 05-06-15 05-06-15 12-17-14 05-06-15 03-03-15 03-03-15 05-06-15 05-06-15 07-17-15 07-17-15 07-13-15 01-02-15 09-22-14 09-22-14 09-15-14 08-07-14 08-14-14 10-16-14 10-13-14 10-27-14 01-02-15 11-20-14 11-14-14 12-19-14 01-02-15 11-21-14 01-02-15 11-07-14 01-02-15 01-02-15 12-10-14 12-09-14 12-01-14 01-02-15 12-08-14 12-17-14 01-02-15 01-02-15 07-13-15 03-24-14 10-06-14

Total Free Float Float 72 26 110 22 26 72 26 73 26 110 110 22 48 26 72 73 34 34 22 72 9 9 39 34 49 49 125 29 55 55 55 9 9 58 66 65 101 71 65 78 99 65 92 53 81 81 57 53 40 69 40 40 50 29 125 19 44

0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 34 0 0 0 61 0 0 28 20 0 0 0 0 13 13 0 0 0 0 1 0 16 0 0 0 24 0 14 0 0 11 0 0 0 26 0 0 2 16 0 7 4

Calendar 2013 J Jul A S O N D 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec Work Days 0620A - Prec Work Days

0620A - T/P Work Days Work Days 0620A - Prec 0620A - Prec

0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Roofing Finishes - Area B (Low Roof) Entrances - Area B (Low Roof)

J

F

2016 M A M J

Masonry Veneer - Area C (Low Roof) Curtain Wall/ Windows - Area C (Low Roof) Roofing Finishes - Area C (Low Roof) Entrances - Area C (Low Roof) Misc Shell Finishes - Area C (Low Roof) Full Building Enclosure - Areas A/B/C (1-Story)

Masonry Veneer - Area C (Aux Gym) Full Building Enclosure - Area C (Aux Gym) Entrances - Area C (Aux Gym) Roofing Finishes - Area C (Aux Gym) Misc Shell Finishes - Area C (Aux Gym)

Masonry Veneer - Area D/E/F (Low Roof) Roofing Finishes - Area D/E/F (Low Roof) Curtain Wall/ Windows - Area D/E/F (Low Roof) Full Building Enclosure - Area D/E/F (Low Roof) Misc Shell Finishes - Area D/E/F (Low Roof) Entrances - Area D/E/F (Low Roof)

Non-Bearing Masonry Rough-in - Area D (1st Flr) Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) Plumbing Chase Rough-in - Area D (1st Flr) HVAC Ductwork Rough-in - Area D (1st Flr) HVAC Piping Rough-in - Area D (1st Flr) Plumbing Rough-in - Area D (1st Flr) Switchgear - Area D (1st Flr) Conduit - Overhead - Area D (1st Flr) HVAC Controls Rough-in - Area D (1st Flr) Fire Protection Rough-in - Area D (1st Flr) Pull Electrical Wires - Area D (1st Flr) HVAC Insulation - Area D (1st Flr) Fire Protection Above Ceiling Finalization - Area D (1st Flr) Cable Tray - Area D (1st Flr) Electrical Above Ceiling Finalization - Area D (1st Flr) Metal Studs - Area D (1st Flr) HVAC System Testing - Area D (1st Flr) HVAC Above Ceiling Finalization - Area D (1st Flr) Block Filler - Area D (1st Flr) Plumbing Insulation - Area D (1st Flr) Gypsum Board - Area D (1st Flr) Plumbing Above Ceiling Finalization - Area D (1st Flr) Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) Tech Cabling Rough-in (In-Class) - Area D (1st Flr) Tech Above Ceiling Finalization - Area D (1st Flr) Interior Rough-in Substantially Complete - 1st Flr Set Large Mech Equipment - Area E (1st Flr) Plumbing Chase Rough-in - Area E (1st Flr)


Activity ID

0620A-CTT-1830 0620A-ZSE-1820 0620A-RMM-1150 0620A-ZSE-1860 0620A-RMM-1170 0620A-MPH-1600 0620A-ZSE-1960 0620A-GSC-1230 0620A-RMM-1370 0620A-ZSE-2020 0620A-RMM-1270 0620A-SAC-1070 0620A-RMM-1290 0620A-ZSE-2090 0620A-ZSE-2100 0620A-SAC-1090 0620A-RMM-1330 0620A-RMM-1340 0620A-RMM-1560 0620A-ZST-1150 0620A-ZST-1180 0620A-ZST-1190 0620A-GSC-1250 0620A-MPH-1840 0620A-GSC-1430 0620A-MPH-1860 0620A-RMM-1710 0620A-ZSE-2390 0620A-RMM-2000 Area F (1st Flr) 0620A-MPH-1500 0620A-CTT-1740 0620A-ZSE-1760 0620A-ZSE-1800 0620A-RMM-1110 0620A-GSC-1160 0620A-RMM-1120 0620A-MPH-1510 0620A-ZSE-1850 0620A-RMM-1130 0620A-SAC-1050 0620A-ZSE-1970 0620A-RMM-1140 0620A-SAC-1060 0620A-ZSE-3380 0620A-ZSE-1980 0620A-ZST-1050 0620A-RMM-1210 0620A-RMM-1220 0620A-MPH-1800 0620A-GSC-1360 0620A-MPH-1810 0620A-ZST-1110 0620A-GSC-1200 0620A-ZST-1120 Second Floor Area G (2nd Flr)

Activity Name

Orig Start Dur

Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 10 of 25

15 15 25 5 25 15 8 10 20 9 10 15 10 5 5 5 5 5 20 4 5 3 5 8 15 5 10 17 10 82 5 10 10 4 25 7 25 15 18 7 13 11 17 5 5 3 10 5 5 8 10 5 7 5 5 175 136

07-29-14 07-29-14 07-29-14 08-05-14 08-05-14 08-12-14 08-19-14 08-26-14 08-27-14 08-29-14 09-03-14 09-03-14 09-10-14 09-12-14 09-12-14 09-17-14 09-24-14 09-24-14 10-07-14 10-22-14 10-24-14 10-28-14 10-28-14 10-28-14 10-28-14 10-31-14 11-04-14 11-04-14 01-02-15 08-11-14 08-11-14 08-19-14 08-19-14 08-26-14 09-03-14 09-10-14 09-10-14 09-17-14 09-17-14 10-08-14 10-08-14 10-13-14 10-15-14 10-20-14 10-28-14 10-30-14 11-04-14 11-07-14 11-07-14 11-10-14 11-11-14 11-13-14 11-25-14 11-26-14 11-28-14 06-06-14 06-26-14

Finish

08-18-14 08-18-14 09-02-14 08-11-14 09-09-14 09-02-14 08-28-14 09-09-14 09-24-14 09-11-14 09-16-14 09-23-14 09-23-14 09-18-14 09-18-14 09-23-14 09-30-14 09-30-14 11-03-14 10-27-14 10-30-14 10-30-14 11-03-14 11-06-14 11-17-14 11-06-14 11-17-14 11-26-14 01-15-15 12-04-14 08-15-14 09-02-14 09-02-14 08-29-14 10-07-14 09-18-14 10-14-14 10-07-14 10-10-14 10-16-14 10-24-14 10-27-14 11-06-14 10-24-14 11-03-14 11-03-14 11-17-14 11-13-14 11-13-14 11-19-14 11-24-14 11-19-14 12-04-14 12-03-14 12-04-14 02-12-15 01-08-15

Late Start

09-23-14 09-23-14 08-08-14 10-21-14 08-15-14 10-17-14 10-29-14 11-26-14 10-14-14 11-21-14 01-07-15 11-21-14 12-22-14 12-11-14 01-14-15 01-14-15 01-14-15 01-14-15 01-29-15 12-18-14 01-14-15 12-24-14 12-26-14 12-10-14 12-11-14 01-14-15 05-22-15 06-19-15 06-08-15 09-15-14 10-28-14 10-21-14 10-21-14 10-28-14 09-15-14 12-18-14 09-22-14 11-07-14 11-10-14 01-28-15 12-15-14 12-05-14 01-07-15 01-30-15 12-22-14 02-03-15 12-30-14 01-30-15 01-30-15 12-22-14 12-30-14 01-30-15 01-14-15 01-28-15 01-30-15 06-18-14 10-20-14

Late Finish 10-13-14 10-13-14 09-12-14 10-27-14 09-19-14 11-06-14 11-07-14 12-10-14 11-10-14 12-04-14 01-20-15 12-12-14 01-06-15 12-17-14 01-20-15 01-20-15 01-20-15 01-20-15 02-25-15 12-23-14 01-20-15 12-29-14 01-02-15 12-19-14 01-02-15 01-20-15 06-05-15 07-13-15 06-19-15 02-05-15 11-03-14 11-03-14 11-03-14 10-31-14 10-17-14 12-29-14 10-24-14 11-28-14 12-04-14 02-05-15 01-02-15 12-19-14 01-29-15 02-05-15 12-29-14 02-05-15 01-13-15 02-05-15 02-05-15 01-02-15 01-13-15 02-05-15 01-22-15 02-03-15 02-05-15 07-17-15 02-23-15

Total Free Float Float 39 39 8 54 8 47 50 65 33 59 87 57 72 63 85 82 77 77 79 40 55 40 41 30 31 50 139 158 109 43 55 44 44 44 8 70 8 37 38 77 47 38 57 71 38 65 38 57 57 29 33 53 33 42 43 109 32

0 0 0 5 0 0 0 0 0 0 10 0 0 0 29 18 0 27 0 0 19 0 0 0 0 4 30 23 0 0 11 0 0 6 0 0 0 0 0 13 0 0 0 9 0 17 5 0 0 0 0 4 0 0 18 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)


Activity ID

0620A-MPH-1670 0620A-CTT-1930 0620A-ZSE-1930 0620A-GSC-1620 0620A-GSC-1520 0620A-RMM-1630 0620A-RMM-1690 0620A-MPH-1950 0620A-SAC-1240 0620A-ZSE-2410 0620A-RMM-1790 0620A-SAC-1270 0620A-RMM-1830 0620A-RMM-1810 0620A-RMM-1820 0620A-GSC-1730 0620A-MPH-1980 0620A-ZSE-2600 0620A-MPH-2050 0620A-ZSE-2620 0620A-ZSE-2680 0620A-ZST-1530 0620A-ZST-1630 0620A-ZST-1650 0620A-ALL-1230 Area H (2nd Flr) 0620A-RMM-1250 0620A-MPH-1650 0620A-CTT-1850 0620A-ZSE-1840 0620A-GSC-1550 0620A-GSC-1460 0620A-RMM-1720 0620A-RMM-1450 0620A-RMM-1530 0620A-MPH-1850 0620A-SAC-1180 0620A-ZSE-2290 0620A-MPH-1960 0620A-GSC-1630 0620A-RMM-1900 0620A-MPH-1970 0620A-RMM-1620 0620A-SAC-1220 0620A-RMM-1680 0620A-ZSE-2380 0620A-RMM-1740 0620A-RMM-1760 0620A-ZSE-2750 0620A-RMM-1990 0620A-ZST-1390 0620A-RMM-2110 0620A-ZST-1460 0620A-ZST-1470 0620A-ZSE-2500 0620A-ZSE-2520 Area I (2nd Flr)

Activity Name

Orig Start Dur

Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 11 of 25

5 15 15 10 5 20 20 5 12 17 10 5 10 5 5 15 5 9 5 5 6 10 7 5 0 168 1 5 15 15 10 5 20 20 20 5 15 16 5 15 20 5 10 5 10 14 5 5 4 10 7 10 5 5 6 5 130

06-26-14 07-11-14 07-11-14 09-19-14 09-22-14 10-08-14 10-15-14 10-22-14 10-29-14 10-29-14 11-05-14 11-07-14 11-12-14 11-14-14 11-14-14 11-18-14 11-20-14 11-21-14 11-26-14 11-28-14 12-05-14 12-15-14 12-30-14 01-02-15 06-06-14 06-06-14 07-29-14 08-01-14 08-01-14 10-03-14 11-04-14 11-04-14 11-05-14 11-12-14 11-19-14 11-26-14 11-26-14 11-28-14 12-01-14 12-03-14 12-04-14 12-04-14 12-11-14 12-11-14 12-19-14 12-26-14 12-26-14 01-02-15 01-02-15 01-12-15 01-16-15 01-21-15 01-21-15 01-27-15 01-28-15 08-11-14

Finish

07-02-14 07-31-14 07-31-14 10-02-14 09-26-14 11-04-14 11-11-14 10-28-14 11-13-14 11-20-14 11-18-14 11-13-14 11-25-14 11-20-14 11-20-14 12-09-14 11-26-14 12-04-14 12-03-14 12-04-14 12-12-14 12-29-14 01-08-15 01-08-15 01-08-15 02-03-15 06-06-14 08-04-14 08-21-14 08-21-14 10-16-14 11-10-14 12-02-14 12-03-14 12-10-14 11-25-14 12-17-14 12-18-14 12-04-14 12-19-14 12-31-14 12-10-14 12-17-14 12-17-14 12-24-14 01-09-15 01-02-15 01-02-15 01-07-15 01-15-15 01-20-15 01-29-15 01-27-15 01-27-15 02-03-15 02-03-15 02-12-15

Late Start

11-04-14 11-14-14 11-14-14 01-05-15 12-11-14 10-20-14 10-27-14 12-01-14 01-16-15 12-08-14 02-10-15 02-17-15 02-03-15 02-17-15 02-17-15 01-22-15 01-29-15 01-02-15 02-17-15 02-17-15 01-15-15 01-23-15 02-06-15 02-17-15 06-18-14 06-18-14 11-11-14 12-08-14 12-08-14 01-19-15 01-07-15 02-26-15 11-17-14 11-24-14 12-29-14 02-03-15 01-06-15 02-05-15 02-03-15 03-26-15 03-05-15 03-09-15 03-05-15 02-25-15 01-28-15 03-25-15 03-25-15 07-14-15 06-08-15 02-17-15 06-22-15 02-26-15 03-05-15 03-24-15 03-25-15 11-18-14

Late Finish 11-10-14 12-05-14 12-05-14 01-16-15 12-17-14 11-14-14 11-21-14 12-05-14 02-02-15 12-31-14 02-23-15 02-23-15 02-16-15 02-23-15 02-23-15 02-11-15 02-04-15 01-14-15 02-23-15 02-23-15 01-22-15 02-05-15 02-16-15 02-23-15 02-23-15 07-17-15 06-18-14 11-17-14 12-29-14 12-29-14 01-30-15 01-13-15 03-25-15 12-15-14 12-22-14 01-05-15 02-23-15 01-27-15 02-11-15 02-23-15 04-23-15 03-11-15 03-20-15 03-11-15 03-10-15 02-16-15 03-31-15 03-31-15 07-17-15 06-19-15 02-25-15 07-03-15 03-04-15 03-11-15 03-31-15 03-31-15 04-08-15

Total Free Float Float 91 89 89 73 57 8 8 27 54 27 66 69 56 64 64 44 47 27 56 55 27 27 27 32 32 116 8 74 89 89 73 43 79 8 8 26 46 26 47 44 79 63 65 58 52 26 62 62 135 109 26 109 26 31 40 40 38

17 0 0 0 0 0 0 0 0 0 2 18 0 0 23 0 0 0 0 23 0 0 0 0 19 0 0 4 0 0 0 1 0 0 0 0 0 0 4 0 0 13 10 13 0 0 0 15 98 0 0 30 0 7 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)


Activity ID

0620A-MPH-1640 0620A-CTT-1780 0620A-ZSE-1790 0620A-GSC-1450 0620A-GSC-1410 0620A-RMM-1360 0620A-RMM-1390 0620A-GSC-1590 0620A-MPH-1760 0620A-ZSE-2070 0620A-MPH-1930 0620A-SAC-1150 0620A-MPH-1940 0620A-RMM-1440 0620A-SAC-1160 0620A-ZSE-2270 0620A-RMM-1520 0620A-ZSE-2310 0620A-RMM-1570 0620A-RMM-1580 0620A-ZST-1310 0620A-ZSE-2300 0620A-ZST-1340 0620A-ZST-1350 Third Floor Area G (3rd Flr) 0620A-CTT-2310 0620A-ZSE-2230 0620A-MPH-1780 0620A-MPH-1820 0620A-GSC-1690 0620A-GSC-1920 0620A-GSC-2030 0620A-RMM-2100 0620A-RMM-2130 0620A-MPH-2160 0620A-ZSE-2880 0620A-MPH-2170 0620A-MPH-2180 0620A-RMM-2190 0620A-SAC-1420 0620A-RMM-2210 0620A-SAC-1450 0620A-ZSE-3040 0620A-RMM-2250 0620A-RMM-2260 0620A-ZSE-3120 0620A-ZSE-3130 0620A-ZST-2180 0620A-ZST-2210 0620A-ZST-2220 0620A-ALL-1300 Area H (3rd Flr) 0620A-RMM-1260 0620A-MPH-1750 0620A-CTT-2160 0620A-ZSE-2080

Activity Name

Orig Start Dur

Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)

Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 12 of 25

5 10 10 7 5 20 20 10 5 5 8 13 5 7 5 7 10 4 5 5 7 5 5 5 174 149 15 15 10 5 5 10 15 20 20 10 17 5 5 10 12 10 5 9 5 5 6 5 10 7 5 0 152 1 10 15 15

08-11-14 08-22-14 08-22-14 10-17-14 12-04-14 12-04-14 12-11-14 12-15-14 12-18-14 12-26-14 12-26-14 12-26-14 12-31-14 01-05-15 01-08-15 01-12-15 01-12-15 01-21-15 01-26-15 01-26-15 01-28-15 02-04-15 02-06-15 02-06-15 09-03-14 09-03-14 09-03-14 09-03-14 09-09-14 09-23-14 09-29-14 11-19-14 12-22-14 01-05-15 01-12-15 01-19-15 01-26-15 02-02-15 02-02-15 02-02-15 02-02-15 02-09-15 02-11-15 02-18-15 02-23-15 02-23-15 03-03-15 03-04-15 03-11-15 03-25-15 03-27-15 09-17-14 09-17-14 10-22-14 10-22-14 10-22-14

Finish

08-15-14 09-05-14 09-05-14 10-27-14 12-10-14 01-02-15 01-09-15 12-29-14 12-24-14 01-02-15 01-07-15 01-14-15 01-07-15 01-13-15 01-14-15 01-20-15 01-23-15 01-26-15 01-30-15 01-30-15 02-05-15 02-10-15 02-12-15 02-12-15 05-08-15 04-02-15 09-23-14 09-23-14 09-22-14 09-29-14 10-03-14 12-03-14 01-13-15 01-30-15 02-06-15 01-30-15 02-17-15 02-06-15 02-06-15 02-13-15 02-17-15 02-20-15 02-17-15 03-02-15 02-27-15 02-27-15 03-10-15 03-10-15 03-24-15 04-02-15 04-02-15 04-02-15 04-22-15 09-17-14 11-04-14 11-11-14 11-11-14

Late Start

11-18-14 12-30-14 12-30-14 02-02-15 02-06-15 12-16-14 12-23-14 02-27-15 01-22-15 01-29-15 02-12-15 03-06-15 03-23-15 03-23-15 03-23-15 02-19-15 03-11-15 03-18-15 04-01-15 04-01-15 03-05-15 04-01-15 03-16-15 03-23-15 09-26-14 10-21-14 11-26-14 11-26-14 10-21-14 12-30-14 12-18-14 02-18-15 03-06-15 01-15-15 01-22-15 01-29-15 02-05-15 03-25-15 04-09-15 04-01-15 03-25-15 03-25-15 04-09-15 03-02-15 04-09-15 04-09-15 03-13-15 04-09-15 03-23-15 04-07-15 04-09-15 09-26-14 09-26-14 11-04-14 12-22-14 12-22-14

Late Finish 11-24-14 01-13-15 01-13-15 02-10-15 02-12-15 01-14-15 01-21-15 03-12-15 01-28-15 02-04-15 02-23-15 03-24-15 03-27-15 03-31-15 03-27-15 02-27-15 03-24-15 03-23-15 04-08-15 04-08-15 03-13-15 04-08-15 03-20-15 03-27-15 07-17-15 04-15-15 12-17-14 12-17-14 11-03-14 01-06-15 12-24-14 03-03-15 03-26-15 02-11-15 02-18-15 02-11-15 02-27-15 03-31-15 04-15-15 04-15-15 04-10-15 04-08-15 04-15-15 03-12-15 04-15-15 04-15-15 03-20-15 04-15-15 04-03-15 04-15-15 04-15-15 04-15-15 07-17-15 09-26-14 11-17-14 01-13-15 01-13-15

Total Free Float Float 70 89 89 73 44 8 8 52 23 23 33 49 57 55 52 28 42 40 47 47 26 40 26 31 49 8 60 60 30 68 57 62 52 8 8 8 8 37 47 42 37 32 40 8 32 32 8 25 8 8 8 8 61 7 9 42 42

14 29 29 11 0 0 0 0 0 5 0 0 17 13 19 0 0 0 0 15 0 15 0 18 0 0 3 3 0 26 16 0 0 0 0 0 0 0 15 10 0 0 18 0 0 15 0 13 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)

Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)


Activity ID

0620A-ZSE-2120 0620A-ZSE-2170 0620A-MPH-1770 0620A-GSC-1600 0620A-GSC-1820 0620A-RMM-2010 0620A-GSC-1930 0620A-RMM-2150 0620A-RMM-1940 0620A-RMM-1970 0620A-MPH-2090 0620A-ZSE-2770 0620A-RMM-2240 0620A-MPH-2140 0620A-MPH-2150 0620A-RMM-2090 0620A-SAC-1360 0620A-RMM-2120 0620A-RMM-2290 0620A-ZSE-2980 0620A-ZSE-2820 0620A-SAC-1380 0620A-RMM-2170 0620A-RMM-2180 0620A-ZSE-2930 0620A-ZST-1870 0620A-ZST-1980 0620A-ZST-1990 Area I (3rd Flr) 0620A-MPH-1730 0620A-MPH-1660 0620A-CTT-2070 0620A-ZSE-2000 0620A-ZSE-2030 0620A-GSC-1580 0620A-GSC-1720 0620A-GSC-1860 0620A-RMM-1800 0620A-MPH-2020 0620A-RMM-1840 0620A-ZSE-2590 0620A-MPH-2040 0620A-MPH-2070 0620A-SAC-1320 0620A-RMM-1930 0620A-SAC-1330 0620A-ZSE-2690 0620A-RMM-1960 0620A-ZSE-2710 0620A-RMM-2030 0620A-RMM-2050 0620A-ZST-1710 0620A-ZST-1750 0620A-ZST-1770 One Story Areas Area B (Gym) Area B.1 (Gym)

Activity Name

Orig Start Dur

Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Flr) HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd Flr) Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr) Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 13 of 25

Finish

Late Start

Late Finish

Total Free Float Float

Calendar 2013 J Jul A S O N D

4 2 5 5 10 20 15 20 20

10-29-14 11-04-14 11-05-14 11-12-14 12-04-14 01-02-15 01-05-15 01-30-15 02-02-15

11-03-14 11-05-14 11-11-14 11-18-14 12-17-14 01-29-15 01-23-15 02-26-15 02-27-15

02-19-15 02-25-15 01-07-15 01-14-15 03-04-15 04-24-15 03-18-15 05-22-15 02-12-15

02-24-15 02-26-15 01-13-15 01-20-15 03-17-15 05-21-15 04-08-15 06-19-15 03-11-15

78 78 42 42 62 79 52 79 8

0 9 0 0 0 0 0 0 0

Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days

20 10 14 10 5 5 10 15 10 10 12 16 5 5 5 5 7 5 5 129 10 5 10 10 4 5 7 10 20 10 20 7 5 5 13 7 5 7 10 5 5 5 7 5 5 283 131 131

02-09-15 02-16-15 02-23-15 02-27-15 03-02-15 03-02-15 03-02-15 03-02-15 03-09-15 03-13-15 03-13-15 03-13-15 03-16-15 03-23-15 03-23-15 03-30-15 04-07-15 04-16-15 04-16-15 11-05-14 11-05-14 11-12-14 11-12-14 11-12-14 11-19-14 12-11-14 12-18-14 01-19-15 03-02-15 03-09-15 03-09-15 03-16-15 03-23-15 03-23-15 03-23-15 03-30-15 04-02-15 04-07-15 04-07-15 04-09-15 04-21-15 04-21-15 04-23-15 05-04-15 05-04-15 03-21-14 03-21-14 03-21-14

03-06-15 02-27-15 03-12-15 03-12-15 03-06-15 03-06-15 03-13-15 03-20-15 03-20-15 03-26-15 03-30-15 04-03-15 03-20-15 03-27-15 03-27-15 04-03-15 04-15-15 04-22-15 04-22-15 05-08-15 11-18-14 11-18-14 11-25-14 11-25-14 11-24-14 12-17-14 12-29-14 01-30-15 03-27-15 03-20-15 04-03-15 03-24-15 03-27-15 03-27-15 04-09-15 04-08-15 04-09-15 04-15-15 04-20-15 04-15-15 04-27-15 04-27-15 05-01-15 05-08-15 05-08-15 05-01-15 09-25-14 09-25-14

02-19-15 02-26-15 03-05-15 06-22-15 04-01-15 05-07-15 04-21-15 04-13-15 04-14-15 07-06-15 04-21-15 03-25-15 04-28-15 04-28-15 04-28-15 04-28-15 04-17-15 04-28-15 04-28-15 11-18-14 11-18-14 02-06-15 01-30-15 01-30-15 02-27-15 02-13-15 03-23-15 04-01-15 03-18-15 03-25-15 04-01-15 04-15-15 04-09-15 05-14-15 05-04-15 05-12-15 05-14-15 04-24-15 04-30-15 05-14-15 05-14-15 05-14-15 05-05-15 05-14-15 05-14-15 05-19-14 05-19-14 05-19-14

03-18-15 03-11-15 03-24-15 07-03-15 04-08-15 05-13-15 05-04-15 05-01-15 04-27-15 07-17-15 05-06-15 04-16-15 05-04-15 05-04-15 05-04-15 05-04-15 04-27-15 05-04-15 05-04-15 05-20-15 12-02-14 02-12-15 02-12-15 02-12-15 03-04-15 02-19-15 03-31-15 04-15-15 04-15-15 04-08-15 04-29-15 04-23-15 04-15-15 05-20-15 05-20-15 05-20-15 05-20-15 05-04-15 05-13-15 05-20-15 05-20-15 05-20-15 05-13-15 05-20-15 05-20-15 06-05-15 02-13-15 02-13-15

8 8 8 79 22 47 35 29 25 79 26 8 30 25 25 20 8 8 8 8 9 59 54 54 69 44 65 52 12 12 17 21 12 37 29 30 29 13 17 25 17 17 8 8 8 24 98 98

0 0 0 0 0 10 10 0 0 71 12 0 8 0 15 2 0 0 0 0 2 5 0 0 0 31 13 44 0 0 0 8 0 29 0 13 21 0 0 17 0 9 0 0 0 0 0 0

Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Fl HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd F Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)


Activity ID

0620A-MPH-1470 0620A-RMM-1080 0620A-RMM-1090 0620A-RMM-1100 0620A-SAC-1080 0620A-MPH-1700 0620A-GSC-1150 0620A-ZSE-2010 0620A-SAC-1110 0620A-ZSE-2160 0620A-ZSE-2190 0620A-RMM-1490 0620A-ZST-1080 0620A-ZST-1090 0620A-ALL-1170 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-3230 0620A-CTT-1540 0620A-ZSE-1550 0620A-ZSE-1580 0620A-MPH-1530 0620A-MPH-1540 0620A-SSI-1000 0620A-RMM-1160 0620A-RMM-1180 0620A-MPH-1610 0620A-ZSE-1770 0620A-GSC-1030 0620A-GSC-1040 0620A-MPH-1680 0620A-ZSE-1900 0620A-ZSE-1910 0620A-SAC-1100 0620A-MPH-1720 0620A-RMM-1400 0620A-ZSE-2050 0620A-ZSE-2060 0620A-RMM-1430 0620A-SAC-1120 0620A-ZSE-2180 0620A-ZSE-2220 0620A-ZST-1100 0620A-ZST-1130 0620A-GSC-1170 0620A-ZST-1170 0620A-RMM-1650 0620A-RMM-1660 0620A-SSI-1010 Area B (Low Roof) 0620A-RMM-1190 0620A-GSC-3240 0620A-CTT-1590 0620A-ZSE-1640 0620A-ZSE-1660 0620A-MPH-1550 0620A-MPH-1580

Activity Name

Orig Start Dur

Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)

Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 14 of 25

10 12 3 5 15 5 5 17 5 5 4 5 1 1 0 191 137 10 15 15 16 5 10 3 60 60 25 24 5 10 12 20 23 36 5 15 10 12 30 5 3 5 5 5 15 5 5 5 5 183 1 9 10 10 20 5 10

03-21-14 04-04-14 04-23-14 04-28-14 07-10-14 07-29-14 08-19-14 08-26-14 09-08-14 09-18-14 09-19-14 09-19-14 09-25-14 09-25-14 04-07-14 04-23-14 04-23-14 05-07-14 05-07-14 05-14-14 05-21-14 05-29-14 06-03-14 06-05-14 06-12-14 06-19-14 06-26-14 07-22-14 07-22-14 07-25-14 07-31-14 07-31-14 07-31-14 08-05-14 08-29-14 09-03-14 09-03-14 09-08-14 09-15-14 09-19-14 09-25-14 09-26-14 10-03-14 10-08-14 10-10-14 10-20-14 10-20-14 10-29-14 04-07-14 04-07-14 05-15-14 05-29-14 05-29-14 06-06-14 06-10-14 06-17-14

Finish

04-03-14 04-22-14 04-25-14 05-02-14 07-30-14 08-04-14 08-25-14 09-18-14 09-12-14 09-24-14 09-24-14 09-25-14 09-25-14 09-25-14 09-25-14 01-07-15 11-04-14 05-06-14 05-28-14 05-28-14 06-05-14 05-28-14 06-11-14 06-05-14 08-28-14 09-05-14 07-24-14 07-30-14 07-28-14 08-04-14 08-11-14 08-27-14 09-02-14 09-19-14 08-11-14 09-19-14 09-16-14 09-18-14 10-17-14 09-19-14 09-23-14 10-01-14 10-02-14 10-09-14 10-28-14 10-16-14 10-24-14 10-24-14 11-04-14 12-24-14 04-07-14 05-28-14 06-11-14 06-11-14 07-03-14 06-16-14 06-30-14

Late Start

05-19-14 06-03-14 11-12-14 11-25-14 08-08-14 12-03-14 11-19-14 10-24-14 12-03-14 12-03-14 11-18-14 12-03-14 11-24-14 12-09-14 05-29-14 05-29-14 05-29-14 06-26-14 06-26-14 07-03-14 06-05-14 06-12-14 12-10-14 06-19-14 06-26-14 07-21-14 07-28-14 10-22-14 10-06-14 12-01-14 10-03-14 09-30-14 08-29-14 12-10-14 11-17-14 12-03-14 10-31-14 10-20-14 12-10-14 11-20-14 12-10-14 11-25-14 12-03-14 11-18-14 12-10-14 12-10-14 12-10-14 12-10-14 06-16-14 06-16-14 07-22-14 08-04-14 08-04-14 09-10-14 07-28-14 08-04-14

Late Finish 06-02-14 06-18-14 11-14-14 12-02-14 08-28-14 12-09-14 11-25-14 11-17-14 12-09-14 12-09-14 11-21-14 12-09-14 11-24-14 12-09-14 02-13-15 06-05-15 12-16-14 06-11-14 07-17-14 07-17-14 07-25-14 06-11-14 06-25-14 12-12-14 09-12-14 09-19-14 08-22-14 08-28-14 10-28-14 10-17-14 12-16-14 10-30-14 10-30-14 10-20-14 12-16-14 12-08-14 12-16-14 11-17-14 12-01-14 12-16-14 11-24-14 12-16-14 12-02-14 12-09-14 12-09-14 12-16-14 12-16-14 12-16-14 12-16-14 06-01-15 06-16-14 08-01-14 08-15-14 08-15-14 10-07-14 08-01-14 08-15-14

Total Free Float Float 40 40 142 148 21 89 65 42 61 53 42 52 42 52 98 105 29 25 35 35 35 10 10 133 10 10 21 21 65 53 89 45 42 21 89 55 64 42 30 61 44 53 42 42 29 42 36 36 29 109 48 46 46 46 66 33 33

0 0 0 96 0 0 0 0 0 0 0 0 0 0 88 0 0 0 0 0 0 0 0 107 0 0 0 0 0 0 0 3 0 0 3 5 11 0 0 28 2 6 0 0 0 5 0 5 3 0 1 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)

Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)

F

2016 M A M J


Activity ID

0620A-RMM-1200 0620A-GSC-1050 0620A-RMM-1320 0620A-GSC-1080 0620A-RMM-1410 0620A-RMM-1420 0620A-MPH-1790 0620A-ZSE-2200 0620A-ZSE-2150 0620A-RMM-1480 0620A-RMM-1540 0620A-ZSE-2280 0620A-MPH-1880 0620A-SAC-1170 0620A-MPH-1890 0620A-ZSE-2320 0620A-ZSE-2330 0620A-ZST-1200 0620A-RMM-1670 0620A-GSC-1260 0620A-ZST-1230 0620A-ZST-1240 0620A-SAC-1190 0620A-RMM-1730 0620A-RMM-1750 0620A-RMM-1850 Area C (Low Roof) 0620A-RMM-1240 0620A-CTT-1630 0620A-ZSE-1670 0620A-MPH-1590 0620A-MPH-1620 0620A-ZSE-1750 0620A-GSC-3250 0620A-RMM-1310 0620A-GSC-1100 0620A-GSC-1120 0620A-RMM-1470 0620A-RMM-1550 0620A-RMM-1590 0620A-MPH-1920 0620A-ZSE-2370 0620A-RMM-1640 0620A-GSC-1310 0620A-ZSE-2430 0620A-MPH-1990 0620A-ZSE-2490 0620A-MPH-2010 0620A-ZSE-2510 0620A-ZST-1360 0620A-RMM-1870 0620A-SAC-1280 0620A-ZST-1410 0620A-ZST-1420 0620A-RMM-1910 0620A-RMM-1980 0620A-SAC-1290

Activity Name

Orig Start Dur

HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 15 of 25

20 5 40 5 20 20 15 8 5 20 10 8 7 23 5 5 3 5 10 10 5 5 5 5 5 20 170 1 20 20 5 10 3 1 20 10 5 8 40 40 20 11 4 5 10 10 5 5 4 5 10 26 5 5 20 4 5

07-01-14 07-29-14 07-30-14 08-05-14 08-29-14 09-08-14 09-15-14 09-22-14 09-25-14 09-25-14 09-29-14 10-02-14 10-06-14 10-06-14 10-08-14 10-10-14 10-14-14 10-17-14 10-20-14 10-22-14 10-24-14 10-24-14 10-30-14 11-03-14 11-03-14 11-26-14 05-07-14 05-07-14 06-12-14 06-12-14 06-19-14 07-01-14 07-07-14 07-22-14 07-30-14 08-05-14 08-12-14 09-25-14 09-29-14 10-06-14 10-13-14 10-20-14 10-23-14 11-03-14 11-04-14 11-10-14 11-17-14 11-17-14 11-18-14 11-24-14 11-24-14 11-28-14 12-02-14 12-02-14 12-02-14 12-26-14 12-30-14

Finish

07-29-14 08-04-14 09-24-14 08-11-14 09-26-14 10-03-14 10-03-14 10-01-14 10-01-14 10-22-14 10-10-14 10-13-14 10-14-14 11-05-14 10-14-14 10-16-14 10-16-14 10-23-14 10-31-14 11-04-14 10-30-14 10-30-14 11-05-14 11-07-14 11-07-14 12-24-14 01-07-15 05-07-14 07-10-14 07-10-14 06-25-14 07-15-14 07-09-14 07-22-14 08-26-14 08-18-14 08-18-14 10-06-14 11-21-14 12-01-14 11-07-14 11-03-14 10-28-14 11-07-14 11-17-14 11-21-14 11-21-14 11-21-14 11-21-14 12-01-14 12-08-14 01-06-15 12-08-14 12-08-14 12-30-14 12-31-14 01-06-15

Late Start

08-18-14 10-29-14 09-25-14 10-20-14 09-15-14 09-22-14 09-30-14 11-17-14 11-20-14 04-20-15 12-09-14 11-28-14 12-24-14 10-21-14 12-29-14 12-29-14 12-16-14 12-19-14 12-02-14 12-17-14 12-29-14 12-29-14 12-29-14 12-29-14 12-29-14 05-04-15 06-17-14 06-17-14 09-29-14 09-29-14 09-19-14 09-26-14 10-08-14 09-15-14 09-16-14 11-05-14 10-27-14 01-19-15 10-13-14 10-20-14 11-14-14 12-02-14 05-18-15 01-13-15 12-17-14 01-08-15 01-15-15 01-15-15 01-02-15 01-08-15 12-31-14 12-15-14 01-15-15 01-15-15 12-16-14 06-02-15 01-15-15

Late Finish 09-15-14 11-04-14 11-19-14 10-24-14 10-10-14 10-17-14 10-20-14 11-26-14 11-26-14 05-15-15 12-22-14 12-09-14 01-05-15 11-20-14 01-05-15 01-05-15 12-18-14 12-26-14 12-15-14 12-31-14 01-05-15 01-05-15 01-05-15 01-05-15 01-05-15 06-01-15 06-05-15 06-17-14 10-24-14 10-24-14 09-25-14 10-09-14 10-10-14 09-15-14 10-13-14 11-18-14 10-31-14 01-28-15 12-08-14 12-15-14 12-12-14 12-16-14 05-21-15 01-19-15 12-31-14 01-21-15 01-21-15 01-21-15 01-07-15 01-14-15 01-14-15 01-21-15 01-21-15 01-21-15 01-14-15 06-05-15 01-21-15

Total Free Float Float 33 65 40 53 10 10 11 40 40 143 50 40 56 11 56 54 44 44 30 39 44 44 40 38 38 109 105 28 75 75 64 61 66 38 33 65 53 79 10 10 24 30 143 48 30 40 40 40 30 30 25 11 30 30 10 109 11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 0 0 0 0 0 0 18 10 0 12 0 0 4 0 0 0 20 0 5 0 0 0 0 0 0 0 0 4 9 0 0 30 30 0 0 15 0 0 0 0 0 1

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)


Activity ID

Activity Name

Orig Start Dur

0620A-RMM-2020 HVAC System Testing - Area C (Low Roof) 0620A-RMM-2040 HVAC Above Ceiling Finalization - Area C (Low Roof) 0620A-ALL-1220 Interior Rough-in Substantially Complete - Area A /B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-MPH-1710 Storm Drain Rough-in - Area C (Aux Gym) 0620A-MPH-1740 Plumbing Above Ceiling Finalization - Area C (Aux Gym) 0620A-GSC-1130 Block Filler - Area C (Aux Gym) 0620A-RMM-1460 HVAC Ductwork Rough-in - Area C (Aux Gym) 0620A-ZSE-2260 Conduit - Overhead - Area C (Aux Gym) 0620A-RMM-1610 HVAC Controls Rough-in - Area C (Aux Gym) 0620A-ZSE-2340 Pull Electrical Wires - Area C (Aux Gym) 0620A-ZSE-2360 Electrical Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1260 Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) 0620A-SAC-1200 Fire Protection Rough-in - Area C (Aux Gym) 0620A-SAC-1210 Fire Protection Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1450 Tech Above Ceiling Finalization - Area C (Aux Gym) 0620A-RMM-2070 HVAC System Testing - Area C (Aux Gym) 0620A-RMM-2080 HVAC Above Ceiling Finalization - Area C (Aux Gym) 0620A-ALL-1240 Interior Rough-in Substantially Complete - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2200 Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2130 Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1390 Metal Studs - Area D/E/F (Low Roof) 0620A-MPH-1830 Plumbing Chase Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1510 Gypsum Board - Area D/E/F (Low Roof) 0620A-GSC-1400 Block Filler - Area D/E/F (Low Roof) 0620A-MPH-1870 Storm Drain Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2210 Switchgear - Area D/E/F (Low Roof) 0620A-RMM-1880 HVAC Ductwork Rough-in - Area D/E/F (Low Roof) 0620A-RMM-1920 HVAC Piping Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2080 Plumbing Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2730 Conduit - Overhead - Area D/E/F (Low Roof) 0620A-MPH-2120 Plumbing Insulation - Area D/E/F (Low Roof) 0620A-SAC-1430 Fire Protection Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2130 Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZSE-2790 Pull Electrical Wires - Area D/E/F (Low Roof) 0620A-ZSE-2830 Cable Tray - Area D/E/F (Low Roof) 0620A-ZSE-2860 Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1800 Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) 0620A-ZST-1840 Tech Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1850 Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) 0620A-RMM-2270 HVAC Controls Rough-in - Area D/E/F (Low Roof) 0620A-RMM-2280 HVAC Insulation - Area D/E/F (Low Roof) 0620A-SAC-1460 Fire Protection Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-RMM-2330 HVAC System Testing - Area D/E/F (Low Roof) 0620A-RMM-2340 HVAC Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ALL-1310 Interior Rough-in Substantially Complete - Area D/E/F (Low Roof) Interior Finishes Academic Area First Floor Area D (1st Flr) 0620A-ZST-1160 Tech Rm Build-out and Backbone - Area D (1st Flr) 0620A-GSC-1770 Paint - Area D (1st Flr) 0620A-GSC-1800 Ceiling Grid - Area D (1st Flr) 0620A-ZSE-2560 Light Fixtures - Area D (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 16 of 25

5 5 0 107 107 7 5 5 8 7 5 5 5 1 15 5 5 5 5 0 124 124 5 5 5 5 5 5 10 6 65 65 15 12 7 54 5 13 7 5 6 5 4 10 27 5 5 5 0 208 202 135 135 5 12 12 8

12-31-14 12-31-14 08-13-14 08-13-14 08-13-14 08-15-14 08-26-14 09-25-14 10-07-14 10-13-14 10-16-14 10-17-14 10-31-14 11-06-14 11-20-14 12-09-14 01-08-15 01-08-15 11-05-14 11-05-14 11-05-14 11-05-14 11-12-14 11-14-14 11-19-14 11-19-14 11-21-14 11-25-14 12-08-14 12-15-14 12-22-14 12-30-14 01-14-15 01-14-15 01-16-15 01-16-15 02-04-15 02-06-15 02-13-15 02-20-15 02-23-15 03-11-15 03-18-15 03-24-15 04-27-15 04-27-15 09-22-14 09-22-14 09-22-14 09-22-14 09-22-14 12-11-14 12-15-14 12-23-14

Finish

01-07-15 01-07-15 01-07-15 01-14-15 01-14-15 08-21-14 08-21-14 09-02-14 10-06-14 10-15-14 10-17-14 10-22-14 10-23-14 10-31-14 11-26-14 11-26-14 12-15-14 01-14-15 01-14-15 01-14-15 05-01-15 05-01-15 11-11-14 11-11-14 11-18-14 11-20-14 11-25-14 11-25-14 12-05-14 12-03-14 03-10-15 03-17-15 01-13-15 01-15-15 01-22-15 03-30-15 01-22-15 02-03-15 02-12-15 02-12-15 02-20-15 02-26-15 02-26-15 03-24-15 04-24-15 03-30-15 05-01-15 05-01-15 05-01-15 07-15-15 07-07-15 04-01-15 04-01-15 09-26-14 12-29-14 12-31-14 01-05-15

Late Start

01-15-15 01-15-15 10-10-14 10-10-14 10-10-14 12-19-14 11-26-14 11-11-14 12-01-14 12-23-14 12-10-14 01-08-15 01-07-15 11-21-14 01-08-15 04-29-15 02-18-15 02-18-15 11-25-14 11-25-14 01-14-15 01-14-15 02-11-15 11-25-14 02-25-15 01-21-15 12-03-14 03-05-15 12-17-14 12-24-14 02-04-15 03-13-15 05-04-15 02-25-15 05-06-15 03-31-15 04-20-15 05-06-15 04-29-15 05-06-15 05-07-15 04-29-15 03-27-15 05-06-15 05-06-15 05-06-15 11-17-14 11-17-14 11-17-14 11-17-14 11-17-14 12-31-14 01-05-15 02-09-15

Late Finish 01-21-15 01-21-15 01-21-15 05-05-15 05-05-15 10-20-14 12-26-14 12-03-14 11-20-14 12-09-14 12-30-14 12-16-14 01-14-15 01-07-15 12-12-14 01-14-15 05-05-15 02-24-15 02-24-15 02-24-15 05-12-15 05-12-15 01-20-15 01-20-15 02-17-15 12-02-14 03-03-15 01-27-15 12-16-14 03-12-15 03-19-15 03-26-15 02-24-15 03-30-15 05-12-15 05-12-15 05-12-15 04-17-15 04-28-15 05-12-15 05-06-15 05-12-15 05-12-15 05-12-15 05-05-15 05-12-15 05-12-15 05-12-15 05-12-15 07-24-15 07-17-15 07-10-15 07-10-15 11-21-14 01-16-15 01-20-15 02-18-15

Total Free Float Float 10 10 10 78 78 41 88 65 33 38 50 38 56 45 11 32 98 29 29 29 7 7 47 47 62 7 67 42 7 69 7 7 30 52 77 30 77 52 52 62 52 52 52 34 7 30 7 7 7 7 8 70 70 40 13 13 32

0 0 0 0 0 0 32 8 0 0 25 1 16 15 0 21 46 0 0 19 0 0 0 0 0 0 58 0 0 17 0 0 0 0 0 0 70 0 0 55 0 45 0 27 0 23 0 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J HVAC System Testing - Area C (Low Roof) HVAC Above Ceiling Finalization - Area C (Low Roof) Interior Rough-in Substantially Complete - Area A /B/C (1-Story)

Storm Drain Rough-in - Area C (Aux Gym) Plumbing Above Ceiling Finalization - Area C (Aux Gym) Block Filler - Area C (Aux Gym) HVAC Ductwork Rough-in - Area C (Aux Gym) Conduit - Overhead - Area C (Aux Gym) HVAC Controls Rough-in - Area C (Aux Gym) Pull Electrical Wires - Area C (Aux Gym) Electrical Above Ceiling Finalization - Area C (Aux Gym) Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) Fire Protection Rough-in - Area C (Aux Gym) Fire Protection Above Ceiling Finalization - Area C (Aux Gym) Tech Above Ceiling Finalization - Area C (Aux Gym) HVAC System Testing - Area C (Aux Gym) HVAC Above Ceiling Finalization - Area C (Aux Gym) Interior Rough-in Substantially Complete - Area C (Aux Gym)

Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) Metal Studs - Area D/E/F (Low Roof) Plumbing Chase Rough-in - Area D/E/F (Low Roof) Gypsum Board - Area D/E/F (Low Roof) Block Filler - Area D/E/F (Low Roof) Storm Drain Rough-in - Area D/E/F (Low Roof) Switchgear - Area D/E/F (Low Roof) HVAC Ductwork Rough-in - Area D/E/F (Low Roof) HVAC Piping Rough-in - Area D/E/F (Low Roof) Plumbing Rough-in - Area D/E/F (Low Roof) Conduit - Overhead - Area D/E/F (Low Roof) Plumbing Insulation - Area D/E/F (Low Roof) Fire Protection Rough-in - Area D/E/F (Low Roof) Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) Pull Electrical Wires - Area D/E/F (Low Roof) Cable Tray - Area D/E/F (Low Roof) Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) Tech Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) HVAC Controls Rough-in - Area D/E/F (Low Roof) HVAC Insulation - Area D/E/F (Low Roof) Fire Protection Above Ceiling Finalization - Area D/E/F (L HVAC System Testing - Area D/E/F (Low Roof) HVAC Above Ceiling Finalization - Area D/E/F (Low Interior Rough-in Substantially Complete - Area D/E/

Tech Rm Build-out and Backbone - Area D (1st Flr) Paint - Area D (1st Flr) Ceiling Grid - Area D (1st Flr) Light Fixtures - Area D (1st Flr)


Activity ID

0620A-RMM-1890 0620A-GSC-1910 0620A-ZST-1370 0620A-SAC-1310 0620A-ZSE-2630 0620A-GSC-1980 0620A-ZSE-2670 0620A-FEC-1040 0620A-GSC-2080 0620A-ZSE-2720 0620A-GSC-2090 0620A-ZST-1520 0620A-MPH-2100 0620A-ZST-1580 0620A-GSC-2190 0620A-GSC-2210 0620A-ZST-1680 0620A-GSC-2240 0620A-GSC-2250 0620A-ZST-1740 0620A-ZST-1820 0620A-GSC-2570 0620A-GSC-2220 0620A-ALL-1280 Area E (1st Flr) 0620A-GSC-1670 0620A-GSC-1700 0620A-ZSE-2440 0620A-RMM-1780 0620A-ZST-1300 0620A-GSC-1760 0620A-SAC-1260 0620A-ZSE-2480 0620A-GSC-1840 0620A-ZSE-2550 0620A-FEC-1020 0620A-ZSE-2570 0620A-GSC-1900 0620A-ZST-1400 0620A-GSC-1940 0620A-ZST-1430 0620A-MPH-2060 0620A-ZST-1720 0620A-GSC-2000 0620A-GSC-2040 0620A-GSC-2060 0620A-GSC-2070 0620A-ZST-1790 0620A-GSC-2050 Area F (1st Flr) 0620A-ZST-1070 0620A-GSC-1560 0620A-GSC-1570 0620A-ZSE-2350 0620A-RMM-1700 0620A-GSC-1660 0620A-ZST-1250

Activity Name

Orig Start Dur

HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr) Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 17 of 25

6 10 10 3 3 10 5 8 15 1 5 5 10 5 10 3 5 5 6 5 10 10 5 0 57 12 12 7 6 5 10 3 4 10 3 8 1 15 2 5 2 10 2 10 3 4 6 4 5 94 5 12 12 10 6 8 10

12-26-14 12-30-14 12-30-14 12-31-14 01-06-15 01-06-15 01-09-15 01-12-15 01-14-15 01-16-15 01-20-15 01-20-15 01-20-15 01-27-15 01-28-15 02-03-15 02-03-15 02-04-15 02-04-15 02-10-15 02-17-15 03-03-15 03-06-15 12-30-14 12-30-14 01-02-15 01-13-15 01-14-15 01-16-15 01-16-15 01-19-15 01-22-15 01-22-15 01-28-15 01-28-15 02-02-15 02-04-15 02-05-15 02-05-15 02-09-15 02-10-15 02-17-15 02-18-15 02-24-15 02-25-15 02-25-15 03-03-15 03-13-15 11-18-14 11-18-14 01-16-15 01-20-15 01-26-15 01-30-15 02-03-15 02-03-15

Finish

01-05-15 01-13-15 01-13-15 01-05-15 01-08-15 01-19-15 01-15-15 01-21-15 02-03-15 01-16-15 01-26-15 01-26-15 02-02-15 02-02-15 02-10-15 02-05-15 02-09-15 02-10-15 02-11-15 02-16-15 03-02-15 03-16-15 03-12-15 04-01-15 03-19-15 01-15-15 01-19-15 01-21-15 01-21-15 01-22-15 01-29-15 01-21-15 01-27-15 02-04-15 01-30-15 02-06-15 02-02-15 02-24-15 02-06-15 02-11-15 02-10-15 02-23-15 02-18-15 03-03-15 02-26-15 03-02-15 03-04-15 03-06-15 03-19-15 04-01-15 11-24-14 02-02-15 02-04-15 02-06-15 02-06-15 02-12-15 02-16-15

Late Start

02-06-15 02-18-15 03-24-15 02-11-15 05-15-15 02-16-15 06-10-15 03-04-15 03-18-15 07-07-15 03-26-15 04-09-15 04-28-15 04-16-15 04-30-15 05-21-15 04-23-15 06-15-15 05-04-15 04-30-15 05-07-15 06-29-15 06-08-15 01-19-15 01-19-15 01-21-15 02-19-15 02-20-15 04-08-15 03-04-15 02-25-15 05-20-15 03-02-15 06-17-15 03-16-15 07-08-15 04-09-15 04-27-15 04-08-15 05-04-15 05-12-15 05-18-15 05-14-15 05-27-15 06-22-15 05-12-15 05-21-15 06-15-15 01-07-15 01-07-15 02-04-15 02-06-15 03-02-15 03-06-15 03-18-15 04-15-15

Late Finish 02-13-15 03-03-15 04-07-15 02-13-15 05-19-15 02-27-15 06-16-15 03-13-15 04-08-15 07-07-15 04-01-15 04-15-15 05-11-15 04-22-15 05-13-15 05-26-15 04-29-15 06-19-15 05-11-15 05-06-15 05-20-15 07-10-15 06-12-15 07-10-15 07-08-15 02-03-15 02-05-15 02-27-15 02-27-15 04-14-15 03-17-15 02-27-15 05-26-15 03-13-15 06-19-15 03-25-15 07-08-15 04-29-15 04-28-15 04-14-15 05-05-15 05-26-15 05-19-15 05-28-15 05-29-15 06-25-15 05-19-15 05-27-15 06-19-15 07-09-15 01-13-15 02-19-15 02-23-15 03-13-15 03-13-15 03-27-15 04-28-15

Total Free Float Float 29 35 59 29 92 29 106 37 45 120 47 56 69 56 65 76 56 91 62 56 56 82 64 70 77 13 13 27 27 57 33 27 83 27 98 33 110 45 56 43 59 64 63 60 64 81 53 56 64 69 33 13 13 25 25 31 50

0 0 2 0 0 0 0 0 0 10 2 0 0 0 5 12 0 10 9 0 0 12 0 0 0 0 0 0 0 7 2 0 0 0 0 2 15 0 0 5 4 0 8 1 0 6 4 8 4 0 0 0 0 0 0 4 2

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

2015 J F M A M J Jul A S O N D J HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr)

Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)

F

2016 M A M J


Activity ID

0620A-SAC-1230 0620A-GSC-1710 0620A-ZSE-2400 0620A-FEC-1000 0620A-ZSE-2450 0620A-GSC-1750 0620A-ZST-1290 0620A-ZSE-2460 0620A-GSC-1740 0620A-ZST-1330 0620A-MPH-2000 0620A-ZST-1600 0620A-GSC-1850 0620A-GSC-1870 0620A-GSC-1880 0620A-ZST-1670 0620A-ZST-1730 Second Floor Area G (2nd Flr) 0620A-GSC-2100 0620A-GSC-2280 0620A-ZSE-2850 0620A-RMM-2160 0620A-GSC-2260 0620A-ZST-1660 0620A-SAC-1390 0620A-ZSE-2900 0620A-GSC-2380 0620A-ZSE-2950 0620A-FEC-1080 0620A-GSC-2580 0620A-GSC-2400 0620A-ZSE-2970 0620A-GSC-2820 0620A-ZST-1920 0620A-MPH-2260 0620A-ZST-2050 0620A-ZST-2070 0620A-GSC-2930 0620A-GSC-2940 0620A-GSC-2950 0620A-GSC-2960 0620A-ZST-2140 0620A-GSC-2910 0620A-ALL-1320 Area H (2nd Flr) 0620A-ZST-1690 0620A-GSC-1950 0620A-GSC-2110 0620A-ZSE-2800 0620A-RMM-2060 0620A-ZST-1550 0620A-GSC-2180 0620A-SAC-1350 0620A-ZSE-2840 0620A-GSC-2320 0620A-FEC-1060

Activity Name

Orig Start Dur

Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)

Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 18 of 25

3 8 8 8 3 5 5 1 10 5 8 5 8 3 6 5 10 119 80 12 12 7 6 10 10 3 3 10 3 8 10 5 1 15 5 10 3 5 3 4 5 6 10 10 0 111 10 12 12 9 6 7 10 3 7 10 8

02-04-15 02-09-15 02-09-15 02-11-15 02-19-15 02-19-15 02-19-15 02-24-15 02-25-15 02-26-15 03-03-15 03-05-15 03-05-15 03-11-15 03-11-15 03-12-15 03-19-15 12-08-14 02-03-15 02-03-15 02-05-15 02-16-15 02-17-15 02-19-15 02-19-15 02-20-15 02-25-15 02-25-15 03-02-15 03-03-15 03-03-15 03-04-15 03-05-15 03-05-15 03-11-15 03-12-15 03-18-15 03-23-15 03-26-15 03-26-15 03-26-15 03-26-15 04-02-15 04-17-15 12-08-14 12-08-14 02-19-15 02-23-15 02-26-15 03-05-15 03-09-15 03-09-15 03-10-15 03-11-15 03-13-15 03-19-15

Finish

02-06-15 02-18-15 02-18-15 02-20-15 02-23-15 02-25-15 02-25-15 02-24-15 03-10-15 03-04-15 03-12-15 03-11-15 03-16-15 03-13-15 03-18-15 03-18-15 04-01-15 05-27-15 05-27-15 02-18-15 02-20-15 02-24-15 02-24-15 03-04-15 03-04-15 02-24-15 02-27-15 03-10-15 03-04-15 03-12-15 03-16-15 03-10-15 03-05-15 03-25-15 03-17-15 03-25-15 03-20-15 03-27-15 03-30-15 03-31-15 04-01-15 04-02-15 04-16-15 04-30-15 05-27-15 05-14-15 12-19-14 03-06-15 03-10-15 03-10-15 03-12-15 03-17-15 03-20-15 03-12-15 03-19-15 03-26-15 03-30-15

Late Start

03-11-15 03-16-15 05-27-15 03-26-15 06-22-15 04-15-15 04-29-15 07-09-15 04-30-15 05-06-15 05-29-15 05-13-15 05-29-15 06-26-15 05-20-15 05-20-15 05-28-15 02-20-15 02-20-15 02-20-15 02-24-15 03-17-15 03-18-15 03-30-15 05-08-15 03-23-15 06-08-15 03-26-15 06-25-15 04-08-15 07-06-15 04-22-15 07-10-15 04-14-15 05-22-15 05-14-15 06-01-15 06-04-15 06-22-15 06-30-15 06-22-15 05-29-15 06-11-15 06-03-15 03-10-15 06-08-15 03-10-15 03-12-15 03-27-15 04-01-15 06-01-15 04-21-15 04-07-15 06-11-15 04-10-15 04-20-15

Late Finish 03-13-15 03-25-15 06-05-15 04-07-15 06-24-15 04-21-15 05-05-15 07-09-15 05-13-15 05-12-15 06-09-15 05-19-15 06-09-15 06-30-15 05-28-15 05-27-15 06-10-15 07-17-15 07-17-15 03-09-15 03-11-15 03-25-15 03-25-15 04-13-15 05-21-15 03-25-15 06-10-15 04-09-15 06-29-15 04-17-15 07-17-15 04-28-15 07-10-15 05-04-15 05-29-15 05-28-15 06-03-15 06-10-15 06-24-15 07-03-15 06-26-15 06-05-15 06-24-15 06-16-15 07-17-15 07-17-15 06-19-15 03-25-15 03-27-15 04-09-15 04-09-15 06-09-15 05-04-15 04-09-15 06-19-15 04-23-15 04-29-15

Total Free Float Float 25 25 75 31 85 38 48 95 45 48 61 48 59 75 49 48 48 37 37 13 13 21 21 27 55 21 71 21 81 25 87 34 89 27 51 44 51 51 60 66 60 44 48 32 37 45 126 13 13 21 19 58 30 19 64 19 21

0 0 0 6 0 4 0 6 0 0 39 0 12 13 5 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 50 7 13 0 0 0 0 3 0 11 9 9 0 0 0 0 17 0 0 0 0 5 2 0 0 0 2

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D J Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)

F

Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)

2016 M A M J


Activity ID

0620A-ZSE-2890 0620A-ZSE-2920 0620A-GSC-2660 0620A-GSC-2370 0620A-ZST-1810 0620A-MPH-2240 0620A-ZST-1860 0620A-ZST-1910 0620A-GSC-2780 0620A-GSC-2790 0620A-GSC-2800 0620A-GSC-2810 0620A-ZST-2060 0620A-ZST-2150 0620A-GSC-2760 Area I (2nd Flr) 0620A-GSC-1810 0620A-GSC-1960 0620A-ZSE-2660 0620A-RMM-1950 0620A-ZST-1500 0620A-GSC-2010 0620A-SAC-1340 0620A-ZSE-2740 0620A-GSC-2160 0620A-FEC-1050 0620A-ZSE-2760 0620A-ZSE-2780 0620A-GSC-2200 0620A-ZST-1620 0620A-GSC-2520 0620A-ZST-1700 0620A-ZST-1780 0620A-MPH-2200 0620A-ZST-1930 0620A-GSC-2640 0620A-GSC-2650 0620A-GSC-2700 Third Floor Area G (3rd Flr) 0620A-GSC-2590 0620A-GSC-2270 0620A-ZST-2160 0620A-GSC-2830 0620A-GSC-2740 0620A-ZSE-3210 0620A-RMM-2350 0620A-SAC-1500 0620A-ZSE-3220 0620A-GSC-2970 0620A-ZSE-3240 0620A-ZSE-3250 0620A-FEC-1130 0620A-GSC-3020 0620A-GSC-3040 0620A-ZST-2280 0620A-MPH-2290

Activity Name

Orig Start Dur

Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr)

3 1 15 5 5 10 3 3 3 5 6 6 7 10 10 56 12 12 10 6 7 8 3 5 8 8 3 1 5 5 12 3 3 8 7 3 6 8 89 89 10 12 10 12 10 7 6 3 2 10 2 1 8 15 5 5 10

Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)

Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 19 of 25

03-20-15 03-25-15 03-26-15 03-27-15 03-27-15 04-01-15 04-03-15 04-09-15 04-16-15 04-16-15 04-17-15 04-17-15 04-17-15 04-28-15 05-01-15 03-09-15 03-09-15 03-11-15 03-17-15 03-23-15 03-25-15 03-25-15 03-26-15 03-31-15 03-31-15 04-02-15 04-08-15 04-13-15 04-13-15 04-13-15 04-17-15 04-20-15 04-23-15 04-23-15 04-28-15 05-05-15 05-05-15 05-15-15 03-03-15 03-03-15 03-03-15 03-12-15 03-30-15 04-03-15 04-10-15 04-15-15 04-16-15 04-21-15 04-24-15 04-24-15 04-28-15 04-30-15 04-30-15 05-04-15 05-08-15 05-08-15 05-08-15

Finish

03-24-15 03-25-15 04-16-15 04-02-15 04-02-15 04-15-15 04-08-15 04-13-15 04-20-15 04-22-15 04-24-15 04-24-15 04-27-15 05-11-15 05-14-15 05-27-15 03-24-15 03-26-15 03-30-15 03-30-15 04-02-15 04-03-15 03-30-15 04-07-15 04-10-15 04-14-15 04-10-15 04-13-15 04-17-15 04-17-15 05-04-15 04-22-15 04-27-15 05-04-15 05-06-15 05-07-15 05-12-15 05-27-15 07-07-15 07-07-15 03-16-15 03-27-15 04-13-15 04-21-15 04-23-15 04-23-15 04-23-15 04-23-15 04-27-15 05-07-15 04-29-15 04-30-15 05-11-15 05-22-15 05-14-15 05-14-15 05-21-15

Late Start

06-30-15 07-13-15 05-05-15 05-08-15 06-10-15 05-29-15 06-17-15 06-22-15 06-29-15 06-29-15 06-08-15 07-06-15 06-25-15 07-06-15 06-17-15 03-26-15 03-26-15 03-30-15 04-10-15 04-16-15 06-15-15 05-14-15 04-21-15 06-22-15 04-24-15 04-30-15 07-03-15 07-14-15 05-15-15 06-24-15 05-27-15 07-01-15 07-06-15 06-12-15 07-09-15 07-14-15 06-16-15 07-01-15 04-14-15 04-14-15 06-10-15 04-14-15 05-12-15 04-16-15 04-30-15 04-27-15 04-28-15 05-01-15 06-29-15 05-06-15 07-08-15 07-15-15 05-12-15 05-14-15 05-22-15 05-27-15 06-10-15

Late Finish 07-02-15 07-13-15 05-26-15 05-14-15 06-16-15 06-11-15 06-19-15 06-24-15 07-01-15 07-03-15 06-15-15 07-13-15 07-03-15 07-17-15 06-30-15 07-17-15 04-13-15 04-15-15 04-23-15 04-23-15 06-23-15 05-26-15 04-23-15 06-26-15 05-05-15 05-11-15 07-07-15 07-14-15 05-21-15 06-30-15 06-11-15 07-03-15 07-08-15 06-23-15 07-17-15 07-16-15 06-23-15 07-10-15 07-17-15 07-17-15 06-23-15 04-29-15 05-26-15 05-01-15 05-13-15 05-05-15 05-05-15 05-05-15 06-30-15 05-19-15 07-09-15 07-15-15 05-21-15 06-04-15 05-29-15 06-02-15 06-23-15

Total Free Float Float 70 76 27 29 51 40 51 51 51 51 35 55 48 48 32 37 13 13 17 17 56 35 17 57 17 19 61 65 24 51 27 51 51 35 51 49 29 32 8 8 69 22 30 8 14 8 8 8 45 8 50 53 8 8 10 12 22

0 11 0 5 0 0 0 3 0 18 6 6 0 11 0 0 0 0 0 0 5 8 0 0 0 8 0 12 7 0 0 0 0 16 14 13 8 0 0 0 48 0 2 0 0 0 0 0 0 0 0 16 0 0 2 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr) Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)

Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)


Activity ID

0620A-GSC-3070 0620A-ZST-2300 0620A-GSC-3100 0620A-GSC-3110 0620A-ZST-2320 0620A-GSC-3120 0620A-GSC-3130 0620A-ZST-2340 0620A-ALL-1380 Area H (3rd Flr) 0620A-GSC-2170 0620A-ZST-2100 0620A-GSC-2530 0620A-GSC-2610 0620A-ZSE-3150 0620A-RMM-2310 0620A-SAC-1480 0620A-ZSE-3170 0620A-GSC-2710 0620A-FEC-1120 0620A-ZSE-3190 0620A-ZSE-3200 0620A-GSC-2750 0620A-GSC-2770 0620A-ZST-2230 0620A-MPH-2250 0620A-ZST-2240 0620A-ZST-2250 0620A-GSC-2860 0620A-ZST-2260 0620A-GSC-2880 0620A-GSC-2890 0620A-GSC-2980 0620A-GSC-2990 Area I (3rd Flr) 0620A-GSC-1990 0620A-ZST-2000 0620A-GSC-2510 0620A-GSC-2340 0620A-ZSE-2940 0620A-RMM-2200 0620A-SAC-1440 0620A-ZSE-3010 0620A-GSC-2430 0620A-FEC-1090 0620A-ZSE-3060 0620A-ZSE-3090 0620A-GSC-2540 0620A-ZST-2090 0620A-GSC-2620 0620A-ZST-2130 0620A-MPH-2220 0620A-ZST-2170 0620A-GSC-2670 0620A-ZST-2190 0620A-GSC-2720 0620A-GSC-2730

Activity Name

Orig Start Dur

Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr

3 3 10 5 5 4 6 10 0 67 12 7 12 10 9 6 3 5 10 8 3 1 15 5 5 10 3 3 10 7 6 6 3 5 58 12 7 8 12 10 6 3 5 8 8 2 1 5 5 10 3 8 3 8 7 3 6

Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 20 of 25

05-15-15 05-15-15 05-18-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 03-30-15 03-30-15 04-16-15 04-23-15 04-24-15 04-30-15 05-05-15 05-08-15 05-13-15 05-13-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 05-28-15 06-01-15 06-04-15 06-09-15 06-09-15 06-12-15 06-16-15 06-16-15 06-26-15 06-26-15 04-16-15 04-16-15 05-04-15 05-08-15 05-11-15 05-15-15 05-21-15 05-27-15 06-01-15 06-01-15 06-03-15 06-08-15 06-10-15 06-11-15 06-11-15 06-16-15 06-18-15 06-22-15 06-23-15 06-24-15 06-26-15 06-30-15 06-30-15

Finish

05-19-15 05-19-15 06-01-15 05-26-15 05-27-15 05-29-15 06-02-15 06-10-15 07-07-15 07-02-15 04-15-15 04-24-15 05-08-15 05-07-15 05-12-15 05-12-15 05-12-15 05-19-15 05-27-15 05-29-15 05-22-15 05-26-15 06-15-15 06-03-15 06-03-15 06-12-15 06-08-15 06-11-15 06-22-15 06-22-15 06-23-15 06-23-15 06-30-15 07-02-15 07-07-15 05-01-15 05-12-15 05-19-15 05-27-15 05-29-15 05-29-15 05-29-15 06-05-15 06-10-15 06-12-15 06-09-15 06-10-15 06-17-15 06-17-15 06-29-15 06-22-15 07-01-15 06-25-15 07-03-15 07-06-15 07-02-15 07-07-15

Late Start

07-03-15 06-03-15 06-10-15 07-06-15 06-08-15 07-01-15 06-24-15 06-15-15 05-01-15 05-01-15 06-03-15 05-05-15 05-21-15 05-14-15 05-19-15 05-22-15 07-01-15 05-28-15 06-03-15 07-10-15 07-16-15 06-05-15 06-15-15 06-12-15 06-24-15 06-19-15 06-24-15 06-24-15 06-29-15 07-02-15 07-07-15 07-13-15 07-13-15 05-19-15 05-19-15 06-12-15 06-16-15 05-21-15 05-28-15 06-03-15 06-08-15 07-08-15 06-11-15 06-24-15 07-15-15 07-17-15 06-29-15 06-23-15 06-26-15 06-30-15 07-08-15 07-03-15 07-08-15 07-08-15 07-15-15 07-10-15

Late Finish 07-07-15 06-05-15 06-23-15 07-10-15 06-12-15 07-06-15 07-01-15 06-26-15 07-17-15 07-17-15 05-18-15 06-11-15 05-20-15 06-04-15 05-27-15 05-27-15 05-27-15 07-07-15 06-10-15 06-12-15 07-14-15 07-16-15 06-25-15 06-19-15 06-18-15 07-07-15 06-23-15 06-26-15 07-07-15 07-07-15 07-09-15 07-14-15 07-15-15 07-17-15 07-17-15 06-04-15 06-22-15 06-25-15 06-08-15 06-10-15 06-10-15 06-10-15 07-14-15 06-22-15 07-03-15 07-16-15 07-17-15 07-03-15 06-29-15 07-09-15 07-02-15 07-17-15 07-07-15 07-17-15 07-16-15 07-17-15 07-17-15

Total Free Float Float 34 12 16 33 12 26 21 12 8 11 23 33 8 19 10 10 10 34 10 10 36 37 8 12 11 17 11 11 11 11 12 15 11 11 8 23 28 26 8 8 8 8 27 8 15 27 27 12 8 8 8 12 8 10 8 11 8

2 0 5 22 0 11 9 1 0 0 0 5 0 0 0 0 0 0 0 2 0 10 0 4 0 5 0 0 1 3 4 4 0 0 0 0 20 18 0 0 0 0 0 0 7 0 19 4 0 0 0 4 0 2 0 3 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)


Activity ID

One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-SAC-1400 0620A-GSC-2360 0620A-ZSE-2990 0620A-RMM-2220 0620A-ZSE-3000 0620A-ZSE-3030 0620A-GSC-2450 0620A-ZSE-3070 0620A-ZSE-3110 0620A-ZSE-3160 0620A-ZST-1880 0620A-ZST-1900 0620A-ZST-1940 0620A-ZST-2020 0620A-ZST-2080 0620A-GSC-2410 0620A-GSC-2560 0620A-GSC-2680 0620A-GSC-2840 0620A-GSC-2870 0620A-GSC-3030 0620A-ZSE-3390 0620A-ALL-1340 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-1290 0620A-GSC-1680 0620A-RMM-1770 0620A-ZSE-2420 0620A-SAC-1250 0620A-ZST-1060 0620A-GSC-1370 0620A-ZSE-2470 0620A-GSC-1830 0620A-ZSE-2530 0620A-FEC-1010 0620A-GSC-1890 0620A-ZSE-2580 0620A-ZST-1380 0620A-ZST-1440 0620A-ZSE-2650 0620A-ZST-1490 0620A-MPH-2030 0620A-ZST-1540 0620A-GSC-2120 0620A-GSC-2130 0620A-SSI-1020 0620A-GSC-2150 0620A-ZST-1560 0620A-ZST-1610 0620A-SSI-1030 0620A-GSC-2020 0620A-GSC-3210 Area B (Low Roof)

Activity Name

Orig Start Dur

Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)

Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 21 of 25

175 107 107 3 7 4 5 1 5 8 1 8 3 1 1 1 1 1 5 5 27 5 15 2 4 0 85 85 12 12 6 8 6 5 10 3 10 5 8 18 6 4 5 18 5 13 3 5 6 7 20 5 5 3 5 10 53

11-06-14 01-28-15 01-28-15 01-28-15 02-02-15 02-11-15 02-11-15 02-17-15 02-18-15 02-18-15 02-25-15 03-02-15 03-12-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 03-26-15 04-02-15 04-10-15 05-19-15 06-03-15 06-24-15 06-24-15 11-06-14 11-06-14 11-06-14 11-10-14 11-18-14 11-18-14 11-20-14 11-24-14 11-24-14 12-01-14 12-01-14 12-04-14 12-05-14 12-09-14 12-11-14 12-15-14 12-19-14 12-19-14 12-29-14 01-05-15 01-06-15 01-06-15 01-06-15 01-06-15 01-06-15 01-09-15 01-16-15 01-22-15 01-22-15 02-24-15 11-24-14

Finish

07-15-15 06-29-15 06-29-15 01-30-15 02-10-15 02-16-15 02-17-15 02-17-15 02-24-15 02-27-15 02-25-15 03-11-15 03-16-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 04-01-15 04-09-15 05-18-15 05-26-15 06-23-15 06-25-15 06-29-15 06-29-15 03-09-15 03-09-15 11-21-14 11-25-14 11-25-14 11-28-14 11-28-14 12-01-14 12-08-14 12-03-14 12-12-14 12-10-14 12-16-14 01-05-15 12-18-14 12-18-14 12-26-14 01-15-15 01-05-15 01-21-15 01-08-15 01-12-15 01-13-15 01-14-15 02-02-15 01-15-15 01-22-15 01-26-15 01-28-15 03-09-15 02-09-15

Late Start

12-15-14 02-11-15 02-11-15 02-11-15 02-16-15 03-23-15 03-19-15 03-27-15 03-30-15 03-26-15 04-07-15 04-08-15 04-20-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-09-15 04-16-15 04-23-15 06-02-15 06-16-15 07-09-15 07-07-15 12-15-14 12-15-14 12-15-14 12-17-14 01-06-15 12-29-14 01-06-15 02-27-15 01-08-15 01-09-15 01-14-15 01-14-15 01-20-15 01-22-15 01-21-15 03-06-15 03-12-15 01-29-15 03-19-15 04-09-15 03-26-15 06-16-15 06-10-15 04-10-15 02-25-15 03-31-15 06-22-15 07-01-15 05-22-15 04-09-15 01-02-15

Late Finish 07-24-15 07-10-15 07-10-15 02-13-15 02-24-15 03-26-15 03-25-15 03-27-15 04-03-15 04-07-15 04-07-15 04-17-15 04-22-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-15-15 04-22-15 06-01-15 06-08-15 07-06-15 07-10-15 07-10-15 07-10-15 07-03-15 07-03-15 12-31-14 01-05-15 01-13-15 01-08-15 01-13-15 03-05-15 01-21-15 01-13-15 01-27-15 01-20-15 01-29-15 02-16-15 01-28-15 03-11-15 03-18-15 02-23-15 03-25-15 04-27-15 03-30-15 06-22-15 06-17-15 04-20-15 03-24-15 04-07-15 06-26-15 07-03-15 05-29-15 04-22-15 07-03-15

Total Free Float Float 7 9 9 10 10 28 26 28 28 26 28 26 26 18 18 18 18 18 9 9 9 9 9 11 9 9 82 82 26 26 32 27 30 66 30 27 30 27 30 30 27 57 57 27 57 67 57 113 109 67 36 57 109 112 85 31 102

0 0 0 0 0 0 0 0 0 0 1 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 13 12 0 0 0 3 30 21 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D

J

F

2016 M A M J

Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)

Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)


Activity ID

0620A-GSC-1380 0620A-GSC-1780 0620A-ZSE-2540 0620A-RMM-1860 0620A-SAC-1300 0620A-GSC-1490 0620A-ZST-1140 0620A-ZSE-2610 0620A-GSC-1970 0620A-ZSE-2640 0620A-FEC-1030 0620A-ZSE-2700 0620A-ZST-1480 0620A-ZST-1510 0620A-GSC-2140 0620A-ZST-1570 0620A-ZST-1590 0620A-ZST-1640 0620A-MPH-2110 0620A-ZST-1760 0620A-GSC-2290 0620A-GSC-2300 0620A-GSC-2310 Area C (Low Roof) 0620A-GSC-1500 0620A-ZST-1220 0620A-GSC-1610 0620A-GSC-2230 0620A-ZSE-2810 0620A-RMM-2140 0620A-SAC-1370 0620A-ZSE-2870 0620A-GSC-2330 0620A-FEC-1070 0620A-GSC-2350 0620A-ZSE-2910 0620A-ZSE-2960 0620A-ZST-1830 0620A-MPH-2190 0620A-GSC-2390 0620A-ZST-1890 0620A-ZST-1960 0620A-GSC-2460 0620A-ZST-2030 0620A-GSC-2470 0620A-GSC-2480 0620A-GSC-2490 0620A-GSC-2500 0620A-ALL-1260 Area C (Aux Gym) Area C (Aux Gym) 0620A-SAC-1410 0620A-GSC-2420 0620A-ZSE-3020 0620A-RMM-2230 0620A-ZSE-3050 0620A-ZSE-3080

Activity Name

Orig Start Dur

Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)

Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 22 of 25

12 12 9 6 4 5 5 1 6 5 8 2 4 5 18 5 3 5 2 5 2 6 5 61 12 5 10 12 9 6 4 5 8 8 18 3 1 4 10 10 5 3 10 5 3 5 3 6 0 104 104 4 5 4 5 1 2

11-24-14 11-26-14 12-04-14 12-09-14 12-11-14 12-11-14 12-11-14 12-17-14 12-17-14 12-18-14 12-19-14 12-26-14 12-26-14 01-02-15 01-06-15 01-09-15 01-16-15 01-21-15 01-22-15 01-28-15 01-30-15 01-30-15 02-03-15 12-11-14 12-11-14 12-30-14 12-30-14 01-08-15 01-16-15 01-20-15 01-22-15 01-29-15 01-29-15 02-02-15 02-04-15 02-05-15 02-10-15 02-10-15 02-10-15 02-10-15 02-16-15 02-23-15 02-23-15 02-26-15 02-27-15 02-27-15 03-02-15 03-02-15 02-02-15 02-02-15 02-02-15 02-11-15 02-18-15 02-18-15 02-24-15 02-25-15

Finish

12-10-14 12-12-14 12-16-14 12-16-14 12-16-14 12-17-14 12-17-14 12-17-14 12-24-14 12-24-14 12-31-14 12-29-14 12-31-14 01-08-15 01-29-15 01-15-15 01-20-15 01-27-15 01-23-15 02-03-15 02-02-15 02-06-15 02-09-15 03-09-15 12-29-14 01-06-15 01-13-15 01-23-15 01-28-15 01-27-15 01-27-15 02-04-15 02-09-15 02-11-15 02-27-15 02-09-15 02-10-15 02-13-15 02-23-15 02-23-15 02-20-15 02-25-15 03-06-15 03-04-15 03-03-15 03-05-15 03-04-15 03-09-15 03-09-15 06-29-15 06-29-15 02-05-15 02-17-15 02-23-15 02-24-15 02-24-15 02-26-15

Late Start

01-02-15 01-06-15 01-16-15 03-03-15 01-30-15 02-10-15 03-06-15 03-17-15 02-11-15 03-18-15 02-13-15 04-01-15 03-13-15 03-19-15 02-17-15 03-26-15 04-02-15 04-08-15 04-28-15 06-29-15 06-23-15 06-18-15 03-25-15 01-20-15 01-20-15 03-20-15 02-27-15 01-22-15 02-24-15 03-11-15 02-05-15 03-18-15 03-09-15 03-11-15 03-13-15 03-25-15 04-03-15 03-27-15 04-30-15 03-19-15 04-02-15 04-10-15 04-01-15 04-15-15 06-01-15 06-01-15 06-25-15 06-26-15 02-19-15 02-19-15 02-19-15 02-25-15 05-19-15 05-15-15 06-04-15 06-05-15

Late Finish 01-19-15 01-21-15 01-28-15 03-10-15 02-04-15 02-16-15 03-12-15 03-17-15 02-18-15 03-24-15 02-24-15 04-02-15 03-18-15 03-25-15 03-12-15 04-01-15 04-07-15 04-14-15 04-29-15 07-03-15 06-24-15 06-25-15 03-31-15 07-03-15 02-04-15 03-26-15 03-12-15 02-06-15 03-06-15 03-18-15 02-10-15 03-24-15 03-18-15 03-20-15 04-08-15 03-27-15 04-03-15 04-01-15 05-13-15 04-01-15 04-09-15 04-14-15 04-15-15 04-21-15 06-03-15 06-05-15 06-29-15 07-03-15 07-03-15 07-17-15 07-17-15 02-24-15 03-03-15 05-22-15 05-21-15 06-04-15 06-08-15

Total Free Float Float 26 26 29 58 34 41 59 62 38 62 38 67 54 54 30 54 54 54 67 106 100 97 36 82 26 57 42 10 27 36 10 34 27 27 27 34 38 33 56 27 33 33 27 33 64 64 81 82 82 14 14 13 10 63 61 70 70

0 0 0 22 0 7 5 0 0 0 8 29 0 0 0 0 0 0 11 24 19 15 9 0 0 24 15 0 0 10 0 0 0 0 0 0 10 0 3 0 0 0 1 3 0 0 3 0 0 0 0 3 0 0 54 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

2015 2016 J F M A M J Jul A S O N D J F M A M J Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)

Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)


Activity ID

Activity Name

Orig Start Dur

0620A-ZSE-3100 Lighting Controls - Area C (Aux Gym) 0620A-GSC-2550 Gym Equipment - Area C (Aux Gym) 0620A-ZST-1950 Tech Terminations - Area C (Aux Gym) 0620A-ZST-1970 Paging Devices - Area C (Aux Gym) 0620A-ZST-2010 Security Devices - Area C (Aux Gym) 0620A-ZST-2040 Tech Devices - Area C (Aux Gym) 0620A-ZST-2110 A/V Devices - Area C (Aux Gym) 0620A-GSC-2440 Misc Finishes - Area C (Aux Gym) 0620A-GSC-2630 Specialties - Area C (Aux Gym) 0620A-GSC-2850 Gym Flooring - Area C (Aux Gym) 0620A-GSC-2920 Gym Floor Striping - Area C (Aux Gym) 0620A-GSC-3000 Doors/ Hardware - Area C (Aux Gym) 0620A-ALL-1330 Substantial Completion - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-GSC-1650 Paint - Area D/E/F (Low Roof) 0620A-ZST-1320 Tech Terminations - Area D/E/F (Low Roof) 0620A-GSC-1790 Misc Finishes - Area D/E/F (Low Roof) 0620A-GSC-2900 Ceiling Grid - Area D/E/F (Low Roof) 0620A-ZSE-3230 Light Fixtures - Area D/E/F (Low Roof) 0620A-RMM-2360 HVAC Ceiling Finishes - Area D/E/F (Low Roof) 0620A-SAC-1510 Fire Protection Heads - Area D/E/F (Low Roof) 0620A-ZSE-3280 Wiring Devices - Area D/E/F (Low Roof) 0620A-GSC-3060 Ceiling Pads - Area D/E/F (Low Roof) 0620A-FEC-1160 Casework - Area D/E/F (Low Roof) 0620A-ZSE-3300 Fire Alarm System - Area D/E/F (Low Roof) 0620A-GSC-3090 Flooring - Area D/E/F (Low Roof) 0620A-ZSE-3320 Lighting Controls - Area D/E/F (Low Roof) 0620A-MPH-2310 Plumbing Fixtures - Area D/E/F (Low Roof) 0620A-ZST-2330 Paging Devices - Area D/E/F (Low Roof) 0620A-GSC-3140 Toilet Partitions - Area D/E/F (Low Roof) 0620A-ZST-2350 Security Devices - Area D/E/F (Low Roof) 0620A-ZST-2360 Tech Devices - Area D/E/F (Low Roof) 0620A-GSC-3170 Specialties - Area D/E/F (Low Roof) 0620A-GSC-3150 Toilet Accessories - Area D/E/F (Low Roof) 0620A-ZST-2380 A/V Devices - Area D/E/F (Low Roof) 0620A-GSC-3180 Doors/ Hardware - Area D/E/F (Low Roof) 0620A-GSC-3190 Furnishings - Area D/E/F (Low Roof) 0620A-ALL-1430 Substantial Completion - Area D/E/F (Low Roof) Site Finishes Site Finishes Entire Site

1 5 1 1 1 1 1 5 5 15 5 2 0 103 103 15 6 10 15 9 10 9 5 10 12 3 25 1 10 3 3 3 3 10 5 6 6 6 0 63 63 63 63 10 20 15 10 15 5 5 5 5 0 95 11 11 11

0620A-NCP-1000 Finish Grading - All 0620A-NCP-1010 Curbs/ Walks - All 0620A-NCP-1020 Pavement - All 0620A-NCP-1030 Seeding/ Planting - All 0620A-ZSE-3270 Site Lighting Rough-in 0620A-NCP-1040 Misc Finishes - All 0620A-NCP-1050 Specialties - All 0620A-ZSE-3330 Light Poles 0620A-ZSE-3350 Emergency Generator 0620A-ALL-1390 Site Substantial Completion Punch List/ Commissioning Commiss Entire Project All Areas

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 23 of 25

02-27-15 03-02-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-02-15 04-10-15 05-19-15 06-10-15 06-26-15 02-19-15 02-19-15 02-19-15 03-12-15 03-12-15 05-04-15 05-12-15 05-13-15 05-14-15 05-26-15 05-28-15 06-01-15 06-02-15 06-03-15 06-05-15 06-09-15 06-18-15 06-23-15 06-23-15 06-26-15 07-01-15 07-03-15 07-07-15 07-08-15 07-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-16-15 05-05-15 05-13-15 05-21-15 06-03-15 06-03-15 06-19-15 06-29-15 03-10-15 07-07-15 07-07-15 07-07-15

Finish

02-27-15 03-06-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-09-15 04-16-15 06-09-15 06-16-15 06-29-15 06-29-15 07-15-15 07-15-15 03-11-15 03-19-15 03-25-15 05-22-15 05-22-15 05-27-15 05-27-15 06-01-15 06-10-15 06-16-15 06-04-15 07-07-15 06-05-15 06-22-15 06-22-15 06-25-15 06-25-15 06-30-15 07-14-15 07-09-15 07-14-15 07-15-15 07-15-15 07-15-15 07-06-15 07-06-15 07-06-15 07-06-15 04-23-15 05-19-15 06-02-15 06-02-15 06-18-15 06-10-15 06-10-15 06-26-15 07-06-15 07-06-15 07-22-15 07-21-15 07-21-15 07-21-15

Late Start

06-09-15 06-03-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-23-15 05-27-15 06-10-15 07-01-15 07-15-15 03-04-15 03-04-15 03-04-15 04-08-15 03-25-15 05-13-15 05-26-15 05-22-15 05-26-15 07-14-15 06-08-15 06-10-15 07-21-15 06-12-15 07-24-15 06-24-15 07-06-15 07-08-15 07-09-15 07-14-15 07-13-15 07-20-15 07-17-15 07-17-15 07-17-15 04-27-15 04-27-15 04-27-15 04-27-15 04-27-15 05-06-15 06-22-15 07-08-15 06-12-15 07-20-15 07-20-15 07-08-15 07-20-15 07-06-15 07-17-15 07-17-15 07-17-15

Late Finish 06-09-15 06-09-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-29-15 06-02-15 06-30-15 07-07-15 07-16-15 07-17-15 07-24-15 07-24-15 03-24-15 04-15-15 04-08-15 06-03-15 06-05-15 06-05-15 06-05-15 07-20-15 06-19-15 06-25-15 07-23-15 07-16-15 07-24-15 07-07-15 07-08-15 07-10-15 07-13-15 07-16-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 05-13-15 06-11-15 07-16-15 07-24-15 07-07-15 07-24-15 07-24-15 07-16-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15

Total Free Float Float 70 65 34 43 47 49 50 14 32 15 15 13 14 7 7 9 18 9 7 9 7 7 35 7 7 35 7 35 11 12 11 12 12 8 11 8 7 7 7 14 14 14 14 11 11 26 31 11 26 26 11 11 14 7 8 8 8

55 50 0 0 0 0 35 0 0 0 2 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 4 1 4 1 0 0 0 0 0 0 0 0 0 0 20 0 15 15 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec Work Days Work Days Work Days Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Lighting Controls - Area C (Aux Gym) Gym Equipment - Area C (Aux Gym) Tech Terminations - Area C (Aux Gym) Paging Devices - Area C (Aux Gym) Security Devices - Area C (Aux Gym) Tech Devices - Area C (Aux Gym) A/V Devices - Area C (Aux Gym) Misc Finishes - Area C (Aux Gym) Specialties - Area C (Aux Gym) Gym Flooring - Area C (Aux Gym) Gym Floor Striping - Area C (Aux Gym) Doors/ Hardware - Area C (Aux Gym) Substantial Completion - Area C (Aux Gym)

Paint - Area D/E/F (Low Roof) Tech Terminations - Area D/E/F (Low Roof) Misc Finishes - Area D/E/F (Low Roof) Ceiling Grid - Area D/E/F (Low Roof) Light Fixtures - Area D/E/F (Low Roof) HVAC Ceiling Finishes - Area D/E/F (Low Roof) Fire Protection Heads - Area D/E/F (Low Roof) Wiring Devices - Area D/E/F (Low Roof) Ceiling Pads - Area D/E/F (Low Roof) Casework - Area D/E/F (Low Roof) Fire Alarm System - Area D/E/F (Low Roof) Flooring - Area D/E/F (Low Roof) Lighting Controls - Area D/E/F (Low Roof) Plumbing Fixtures - Area D/E/F (Low Roof) Paging Devices - Area D/E/F (Low Roof) Toilet Partitions - Area D/E/F (Low Roof) Security Devices - Area D/E/F (Low Roof) Tech Devices - Area D/E/F (Low Roof) Specialties - Area D/E/F (Low Roof) Toilet Accessories - Area D/E/F (Low Roof) A/V Devices - Area D/E/F (Low Roof) Doors/ Hardware - Area D/E/F (Low Roof) Furnishings - Area D/E/F (Low Roof) Substantial Completion - Area D/E/F (Low

Finish Grading - All Curbs/ Walks - All Pavement - All Seeding/ Planting - All Site Lighting Rough-in Misc Finishes - All Specialties - All Light Poles Emergency Generator Site Substantial Completion


Activity ID

0620A-ZSE-3400 0620A-RMM-2410 0620A-ZSE-3410 0620A-ZSE-3420 Academic Area First Floor

Activity Name

Orig Start Dur

Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections

0620A-RMM-2320 0620A-ZSE-3180 0620A-ZST-2200 0620A-MPH-2230 0620A-SAC-1490 0620A-GSC-2690 0620A-CTT-2400 0620A-FEC-1110 0620A-ALL-1290 Second Floor

HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr

0620A-RMM-2370 0620A-ZSE-3260 0620A-ZST-2270 0620A-MPH-2270 0620A-SAC-1520 0620A-GSC-3010 0620A-CTT-2410 0620A-FEC-1140 0620A-ALL-1350 Third Floor

HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd Flr CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr

0620A-RMM-2400 0620A-ZSE-3340 0620A-ZST-2370 0620A-MPH-2320 0620A-SAC-1550 0620A-GSC-3160 0620A-CTT-2440 0620A-FEC-1180 0620A-ALL-1400 One Story Areas Area B (Gym)

HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning - 3rd Flr CT Taylor Punch List/ Commissioning - 3rd Flr Casework Punch List/ Commissioning - 3rd Flr Final Completion - 3rd Flr

0620A-RMM-2380 0620A-ZSE-3290 0620A-ZST-2290 0620A-MPH-2280 0620A-SAC-1530 0620A-GSC-3050 0620A-CTT-2420 0620A-FEC-1150 0620A-ALL-1360 Area A/B/C (1-Story) 0620A-SSI-1040 0620A-RMM-2300 0620A-ZSE-3140 0620A-ZST-2120 0620A-MPH-2210

HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - Area B (Gym) CT Taylor Punch List/ Commissioning - Area B (Gym) Casework Punch List/ Commissioning - Area B (Gym) Final Completion - Area B (Gym)

Kitchen Equipment Punch List/ Commissioning - Area A/B/C (1-Stor HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 24 of 25

5 10 5 1 77 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 10 10 5 5 5 5 5 5 5 5 0 95 5 5 5 5 5 5 5 5 5 5 0 5 5 3 5 5 5 5

07-07-15 07-08-15 07-14-15 07-21-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 03-10-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15

Finish

07-13-15 07-21-15* 07-20-15 07-21-15 07-21-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 07-21-15 07-21-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-21-15 07-22-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 03-16-15 03-16-15 03-12-15 03-16-15 03-16-15 03-16-15 03-16-15

Late Start

07-17-15 07-20-15 07-24-15 07-31-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-06-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-06-15 07-06-15 07-29-15 07-06-15 07-06-15 07-06-15 07-06-15

Late Finish 07-23-15 07-31-15 07-30-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-31-15 07-10-15 07-10-15 07-10-15 07-10-15

Total Free Float Float 8 8 8 8 8 80 80 70 70 70 70 70 70 70 70 80 42 42 37 37 37 37 37 37 37 37 42 8 8 13 13 13 13 13 13 13 13 8 7 19 19 9 9 9 9 9 9 9 9 19 97 97 99 82 82 82 82

0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 0 42 0 0 5 5 5 5 5 5 5 5 8 0 0 0 0 0 0 0 0 0 0 0 19 0 0 2 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections

HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr

HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd F CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr

HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - 3rd Casework Punch List/ Commissioning - 3r Final Completion - 3rd Flr

HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Area Casework Punch List/ Commissioning - Are Final Completion - Area B (Gym)

Kitchen Equipment Punch List/ Commissioning - Area A/B/ HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)


Activity ID

Activity Name

Orig Start Dur

0620A-SAC-1470 0620A-GSC-2600 0620A-CTT-2390 0620A-FEC-1100 0620A-ALL-1270 Area C (Aux Gym)

Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-Story) CT Taylor Punch List/ Commissioning - Area A/B/C (1-Story) Casework Punch List/ Commissioning - Area A/B/C (1-Story) Final Completion - Area A/B/C (1-Story)

0620A-RMM-2390 0620A-ZSE-3310 0620A-ZST-2310 0620A-MPH-2300 0620A-SAC-1540 0620A-GSC-3080 0620A-CTT-2430 0620A-FEC-1170 0620A-ALL-1370 Area D/E/F (1-Story)

HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux Gym) Greenspace Punch List/ Commissioning - Area C (Gym) CT Taylor Punch List/ Commissioning - Area C (Gym) Casework Punch List/ Commissioning - Area C (Gym) Final Completion - Area C (Gym)

0620A-RMM-2420 0620A-ZSE-3360 0620A-ZST-2390 0620A-MPH-2330 0620A-SAC-1560 0620A-GSC-3200 0620A-CTT-2450 0620A-FEC-1190 0620A-ALL-1440 Site Finishes Entire Site 0620A-NCP-1060 0620A-ALL-1410

HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story) Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story) Fire Protection Punch List - Area D/E/F (Low Roof) Greenspace Punch List/ Commissioning - Area D/E/F (1-Story) CT Taylor Punch List/ Commissioning - Area D/E/F (1-Story) Casework Punch List/ Commissioning - Area D/E/F (1-Story) Final Completion - Area D/E/F (1-Story)

Punch List/ Commissioning - Site Final Completion - Site

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 25 of 25

5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 7 7 7 5 0

03-10-15 03-10-15 03-10-15 03-10-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-07-15 07-07-15 07-07-15 07-07-15

Finish

03-16-15 03-16-15 03-16-15 03-16-15 03-16-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-15-15 07-15-15 07-15-15 07-15-15 07-15-15

Late Start

07-06-15 07-06-15 07-06-15 07-06-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15

Late Finish 07-10-15 07-10-15 07-10-15 07-10-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15

Total Free Float Float 82 82 82 82 97 14 14 9 9 9 9 9 9 9 9 14 7 7 7 7 7 7 7 7 7 7 7 12 12 12 11 12

0 0 0 0 97 0 0 2 2 2 2 2 0 0 0 14 0 0 7 7 7 7 7 0 0 0 7 0 0 0 0 12

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A - T/P Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-S CT Taylor Punch List/ Commissioning - Area A/B/C (1-Sto Casework Punch List/ Commissioning - Area A/B/C (1-Sto Final Completion - Area A/B/C (1-Story)

HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux G Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Are Casework Punch List/ Commissioning - Ar Final Completion - Area C (Gym)

HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story Fire Protection Punch List - Area D/E/F (L Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - Ar Casework Punch List/ Commissioning - A Final Completion - Area D/E/F (1-Story)

Punch List/ Commissioning - Site Final Completion - Site


Activity ID

Activity Name

Orig Start Dur

Milestones Entire Project All Areas 0620A-ALL-1000 0620A-ALL-1020 0620A-ALL-1030 0620A-ALL-1040 0620A-ALL-1050 0620A-ALL-1060 0620A-ALL-1070 0620A-ALL-1120 0620A-RMM-1600 0620A-ALL-1250 0620A-ALL-1420 0620A-ALL-1450 Site Mobilization Entire Project All Areas

Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy

0620A-ALL-1010 Site Mobilization Material Procurement Entire Project All Areas 0620A-CTI-1000 0620A-CTT-3000 0620A-CTT-3010 0620A-CTT-3020 0620A-CTT-3030 0620A-GSC-1000 0620A-CTT-3040 0620A-CTI-1020 0620A-GEO-1000 0620A-GEO-1010 0620A-CTT-3050 0620A-CTT-3060 0620A-CTT-3070 0620A-GSC-1010 0620A-CTT-3080 0620A-GEO-1020 0620A-GEO-1030 0620A-CTI-1040 0620A-RMM-1000 0620A-GEO-1040 0620A-GEO-1050 0620A-CTT-3090 0620A-CTT-3100 0620A-RMM-1010 0620A-ZSE-1000 0620A-ZSE-1010 0620A-CTT-3110 0620A-ZSE-1090 0620A-RMM-2430 0620A-RMM-1060 0620A-RMM-2440 0620A-ZSE-1570

Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 1 of 25

545 545 545 545 0 0 0 0 0 0 0 0 5 0 0 0 15 15 15 15 15 332 332 332 332 10 10 15 15 15 20 10 10 10 10 10 10 15 10 1 10 10 1 30 1 1 1 1 10 30 50 1 10 1 1 1 1

06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A

11-21-14

06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-11-13 A 06-25-13 A 06-25-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-02-13 A 07-10-13 A 07-17-13 A 07-17-13 A 07-17-13 A 07-22-13 A 07-22-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-03-13 A 09-16-13 A 09-16-13 A 10-21-13 11-14-13 02-24-14 04-07-14 05-06-14 05-13-14

Finish

07-31-15 07-31-15 07-31-15 07-31-15 06-11-13 A 06-18-13 A 07-01-13 A 07-22-13 A 09-11-13 A 09-23-13 A 10-25-13 10-23-14 11-28-14 04-16-15 07-15-15 07-31-15* 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-01-13 A 09-30-14 09-30-14 09-30-14 09-30-14 06-24-13 A 06-24-13 A 07-01-13 A 07-01-13 A 07-01-13 A 07-09-13 A 07-09-13 A 07-09-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-16-13 A 07-23-13 A 07-23-13 A 07-17-13 A 07-30-13 A 07-30-13 A 07-22-13 A 08-30-13 A 08-07-13 A 08-07-13 A 08-14-13 A 08-14-13 A 09-16-13 A 11-13-13* 12-12-13 10-21-13 11-27-13 02-24-14 04-07-14 05-06-14 05-13-14

Late Start

10-21-13 10-21-13 10-21-13 10-21-13

01-07-15

10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 02-04-14 03-03-14 02-25-14 03-10-14 03-21-14 06-16-14 06-16-14 07-02-14

Late Finish 07-31-15 07-31-15 07-31-15 07-31-15 10-21-13 10-21-13 11-01-13 10-21-13 10-21-13 10-21-13 11-01-13 11-05-14 01-13-15 05-06-15 07-24-15 07-31-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-10-14 11-10-14 11-10-14 11-10-14 03-27-14 10-21-13 11-18-13 02-25-14 04-04-14 11-04-14 10-21-13 03-27-14 11-01-13 11-01-13 11-18-13 04-04-14 02-25-14 11-04-14 10-21-13 11-01-13 11-01-13 03-27-14 01-22-14 11-01-13 11-01-13 11-18-13 04-04-14 01-22-14 03-07-14 05-02-14 02-25-14 03-21-14 03-21-14 06-16-14 06-16-14 07-02-14

Total Free Float Float 0 0 0 0

0 0 0 0

5 9 30 14 7 0

0 2 0 0 7 0 0 0 0 0

29 29 29 29

0 0 0 0

79 98 88 79 19 48 28 35

0 0 0 44 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D

J

F

2016 M A M J

Notice to Proceed Start Construction Award GS/VV Start Building Construction Notice to Proceed - ReBid Packages Commence Work On-site - ReBid Packages Start Geo-Seal/ Vapor Vent Geo-Seal/ Vapor Vent Underground Complete HVAC System Start-up for Temp Heat Shell Finishes Complete Final Substantial Completion Final Completion/ Ready for Occupancy

Site Mobilization -

Prepare Sewer Submittals Prepare Foundations Submittals Prepare Masonry Submittals Prepare Structural Steel Submittals Prepare Roofing Submittals Prepare Curtain Wall Submittals A/E Review Foundations Submittals A/E Review Sewer Submittals Prepare Geo-Seal Submittals Prepare Vapor Vent Submittals A/E Review Masonry Submittals A/E Review Roofing Submittals A/E Review Structural Steel Submittals A/E Review Curtain Wall Submittals Foundation Materials Available/ On-Site A/E Review Vapor Vent Submittals A/E Review Geo-Seal Submittals Sewer Materials Available/ On-Site Prepare Large HVAC Equip Submittals Vapor Vent Materials Available/ On-site Geo-Seal Materials Available/ On-site Masonry Materials Available/ On-Site Roofing Materials Available/ On-Site A/E Review Large HVAC Equip Submittals Prepare Switchgear Submittals Obtain Utility Engineered Drawings Structural Steel Materials Available/ On-Site A/E Review Switchgear Submittals Large HVAC Equip Available/ On-Site - Area E (1st Flr) Large HVAC Equip Available/ On-Site - Area B (Low Roof) Large HVAC Equip Available/ On-Site - Area C (Low Roof) Switchgear Equip Available/ On-Site


Activity ID

0620A-RMM-2450 0620A-RMM-2460 0620A-GSC-1020 Project Coordination Academic Area First Floor

Activity Name

Orig Start Dur

Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site

0620A-RMM-1020 0620A-MPH-1030 0620A-SAC-1000 0620A-ZSE-1100 0620A-ZST-1000 Second Floor

HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)

0620A-RMM-1050 0620A-MPH-1430 0620A-SAC-1030 0620A-ZSE-1350 0620A-ZST-1030 Third Floor

HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)

0620A-RMM-1070 0620A-MPH-1450 0620A-SAC-1040 0620A-ZSE-1370 0620A-ZST-1040 One Story Areas Area A/B/C (1-Story)

HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)

0620A-RMM-1030 0620A-MPH-1300 0620A-SAC-1010 0620A-ZSE-1190 0620A-ZST-1010 Area D/E/F (1-Story)

HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)

0620A-RMM-1040 HVAC Coordination - Area D/E/F (Low Roof) 0620A-MPH-1420 Plumbing Coordination - Area D/E/F (Low Roof) 0620A-SAC-1020 Fire Protection Coordination - Area D/E/F (Low Roof) 0620A-ZSE-1290 Electrical Coordination - Area D/E/F (Low Roof) 0620A-ZST-1020 Tech Coordination - Area D/E/F (Low Roof) Site Preparation/ Rou Rough-in Site Preparation All Areas 0620A-CTI-1010 0620A-CTI-1030 0620A-CTI-1050 0620A-CTI-1070 Site Rough-in All Areas 0620A-CTI-1060 0620A-CTI-1080 0620A-MPH-1330 0620A-MPH-1410

Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)

Storm Sewers Sanitary Sewers Site Water Line Site Gas Line

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 2 of 25

1 1 1 199 199 79 79 30 30 30 30 30 76 76 30 30 30 30 30 76 76 30 30 30 30 30 106 76 76 30 30 30 30 30 76 76 30 30 30 30 30 191 33 33 33 5 3 9 6 169 169 169 25 10 10 10

06-05-14 09-16-14 09-30-14 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 09-16-13 A 10-11-13 10-25-13 11-08-13 11-22-13 01-28-14 01-28-14 01-28-14 02-19-14 03-05-14 03-19-14 04-02-14 03-11-14 03-11-14 03-11-14 04-02-14 04-16-14 05-01-14 05-15-14 10-31-13 10-31-13 10-31-13 10-31-13 11-22-13 12-09-13 12-23-13 01-08-14 12-13-13 12-13-13 12-13-13 01-08-14 01-22-14 02-05-14 02-19-14 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 06-19-13 A 07-15-13 A 07-22-13 A 08-07-13 A 07-22-13 A 07-22-13 A 07-22-13 A 07-22-13 A 09-05-13 A 11-05-13 11-21-13

Finish

06-05-14 09-16-14 09-30-14 06-26-14 06-26-14 01-07-14 01-07-14 10-30-13 11-21-13 12-06-13 12-20-13 01-07-14 05-14-14 05-14-14 03-10-14 04-01-14 04-15-14 04-30-14 05-14-14 06-26-14 06-26-14 04-22-14 05-14-14 05-29-14 06-12-14 06-26-14 04-01-14 02-18-14 02-18-14 12-12-13 01-07-14 01-21-14 02-04-14 02-18-14 04-01-14 04-01-14 01-27-14 02-18-14 03-04-14 03-18-14 04-01-14 03-19-14 08-15-13 A 08-15-13 A 08-15-13 A 06-27-13 A 07-17-13 A 08-06-13 A 08-15-13 A 03-19-14 03-19-14 03-19-14 09-04-13 A 09-20-13 A 11-19-13 12-06-13

Late Start

06-17-14 09-25-14 11-10-14 10-23-13 10-23-13 10-23-13 10-23-13 10-23-13 01-10-14 01-24-14 02-07-14 02-21-14 02-07-14 02-07-14 02-07-14 07-14-14 07-28-14 08-11-14 08-25-14 05-19-14 05-19-14 05-19-14 08-25-14 09-09-14 09-23-14 10-07-14 11-12-13 11-12-13 11-12-13 11-12-13 02-21-14 03-07-14 03-21-14 04-04-14 12-26-13 12-26-13 12-26-13 05-30-14 06-13-14 06-27-14 07-14-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 11-14-13 11-14-13 11-14-13 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 03-27-14 04-14-14

Late Finish 06-17-14 09-25-14 11-10-14 11-17-14 11-17-14 04-03-14 04-03-14 11-11-13 02-20-14 03-06-14 03-20-14 04-03-14 10-06-14 10-06-14 03-20-14 08-22-14 09-08-14 09-22-14 10-06-14 11-17-14 11-17-14 06-30-14 10-06-14 10-20-14 11-03-14 11-17-14 08-22-14 05-16-14 05-16-14 12-24-13 04-03-14 04-17-14 05-02-14 05-16-14 08-22-14 08-22-14 02-06-14 07-11-14 07-25-14 08-08-14 08-22-14 05-05-15 11-14-13 11-14-13 11-14-13 10-21-13 11-14-13 11-14-13 11-14-13 05-05-15 05-05-15 05-05-15 03-27-14 03-27-14 04-11-14 05-02-14

Total Free Float Float 8 7 29 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 100 100 48 100 100 100 100 100 62 62 8 62 62 62 62 100 100 8 100 100 100 100 286

286 286 286

63 63

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A 0620A 0620A 0620A 0620A 0620A 0620A -

T/P T/P T/P T/P T/P T/P T/P

Remaining Work Critical Remaining Work

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Large HVAC Equip Available/ On-Site - Area H (2nd Flr) Large HVAC Equip Available/ On-Site - Area H (3rd Flr) Curtain Wall Available/ On-site

HVAC Coordination - Academic Area (1st Flr) Plumbing Coordination - Academic Area (1st Flr) Fire Protection Coordination - Academic Area (1st Flr) Electrical Coordination - Academic Area (1st Flr) Tech Coordination - Academic Area (1st Flr)

HVAC Coordination - Academic Area (2nd Flr) Plumbing Coordination - Academic Area (2nd Flr) Fire Protection Coordination - Academic Area (2nd Flr) Electrical Coordination - Academic Area (2nd Flr) Tech Coordination - Academic Area (2nd Flr)

HVAC Coordination - Academic Area (3rd Flr) Plumbing Coordination - Academic Area (3rd Flr) Fire Protection Coordination - Academic Area (3rd Flr) Electrical Coordination - Academic Area (3rd Flr) Tech Coordination - Academic Area (3rd Flr)

HVAC Coordination - Area A/B/C (1-Story) Plumbing Coordination - Area A/B/C (1-Story) Fire Protection Coordination - Area A/B/C (1-Story) Electrical Coordination - Area A/B/C (1-Story) Tech Coordination - Area A/B/C (1-Story)

HVAC Coordination - Area D/E/F (Low Roof) Plumbing Coordination - Area D/E/F (Low Roof) Fire Protection Coordination - Area D/E/F (Low Roof) Electrical Coordination - Area D/E/F (Low Roof) Tech Coordination - Area D/E/F (Low Roof)

Site Layout Initial Erosion Control Temp Roads (Seq 1) Temp Raods (Seq 2)

0 0 0

0 4

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

Storm Sewers Sanitary Sewers Site Water Line Site Gas Line

J

F

2016 M A M J


Activity ID

0620A-ZSE-1250 0620A-CTI-1090 Building Structure Academic Area First Floor Area D (1st Flr) 0620A-CTT-1040 0620A-CTT-1070 0620A-CTT-1110 0620A-CTT-1130 0620A-CTT-1140 0620A-MPH-1130 0620A-MPH-1200 0620A-MPH-1230 0620A-ZSE-3370 0620A-ZSE-1080 0620A-GEO-1090 0620A-GEO-1110 0620A-MPH-1160 0620A-TFC-3020 0620A-CTT-1380 0620A-ZSE-1330 0620A-CTT-1390 0620A-ZSE-1360 0620A-CVS-1050 0620A-CVS-1080 0620A-ZSE-1470 0620A-ALL-1090 0620A-CTT-1650 Area E (1st Flr) 0620A-CTT-1020 0620A-CTT-1030 0620A-CTT-1080 0620A-CTT-1100 0620A-CTT-1150 0620A-MPH-1110 0620A-MPH-1120 0620A-MPH-1140 0620A-ZSE-1050 0620A-ZSE-1060 0620A-GEO-1080 0620A-GEO-1100 0620A-MPH-1100 0620A-TFC-3010 0620A-CTT-1360 0620A-ZSE-1210 0620A-CTT-1370 0620A-ZSE-1280 0620A-CVS-1030 0620A-CVS-1040 0620A-ZSE-1380 0620A-CTT-1570 Area F (1st Flr) 0620A-CTT-1000 0620A-CTT-1010 0620A-CTT-1050 0620A-CTT-1060

Activity Name

Orig Start Dur

Utility Ductbank Finish Earthwork

Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr) Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr) Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 3 of 25

10 15 347 347 261 208 4 2 4 2 8 5 1 3 7 3 2 5 2 5 7 7 12 12 15 5 5 0 5 241 4 4 3 3 10 5 1 3 7 7 2 5 2 5 7 7 15 15 15 5 5 5 261 4 2 4 3

12-13-13 02-21-14 07-25-13 A 07-25-13 A 07-25-13 A 08-15-13 A 08-15-13 A 08-21-13 A 09-02-13 A 09-09-13 A 09-09-13 A 09-30-13 A 10-04-13 A 10-04-13 A 10-11-13 10-21-13 10-25-13 10-29-13 11-06-13 11-06-13 11-14-13 11-14-13 11-26-13 11-26-13 01-17-14 02-26-14 02-26-14 06-04-14 08-01-13 A 08-01-13 A 08-08-13 A 08-22-13 A 08-27-13 A 09-09-13 A 09-23-13 A 09-27-13 A 09-27-13 A 10-22-13 10-25-13 11-06-13 11-08-13 11-18-13 11-18-13 12-23-13 12-23-13 01-17-14 01-17-14 03-07-14 04-03-14 04-03-14 07-07-14 07-25-13 A 07-25-13 A 07-29-13 A 08-13-13 A 08-19-13 A

Finish

01-20-14 03-19-14 12-01-14 12-01-14 07-30-14 06-10-14 09-03-13 A 08-30-13 A 09-06-13 A 09-10-13 A 09-13-13 A 10-04-13 A 10-04-13 A 10-08-13 A 10-22-13 10-23-13 10-28-13 11-05-13 11-07-13 11-13-13 11-25-13 11-25-13 12-13-13 12-13-13 02-25-14 03-06-14 03-06-14 05-09-14 06-10-14 07-14-14 08-08-13 A 08-15-13 A 08-26-13 A 08-30-13 A 09-09-13 A 09-27-13 A 09-27-13 A 10-01-13 A 10-31-13 11-05-13 11-07-13 11-15-13 11-19-13 11-25-13 01-16-14 01-16-14 02-25-14 02-25-14 04-02-14 04-10-14 04-10-14 07-14-14 07-30-14 08-05-13 A 08-06-13 A 08-16-13 A 08-21-13 A

Late Start

05-05-14 04-09-15 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-21-13 10-29-13 11-01-13 11-06-13 11-14-13 11-14-13 11-22-13 11-22-13 12-05-13 12-05-13 02-26-14 03-26-14 06-24-14 06-24-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-08-13 11-13-13 11-26-13 12-02-13 12-09-13 12-09-13 01-13-14 01-13-14 01-28-14 01-28-14 03-25-14 05-28-14 07-30-14 07-30-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13

Late Finish 05-20-14 05-05-15 03-17-15 03-17-15 09-12-14 07-02-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 10-30-13 10-31-13 11-05-13 11-13-13 11-15-13 11-21-13 12-04-13 12-04-13 01-10-14 01-10-14 03-25-14 04-02-14 07-02-14 06-17-14 07-02-14 08-07-14 10-21-13 10-21-13 10-21-13 10-21-13 10-21-13 10-23-13 10-29-13 10-29-13 11-19-13 11-22-13 11-27-13 12-06-13 12-10-13 12-13-13 01-27-14 01-27-14 03-06-14 03-06-14 04-17-14 06-05-14 08-07-14 08-07-14 09-12-14 10-21-13 10-21-13 10-21-13 10-21-13

Total Free Float Float 59 198 74 74 31 16

5 5 5 5 5 5 5 5 5 5 15 15 64 26 12 18

11 11 12 12 12 12 5 5 5 5 9 29 64 14 31

15 187 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 15 19 5 0

0 0 0 0 0 2 0 0 0 0 0 5 5 5 0

Calendar 2013 J Jul A S O N D 0620A - Prec 0620A - T/P

Remaining Work Critical Remaining Work

2014 F M A M J Jul A S O N D Utility Ductbank Finish Earthwork

J

2015 F M A M J Jul A S O N D

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec

Exterior Foundations - Area D (1st Flr) Interior Foundations - Area D (1st Flr) Exterior Masonry to Grade - Area D (1st Flr) Interior Masonry to Grade - Area D (1st Flr) Backfill Foundations - Area D (1st Flr) Underground Plumbing - Area D (1st Flr) Underground Testing/ Inspection - Area D (1st Flr) Backfill Underground Plumbing - Area D (1st Flr) Underground Conduit (Seq 1) - Area D (1st Flr) Underground Conduit (Seq 2) - Area D (1st Flr) Prep for Venting - Area D (1st Flr) Geo-Seal/ Vapor Vent - Area D (1st Flr) FD/ Trap Primer/ C.O. - Area D (1st Flr) Prep/ Pour SOG - Area D (1st Flr) Exterior Bearing Masonry - Area D (1st Flr) Elec at Ext Brng Masonry - Area D (1st Flr) Interior Bearing Masonry - Area D (1st Flr) Elec at Int Brng Masonry - Area D (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area D (1st Flr) Install Stairs - Area D (1st Flr) Temp Power - Area D (1st Flr) Structure Substantially Complete - 1st Flr Temp Enclosure (as needed) - Area D (1st Flr)

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Exterior Foundations - Area E (1st Flr) Interior Foundations - Area E (1st Flr) Exterior Masonry to Grade - Area E (1st Flr) Interior Masonry to Grade - Area E (1st Flr) Backfill Foundations - Area E (1st Flr) Underground Plumbing - Area E (1st Flr) Underground Testing/ Inspection - Area E (1st Flr) Backfill Underground Plumbing - Area E (1st Flr) Underground Conduit (Seq 1) - Area E (1st Flr) Underground Conduit (Seq 2) - Area E (1st Flr) Prep for Venting - Area E (1st Flr) Geo-Seal/ Vapor Vent - Area E (1st Flr) FD/ Trap Primer/ C.O. - Area E (1st Flr) Prep/ Pour SOG - Area E (1st Flr) Exterior Bearing Masonry - Area E (1st Flr) Elec at Ext Brng Masonry - Area E (1st Flr) Interior Bearing Masonry - Area E (1st Flr) Elec at Int Brng Masonry - Area E (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area E (1st Flr) Install Stairs - Area E (1st Flr) Temp Power - Area E (1st Flr) Temp Enclosure (as needed) - Area E (1st Flr)

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

Exterior Foundations - Area F (1st Flr) Interior Foundations - Area F (1st Flr) Exterior Masonry to Grade - Area F (1st Flr) Interior Masonry to Grade - Area F (1st Flr)

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

F

2016 M A M J


Activity ID

0620A-CTT-1090 0620A-MPH-1000 0620A-MPH-2370 0620A-MPH-1080 0620A-MPH-1090 0620A-GEO-1240 0620A-ZSE-1030 0620A-ZSE-1040 0620A-GEO-1060 0620A-GEO-1070 0620A-MPH-1020 0620A-TFC-3000 0620A-CTT-1300 0620A-ZSE-1160 0620A-CTT-1330 0620A-ZSE-1180 0620A-CVS-1010 0620A-ZSE-1310 0620A-CVS-1020 0620A-CTT-1470 Second Floor Area G (2nd Flr) 0620A-MPH-1480 0620A-ZSE-1480 0620A-TFC-3090 0620A-CTT-1490 0620A-ZSE-1530 0620A-CTT-1550 0620A-ZSE-1560 0620A-CVS-1140 0620A-CVS-1160 0620A-ZSE-1710 0620A-CTT-2110 0620A-ALL-1100 Area H (2nd Flr) 0620A-MPH-1460 0620A-ZSE-1390 0620A-TFC-3060 0620A-CTT-1420 0620A-ZSE-1450 0620A-CTT-1460 0620A-ZSE-1490 0620A-CVS-1110 0620A-CVS-1130 0620A-ZSE-1600 0620A-CTT-1950 Area I (2nd Flr) 0620A-MPH-1440 0620A-ZSE-1340 0620A-TFC-3040 0620A-CTT-1400 0620A-ZSE-1400 0620A-CTT-1410 0620A-ZSE-1420 0620A-CVS-1070 0620A-ZSE-1520 0620A-CVS-1090

Activity Name

Orig Start Dur

Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)

Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 4 of 25

7 4 2 1 3 1 7 5 2 5 2 5 5 5 15 15 10 3 5 5 176 176 2 5 5 7 7 10 10 15 5 5 5 0 140 2 8 5 8 8 10 10 15 5 5 5 138 2 5 5 5 5 10 10 10 3 5

08-26-13 A 10-14-13* 10-21-13* 10-22-13 10-22-13 10-23-13 10-31-13 11-06-13 11-14-13 11-18-13 11-26-13 11-26-13 02-26-14 02-26-14 03-07-14 03-07-14 04-03-14 04-22-14 04-22-14 07-23-14 02-26-14 02-26-14 02-26-14 02-26-14 03-07-14 04-03-14 04-03-14 04-15-14 04-15-14 05-06-14 06-04-14 06-04-14 08-29-14 04-03-14 04-03-14 04-03-14 04-17-14 05-06-14 05-06-14 05-20-14 05-20-14 06-09-14 07-07-14 07-07-14 10-14-14 04-22-14 04-22-14 04-22-14 05-02-14 06-09-14 06-09-14 06-18-14 06-18-14 07-07-14 07-23-14 07-23-14

Finish

08-29-13 A 10-18-13 10-22-13 10-22-13 10-25-13 10-23-13 11-11-13 11-13-13 11-15-13 11-25-13 11-27-13 12-04-13 03-06-14 03-06-14 04-02-14 04-02-14 04-18-14 04-25-14 04-29-14 07-30-14 11-04-14 11-04-14 02-27-14 03-06-14 03-17-14 04-14-14 04-14-14 05-05-14 05-05-14 06-02-14 06-10-14 06-10-14 09-08-14 11-04-14 10-21-14 04-04-14 04-15-14 04-25-14 05-19-14 05-19-14 06-06-14 06-06-14 07-03-14 07-14-14 07-14-14 10-21-14 11-04-14 04-23-14 04-29-14 05-09-14 06-17-14 06-17-14 07-03-14 07-03-14 07-22-14 07-28-14 07-30-14

Late Start

10-21-13 10-25-13 10-31-13 11-19-13 11-19-13 11-05-13 11-19-13 11-25-13 12-10-13 12-12-13 02-18-14 02-26-14 03-07-14 03-07-14 03-18-14 03-18-14 05-09-14 09-09-14 06-06-14 09-05-14 03-26-14 03-26-14 03-28-14 03-26-14 04-03-14 04-11-14 04-11-14 04-25-14 04-25-14 05-19-14 06-17-14 09-19-14 10-10-14 04-18-14 04-29-14 04-18-14 05-06-14 05-15-14 05-15-14 05-30-14 05-30-14 06-19-14 12-02-14 09-29-14 11-07-14 05-30-14 06-04-14 05-30-14 06-09-14 06-18-14 06-18-14 06-25-14 06-25-14 08-11-14 10-08-14 12-09-14

Late Finish 10-21-13 10-30-13 11-01-13 11-19-13 11-22-13 11-05-13 12-02-13 12-03-13 12-11-13 01-08-14 02-21-14 03-06-14 03-17-14 03-17-14 04-10-14 04-10-14 05-27-14 09-12-14 06-13-14 09-12-14 12-15-14 12-15-14 03-31-14 04-02-14 04-10-14 04-23-14 04-23-14 05-14-14 05-14-14 06-13-14 06-23-14 09-26-14 10-17-14 12-15-14 12-08-14 05-02-14 05-05-14 05-14-14 05-28-14 05-28-14 06-17-14 06-17-14 07-16-14 12-08-14 10-06-14 11-14-14 12-15-14 06-05-14 06-06-14 06-17-14 06-24-14 06-24-14 07-14-14 07-14-14 08-26-14 10-10-14 12-15-14

Total Free Float Float

7 7 17 17 7 11 11 15 15 30 15 5 5 5 5 19 77 24 25 28 28 17 15 15 5 5 5 5 7 7 61 23 28 33 14 9 9 5 5 5 5 6 85 48 15 28 22 20 20 5 5 5 5 20 43 80

0 0 0 6 2 0 0 0 0 0 9 0 0 0 0 0 19 5 17 0 0 2 0 10 0 0 0 0 0 0 9 16 0 0 5 0 4 0 0 0 0 0 5 5 3 0 2 0 0 0 0 0 0 0 7 55

Calendar

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prot 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec

0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

2013 2014 2015 J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D Backfill Foundations - Area F (1st Flr) Underground Plumbing - Area F (1st Flr) Vapor Well - Area F (1st Flr) Underground Testing/ Inspection - Area F (1st Flr) Backfill Underground Plumbing - Area F (1st Flr) Seal Vapor Well - Area F (1st Flr) Underground Conduit (Seq 1) - Area F (1st Flr) Underground Conduit (Seq 2) - Area F (1st Flr) Prep for Venting - Area F (1st Flr) Geo-Seal/ Vapor Vent - Area F (1st Flr) FD/ Trap Primer/ C.O. - Area F (1st Flr) Prep/ Pour SOG - Area F (1st Flr) Exterior Bearing Masonry - Area F (1st Flr) Elec at Ext Brng Masonry - Area F (1st Flr) Interior Bearing Masonry - Area F (1st Flr) Elec at Int Brng Masonry - Area F (1st Flr) 2nd Flr Structural Steel/ Metal Deck - Area F (1st Flr) Temp Power - Area F (1st Flr) Install Stairs - Area F (1st Flr) Temp Enclosure (as needed) - Area F (1st Flr)

Inslab Plumbing - Area G (2nd Flr) Conduit - Branch Slabs - Area G (2nd Flr) Prep/ Pour SOD - Area G (2nd Flr) Exterior Bearing Masonry - Area G (2nd Flr) Elec at Ext Brng Masonry - Area G (2nd Flr) Interior Bearing Masonry - Area G (2nd Flr) Elec at Int Brng Masonry - Area G (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area G (2nd Flr) Install Stairs - Area G (2nd Flr) Temp Power - Area G (2nd Flr) Temp Enclosure (as needed) - Area G (2nd Flr) Structure Substantially Complete - 2nd Flr Inslab Plumbing - Area H (2nd Flr) Conduit - Branch Slabs - Area H (2nd Flr) Prep/ Pour SOD - Area H (2nd Flr) Exterior Bearing Masonry - Area H (2nd Flr) Elec at Ext Brng Masonry - Area H (2nd Flr) Interior Bearing Masonry - Area H (2nd Flr) Elec at Int Brng Masonry - Area H (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area H (2nd Flr) Install Stairs - Area H (2nd Flr) Temp Power - Area H (2nd Flr) Temp Enclosure (as needed) - Area H (2nd Flr) Inslab Plumbing - Area I (2nd Flr) Conduit - Branch Slabs - Area I (2nd Flr) Prep/ Pour SOD - Area I (2nd Flr) Exterior Bearing Masonry - Area I (2nd Flr) Elec at Ext Brng Masonry - Area I (2nd Flr) Interior Bearing Masonry - Area I (2nd Flr) Elec at Int Brng Masonry - Area I (2nd Flr) 3rd Flr Structural Steel/ Metal Deck - Area I (2nd Flr) Temp Power - Area I (2nd Flr) Install Stairs - Area I (2nd Flr)

J

F

2016 M A M J


Activity ID

0620A-CTT-1680 Third Floor Area G (3rd Flr) 0620A-MPH-1570 0620A-ZSE-1720 0620A-TFC-3130 0620A-CTT-1820 0620A-ZSE-1810 0620A-CTT-1880 0620A-ZSE-1870 0620A-CVS-1190 0620A-ZSE-2040 0620A-CTT-2130 0620A-CTT-2150 0620A-CTT-2180 0620A-ALL-1160 Area H (3rd Flr) 0620A-MPH-1520 0620A-ZSE-1610 0620A-TFC-3120 0620A-CTT-1640 0620A-ZSE-1690 0620A-CTT-1770 0620A-ZSE-1780 0620A-CVS-1180 0620A-ZSE-1940 0620A-CTT-1970 0620A-CTT-2000 0620A-CTT-2010 Area I (3rd Flr) 0620A-MPH-1490 0620A-ZSE-1500 0620A-TFC-3100 0620A-CTT-1560 0620A-ZSE-1590 0620A-CTT-1600 0620A-ZSE-1650 0620A-CVS-1150 0620A-ZSE-1740 0620A-CTT-1700 0620A-CTT-1710 0620A-CTT-1750 One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1180 0620A-CTT-1230 0620A-ZSE-1020 0620A-CVS-1000 0620A-CTT-1310 0620A-CTT-1320 0620A-CTT-1340 0620A-ZSE-1110 0620A-GEO-1130 0620A-GEO-1150 0620A-TFC-3050 0620A-ALL-1080

Activity Name

Orig Start Dur

Temp Enclosure (as needed) - Area I (2nd Flr)

Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Fl Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)

Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 5 of 25

5 126 114 2 5 5 7 7 10 10 15 5 5 5 5 0 98 2 8 5 15 15 10 10 15 5 5 5 5 92 2 5 5 5 5 8 8 10 3 5 5 5 311 145 145 2 15 15 8 5 5 5 3 3 7 5 0

10-28-14 06-04-14 06-04-14 06-04-14 06-04-14 06-12-14 07-07-14 07-07-14 07-18-14 07-18-14 08-05-14 08-29-14 08-29-14 09-05-14 11-05-14 07-07-14 07-07-14 07-07-14 07-21-14 08-05-14 08-05-14 08-29-14 08-29-14 09-18-14 10-14-14 10-14-14 10-20-14 11-13-14 07-23-14 07-23-14 07-23-14 07-31-14 09-18-14 09-18-14 09-26-14 09-26-14 10-10-14 10-28-14 10-28-14 10-31-14 11-21-14 08-01-13 A 09-13-13 A 09-13-13 A 09-13-13 A 09-25-13 A 09-25-13 A 10-22-13 11-05-13 11-05-13 11-08-13 01-03-14 01-10-14 01-29-14 03-05-14*

Finish

11-04-14 12-01-14 11-12-14 06-05-14 06-10-14 06-19-14 07-17-14 07-17-14 08-04-14 08-04-14 08-28-14 09-08-14 09-08-14 09-12-14 11-12-14 11-07-14 11-20-14 07-08-14 07-18-14 07-28-14 08-28-14 08-28-14 09-17-14 09-17-14 10-13-14 10-21-14 10-21-14 10-27-14 11-20-14 12-01-14 07-25-14 07-30-14 08-08-14 09-25-14 09-25-14 10-09-14 10-09-14 10-27-14 10-30-14 11-04-14 11-07-14 12-01-14 11-13-14 03-20-14 03-20-14 09-18-13 A 10-21-13 10-21-13 11-01-13 11-11-13 11-11-13 11-15-13 01-09-14 01-16-14 02-21-14 03-11-14 03-11-14

Late Start

12-09-14 06-17-14 06-17-14 06-19-14 06-17-14 06-24-14 07-16-14 07-16-14 07-28-14 07-28-14 09-09-14 10-13-14 10-06-14 10-10-14 12-17-14 07-17-14 07-25-14 07-17-14 07-30-14 08-14-14 08-14-14 09-09-14 09-09-14 09-29-14 10-27-14 11-04-14 11-07-14 01-28-15 08-27-14 08-29-14 08-27-14 09-05-14 09-26-14 09-26-14 10-14-14 10-14-14 10-28-14 11-13-14 12-04-14 12-09-14 03-06-15 10-23-13 11-18-13 11-18-13 11-18-13 11-25-13 11-25-13 03-10-14 04-04-14 03-31-14 04-04-14 03-24-14 03-27-14 04-02-14 04-14-14

Late Finish 12-15-14 03-17-15 01-12-15 06-20-14 06-23-14 07-02-14 07-25-14 07-25-14 08-12-14 08-12-14 10-03-14 10-20-14 10-13-14 10-17-14 01-12-15 12-19-14 02-10-15 07-28-14 07-29-14 08-07-14 09-08-14 09-08-14 09-25-14 09-25-14 10-23-14 10-31-14 11-10-14 11-14-14 02-10-15 03-17-15 09-03-14 09-04-14 09-12-14 10-03-14 10-03-14 10-27-14 10-27-14 11-12-14 11-17-14 12-10-14 12-15-14 03-17-15 02-17-15 12-12-14 12-12-14 11-18-13 12-04-13 12-04-13 03-24-14 04-11-14 04-07-14 04-11-14 03-26-14 03-31-14 04-11-14 04-22-14 12-12-14

Total Free Float Float 25 74 40 9 7 7 5 5 5 5 20 24 20 20 26 29 55 11 6 6 5 5 5 5 6 7 12 12 32 74 22 20 20 5 5 10 10 10 10 22 22 43 65 186 186

0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2 0 0 35 0 0 0

26 26 61 68 46 46 34 34 28 23 193

0 0 0 45 0 23 0 6 5 0 167

Calendar 2013 J Jul A S O N D 0620A - Prec

0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec Work Days 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec

0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Temp Enclosure (as needed) - Area I (2nd Flr)

J

F

2016 M A M J

Inslab Plumbing - Area G (3rd Flr) Conduit - Branch Slabs - Area G (3rd Flr) Prep/ Pour SOD - Area G (3rd Flr) Exterior Bearing Masonry - Area G (3rd Flr) Elec at Ext Brng Masonry - Area G (3rd Flr) Interior Bearing Masonry - Area G (3rd Flr) Elec at Int Brng Masonry - Area G (3rd Flr) Roof Structural Steel/ Metal Deck - Area G (3rd Flr) Temp Power - Area G (3rd Flr) Roof Blocking - Area G (3rd Flr) Roofing Dry-in - Area G (3rd Flr) Temp Enclosure (as needed) - Area G (3rd Flr) Structure Substantially Complete/ Roof Dried-in - 3rd Flr Inslab Plumbing - Area H (3rd Flr) Conduit - Branch Slabs - Area H (3rd Flr) Prep/ Pour SOD - Area H (3rd Flr) Exterior Bearing Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Elec at Ext Brng Masonry/ Veneer over E (1-Story) - Area H (3rd Flr) Interior Bearing Masonry - Area H (3rd Flr) Elec at Int Brng Masonry - Area H (3rd Flr) Roof Structural Steel/ Metal Deck - Area H (3rd Flr) Temp Power - Area H (3rd Flr) Roof Blocking - Area H (3rd Flr) Roofing Dry-in - Area H (3rd Flr) Temp Enclosure (as needed) - Area H (3rd Flr) Inslab Plumbing - Area I (3rd Flr) Conduit - Branch Slabs - Area I (3rd Flr) Prep/ Pour SOD - Area I (3rd Flr) Exterior Bearing Masonry - Area I (3rd Flr) Elec at Ext Brng Masonry - Area I (3rd Flr) Interior Bearing Masonry - Area I (3rd Flr) Elec at Int Brng Masonry - Area I (3rd Flr) Roof Structural Steel/ Metal Deck - Area I (3rd Flr) Temp Power - Area I (3rd Flr) Roof Blocking - Area I (3rd Flr) Roofing Dry-in - Area I (3rd Flr) Temp Enclosure (as needed) - Area I (3rd Flr)

Foundations - Area B (Gym) Bearing Masonry - Area B (Gym) Elec at Brng Masonry - Area B (Gym) Roof Structural Steel/ Metal Deck - Area B (Gym) Temp Enclosure (as needed) - Area B (Gym) Roof Blocking - Area B (Gym) Roofing Dry-in - Area B (Gym) Underground Conduit - Area B (Gym) Prep for Venting - Area B (Gym) Geo-Seal/ Vapor Vent - Area B (Gym) Prep/ Pour SOG - Area B (Gym) Structure Substantially Complete/ Roof Dried-in - Area B (Gym)


Activity ID

0620A-ZSE-1430 Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1120 0620A-CTT-1160 0620A-CTT-1170 0620A-MPH-1060 0620A-MPH-1240 0620A-MPH-1260 0620A-CTT-1350 0620A-ZSE-1200 0620A-ZSE-1070 0620A-ZSE-1140 0620A-GEO-1120 0620A-GEO-1140 0620A-MPH-1170 0620A-TFC-3030 0620A-CVS-1060 0620A-CTT-1440 0620A-CTT-1450 0620A-TFC-3110 0620A-CTT-1500 0620A-ZSE-1540 Area B (Low Roof) 0620A-CTT-1200 0620A-CTT-1220 0620A-CTT-1260 0620A-MPH-1190 0620A-MPH-1280 0620A-MPH-1290 0620A-ZSE-1150 0620A-ZSE-1230 0620A-GEO-1160 0620A-GEO-1180 0620A-MPH-1220 0620A-TFC-3070 0620A-CTT-1430 0620A-ZSE-1460 0620A-CVS-1100 0620A-CTT-1510 0620A-CTT-1530 0620A-CTT-1660 0620A-ZSE-1630 Area C (Low Roof) 0620A-CTT-1190 0620A-CTT-1240 0620A-MPH-1270 0620A-CTT-1280 0620A-MPH-1350 0620A-MPH-1360 0620A-ZSE-1220 0620A-ZSE-1270 0620A-GEO-1170 0620A-GEO-1190 0620A-MPH-1310 0620A-TFC-3080 0620A-CTT-1480

Activity Name

Orig Start Dur

Temp Power - Area B (Gym)

Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 6 of 25

5 227 185 6 5 5 7 1 3 30 30 5 5 3 7 2 5 20 10 10 5 5 10 190 4 4 5 3 1 2 5 10 3 7 2 5 10 10 8 5 5 5 10 214 3 3 10 5 1 3 5 5 3 7 2 5 20

03-14-14 09-04-13 A 09-04-13 A 09-04-13 A 09-10-13 A 09-12-13 A 10-29-13 11-07-13 11-07-13 11-22-13 11-22-13 12-02-13 12-10-13 01-03-14 01-16-14 01-29-14 02-21-14 03-05-14 03-31-14 04-04-14 04-23-14 04-23-14 05-05-14 09-19-13 A 09-19-13 A 09-23-13 A 10-21-13 10-23-13 10-28-13 10-28-13 11-21-13 11-22-13 12-10-13 12-13-13 01-16-14 03-10-14 03-24-14 03-24-14 04-09-14 04-23-14 05-05-14 05-06-14 05-22-14 09-18-13 A 09-18-13 A 09-30-13 A 10-07-13 A 10-11-13 10-22-13 10-22-13 11-13-13 11-14-13 11-22-13 11-27-13 12-10-13 03-17-14 04-09-14

Finish

03-20-14 07-21-14 05-20-14 09-13-13 A 09-20-13 A 11-01-13 11-07-13 11-07-13 11-11-13 03-20-14 03-20-14 12-06-13 12-23-13 01-09-14 01-28-14 02-06-14 02-27-14 04-07-14 04-15-14 04-22-14 05-02-14 05-02-14 05-20-14 06-09-14 09-20-13 A 09-27-13 A 10-28-13 10-28-13 10-28-13 10-29-13 11-27-13 12-09-13 12-12-13 01-13-14 01-17-14 03-18-14 04-07-14 04-07-14 04-22-14 05-02-14 05-12-14 05-14-14 06-09-14 07-21-14 09-27-13 A 10-04-13 A 10-21-13 10-18-13 10-22-13 10-25-13 11-19-13 11-21-13 11-26-13 12-09-13 12-11-13 03-24-14 05-15-14

Late Start

05-08-14 11-18-13 11-18-13 11-18-13 11-18-13 01-20-14 02-18-14 09-26-14 09-26-14 12-05-13 12-05-13 01-20-14 01-21-14 02-06-14 02-13-14 02-28-14 03-06-14 03-18-14 04-11-14 04-17-14 05-08-14 06-10-14 05-16-14 11-18-13 11-18-13 11-18-13 12-03-13 12-05-13 12-09-13 12-09-13 12-10-13 12-11-13 01-17-14 01-24-14 02-26-14 04-18-14 04-29-14 05-12-14 06-23-14 07-08-14 08-08-14 07-14-14 07-10-14 11-18-13 11-18-13 11-18-13 11-18-13 11-18-13 11-27-13 11-27-13 12-03-13 12-04-13 12-23-13 01-09-14 02-24-14 05-08-14 05-19-14

Late Finish 05-15-14 10-03-14 09-30-14 11-18-13 11-18-13 01-27-14 02-28-14 09-26-14 09-30-14 04-02-14 04-02-14 01-28-14 01-29-14 02-10-14 02-27-14 03-05-14 03-14-14 04-18-14 04-29-14 05-06-14 05-15-14 06-18-14 06-04-14 08-15-14 11-18-13 11-18-13 12-09-13 12-09-13 12-09-13 12-10-13 12-23-13 01-16-14 01-21-14 02-10-14 02-27-14 04-28-14 05-16-14 05-28-14 07-07-14 07-16-14 08-15-14 07-21-14 07-25-14 10-03-14 11-18-13 11-18-13 11-26-13 11-25-13 11-27-13 12-03-13 12-09-13 12-10-13 01-08-14 01-21-14 02-25-14 05-15-14 06-23-14

Total Free Float Float 30 53 92

37 47 162 162 7 7 18 13 13 11 11 7 7 7 7 7 25 7 48

25 25 25 25 11 11 11 11 16 23 21 27 40 40 53 37 26 53

22 22 22 22 11 11 14 14 24 29 21

0 0 0

0 0 0 2 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0

0 0 0 5 0 0 0 0 5 0 0 0 0 3 10 0 0 0

0 0 0 0 0 0 0 0 8 9 0

Calendar 2013 J Jul A S O N D 0620A - Prec

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D Temp Power - Area B (Gym)

J

2015 F M A M J Jul A S O N D

Foundations - Area A (Low Roof) Masonry to Grade - Area A (Low Roof) Backfill Foundations - Area A (Low Roof) Underground Plumbing - Area A (Low Roof) Underground Testing/ Inspection - Area A (Low Roof) Backfill Underground Plumbing - Area A (Low Roof) Bearing Masonry - Area A (Low Roof) Elec at Brng Masonry - Area A (Low Roof) Underground Conduit (Seq 1) - Area A (Low Roof) Underground Conduit (Seq 2) - Area A (Low Roof) Prep for Venting - Area A (Low Roof) Geo-Seal/ Vapor Vent - Area A (Low Roof) FD/ Trap Primer/ C.O. - Area A (Low Roof) Prep/ Pour SOG (Seq 1) - Area A (Low Roof) Roof Structural Steel/ Metal Deck - Area A (Low Roof) Roof Blocking - Area A (Low Roof) Roofing Dry-in - Area A (Low Roof) Prep/ Pour SOG (Seq 2) - Area A (Low Roof) Temp Enclosure (as needed) - Area A (Low Roof) Temp Power - Area A (Low Roof) Foundations - Area B (Low Roof) Masonry to Grade - Area B (Low Roof) Backfill Foundations - Area B (Low Roof) Underground Plumbing - Area B (Low Roof) Underground Testing/ Inspection - Area B (Low Roof) Backfill Underground Plumbing - Area B (Low Roof) Underground Conduit (Seq 1) - Area B (Low Roof) Underground Conduit (Seq 2) - Area B (Low Roof) Prep for Venting - Area B (Low Roof) Geo-Seal/ Vapor Vent - Area B (Low Roof) FD/ Trap Primer/ C.O. - Area B (Low Roof) Prep/ Pour SOG - Area B (Low Roof) Bearing Masonry - Area B (Low Roof) Elec at Brng Masonry - Area B (Low Roof) Roof Structural Steel/ Metal Deck - Area B (Low Roof) Roof Blocking - Area B (Low Roof) Temp Enclosure (as needed) - Area B (Low Roof) Roofing Dry-in - Area B (Low Roof) Temp Power - Area B (Low Roof) Foundations - Area C (Low Roof) Masonry to Grade - Area C (Low Roof) Underground Plumbing - Area C (Low Roof) Backfill Foundations - Area C (Low Roof) Underground Testing/ Inspection - Area C (Low Roof) Backfill Underground Plumbing - Area C (Low Roof) Underground Conduit (Seq 1) - Area C (Low Roof) Underground Conduit (Seq 2) - Area C (Low Roof) Prep for Venting - Area C (Low Roof) Geo-Seal/ Vapor Vent - Area C (Low Roof) FD/ Trap Primer/ C.O. - Area C (Low Roof) Prep/ Pour SOG - Area C (Low Roof) Bearing Masonry - Area C (Low Roof)

J

F

2016 M A M J


Activity ID

Activity Name

Orig Start Dur

0620A-ZSE-1510 Elec at Brng Masonry - Area C (Low Roof) 0620A-CTT-1520 Set Precast at Mech Rm - Area C (Low Roof) 0620A-CVS-1120 Roof Structural Steel/ Metal Deck - Area C (Low Roof) 0620A-CTT-1610 Temp Enclosure (as needed) - Area C (Low Roof) 0620A-CTT-1620 Roof Blocking - Area C (Low Roof) 0620A-ZSE-1680 Temp Power - Area C (Low Roof) 0620A-CTT-1790 Roofing Dry-in - Area C (Low Roof) 0620A-ALL-1110 Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Sto Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-1210 Foundations - Area C (Aux Gym) 0620A-CTT-1580 Bearing Masonry - Area C (Aux Gym) 0620A-ZSE-1620 Elec at Brng Masonry - Area C (Aux Gym) 0620A-ZSE-1700 Underground Conduit - Area C (Aux Gym) 0620A-CVS-1170 Roof Structural Steel/ Metal Deck - Area C (Aux Gym) 0620A-GEO-1200 Prep for Venting - Area C (Aux Gym) 0620A-CTT-1720 Temp Enclosure (as needed) - Area C (Aux Gym) 0620A-CTT-1730 Roof Blocking - Area C (Aux Gym) 0620A-GEO-1210 Geo-Seal/ Vapor Vent - Area C (Aux Gym) 0620A-CTT-1860 Roofing Dry-in - Area C (Aux Gym) 0620A-TFC-3140 Prep/ Pour SOG - Area C (Aux Gym) 0620A-ALL-1130 Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) 0620A-ZSE-1890 Temp Power - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-1250 Foundations - Area D/E/F (Low Roof) 0620A-CTT-1270 Masonry to Grade - Area D/E/F (Low Roof) 0620A-MPH-2340 Underground Plumbing - Area D/E/F (Low Roof) 0620A-MPH-2350 Underground Testing/ Inspection - Area D/E/F (Low Roof) 0620A-MPH-2360 Backfill Underground Plumbing - Area D/E/F (Low Roof) 0620A-CTT-1290 Backfill Foundations - Area D/E/F (Low Roof) 0620A-MPH-1320 Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1390 Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) 0620A-MPH-1400 Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) 0620A-ZSE-1260 Underground Conduit (Seq 1) - Area D/E/F (Low Roof) 0620A-CTT-1670 Bearing Masonry - Area D/E/F (Low Roof) 0620A-ZSE-1730 Elec at Brng Masonry - Area D/E/F (Low Roof) 0620A-CVS-1200 Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) 0620A-ZSE-1320 Underground Conduit (Seq 2) - Area D/E/F (Low Roof) 0620A-GEO-1220 Prep for Venting - Area D/E/F (Low Roof) 0620A-CTT-2210 Temp Enclosure (as needed) - Area D/E/F (Low Roof) 0620A-CTT-2230 Roof Blocking - Area D/E/F (Low Roof) 0620A-GEO-1230 Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) 0620A-CTT-2260 Roofing Dry-in - Area D/E/F (Low Roof) 0620A-MPH-1370 FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) 0620A-TFC-3150 Prep/ Pour SOG - Area D/E/F (Low Roof) 0620A-ALL-1180 Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low R 0620A-ZSE-2140 Temp Power - Area D/E/F (Low Roof) Building Shell Academic Area First Floor Area D (1st Flr) 0620A-CTT-2100 Masonry Veneer - Area D (1st Flr) 0620A-GSC-1420 Curtain Wall/ Windows - Area D (1st Flr) 0620A-GSC-1540 Entrances - Area D (1st Flr) 0620A-CTT-2350 Misc Shell Finishes - Area D (1st Flr) Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 7 of 25

20 5 10 5 5 5 5 0 232 232 2 20 20 2 8 3 5 5 7 5 5 0 5 278 278 4 4 5 1 3 5 5 1 3 5 15 15 15 6 3 5 10 7 10 2 5 0 6 188 141 136 123 5 34 19 5 110

04-09-14 04-28-14 05-14-14 06-02-14 06-02-14 06-10-14 07-14-14 09-19-13 A 09-19-13 A 09-19-13 A 05-16-14 05-16-14 06-23-14 06-23-14 07-08-14 07-08-14 07-08-14 07-14-14 07-28-14 08-05-14 08-14-14 08-01-13 A 08-01-13 A 08-01-13 A 08-13-13 A 10-07-13 A 10-11-13 10-11-13 11-01-13 11-08-13 11-15-13 11-15-13 12-09-13 08-19-14 08-19-14 09-15-14 09-26-14 10-08-14 10-10-14 10-10-14 10-13-14 10-16-14 10-24-14 10-28-14 11-05-14 07-22-14 09-26-14 09-26-14 09-26-14 09-26-14 11-17-14 02-24-15 03-13-15 10-23-14

Finish

05-15-14 05-06-14 05-30-14 06-09-14 06-09-14 06-18-14 07-21-14 07-21-14 08-20-14 08-20-14 09-27-13 A 06-20-14 06-20-14 06-24-14 07-07-14 07-11-14 07-16-14 07-16-14 07-23-14 08-04-14 08-12-14 08-12-14 08-20-14 11-13-14 11-13-14 09-03-13 A 09-10-13 A 10-11-13 10-11-13 10-16-13 11-11-13 11-15-13 11-15-13 11-19-13 12-13-13 09-12-14 09-12-14 10-09-14 10-06-14 10-10-14 10-17-14 10-27-14 10-23-14 10-30-14 10-27-14 11-04-14 11-04-14 11-13-14 04-16-15 04-16-15 04-09-15 03-20-15 10-03-14 01-06-15 03-20-15 03-19-15 03-30-15

Late Start

05-30-14 06-06-14 07-29-14 09-08-14 08-15-14 09-08-14 08-28-14 07-07-14 07-07-14 07-07-14 07-07-14 07-07-14 09-11-14 08-11-14 09-15-14 09-23-14 08-25-14 09-19-14 09-23-14 10-01-14 11-04-14 10-23-13 10-23-13 11-18-13 09-17-14 10-23-13 11-14-13 11-14-13 09-22-14 09-25-14 10-01-14 10-01-14 10-06-14 09-17-14 09-17-14 10-13-14 10-08-14 10-17-14 12-10-14 11-26-14 10-23-14 12-03-14 11-04-14 11-06-14 11-14-14 09-08-14 10-06-14 10-06-14 10-06-14 10-06-14 12-05-14 03-13-15 03-31-15 10-30-14

Late Finish 07-03-14 06-13-14 08-14-14 09-15-14 08-22-14 09-15-14 09-05-14 10-03-14 11-10-14 11-10-14 07-07-14 08-08-14 08-08-14 09-12-14 08-22-14 09-18-14 09-30-14 08-29-14 09-30-14 09-30-14 10-09-14 10-09-14 11-10-14 02-17-15 02-17-15 11-18-13 09-17-14 10-23-13 11-14-13 11-18-13 09-29-14 10-01-14 10-01-14 10-06-14 10-13-14 10-10-14 10-10-14 11-05-14 10-16-14 10-21-14 12-16-14 12-11-14 10-31-14 12-16-14 11-05-14 11-13-14 02-17-15 11-24-14 05-06-15 05-06-15 05-06-15 04-09-15 10-13-14 01-23-15 04-09-15 04-08-15 04-17-15

Total Free Float Float 27 21 42 55 42 50 27 53 57 57

0 0 0 15 15 0 0 0 0 0

27 27 45 27 39 44 27 39 33 33 41 47 65 65

0 0 6 0 0 11 0 6 0 0 0 19 0 0

7 20 20 161 160 160 160 149 16 16 16 6 6 36 28 6 28 6 6 72 6 14 14 19 13 5 13 13 11 13

0 0 3 1 0 0 154 143 0 0 0 0 0 10 0 0 2 0 0 6 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days

0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P Work Days 0620A - Prec

0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec 0620A - Prec 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P 0620A - Prec 0620A - T/P Work Days 0620A - Prec

0620A - T/P Work Days Work Days 0620A - Prec

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Elec at Brng Masonry - Area C (Low Roof) Set Precast at Mech Rm - Area C (Low Roof) Roof Structural Steel/ Metal Deck - Area C (Low Roof) Temp Enclosure (as needed) - Area C (Low Roof) Roof Blocking - Area C (Low Roof) Temp Power - Area C (Low Roof) Roofing Dry-in - Area C (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area A/B/C (1-Story)

2016 M A M J

Foundations - Area C (Aux Gym) Bearing Masonry - Area C (Aux Gym) Elec at Brng Masonry - Area C (Aux Gym) Underground Conduit - Area C (Aux Gym) Roof Structural Steel/ Metal Deck - Area C (Aux Gym) Prep for Venting - Area C (Aux Gym) Temp Enclosure (as needed) - Area C (Aux Gym) Roof Blocking - Area C (Aux Gym) Geo-Seal/ Vapor Vent - Area C (Aux Gym) Roofing Dry-in - Area C (Aux Gym) Prep/ Pour SOG - Area C (Aux Gym) Structure Substantially Complete/ Roof Dried-in - Area C (Aux Gym) Temp Power - Area C (Aux Gym)

Foundations - Area D/E/F (Low Roof) Masonry to Grade - Area D/E/F (Low Roof) Underground Plumbing - Area D/E/F (Low Roof) Underground Testing/ Inspection - Area D/E/F (Low Roof) Backfill Underground Plumbing - Area D/E/F (Low Roof) Backfill Foundations - Area D/E/F (Low Roof) Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Testing/ Inspection (Seq 2) - Area D/E/F (Low Roof) Backfill Underground Plumbing (Seq 2) - Area D/E/F (Low Roof) Underground Conduit (Seq 1) - Area D/E/F (Low Roof) Bearing Masonry - Area D/E/F (Low Roof) Elec at Brng Masonry - Area D/E/F (Low Roof) Roof Structural Steel/ Metal Deck - Area D/E/F (Low Roof) Underground Conduit (Seq 2) - Area D/E/F (Low Roof) Prep for Venting - Area D/E/F (Low Roof) Temp Enclosure (as needed) - Area D/E/F (Low Roof) Roof Blocking - Area D/E/F (Low Roof) Geo-Seal/ Vapor Vent - Area D/E/F (Low Roof) Roofing Dry-in - Area D/E/F (Low Roof) FD/ Trap Primer/ C.O. - Area D/E/F (Low Roof) Prep/ Pour SOG - Area D/E/F (Low Roof) Structure Substantially Complete/ Roof Dried-in - Area D/E/F (Low Roof) Temp Power - Area D/E/F (Low Roof)

Masonry Veneer - Area D (1st Flr) Curtain Wall/ Windows - Area D (1st Flr) Entrances - Area D (1st Flr) Misc Shell Finishes - Area D (1st Flr)


Activity ID

Activity Name

0620A-CTT-1960 Masonry Veneer - Area E (1st Flr) 0620A-GSC-1300 Curtain Wall/ Windows - Area E (1st Flr) 0620A-GSC-1340 Entrances - Area E (1st Flr) 0620A-CTT-2290 Misc Shell Finishes - Area E (1st Flr) Area F (1st Flr) 0620A-CTT-1690 Masonry Veneer - Area F (1st Flr) 0620A-GSC-1060 Curtain Wall/ Windows - Area F (1st Flr) 0620A-GSC-3220 Entrances - Area F (1st Flr) 0620A-CTT-2240 Misc Shell Finishes - Area F (1st Flr) Second Floor Area G (2nd Flr) 0620A-CTT-2190 Masonry Veneer - Area G (2nd Flr) 0620A-GSC-1440 Curtain Wall/ Windows - Area G (2nd Flr) 0620A-CTT-2360 Misc Shell Finishes - Area G (2nd Flr) Area H (2nd Flr) 0620A-CTT-2020 Masonry Veneer - Area H (2nd Flr) 0620A-GSC-1320 Curtain Wall/ Windows - Area H (2nd Flr) 0620A-CTT-2320 Misc Shell Finishes - Area H (2nd Flr) Area I (2nd Flr) 0620A-CTT-1760 Masonry Veneer - Area I (2nd Flr) 0620A-GSC-1070 Curtain Wall/ Windows - Area I (2nd Flr) 0620A-CTT-2270 Misc Shell Finishes - Area I (2nd Flr) Third Floor Area G (3rd Flr) 0620A-CTT-2250 Masonry Veneer - Area G (3rd Flr) 0620A-CTT-2300 Roofing Finishes - Area G (3rd Flr) 0620A-GSC-1470 Curtain Wall/ Windows - Area G (3rd Flr) 0620A-ALL-1190 Full Building Enclosure - Academic Area 0620A-CTT-2370 Misc Shell Finishes - Area G (3rd Flr) Area H (3rd Flr) 0620A-CTT-2060 Masonry Veneer - Area H (3rd Flr) 0620A-GSC-1330 Curtain Wall/ Windows - Area H (3rd Flr) 0620A-CTT-2120 Roofing Finishes - Area H (3rd Flr) 0620A-CTT-2330 Misc Shell Finishes - Area H (3rd Flr) Area I (3rd Flr) 0620A-CTT-1800 Masonry Veneer - Area I (3rd Flr) 0620A-CTT-1870 Roofing Finishes - Area I (3rd Flr) 0620A-GSC-1090 Curtain Wall/ Windows - Area I (3rd Flr) 0620A-CTT-2280 Misc Shell Finishes - Area I (3rd Flr) One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-CTT-1810 Metal Wall Panels - Area B (Gym) 0620A-CTT-1890 Roofing Finishes - Area B (Gym) 0620A-GSC-1110 Curtain Wall/ Windows - Area B (Gym) 0620A-CTT-1910 Misc Shell Finishes - Area B (Gym) Area A/B/C (1-Story) Area A (Low Roof) 0620A-CTT-1840 Masonry Veneer - Area A (Low Roof) 0620A-GSC-1140 Curtain Wall/ Windows - Area A (Low Roof) 0620A-CTT-1940 Roofing Finishes - Area A (Low Roof) 0620A-CTT-1990 Misc Shell Finishes - Area A (Low Roof) 0620A-GSC-1180 Entrances - Area A (Low Roof) Area B (Low Roof) 0620A-CTT-1900 Masonry Veneer - Area B (Low Roof) 0620A-GSC-1190 Curtain Wall/ Windows - Area B (Low Roof) 0620A-CTT-2040 Misc Shell Finishes - Area B (Low Roof) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 8 of 25

Orig Start Dur 5 14 6 5 100 5 14 2 5 132 119 5 34 5 107 5 14 5 96 5 14 5 129 115 5 5 34 0 5 104 5 14 5 5 93 5 5 14 5 168 54 54 10 5 4 5 41 33 10 5 10 5 5 22 5 2 5

10-23-14 11-17-14 03-23-15 03-24-15 11-17-14 11-17-14 12-29-14 03-31-15 04-01-15 10-06-14 10-06-14 10-06-14 12-11-14 03-17-15 10-30-14 10-30-14 11-26-14 03-26-15 11-25-14 11-25-14 01-08-15 04-07-15 10-14-14 10-14-14 10-14-14 12-04-14 01-07-15 03-19-15 11-07-14 11-07-14 12-08-14 12-11-14 03-30-15 12-04-14 12-04-14 01-02-15 01-16-15 04-09-15 07-22-14 07-22-14 07-22-14 07-22-14 08-08-14 09-25-14 09-29-14 09-15-14 09-15-14 09-15-14 10-01-14 10-01-14 10-08-14 10-23-14 10-01-14 10-01-14 10-10-14 10-16-14

Finish

10-29-14 12-05-14 03-30-15 03-30-15 04-09-15 11-24-14 01-16-15 04-01-15 04-09-15 04-13-15 03-24-15 10-13-14 01-29-15 03-24-15 04-01-15 11-06-14 12-16-14 04-01-15 04-13-15 12-03-14 01-27-15 04-13-15 04-16-15 03-26-15 10-21-14 12-10-14 02-23-15 02-23-15 03-26-15 04-07-15 11-14-14 12-26-14 12-17-14 04-07-15 04-16-15 12-10-14 01-15-15 02-04-15 04-16-15 03-18-15 10-06-14 10-06-14 08-07-14 08-15-14 09-30-14* 10-06-14 11-10-14 10-29-14 09-30-14 10-07-14 10-17-14 10-14-14 10-29-14 10-30-14 10-09-14 10-13-14 10-23-14

Late Start

10-30-14 12-01-14 04-10-15 04-10-15 11-25-14 11-25-14 01-12-15 05-05-15 04-21-15 10-14-14 10-14-14 10-14-14 12-31-14 04-02-15 11-07-14 11-07-14 12-10-14 04-15-15 12-04-14 12-04-14 01-21-15 04-24-15 10-23-14 10-23-14 10-23-14 03-30-15 01-26-15 04-08-15 11-17-14 11-17-14 12-19-14 04-20-15 04-17-15 12-11-14 12-11-14 04-28-15 01-29-15 04-28-15 09-08-14 09-08-14 09-08-14 09-08-14 02-25-15 09-25-14 03-17-15 10-23-14 10-23-14 10-23-14 11-11-14 03-05-15 03-25-15 12-01-14 11-07-14 11-07-14 11-21-14 04-01-15

Late Finish 11-06-14 12-18-14 04-17-15 04-17-15 05-06-15 12-03-14 01-29-15 05-06-15 04-28-15 05-01-15 04-10-15 10-21-14 02-17-15 04-10-15 04-21-15 11-14-14 12-30-14 04-21-15 05-01-15 12-10-14 02-09-15 05-01-15 05-06-15 04-15-15 10-29-14 04-07-15 03-12-15 04-13-15 04-15-15 04-27-15 11-24-14 01-09-15 04-27-15 04-24-15 05-06-15 12-17-14 05-06-15 02-17-15 05-06-15 05-06-15 03-24-15 03-24-15 09-23-14 03-04-15 09-30-14 03-24-15 04-17-15 03-31-15 11-06-14 11-17-14 03-24-15 03-31-15 12-05-14 04-09-15 11-14-14 11-24-14 04-09-15

Total Free Float Float 5 9 13 11 19 5 9 24 11 14 12 5 13 11 13 5 9 11 14 5 9 11 14 13 5 48 13 34 11 14 5 9 55 11 14 5 55 9 11 34 118 118 27 98 0 79 110 106 22 29 72 79 26 111 22 30 79

0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 44 0 0 0 0 0 0 26 0 0 0 0 0 0 0 0 0 0 0 2 6

Calendar 2013 J Jul A S O N D 0620A - T/P Work Days Work Days 0620A - Prec 0620A - T/P Work Days Work Days 0620A - Prec

Remaining Work Critical Remaining Work

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F Masonry Veneer - Area E (1st Flr) Curtain Wall/ Windows - Area E (1st Flr) Entrances - Area E (1st Flr) Misc Shell Finishes - Area E (1st Flr) Masonry Veneer - Area F (1st Flr) Curtain Wall/ Windows - Area F (1st Flr) Entrances - Area F (1st Flr) Misc Shell Finishes - Area F (1st Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area G (2nd Flr) Curtain Wall/ Windows - Area G (2nd Flr) Misc Shell Finishes - Area G (2nd Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area H (2nd Flr) Curtain Wall/ Windows - Area H (2nd Flr) Misc Shell Finishes - Area H (2nd Flr)

0620A - T/P Work Days 0620A - Prec

Masonry Veneer - Area I (2nd Flr) Curtain Wall/ Windows - Area I (2nd Flr) Misc Shell Finishes - Area I (2nd Flr)

0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec

Masonry Veneer - Area G (3rd Flr) Roofing Finishes - Area G (3rd Flr) Curtain Wall/ Windows - Area G (3rd Flr) Full Building Enclosure - Academic Area Misc Shell Finishes - Area G (3rd Flr)

0620A - T/P Work Days 0620A - Prec 0620A - Prec

Masonry Veneer - Area H (3rd Flr) Curtain Wall/ Windows - Area H (3rd Flr) Roofing Finishes - Area H (3rd Flr) Misc Shell Finishes - Area H (3rd Flr)

0620A - T/P 0620A - Prec Work Days 0620A - Prec

Masonry Veneer - Area I (3rd Flr) Roofing Finishes - Area I (3rd Flr) Curtain Wall/ Windows - Area I (3rd Flr) Misc Shell Finishes - Area I (3rd Flr)

0620A - T/P 0620A - Prec Work Days 0620A - Prec

0620A - T/P Work Days 0620A - Prec 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec

Milestone Actual Work

J

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

Metal Wall Panels - Area B (Gym) Roofing Finishes - Area B (Gym) Curtain Wall/ Windows - Area B (Gym) Misc Shell Finishes - Area B (Gym)

Masonry Veneer - Area A (Low Roof) Curtain Wall/ Windows - Area A (Low Roof) Roofing Finishes - Area A (Low Roof) Misc Shell Finishes - Area A (Low Roof) Entrances - Area A (Low Roof) Masonry Veneer - Area B (Low Roof) Curtain Wall/ Windows - Area B (Low Roof) Misc Shell Finishes - Area B (Low Roof)

2016 M A M J


Activity ID

Activity Name

Orig Start Dur

0620A-CTT-2050 Roofing Finishes - Area B (Low Roof) 0620A-GSC-1210 Entrances - Area B (Low Roof) Area C (Low Roof) 0620A-CTT-1980 Masonry Veneer - Area C (Low Roof) 0620A-GSC-1220 Curtain Wall/ Windows - Area C (Low Roof) 0620A-CTT-2090 Roofing Finishes - Area C (Low Roof) 0620A-GSC-1240 Entrances - Area C (Low Roof) 0620A-CTT-2080 Misc Shell Finishes - Area C (Low Roof) 0620A-ALL-1150 Full Building Enclosure - Areas A/B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-CTT-2030 Masonry Veneer - Area C (Aux Gym) 0620A-ALL-1140 Full Building Enclosure - Area C (Aux Gym) 0620A-GSC-1270 Entrances - Area C (Aux Gym) 0620A-CTT-2170 Roofing Finishes - Area C (Aux Gym) 0620A-CTT-2140 Misc Shell Finishes - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2220 Masonry Veneer - Area D/E/F (Low Roof) 0620A-CTT-2340 Roofing Finishes - Area D/E/F (Low Roof) 0620A-GSC-1530 Curtain Wall/ Windows - Area D/E/F (Low Roof) 0620A-ALL-1200 Full Building Enclosure - Area D/E/F (Low Roof) 0620A-CTT-2380 Misc Shell Finishes - Area D/E/F (Low Roof) 0620A-GSC-1640 Entrances - Area D/E/F (Low Roof) Interior Rough-in Academic Area First Floor Area D (1st Flr) 0620A-CTT-1920 Non-Bearing Masonry Rough-in - Area D (1st Flr) 0620A-ZSE-1920 Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) 0620A-MPH-1630 Plumbing Chase Rough-in - Area D (1st Flr) 0620A-RMM-1280 HVAC Ductwork Rough-in - Area D (1st Flr) 0620A-RMM-1300 HVAC Piping Rough-in - Area D (1st Flr) 0620A-MPH-1690 Plumbing Rough-in - Area D (1st Flr) 0620A-ZSE-1950 Switchgear - Area D (1st Flr) 0620A-ZSE-1990 Conduit - Overhead - Area D (1st Flr) 0620A-RMM-1350 HVAC Controls Rough-in - Area D (1st Flr) 0620A-SAC-1130 Fire Protection Rough-in - Area D (1st Flr) 0620A-ZSE-2110 Pull Electrical Wires - Area D (1st Flr) 0620A-RMM-1380 HVAC Insulation - Area D (1st Flr) 0620A-SAC-1140 Fire Protection Above Ceiling Finalization - Area D (1st Flr) 0620A-ZSE-2240 Cable Tray - Area D (1st Flr) 0620A-ZSE-2250 Electrical Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1280 Metal Studs - Area D (1st Flr) 0620A-RMM-1500 HVAC System Testing - Area D (1st Flr) 0620A-RMM-1510 HVAC Above Ceiling Finalization - Area D (1st Flr) 0620A-GSC-1350 Block Filler - Area D (1st Flr) 0620A-MPH-1900 Plumbing Insulation - Area D (1st Flr) 0620A-GSC-1480 Gypsum Board - Area D (1st Flr) 0620A-MPH-1910 Plumbing Above Ceiling Finalization - Area D (1st Flr) 0620A-ZST-1210 Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) 0620A-ZST-1270 Tech Cabling Rough-in (In-Class) - Area D (1st Flr) 0620A-ZST-1280 Tech Above Ceiling Finalization - Area D (1st Flr) 0620A-ALL-1210 Interior Rough-in Substantially Complete - 1st Flr Area E (1st Flr) 0620A-RMM-1230 Set Large Mech Equipment - Area E (1st Flr) 0620A-MPH-1560 Plumbing Chase Rough-in - Area E (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 9 of 25

5 1 22 5 3 5 2 5 0 22 22 5 0 2 5 5 99 99 10 10 10 0 5 20 306 306 226 112 15 15 5 25 25 15 1 10 10 12 14 20 5 5 5 5 5 5 5 8 15 5 10 7 5 0 226 1 5

10-20-14 10-30-14 10-10-14 10-10-14 10-20-14 10-28-14 10-31-14 11-04-14 10-20-14 10-20-14 10-20-14 11-04-14 11-05-14 11-12-14 10-28-14 10-28-14 10-28-14 11-13-14 02-05-15 02-19-15 02-19-15 02-25-14 02-25-14 02-25-14 06-13-14 06-13-14 06-13-14 06-20-14 06-20-14 06-27-14 07-07-14 07-10-14 07-14-14 07-28-14 07-28-14 07-28-14 08-04-14 08-06-14 08-15-14 08-15-14 08-19-14 09-02-14 09-02-14 09-15-14 09-15-14 09-15-14 09-18-14 09-29-14 10-13-14 10-15-14 02-25-14 02-25-14 07-29-14

Finish

10-27-14 10-30-14 11-10-14 10-17-14 10-22-14 11-04-14 11-03-14 11-10-14 11-05-14 11-18-14 11-18-14 10-27-14 10-27-14 11-05-14 11-12-14 11-18-14 03-18-15 03-18-15 11-12-14 12-01-14 02-18-15 02-18-15 02-25-15 03-18-15 05-08-15 05-08-15 01-15-15 11-19-14 07-03-14 07-03-14 06-26-14 07-25-14 08-01-14 07-25-14 07-10-14 07-25-14 08-08-14 08-12-14 08-14-14 08-29-14 08-12-14 08-21-14 08-21-14 08-25-14 09-08-14 09-08-14 09-19-14 09-24-14 10-03-14 09-24-14 10-10-14 10-21-14 10-21-14 11-19-14 01-15-15 02-25-14 08-04-14

Late Start

03-25-15 12-08-14 11-17-14 11-17-14 11-25-14 04-01-15 12-09-14 04-10-15 11-25-14 11-25-14 11-25-14 12-11-14 04-10-15 04-20-15 12-04-14 12-04-14 12-04-14 04-20-15 02-18-15 04-28-15 04-09-15 03-24-14 03-24-14 03-24-14 07-03-14 09-02-14 09-02-14 09-09-14 07-03-14 07-11-14 09-26-14 10-13-14 10-14-14 12-18-14 11-05-14 10-28-14 11-21-14 12-26-14 11-17-14 12-26-14 11-03-14 12-26-14 12-26-14 12-04-14 11-28-14 11-10-14 12-26-14 11-24-14 12-09-14 12-26-14 03-24-14 03-24-14 09-30-14

Late Finish 03-31-15 12-08-14 04-17-15 11-24-14 11-28-14 04-09-15 12-10-14 04-17-15 12-12-14 04-27-15 04-27-15 12-03-14 01-06-15 12-12-14 04-17-15 04-27-15 05-06-15 05-06-15 12-17-14 05-06-15 03-03-15 03-03-15 05-06-15 05-06-15 07-17-15 07-17-15 07-13-15 01-02-15 09-22-14 09-22-14 09-15-14 08-07-14 08-14-14 10-16-14 10-13-14 10-27-14 01-02-15 11-20-14 11-14-14 12-19-14 01-02-15 11-21-14 01-02-15 11-07-14 01-02-15 01-02-15 12-10-14 12-09-14 12-01-14 01-02-15 12-08-14 12-17-14 01-02-15 01-02-15 07-13-15 03-24-14 10-06-14

Total Free Float Float 72 26 110 22 26 72 26 73 26 110 110 22 48 26 72 73 34 34 22 72 9 9 39 34 49 49 125 29 55 55 55 9 9 58 66 65 101 71 65 78 99 65 92 53 81 81 57 53 40 69 40 40 50 29 125 19 44

0 0 0 0 0 0 0 0 0 0 0 0 18 0 0 34 0 0 0 61 0 0 28 20 0 0 0 0 13 13 0 0 0 0 1 0 16 0 0 0 24 0 14 0 0 11 0 0 0 26 0 0 2 16 0 7 4

Calendar 2013 J Jul A S O N D 0620A - Prec Work Days 0620A - T/P Work Days 0620A - Prec Work Days 0620A - Prec Work Days

0620A - T/P Work Days Work Days 0620A - Prec 0620A - Prec

0620A - T/P 0620A - Prec Work Days Work Days 0620A - Prec Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D Roofing Finishes - Area B (Low Roof) Entrances - Area B (Low Roof)

J

F

2016 M A M J

Masonry Veneer - Area C (Low Roof) Curtain Wall/ Windows - Area C (Low Roof) Roofing Finishes - Area C (Low Roof) Entrances - Area C (Low Roof) Misc Shell Finishes - Area C (Low Roof) Full Building Enclosure - Areas A/B/C (1-Story)

Masonry Veneer - Area C (Aux Gym) Full Building Enclosure - Area C (Aux Gym) Entrances - Area C (Aux Gym) Roofing Finishes - Area C (Aux Gym) Misc Shell Finishes - Area C (Aux Gym)

Masonry Veneer - Area D/E/F (Low Roof) Roofing Finishes - Area D/E/F (Low Roof) Curtain Wall/ Windows - Area D/E/F (Low Roof) Full Building Enclosure - Area D/E/F (Low Roof) Misc Shell Finishes - Area D/E/F (Low Roof) Entrances - Area D/E/F (Low Roof)

Non-Bearing Masonry Rough-in - Area D (1st Flr) Elec at Non-Brng Masonry Rough-in - Area D (1st Flr) Plumbing Chase Rough-in - Area D (1st Flr) HVAC Ductwork Rough-in - Area D (1st Flr) HVAC Piping Rough-in - Area D (1st Flr) Plumbing Rough-in - Area D (1st Flr) Switchgear - Area D (1st Flr) Conduit - Overhead - Area D (1st Flr) HVAC Controls Rough-in - Area D (1st Flr) Fire Protection Rough-in - Area D (1st Flr) Pull Electrical Wires - Area D (1st Flr) HVAC Insulation - Area D (1st Flr) Fire Protection Above Ceiling Finalization - Area D (1st Flr) Cable Tray - Area D (1st Flr) Electrical Above Ceiling Finalization - Area D (1st Flr) Metal Studs - Area D (1st Flr) HVAC System Testing - Area D (1st Flr) HVAC Above Ceiling Finalization - Area D (1st Flr) Block Filler - Area D (1st Flr) Plumbing Insulation - Area D (1st Flr) Gypsum Board - Area D (1st Flr) Plumbing Above Ceiling Finalization - Area D (1st Flr) Tech Cabling Rough-in (Homeruns) - Area D (1st Flr) Tech Cabling Rough-in (In-Class) - Area D (1st Flr) Tech Above Ceiling Finalization - Area D (1st Flr) Interior Rough-in Substantially Complete - 1st Flr Set Large Mech Equipment - Area E (1st Flr) Plumbing Chase Rough-in - Area E (1st Flr)


Activity ID

0620A-CTT-1830 0620A-ZSE-1820 0620A-RMM-1150 0620A-ZSE-1860 0620A-RMM-1170 0620A-MPH-1600 0620A-ZSE-1960 0620A-GSC-1230 0620A-RMM-1370 0620A-ZSE-2020 0620A-RMM-1270 0620A-SAC-1070 0620A-RMM-1290 0620A-ZSE-2090 0620A-ZSE-2100 0620A-SAC-1090 0620A-RMM-1330 0620A-RMM-1340 0620A-RMM-1560 0620A-ZST-1150 0620A-ZST-1180 0620A-ZST-1190 0620A-GSC-1250 0620A-MPH-1840 0620A-GSC-1430 0620A-MPH-1860 0620A-RMM-1710 0620A-ZSE-2390 0620A-RMM-2000 Area F (1st Flr) 0620A-MPH-1500 0620A-CTT-1740 0620A-ZSE-1760 0620A-ZSE-1800 0620A-RMM-1110 0620A-GSC-1160 0620A-RMM-1120 0620A-MPH-1510 0620A-ZSE-1850 0620A-RMM-1130 0620A-SAC-1050 0620A-ZSE-1970 0620A-RMM-1140 0620A-SAC-1060 0620A-ZSE-3380 0620A-ZSE-1980 0620A-ZST-1050 0620A-RMM-1210 0620A-RMM-1220 0620A-MPH-1800 0620A-GSC-1360 0620A-MPH-1810 0620A-ZST-1110 0620A-GSC-1200 0620A-ZST-1120 Second Floor Area G (2nd Flr)

Activity Name

Orig Start Dur

Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 10 of 25

15 15 25 5 25 15 8 10 20 9 10 15 10 5 5 5 5 5 20 4 5 3 5 8 15 5 10 17 10 82 5 10 10 4 25 7 25 15 18 7 13 11 17 5 5 3 10 5 5 8 10 5 7 5 5 175 136

07-29-14 07-29-14 07-29-14 08-05-14 08-05-14 08-12-14 08-19-14 08-26-14 08-27-14 08-29-14 09-03-14 09-03-14 09-10-14 09-12-14 09-12-14 09-17-14 09-24-14 09-24-14 10-07-14 10-22-14 10-24-14 10-28-14 10-28-14 10-28-14 10-28-14 10-31-14 11-04-14 11-04-14 01-02-15 08-11-14 08-11-14 08-19-14 08-19-14 08-26-14 09-03-14 09-10-14 09-10-14 09-17-14 09-17-14 10-08-14 10-08-14 10-13-14 10-15-14 10-20-14 10-28-14 10-30-14 11-04-14 11-07-14 11-07-14 11-10-14 11-11-14 11-13-14 11-25-14 11-26-14 11-28-14 06-06-14 06-26-14

Finish

08-18-14 08-18-14 09-02-14 08-11-14 09-09-14 09-02-14 08-28-14 09-09-14 09-24-14 09-11-14 09-16-14 09-23-14 09-23-14 09-18-14 09-18-14 09-23-14 09-30-14 09-30-14 11-03-14 10-27-14 10-30-14 10-30-14 11-03-14 11-06-14 11-17-14 11-06-14 11-17-14 11-26-14 01-15-15 12-04-14 08-15-14 09-02-14 09-02-14 08-29-14 10-07-14 09-18-14 10-14-14 10-07-14 10-10-14 10-16-14 10-24-14 10-27-14 11-06-14 10-24-14 11-03-14 11-03-14 11-17-14 11-13-14 11-13-14 11-19-14 11-24-14 11-19-14 12-04-14 12-03-14 12-04-14 02-12-15 01-08-15

Late Start

09-23-14 09-23-14 08-08-14 10-21-14 08-15-14 10-17-14 10-29-14 11-26-14 10-14-14 11-21-14 01-07-15 11-21-14 12-22-14 12-11-14 01-14-15 01-14-15 01-14-15 01-14-15 01-29-15 12-18-14 01-14-15 12-24-14 12-26-14 12-10-14 12-11-14 01-14-15 05-22-15 06-19-15 06-08-15 09-15-14 10-28-14 10-21-14 10-21-14 10-28-14 09-15-14 12-18-14 09-22-14 11-07-14 11-10-14 01-28-15 12-15-14 12-05-14 01-07-15 01-30-15 12-22-14 02-03-15 12-30-14 01-30-15 01-30-15 12-22-14 12-30-14 01-30-15 01-14-15 01-28-15 01-30-15 06-18-14 10-20-14

Late Finish 10-13-14 10-13-14 09-12-14 10-27-14 09-19-14 11-06-14 11-07-14 12-10-14 11-10-14 12-04-14 01-20-15 12-12-14 01-06-15 12-17-14 01-20-15 01-20-15 01-20-15 01-20-15 02-25-15 12-23-14 01-20-15 12-29-14 01-02-15 12-19-14 01-02-15 01-20-15 06-05-15 07-13-15 06-19-15 02-05-15 11-03-14 11-03-14 11-03-14 10-31-14 10-17-14 12-29-14 10-24-14 11-28-14 12-04-14 02-05-15 01-02-15 12-19-14 01-29-15 02-05-15 12-29-14 02-05-15 01-13-15 02-05-15 02-05-15 01-02-15 01-13-15 02-05-15 01-22-15 02-03-15 02-05-15 07-17-15 02-23-15

Total Free Float Float 39 39 8 54 8 47 50 65 33 59 87 57 72 63 85 82 77 77 79 40 55 40 41 30 31 50 139 158 109 43 55 44 44 44 8 70 8 37 38 77 47 38 57 71 38 65 38 57 57 29 33 53 33 42 43 109 32

0 0 0 5 0 0 0 0 0 0 10 0 0 0 29 18 0 27 0 0 19 0 0 0 0 4 30 23 0 0 11 0 0 6 0 0 0 0 0 13 0 0 0 9 0 17 5 0 0 0 0 4 0 0 18 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Non-Bearing Masonry Rough-in - Area E (1st Flr) Elec at Non-Brng Masonry Rough-in - Area E (1st Flr) HVAC Ductwork Rough-in - Area E (1st Flr) Switchgear - Area E (1st Flr) HVAC Piping Rough-in - Area E (1st Flr) Plumbing Rough-in - Area E (1st Flr) Conduit - Overhead - Area E (1st Flr) Metal Studs - Area E (1st Flr) HVAC Ductwork Mech Rm Rough-in - Area E (1st Flr) Pull Electrical Wires - Area E (1st Flr) HVAC Controls Rough-in - Area E (1st Flr) Fire Protection Rough-in - Area E (1st Flr) HVAC Insulation - Area E (1st Flr) Cable Tray - Area E (1st Flr) Electrical Above Ceiling Finalization - Area E (1st Flr) Fire Protection Above Ceiling Finalization - Area E (1st Flr) HVAC System Testing - Area E (1st Flr) HVAC Above Ceiling Finalization - Area E (1st Flr) HVAC Piping Mech Rm Rough-in - Area E (1st Flr) Tech Cabling Rough-in (Homeruns) - Area E (1st Flr) Tech Above Ceiling Finalization - Area E (1st Flr) Tech Cabling Rough-in (In-Class) - Area E (1st Flr) Block Filler - Area E (1st Flr) Plumbing Insulation - Area E (1st Flr) Gypsum Board - Area E (1st Flr) Plumbing Above Ceiling Finalization - Area E (1st Flr) HVAC Mech Rm Insulation - Area E (1st Flr) Conduit - Mech Rms - Area E (1st Flr) HVAC Mech Rm Controls Rough-in - Area E (1st Flr) Plumbing Chase Rough-in - Area F (1st Flr) Non-Bearing Masonry Rough-in - Area F (1st Flr) Elec at Non-Brng Masonry Rough-in - Area F (1st Flr) Switchgear - Area F (1st Flr) HVAC Ductwork Rough-in - Area F (1st Flr) Metal Studs - Area F (1st Flr) HVAC Piping Rough-in - Area F (1st Flr) Plumbing Rough-in - Area F (1st Flr) Conduit - Overhead - Area F (1st Flr) HVAC Controls Rough-in - Area F (1st Flr) Fire Protection Rough-in - Area F (1st Flr) Pull Electrical Wires - Area F (1st Flr) HVAC Insulation - Area F (1st Flr) Fire Protection Above Ceiling Finalization - Area F (1st Flr) Cable Tray - Area F (1st Flr) Electrical Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (Homeruns) - Area F (1st Flr) HVAC System Testing - Area F (1st Flr) HVAC Above Ceiling Finalization - Area F (1st Flr) Plumbing Insulation - Area F (1st Flr) Gypsum Board - Area F (1st Flr) Plumbing Above Ceiling Finalization - Area F (1st Flr) Tech Cabling Rough-in (In-Class) - Area F (1st Flr) Block Filler - Area F (1st Flr) Tech Above Ceiling Finalization - Area F (1st Flr)


Activity ID

0620A-MPH-1670 0620A-CTT-1930 0620A-ZSE-1930 0620A-GSC-1620 0620A-GSC-1520 0620A-RMM-1630 0620A-RMM-1690 0620A-MPH-1950 0620A-SAC-1240 0620A-ZSE-2410 0620A-RMM-1790 0620A-SAC-1270 0620A-RMM-1830 0620A-RMM-1810 0620A-RMM-1820 0620A-GSC-1730 0620A-MPH-1980 0620A-ZSE-2600 0620A-MPH-2050 0620A-ZSE-2620 0620A-ZSE-2680 0620A-ZST-1530 0620A-ZST-1630 0620A-ZST-1650 0620A-ALL-1230 Area H (2nd Flr) 0620A-RMM-1250 0620A-MPH-1650 0620A-CTT-1850 0620A-ZSE-1840 0620A-GSC-1550 0620A-GSC-1460 0620A-RMM-1720 0620A-RMM-1450 0620A-RMM-1530 0620A-MPH-1850 0620A-SAC-1180 0620A-ZSE-2290 0620A-MPH-1960 0620A-GSC-1630 0620A-RMM-1900 0620A-MPH-1970 0620A-RMM-1620 0620A-SAC-1220 0620A-RMM-1680 0620A-ZSE-2380 0620A-RMM-1740 0620A-RMM-1760 0620A-ZSE-2750 0620A-RMM-1990 0620A-ZST-1390 0620A-RMM-2110 0620A-ZST-1460 0620A-ZST-1470 0620A-ZSE-2500 0620A-ZSE-2520 Area I (2nd Flr)

Activity Name

Orig Start Dur

Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 11 of 25

5 15 15 10 5 20 20 5 12 17 10 5 10 5 5 15 5 9 5 5 6 10 7 5 0 168 1 5 15 15 10 5 20 20 20 5 15 16 5 15 20 5 10 5 10 14 5 5 4 10 7 10 5 5 6 5 130

06-26-14 07-11-14 07-11-14 09-19-14 09-22-14 10-08-14 10-15-14 10-22-14 10-29-14 10-29-14 11-05-14 11-07-14 11-12-14 11-14-14 11-14-14 11-18-14 11-20-14 11-21-14 11-26-14 11-28-14 12-05-14 12-15-14 12-30-14 01-02-15 06-06-14 06-06-14 07-29-14 08-01-14 08-01-14 10-03-14 11-04-14 11-04-14 11-05-14 11-12-14 11-19-14 11-26-14 11-26-14 11-28-14 12-01-14 12-03-14 12-04-14 12-04-14 12-11-14 12-11-14 12-19-14 12-26-14 12-26-14 01-02-15 01-02-15 01-12-15 01-16-15 01-21-15 01-21-15 01-27-15 01-28-15 08-11-14

Finish

07-02-14 07-31-14 07-31-14 10-02-14 09-26-14 11-04-14 11-11-14 10-28-14 11-13-14 11-20-14 11-18-14 11-13-14 11-25-14 11-20-14 11-20-14 12-09-14 11-26-14 12-04-14 12-03-14 12-04-14 12-12-14 12-29-14 01-08-15 01-08-15 01-08-15 02-03-15 06-06-14 08-04-14 08-21-14 08-21-14 10-16-14 11-10-14 12-02-14 12-03-14 12-10-14 11-25-14 12-17-14 12-18-14 12-04-14 12-19-14 12-31-14 12-10-14 12-17-14 12-17-14 12-24-14 01-09-15 01-02-15 01-02-15 01-07-15 01-15-15 01-20-15 01-29-15 01-27-15 01-27-15 02-03-15 02-03-15 02-12-15

Late Start

11-04-14 11-14-14 11-14-14 01-05-15 12-11-14 10-20-14 10-27-14 12-01-14 01-16-15 12-08-14 02-10-15 02-17-15 02-03-15 02-17-15 02-17-15 01-22-15 01-29-15 01-02-15 02-17-15 02-17-15 01-15-15 01-23-15 02-06-15 02-17-15 06-18-14 06-18-14 11-11-14 12-08-14 12-08-14 01-19-15 01-07-15 02-26-15 11-17-14 11-24-14 12-29-14 02-03-15 01-06-15 02-05-15 02-03-15 03-26-15 03-05-15 03-09-15 03-05-15 02-25-15 01-28-15 03-25-15 03-25-15 07-14-15 06-08-15 02-17-15 06-22-15 02-26-15 03-05-15 03-24-15 03-25-15 11-18-14

Late Finish 11-10-14 12-05-14 12-05-14 01-16-15 12-17-14 11-14-14 11-21-14 12-05-14 02-02-15 12-31-14 02-23-15 02-23-15 02-16-15 02-23-15 02-23-15 02-11-15 02-04-15 01-14-15 02-23-15 02-23-15 01-22-15 02-05-15 02-16-15 02-23-15 02-23-15 07-17-15 06-18-14 11-17-14 12-29-14 12-29-14 01-30-15 01-13-15 03-25-15 12-15-14 12-22-14 01-05-15 02-23-15 01-27-15 02-11-15 02-23-15 04-23-15 03-11-15 03-20-15 03-11-15 03-10-15 02-16-15 03-31-15 03-31-15 07-17-15 06-19-15 02-25-15 07-03-15 03-04-15 03-11-15 03-31-15 03-31-15 04-08-15

Total Free Float Float 91 89 89 73 57 8 8 27 54 27 66 69 56 64 64 44 47 27 56 55 27 27 27 32 32 116 8 74 89 89 73 43 79 8 8 26 46 26 47 44 79 63 65 58 52 26 62 62 135 109 26 109 26 31 40 40 38

17 0 0 0 0 0 0 0 0 0 2 18 0 0 23 0 0 0 0 23 0 0 0 0 19 0 0 4 0 0 0 1 0 0 0 0 0 0 4 0 0 13 10 13 0 0 0 15 98 0 0 30 0 7 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area G (2nd Flr) Non-Bearing Masonry Rough-in - Area G (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area G (2nd Flr) Metal Studs - Area G (2nd Flr) Block Filler - Area G (2nd Flr) HVAC Ductwork Rough-in - Area G (2nd Flr) HVAC Piping Rough-in - Area G (2nd Flr) Plumbing Rough-in - Area G (2nd Flr) Fire Protection Rough-in - Area G (2nd Flr) Conduit - Overhead - Area G (2nd Flr) HVAC Controls Rough-in - Area G (2nd Flr) Fire Protection Above Ceiling Finalization - Area G (2nd Flr) HVAC Insulation - Area G (2nd Flr) HVAC System Testing - Area G (2nd Flr) HVAC Above Ceiling Finalization - Area G (2nd Flr) Gypsum Board - Area G (2nd Flr) Plumbing Insulation - Area G (2nd Flr) Pull Electrical Wires - Area G (2nd Flr) Plumbing Above Ceiling Finalization - Area G (2nd Flr) Electrical Above Ceiling Finalization - Area G (2nd Flr) Cable Tray - Area G (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area G (2nd Flr) Tech Cabling Rough-in (In-Class) - Area G (2nd Flr) Tech Above Ceiling Finalization - Area G (2nd Flr) Interior Rough-in Substantially Complete - 2nd Flr Set Large Mech Equipment - Area H (2nd Flr) Plumbing Chase Rough-in - Area H (2nd Flr) Non-Bearing Masonry Rough-in - Area H (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area H (2nd Flr) Metal Studs - Area H (2nd Flr) Block Filler - Area H (2nd Flr) HVAC Piping Mech Rm Rough-in - Area H (2nd Flr) HVAC Ductwork Rough-in - Area H (2nd Flr) HVAC Piping Rough-in - Area H (2nd Flr) Plumbing Rough-in - Area H (2nd Flr) Fire Protection Rough-in - Area H (2nd Flr) Conduit - Overhead & Feeders - Area H (2nd Flr) Plumbing Insulation - Area H (2nd Flr) Gypsum Board - Area H (2nd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (2nd Flr) Plumbing Above Ceiling Finalization - Area H (2nd Flr) HVAC Controls Rough-in - Area H (2nd Flr) Fire Protection Above Ceiling Finalization - Area H (2nd Flr) HVAC Insulation - Area H (2nd Flr) Pull Electrical Wires - Area H (2nd Flr) HVAC System Testing - Area H (2nd Flr) HVAC Above Ceiling Finalization - Area H (2nd Flr) Conduit - Mech Rooms - Area H (2nd Flr) HVAC Mech Rm Insulation - Area H (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area H (2nd Flr) HVAC Mech Rm Controls Rough-in - Area H (2nd Flr) Tech Cabling Rough-in (In-Class) - Area H (2nd Flr) Tech Above Ceiling Finalization - Area H (2nd Flr) Switchgear - Area H (2nd Flr) Electrical Above Ceiling Finalization - Area H (2nd Flr)


Activity ID

0620A-MPH-1640 0620A-CTT-1780 0620A-ZSE-1790 0620A-GSC-1450 0620A-GSC-1410 0620A-RMM-1360 0620A-RMM-1390 0620A-GSC-1590 0620A-MPH-1760 0620A-ZSE-2070 0620A-MPH-1930 0620A-SAC-1150 0620A-MPH-1940 0620A-RMM-1440 0620A-SAC-1160 0620A-ZSE-2270 0620A-RMM-1520 0620A-ZSE-2310 0620A-RMM-1570 0620A-RMM-1580 0620A-ZST-1310 0620A-ZSE-2300 0620A-ZST-1340 0620A-ZST-1350 Third Floor Area G (3rd Flr) 0620A-CTT-2310 0620A-ZSE-2230 0620A-MPH-1780 0620A-MPH-1820 0620A-GSC-1690 0620A-GSC-1920 0620A-GSC-2030 0620A-RMM-2100 0620A-RMM-2130 0620A-MPH-2160 0620A-ZSE-2880 0620A-MPH-2170 0620A-MPH-2180 0620A-RMM-2190 0620A-SAC-1420 0620A-RMM-2210 0620A-SAC-1450 0620A-ZSE-3040 0620A-RMM-2250 0620A-RMM-2260 0620A-ZSE-3120 0620A-ZSE-3130 0620A-ZST-2180 0620A-ZST-2210 0620A-ZST-2220 0620A-ALL-1300 Area H (3rd Flr) 0620A-RMM-1260 0620A-MPH-1750 0620A-CTT-2160 0620A-ZSE-2080

Activity Name

Orig Start Dur

Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)

Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 12 of 25

5 10 10 7 5 20 20 10 5 5 8 13 5 7 5 7 10 4 5 5 7 5 5 5 174 149 15 15 10 5 5 10 15 20 20 10 17 5 5 10 12 10 5 9 5 5 6 5 10 7 5 0 152 1 10 15 15

08-11-14 08-22-14 08-22-14 10-17-14 12-04-14 12-04-14 12-11-14 12-15-14 12-18-14 12-26-14 12-26-14 12-26-14 12-31-14 01-05-15 01-08-15 01-12-15 01-12-15 01-21-15 01-26-15 01-26-15 01-28-15 02-04-15 02-06-15 02-06-15 09-03-14 09-03-14 09-03-14 09-03-14 09-09-14 09-23-14 09-29-14 11-19-14 12-22-14 01-05-15 01-12-15 01-19-15 01-26-15 02-02-15 02-02-15 02-02-15 02-02-15 02-09-15 02-11-15 02-18-15 02-23-15 02-23-15 03-03-15 03-04-15 03-11-15 03-25-15 03-27-15 09-17-14 09-17-14 10-22-14 10-22-14 10-22-14

Finish

08-15-14 09-05-14 09-05-14 10-27-14 12-10-14 01-02-15 01-09-15 12-29-14 12-24-14 01-02-15 01-07-15 01-14-15 01-07-15 01-13-15 01-14-15 01-20-15 01-23-15 01-26-15 01-30-15 01-30-15 02-05-15 02-10-15 02-12-15 02-12-15 05-08-15 04-02-15 09-23-14 09-23-14 09-22-14 09-29-14 10-03-14 12-03-14 01-13-15 01-30-15 02-06-15 01-30-15 02-17-15 02-06-15 02-06-15 02-13-15 02-17-15 02-20-15 02-17-15 03-02-15 02-27-15 02-27-15 03-10-15 03-10-15 03-24-15 04-02-15 04-02-15 04-02-15 04-22-15 09-17-14 11-04-14 11-11-14 11-11-14

Late Start

11-18-14 12-30-14 12-30-14 02-02-15 02-06-15 12-16-14 12-23-14 02-27-15 01-22-15 01-29-15 02-12-15 03-06-15 03-23-15 03-23-15 03-23-15 02-19-15 03-11-15 03-18-15 04-01-15 04-01-15 03-05-15 04-01-15 03-16-15 03-23-15 09-26-14 10-21-14 11-26-14 11-26-14 10-21-14 12-30-14 12-18-14 02-18-15 03-06-15 01-15-15 01-22-15 01-29-15 02-05-15 03-25-15 04-09-15 04-01-15 03-25-15 03-25-15 04-09-15 03-02-15 04-09-15 04-09-15 03-13-15 04-09-15 03-23-15 04-07-15 04-09-15 09-26-14 09-26-14 11-04-14 12-22-14 12-22-14

Late Finish 11-24-14 01-13-15 01-13-15 02-10-15 02-12-15 01-14-15 01-21-15 03-12-15 01-28-15 02-04-15 02-23-15 03-24-15 03-27-15 03-31-15 03-27-15 02-27-15 03-24-15 03-23-15 04-08-15 04-08-15 03-13-15 04-08-15 03-20-15 03-27-15 07-17-15 04-15-15 12-17-14 12-17-14 11-03-14 01-06-15 12-24-14 03-03-15 03-26-15 02-11-15 02-18-15 02-11-15 02-27-15 03-31-15 04-15-15 04-15-15 04-10-15 04-08-15 04-15-15 03-12-15 04-15-15 04-15-15 03-20-15 04-15-15 04-03-15 04-15-15 04-15-15 04-15-15 07-17-15 09-26-14 11-17-14 01-13-15 01-13-15

Total Free Float Float 70 89 89 73 44 8 8 52 23 23 33 49 57 55 52 28 42 40 47 47 26 40 26 31 49 8 60 60 30 68 57 62 52 8 8 8 8 37 47 42 37 32 40 8 32 32 8 25 8 8 8 8 61 7 9 42 42

14 29 29 11 0 0 0 0 0 5 0 0 17 13 19 0 0 0 0 15 0 15 0 18 0 0 3 3 0 26 16 0 0 0 0 0 0 0 15 10 0 0 18 0 0 15 0 13 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Plumbing Chase Rough-in - Area I (2nd Flr) Non-Bearing Masonry Rough-in - Area I (2nd Flr) Elec at Non-Brng Masonry Rough-in - Area I (2nd Flr) Metal Studs - Area I (2nd Flr) Block Filler - Area I (2nd Flr) HVAC Ductwork Rough-in - Area I (2nd Flr) HVAC Piping Rough-in - Area I (2nd Flr) Gypsum Board - Area I (2nd Flr) Plumbing Rough-in - Area I (2nd Flr) Conduit - Overhead & Feeders - Area I (2nd Flr) Plumbing Insulation - Area I (2nd Flr) Fire Protection Rough-in - Area I (2nd Flr) Plumbing Above Ceiling Finalization - Area I (2nd Flr) HVAC Controls Rough-in - Area I (2nd Flr) Fire Protection Above Ceiling Finalization - Area I (2nd Flr) Pull Electrical Wires - Area I (2nd Flr) HVAC Insulation - Area I (2nd Flr) Switchgear - Area I (2nd Flr) HVAC System Testing - Area I (2nd Flr) HVAC Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (Homeruns) - Area I (2nd Flr) Electrical Above Ceiling Finalization - Area I (2nd Flr) Tech Cabling Rough-in (In-Class) - Area I (2nd Flr) Tech Above Ceiling Finalization - Area I (2nd Flr)

Non-Bearing Masonry Rough-in - Area G (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area G (3rd Flr) Storm Drain Rough-in - Area G (3rd Flr) Plumbing Chase Rough-in - Area G (3rd Flr) Block Filler - Area G (3rd Flr) Metal Studs - Area G (3rd Flr) Gypsum Board - Area G (3rd Flr) HVAC Ductwork Rough-in - Area G (3rd Flr) HVAC Piping Rough-in - Area G (3rd Flr) Plumbing Rough-in - Area G (3rd Flr) Conduit - Overhead - Area G (3rd Flr) Plumbing Insulation - Area G (3rd Flr) Plumbing Above Ceiling Finalization - Area G (3rd Flr) HVAC Controls Rough-in - Area G (3rd Flr) Fire Protection Rough-in - Area G (3rd Flr) HVAC Insulation - Area G (3rd Flr) Fire Protection Above Ceiling Finalization - Area G (3rd Flr) Pull Electrical Wires - Area G (3rd Flr) HVAC System Testing - Area G (3rd Flr) HVAC Above Ceiling Finalization - Area G (3rd Flr) Cable Tray - Area G (3rd Flr) Electrical Above Ceiling Finalization - Area G (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area G (3rd Flr) Tech Cabling Rough-in (In-Class) - Area G (3rd Flr) Tech Above Ceiling Finalization - Area G (3rd Flr) Interior Rough-in Substantially Complete - 3rd Flr Set Large Mech Equipment - Area H (3rd Flr) Storm Drain Rough-in - Area H (3rd Flr) Non-Bearing Masonry Rough-in - Area H (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area H (3rd Flr)


Activity ID

0620A-ZSE-2120 0620A-ZSE-2170 0620A-MPH-1770 0620A-GSC-1600 0620A-GSC-1820 0620A-RMM-2010 0620A-GSC-1930 0620A-RMM-2150 0620A-RMM-1940 0620A-RMM-1970 0620A-MPH-2090 0620A-ZSE-2770 0620A-RMM-2240 0620A-MPH-2140 0620A-MPH-2150 0620A-RMM-2090 0620A-SAC-1360 0620A-RMM-2120 0620A-RMM-2290 0620A-ZSE-2980 0620A-ZSE-2820 0620A-SAC-1380 0620A-RMM-2170 0620A-RMM-2180 0620A-ZSE-2930 0620A-ZST-1870 0620A-ZST-1980 0620A-ZST-1990 Area I (3rd Flr) 0620A-MPH-1730 0620A-MPH-1660 0620A-CTT-2070 0620A-ZSE-2000 0620A-ZSE-2030 0620A-GSC-1580 0620A-GSC-1720 0620A-GSC-1860 0620A-RMM-1800 0620A-MPH-2020 0620A-RMM-1840 0620A-ZSE-2590 0620A-MPH-2040 0620A-MPH-2070 0620A-SAC-1320 0620A-RMM-1930 0620A-SAC-1330 0620A-ZSE-2690 0620A-RMM-1960 0620A-ZSE-2710 0620A-RMM-2030 0620A-RMM-2050 0620A-ZST-1710 0620A-ZST-1750 0620A-ZST-1770 One Story Areas Area B (Gym) Area B.1 (Gym)

Activity Name

Orig Start Dur

Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Flr) HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd Flr) Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr) Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 13 of 25

Finish

Late Start

Late Finish

Total Free Float Float

Calendar 2013 J Jul A S O N D

4 2 5 5 10 20 15 20 20

10-29-14 11-04-14 11-05-14 11-12-14 12-04-14 01-02-15 01-05-15 01-30-15 02-02-15

11-03-14 11-05-14 11-11-14 11-18-14 12-17-14 01-29-15 01-23-15 02-26-15 02-27-15

02-19-15 02-25-15 01-07-15 01-14-15 03-04-15 04-24-15 03-18-15 05-22-15 02-12-15

02-24-15 02-26-15 01-13-15 01-20-15 03-17-15 05-21-15 04-08-15 06-19-15 03-11-15

78 78 42 42 62 79 52 79 8

0 9 0 0 0 0 0 0 0

Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days

20 10 14 10 5 5 10 15 10 10 12 16 5 5 5 5 7 5 5 129 10 5 10 10 4 5 7 10 20 10 20 7 5 5 13 7 5 7 10 5 5 5 7 5 5 283 131 131

02-09-15 02-16-15 02-23-15 02-27-15 03-02-15 03-02-15 03-02-15 03-02-15 03-09-15 03-13-15 03-13-15 03-13-15 03-16-15 03-23-15 03-23-15 03-30-15 04-07-15 04-16-15 04-16-15 11-05-14 11-05-14 11-12-14 11-12-14 11-12-14 11-19-14 12-11-14 12-18-14 01-19-15 03-02-15 03-09-15 03-09-15 03-16-15 03-23-15 03-23-15 03-23-15 03-30-15 04-02-15 04-07-15 04-07-15 04-09-15 04-21-15 04-21-15 04-23-15 05-04-15 05-04-15 03-21-14 03-21-14 03-21-14

03-06-15 02-27-15 03-12-15 03-12-15 03-06-15 03-06-15 03-13-15 03-20-15 03-20-15 03-26-15 03-30-15 04-03-15 03-20-15 03-27-15 03-27-15 04-03-15 04-15-15 04-22-15 04-22-15 05-08-15 11-18-14 11-18-14 11-25-14 11-25-14 11-24-14 12-17-14 12-29-14 01-30-15 03-27-15 03-20-15 04-03-15 03-24-15 03-27-15 03-27-15 04-09-15 04-08-15 04-09-15 04-15-15 04-20-15 04-15-15 04-27-15 04-27-15 05-01-15 05-08-15 05-08-15 05-01-15 09-25-14 09-25-14

02-19-15 02-26-15 03-05-15 06-22-15 04-01-15 05-07-15 04-21-15 04-13-15 04-14-15 07-06-15 04-21-15 03-25-15 04-28-15 04-28-15 04-28-15 04-28-15 04-17-15 04-28-15 04-28-15 11-18-14 11-18-14 02-06-15 01-30-15 01-30-15 02-27-15 02-13-15 03-23-15 04-01-15 03-18-15 03-25-15 04-01-15 04-15-15 04-09-15 05-14-15 05-04-15 05-12-15 05-14-15 04-24-15 04-30-15 05-14-15 05-14-15 05-14-15 05-05-15 05-14-15 05-14-15 05-19-14 05-19-14 05-19-14

03-18-15 03-11-15 03-24-15 07-03-15 04-08-15 05-13-15 05-04-15 05-01-15 04-27-15 07-17-15 05-06-15 04-16-15 05-04-15 05-04-15 05-04-15 05-04-15 04-27-15 05-04-15 05-04-15 05-20-15 12-02-14 02-12-15 02-12-15 02-12-15 03-04-15 02-19-15 03-31-15 04-15-15 04-15-15 04-08-15 04-29-15 04-23-15 04-15-15 05-20-15 05-20-15 05-20-15 05-20-15 05-04-15 05-13-15 05-20-15 05-20-15 05-20-15 05-13-15 05-20-15 05-20-15 06-05-15 02-13-15 02-13-15

8 8 8 79 22 47 35 29 25 79 26 8 30 25 25 20 8 8 8 8 9 59 54 54 69 44 65 52 12 12 17 21 12 37 29 30 29 13 17 25 17 17 8 8 8 24 98 98

0 0 0 0 0 10 10 0 0 71 12 0 8 0 15 2 0 0 0 0 2 5 0 0 0 31 13 44 0 0 0 8 0 29 0 13 21 0 0 17 0 9 0 0 0 0 0 0

Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J Switchgear - Area H (3rd Flr) Switchgear - Area H (Roof) Plumbing Chase Rough-in - Area H (3rd Flr) Block Filler - Area H (3rd Flr) Metal Studs - Area H (3rd Flr) HVAC Ductwork Mech Rm Rough-in - Area H (3rd Flr) Gypsum Board - Area H (3rd Flr) HVAC Piping Mech Rm Rough-in - Area H (3rd Flr) HVAC Ductwork Rough-in - Area H (3rd Flr) HVAC Piping Rough-in - Area H (3rd Flr) Plumbing Rough-in - Area H (3rd Flr) Conduit - Overhead & Feeders - Area H (3rd Flr) HVAC Mech Rm Insulation - Area H (3rd Flr) Plumbing Insulation - Area H (3rd Flr) Plumbing Above Ceiling Finalization - Area H (3rd Flr) HVAC Controls Rough-in - Area H (3rd Flr) Fire Protection Rough-in - Area H (3rd Flr) HVAC Insulation - Area H (3rd Flr) HVAC Mech Rm Controls Rough-in - Area H (3rd Flr) Pull Electrical Wires - Area H (Roof) Pull Electrical Wires - Area H (3rd Flr) Fire Protection Above Ceiling Finalization - Area H (3rd Fl HVAC System Testing - Area H (3rd Flr) HVAC Above Ceiling Finalization - Area H (3rd Flr) Electrical Above Ceiling Finalization - Area H (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area H (3rd Flr) Tech Cabling Rough-in (In-Class) - Area H (3rd Flr) Tech Above Ceiling Finalization - Area H (3rd Flr) Storm Drain Rough-in - Area I (3rd Flr) Plumbing Chase Rough-in - Area I (3rd Flr) Non-Bearing Masonry Rough-in - Area I (3rd Flr) Elec at Non-Brng Masonry Rough-in - Area I (3rd Flr) Switchgear - Area I (3rd Flr) Block Filler - Area I (3rd Flr) Metal Studs - Area I (3rd Flr) Gypsum Board - Area I (3rd Flr) HVAC Ductwork Rough-in - Area I (3rd Flr) Plumbing Rough-in - Area I (3rd Flr) HVAC Piping Rough-in - Area I (3rd Flr) Conduit - Overhead & Feeders - Area I (3rd Flr) Plumbing Insulation - Area I (3rd Flr) Plumbing Above Ceiling Finalization - Area I (3rd Flr) Fire Protection Rough-in - Area I (3rd Flr) HVAC Controls Rough-in - Area I (3rd Flr) Fire Protection Above Ceiling Finalization - Area I (3rd F Pull Electrical Wires - Area I (3rd Flr) HVAC Insulation - Area I (3rd Flr) Electrical Above Ceiling Finalization - Area I (3rd Flr) HVAC System Testing - Area I (3rd Flr) HVAC Above Ceiling Finalization - Area I (3rd Flr) Tech Cabling Rough-in (Homeruns) - Area I (3rd Flr Tech Cabling Rough-in (In-Class) - Area I (3rd Flr) Tech Above Ceiling Finalization - Area I (3rd Flr)


Activity ID

0620A-MPH-1470 0620A-RMM-1080 0620A-RMM-1090 0620A-RMM-1100 0620A-SAC-1080 0620A-MPH-1700 0620A-GSC-1150 0620A-ZSE-2010 0620A-SAC-1110 0620A-ZSE-2160 0620A-ZSE-2190 0620A-RMM-1490 0620A-ZST-1080 0620A-ZST-1090 0620A-ALL-1170 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-3230 0620A-CTT-1540 0620A-ZSE-1550 0620A-ZSE-1580 0620A-MPH-1530 0620A-MPH-1540 0620A-SSI-1000 0620A-RMM-1160 0620A-RMM-1180 0620A-MPH-1610 0620A-ZSE-1770 0620A-GSC-1030 0620A-GSC-1040 0620A-MPH-1680 0620A-ZSE-1900 0620A-ZSE-1910 0620A-SAC-1100 0620A-MPH-1720 0620A-RMM-1400 0620A-ZSE-2050 0620A-ZSE-2060 0620A-RMM-1430 0620A-SAC-1120 0620A-ZSE-2180 0620A-ZSE-2220 0620A-ZST-1100 0620A-ZST-1130 0620A-GSC-1170 0620A-ZST-1170 0620A-RMM-1650 0620A-RMM-1660 0620A-SSI-1010 Area B (Low Roof) 0620A-RMM-1190 0620A-GSC-3240 0620A-CTT-1590 0620A-ZSE-1640 0620A-ZSE-1660 0620A-MPH-1550 0620A-MPH-1580

Activity Name

Orig Start Dur

Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)

Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 14 of 25

10 12 3 5 15 5 5 17 5 5 4 5 1 1 0 191 137 10 15 15 16 5 10 3 60 60 25 24 5 10 12 20 23 36 5 15 10 12 30 5 3 5 5 5 15 5 5 5 5 183 1 9 10 10 20 5 10

03-21-14 04-04-14 04-23-14 04-28-14 07-10-14 07-29-14 08-19-14 08-26-14 09-08-14 09-18-14 09-19-14 09-19-14 09-25-14 09-25-14 04-07-14 04-23-14 04-23-14 05-07-14 05-07-14 05-14-14 05-21-14 05-29-14 06-03-14 06-05-14 06-12-14 06-19-14 06-26-14 07-22-14 07-22-14 07-25-14 07-31-14 07-31-14 07-31-14 08-05-14 08-29-14 09-03-14 09-03-14 09-08-14 09-15-14 09-19-14 09-25-14 09-26-14 10-03-14 10-08-14 10-10-14 10-20-14 10-20-14 10-29-14 04-07-14 04-07-14 05-15-14 05-29-14 05-29-14 06-06-14 06-10-14 06-17-14

Finish

04-03-14 04-22-14 04-25-14 05-02-14 07-30-14 08-04-14 08-25-14 09-18-14 09-12-14 09-24-14 09-24-14 09-25-14 09-25-14 09-25-14 09-25-14 01-07-15 11-04-14 05-06-14 05-28-14 05-28-14 06-05-14 05-28-14 06-11-14 06-05-14 08-28-14 09-05-14 07-24-14 07-30-14 07-28-14 08-04-14 08-11-14 08-27-14 09-02-14 09-19-14 08-11-14 09-19-14 09-16-14 09-18-14 10-17-14 09-19-14 09-23-14 10-01-14 10-02-14 10-09-14 10-28-14 10-16-14 10-24-14 10-24-14 11-04-14 12-24-14 04-07-14 05-28-14 06-11-14 06-11-14 07-03-14 06-16-14 06-30-14

Late Start

05-19-14 06-03-14 11-12-14 11-25-14 08-08-14 12-03-14 11-19-14 10-24-14 12-03-14 12-03-14 11-18-14 12-03-14 11-24-14 12-09-14 05-29-14 05-29-14 05-29-14 06-26-14 06-26-14 07-03-14 06-05-14 06-12-14 12-10-14 06-19-14 06-26-14 07-21-14 07-28-14 10-22-14 10-06-14 12-01-14 10-03-14 09-30-14 08-29-14 12-10-14 11-17-14 12-03-14 10-31-14 10-20-14 12-10-14 11-20-14 12-10-14 11-25-14 12-03-14 11-18-14 12-10-14 12-10-14 12-10-14 12-10-14 06-16-14 06-16-14 07-22-14 08-04-14 08-04-14 09-10-14 07-28-14 08-04-14

Late Finish 06-02-14 06-18-14 11-14-14 12-02-14 08-28-14 12-09-14 11-25-14 11-17-14 12-09-14 12-09-14 11-21-14 12-09-14 11-24-14 12-09-14 02-13-15 06-05-15 12-16-14 06-11-14 07-17-14 07-17-14 07-25-14 06-11-14 06-25-14 12-12-14 09-12-14 09-19-14 08-22-14 08-28-14 10-28-14 10-17-14 12-16-14 10-30-14 10-30-14 10-20-14 12-16-14 12-08-14 12-16-14 11-17-14 12-01-14 12-16-14 11-24-14 12-16-14 12-02-14 12-09-14 12-09-14 12-16-14 12-16-14 12-16-14 12-16-14 06-01-15 06-16-14 08-01-14 08-15-14 08-15-14 10-07-14 08-01-14 08-15-14

Total Free Float Float 40 40 142 148 21 89 65 42 61 53 42 52 42 52 98 105 29 25 35 35 35 10 10 133 10 10 21 21 65 53 89 45 42 21 89 55 64 42 30 61 44 53 42 42 29 42 36 36 29 109 48 46 46 46 66 33 33

0 0 0 96 0 0 0 0 0 0 0 0 0 0 88 0 0 0 0 0 0 0 0 107 0 0 0 0 0 0 0 3 0 0 3 5 11 0 0 28 2 6 0 0 0 5 0 5 3 0 1 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 F M A M J Jul A S O N D J F M A M J Jul A S O N D J Storm Drain Rough-in - Area B (Gym) HVAC Ductwork Rough-in - Area B (Gym) HVAC Controls Rough-in - Area B (Gym) HVAC System Testing - Area B (Gym) Fire Protection Rough-in - Area B (Gym) Plumbing Above Ceiling Finalization - Area B (Gym) Block Filler - Area B (Gym) Conduit - Overhead - Area B (Gym) Fire Protection Above Ceiling Finalization - Area B (Gym) Electrical Above Ceiling Finalization - Area B (Gym) Pull Electrical Wires - Area B (Gym) HVAC Above Ceiling Finalization - Area B (Gym) Tech Cabling Rough-in (Homeruns) - Area B (Gym) Tech Above Ceiling Finalization - Area B (Gym) Interior Rough-in Substantially Complete - Area B (Gym)

Spray Applied Fireproofing - Area A (Low Roof) Non-Bearing Masonry Rough-in - Area A (Low Roof) Elec at Non-Brng Masonry Rough-in - Area A (Low Roof) Switchgear - Area A (Low Roof) Plumbing Chase Rough-in - Area A (Low Roof) Storm Drain Rough-in - Area A (Low Roof) Coolers/ Freezers - Area A (Low Roof) HVAC Ductwork Rough-in - Area A (Low Roof) HVAC Piping Rough-in - Area A (Low Roof) Plumbing Rough-in - Area A (Low Roof) Conduit - Overhead - Area A (Low Roof) Block Filler - Area A (Low Roof) Metal Studs - Area A (Low Roof) Plumbing Insulation - Area A (Low Roof) Conduit - Chillers - Area A (Low Roof) Pull Electrical Wires - Area A (Low Roof) Fire Protection Rough-in - Area A (Low Roof) Plumbing Above Ceiling Finalization - Area A (Low Roof) HVAC Controls Rough-in - Area A (Low Roof) Methane Gas Detection System - Area A (Low Roof) Pull Electrical Wires - Chiller - Area A (Low Roof) HVAC Insulation - Area A (Low Roof) Fire Protection Above Ceiling Finalization - Area A (Low Roof) Cable Tray - Area A (Low Roof) Electrical Above Ceiling Finalization - Area A (Low Roof) Tech Cabling Rough-in (Homeruns) - Area A (Low Roof) Tech Cabling Rough-in (In-Class) - Area A (Low Roof) Gypsum Board - Area A (Low Roof) Tech Above Ceiling Finalization - Area A (Low Roof) HVAC System Testing - Area A (Low Roof) HVAC Above Ceiling Finalization - Area A (Low Roof) Kitchen Hood - Area A (Low Roof) Set Large Mech Equipment - Area B (Low Roof) Spray Applied Fireproofing - Area B (Low Roof) Non-Bearing Masonry Rough-in - Area B (Low Roof) Elec at Non-Brng Masonry Rough-in - Area B (Low Roof) Switchgear - Area B (Low Roof) Plumbing Chase Rough-in - Area B (Low Roof) Storm Drain Rough-in - Area B (Low Roof)

F

2016 M A M J


Activity ID

0620A-RMM-1200 0620A-GSC-1050 0620A-RMM-1320 0620A-GSC-1080 0620A-RMM-1410 0620A-RMM-1420 0620A-MPH-1790 0620A-ZSE-2200 0620A-ZSE-2150 0620A-RMM-1480 0620A-RMM-1540 0620A-ZSE-2280 0620A-MPH-1880 0620A-SAC-1170 0620A-MPH-1890 0620A-ZSE-2320 0620A-ZSE-2330 0620A-ZST-1200 0620A-RMM-1670 0620A-GSC-1260 0620A-ZST-1230 0620A-ZST-1240 0620A-SAC-1190 0620A-RMM-1730 0620A-RMM-1750 0620A-RMM-1850 Area C (Low Roof) 0620A-RMM-1240 0620A-CTT-1630 0620A-ZSE-1670 0620A-MPH-1590 0620A-MPH-1620 0620A-ZSE-1750 0620A-GSC-3250 0620A-RMM-1310 0620A-GSC-1100 0620A-GSC-1120 0620A-RMM-1470 0620A-RMM-1550 0620A-RMM-1590 0620A-MPH-1920 0620A-ZSE-2370 0620A-RMM-1640 0620A-GSC-1310 0620A-ZSE-2430 0620A-MPH-1990 0620A-ZSE-2490 0620A-MPH-2010 0620A-ZSE-2510 0620A-ZST-1360 0620A-RMM-1870 0620A-SAC-1280 0620A-ZST-1410 0620A-ZST-1420 0620A-RMM-1910 0620A-RMM-1980 0620A-SAC-1290

Activity Name

Orig Start Dur

HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 15 of 25

20 5 40 5 20 20 15 8 5 20 10 8 7 23 5 5 3 5 10 10 5 5 5 5 5 20 170 1 20 20 5 10 3 1 20 10 5 8 40 40 20 11 4 5 10 10 5 5 4 5 10 26 5 5 20 4 5

07-01-14 07-29-14 07-30-14 08-05-14 08-29-14 09-08-14 09-15-14 09-22-14 09-25-14 09-25-14 09-29-14 10-02-14 10-06-14 10-06-14 10-08-14 10-10-14 10-14-14 10-17-14 10-20-14 10-22-14 10-24-14 10-24-14 10-30-14 11-03-14 11-03-14 11-26-14 05-07-14 05-07-14 06-12-14 06-12-14 06-19-14 07-01-14 07-07-14 07-22-14 07-30-14 08-05-14 08-12-14 09-25-14 09-29-14 10-06-14 10-13-14 10-20-14 10-23-14 11-03-14 11-04-14 11-10-14 11-17-14 11-17-14 11-18-14 11-24-14 11-24-14 11-28-14 12-02-14 12-02-14 12-02-14 12-26-14 12-30-14

Finish

07-29-14 08-04-14 09-24-14 08-11-14 09-26-14 10-03-14 10-03-14 10-01-14 10-01-14 10-22-14 10-10-14 10-13-14 10-14-14 11-05-14 10-14-14 10-16-14 10-16-14 10-23-14 10-31-14 11-04-14 10-30-14 10-30-14 11-05-14 11-07-14 11-07-14 12-24-14 01-07-15 05-07-14 07-10-14 07-10-14 06-25-14 07-15-14 07-09-14 07-22-14 08-26-14 08-18-14 08-18-14 10-06-14 11-21-14 12-01-14 11-07-14 11-03-14 10-28-14 11-07-14 11-17-14 11-21-14 11-21-14 11-21-14 11-21-14 12-01-14 12-08-14 01-06-15 12-08-14 12-08-14 12-30-14 12-31-14 01-06-15

Late Start

08-18-14 10-29-14 09-25-14 10-20-14 09-15-14 09-22-14 09-30-14 11-17-14 11-20-14 04-20-15 12-09-14 11-28-14 12-24-14 10-21-14 12-29-14 12-29-14 12-16-14 12-19-14 12-02-14 12-17-14 12-29-14 12-29-14 12-29-14 12-29-14 12-29-14 05-04-15 06-17-14 06-17-14 09-29-14 09-29-14 09-19-14 09-26-14 10-08-14 09-15-14 09-16-14 11-05-14 10-27-14 01-19-15 10-13-14 10-20-14 11-14-14 12-02-14 05-18-15 01-13-15 12-17-14 01-08-15 01-15-15 01-15-15 01-02-15 01-08-15 12-31-14 12-15-14 01-15-15 01-15-15 12-16-14 06-02-15 01-15-15

Late Finish 09-15-14 11-04-14 11-19-14 10-24-14 10-10-14 10-17-14 10-20-14 11-26-14 11-26-14 05-15-15 12-22-14 12-09-14 01-05-15 11-20-14 01-05-15 01-05-15 12-18-14 12-26-14 12-15-14 12-31-14 01-05-15 01-05-15 01-05-15 01-05-15 01-05-15 06-01-15 06-05-15 06-17-14 10-24-14 10-24-14 09-25-14 10-09-14 10-10-14 09-15-14 10-13-14 11-18-14 10-31-14 01-28-15 12-08-14 12-15-14 12-12-14 12-16-14 05-21-15 01-19-15 12-31-14 01-21-15 01-21-15 01-21-15 01-07-15 01-14-15 01-14-15 01-21-15 01-21-15 01-21-15 01-14-15 06-05-15 01-21-15

Total Free Float Float 33 65 40 53 10 10 11 40 40 143 50 40 56 11 56 54 44 44 30 39 44 44 40 38 38 109 105 28 75 75 64 61 66 38 33 65 53 79 10 10 24 30 143 48 30 40 40 40 30 30 25 11 30 30 10 109 11

0 0 0 0 0 0 0 0 0 0 0 0 0 0 23 0 0 0 0 0 0 18 10 0 12 0 0 4 0 0 0 20 0 5 0 0 0 0 0 0 0 0 4 9 0 0 30 30 0 0 15 0 0 0 0 0 1

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 2015 2016 F M A M J Jul A S O N D J F M A M J Jul A S O N D J F M A M J HVAC Ductwork Mech Rm Rough-in - Area B (Low Roof) Block Filler - Area B (Low Roof) HVAC Piping Mech Rm Rough-in - Area B (Low Roof) Metal Studs - Area B (Low Roof) HVAC Ductwork Rough-in - Area B (Low Roof) HVAC Piping Rough-in - Area B (Low Roof) Plumbing Rough-in - Area B (Low Roof) Conduit - Overhead - Area B (Low Roof) Conduit - Mech Rms - Area B (Low Roof) HVAC Mech Rm Insulation - Area B (Low Roof) HVAC Controls Rough-in - Area B (Low Roof) Pull Electrical Wires - Area B (Low Roof) Plumbing Insulation - Area B (Low Roof) Fire Protection Rough-in - Area B (Low Roof) Plumbing Above Ceiling Finalization - Area B (Low Roof) Electrical Above Ceiling Finalization - Area B (Low Roof) Cable Tray - Area B (Low Roof) Tech Cabling Rough-in (Homeruns) - Area B (Low Roof) HVAC Insulation - Area B (Low Roof) Gypsum Board - Area B (Low Roof) Tech Cabling Rough-in (In-Class) - Area B (Low Roof) Tech Above Ceiling Finalization - Area B (Low Roof) Fire Protection Above Ceiling Finalization - Area B (Low Roof) HVAC System Testing - Area B (Low Roof) HVAC Above Ceiling Finalization - Area B (Low Roof) HVAC Mech Rm Controls Rough-in - Area B (Low Roof) Set Large Mech Equipment - Area C (Low Roof) Non-Bearing Masonry Rough-in - Area C (Low Roof) Elec at Non-Brng Masonry Rough-in - Area C (Low Roof) Plumbing Chase Rough-in - Area C (Low Roof) Storm Drain Rough-in - Area C (Low Roof) Switchgear - Area C (Low Roof) Spray Applied Fireproofing Mech Rm- Area C (Low Roof) HVAC Ductwork Mech Rm Rough-in - Area C (Low Roof) Block Filler - Area C (Low Roof) Metal Studs - Area C (Low Roof) HVAC Piping Mech Rm Rough-in - Area C (Low Roof) HVAC Ductwork Rough-in - Area C (Low Roof) HVAC Piping Rough-in - Area C (Low Roof) Plumbing Rough-in - Area C (Low Roof) Conduit - Overhead - Area C (Low Roof) HVAC Mech Rm Insulation - Area C (Low Roof) Gypsum Board - Area C (Low Roof) Pull Electrical Wires - Area C (Low Roof) Plumbing Insulation - Area C (Low Roof) Electrical Above Ceiling Finalization - Area C (Low Roof) Plumbing Above Ceiling Finalization - Area C (Low Roof) Cable Tray - Area C (Low Roof) Tech Cabling Rough-in (Homeruns) - Area C (Low Roof) HVAC Controls Rough-in - Area C (Low Roof) Fire Protection Rough-in - Area C (Low Roof) Tech Cabling Rough-in (In-Class) - Area C (Low Roof) Tech Above Ceiling Finalization - Area C (Low Roof) HVAC Insulation - Area C (Low Roof) HVAC Mech Rm Controls Rough-in - Area C (Low Roof) Fire Protection Above Ceiling Finalization - Area C (Low Roof)


Activity ID

Activity Name

Orig Start Dur

0620A-RMM-2020 HVAC System Testing - Area C (Low Roof) 0620A-RMM-2040 HVAC Above Ceiling Finalization - Area C (Low Roof) 0620A-ALL-1220 Interior Rough-in Substantially Complete - Area A /B/C (1-Story) Area C (Aux Gym) Area C (Aux Gym) 0620A-MPH-1710 Storm Drain Rough-in - Area C (Aux Gym) 0620A-MPH-1740 Plumbing Above Ceiling Finalization - Area C (Aux Gym) 0620A-GSC-1130 Block Filler - Area C (Aux Gym) 0620A-RMM-1460 HVAC Ductwork Rough-in - Area C (Aux Gym) 0620A-ZSE-2260 Conduit - Overhead - Area C (Aux Gym) 0620A-RMM-1610 HVAC Controls Rough-in - Area C (Aux Gym) 0620A-ZSE-2340 Pull Electrical Wires - Area C (Aux Gym) 0620A-ZSE-2360 Electrical Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1260 Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) 0620A-SAC-1200 Fire Protection Rough-in - Area C (Aux Gym) 0620A-SAC-1210 Fire Protection Above Ceiling Finalization - Area C (Aux Gym) 0620A-ZST-1450 Tech Above Ceiling Finalization - Area C (Aux Gym) 0620A-RMM-2070 HVAC System Testing - Area C (Aux Gym) 0620A-RMM-2080 HVAC Above Ceiling Finalization - Area C (Aux Gym) 0620A-ALL-1240 Interior Rough-in Substantially Complete - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-CTT-2200 Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2130 Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1390 Metal Studs - Area D/E/F (Low Roof) 0620A-MPH-1830 Plumbing Chase Rough-in - Area D/E/F (Low Roof) 0620A-GSC-1510 Gypsum Board - Area D/E/F (Low Roof) 0620A-GSC-1400 Block Filler - Area D/E/F (Low Roof) 0620A-MPH-1870 Storm Drain Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2210 Switchgear - Area D/E/F (Low Roof) 0620A-RMM-1880 HVAC Ductwork Rough-in - Area D/E/F (Low Roof) 0620A-RMM-1920 HVAC Piping Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2080 Plumbing Rough-in - Area D/E/F (Low Roof) 0620A-ZSE-2730 Conduit - Overhead - Area D/E/F (Low Roof) 0620A-MPH-2120 Plumbing Insulation - Area D/E/F (Low Roof) 0620A-SAC-1430 Fire Protection Rough-in - Area D/E/F (Low Roof) 0620A-MPH-2130 Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZSE-2790 Pull Electrical Wires - Area D/E/F (Low Roof) 0620A-ZSE-2830 Cable Tray - Area D/E/F (Low Roof) 0620A-ZSE-2860 Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1800 Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) 0620A-ZST-1840 Tech Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ZST-1850 Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) 0620A-RMM-2270 HVAC Controls Rough-in - Area D/E/F (Low Roof) 0620A-RMM-2280 HVAC Insulation - Area D/E/F (Low Roof) 0620A-SAC-1460 Fire Protection Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-RMM-2330 HVAC System Testing - Area D/E/F (Low Roof) 0620A-RMM-2340 HVAC Above Ceiling Finalization - Area D/E/F (Low Roof) 0620A-ALL-1310 Interior Rough-in Substantially Complete - Area D/E/F (Low Roof) Interior Finishes Academic Area First Floor Area D (1st Flr) 0620A-ZST-1160 Tech Rm Build-out and Backbone - Area D (1st Flr) 0620A-GSC-1770 Paint - Area D (1st Flr) 0620A-GSC-1800 Ceiling Grid - Area D (1st Flr) 0620A-ZSE-2560 Light Fixtures - Area D (1st Flr) 0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 16 of 25

5 5 0 107 107 7 5 5 8 7 5 5 5 1 15 5 5 5 5 0 124 124 5 5 5 5 5 5 10 6 65 65 15 12 7 54 5 13 7 5 6 5 4 10 27 5 5 5 0 208 202 135 135 5 12 12 8

12-31-14 12-31-14 08-13-14 08-13-14 08-13-14 08-15-14 08-26-14 09-25-14 10-07-14 10-13-14 10-16-14 10-17-14 10-31-14 11-06-14 11-20-14 12-09-14 01-08-15 01-08-15 11-05-14 11-05-14 11-05-14 11-05-14 11-12-14 11-14-14 11-19-14 11-19-14 11-21-14 11-25-14 12-08-14 12-15-14 12-22-14 12-30-14 01-14-15 01-14-15 01-16-15 01-16-15 02-04-15 02-06-15 02-13-15 02-20-15 02-23-15 03-11-15 03-18-15 03-24-15 04-27-15 04-27-15 09-22-14 09-22-14 09-22-14 09-22-14 09-22-14 12-11-14 12-15-14 12-23-14

Finish

01-07-15 01-07-15 01-07-15 01-14-15 01-14-15 08-21-14 08-21-14 09-02-14 10-06-14 10-15-14 10-17-14 10-22-14 10-23-14 10-31-14 11-26-14 11-26-14 12-15-14 01-14-15 01-14-15 01-14-15 05-01-15 05-01-15 11-11-14 11-11-14 11-18-14 11-20-14 11-25-14 11-25-14 12-05-14 12-03-14 03-10-15 03-17-15 01-13-15 01-15-15 01-22-15 03-30-15 01-22-15 02-03-15 02-12-15 02-12-15 02-20-15 02-26-15 02-26-15 03-24-15 04-24-15 03-30-15 05-01-15 05-01-15 05-01-15 07-15-15 07-07-15 04-01-15 04-01-15 09-26-14 12-29-14 12-31-14 01-05-15

Late Start

01-15-15 01-15-15 10-10-14 10-10-14 10-10-14 12-19-14 11-26-14 11-11-14 12-01-14 12-23-14 12-10-14 01-08-15 01-07-15 11-21-14 01-08-15 04-29-15 02-18-15 02-18-15 11-25-14 11-25-14 01-14-15 01-14-15 02-11-15 11-25-14 02-25-15 01-21-15 12-03-14 03-05-15 12-17-14 12-24-14 02-04-15 03-13-15 05-04-15 02-25-15 05-06-15 03-31-15 04-20-15 05-06-15 04-29-15 05-06-15 05-07-15 04-29-15 03-27-15 05-06-15 05-06-15 05-06-15 11-17-14 11-17-14 11-17-14 11-17-14 11-17-14 12-31-14 01-05-15 02-09-15

Late Finish 01-21-15 01-21-15 01-21-15 05-05-15 05-05-15 10-20-14 12-26-14 12-03-14 11-20-14 12-09-14 12-30-14 12-16-14 01-14-15 01-07-15 12-12-14 01-14-15 05-05-15 02-24-15 02-24-15 02-24-15 05-12-15 05-12-15 01-20-15 01-20-15 02-17-15 12-02-14 03-03-15 01-27-15 12-16-14 03-12-15 03-19-15 03-26-15 02-24-15 03-30-15 05-12-15 05-12-15 05-12-15 04-17-15 04-28-15 05-12-15 05-06-15 05-12-15 05-12-15 05-12-15 05-05-15 05-12-15 05-12-15 05-12-15 05-12-15 07-24-15 07-17-15 07-10-15 07-10-15 11-21-14 01-16-15 01-20-15 02-18-15

Total Free Float Float 10 10 10 78 78 41 88 65 33 38 50 38 56 45 11 32 98 29 29 29 7 7 47 47 62 7 67 42 7 69 7 7 30 52 77 30 77 52 52 62 52 52 52 34 7 30 7 7 7 7 8 70 70 40 13 13 32

0 0 0 0 0 0 32 8 0 0 25 1 16 15 0 21 46 0 0 19 0 0 0 0 0 0 58 0 0 17 0 0 0 0 0 0 70 0 0 55 0 45 0 27 0 23 0 0 0 0 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J HVAC System Testing - Area C (Low Roof) HVAC Above Ceiling Finalization - Area C (Low Roof) Interior Rough-in Substantially Complete - Area A /B/C (1-Story)

Storm Drain Rough-in - Area C (Aux Gym) Plumbing Above Ceiling Finalization - Area C (Aux Gym) Block Filler - Area C (Aux Gym) HVAC Ductwork Rough-in - Area C (Aux Gym) Conduit - Overhead - Area C (Aux Gym) HVAC Controls Rough-in - Area C (Aux Gym) Pull Electrical Wires - Area C (Aux Gym) Electrical Above Ceiling Finalization - Area C (Aux Gym) Tech Cabling Rough-in (Homeruns) - Area C (Aux Gym) Fire Protection Rough-in - Area C (Aux Gym) Fire Protection Above Ceiling Finalization - Area C (Aux Gym) Tech Above Ceiling Finalization - Area C (Aux Gym) HVAC System Testing - Area C (Aux Gym) HVAC Above Ceiling Finalization - Area C (Aux Gym) Interior Rough-in Substantially Complete - Area C (Aux Gym)

Non-Bearing Masonry Rough-in - Area D/E/F (Low Roof) Elec at Non-Brng Masonry Rough-in - Area D/E/F (Low Roof) Metal Studs - Area D/E/F (Low Roof) Plumbing Chase Rough-in - Area D/E/F (Low Roof) Gypsum Board - Area D/E/F (Low Roof) Block Filler - Area D/E/F (Low Roof) Storm Drain Rough-in - Area D/E/F (Low Roof) Switchgear - Area D/E/F (Low Roof) HVAC Ductwork Rough-in - Area D/E/F (Low Roof) HVAC Piping Rough-in - Area D/E/F (Low Roof) Plumbing Rough-in - Area D/E/F (Low Roof) Conduit - Overhead - Area D/E/F (Low Roof) Plumbing Insulation - Area D/E/F (Low Roof) Fire Protection Rough-in - Area D/E/F (Low Roof) Plumbing Above Ceiling Finalization - Area D/E/F (Low Roof) Pull Electrical Wires - Area D/E/F (Low Roof) Cable Tray - Area D/E/F (Low Roof) Electrical Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (Homeruns) - Area D/E/F (Low Roof) Tech Above Ceiling Finalization - Area D/E/F (Low Roof) Tech Cabling Rough-in (In-Class) - Area D/E/F (Low Roof) HVAC Controls Rough-in - Area D/E/F (Low Roof) HVAC Insulation - Area D/E/F (Low Roof) Fire Protection Above Ceiling Finalization - Area D/E/F (L HVAC System Testing - Area D/E/F (Low Roof) HVAC Above Ceiling Finalization - Area D/E/F (Low Interior Rough-in Substantially Complete - Area D/E/

Tech Rm Build-out and Backbone - Area D (1st Flr) Paint - Area D (1st Flr) Ceiling Grid - Area D (1st Flr) Light Fixtures - Area D (1st Flr)


Activity ID

0620A-RMM-1890 0620A-GSC-1910 0620A-ZST-1370 0620A-SAC-1310 0620A-ZSE-2630 0620A-GSC-1980 0620A-ZSE-2670 0620A-FEC-1040 0620A-GSC-2080 0620A-ZSE-2720 0620A-GSC-2090 0620A-ZST-1520 0620A-MPH-2100 0620A-ZST-1580 0620A-GSC-2190 0620A-GSC-2210 0620A-ZST-1680 0620A-GSC-2240 0620A-GSC-2250 0620A-ZST-1740 0620A-ZST-1820 0620A-GSC-2570 0620A-GSC-2220 0620A-ALL-1280 Area E (1st Flr) 0620A-GSC-1670 0620A-GSC-1700 0620A-ZSE-2440 0620A-RMM-1780 0620A-ZST-1300 0620A-GSC-1760 0620A-SAC-1260 0620A-ZSE-2480 0620A-GSC-1840 0620A-ZSE-2550 0620A-FEC-1020 0620A-ZSE-2570 0620A-GSC-1900 0620A-ZST-1400 0620A-GSC-1940 0620A-ZST-1430 0620A-MPH-2060 0620A-ZST-1720 0620A-GSC-2000 0620A-GSC-2040 0620A-GSC-2060 0620A-GSC-2070 0620A-ZST-1790 0620A-GSC-2050 Area F (1st Flr) 0620A-ZST-1070 0620A-GSC-1560 0620A-GSC-1570 0620A-ZSE-2350 0620A-RMM-1700 0620A-GSC-1660 0620A-ZST-1250

Activity Name

Orig Start Dur

HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr) Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 17 of 25

6 10 10 3 3 10 5 8 15 1 5 5 10 5 10 3 5 5 6 5 10 10 5 0 57 12 12 7 6 5 10 3 4 10 3 8 1 15 2 5 2 10 2 10 3 4 6 4 5 94 5 12 12 10 6 8 10

12-26-14 12-30-14 12-30-14 12-31-14 01-06-15 01-06-15 01-09-15 01-12-15 01-14-15 01-16-15 01-20-15 01-20-15 01-20-15 01-27-15 01-28-15 02-03-15 02-03-15 02-04-15 02-04-15 02-10-15 02-17-15 03-03-15 03-06-15 12-30-14 12-30-14 01-02-15 01-13-15 01-14-15 01-16-15 01-16-15 01-19-15 01-22-15 01-22-15 01-28-15 01-28-15 02-02-15 02-04-15 02-05-15 02-05-15 02-09-15 02-10-15 02-17-15 02-18-15 02-24-15 02-25-15 02-25-15 03-03-15 03-13-15 11-18-14 11-18-14 01-16-15 01-20-15 01-26-15 01-30-15 02-03-15 02-03-15

Finish

01-05-15 01-13-15 01-13-15 01-05-15 01-08-15 01-19-15 01-15-15 01-21-15 02-03-15 01-16-15 01-26-15 01-26-15 02-02-15 02-02-15 02-10-15 02-05-15 02-09-15 02-10-15 02-11-15 02-16-15 03-02-15 03-16-15 03-12-15 04-01-15 03-19-15 01-15-15 01-19-15 01-21-15 01-21-15 01-22-15 01-29-15 01-21-15 01-27-15 02-04-15 01-30-15 02-06-15 02-02-15 02-24-15 02-06-15 02-11-15 02-10-15 02-23-15 02-18-15 03-03-15 02-26-15 03-02-15 03-04-15 03-06-15 03-19-15 04-01-15 11-24-14 02-02-15 02-04-15 02-06-15 02-06-15 02-12-15 02-16-15

Late Start

02-06-15 02-18-15 03-24-15 02-11-15 05-15-15 02-16-15 06-10-15 03-04-15 03-18-15 07-07-15 03-26-15 04-09-15 04-28-15 04-16-15 04-30-15 05-21-15 04-23-15 06-15-15 05-04-15 04-30-15 05-07-15 06-29-15 06-08-15 01-19-15 01-19-15 01-21-15 02-19-15 02-20-15 04-08-15 03-04-15 02-25-15 05-20-15 03-02-15 06-17-15 03-16-15 07-08-15 04-09-15 04-27-15 04-08-15 05-04-15 05-12-15 05-18-15 05-14-15 05-27-15 06-22-15 05-12-15 05-21-15 06-15-15 01-07-15 01-07-15 02-04-15 02-06-15 03-02-15 03-06-15 03-18-15 04-15-15

Late Finish 02-13-15 03-03-15 04-07-15 02-13-15 05-19-15 02-27-15 06-16-15 03-13-15 04-08-15 07-07-15 04-01-15 04-15-15 05-11-15 04-22-15 05-13-15 05-26-15 04-29-15 06-19-15 05-11-15 05-06-15 05-20-15 07-10-15 06-12-15 07-10-15 07-08-15 02-03-15 02-05-15 02-27-15 02-27-15 04-14-15 03-17-15 02-27-15 05-26-15 03-13-15 06-19-15 03-25-15 07-08-15 04-29-15 04-28-15 04-14-15 05-05-15 05-26-15 05-19-15 05-28-15 05-29-15 06-25-15 05-19-15 05-27-15 06-19-15 07-09-15 01-13-15 02-19-15 02-23-15 03-13-15 03-13-15 03-27-15 04-28-15

Total Free Float Float 29 35 59 29 92 29 106 37 45 120 47 56 69 56 65 76 56 91 62 56 56 82 64 70 77 13 13 27 27 57 33 27 83 27 98 33 110 45 56 43 59 64 63 60 64 81 53 56 64 69 33 13 13 25 25 31 50

0 0 2 0 0 0 0 0 0 10 2 0 0 0 5 12 0 10 9 0 0 12 0 0 0 0 0 0 0 7 2 0 0 0 0 2 15 0 0 5 4 0 8 1 0 6 4 8 4 0 0 0 0 0 0 4 2

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

2015 J F M A M J Jul A S O N D J HVAC Ceiling Finishes - Area D (1st Flr) Misc Finishes - Area D (1st Flr) Tech Terminations - Area D (1st Flr) Fire Protection Heads - Area D (1st Flr) Wiring Devices - Area D (1st Flr) Ceiling Pads - Area D (1st Flr) Fire Alarm System - Area D (1st Flr) Casework - Area D (1st Flr) Flooring - Area D (1st Flr) Lighting Controls - Area D (1st Flr) Lockers - Area D (1st Flr) Paging Devices - Area D (1st Flr) Plumbing Fixtures - Area D (1st Flr) Security Devices - Area D (1st Flr) Specialties - Area D (1st Flr) Toilet Partitions - Area D (1st Flr) Tech Rm Headend - Area D (1st Flr) Furnishings - Area D (1st Flr) Doors/ Hardware - Area D (1st Flr) Tech Devices - Area D (1st Flr) A/V Devices - Area D (1st Flr) Elevator Installation - Area D (1st Flr) Toilet Accessories - Area D (1st Flr) Substantial Completion - 1st Flr Paint - Area E (1st Flr) Ceiling Grid - Area E (1st Flr) Light Fixtures - Area E (1st Flr) HVAC Ceiling Finishes - Area E (1st Flr) Tech Terminations - Area E (1st Flr) Misc Finishes - Area E (1st Flr) Fire Protection Heads - Area E (1st Flr) Wiring Devices - Area E (1st Flr) Ceiling Pads - Area E (1st Flr) Fire Alarm System - Area E (1st Flr) Casework - Area E (1st Flr) Lighting Controls - Area E (1st Flr) Flooring - Area E (1st Flr) Paging Devices - Area E (1st Flr) Lockers - Area E (1st Flr) Security Devices - Area E (1st Flr) Plumbing Fixtures - Area E (1st Flr) Tech Devices - Area E (1st Flr) Specialties - Area E (1st Flr) Toilet Partitions - Area E (1st Flr) Furnishings - Area E (1st Flr) Doors/ Hardware - Area E (1st Flr) A/V Devices - Area E (1st Flr) Toilet Accessories - Area E (1st Flr)

Tech Rm Build-out and Backbone - Area F (1st Flr) Paint - Area F (1st Flr) Ceiling Grid - Area F (1st Flr) Light Fixtures - Area F (1st Flr) HVAC Ceiling Finishes - Area F (1st Flr) Misc Finishes - Area F (1st Flr) Tech Terminations - Area F (1st Flr)

F

2016 M A M J


Activity ID

0620A-SAC-1230 0620A-GSC-1710 0620A-ZSE-2400 0620A-FEC-1000 0620A-ZSE-2450 0620A-GSC-1750 0620A-ZST-1290 0620A-ZSE-2460 0620A-GSC-1740 0620A-ZST-1330 0620A-MPH-2000 0620A-ZST-1600 0620A-GSC-1850 0620A-GSC-1870 0620A-GSC-1880 0620A-ZST-1670 0620A-ZST-1730 Second Floor Area G (2nd Flr) 0620A-GSC-2100 0620A-GSC-2280 0620A-ZSE-2850 0620A-RMM-2160 0620A-GSC-2260 0620A-ZST-1660 0620A-SAC-1390 0620A-ZSE-2900 0620A-GSC-2380 0620A-ZSE-2950 0620A-FEC-1080 0620A-GSC-2580 0620A-GSC-2400 0620A-ZSE-2970 0620A-GSC-2820 0620A-ZST-1920 0620A-MPH-2260 0620A-ZST-2050 0620A-ZST-2070 0620A-GSC-2930 0620A-GSC-2940 0620A-GSC-2950 0620A-GSC-2960 0620A-ZST-2140 0620A-GSC-2910 0620A-ALL-1320 Area H (2nd Flr) 0620A-ZST-1690 0620A-GSC-1950 0620A-GSC-2110 0620A-ZSE-2800 0620A-RMM-2060 0620A-ZST-1550 0620A-GSC-2180 0620A-SAC-1350 0620A-ZSE-2840 0620A-GSC-2320 0620A-FEC-1060

Activity Name

Orig Start Dur

Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)

Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 18 of 25

3 8 8 8 3 5 5 1 10 5 8 5 8 3 6 5 10 119 80 12 12 7 6 10 10 3 3 10 3 8 10 5 1 15 5 10 3 5 3 4 5 6 10 10 0 111 10 12 12 9 6 7 10 3 7 10 8

02-04-15 02-09-15 02-09-15 02-11-15 02-19-15 02-19-15 02-19-15 02-24-15 02-25-15 02-26-15 03-03-15 03-05-15 03-05-15 03-11-15 03-11-15 03-12-15 03-19-15 12-08-14 02-03-15 02-03-15 02-05-15 02-16-15 02-17-15 02-19-15 02-19-15 02-20-15 02-25-15 02-25-15 03-02-15 03-03-15 03-03-15 03-04-15 03-05-15 03-05-15 03-11-15 03-12-15 03-18-15 03-23-15 03-26-15 03-26-15 03-26-15 03-26-15 04-02-15 04-17-15 12-08-14 12-08-14 02-19-15 02-23-15 02-26-15 03-05-15 03-09-15 03-09-15 03-10-15 03-11-15 03-13-15 03-19-15

Finish

02-06-15 02-18-15 02-18-15 02-20-15 02-23-15 02-25-15 02-25-15 02-24-15 03-10-15 03-04-15 03-12-15 03-11-15 03-16-15 03-13-15 03-18-15 03-18-15 04-01-15 05-27-15 05-27-15 02-18-15 02-20-15 02-24-15 02-24-15 03-04-15 03-04-15 02-24-15 02-27-15 03-10-15 03-04-15 03-12-15 03-16-15 03-10-15 03-05-15 03-25-15 03-17-15 03-25-15 03-20-15 03-27-15 03-30-15 03-31-15 04-01-15 04-02-15 04-16-15 04-30-15 05-27-15 05-14-15 12-19-14 03-06-15 03-10-15 03-10-15 03-12-15 03-17-15 03-20-15 03-12-15 03-19-15 03-26-15 03-30-15

Late Start

03-11-15 03-16-15 05-27-15 03-26-15 06-22-15 04-15-15 04-29-15 07-09-15 04-30-15 05-06-15 05-29-15 05-13-15 05-29-15 06-26-15 05-20-15 05-20-15 05-28-15 02-20-15 02-20-15 02-20-15 02-24-15 03-17-15 03-18-15 03-30-15 05-08-15 03-23-15 06-08-15 03-26-15 06-25-15 04-08-15 07-06-15 04-22-15 07-10-15 04-14-15 05-22-15 05-14-15 06-01-15 06-04-15 06-22-15 06-30-15 06-22-15 05-29-15 06-11-15 06-03-15 03-10-15 06-08-15 03-10-15 03-12-15 03-27-15 04-01-15 06-01-15 04-21-15 04-07-15 06-11-15 04-10-15 04-20-15

Late Finish 03-13-15 03-25-15 06-05-15 04-07-15 06-24-15 04-21-15 05-05-15 07-09-15 05-13-15 05-12-15 06-09-15 05-19-15 06-09-15 06-30-15 05-28-15 05-27-15 06-10-15 07-17-15 07-17-15 03-09-15 03-11-15 03-25-15 03-25-15 04-13-15 05-21-15 03-25-15 06-10-15 04-09-15 06-29-15 04-17-15 07-17-15 04-28-15 07-10-15 05-04-15 05-29-15 05-28-15 06-03-15 06-10-15 06-24-15 07-03-15 06-26-15 06-05-15 06-24-15 06-16-15 07-17-15 07-17-15 06-19-15 03-25-15 03-27-15 04-09-15 04-09-15 06-09-15 05-04-15 04-09-15 06-19-15 04-23-15 04-29-15

Total Free Float Float 25 25 75 31 85 38 48 95 45 48 61 48 59 75 49 48 48 37 37 13 13 21 21 27 55 21 71 21 81 25 87 34 89 27 51 44 51 51 60 66 60 44 48 32 37 45 126 13 13 21 19 58 30 19 64 19 21

0 0 0 6 0 4 0 6 0 0 39 0 12 13 5 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 50 7 13 0 0 0 0 3 0 11 9 9 0 0 0 0 17 0 0 0 0 5 2 0 0 0 2

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D J Fire Protection Heads - Area F (1st Flr) Ceiling Pads - Area F (1st Flr) Wiring Devices - Area F (1st Flr) Casework - Area F (1st Flr) Fire Alarm System - Area F (1st Flr) Lockers - Area F (1st Flr) Paging Devices - Area F (1st Flr) Lighting Controls - Area F (1st Flr) Flooring - Area F (1st Flr) Security Devices - Area F (1st Flr) Plumbing Fixtures - Area F (1st Flr) Tech Rm Headend - Area F (1st Flr) Specialties - Area F (1st Flr) Furnishings - Area F (1st Flr) Doors/ Hardware - Area F (1st Flr) Tech Devices - Area F (1st Flr) A/V Devices - Area F (1st Flr)

F

Paint - Area G (2nd Flr) Ceiling Grid - Area G (2nd Flr) Light Fixtures - Area G (2nd Flr) HVAC Ceiling Finishes - Area G (2nd Flr) Misc Finishes - Area G (2nd Flr) Tech Terminations - Area G (2nd Flr) Fire Protection Heads - Area G (2nd Flr) Wiring Devices - Area G (2nd Flr) Ceiling Pads - Area G (2nd Flr) Fire Alarm System - Area G (2nd Flr) Casework - Area G (2nd Flr) Elevator Installation - Area G (2nd Flr) Lockers - Area G (2nd Flr) Lighting Controls - Area G (2nd Flr) Flooring - Area G (2nd Flr) Paging Devices - Area G (2nd Flr) Plumbing Fixtures - Area G (2nd Flr) Security Devices - Area G (2nd Flr) Tech Devices - Area G (2nd Flr) Toilet Partitions - Area G (2nd Flr) Furnishings - Area G (2nd Flr) Toilet Accessories - Area G (2nd Flr) Doors/ Hardware - Area G (2nd Flr) A/V Devices - Area G (2nd Flr) Specialties - Area G (2nd Flr) Substantial Completion - 2nd Flr Tech Rm Build-out and Backbone - Area H (2nd Flr) Paint - Area H (2nd Flr) Ceiling Grid - Area H (2nd Flr) Light Fixtures - Area H (2nd Flr) HVAC Ceiling Finishes - Area H (2nd Flr) Tech Terminations - Area H (2nd Flr) Misc Finishes - Area H (2nd Flr) Fire Protection Heads - Area H (2nd Flr) Wiring Devices - Area H (2nd Flr) Ceiling Pads - Area H (2nd Flr) Casework - Area H (2nd Flr)

2016 M A M J


Activity ID

0620A-ZSE-2890 0620A-ZSE-2920 0620A-GSC-2660 0620A-GSC-2370 0620A-ZST-1810 0620A-MPH-2240 0620A-ZST-1860 0620A-ZST-1910 0620A-GSC-2780 0620A-GSC-2790 0620A-GSC-2800 0620A-GSC-2810 0620A-ZST-2060 0620A-ZST-2150 0620A-GSC-2760 Area I (2nd Flr) 0620A-GSC-1810 0620A-GSC-1960 0620A-ZSE-2660 0620A-RMM-1950 0620A-ZST-1500 0620A-GSC-2010 0620A-SAC-1340 0620A-ZSE-2740 0620A-GSC-2160 0620A-FEC-1050 0620A-ZSE-2760 0620A-ZSE-2780 0620A-GSC-2200 0620A-ZST-1620 0620A-GSC-2520 0620A-ZST-1700 0620A-ZST-1780 0620A-MPH-2200 0620A-ZST-1930 0620A-GSC-2640 0620A-GSC-2650 0620A-GSC-2700 Third Floor Area G (3rd Flr) 0620A-GSC-2590 0620A-GSC-2270 0620A-ZST-2160 0620A-GSC-2830 0620A-GSC-2740 0620A-ZSE-3210 0620A-RMM-2350 0620A-SAC-1500 0620A-ZSE-3220 0620A-GSC-2970 0620A-ZSE-3240 0620A-ZSE-3250 0620A-FEC-1130 0620A-GSC-3020 0620A-GSC-3040 0620A-ZST-2280 0620A-MPH-2290

Activity Name

Orig Start Dur

Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr)

3 1 15 5 5 10 3 3 3 5 6 6 7 10 10 56 12 12 10 6 7 8 3 5 8 8 3 1 5 5 12 3 3 8 7 3 6 8 89 89 10 12 10 12 10 7 6 3 2 10 2 1 8 15 5 5 10

Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)

Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 19 of 25

03-20-15 03-25-15 03-26-15 03-27-15 03-27-15 04-01-15 04-03-15 04-09-15 04-16-15 04-16-15 04-17-15 04-17-15 04-17-15 04-28-15 05-01-15 03-09-15 03-09-15 03-11-15 03-17-15 03-23-15 03-25-15 03-25-15 03-26-15 03-31-15 03-31-15 04-02-15 04-08-15 04-13-15 04-13-15 04-13-15 04-17-15 04-20-15 04-23-15 04-23-15 04-28-15 05-05-15 05-05-15 05-15-15 03-03-15 03-03-15 03-03-15 03-12-15 03-30-15 04-03-15 04-10-15 04-15-15 04-16-15 04-21-15 04-24-15 04-24-15 04-28-15 04-30-15 04-30-15 05-04-15 05-08-15 05-08-15 05-08-15

Finish

03-24-15 03-25-15 04-16-15 04-02-15 04-02-15 04-15-15 04-08-15 04-13-15 04-20-15 04-22-15 04-24-15 04-24-15 04-27-15 05-11-15 05-14-15 05-27-15 03-24-15 03-26-15 03-30-15 03-30-15 04-02-15 04-03-15 03-30-15 04-07-15 04-10-15 04-14-15 04-10-15 04-13-15 04-17-15 04-17-15 05-04-15 04-22-15 04-27-15 05-04-15 05-06-15 05-07-15 05-12-15 05-27-15 07-07-15 07-07-15 03-16-15 03-27-15 04-13-15 04-21-15 04-23-15 04-23-15 04-23-15 04-23-15 04-27-15 05-07-15 04-29-15 04-30-15 05-11-15 05-22-15 05-14-15 05-14-15 05-21-15

Late Start

06-30-15 07-13-15 05-05-15 05-08-15 06-10-15 05-29-15 06-17-15 06-22-15 06-29-15 06-29-15 06-08-15 07-06-15 06-25-15 07-06-15 06-17-15 03-26-15 03-26-15 03-30-15 04-10-15 04-16-15 06-15-15 05-14-15 04-21-15 06-22-15 04-24-15 04-30-15 07-03-15 07-14-15 05-15-15 06-24-15 05-27-15 07-01-15 07-06-15 06-12-15 07-09-15 07-14-15 06-16-15 07-01-15 04-14-15 04-14-15 06-10-15 04-14-15 05-12-15 04-16-15 04-30-15 04-27-15 04-28-15 05-01-15 06-29-15 05-06-15 07-08-15 07-15-15 05-12-15 05-14-15 05-22-15 05-27-15 06-10-15

Late Finish 07-02-15 07-13-15 05-26-15 05-14-15 06-16-15 06-11-15 06-19-15 06-24-15 07-01-15 07-03-15 06-15-15 07-13-15 07-03-15 07-17-15 06-30-15 07-17-15 04-13-15 04-15-15 04-23-15 04-23-15 06-23-15 05-26-15 04-23-15 06-26-15 05-05-15 05-11-15 07-07-15 07-14-15 05-21-15 06-30-15 06-11-15 07-03-15 07-08-15 06-23-15 07-17-15 07-16-15 06-23-15 07-10-15 07-17-15 07-17-15 06-23-15 04-29-15 05-26-15 05-01-15 05-13-15 05-05-15 05-05-15 05-05-15 06-30-15 05-19-15 07-09-15 07-15-15 05-21-15 06-04-15 05-29-15 06-02-15 06-23-15

Total Free Float Float 70 76 27 29 51 40 51 51 51 51 35 55 48 48 32 37 13 13 17 17 56 35 17 57 17 19 61 65 24 51 27 51 51 35 51 49 29 32 8 8 69 22 30 8 14 8 8 8 45 8 50 53 8 8 10 12 22

0 11 0 5 0 0 0 3 0 18 6 6 0 11 0 0 0 0 0 0 5 8 0 0 0 8 0 12 7 0 0 0 0 16 14 13 8 0 0 0 48 0 2 0 0 0 0 0 0 0 0 16 0 0 2 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm System - Area H (2nd Flr) Lighting Controls - Area H (2nd Flr) Flooring - Area H (2nd Flr) Lockers - Area H (2nd Flr) Paging Devices - Area H (2nd Flr) Plumbing Fixtures - Area H (2nd Flr) Security Devices - Area H (2nd Flr) Tech Devices - Area H (2nd Flr) Toilet Partitions - Area H (2nd Flr) Toilet Accessories - Area H (2nd Flr) Doors/ Hardware - Area H (2nd Flr) Furnishings - Area H (2nd Flr) A/V Devices - Area H (2nd Flr) Tech Rm Headend - Area H (2nd Flr) Specialties - Area H (2nd Flr) Paint - Area I (2nd Flr) Ceiling Grid - Area I (2nd Flr) Light Fixtures - Area I (2nd Flr) HVAC Ceiling Finishes - Area I (2nd Flr) Tech Terminations - Area I (2nd Flr) Misc Finishes - Area I (2nd Flr) Fire Protection Heads - Area I (2nd Flr) Wiring Devices - Area I (2nd Flr) Ceiling Pads - Area I (2nd Flr) Casework - Area I (2nd Flr) Fire Alarm System - Area I (2nd Flr) Lighting Controls - Area I (2nd Flr) Lockers - Area I (2nd Flr) Paging Devices - Area I (2nd Flr) Flooring - Area I (2nd Flr) Security Devices - Area I (2nd Flr) Tech Devices - Area I (2nd Flr) Plumbing Fixtures - Area I (2nd Flr) A/V Devices - Area I (2nd Flr) Furnishings - Area I (2nd Flr) Doors/ Hardware - Area I (2nd Flr) Specialties - Area I (2nd Flr)

Elevator Installation - Area G (3rd Flr) Paint - Area G (3rd Flr) Tech Terminations - Area G (3rd Flr) Ceiling Grid - Area G (3rd Flr) Misc Finishes - Area G (3rd Flr) Light Fixtures - Area G (3rd Flr) HVAC Ceiling Finishes - Area G (3rd Flr) Fire Protection Heads - Area G (3rd Flr) Wiring Devices - Area G (3rd Flr) Ceiling Pads - Area G (3rd Flr) Fire Alarm System - Area G (3rd Flr) Lighting Controls - Area G (3rd Flr) Casework - Area G (3rd Flr) Flooring - Area G (3rd Flr) Lockers - Area G (3rd Flr) Paging Devices - Area G (3rd Flr) Plumbing Fixtures - Area G (3rd Flr)


Activity ID

0620A-GSC-3070 0620A-ZST-2300 0620A-GSC-3100 0620A-GSC-3110 0620A-ZST-2320 0620A-GSC-3120 0620A-GSC-3130 0620A-ZST-2340 0620A-ALL-1380 Area H (3rd Flr) 0620A-GSC-2170 0620A-ZST-2100 0620A-GSC-2530 0620A-GSC-2610 0620A-ZSE-3150 0620A-RMM-2310 0620A-SAC-1480 0620A-ZSE-3170 0620A-GSC-2710 0620A-FEC-1120 0620A-ZSE-3190 0620A-ZSE-3200 0620A-GSC-2750 0620A-GSC-2770 0620A-ZST-2230 0620A-MPH-2250 0620A-ZST-2240 0620A-ZST-2250 0620A-GSC-2860 0620A-ZST-2260 0620A-GSC-2880 0620A-GSC-2890 0620A-GSC-2980 0620A-GSC-2990 Area I (3rd Flr) 0620A-GSC-1990 0620A-ZST-2000 0620A-GSC-2510 0620A-GSC-2340 0620A-ZSE-2940 0620A-RMM-2200 0620A-SAC-1440 0620A-ZSE-3010 0620A-GSC-2430 0620A-FEC-1090 0620A-ZSE-3060 0620A-ZSE-3090 0620A-GSC-2540 0620A-ZST-2090 0620A-GSC-2620 0620A-ZST-2130 0620A-MPH-2220 0620A-ZST-2170 0620A-GSC-2670 0620A-ZST-2190 0620A-GSC-2720 0620A-GSC-2730

Activity Name

Orig Start Dur

Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr

3 3 10 5 5 4 6 10 0 67 12 7 12 10 9 6 3 5 10 8 3 1 15 5 5 10 3 3 10 7 6 6 3 5 58 12 7 8 12 10 6 3 5 8 8 2 1 5 5 10 3 8 3 8 7 3 6

Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 20 of 25

05-15-15 05-15-15 05-18-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 03-30-15 03-30-15 04-16-15 04-23-15 04-24-15 04-30-15 05-05-15 05-08-15 05-13-15 05-13-15 05-19-15 05-20-15 05-26-15 05-26-15 05-28-15 05-28-15 06-01-15 06-04-15 06-09-15 06-09-15 06-12-15 06-16-15 06-16-15 06-26-15 06-26-15 04-16-15 04-16-15 05-04-15 05-08-15 05-11-15 05-15-15 05-21-15 05-27-15 06-01-15 06-01-15 06-03-15 06-08-15 06-10-15 06-11-15 06-11-15 06-16-15 06-18-15 06-22-15 06-23-15 06-24-15 06-26-15 06-30-15 06-30-15

Finish

05-19-15 05-19-15 06-01-15 05-26-15 05-27-15 05-29-15 06-02-15 06-10-15 07-07-15 07-02-15 04-15-15 04-24-15 05-08-15 05-07-15 05-12-15 05-12-15 05-12-15 05-19-15 05-27-15 05-29-15 05-22-15 05-26-15 06-15-15 06-03-15 06-03-15 06-12-15 06-08-15 06-11-15 06-22-15 06-22-15 06-23-15 06-23-15 06-30-15 07-02-15 07-07-15 05-01-15 05-12-15 05-19-15 05-27-15 05-29-15 05-29-15 05-29-15 06-05-15 06-10-15 06-12-15 06-09-15 06-10-15 06-17-15 06-17-15 06-29-15 06-22-15 07-01-15 06-25-15 07-03-15 07-06-15 07-02-15 07-07-15

Late Start

07-03-15 06-03-15 06-10-15 07-06-15 06-08-15 07-01-15 06-24-15 06-15-15 05-01-15 05-01-15 06-03-15 05-05-15 05-21-15 05-14-15 05-19-15 05-22-15 07-01-15 05-28-15 06-03-15 07-10-15 07-16-15 06-05-15 06-15-15 06-12-15 06-24-15 06-19-15 06-24-15 06-24-15 06-29-15 07-02-15 07-07-15 07-13-15 07-13-15 05-19-15 05-19-15 06-12-15 06-16-15 05-21-15 05-28-15 06-03-15 06-08-15 07-08-15 06-11-15 06-24-15 07-15-15 07-17-15 06-29-15 06-23-15 06-26-15 06-30-15 07-08-15 07-03-15 07-08-15 07-08-15 07-15-15 07-10-15

Late Finish 07-07-15 06-05-15 06-23-15 07-10-15 06-12-15 07-06-15 07-01-15 06-26-15 07-17-15 07-17-15 05-18-15 06-11-15 05-20-15 06-04-15 05-27-15 05-27-15 05-27-15 07-07-15 06-10-15 06-12-15 07-14-15 07-16-15 06-25-15 06-19-15 06-18-15 07-07-15 06-23-15 06-26-15 07-07-15 07-07-15 07-09-15 07-14-15 07-15-15 07-17-15 07-17-15 06-04-15 06-22-15 06-25-15 06-08-15 06-10-15 06-10-15 06-10-15 07-14-15 06-22-15 07-03-15 07-16-15 07-17-15 07-03-15 06-29-15 07-09-15 07-02-15 07-17-15 07-07-15 07-17-15 07-16-15 07-17-15 07-17-15

Total Free Float Float 34 12 16 33 12 26 21 12 8 11 23 33 8 19 10 10 10 34 10 10 36 37 8 12 11 17 11 11 11 11 12 15 11 11 8 23 28 26 8 8 8 8 27 8 15 27 27 12 8 8 8 12 8 10 8 11 8

2 0 5 22 0 11 9 1 0 0 0 5 0 0 0 0 0 0 0 2 0 10 0 4 0 5 0 0 1 3 4 4 0 0 0 0 20 18 0 0 0 0 0 0 7 0 19 4 0 0 0 4 0 2 0 3 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Toilet Partitions - Area G (3rd Flr) Security Devices - Area G (3rd Flr) Specialties - Area G (3rd Flr) Toilet Accessories - Area G (3rd Flr) Tech Devices - Area G (3rd Flr) Furnishings - Area G (3rd Flr) Doors/ Hardware - Area G (3rd Flr) A/V Devices - Area G (3rd Flr) Substantial Completion - 3rd Flr Paint - Area H (3rd Flr) Tech Terminations - Area H (3rd Flr) Ceiling Grid - Area H (3rd Flr) Misc Finishes - Area H (3rd Flr) Light Fixtures - Area H (3rd Flr) HVAC Ceiling Finishes - Area H (3rd Flr) Fire Protection Heads - Area H (3rd Flr) Wiring Devices - Area H (3rd Flr) Ceiling Pads - Area H (3rd Flr) Casework - Area H (3rd Flr) Fire Alarm System - Area H (3rd Flr) Lighting Controls - Area H (3rd Flr) Flooring - Area H (3rd Flr) Lockers - Area H (3rd Flr) Paging Devices - Area H (3rd Flr) Plumbing Fixtures - Area H (3rd Flr) Security Devices - Area H (3rd Flr) Tech Devices - Area H (3rd Flr) Specialties - Area H (3rd Flr) A/V Devices - Area H (3rd Flr) Doors/ Hardware - Area H (3rd Flr) Furnishings - Area H (3rd Flr) Toilet Partitions - Area H (3rd Flr) Toilet Accessories - Area H (3rd Flr) Paint - Area I (3rd Flr) Tech Terminations - Area I (3rd Flr) Misc Finishes - Area I (3rd Flr) Ceiling Grid - Area I (3rd Flr) Light Fixtures - Area I (3rd Flr) HVAC Ceiling Finishes - Area I (3rd Flr) Fire Protection Heads - Area I (3rd Flr) Wiring Devices - Area I (3rd Flr) Ceiling Pads - Area I (3rd Flr) Casework - Area I (3rd Flr) Fire Alarm System - Area I (3rd Flr) Lighting Controls - Area I (3rd Flr) Lockers - Area I (3rd Flr) Paging Devices - Area I (3rd Flr) Flooring - Area I (3rd Flr) Security Devices - Area I (3rd Flr) Plumbing Fixtures - Area I (3rd Flr) Tech Devices - Area I (3rd Flr) Specialties - Area I (3rd Flr) A/V Devices - Area I (3rd Flr) Furnishings - Area I (3rd Flr) Doors/ Hardware - Area I (3rd Flr)


Activity ID

One Story Areas Area B (Gym) Area B.1 (Gym) 0620A-SAC-1400 0620A-GSC-2360 0620A-ZSE-2990 0620A-RMM-2220 0620A-ZSE-3000 0620A-ZSE-3030 0620A-GSC-2450 0620A-ZSE-3070 0620A-ZSE-3110 0620A-ZSE-3160 0620A-ZST-1880 0620A-ZST-1900 0620A-ZST-1940 0620A-ZST-2020 0620A-ZST-2080 0620A-GSC-2410 0620A-GSC-2560 0620A-GSC-2680 0620A-GSC-2840 0620A-GSC-2870 0620A-GSC-3030 0620A-ZSE-3390 0620A-ALL-1340 Area A/B/C (1-Story) Area A (Low Roof) 0620A-GSC-1290 0620A-GSC-1680 0620A-RMM-1770 0620A-ZSE-2420 0620A-SAC-1250 0620A-ZST-1060 0620A-GSC-1370 0620A-ZSE-2470 0620A-GSC-1830 0620A-ZSE-2530 0620A-FEC-1010 0620A-GSC-1890 0620A-ZSE-2580 0620A-ZST-1380 0620A-ZST-1440 0620A-ZSE-2650 0620A-ZST-1490 0620A-MPH-2030 0620A-ZST-1540 0620A-GSC-2120 0620A-GSC-2130 0620A-SSI-1020 0620A-GSC-2150 0620A-ZST-1560 0620A-ZST-1610 0620A-SSI-1030 0620A-GSC-2020 0620A-GSC-3210 Area B (Low Roof)

Activity Name

Orig Start Dur

Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)

Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 21 of 25

175 107 107 3 7 4 5 1 5 8 1 8 3 1 1 1 1 1 5 5 27 5 15 2 4 0 85 85 12 12 6 8 6 5 10 3 10 5 8 18 6 4 5 18 5 13 3 5 6 7 20 5 5 3 5 10 53

11-06-14 01-28-15 01-28-15 01-28-15 02-02-15 02-11-15 02-11-15 02-17-15 02-18-15 02-18-15 02-25-15 03-02-15 03-12-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 03-26-15 04-02-15 04-10-15 05-19-15 06-03-15 06-24-15 06-24-15 11-06-14 11-06-14 11-06-14 11-10-14 11-18-14 11-18-14 11-20-14 11-24-14 11-24-14 12-01-14 12-01-14 12-04-14 12-05-14 12-09-14 12-11-14 12-15-14 12-19-14 12-19-14 12-29-14 01-05-15 01-06-15 01-06-15 01-06-15 01-06-15 01-06-15 01-09-15 01-16-15 01-22-15 01-22-15 02-24-15 11-24-14

Finish

07-15-15 06-29-15 06-29-15 01-30-15 02-10-15 02-16-15 02-17-15 02-17-15 02-24-15 02-27-15 02-25-15 03-11-15 03-16-15 03-20-15 03-23-15 03-24-15 03-25-15 03-26-15 04-01-15 04-09-15 05-18-15 05-26-15 06-23-15 06-25-15 06-29-15 06-29-15 03-09-15 03-09-15 11-21-14 11-25-14 11-25-14 11-28-14 11-28-14 12-01-14 12-08-14 12-03-14 12-12-14 12-10-14 12-16-14 01-05-15 12-18-14 12-18-14 12-26-14 01-15-15 01-05-15 01-21-15 01-08-15 01-12-15 01-13-15 01-14-15 02-02-15 01-15-15 01-22-15 01-26-15 01-28-15 03-09-15 02-09-15

Late Start

12-15-14 02-11-15 02-11-15 02-11-15 02-16-15 03-23-15 03-19-15 03-27-15 03-30-15 03-26-15 04-07-15 04-08-15 04-20-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-09-15 04-16-15 04-23-15 06-02-15 06-16-15 07-09-15 07-07-15 12-15-14 12-15-14 12-15-14 12-17-14 01-06-15 12-29-14 01-06-15 02-27-15 01-08-15 01-09-15 01-14-15 01-14-15 01-20-15 01-22-15 01-21-15 03-06-15 03-12-15 01-29-15 03-19-15 04-09-15 03-26-15 06-16-15 06-10-15 04-10-15 02-25-15 03-31-15 06-22-15 07-01-15 05-22-15 04-09-15 01-02-15

Late Finish 07-24-15 07-10-15 07-10-15 02-13-15 02-24-15 03-26-15 03-25-15 03-27-15 04-03-15 04-07-15 04-07-15 04-17-15 04-22-15 04-16-15 04-17-15 04-20-15 04-21-15 04-22-15 04-15-15 04-22-15 06-01-15 06-08-15 07-06-15 07-10-15 07-10-15 07-10-15 07-03-15 07-03-15 12-31-14 01-05-15 01-13-15 01-08-15 01-13-15 03-05-15 01-21-15 01-13-15 01-27-15 01-20-15 01-29-15 02-16-15 01-28-15 03-11-15 03-18-15 02-23-15 03-25-15 04-27-15 03-30-15 06-22-15 06-17-15 04-20-15 03-24-15 04-07-15 06-26-15 07-03-15 05-29-15 04-22-15 07-03-15

Total Free Float Float 7 9 9 10 10 28 26 28 28 26 28 26 26 18 18 18 18 18 9 9 9 9 9 11 9 9 82 82 26 26 32 27 30 66 30 27 30 27 30 30 27 57 57 27 57 67 57 113 109 67 36 57 109 112 85 31 102

0 0 0 0 0 0 0 0 0 0 1 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 13 12 0 0 0 3 30 21 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 F M A M J Jul A S O N D

J

F

2016 M A M J

Fire Protection Heads - Area B (Gym) Paint - Area B (Gym) Light Fixtures - Area B (Gym) HVAC Ceiling Finishes - Area B (Gym) Wiring Devices - Area B (Gym) Fire Alarm System - Area B (Gym) Gym Equipment - Area B (Gym) Lighting Controls - Area B (Gym) Equipment Hookups - Area B (Gym) Scoreboard - Area B (Gym) Tech Terminations - Area B (Gym) Paging Devices - Area B (Gym) Security Devices - Area B (Gym) Tech Devices - Area B (Gym) A/V Devices - Area B (Gym) Misc Finishes - Area B (Gym) Specialties - Area B (Gym) Gym Flooring - Area B (Gym) Gym Floor Striping - Area B (Gym) Bleachers - Area B (Gym) Doors/ Hardware - Area B (Gym) Bleacher Connections - Area B (Gym) Substantial Completion - Area B (Gym)

Paint - Area A (Low Roof) Ceiling Grid - Area A (Low Roof) HVAC Ceiling Finishes - Area A (Low Roof) Light Fixtures - Area A (Low Roof) Fire Protection Heads - Area A (Low Roof) Tech Terminations - Area A (Low Roof) Misc Finishes - Area A (Low Roof) Wiring Devices - Area A (Low Roof) Ceiling Pads - Area A (Low Roof) Fire Alarm System - Area A (Low Roof) Casework - Area A (Low Roof) Flooring - Area A (Low Roof) Lighting Controls - Area A (Low Roof) Paging Devices - Area A (Low Roof) Security Devices - Area A (Low Roof) Theater Lighting - Area A (Low Roof) Tech Rm Headend - Area A (Low Roof) Plumbing Fixtures/ KE connections - Area A (Low Roof) Tech Devices - Area A (Low Roof) Furnishings - Area A (Low Roof) Doors/ Hardware - Area A (Low Roof) Install Kitchen Equipment - Area A (Low Roof) Specialties - Area A (Low Roof) A/V Devices - Area A (Low Roof) Tech Rm Build-out and Backbone - Area A (Low Roof) Final Set Kitchen Equipment - Area A (Low Roof) Toilet Accessories - Area A (Low Roof) Stage Flooring - Area A (Low Roof)


Activity ID

0620A-GSC-1380 0620A-GSC-1780 0620A-ZSE-2540 0620A-RMM-1860 0620A-SAC-1300 0620A-GSC-1490 0620A-ZST-1140 0620A-ZSE-2610 0620A-GSC-1970 0620A-ZSE-2640 0620A-FEC-1030 0620A-ZSE-2700 0620A-ZST-1480 0620A-ZST-1510 0620A-GSC-2140 0620A-ZST-1570 0620A-ZST-1590 0620A-ZST-1640 0620A-MPH-2110 0620A-ZST-1760 0620A-GSC-2290 0620A-GSC-2300 0620A-GSC-2310 Area C (Low Roof) 0620A-GSC-1500 0620A-ZST-1220 0620A-GSC-1610 0620A-GSC-2230 0620A-ZSE-2810 0620A-RMM-2140 0620A-SAC-1370 0620A-ZSE-2870 0620A-GSC-2330 0620A-FEC-1070 0620A-GSC-2350 0620A-ZSE-2910 0620A-ZSE-2960 0620A-ZST-1830 0620A-MPH-2190 0620A-GSC-2390 0620A-ZST-1890 0620A-ZST-1960 0620A-GSC-2460 0620A-ZST-2030 0620A-GSC-2470 0620A-GSC-2480 0620A-GSC-2490 0620A-GSC-2500 0620A-ALL-1260 Area C (Aux Gym) Area C (Aux Gym) 0620A-SAC-1410 0620A-GSC-2420 0620A-ZSE-3020 0620A-RMM-2230 0620A-ZSE-3050 0620A-ZSE-3080

Activity Name

Orig Start Dur

Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)

Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 22 of 25

12 12 9 6 4 5 5 1 6 5 8 2 4 5 18 5 3 5 2 5 2 6 5 61 12 5 10 12 9 6 4 5 8 8 18 3 1 4 10 10 5 3 10 5 3 5 3 6 0 104 104 4 5 4 5 1 2

11-24-14 11-26-14 12-04-14 12-09-14 12-11-14 12-11-14 12-11-14 12-17-14 12-17-14 12-18-14 12-19-14 12-26-14 12-26-14 01-02-15 01-06-15 01-09-15 01-16-15 01-21-15 01-22-15 01-28-15 01-30-15 01-30-15 02-03-15 12-11-14 12-11-14 12-30-14 12-30-14 01-08-15 01-16-15 01-20-15 01-22-15 01-29-15 01-29-15 02-02-15 02-04-15 02-05-15 02-10-15 02-10-15 02-10-15 02-10-15 02-16-15 02-23-15 02-23-15 02-26-15 02-27-15 02-27-15 03-02-15 03-02-15 02-02-15 02-02-15 02-02-15 02-11-15 02-18-15 02-18-15 02-24-15 02-25-15

Finish

12-10-14 12-12-14 12-16-14 12-16-14 12-16-14 12-17-14 12-17-14 12-17-14 12-24-14 12-24-14 12-31-14 12-29-14 12-31-14 01-08-15 01-29-15 01-15-15 01-20-15 01-27-15 01-23-15 02-03-15 02-02-15 02-06-15 02-09-15 03-09-15 12-29-14 01-06-15 01-13-15 01-23-15 01-28-15 01-27-15 01-27-15 02-04-15 02-09-15 02-11-15 02-27-15 02-09-15 02-10-15 02-13-15 02-23-15 02-23-15 02-20-15 02-25-15 03-06-15 03-04-15 03-03-15 03-05-15 03-04-15 03-09-15 03-09-15 06-29-15 06-29-15 02-05-15 02-17-15 02-23-15 02-24-15 02-24-15 02-26-15

Late Start

01-02-15 01-06-15 01-16-15 03-03-15 01-30-15 02-10-15 03-06-15 03-17-15 02-11-15 03-18-15 02-13-15 04-01-15 03-13-15 03-19-15 02-17-15 03-26-15 04-02-15 04-08-15 04-28-15 06-29-15 06-23-15 06-18-15 03-25-15 01-20-15 01-20-15 03-20-15 02-27-15 01-22-15 02-24-15 03-11-15 02-05-15 03-18-15 03-09-15 03-11-15 03-13-15 03-25-15 04-03-15 03-27-15 04-30-15 03-19-15 04-02-15 04-10-15 04-01-15 04-15-15 06-01-15 06-01-15 06-25-15 06-26-15 02-19-15 02-19-15 02-19-15 02-25-15 05-19-15 05-15-15 06-04-15 06-05-15

Late Finish 01-19-15 01-21-15 01-28-15 03-10-15 02-04-15 02-16-15 03-12-15 03-17-15 02-18-15 03-24-15 02-24-15 04-02-15 03-18-15 03-25-15 03-12-15 04-01-15 04-07-15 04-14-15 04-29-15 07-03-15 06-24-15 06-25-15 03-31-15 07-03-15 02-04-15 03-26-15 03-12-15 02-06-15 03-06-15 03-18-15 02-10-15 03-24-15 03-18-15 03-20-15 04-08-15 03-27-15 04-03-15 04-01-15 05-13-15 04-01-15 04-09-15 04-14-15 04-15-15 04-21-15 06-03-15 06-05-15 06-29-15 07-03-15 07-03-15 07-17-15 07-17-15 02-24-15 03-03-15 05-22-15 05-21-15 06-04-15 06-08-15

Total Free Float Float 26 26 29 58 34 41 59 62 38 62 38 67 54 54 30 54 54 54 67 106 100 97 36 82 26 57 42 10 27 36 10 34 27 27 27 34 38 33 56 27 33 33 27 33 64 64 81 82 82 14 14 13 10 63 61 70 70

0 0 0 22 0 7 5 0 0 0 8 29 0 0 0 0 0 0 11 24 19 15 9 0 0 24 15 0 0 10 0 0 0 0 0 0 10 0 3 0 0 0 1 3 0 0 3 0 0 0 0 3 0 0 54 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

2015 2016 J F M A M J Jul A S O N D J F M A M J Paint - Area B (Low Roof) Ceiling Grid - Area B (Low Roof) Light Fixtures - Area B (Low Roof) HVAC Ceiling Finishes - Area B (Low Roof) Fire Protection Heads - Area B (Low Roof) Misc Finishes - Area B (Low Roof) Tech Terminations - Area B (Low Roof) Wiring Devices - Area B (Low Roof) Ceiling Pads - Area B (Low Roof) Fire Alarm System - Area B (Low Roof) Casework - Area B (Low Roof) Lighting Controls - Area B (Low Roof) Paging Devices - Area B (Low Roof) Security Devices - Area B (Low Roof) Flooring - Area B (Low Roof) Tech Rm Headend - Area B (Low Roof) Tech Devices - Area B (Low Roof) A/V Devices - Area B (Low Roof) Plumbing Fixtures - Area B (Low Roof) Tech Rm Build-out and Backbone - Area B (Low Roof) Furnishings - Area B (Low Roof) Doors/ Hardware - Area B (Low Roof) Specialties - Area B (Low Roof) Paint - Area C (Low Roof) Tech Terminations - Area C (Low Roof) Misc Finishes - Area C (Low Roof) Ceiling Grid - Area C (Low Roof) Light Fixtures - Area C (Low Roof) HVAC Ceiling Finishes - Area C (Low Roof) Fire Protection Heads - Area C (Low Roof) Wiring Devices - Area C (Low Roof) Ceiling Pads - Area C (Low Roof) Casework - Area C (Low Roof) Flooring - Area C (Low Roof) Fire Alarm System - Area C (Low Roof) Lighting Controls - Area C (Low Roof) Paging Devices - Area C (Low Roof) Plumbing Fixtures - Area C (Low Roof) Lockers - Area C (Low Roof) Security Devices - Area C (Low Roof) Tech Devices - Area C (Low Roof) Specialties - Area C (Low Roof) A/V Devices - Area C (Low Roof) Toilet Partitions - Area C (Low Roof) Toilet Accessories - Area C (Low Roof) Furnishings - Area C (Low Roof) Doors/ Hardware - Area C (Low Roof) Substantial Completion - Area A/B/C (1-Story)

Fire Protection Heads - Area C (Aux Gym) Paint - Area C (Aux Gym) Light Fixtures - Area C (Aux Gym) HVAC Ceiling Finishes - Area C (Aux Gym) Wiring Devices - Area C (Aux Gym) Fire Alarm System - Area C (Aux Gym)


Activity ID

Activity Name

Orig Start Dur

0620A-ZSE-3100 Lighting Controls - Area C (Aux Gym) 0620A-GSC-2550 Gym Equipment - Area C (Aux Gym) 0620A-ZST-1950 Tech Terminations - Area C (Aux Gym) 0620A-ZST-1970 Paging Devices - Area C (Aux Gym) 0620A-ZST-2010 Security Devices - Area C (Aux Gym) 0620A-ZST-2040 Tech Devices - Area C (Aux Gym) 0620A-ZST-2110 A/V Devices - Area C (Aux Gym) 0620A-GSC-2440 Misc Finishes - Area C (Aux Gym) 0620A-GSC-2630 Specialties - Area C (Aux Gym) 0620A-GSC-2850 Gym Flooring - Area C (Aux Gym) 0620A-GSC-2920 Gym Floor Striping - Area C (Aux Gym) 0620A-GSC-3000 Doors/ Hardware - Area C (Aux Gym) 0620A-ALL-1330 Substantial Completion - Area C (Aux Gym) Area D/E/F (1-Story) Area D/E/F (Low R Roof) 0620A-GSC-1650 Paint - Area D/E/F (Low Roof) 0620A-ZST-1320 Tech Terminations - Area D/E/F (Low Roof) 0620A-GSC-1790 Misc Finishes - Area D/E/F (Low Roof) 0620A-GSC-2900 Ceiling Grid - Area D/E/F (Low Roof) 0620A-ZSE-3230 Light Fixtures - Area D/E/F (Low Roof) 0620A-RMM-2360 HVAC Ceiling Finishes - Area D/E/F (Low Roof) 0620A-SAC-1510 Fire Protection Heads - Area D/E/F (Low Roof) 0620A-ZSE-3280 Wiring Devices - Area D/E/F (Low Roof) 0620A-GSC-3060 Ceiling Pads - Area D/E/F (Low Roof) 0620A-FEC-1160 Casework - Area D/E/F (Low Roof) 0620A-ZSE-3300 Fire Alarm System - Area D/E/F (Low Roof) 0620A-GSC-3090 Flooring - Area D/E/F (Low Roof) 0620A-ZSE-3320 Lighting Controls - Area D/E/F (Low Roof) 0620A-MPH-2310 Plumbing Fixtures - Area D/E/F (Low Roof) 0620A-ZST-2330 Paging Devices - Area D/E/F (Low Roof) 0620A-GSC-3140 Toilet Partitions - Area D/E/F (Low Roof) 0620A-ZST-2350 Security Devices - Area D/E/F (Low Roof) 0620A-ZST-2360 Tech Devices - Area D/E/F (Low Roof) 0620A-GSC-3170 Specialties - Area D/E/F (Low Roof) 0620A-GSC-3150 Toilet Accessories - Area D/E/F (Low Roof) 0620A-ZST-2380 A/V Devices - Area D/E/F (Low Roof) 0620A-GSC-3180 Doors/ Hardware - Area D/E/F (Low Roof) 0620A-GSC-3190 Furnishings - Area D/E/F (Low Roof) 0620A-ALL-1430 Substantial Completion - Area D/E/F (Low Roof) Site Finishes Site Finishes Entire Site

1 5 1 1 1 1 1 5 5 15 5 2 0 103 103 15 6 10 15 9 10 9 5 10 12 3 25 1 10 3 3 3 3 10 5 6 6 6 0 63 63 63 63 10 20 15 10 15 5 5 5 5 0 95 11 11 11

0620A-NCP-1000 Finish Grading - All 0620A-NCP-1010 Curbs/ Walks - All 0620A-NCP-1020 Pavement - All 0620A-NCP-1030 Seeding/ Planting - All 0620A-ZSE-3270 Site Lighting Rough-in 0620A-NCP-1040 Misc Finishes - All 0620A-NCP-1050 Specialties - All 0620A-ZSE-3330 Light Poles 0620A-ZSE-3350 Emergency Generator 0620A-ALL-1390 Site Substantial Completion Punch List/ Commissioning Commiss Entire Project All Areas

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 23 of 25

02-27-15 03-02-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-02-15 04-10-15 05-19-15 06-10-15 06-26-15 02-19-15 02-19-15 02-19-15 03-12-15 03-12-15 05-04-15 05-12-15 05-13-15 05-14-15 05-26-15 05-28-15 06-01-15 06-02-15 06-03-15 06-05-15 06-09-15 06-18-15 06-23-15 06-23-15 06-26-15 07-01-15 07-03-15 07-07-15 07-08-15 07-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-08-15 04-16-15 05-05-15 05-13-15 05-21-15 06-03-15 06-03-15 06-19-15 06-29-15 03-10-15 07-07-15 07-07-15 07-07-15

Finish

02-27-15 03-06-15 03-23-15 03-24-15 03-25-15 03-26-15 03-27-15 04-09-15 04-16-15 06-09-15 06-16-15 06-29-15 06-29-15 07-15-15 07-15-15 03-11-15 03-19-15 03-25-15 05-22-15 05-22-15 05-27-15 05-27-15 06-01-15 06-10-15 06-16-15 06-04-15 07-07-15 06-05-15 06-22-15 06-22-15 06-25-15 06-25-15 06-30-15 07-14-15 07-09-15 07-14-15 07-15-15 07-15-15 07-15-15 07-06-15 07-06-15 07-06-15 07-06-15 04-23-15 05-19-15 06-02-15 06-02-15 06-18-15 06-10-15 06-10-15 06-26-15 07-06-15 07-06-15 07-22-15 07-21-15 07-21-15 07-21-15

Late Start

06-09-15 06-03-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-23-15 05-27-15 06-10-15 07-01-15 07-15-15 03-04-15 03-04-15 03-04-15 04-08-15 03-25-15 05-13-15 05-26-15 05-22-15 05-26-15 07-14-15 06-08-15 06-10-15 07-21-15 06-12-15 07-24-15 06-24-15 07-06-15 07-08-15 07-09-15 07-14-15 07-13-15 07-20-15 07-17-15 07-17-15 07-17-15 04-27-15 04-27-15 04-27-15 04-27-15 04-27-15 05-06-15 06-22-15 07-08-15 06-12-15 07-20-15 07-20-15 07-08-15 07-20-15 07-06-15 07-17-15 07-17-15 07-17-15

Late Finish 06-09-15 06-09-15 05-11-15 05-26-15 06-02-15 06-05-15 06-09-15 04-29-15 06-02-15 06-30-15 07-07-15 07-16-15 07-17-15 07-24-15 07-24-15 03-24-15 04-15-15 04-08-15 06-03-15 06-05-15 06-05-15 06-05-15 07-20-15 06-19-15 06-25-15 07-23-15 07-16-15 07-24-15 07-07-15 07-08-15 07-10-15 07-13-15 07-16-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 05-13-15 06-11-15 07-16-15 07-24-15 07-07-15 07-24-15 07-24-15 07-16-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15

Total Free Float Float 70 65 34 43 47 49 50 14 32 15 15 13 14 7 7 9 18 9 7 9 7 7 35 7 7 35 7 35 11 12 11 12 12 8 11 8 7 7 7 14 14 14 14 11 11 26 31 11 26 26 11 11 14 7 8 8 8

55 50 0 0 0 0 35 0 0 0 2 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 28 0 0 0 0 4 1 4 1 0 0 0 0 0 0 0 0 0 0 20 0 15 15 0 0 0 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A - T/P 0620A - T/P 0620A - T/P 0620A - T/P 0620A - Prec 0620A - T/P 0620A - T/P 0620A - Prec 0620A - Prec Work Days Work Days Work Days Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Lighting Controls - Area C (Aux Gym) Gym Equipment - Area C (Aux Gym) Tech Terminations - Area C (Aux Gym) Paging Devices - Area C (Aux Gym) Security Devices - Area C (Aux Gym) Tech Devices - Area C (Aux Gym) A/V Devices - Area C (Aux Gym) Misc Finishes - Area C (Aux Gym) Specialties - Area C (Aux Gym) Gym Flooring - Area C (Aux Gym) Gym Floor Striping - Area C (Aux Gym) Doors/ Hardware - Area C (Aux Gym) Substantial Completion - Area C (Aux Gym)

Paint - Area D/E/F (Low Roof) Tech Terminations - Area D/E/F (Low Roof) Misc Finishes - Area D/E/F (Low Roof) Ceiling Grid - Area D/E/F (Low Roof) Light Fixtures - Area D/E/F (Low Roof) HVAC Ceiling Finishes - Area D/E/F (Low Roof) Fire Protection Heads - Area D/E/F (Low Roof) Wiring Devices - Area D/E/F (Low Roof) Ceiling Pads - Area D/E/F (Low Roof) Casework - Area D/E/F (Low Roof) Fire Alarm System - Area D/E/F (Low Roof) Flooring - Area D/E/F (Low Roof) Lighting Controls - Area D/E/F (Low Roof) Plumbing Fixtures - Area D/E/F (Low Roof) Paging Devices - Area D/E/F (Low Roof) Toilet Partitions - Area D/E/F (Low Roof) Security Devices - Area D/E/F (Low Roof) Tech Devices - Area D/E/F (Low Roof) Specialties - Area D/E/F (Low Roof) Toilet Accessories - Area D/E/F (Low Roof) A/V Devices - Area D/E/F (Low Roof) Doors/ Hardware - Area D/E/F (Low Roof) Furnishings - Area D/E/F (Low Roof) Substantial Completion - Area D/E/F (Low

Finish Grading - All Curbs/ Walks - All Pavement - All Seeding/ Planting - All Site Lighting Rough-in Misc Finishes - All Specialties - All Light Poles Emergency Generator Site Substantial Completion


Activity ID

0620A-ZSE-3400 0620A-RMM-2410 0620A-ZSE-3410 0620A-ZSE-3420 Academic Area First Floor

Activity Name

Orig Start Dur

Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections

0620A-RMM-2320 0620A-ZSE-3180 0620A-ZST-2200 0620A-MPH-2230 0620A-SAC-1490 0620A-GSC-2690 0620A-CTT-2400 0620A-FEC-1110 0620A-ALL-1290 Second Floor

HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr

0620A-RMM-2370 0620A-ZSE-3260 0620A-ZST-2270 0620A-MPH-2270 0620A-SAC-1520 0620A-GSC-3010 0620A-CTT-2410 0620A-FEC-1140 0620A-ALL-1350 Third Floor

HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd Flr CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr

0620A-RMM-2400 0620A-ZSE-3340 0620A-ZST-2370 0620A-MPH-2320 0620A-SAC-1550 0620A-GSC-3160 0620A-CTT-2440 0620A-FEC-1180 0620A-ALL-1400 One Story Areas Area B (Gym)

HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning - 3rd Flr CT Taylor Punch List/ Commissioning - 3rd Flr Casework Punch List/ Commissioning - 3rd Flr Final Completion - 3rd Flr

0620A-RMM-2380 0620A-ZSE-3290 0620A-ZST-2290 0620A-MPH-2280 0620A-SAC-1530 0620A-GSC-3050 0620A-CTT-2420 0620A-FEC-1150 0620A-ALL-1360 Area A/B/C (1-Story) 0620A-SSI-1040 0620A-RMM-2300 0620A-ZSE-3140 0620A-ZST-2120 0620A-MPH-2210

HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - Area B (Gym) CT Taylor Punch List/ Commissioning - Area B (Gym) Casework Punch List/ Commissioning - Area B (Gym) Final Completion - Area B (Gym)

Kitchen Equipment Punch List/ Commissioning - Area A/B/C (1-Stor HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 24 of 25

5 10 5 1 77 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 10 10 5 5 5 5 5 5 5 5 0 95 5 5 5 5 5 5 5 5 5 5 0 5 5 3 5 5 5 5

07-07-15 07-08-15 07-14-15 07-21-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 04-02-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 05-28-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 07-08-15 03-10-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 06-30-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15 03-10-15

Finish

07-13-15 07-21-15* 07-20-15 07-21-15 07-21-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 04-09-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 06-03-15 07-21-15 07-21-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-14-15 07-21-15 07-22-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 07-06-15 03-16-15 03-16-15 03-12-15 03-16-15 03-16-15 03-16-15 03-16-15

Late Start

07-17-15 07-20-15 07-24-15 07-31-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-06-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-06-15 07-06-15 07-29-15 07-06-15 07-06-15 07-06-15 07-06-15

Late Finish 07-23-15 07-31-15 07-30-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-17-15 07-31-15 07-31-15 07-31-15 07-31-15 07-10-15 07-10-15 07-10-15 07-10-15

Total Free Float Float 8 8 8 8 8 80 80 70 70 70 70 70 70 70 70 80 42 42 37 37 37 37 37 37 37 37 42 8 8 13 13 13 13 13 13 13 13 8 7 19 19 9 9 9 9 9 9 9 9 19 97 97 99 82 82 82 82

0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 0 42 0 0 5 5 5 5 5 5 5 5 8 0 0 0 0 0 0 0 0 0 0 0 19 0 0 2 0 0 0 0

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Alarm Programming HVAC Commissioning Assist Fire Alarm Commissioning Fire Alarm Testing/ Inspections

HVAC Punch List - 1st Flr Electrical Punch List - 1st Flr Tech Punch List - 1st Flr Plumbing Punch List - 1st Flr Fire Protection Punch List - 1st Flr Greenspace Punch List/ Commissioning - 1st Flr CT Taylor Punch List/ Commissioning - 1st Flr Casework Punch List/ Commissioning - 1st Flr Final Completion - 1st Flr

HVAC Punch List - 2nd Flr Electrical Punch List - 2nd Flr Tech Punch List - 2nd Flr Plumbing Punch List - 2nd Flr Fire Protection Punch List - 2nd Flr Greenspace Punch List/ Commissioning - 2nd F CT Taylor Punch List/ Commissioning - 2nd Flr Casework Punch List/ Commissioning - 2nd Flr Final Completion - 2nd Flr

HVAC Punch List - 3rd Flr Electrical Punch List - 3rd Flr Tech Punch List - 3rd Flr Plumbing Punch List - 3rd Flr Fire Protection Punch List - 3rd Flr Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - 3rd Casework Punch List/ Commissioning - 3r Final Completion - 3rd Flr

HVAC Punch List - Area B (Gym) Electrical Punch List - Area B (Gym) Tech Punch List - Area B (Gym) Plumbing Punch List - Area B (Gym) Fire Protection Punch List - Area B (Gym) Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Area Casework Punch List/ Commissioning - Are Final Completion - Area B (Gym)

Kitchen Equipment Punch List/ Commissioning - Area A/B/ HVAC Punch List - Area A/B/C (1-Story) Electrical Punch List - Area A/B/C (1-Story) Tech Punch List - Area A/B/C (1-Story) Plumbing Punch List - Area A/B/C (1-Story)


Activity ID

Activity Name

Orig Start Dur

0620A-SAC-1470 0620A-GSC-2600 0620A-CTT-2390 0620A-FEC-1100 0620A-ALL-1270 Area C (Aux Gym)

Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-Story) CT Taylor Punch List/ Commissioning - Area A/B/C (1-Story) Casework Punch List/ Commissioning - Area A/B/C (1-Story) Final Completion - Area A/B/C (1-Story)

0620A-RMM-2390 0620A-ZSE-3310 0620A-ZST-2310 0620A-MPH-2300 0620A-SAC-1540 0620A-GSC-3080 0620A-CTT-2430 0620A-FEC-1170 0620A-ALL-1370 Area D/E/F (1-Story)

HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux Gym) Greenspace Punch List/ Commissioning - Area C (Gym) CT Taylor Punch List/ Commissioning - Area C (Gym) Casework Punch List/ Commissioning - Area C (Gym) Final Completion - Area C (Gym)

0620A-RMM-2420 0620A-ZSE-3360 0620A-ZST-2390 0620A-MPH-2330 0620A-SAC-1560 0620A-GSC-3200 0620A-CTT-2450 0620A-FEC-1190 0620A-ALL-1440 Site Finishes Entire Site 0620A-NCP-1060 0620A-ALL-1410

HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story) Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story) Fire Protection Punch List - Area D/E/F (Low Roof) Greenspace Punch List/ Commissioning - Area D/E/F (1-Story) CT Taylor Punch List/ Commissioning - Area D/E/F (1-Story) Casework Punch List/ Commissioning - Area D/E/F (1-Story) Final Completion - Area D/E/F (1-Story)

Punch List/ Commissioning - Site Final Completion - Site

0620A-7:CMSD - JMHS (Upd Rev Contractor Scedule 20130924 0620A 01 Detailed Run Date 10-17-13 Data Date 10-11-13 25 of 25

5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 5 5 5 5 5 5 5 5 5 5 0 7 7 7 5 0

03-10-15 03-10-15 03-10-15 03-10-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-07-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-16-15 07-07-15 07-07-15 07-07-15 07-07-15

Finish

03-16-15 03-16-15 03-16-15 03-16-15 03-16-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-13-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-22-15 07-15-15 07-15-15 07-15-15 07-15-15 07-15-15

Late Start

07-06-15 07-06-15 07-06-15 07-06-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-20-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15 07-27-15

Late Finish 07-10-15 07-10-15 07-10-15 07-10-15 07-31-15 07-31-15 07-31-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-24-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15 07-31-15

Total Free Float Float 82 82 82 82 97 14 14 9 9 9 9 9 9 9 9 14 7 7 7 7 7 7 7 7 7 7 7 12 12 12 11 12

0 0 0 0 97 0 0 2 2 2 2 2 0 0 0 14 0 0 7 7 7 7 7 0 0 0 7 0 0 0 0 12

Calendar 2013 J Jul A S O N D Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work Work

Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days Days

0620A - T/P Work Days

Milestone Actual Work Remaining Work Critical Remaining Work

Cleveland Municipal School District John Marshall High School Baseline Construction Schedule (10-17-13)

J

2014 F M A M J Jul A S O N D

J

2015 2016 F M A M J Jul A S O N D J F M A M J Fire Protection Punch List - Area A/B/C (1-Story) Greenspace Punch List/ Commissioning - Area A/B/C (1-S CT Taylor Punch List/ Commissioning - Area A/B/C (1-Sto Casework Punch List/ Commissioning - Area A/B/C (1-Sto Final Completion - Area A/B/C (1-Story)

HVAC Punch List - Area C (Aux Gym) Electrical Punch List - Area C (Aux Gym) Tech Punch List - Area C (Aux Gym) Plumbing Punch List - Area C (Aux Gym) Fire Protection Punch List - Area C (Aux G Greenspace Punch List/ Commissioning - A CT Taylor Punch List/ Commissioning - Are Casework Punch List/ Commissioning - Ar Final Completion - Area C (Gym)

HVAC Punch List - Area D/E/F (1-Story) Electrical Punch List - Area D/E/F (1-Story Tech Punch List - Area D/E/F (Low Roof) Plumbing Punch List - Area D/E/F (1-Story Fire Protection Punch List - Area D/E/F (L Greenspace Punch List/ Commissioning CT Taylor Punch List/ Commissioning - Ar Casework Punch List/ Commissioning - A Final Completion - Area D/E/F (1-Story)

Punch List/ Commissioning - Site Final Completion - Site


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL PRE-CONSTRUCTION GENERAL GENERAL

PRCO-10

COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING

1 02-22-13 A

02-22-13 A

PRCO-15

REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD

1 03-04-13 A

03-04-13 A

PRCO-30

NOTIFY TDA OF VE CHANGES - CMSD

4 03-11-13 A

03-14-13 A

PRCO-20

CMSD TO APPROVE - CMSD

1 04-01-13 A

04-01-13 A

PRCO-40

CITY PERMIT REVIEW - SITE

46 04-08-13 A

06-11-13 A

CITY PERMIT REVIEW - SITE

PRCO-25

FINALIZE GMP & CONTRACT NEGOTIATION

1 04-26-13 A

04-26-13 A

FINALIZE GMP & CONTRACT NEGOTIATION

PRCO-35

COMPLETE SITE CONSTRUCTION DOCUMENTS

0

04-26-13 A

COMPLETE SITE CONSTRUCTION DOCUMENTS

PRCO-50

COMPLETE BUILDING CONSTRUCTION DOCUMENTS

0

05-31-13 A

PRCO-55

CITY PERMIT REVIEW - BUILDING

34 06-03-13 A

07-19-13 A

PRCO-60

BIDDING PROCESS

15 06-18-13 A

07-09-13 A

PRCO-75

BIDDING PROCESS / AWARD - FOOD SERVICES

11 08-12-13 A

08-23-13 A

PRCO-100

AMH - SCOPE AND AWARD

10 09-05-13 A

10-14-13 A

PRCO-70

BIDDING PROCESS / AWARD - FURNITURE

11 01-02-14*

01-16-14

COMPLETE GMP ESTIMATE, SCHEDULE, VALUE ENGINEERING REVIEW GMP & POT. VE INCLUSION - HIGLEY & CMSD NOTIFY TDA OF VE CHANGES - CMSD CMSD TO APPROVE - CMSD

COMPLETE BUILDING CONSTRUCTION DOCUMENTS CITY PERMIT REVIEW - BUILDING BIDDING PROCESS BIDDING PROCESS / AWARD - FOOD SERVICES AMH - SCOPE AND AWARD BIDDING PROCESS / AWARD - FURNITURE

NOTICE TO PROCEED PRCO-80

NTP - SITE

0 05-24-13 A

PRCO-85

NTP - MASON, CONCRETE, STEEL, GENERAL

0 06-27-13 A

PRCO-90

NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION

0 07-10-13 A

PRCO-110

NTP - ROOFING, GLAZING

0 07-25-13 A

PRCO-95

NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING NTP - FOOD SERVICES

0 09-05-13 A

NTP - PAVING, KITCHEN EQUIP, FLOORING, DRYWALL, PAINTING

0 09-05-13 A

NTP - FOOD SERVICES

PRCO-105

NTP - SITE NTP - MASON, CONCRETE, STEEL, GENERAL NTP - HVAC, ELECTRICAL, PLUMBING, FIRE SUPPRESSION NTP - ROOFING, GLAZING

ISSUES / DELAYS

PRCO-115

BUILDING PERMIT - DELAY

10 07-08-13 A

07-19-13 A

BUILDING PERMIT - DELAY

SUB-125

LINTELS - A, B, C

10 07-08-13 A

07-19-13 A

LINTELS - A, B, C

SUB-150

BAR JOISTS - A

10 07-26-13 A

08-08-13 A

BAR JOISTS - A

SUB-155

BAR JOISTS - B

10 07-26-13 A

08-08-13 A

BAR JOISTS - B

SUB-160

BAR JOISTS - C

10 07-26-13 A

08-08-13 A

BAR JOISTS - C

SUB-100

STRUCTURAL STEEL - A

10 07-31-13 A

08-13-13 A

STEEL SUBMITTALS

11-21-13 13:04 MAX HAYES HS Sheet 1 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

STRUCTURAL STEEL - A

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-105

STRUCTURAL STEEL - B

10 08-06-13 A

08-19-13 A

STRUCTURAL STEEL - B

SUB-110

STRUCTURAL STEEL - C

10 08-06-13 A

08-19-13 A

STRUCTURAL STEEL - C

SUB-165

BAR JOISTS - D

10 08-06-13 A

08-19-13 A

BAR JOISTS - D

SUB-170

BAR JOISTS - E

10 08-06-13 A

08-19-13 A

BAR JOISTS - E

SUB-175

METAL STAIRS AND HANDRAIL

10 09-10-13 A

09-23-13 A

SUB-130

LINTELS - D AND E

10 10-08-13 A

10-21-13 A

SUB-115

STRUCTURAL STEEL - D

10 10-21-13 A

11-11-13 A

STRUCTURAL STEEL - D

SUB-120

STRUCTURAL STEEL - E

10 10-21-13 A

11-11-13 A

STRUCTURAL STEEL - E

APP-125

LINTELS - A, B, C

10 07-19-13 A

08-08-13 A

APP-150

BAR JOISTS - A

10 08-08-13 A

08-22-13 A

BAR JOISTS - A

APP-155

BAR JOISTS - B

10 08-08-13 A

08-22-13 A

BAR JOISTS - B

APP-160

BAR JOISTS - C

10 08-08-13 A

08-22-13 A

BAR JOISTS - C

APP-100

STRUCTURAL STEEL - A

10 08-13-13 A

08-21-13 A

STRUCTURAL STEEL - A

APP-105

STRUCTURAL STEEL - B

10 08-19-13 A

08-23-13 A

STRUCTURAL STEEL - B

APP-110

STRUCTURAL STEEL - C

10 08-19-13 A

08-23-13 A

STRUCTURAL STEEL - C

APP-165

BAR JOISTS - D

10 08-19-13 A

08-27-13 A

BAR JOISTS - D

APP-170

BAR JOISTS - E

10 08-19-13 A

08-27-13 A

BAR JOISTS - E

APP-175

METAL STAIRS AND HANDRAIL

10 09-23-13 A

10-28-13 A

METAL STAIRS AND HANDRAIL

APP-130

LINTELS - D AND E

10 10-21-13 A

10-25-13 A

LINTELS - D AND E

APP-115

STRUCTURAL STEEL - D

10 11-11-13 A

11-22-13

STRUCTURAL STEEL - D

APP-120

STRUCTURAL STEEL - E

10 11-11-13 A

11-22-13

STRUCTURAL STEEL - E

LEAD-125

LINTELS - A

10 08-08-13 A

08-12-13 A

LEAD-126

LINTELS - B

10 08-08-13 A

08-19-13 A

LEAD-127

LINTELS - C

10 08-08-13 A

09-26-13 A

LINTELS - C

LEAD-100

STRUCTURAL STEEL - A

25 08-21-13 A

09-30-13 A

STRUCTURAL STEEL - A

LEAD-150

BAR JOISTS - A

25 08-22-13 A

10-02-13 A

BAR JOISTS - A

LEAD-155

BAR JOISTS - B

25 08-22-13 A

10-01-13 A

BAR JOISTS - B

LEAD-160

BAR JOISTS - C

25 08-22-13 A

10-03-13 A

BAR JOISTS - C

LEAD-105

STRUCTURAL STEEL - B

19 08-23-13 A

08-28-13 A

LEAD-110

STRUCTURAL STEEL - C

19 08-23-13 A

09-26-13 A

LEAD-128

LINTELS - D

10 10-25-13 A

11-19-13

LINTELS - D

LEAD-129

LINTELS - E

10 10-25-13 A

11-19-13

LINTELS - E

METAL STAIRS AND HANDRAIL LINTELS - D AND E

APPROVALS

LINTELS - A, B, C

LEAD TIMES

11-21-13 13:04 MAX HAYES HS Sheet 2 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

LINTELS - A LINTELS - B

STRUCTURAL STEEL - B STRUCTURAL STEEL - C

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

LEAD-175

METAL STAIRS AND HANDRAIL - A / B

15 10-28-13 A

11-05-13 A

LEAD-165

BAR JOISTS - D

30 11-19-13

01-02-14

BAR JOISTS - D

LEAD-170

BAR JOISTS - E

30 11-19-13

01-02-14

BAR JOISTS - E

LEAD-115

STRUCTURAL STEEL - D

20 11-25-13

12-23-13

STRUCTURAL STEEL - D

LEAD-120

STRUCTURAL STEEL - E

20 11-25-13

12-23-13

STRUCTURAL STEEL - E

METAL STAIRS AND HANDRAIL - A / B

ROUGH CARPENTRY SUBMITTALS

SUB-405

H.M. FRAMES

10 08-01-13 A

08-14-13 A

H.M. FRAMES

SUB-410

WOOD DOORS

10 08-01-13 A

08-14-13 A

WOOD DOORS

SUB-420

FRP DOORS

10 08-26-13 A

09-11-13 A

SUB-415

HARDWARE

10 09-26-13 A

10-14-13 A

APP-405

H.M. FRAMES

10 08-14-13 A

09-05-13 A

H.M. FRAMES

APP-410

WOOD DOORS

10 08-14-13 A

09-05-13 A

WOOD DOORS

APP-420

FRP DOORS

10 09-12-13 A

10-07-13 A

APP-415

HARDWARE

10 10-14-13 A

11-18-13 A

LEAD-405

H.M. FRAMES

20 09-05-13 A

10-03-13 A

LEAD-410

WOOD DOORS

40 09-06-13 A

11-19-13

WOOD DOORS

LEAD-420

FRP DOORS

10 10-07-13 A

11-19-13

FRP DOORS

LEAD-415

HARDWARE

40 11-18-13 A

01-15-14

SUB-260

HOT WATER RADIATOR

10 07-15-13 A

07-26-13 A

HOT WATER RADIATOR

SUB-300

RADIANT HEATER

10 07-15-13 A

07-26-13 A

RADIANT HEATER

SUB-220

GRILLES AND DIFFUSERS

10 07-16-13 A

07-29-13 A

GRILLES AND DIFFUSERS

SUB-265

AIR CURTAIN (HAC)

10 07-16-13 A

07-29-13 A

AIR CURTAIN (HAC)

SUB-280

LOUVERS

10 07-16-13 A

07-29-13 A

LOUVERS

SUB-230

GRAVITY VENTILATOR

10 07-23-13 A

08-05-13 A

GRAVITY VENTILATOR

SUB-295

EXHAUST FAN

10 07-23-13 A

08-05-13 A

EXHAUST FAN

SUB-310

SUPPLY FAN

10 07-23-13 A

08-05-13 A

SUPPLY FAN

SUB-320

AIR HANDLING UNIT

10 07-23-13 A

08-05-13 A

AIR HANDLING UNIT

FRP DOORS HARDWARE

APPROVALS

FRP DOORS HARDWARE

LEAD TIMES

H.M. FRAMES

HARDWARE

HVAC SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 3 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-275

FAN POWERED VAV BOXES

10 07-24-13 A

08-06-13 A

FAN POWERED VAV BOXES

SUB-225

MECHANICAL PUMPS

10 07-25-13 A

08-07-13 A

MECHANICAL PUMPS

SUB-245

HOT WATER BOILERS

10 07-25-13 A

08-07-13 A

HOT WATER BOILERS

SUB-250

HOT WATER UNIT HEATER

10 07-25-13 A

08-07-13 A

HOT WATER UNIT HEATER

SUB-235

VAV BOXES

10 07-29-13 A

08-09-13 A

VAV BOXES

SUB-270

ROOFTOP UNIT HEATING AND VENTILLATION

10 07-29-13 A

08-09-13 A

ROOFTOP UNIT HEATING AND VENTILLATION

SUB-305

MAKE-UP AIR UNIT

10 07-29-13 A

08-09-13 A

MAKE-UP AIR UNIT

SUB-240

AIR CONDITIONING UNIT

10 08-02-13 A

08-16-13 A

AIR CONDITIONING UNIT

SUB-255

CABINET UNIT HEATER

10 08-02-13 A

08-16-13 A

CABINET UNIT HEATER

SUB-285

CHILLER

10 08-05-13 A

11-18-13 A

SUB-290

AIR COOLED CONDENSING UNIT

10 08-05-13 A

08-16-13 A

AIR COOLED CONDENSING UNIT

SUB-315

FAN COIL UNIT

10 08-05-13 A

08-16-13 A

FAN COIL UNIT

SUB-325

CONTROL THERMOSTATS

10 10-31-13 A

11-18-13 A

CONTROL THERMOSTATS

SUB-330

CONTROL VALVES

10 10-31-13 A

11-18-13 A

CONTROL VALVES

APP-260

HOT WATER RADIATOR

10 07-26-13 A

08-12-13 A

HOT WATER RADIATOR

APP-300

RADIANT HEATER

10 07-26-13 A

08-15-13 A

RADIANT HEATER

APP-220

GRILLES AND DIFFUSERS

10 07-29-13 A

08-06-13 A

GRILLES AND DIFFUSERS

APP-265

AIR CURTAIN (HAC)

10 07-29-13 A

08-05-13 A

AIR CURTAIN (HAC)

APP-280

LOUVERS

10 07-29-13 A

08-06-13 A

LOUVERS

APP-230

GRAVITY VENTILATOR

10 08-05-13 A

08-15-13 A

GRAVITY VENTILATOR

APP-295

EXHAUST FAN

10 08-05-13 A

08-12-13 A

EXHAUST FAN

APP-310

SUPPLY FAN

10 08-05-13 A

11-19-13

APP-320

AIR HANDLING UNIT

10 08-05-13 A

08-19-13 A

APP-275

FAN POWERED VAV BOXES

10 08-06-13 A

09-10-13 A

APP-225

MECHANICAL PUMPS

10 08-07-13 A

08-23-13 A

MECHANICAL PUMPS

APP-245

HOT WATER BOILERS

10 08-07-13 A

08-23-13 A

HOT WATER BOILERS

APP-250

HOT WATER UNIT HEATER

10 08-08-13 A

08-12-13 A

HOT WATER UNIT HEATER

APP-235

VAV BOXES

10 08-09-13 A

08-22-13 A

APP-305

MAKE-UP AIR UNIT

10 08-09-13 A

09-20-13 A

APP-270

ROOFTOP UNIT HEATING AND VENTILLATION

10 08-12-13 A

08-29-13 A

ROOFTOP UNIT HEATING AND VENTILLATION

APP-240

AIR CONDITIONING UNIT

10 08-16-13 A

08-28-13 A

AIR CONDITIONING UNIT

APP-255

CABINET UNIT HEATER

10 08-16-13 A

08-29-13 A

CABINET UNIT HEATER

APP-290

AIR COOLED CONDENSING UNIT

10 08-16-13 A

08-26-13 A

AIR COOLED CONDENSING UNIT

APP-315

FAN COIL UNIT

10 08-16-13 A

08-29-13 A

CHILLER

APPROVALS

11-21-13 13:05 MAX HAYES HS Sheet 4 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SUPPLY FAN AIR HANDLING UNIT FAN POWERED VAV BOXES

VAV BOXES MAKE-UP AIR UNIT

FAN COIL UNIT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APP-285

CHILLER

10 11-19-13

12-03-13

CHILLER

APP-325

CONTROL THERMOSTATS

10 11-19-13

12-03-13

CONTROL THERMOSTATS

APP-330

CONTROL VALVES

10 11-19-13

12-03-13

CONTROL VALVES

LEAD-265

AIR CURTAIN (HAC)

25 08-05-13 A

11-19-13

AIR CURTAIN (HAC)

LEAD-220

GRILLES AND DIFFUSERS

15 08-06-13 A

11-19-13

GRILLES AND DIFFUSERS

LEAD-280

LOUVERS

25 08-06-13 A

11-19-13

LOUVERS

LEAD-250

HOT WATER UNIT HEATER

25 08-12-13 A

11-19-13

HOT WATER UNIT HEATER

LEAD-260

HOT WATER RADIATOR

25 08-12-13 A

11-19-13

HOT WATER RADIATOR

LEAD-295

EXHAUST FAN

25 08-12-13 A

11-19-13

EXHAUST FAN

LEAD-230

GRAVITY VENTILATOR

15 08-15-13 A

11-19-13

GRAVITY VENTILATOR

LEAD-300

RADIANT HEATER

25 08-15-13 A

11-19-13

RADIANT HEATER

LEAD-320

AIR HANDLING UNIT

60 08-19-13 A

11-19-13

AIR HANDLING UNIT

LEAD-235

VAV BOXES

30 08-22-13 A

11-19-13

VAV BOXES

LEAD-225

MECHANICAL PUMPS

65 08-23-13 A

11-22-13

MECHANICAL PUMPS

LEAD-245

HOT WATER BOILERS

50 08-23-13 A

11-19-13

HOT WATER BOILERS

LEAD-290

AIR COOLED CONDENSING UNIT

40 08-26-13 A

11-19-13

AIR COOLED CONDENSING UNIT

LEAD-240

AIR CONDITIONING UNIT

60 08-28-13 A

11-20-13

AIR CONDITIONING UNIT

LEAD-255

CABINET UNIT HEATERS

25 08-29-13 A

11-19-13

CABINET UNIT HEATERS

LEAD-270

ROOFTOP UNIT HEATING AND VENTILLATION

60 08-29-13 A

11-21-13

ROOFTOP UNIT HEATING AND VENTILLATION

LEAD-315

FAN COIL UNIT

25 08-29-13 A

11-19-13

FAN COIL UNIT

LEAD-275

FAN POWERED VAV BOXES

25 09-10-13 A

11-19-13

FAN POWERED VAV BOXES

LEAD-305

MAKE-UP AIR UNIT

50 09-23-13 A

12-02-13

LEAD-310

SUPPLY FAN

25 11-20-13

12-26-13

LEAD-285

CHILLER

50 12-04-13

02-13-14

CHILLER

LEAD-325

CONTROL THERMOSTATS

15 12-04-13

12-24-13

CONTROL THERMOSTATS

LEAD-330

CONTROL VALVES

15 12-04-13

12-24-13

CONTROL VALVES

SUB-370

CABLE TRAY

10 08-02-13 A

08-16-13 A

CABLE TRAY

SUB-375

LIGHT FIXTURES

10 08-06-13 A

08-20-13 A

LIGHT FIXTURES

SUB-365

POWER DISTRIBUTION

10 09-09-13 A

09-20-13 A

SUB-360

FIRE ALARM DEVICES

10 10-08-13 A

10-21-13 A

SUB-380

IT DEVICES

10 11-19-13

12-03-13

LEAD TIMES

MAKE-UP AIR UNIT SUPPLY FAN

ELECTRICAL SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 5 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

POWER DISTRIBUTION FIRE ALARM DEVICES IT DEVICES

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APPROVALS

APP-370

CABLE TRAY

10 08-16-13 A

09-20-13 A

APP-375

LIGHT FIXTURES - EXTERIOR

10 08-20-13 A

09-06-13 A

APP-376

LIGHT FIXTURES - INTERIOR

10 08-20-13 A

10-03-13 A

APP-365

POWER DISTRIBUTION

10 09-20-13 A

11-19-13

POWER DISTRIBUTION

APP-360

FIRE ALARM DEVICES

10 10-21-13 A

11-19-13

FIRE ALARM DEVICES

APP-380

IT DEVICES

10 12-04-13

12-17-13

IT DEVICES

CABLE TRAY

LEAD-370

CABLE TRAY

30 09-23-13 A

11-19-13

LEAD-375

LIGHT FIXTURES

50 10-03-13 A

12-12-13

LEAD-360

FIRE ALARM DEVICES

40 11-20-13

01-17-14

LEAD-365

POWER DISTRIBUTION

60 11-20-13

02-14-14

POWER DISTRIBUTION

LEAD-380

IT DEVICES

40 12-18-13

02-13-14

IT DEVICES

LIGHT FIXTURES - EXTERIOR LIGHT FIXTURES - INTERIOR

LEAD TIMES

CABLE TRAY LIGHT FIXTURES FIRE ALARM DEVICES

FIRE PROTECTION SUBMITTALS

SUB-335

FIRE VALVE CABINET

10 11-04-13 A

11-15-13 A

FIRE VALVE CABINET

SUB-340

FIRE SPRINKLER PUMP

10 11-04-13 A

11-15-13 A

FIRE SPRINKLER PUMP

SUB-345

FIRE SPRINKLER JOCKEY PUMP

10 11-04-13 A

11-15-13 A

FIRE SPRINKLER JOCKEY PUMP

SUB-350

SIAMESE FIRE DEPARTMENT CONNECTION

10 11-04-13 A

11-19-13

APP-335

FIRE VALVE CABINET

10 11-15-13 A

11-29-13

FIRE VALVE CABINET

APP-340

FIRE SPRINKLER PUMP

10 11-15-13 A

11-29-13

FIRE SPRINKLER PUMP

APP-345

FIRE SPRINKLER JOCKEY PUMP

10 11-15-13 A

11-29-13

FIRE SPRINKLER JOCKEY PUMP

APP-350

SIAMESE FIRE DEPARTMENT CONNECTION

10 11-20-13

12-04-13

LEAD-335

FIRE VALVE CABINET

20 12-02-13

12-30-13

LEAD-340

FIRE SPRINKLER PUMP

40 12-02-13

01-28-14

FIRE SPRINKLER PUMP

LEAD-345

FIRE SPRINKLER JOCKEY PUMP

40 12-02-13

01-28-14

FIRE SPRINKLER JOCKEY PUMP

LEAD-350

SIAMESE FIRE DEPARTMENT CONNECTION

20 12-05-13

01-03-14

SIAMESE FIRE DEPARTMENT CONNECTION

APPROVALS

SIAMESE FIRE DEPARTMENT CONNECTION

LEAD TIMES

FIRE VALVE CABINET

SIAMESE FIRE DEPARTMENT CONNECTION

CARPENTRY SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 6 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-355

ELEVATOR

10 07-19-13 A

08-01-13 A

ELEVATOR

SUB-510

FIRE EXTINGUISHER AND CABINETS

10 07-22-13 A

08-02-13 A

FIRE EXTINGUISHER AND CABINETS

SUB-525

TELESCOPING STANDS

10 09-11-13 A

09-25-13 A

SUB-440

WOOD GYM FLOOR

10 09-17-13 A

09-30-13 A

SUB-475

SCOREKEEPING SYSTEM

10 10-09-13 A

10-22-13 A

SUB-215

LAB FUME HOOD

10 11-19-13

12-03-13

LAB FUME HOOD

SUB-425

OVERHEAD COILING DOORS

10 11-19-13

12-03-13

OVERHEAD COILING DOORS

SUB-445

VOLLEYBALL POST AND NET

10 11-19-13

12-03-13

VOLLEYBALL POST AND NET

SUB-450

WINDOW ROLLER SHADES

10 11-19-13

12-03-13

WINDOW ROLLER SHADES

SUB-455

GYM DIVIDERS

10 11-19-13

12-03-13

GYM DIVIDERS

SUB-460

WIRE MESH PARTITIONS

10 11-19-13

12-03-13

WIRE MESH PARTITIONS

SUB-465

ART KILN

10 11-19-13

12-03-13

ART KILN

SUB-470

PROJECTION SCREENS

10 11-19-13

12-03-13

PROJECTION SCREENS

SUB-485

METAL LOCKERS

10 11-19-13

12-03-13

METAL LOCKERS

SUB-495

METAL STORAGE SHELVING

10 11-19-13

12-03-13

METAL STORAGE SHELVING

SUB-500

TOILET AND SHOWER COMPARTMENTS

10 11-19-13

12-03-13

TOILET AND SHOWER COMPARTMENTS

SUB-505

SIGNAGE

10 11-19-13

12-03-13

SIGNAGE

SUB-515

LAB CASEWORK

10 11-19-13

12-03-13

LAB CASEWORK

SUB-520

P-LAM CASEWORK

10 11-19-13

12-03-13

P-LAM CASEWORK

SUB-490

SITE FURNISHINGS

10 01-17-14

01-30-14

APP-355

ELEVATOR

10 08-01-13 A

08-23-13 A

ELEVATOR

APP-510

FIRE EXTINGUISHER AND CABINETS

10 08-02-13 A

08-22-13 A

FIRE EXTINGUISHER AND CABINETS

APP-525

TELESCOPING STANDS

10 09-25-13 A

11-08-13 A

TELESCOPING STANDS

APP-440

WOOD GYM FLOOR

10 09-30-13 A

11-08-13 A

WOOD GYM FLOOR

APP-475

SCOREKEEPING SYSTEM

10 10-22-13 A

11-19-13

SCOREKEEPING SYSTEM

APP-215

LAB FUME HOOD

10 12-04-13

12-17-13

LAB FUME HOOD

APP-425

OVERHEAD COILING DOORS

10 12-04-13

12-17-13

OVERHEAD COILING DOORS

APP-445

VOLLEYBALL POST AND NET

10 12-04-13

12-17-13

VOLLEYBALL POST AND NET

APP-450

WINDOW ROLLER SHADES

10 12-04-13

12-17-13

WINDOW ROLLER SHADES

APP-455

GYM DIVIDERS

10 12-04-13

12-17-13

GYM DIVIDERS

APP-460

WIRE MESH PARTITIONS

10 12-04-13

12-17-13

WIRE MESH PARTITIONS

APP-465

ART KILN

10 12-04-13

12-17-13

ART KILN

APP-470

PROJECTION SCREENS

10 12-04-13

12-17-13

PROJECTION SCREENS

TELESCOPING STANDS WOOD GYM FLOOR SCOREKEEPING SYSTEM

SITE FURNISHINGS

APPROVALS

11-21-13 13:05 MAX HAYES HS Sheet 7 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APP-485

METAL LOCKERS

10 12-04-13

12-17-13

METAL LOCKERS

APP-495

METAL STORAGE SHELVING

10 12-04-13

12-17-13

METAL STORAGE SHELVING

APP-500

TOILET AND SHOWER COMPARTMENTS

10 12-04-13

12-17-13

TOILET AND SHOWER COMPARTMENTS

APP-505

SIGNAGE

10 12-04-13

12-17-13

SIGNAGE

APP-515

LAB CASEWORK

10 12-04-13

12-17-13

LAB CASEWORK

APP-520

P-LAM CASEWORK

10 12-04-13

12-17-13

P-LAM CASEWORK

APP-490

SITE FURNISHINGS

10 01-31-14

02-13-14

LEAD-510

FIRE EXTINGUISHER AND CABINETS

20 08-22-13 A

11-19-13

FIRE EXTINGUISHER AND CABINETS

LEAD-355

ELEVATOR

50 08-26-13 A

11-19-13

ELEVATOR

LEAD-440

WOOD GYM FLOOR

20 11-08-13 A

12-06-13

LEAD-525

TELESCOPING STANDS

40 11-08-13 A

01-07-14

LEAD-475

SCOREKEEPING SYSTEM

20 11-20-13

12-18-13

LEAD-215

LAB FUME HOOD

50 12-18-13

02-27-14

LEAD-425

OVERHEAD COILING DOORS

30 12-18-13

01-30-14

LEAD-445

VOLLEYBALL POST AND NET

20 12-18-13

01-16-14

VOLLEYBALL POST AND NET

LEAD-450

WINDOW ROLLER SHADES

20 12-18-13

01-16-14

WINDOW ROLLER SHADES

LEAD-455

GYM DIVIDERS

40 12-18-13

02-13-14

GYM DIVIDERS

LEAD-460

WIRE MESH PARTITIONS

20 12-18-13

01-16-14

WIRE MESH PARTITIONS

LEAD-465

ART KILN

10 12-18-13

01-02-14

LEAD-470

PROJECTION SCREENS

20 12-18-13

01-16-14

LEAD-485

METAL LOCKERS

30 12-18-13

01-30-14

LEAD-495

METAL STORAGE SHELVING

20 12-18-13

01-16-14

LEAD-500

TOILET AND SHOWER COMPARTMENTS

30 12-18-13

01-30-14

TOILET AND SHOWER COMPARTMENTS

LEAD-505

SIGNAGE

30 12-18-13

01-30-14

SIGNAGE

LEAD-515

LAB CASEWORK

40 12-18-13

02-13-14

LAB CASEWORK

LEAD-520

P-LAM CASEWORK

40 12-18-13

02-13-14

P-LAM CASEWORK

LEAD-490

SITE FURNISHINGS

20 02-14-14

03-13-14

SUB-190

DOMESTIC WATER HEATER

10 07-10-13 A

07-24-13 A

SUB-200

PLUMBING PUMPS

10 07-29-13 A

08-09-13 A

SUB-180

PLUMBING FIXTURES

10 08-06-13 A

08-19-13 A

PLUMBING FIXTURES

SUB-195

STORAGE TANK

10 08-07-13 A

08-20-13 A

STORAGE TANK

SITE FURNISHINGS

LEAD TIMES

WOOD GYM FLOOR TELESCOPING STANDS SCOREKEEPING SYSTEM LAB FUME HOOD OVERHEAD COILING DOORS

ART KILN PROJECTION SCREENS METAL LOCKERS METAL STORAGE SHELVING

SITE FURNISHINGS

PLUMBING SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 8 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

DOMESTIC WATER HEATER PLUMBING PUMPS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SUB-185

AIR COMPRESSOR (AC)

10 08-14-13 A

08-27-13 A

AIR COMPRESSOR (AC)

SUB-205

GAS REGULATOR

10 09-18-13 A

10-01-13 A

GAS REGULATOR

APP-190

DOMESTIC WATER HEATER

10 07-24-13 A

08-19-13 A

DOMESTIC WATER HEATER

APP-200

PLUMBING PUMPS

10 08-09-13 A

08-19-13 A

PLUMBING PUMPS

APP-180

PLUMBING FIXTURES

10 08-19-13 A

08-28-13 A

PLUMBING FIXTURES

APP-195

STORAGE TANK

10 08-21-13 A

08-27-13 A

STORAGE TANK

APP-185

AIR COMPRESSOR (AC)

10 08-27-13 A

10-09-13 A

APP-205

GAS REGULATOR

10 10-01-13 A

10-03-13 A

LEAD-190

DOMESTIC WATER HEATER

10 08-19-13 A

11-19-13

DOMESTIC WATER HEATER

LEAD-200

PLUMBING PUMPS

20 08-19-13 A

11-19-13

PLUMBING PUMPS

LEAD-195

STORAGE TANK

10 08-27-13 A

11-19-13

STORAGE TANK

LEAD-180

PLUMBING FIXTURES

20 08-28-13 A

11-19-13

PLUMBING FIXTURES

LEAD-205

GAS REGULATOR

10 10-03-13 A

11-19-13

GAS REGULATOR

LEAD-185

AIR COMPRESSOR (AC)

20 10-09-13 A

11-19-13

AIR COMPRESSOR (AC)

SUB-545

FRX PLYWOOD SHEATHING

10 09-03-13 A

09-11-13 A

SUB-550

COLD FORM FRAMING ENGINEERING

10 09-30-13 A

10-11-13 A

SUB-535

ACT

10 11-19-13

12-02-13

ACT

SUB-540

SOUND ABSORBING PANELS

10 11-19-13

12-02-13

SOUND ABSORBING PANELS

APP-545

FRX PLYWOOD SHEATHING

10 09-11-13 A

10-01-13 A

APP-550

COLD FORM FRAMING ENGINEERING

10 10-11-13 A

11-19-13

APP-535

ACT

10 12-03-13

12-16-13

ACT

APP-540

SOUND ABSORBING PANELS

10 12-03-13

12-16-13

SOUND ABSORBING PANELS

APPROVALS

AIR COMPRESSOR (AC) GAS REGULATOR

LEAD TIMES

DRYWALL SUBMITTALS

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING

APPROVALS

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING

LEAD TIMES

LEAD-545

FRX PLYWOOD SHEATHING

LEAD-550

COLD FORM FRAMING ENGINEERING

15 11-20-13

12-10-13

LEAD-535

ACT

15 12-17-13

01-06-14

11-21-13 13:05 MAX HAYES HS Sheet 9 of 26

6 10-01-13 A

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

11-11-13 A

FRX PLYWOOD SHEATHING COLD FORM FRAMING ENGINEERING ACT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID LEAD-540

Activity Name

Original Start Duration

Finish

2013

2014

SOUND ABSORBING PANELS

25 12-17-13

01-20-14

SOUND ABSORBING PANELS

SUB-395

PRE-CAST PLANKS

10 07-11-13 A

07-24-13 A

SUB-385

FACE BRICK

10 07-17-13 A

07-30-13 A

SUB-390

PRE-CAST STONE

10 08-07-13 A

08-20-13 A

APP-395

PRE-CAST PLANKS

10 07-24-13 A

08-01-13 A

PRE-CAST PLANKS

APP-385

FACE BRICK

10 07-30-13 A

08-21-13 A

FACE BRICK

APP-390

PRE-CAST STONE

10 08-20-13 A

09-12-13 A

LEAD-395

PRE-CAST PLANKS

15 08-01-13 A

10-17-13 A

LEAD-385

FACE BRICK

20 08-21-13 A

11-19-13

FACE BRICK

LEAD-390

PRE-CAST STONE

40 09-12-13 A

11-19-13

PRE-CAST STONE

SUB-436

ROOF COPING

10 08-27-13 A

09-09-13 A

SUB-400

ROOF HATCH

10 09-09-13 A

09-20-13 A

ROOF HATCH

APP-436

ROOF COPING

10 09-09-13 A

09-23-13 A

ROOF COPING

APP-400

ROOF HATCH

10 09-20-13 A

09-27-13 A

ROOF HATCH

LEAD-436

ROOF COPING

30 09-23-13 A

11-19-13

ROOF COPING

LEAD-400

ROOF HATCH

10 09-27-13 A

11-19-13

ROOF HATCH

SUB-435

SKY LIGHTS

10 09-16-13 A

09-20-13 A

SKY LIGHTS

SUB-530

WINDOWS

10 09-16-13 A

09-24-13 A

WINDOWS

SUB-430

ALUMINUM FRAMED STOREFRONT

10 10-03-13 A

10-16-13 A

MASON SUBMITTALS

PRE-CAST PLANKS FACE BRICK PRE-CAST STONE

APPROVALS

PRE-CAST STONE

LEAD TIMES

PRE-CAST PLANKS

ROOF SUBMITTALS

ROOF COPING

APPROVALS

LEAD TIMES

GLASS SUBMITTALS

11-21-13 13:05 MAX HAYES HS Sheet 10 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

ALUMINUM FRAMED STOREFRONT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

APPROVALS

APP-435

SKY LIGHTS

10 09-20-13 A

10-22-13 A

APP-530

WINDOWS

10 09-24-13 A

10-10-13 A

APP-430

ALUMINUM FRAMED STOREFRONT

10 10-16-13 A

10-25-13 A

SKY LIGHTS

LEAD-530

WINDOWS

50 10-10-13 A

12-19-13

LEAD-435

SKY LIGHTS

30 10-22-13 A

12-03-13

LEAD-430

ALUMINUM FRAMED STOREFRONT

10 10-25-13 A

11-19-13

SUB-565

CARPET

10 11-18-13 A

11-29-13

CARPET

SUB-555

CERAMIC TILE

10 11-18-13 A

11-29-13

CERAMIC TILE

SUB-560

SHEET VINYL

10 11-18-13 A

11-29-13

SHEET VINYL

SUB-570

RUBBER FLOORING

10 11-18-13 A

11-29-13

RUBBER FLOORING

SUB-575

VCT

10 11-18-13 A

11-29-13

VCT

SUB-580

RUBBER BASE

10 11-18-13 A

11-29-13

RUBBER BASE

APP-555

CERAMIC TILE

10 12-02-13

12-13-13

CERAMIC TILE

APP-560

SHEET VINYL

10 12-02-13

12-13-13

SHEET VINYL

APP-565

CARPET

10 12-02-13

12-13-13

CARPET

APP-570

RUBBER FLOORING

10 12-02-13

12-13-13

RUBBER FLOORING

APP-575

VCT

10 12-02-13

12-13-13

VCT

APP-580

RUBBER BASE

10 12-02-13

12-13-13

RUBBER BASE

LEAD-555

CERAMIC TILE

30 12-16-13

01-24-14

CERAMIC TILE

LEAD-560

SHEET VINYL

30 12-16-13

01-24-14

SHEET VINYL

LEAD-565

CARPET

30 12-16-13

01-24-14

CARPET

LEAD-570

RUBBER FLOORING

30 12-16-13

01-24-14

RUBBER FLOORING

LEAD-575

VCT

30 12-16-13

01-24-14

VCT

LEAD-580

RUBBER BASE

30 12-16-13

01-24-14

RUBBER BASE

WINDOWS ALUMINUM FRAMED STOREFRONT

LEAD TIMES

WINDOWS SKY LIGHTS ALUMINUM FRAMED STOREFRONT

FLOORING SUBMITTALS

APPROVALS

LEAD TIMES

F, F & E - TBD

11-21-13 13:05 MAX HAYES HS Sheet 11 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SUBMITTALS

SUB-480

FF&E

10 11-19-13

12-03-13

FF&E

10 12-04-13

12-17-13

FF&E

10 12-18-13

01-02-14

KITCHEN EQUIPMENT

10 09-19-13 A

10-14-13 A

KITCHEN EQUIPMENT

10 10-14-13 A

11-14-13 A

KITCHEN EQUIPMENT

80 11-14-13 A

03-10-14

FF&E

APPROVALS

APP-480

FF&E

LEAD TIMES

LEAD-480

FF&E

KITCHEN EQUIPMENT SUBMITTALS

SUB-210

KITCHEN EQUIPMENT

APPROVALS

APP-210

KITCHEN EQUIPMENT

LEAD TIMES

LEAD-210

KITCHEN EQUIPMENT

CONSTRUCTION GENERAL MILESTONES

MILE-1030

PERMANENT WATER

0

01-15-14*

MILE-1020

PERMANENT ELECTRICAL

0

04-01-14*

MILE-1010

CASEWORK AVAILABLE - A / B / C

0

05-01-14*

CASEWORK AVAILABLE - A / B / C

MILE-1040

CONDITIONED AIR - A, B, C

0

05-01-14*

CONDITIONED AIR - A, B, C

0

12-17-13*

0

01-13-14*

*05/01/14*

PERMANENT WATER PERMANENT ELECTRICAL *05/01/14*

TEMPORARY ENCLOSURE MILESTONES MILE-1075

TEMPORARY ENCLOSURE - B GYM

*12/31/13*

MILE-1055

TEMPORARY ENCLOSURE - B REMAINING

MILE-1050

TEMPORARY ENCLOSURE - A

*12/31/13*

0

01-20-14*

TEMPORARY ENCLOSURE - A

MILE-1060

TEMPORARY ENCLOSURE - C

*12/31/13*

0

01-22-14*

TEMPORARY ENCLOSURE - C

MILE-1065

TARGET TEMPORARY ENCLOSURE - D

0

05-16-14*

MILE-1070

TARGET TEMPORARY ENCLOSURE - E

0

06-09-14*

0

07-30-14*

*12/31/13*

*09/18/14* *10/31/14*

TEMPORARY ENCLOSURE - B GYM

*12/31/13*

TEMPORARY ENCLOSURE - B REMAINING

*12/31/13*

*12/31/13* *12/31/13*

TARGET TEMPORARY ENCLOSURE - D

*09/18/14*

TARGET TEMPORARY ENCLOSURE - E

*10/31/14*

TARGET COMPLETION MILESTONES MILE-B400

11-21-13 13:05 MAX HAYES HS Sheet 12 of 26

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*06/18/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MILE-B200

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*

0

08-20-14*

MILE-A100

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*

0

08-25-14*

MILE-A200

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*

0

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2

MILE-B100

TARGET COMPLETION MILESTONE - BUILDING B - GYM *9/11/14*

0

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING B - GYM

MILE-B300

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*

0

09-23-14*

MILE-B500

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

0

12-17-14*

MILE-B600

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

0

12-24-14*

MILE-D200

TARGET COMPLETION MILESTONE - BUILDING D *06/24/15* REVISED *03/06/15*

0

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING D

MILE-E300

TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*

ORIGINAL

0

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING E

MILE-C100

TARGET COMPLETION MILESTONE - BUILDING C

*03/19/15*

0

03-05-15*

ORIGINAL

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1

15 06-10-13 A

06-28-13 A

SITE-15

CLEAR SITE & SITE SETUP

10 06-10-13 A

06-21-13 A

SITE-20

SITE DEMO

20 06-24-13 A

07-22-13 A

SITE-25

CONTRACTUAL SOIL REMEDIATION

30 06-24-13 A

07-31-13 A

SITE-115

CUT & FILL SITE TO GRADE

20 07-09-13 A

11-29-13

SITE-190

U/G SANITARY SEWERS

SITE-35

MOBILIZE - FENCING, SWPPP CLEAR SITE & SITE SETUP SITE DEMO CONTRACTUAL SOIL REMEDIATION CUT & FILL SITE TO GRADE

NON-GMP SOIL REMEDIATION

25 07-22-13 A

08-07-13 A

SHNC-95

TEMP. ROAD ON SITE

30 07-29-13 A

11-29-13

TEMP. ROAD ON SITE

SITE-110

U/G STORM SEWERS

30 08-16-13 A

11-29-13

U/G STORM SEWERS

SITE-155

U/G UTILITIES TO BUILDING

30 09-13-13 A

12-13-13

SITE-120

FINISH PAVING & STRIPING

20 10-20-14

11-14-14

U/G SANITARY SEWERS NON-GMP SOIL REMEDIATION

U/G UTILITIES TO BUILDING FINISH PAVING & STRIPING

BUILDING SITE

SITE-70

9 06-24-13 A

07-05-13 A

EXCAVATE / FILL A TO GRADE

EXCAVATE B TO GRADE

10 07-08-13 A

07-19-13 A

EXCAVATE B TO GRADE

SITE-80

EXCAVATE / FILL C TO GRADE

10 07-22-13 A

07-31-13 A

SITE-85

EXCAVATE / FILL D TO GRADE

10 08-02-13 A

08-16-13 A

EXCAVATE / FILL D TO GRADE

SITE-90

EXCAVATE / FILL E TO GRADE

10 08-02-13 A

08-16-13 A

EXCAVATE / FILL E TO GRADE

EXCAVATE / FILL C TO GRADE

SOUTH SITE

11-21-13 13:05 MAX HAYES HS Sheet 13 of 26

*10/20/14*

TARGET COMPLETION MILESTONE - BUILDING C

07-17-13 A

EXCAVATE / FILL A TO GRADE

*9/11/14*

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

2 07-16-13 A

SITE-75

*10/16/14*

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

GENERAL

MOBILIZE - FENCING, SWPPP

*09/15/14*

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS

SITE

SITE-10

*08/22/14*

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

ORIGINAL *06/24/15* ORIGINAL *07/01/15* *03/19/15*

REVIS

REVISE


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

SITE-30

EXCAVATE & STONE - PARKING LOT

24 06-24-13 A

11-15-13 A

SITE-130

CREATE DETENTION SYSTEM

15 08-05-13 A

10-25-13 A

SITE-175

COMPLETE CPP AND CEI ACCESS

SITE-41

EXCAVATE & STONE - PARKING LOT CREATE DETENTION SYSTEM

9 09-03-13 A

11-22-13

RELOCATE CPP

30 09-23-13 A

11-29-13

SITE-180

INSTALL CEI DUCTBANK

10 10-28-13 A

11-22-13

SITE-185

OBTAIN EASEMENT - CEI DUCTBANK

52 11-14-13 A

01-24-14

SITE-40

RELOCATE CEI

10 01-27-14

02-07-14

SITE-135

PAVING STONE AND ASPHALT BASE COURSE

15 08-15-14

09-08-14

SITE-140

LANDSCAPING

10 09-02-14*

09-15-14

LANDSCAPING

SITE-170

PERMIABLE PAVERS

10 09-02-14*

09-15-14

PERMIABLE PAVERS

COMPLETE CPP AND CEI ACCESS

SITE-50

NORTH RETAINING WALL

10 08-05-13 A

08-09-13 A

SITE-165

LANDSCAPING

10 09-02-14

09-15-14

SITE-160

PAVING STONE AND ASPHALT BASE COURSE

15 09-08-14*

09-29-14

SITE-150

INSTALL PERM. FENCING

10 01-06-15

01-19-15

SITE-60

INSTALL RETAINING WALL

20 08-26-13 A

08-30-13 A

SITE-166

LANDSCAPING

10 09-16-14

09-29-14

SITE-167

PAVING STONE AND ASPHALT BASE COURSE

15 09-29-14

10-17-14*

RELOCATE CPP INSTALL CEI DUCTBANK OBTAIN EASEMENT - CEI DUCTBANK RELOCATE CEI PAVING STONE AND ASPHALT BASE COURSE

NORTH SITE

NORTH RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE INSTALL PERM. FENCING

EAST SITE

INSTALL RETAINING WALL LANDSCAPING PAVING STONE AND ASPHALT BASE COURSE

WALWORTH SITE

SITE-101

DOMINION GAS ENGINEERING AND CAP EXISTING

30 08-12-13 A

09-12-13 A

SITE-100

LIGHT WT. FILL

10 09-23-13 A

10-04-13 A

LIGHT WT. FILL

SITE-105

DEMO ROADWAY

10 09-23-13 A

09-27-13 A

DEMO ROADWAY

SITE-116

TEMP CAP 16" WATER MAIN

3 09-25-13 A

09-27-13 A

TEMP CAP 16" WATER MAIN

SITE-111

CLEVELAND WATER DEPT. WORK

5 09-30-13 A

10-04-13 A

SITE-95

RELOCATE GAS LINE

10 10-30-13 A

11-05-13 A

DOMINION GAS ENGINEERING AND CAP EXISTING

LANDSCAPING

10 09-16-14

09-29-14

CLEVELAND WATER DEPT. WORK RELOCATE GAS LINE

WEST SITE

SITE-169

LANDSCAPING

BUILDING A SHELL AND CORE

SHCA-10

11-21-13 13:05 MAX HAYES HS Sheet 14 of 26

FOOTINGS

9 07-30-13 A

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

08-19-13 A

FOOTINGS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

SHCA-15

U/G MEP

5 08-12-13 A

08-22-13 A

U/G MEP

SHCA-20

FOUNDATION BLOCK

5 08-12-13 A

08-21-13 A

FOUNDATION BLOCK

SHCA-25

VAPOR SYSTEM & STONE

6 08-23-13 A

09-03-13 A

VAPOR SYSTEM & STONE

SHCA-30

POUR S.O.G.

3 09-04-13 A

09-06-13 A

POUR S.O.G.

SHCA-40

BLOCK TO 2ND FLR

15 09-09-13 A

10-01-13 A

SHCA-35

H.M. FRAMES - 1ST FLR

3 09-23-13 A

09-25-13 A

H.M. FRAMES - 1ST FLR

SHCA-95

STRUCTURAL STEEL

3 10-01-13 A

10-03-13 A

STRUCTURAL STEEL

SHCA-45

JOIST, DECK - 2ND FLR

5 10-03-13 A

10-15-13 A

JOIST, DECK - 2ND FLR

SHCA-100

POUR CONCRETE - 2ND FLR

2 10-16-13 A

10-18-13 A

POUR CONCRETE - 2ND FLR

SHCA-105

CURE CONCRETE - 2ND FLR

5 10-21-13 A

10-25-13 A

SHCA-50

H.M. FRAMES - 2ND FLR

3 10-28-13 A

11-19-13

H.M. FRAMES - 2ND FLR

SHCA-55

BLOCK TO ROOF

15 10-28-13 A

11-19-13

BLOCK TO ROOF

SHCA-60

JOIST & DECK - ROOF

10 11-15-13 A

12-02-13

SHCA-70

MASONRY VENEER REQUIRED FOR ENCLOSURE

15 11-20-13

12-11-13

MASONRY VENEER REQUIRED FOR ENCLOSURE

SHCA-110

ROOF BLOCKING

5 12-03-13

12-09-13

ROOF BLOCKING

SHCA-115

MEP CURBS & DRAINS

5 12-03-13

12-09-13

MEP CURBS & DRAINS

SHCA-75

ROOFING A

15 12-10-13

12-31-13

ROOFING A

SHCA-80

METAL PANELS

15 12-12-13

01-03-14

METAL PANELS

SHCA-120

MASONRY VENEER - REMAINING

15 12-12-13

01-01-14

MASONRY VENEER - REMAINING

SHCA-85

WINDOWS & CURTAIN WALL

20 12-20-13

01-20-14

SHCA-90

ROOFING TRIM

5 01-06-14

01-10-14

BLOCK TO 2ND FLR

CURE CONCRETE - 2ND FLR

JOIST & DECK - ROOF

WINDOWS & CURTAIN WALL ROOFING TRIM

INTERIOR BUILDOUT 1ST FLOOR INTA-112

OVERHEAD ELECTRICAL

40 10-21-13 A

12-16-13

OVERHEAD ELECTRICAL

INTA-113

OVERHEAD PLUMBING

40 10-21-13 A

12-16-13

OVERHEAD PLUMBING

INTA-110

OVERHEAD DUCTWORK

40 10-28-13 A

12-16-13

OVERHEAD DUCTWORK

INTA-114

OVERHEAD FIRE PROTECTION

10 11-19-13

12-03-13

INTA-115

INTERIOR FRAMING

20 12-17-13

01-15-14

INTA-111

OVERHEAD HVAC PIPING

40 12-26-13

02-20-14

INTA-120

ELECTRICAL IN WALL ROUGH-IN

20 01-16-14

02-12-14

ELECTRICAL IN WALL ROUGH-IN

INTA-121

PLUMBING IN WALL ROUGH-IN

20 01-16-14

02-12-14

PLUMBING IN WALL ROUGH-IN

INTA-125

HANG DRYWALL

10 02-13-14

02-26-14

INTA-126

TAPE AND FINISH

10 04-01-14*

04-14-14

INTA-200

ELEVATOR INSTALLATION

15 04-02-14

04-22-14

INTA-130

CERAMIC TILE

15 04-15-14

05-05-14

CERAMIC TILE

INTA-135

PRIME PAINT

15 04-15-14

05-05-14

PRIME PAINT

11-21-13 13:05 MAX HAYES HS Sheet 15 of 26

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

OVERHEAD FIRE PROTECTION INTERIOR FRAMING OVERHEAD HVAC PIPING

HANG DRYWALL TAPE AND FINISH ELEVATOR INSTALLATION

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTA-145

CLG GRID

15 04-29-14

05-19-14

CLG GRID

INTA-140

CASEWORK

15 05-02-14

05-22-14

CASEWORK

INTA-150

LIGHT FIXTURES

30 05-13-14

06-24-14

LIGHT FIXTURES

INTA-151

DIFFUSERS

30 05-13-14

06-24-14

DIFFUSERS

INTA-152

PLUMBING FINISHES

30 05-13-14

06-24-14

PLUMBING FINISHES

INTA-153

FIRE PROTECTION FINISHES

30 05-13-14

06-24-14

FIRE PROTECTION FINISHES

INTA-155

FINISH PAINT

30 05-28-14

07-09-14

INTA-160

SPECIALTY FLOORING

10 06-18-14

07-01-14

SPECIALTY FLOORING

INTA-165

DOORS & HARDWARE

15 06-18-14

07-09-14

DOORS & HARDWARE

INTA-170

CLG TILE

15 06-25-14

07-16-14

INTA-175

VCT & VINYL FLOORING

15 07-02-14

07-23-14

VCT & VINYL FLOORING

INTA-180

CARPET

10 07-10-14

07-23-14

CARPET

INTA-185

SPECIALTIES

10 07-24-14

08-06-14

INTA-190

PUNCHLIST

20 07-29-14

08-25-14

INTA-195

TESTING & INSPECTIONS

15 07-29-14

08-18-14

MILE-A105

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1 *09/15/14*

0

FINISH PAINT

CLG TILE

SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

08-25-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 1

2ND FLOOR INTA-210

OVERHEAD DUCTWORK

40 12-03-13

01-29-14

OVERHEAD DUCTWORK

INTA-211

OVERHEAD HVAC PIPING

40 12-03-13

01-29-14

OVERHEAD HVAC PIPING

INTA-212

OVERHEAD ELECTRICAL

40 12-03-13

01-29-14

OVERHEAD ELECTRICAL

INTA-213

OVERHEAD PLUMBING

40 12-03-13

01-29-14

OVERHEAD PLUMBING

INTA-214

OVERHEAD FIRE PROTECTION

40 12-03-13

01-29-14

OVERHEAD FIRE PROTECTION

INTA-215

INTERIOR FRAMING

20 01-30-14

02-26-14

INTA-220

ELECTRICAL IN WALL ROUGH-IN

20 02-27-14

03-26-14

ELECTRICAL IN WALL ROUGH-IN

INTA-221

PLUMBING IN WALL ROUGH-IN

20 02-27-14

03-26-14

PLUMBING IN WALL ROUGH-IN

INTA-225

HANG DRYWALL

10 03-27-14

04-09-14

INTA-226

TAPE AND FINISH

10 04-15-14*

04-28-14

INTA-230

CERAMIC TILE

15 04-29-14

05-19-14

CERAMIC TILE

INTA-235

PRIME PAINT

15 04-29-14

05-19-14

PRIME PAINT

INTA-245

CLG GRID

15 05-13-14

06-03-14

CLG GRID

INTA-240

CASEWORK

15 05-23-14

06-13-14

INTA-250

LIGHT FIXTURES

30 05-28-14

07-09-14

LIGHT FIXTURES

INTA-251

DIFFUSERS

30 05-28-14

07-09-14

DIFFUSERS

INTA-252

PLUMBING FINISHES

30 05-28-14

07-09-14

PLUMBING FINISHES

INTA-253

FIRE PROTECTION FINISHES

30 05-28-14

07-09-14

FIRE PROTECTION FINISHES

INTA-255

FINISH PAINT

30 06-11-14

07-23-14

11-21-13 13:05 MAX HAYES HS Sheet 16 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

INTERIOR FRAMING

HANG DRYWALL TAPE AND FINISH

CASEWORK

FINISH PAINT

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*09/15/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTA-260

SPECIALTY FLOORING

10 07-02-14

07-16-14

SPECIALTY FLOORING

INTA-265

DOORS & HARDWARE

15 07-02-14

07-23-14

DOORS & HARDWARE

INTA-270

CLG TILE

15 07-10-14

07-30-14

INTA-275

VCT & VINYL FLOORING

15 07-17-14

08-06-14

VCT & VINYL FLOORING

INTA-280

CARPET

10 07-24-14

08-06-14

CARPET

INTA-285

SPECIALTIES

10 08-07-14

08-20-14

INTA-290

PUNCHLIST

20 08-12-14

09-09-14

INTA-295

TESTING & INSPECTIONS

15 08-12-14

09-02-14

MILE-A205

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2 *10/16/14*

0

CLG TILE

SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

09-09-14*

TARGET COMPLETION MILESTONE - BUILDING A - FLOOR 2

BUILDING B - GYM SHELL AND CORE

SHCB-100

FOOTINGS - GYM & REMAINING

10 08-08-13 A

08-23-13 A

SHCB-105

BLOCK TO ROOF

20 08-14-13 A

09-16-13 A

SHCB-110

ROOF JOIST & DECK

7 10-17-13 A

11-22-13

SHCB-126

VAPOR SYSTEM & STONE

3 11-01-13 A

11-08-13 A

VAPOR SYSTEM & STONE

SHCB-120

U/G MEP

2 11-04-13 A

11-05-13 A

U/G MEP

SHCB-135

POUR S.O.G.

3 11-12-13 A

11-14-13 A

SHCB-115

MASONRY ACCESS OPENING

5 11-15-13 A

11-20-13

SHCB-155

ROOF BLOCKING

5 11-19-13

11-25-13

ROOF BLOCKING

SHCB-160

MEP CURBS & DRAINS

5 11-19-13

11-25-13

MEP CURBS & DRAINS

SHCB-130

ROOFING

15 11-26-13

12-17-13

SHCB-145

ROOFING TRIM

5 12-18-13

12-24-13

SHCB-140

BRICK VENEER

15 03-31-14*

04-18-14

SHCB-150

METAL PANELS

15 04-21-14

05-09-14

FOOTINGS - GYM & REMAINING BLOCK TO ROOF ROOF JOIST & DECK

POUR S.O.G. MASONRY ACCESS OPENING

ROOFING ROOFING TRIM BRICK VENEER METAL PANELS

INTERIOR BUILDOUT

INTB-100

OVERHEAD DUCTWORK

30 12-18-13

01-30-14

OVERHEAD DUCTWORK

INTB-110

OVERHEAD ELECTRICAL

30 12-18-13

01-30-14

OVERHEAD ELECTRICAL

INTB-115

OVERHEAD PLUMBING

30 12-18-13

01-30-14

OVERHEAD PLUMBING

INTB-120

OVERHEAD FIRE PROTECTION

30 12-18-13

01-30-14

OVERHEAD FIRE PROTECTION

INTB-105

OVERHEAD HVAC PIPING

30 12-26-13

02-06-14

INTB-125

ELECTRICAL ROUGH-INS

20 01-31-14

02-27-14

ELECTRICAL ROUGH-INS

INTB-130

PLUMBING ROUGH-INS

20 01-31-14

02-27-14

PLUMBING ROUGH-INS

INTB-135

PRIME PAINT

15 02-28-14

03-20-14

INTB-140

DIFFUSERS

15 03-21-14

04-10-14

11-21-13 13:05 MAX HAYES HS Sheet 17 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

OVERHEAD HVAC PIPING

PRIME PAINT DIFFUSERS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*10/16/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-145

PLUMBING FINISHES

15 03-21-14

04-10-14

PLUMBING FINISHES

INTB-150

FIRE PROTECTION FINISHES

15 03-21-14

04-10-14

FIRE PROTECTION FINISHES

INTB-155

LIGHT FIXTURES

15 03-21-14

04-10-14

LIGHT FIXTURES

INTB-160

FINISH PAINT

15 04-11-14

05-01-14

FINISH PAINT

INTB-170

ACOUSTIC PANELS

5 05-02-14

05-08-14

INTB-175

ATHLETIC EQUIPMENT

30 05-09-14

06-20-14

INTB-165

DOORS & HARDWARE

10 05-23-14

06-06-14

INTB-180

WOOD GYM FLOORING

30 06-23-14

08-04-14

INTB-195

BLEACHERS

5 08-05-14

08-11-14

INTB-185

PUNCHLIST

20 08-12-14

09-09-14

INTB-190

TESTING & INSPECTIONS

15 08-12-14

09-02-14

MILE-B105

TARGET COMPLETION MILESTONE - BUILDING B - GYM *09/11/14*

0

09-09-14*

5 08-19-13 A

08-23-13 A

10 08-26-13 A

09-09-13 A

5 09-03-13 A

09-25-13 A

10 09-03-13 A

09-12-13 A

ACOUSTIC PANELS ATHLETIC EQUIPMENT DOORS & HARDWARE WOOD GYM FLOORING BLEACHERS PUNCHLIST TESTING & INSPECTIONS TARGET COMPLETION MILESTONE - BUILDING B - GYM

BUILDING B - REMAINING SHELL AND CORE

SHCB-200

FOUNDATION BLOCK TO GRADE

SHCB-205

U/G MEP IN LOCKER ROOMS

SHCB-215

VAPOR SYSTEM & STONE IN LOCKER ROOMS

SHCB-210

U/G MEP IN KITCHEN

SHCB-220

VAPOR SYSTEM & STONE IN KITCHEN

5 09-03-13 A

09-20-13 A

VAPOR SYSTEM & STONE IN KITCHEN

SHCB-310

U/G MEP IN MECH ROOMS

5 09-13-13 A

09-24-13 A

U/G MEP IN MECH ROOMS

SHCB-225

POUR S.O.G. - KITCHEN / DINING ROOMS

3 09-23-13 A

09-25-13 A

POUR S.O.G. - KITCHEN / DINING ROOMS

SHCB-226

POUR S.O.G. - LOCKER ROOMS

3 09-25-13 A

09-27-13 A

POUR S.O.G. - LOCKER ROOMS

SHCB-315

VAPOR SYSTEM & STONE IN MECH ROOMS

3 09-26-13 A

09-30-13 A

VAPOR SYSTEM & STONE IN MECH ROOMS

SHCB-235

BLOCK TO ROOF - KITCHEN / DINING ROOMS

20 09-30-13 A

10-28-13 A

SHCB-320

POUR S.O.G - MECH ROOM

5 10-02-13 A

10-08-13 A

SHCB-230

H.M. FRAMES

20 10-03-13 A

10-28-13 A

SHCB-240

BLOCK TO MEZZANINE

8 10-07-13 A

10-16-13 A

BLOCK TO MEZZANINE

SHCB-245

MEZZANINE PRECAST

2 10-17-13 A

10-18-13 A

MEZZANINE PRECAST

SHCB-255

BLOCK TO ROOF - LOCKER / MEZZ

9 10-21-13 A

11-01-13 A

SHCB-325

STRUCTURAL STEEL - KITCHEN

2 10-25-13 A

10-25-13 A

SHCB-250

ROOF JOISTS & DECK - KITCHEN

15 10-25-13 A

11-01-13 A

ROOF JOISTS & DECK - KITCHEN

SHCB-260

ROOF JOISTS & DECK - DINING

8 10-30-13 A

11-13-13 A

ROOF JOISTS & DECK - DINING

SHCB-265

ROOF JOISTS & DECK - LOCKER / MEZZ

15 11-04-13 A

12-05-13

SHCB-305

STAIRS TO MEZZANINE

10 11-04-13 A

11-15-13 A

STAIRS TO MEZZANINE

SHCB-256

MEZZANINE TOPPING

5 11-07-13 A

11-15-13 A

MEZZANINE TOPPING

11-21-13 13:05 MAX HAYES HS Sheet 18 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

FOUNDATION BLOCK TO GRADE U/G MEP IN LOCKER ROOMS VAPOR SYSTEM & STONE IN LOCKER ROOMS U/G MEP IN KITCHEN

BLOCK TO ROOF - KITCHEN / DINING ROOMS POUR S.O.G - MECH ROOM H.M. FRAMES

BLOCK TO ROOF - LOCKER / MEZZ STRUCTURAL STEEL - KITCHEN

ROOF JOISTS & DECK - LOCKER / MEZZ

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*09/11/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

SHCB-330

ROOF BLOCKING - KITCHEN

5 11-11-13 A

11-15-13 A

ROOF BLOCKING - KITCHEN

SHCB-340

MEP CURBS & DRAINS - KITCHEN

5 11-11-13 A

11-15-13 A

MEP CURBS & DRAINS - KITCHEN

SHCB-345

ROOF BLOCKING - DINING

5 11-14-13 A

11-22-13

ROOF BLOCKING - DINING

SHCB-350

MEP CURBS & DRAINS - DINING

5 11-14-13 A

11-22-13

MEP CURBS & DRAINS - DINING

SHCB-270

ROOFING - KITCHEN

10 11-18-13 A

12-02-13

SHCB-365

MECHANICAL HOUSEKEEPING PADS

5 11-19-13

11-25-13

MECHANICAL HOUSEKEEPING PADS

SHCB-280

MASONRY VENEER REQUIRED FOR ENCLOSURE

5 11-20-13

11-26-13

MASONRY VENEER REQUIRED FOR ENCLOSURE

SHCB-257

LOAD MEP EQUIPMENT TO MEZZ

7 11-26-13

12-05-13

SHCB-275

ROOFING - DINING

15 12-02-13

12-20-13

SHCB-355

ROOF BLOCKING - LOCKER / MEZZ

5 12-06-13

12-12-13

ROOF BLOCKING - LOCKER / MEZZ

SHCB-360

MEP CURBS & DRAINS - LOCKER / MEZZ

5 12-06-13

12-12-13

MEP CURBS & DRAINS - LOCKER / MEZZ

SHCB-285

ROOFING - LOCKER / MEZZ

15 12-13-13

01-06-14

SHCB-295

WINDOWS & C.W.

15 12-20-13

01-13-14

WINDOWS & C.W.

SHCB-300

ROOFING TRIM

5 01-07-14

01-13-14

ROOFING TRIM

SHCB-335

MASONRY VENEER - REMAINING

5 03-31-14*

04-04-14

SHCB-290

METAL PANELS

ROOFING - KITCHEN

LOAD MEP EQUIPMENT TO MEZZ ROOFING - DINING

ROOFING - LOCKER / MEZZ

MASONRY VENEER - REMAINING

15 04-07-14

04-25-14

METAL PANELS

INTERIOR BUILDOUT MEZZANINE INTB-402

PLUMBING EQUIPMENT / PIPING

80 01-07-14

04-28-14

PLUMBING EQUIPMENT / PIPING

INTB-400

ELECTRICAL EQUIPMENT / PIPING

80 01-07-14

04-28-14

ELECTRICAL EQUIPMENT / PIPING

INTB-401

MECHANICAL EQUIPMENT / PIPING

80 01-07-14

04-28-14

MECHANICAL EQUIPMENT / PIPING

INTB-405

ELECTRICAL ROUGH-INS

35 01-07-14

02-24-14

ELECTRICAL ROUGH-INS

INTB-406

PLUMBING ROUGH-INS

35 01-07-14

02-24-14

PLUMBING ROUGH-INS

INTB-410

PRIME PAINT

5 04-29-14

05-05-14

INTB-415

LIGHT FIXTURES

10 05-06-14

05-19-14

LIGHT FIXTURES

INTB-420

DIFFUSERS

10 05-06-14

05-19-14

DIFFUSERS

INTB-425

FINISH PAINT

10 05-20-14

06-03-14

INTB-430

DOORS & HARDWARE

5 06-04-14

06-10-14

DOORS & HARDWARE

INTB-440

SPECIALTIES

20 06-11-14

07-09-14

SPECIALTIES

INTB-445

PUNCHLIST

20 07-02-14

07-30-14

INTB-450

TESTING & INSPECTIONS

15 07-02-14

07-23-14

MILE-B405

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE *06/18/14*

0

PRIME PAINT

FINISH PAINT

PUNCHLIST TESTING & INSPECTIONS

07-30-14*

TARGET COMPLETION MILESTONE - BUILDING B - MEZZANINE

LOCKER ROOMS INTB-300

OVERHEAD DUCTWORK

15 12-06-13

12-27-13

OVERHEAD DUCTWORK

INTB-301

OVERHEAD HVAC PIPING

15 12-06-13

12-27-13

OVERHEAD HVAC PIPING

INTB-302

OVERHEAD ELECTRICAL

15 12-06-13

12-27-13

OVERHEAD ELECTRICAL

11-21-13 13:05 MAX HAYES HS Sheet 19 of 26

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*06/18/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-303

OVERHEAD PLUMBING

15 12-06-13

12-27-13

OVERHEAD PLUMBING

INTB-304

OVERHEAD FIRE PROTECTION

15 12-06-13

12-27-13

OVERHEAD FIRE PROTECTION

INTB-305

ELECTRICAL ROUGH-INS

15 12-30-13

01-20-14

ELECTRICAL ROUGH-INS

INTB-306

PLUMBING ROUGH-INS

15 12-30-13

01-20-14

PLUMBING ROUGH-INS

INTB-311

FRAME DRYWALL CEILING

10 01-14-14

01-27-14

INTB-310

DRYWALL CEILING

10 01-28-14

02-10-14

INTB-315

TAPE AND FINISH CEILING

10 04-01-14*

04-14-14

INTB-320

CERAMIC TILE

10 04-15-14

04-28-14

INTB-325

PRIME PAINT

5 04-15-14

04-21-14

INTB-330

PLUMBING FINISHES

10 04-15-14

04-28-14

PLUMBING FINISHES

INTB-335

FIRE PROTECTION FINISHES

10 04-15-14

04-28-14

FIRE PROTECTION FINISHES

INTB-340

CASEWORK

5 06-16-14

06-20-14

CASEWORK

INTB-345

FINISH PAINT

10 06-23-14

07-07-14

INTB-350

DOORS & HARDWARE

10 07-08-14

07-21-14

INTB-370

FLOORING

10 07-22-14

08-04-14

INTB-355

SPECIALTIES

20 08-05-14

09-02-14

INTB-360

PUNCHLIST

20 08-26-14

09-23-14

INTB-365

TESTING & INSPECTIONS

15 08-26-14

09-16-14

MILE-B305

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS *10/20/14*

0

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

FRAME DRYWALL CEILING DRYWALL CEILING TAPE AND FINISH CEILING CERAMIC TILE PRIME PAINT

FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

09-23-14*

TARGET COMPLETION MILESTONE - BUILDING B - LOCKER ROOMS

*10/20/14*

MECHANICAL / ELECTRICAL ROOMS INTB-200

PLUMBING EQUIPMENT / PIPING

70 01-07-14

04-14-14

PLUMBING EQUIPMENT / PIPING

INTB-201

ELECTRICAL EQUIPMENT / PIPING

70 01-07-14

04-14-14

ELECTRICAL EQUIPMENT / PIPING

INTB-202

FIRE PUMP EQUIPMENT / PIPING

70 01-07-14

04-14-14

FIRE PUMP EQUIPMENT / PIPING

INTB-205

ELECTRICAL ROUGH-INS

10 04-15-14

04-28-14

ELECTRICAL ROUGH-INS

INTB-206

PLUMBING ROUGH-INS

10 04-15-14

04-28-14

PLUMBING ROUGH-INS

INTB-210

PRIME PAINT

5 04-29-14

05-05-14

INTB-215

LIGHT FIXTURES

10 05-06-14

05-19-14

LIGHT FIXTURES

INTB-220

DIFFUSERS

10 05-06-14

05-19-14

DIFFUSERS

INTB-225

FINISH PAINT

10 05-20-14

06-03-14

INTB-230

DOORS & HARDWARE

10 06-04-14

06-17-14

INTB-235

FLOORING

10 06-18-14

07-01-14

INTB-240

SPECIALTIES

20 07-02-14

07-30-14

INTB-245

PUNCHLIST

20 07-24-14

08-20-14

INTB-250

TESTING & INSPECTIONS

15 07-24-14

08-13-14

MILE-B205

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS *08/22/14*

11-21-13 13:05 MAX HAYES HS Sheet 20 of 26

0

PRIME PAINT

FINISH PAINT DOORS & HARDWARE FLOORING SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

08-20-14*

TARGET COMPLETION MILESTONE - BUILDING B - MECH / ELEC ROOMS

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*08/22/14*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

KITCHEN INTB-500

OVERHEAD DUCTWORK

30 12-03-13

01-15-14

OVERHEAD DUCTWORK

INTB-501

OVERHEAD HVAC PIPING

30 12-03-13

01-15-14

OVERHEAD HVAC PIPING

INTB-502

OVERHEAD ELECTRICAL

30 12-03-13

01-15-14

OVERHEAD ELECTRICAL

INTB-503

OVERHEAD PLUMBING

30 12-03-13

01-15-14

OVERHEAD PLUMBING

INTB-504

OVERHEAD FIRE PROTECTION

30 12-03-13

01-15-14

OVERHEAD FIRE PROTECTION

INTB-505

ELECTRICAL ROUGH-INS

35 01-16-14

03-05-14

ELECTRICAL ROUGH-INS

INTB-506

PLUMBING ROUGH-INS

35 01-16-14

03-05-14

PLUMBING ROUGH-INS

INTB-507

KITCHEN EQUIPMENT ROUGH-INS

35 01-16-14

03-05-14

KITCHEN EQUIPMENT ROUGH-INS

INTB-510

PRIME PAINT

10 03-06-14

03-19-14

PRIME PAINT

INTB-520

CLG GRID

15 03-20-14

04-09-14

CLG GRID

INTB-525

PLUMBING FINISHES

15 04-10-14

04-30-14

PLUMBING FINISHES

INTB-530

FIRE PROTECTION FINISHES

15 04-10-14

04-30-14

FIRE PROTECTION FINISHES

INTB-535

LIGHT FIXTURES

15 04-10-14

04-30-14

LIGHT FIXTURES

INTB-540

DIFFUSERS

15 04-10-14

04-30-14

DIFFUSERS

INTB-515

CASEWORK

25 06-23-14

07-28-14

INTB-545

FINISH PAINT

10 07-29-14

08-11-14

INTB-550

CLG TILE

5 09-10-14

09-16-14

INTB-555

DOORS & HARDWARE

10 09-10-14

09-23-14

INTB-560

FLOORING

20 09-10-14

10-07-14

INTB-565

KITCHEN EQUIPMENT

30 10-08-14

11-18-14

INTB-570

SPECIALTIES

20 10-08-14

11-04-14

INTB-575

PUNCHLIST

20 11-19-14

12-17-14

INTB-580

TESTING & INSPECTIONS

15 11-19-14

12-10-14

MILE-B505

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN *01/13/15*

0

CASEWORK FINISH PAINT CLG TILE DOORS & HARDWARE FLOORING KITCHEN EQUIPMENT SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

12-17-14*

TARGET COMPLETION MILESTONE - BUILDING B - KITCHEN

STUDENT DINING INTB-600

OVERHEAD DUCTWORK

20 12-23-13

01-21-14

OVERHEAD DUCTWORK

INTB-602

OVERHEAD ELECTRICAL

20 12-23-13

01-21-14

OVERHEAD ELECTRICAL

INTB-603

OVERHEAD PLUMBING

20 12-23-13

01-21-14

OVERHEAD PLUMBING

INTB-604

OVERHEAD FIRE PROTECTION

20 12-23-13

01-21-14

OVERHEAD FIRE PROTECTION

INTB-601

OVERHEAD HVAC PIPING

20 12-26-13

01-23-14

OVERHEAD HVAC PIPING

INTB-605

ELECTRICAL ROUGH-INS

15 01-22-14

02-11-14

ELECTRICAL ROUGH-INS

INTB-606

PLUMBING ROUGH-INS

15 01-22-14

02-11-14

PLUMBING ROUGH-INS

INTB-610

PRIME PAINT

10 02-12-14

02-25-14

INTB-620

CLG GRID

10 02-26-14

03-11-14

INTB-625

PLUMBING FINISHES

10 03-12-14

03-25-14

11-21-13 13:05 MAX HAYES HS Sheet 21 of 26

PRIME PAINT CLG GRID PLUMBING FINISHES

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*01/13/15*


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTB-630

FIRE PROTECTION FINISHES

10 03-12-14

03-25-14

FIRE PROTECTION FINISHES

INTB-635

LIGHT FIXTURES

10 03-12-14

03-25-14

LIGHT FIXTURES

INTB-640

DIFFUSERS

10 03-12-14

03-25-14

DIFFUSERS

INTB-615

CASEWORK

15 07-29-14

08-18-14

INTB-645

FINISH PAINT

10 08-19-14

09-02-14

INTB-650

CLG TILE

10 10-01-14

10-14-14

CLG TILE

INTB-655

DOORS & HARDWARE

10 10-01-14

10-14-14

DOORS & HARDWARE

INTB-660

FLOORING

20 10-01-14

10-28-14

INTB-665

SPECIALTIES

20 10-29-14

11-26-14

SPECIALTIES

INTB-680

ACOUSTIC PANELS

20 10-29-14

11-26-14

ACOUSTIC PANELS

INTB-670

PUNCHLIST

20 11-27-14

12-24-14

INTB-675

TESTING & INSPECTIONS

15 11-27-14

12-17-14

MILE-B605

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

0

CASEWORK FINISH PAINT

FLOORING

PUNCHLIST TESTING & INSPECTIONS

12-24-14*

TARGET COMPLETION MILESTONE - BUILDING B - STUDENT DINING *01/21/15*

BUILDING C SHELL AND CORE

SHCC-235

FOOTINGS

10 08-22-13 A

09-03-13 A

SHCC-240

U/G MEP

10 09-04-13 A

09-24-13 A

SHCC-245

FOUNDATION BLOCK

5 09-04-13 A

09-06-13 A

SHCC-250

VAPOR SYSTEM & STONE

11 09-16-13 A

09-27-13 A

SHCC-255

POUR S.O.G. / CURE

4 09-27-13 A

10-04-13 A

SHCC-260

H.M. FRAMES

5 10-21-13 A

11-22-13

H.M. FRAMES

SHCC-265

BLOCK TO ROOF

20 10-21-13 A

11-22-13

BLOCK TO ROOF

SHCC-270

ROOF JOIST & DECK

15 11-25-13

12-16-13

ROOF JOIST & DECK

SHCC-285

BRICK VENEER

15 11-25-13

12-16-13

BRICK VENEER

SHCC-290

METAL PANELS

15 12-17-13

01-08-14

SHCC-365

ROOF BLOCKING

5 12-17-13

12-23-13

ROOF BLOCKING

SHCC-370

MEP CURBS & DRAINS

5 12-17-13

12-23-13

MEP CURBS & DRAINS

SHCC-295

WINDOWS & C.W.

15 12-20-13

01-13-14

SHCC-280

ROOFING

15 01-02-14

01-22-14

SHCC-296

ROOFING TRIM

5 01-23-14

01-29-14

FOOTINGS U/G MEP FOUNDATION BLOCK VAPOR SYSTEM & STONE POUR S.O.G. / CURE

METAL PANELS

WINDOWS & C.W. ROOFING ROOFING TRIM

INTERIOR BUILDOUT

INTC-115

OVERHEAD DUCTWORK

40 01-23-14

03-19-14

OVERHEAD DUCTWORK

INTC-116

OVERHEAD HVAC PIPING

40 01-23-14

03-19-14

OVERHEAD HVAC PIPING

INTC-117

OVERHEAD ELECTRICAL

40 01-23-14

03-19-14

OVERHEAD ELECTRICAL

11-21-13 13:05 MAX HAYES HS Sheet 22 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTC-118

OVERHEAD PLUMBING

40 01-23-14

03-19-14

OVERHEAD PLUMBING

INTC-119

OVERHEAD FIRE PROTECTION

40 01-23-14

03-19-14

OVERHEAD FIRE PROTECTION

INTC-125

PLUMBING ROUGH-INS

35 03-20-14

05-07-14

PLUMBING ROUGH-INS

INTC-120

ELECTRICAL ROUGH-INS

35 03-20-14

05-07-14

ELECTRICAL ROUGH-INS

INTC-210

FRAME DRYWALL CEILING

5 05-08-14

05-14-14

FRAME DRYWALL CEILING

INTC-220

HANG DRYWALL CEILING

5 05-15-14

05-21-14

HANG DRYWALL CEILING

INTC-130

TAPE & FINISH CEILING

40 05-22-14*

07-18-14

INTC-135

CERAMIC TILE

30 05-30-14

07-11-14

CERAMIC TILE

INTC-140

PRIME PAINT

15 06-20-14

07-11-14

PRIME PAINT

INTC-150

CLG GRID

30 07-07-14

08-15-14

INTC-155

PLUMBING FINISHES

30 08-18-14

09-29-14

PLUMBING FINISHES

INTC-156

FIRE PROTECTION FINISHES

30 08-18-14

09-29-14

FIRE PROTECTION FINISHES

INTC-157

LIGHT FIXTURES

30 08-18-14

09-29-14

LIGHT FIXTURES

INTC-158

DIFFUSERS

30 08-18-14

09-29-14

DIFFUSERS

INTC-145

CASEWORK

25 08-19-14

09-23-14

INTC-160

FINISH PAINT

15 09-30-14

10-20-14

INTC-165

SPECIALTY FLOORING

30 10-21-14

12-02-14

SPECIALTY FLOORING

INTC-170

DOORS & HARDWARE

15 11-11-14

12-02-14

DOORS & HARDWARE

INTC-175

CLG TILE

20 11-11-14

12-09-14

INTC-180

VCT & VINYL FLOORING

20 11-26-14

12-23-14

INTC-185

CARPET

20 12-24-14

01-22-15

INTC-190

SPECIALTIES

20 01-09-15

02-05-15

INTC-195

PUNCHLIST

20 02-06-15

03-05-15

INTC-200

TESTING & INSPECTIONS

15 02-06-15

02-26-15

MILE-C105

TARGET COMPLETION MILESTONE - BUILDING C

*03/19/15*

0

TAPE & FINISH CEILING

CLG GRID

CASEWORK FINISH PAINT

CLG TILE VCT & VINYL FLOORING CARPET SPECIALTIES PUNCHLIST TESTING & INSPECTIONS

03-05-15*

TARGET COMPLETION MILESTONE - BUILDING C

BUILDING D SHELL AND CORE

SHCD-305

FOOTINGS

SHCD-310

FOUNDATION BLOCK

SHCD-345

U/G MEP

SHCD-315

H.M. FRAMES - D WEST BOX

SHCD-320

10 09-04-13 A

09-17-13 A

5 09-18-13 A

09-27-13 A

FOOTINGS FOUNDATION BLOCK

10 09-18-13 A

04-03-14

5 11-04-13 A

12-06-13

H.M. FRAMES - D WEST BOX

BLOCK TO ROOF - D WEST BOX

20 11-04-13 A

12-06-13

BLOCK TO ROOF - D WEST BOX

SHCD-370

BLOCK TO ROOF - D REMAINING

15 12-09-13

12-30-13

BLOCK TO ROOF - D REMAINING

SHCD-321

STRUCTURAL STEEL - D WEST BOX

2 12-24-13

12-26-13

STRUCTURAL STEEL - D WEST BOX

SHCD-330

H.M. FRAMES - D REMAINING

5 12-24-13

12-30-13

H.M. FRAMES - D REMAINING

11-21-13 13:05 MAX HAYES HS Sheet 23 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

U/G MEP

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*03/19/15*


Activity ID

Activity Name

SHCD-325

ROOF JOIST & DECK - D WEST BOX

SHCD-385

Original Start Duration

Finish

2013

2014

2015

30 01-03-14

02-13-14

STRUCTURAL STEEL - D REMAINING

2 01-22-14

01-23-14

SHCD-390

ROOF JOIST & DECK - D REMAINING

30 01-24-14

03-06-14

SHCD-375

ROOF BLOCKING - D WEST BOX

5 02-14-14

02-20-14

ROOF BLOCKING - D WEST BOX

SHCD-380

MEP CURBS & DRAINS - D WEST BOX

5 02-14-14

02-20-14

MEP CURBS & DRAINS - D WEST BOX

SHCD-335

ROOFING - D WEST BOX

20 02-21-14

03-20-14

SHCD-395

ROOF BLOCKING - D REMAINING

5 03-07-14

03-13-14

SHCD-400

MEP CURBS & DRAINS - D REMAINING

5 03-14-14

03-20-14

SHCD-340

ROOFING TRIM - D WEST BOX

5 03-21-14

03-27-14

SHCD-405

ROOFING - D REMAINING

20 03-21-14

04-17-14

SHCD-415

VAPOR SYSTEM & STONE - D REMAINING

10 03-31-14*

04-11-14

VAPOR SYSTEM & STONE - D REMAINING

SHCD-350

VAPOR SYSTEM & STONE - D WEST BOX

10 04-04-14*

04-17-14

VAPOR SYSTEM & STONE - D WEST BOX

SHCD-355

BRICK VENEER

15 04-07-14

04-25-14

BRICK VENEER

SHCD-420

POUR S.O.G. - REMAINING

10 04-14-14

04-25-14

POUR S.O.G. - REMAINING

SHCD-360

POUR S.O.G. - D WEST BOX

10 04-18-14

05-01-14

POUR S.O.G. - D WEST BOX

SHCD-410

ROOFING TRIM - D REMAINING

5 04-18-14

04-24-14

ROOFING TRIM - D REMAINING

SHCD-425

WINDOWS & C.W. - D REMAINING

15 04-25-14

05-15-14

WINDOWS & C.W. - D REMAINING

SHCD-365

METAL PANELS

15 04-28-14

05-16-14

METAL PANELS

SHCD-369

WINDOWS & C.W. - D WEST BOX

15 04-28-14

05-16-14

WINDOWS & C.W. - D WEST BOX

ROOF JOIST & DECK - D WEST BOX

NON BEARING MASONRY WALLS

STRUCTURAL STEEL - D REMAINING ROOF JOIST & DECK - D REMAINING

ROOFING - D WEST BOX ROOF BLOCKING - D REMAINING MEP CURBS & DRAINS - D REMAINING ROOFING TRIM - D WEST BOX ROOFING - D REMAINING

INTERIOR BUILDOUT

INTD-105

NON BEARING MASONRY WALLS

10 05-02-14

05-15-14

INTD-110

OVERHEAD DUCTWORK

55 05-16-14

08-04-14

OVERHEAD DUCTWORK

INTD-111

OVERHEAD HVAC PIPING

55 05-16-14

08-04-14

OVERHEAD HVAC PIPING

INTD-112

OVERHEAD ELECTRICAL

55 05-16-14

08-04-14

OVERHEAD ELECTRICAL

INTD-113

OVERHEAD PLUMBING

55 05-16-14

08-04-14

OVERHEAD PLUMBING

INTD-114

OVERHEAD FIRE PROTECTION

55 05-16-14

08-04-14

OVERHEAD FIRE PROTECTION

INTD-125

ELECTRICAL ROUGH-INS

35 07-08-14

08-25-14

ELECTRICAL ROUGH-INS

INTD-126

PLUMBING ROUGH-INS

35 07-08-14

08-25-14

PLUMBING ROUGH-INS

INTD-130

FRAME DRYWALL CEILING

15 08-05-14

08-25-14

FRAME DRYWALL CEILING

INTD-131

HANG DRYWALL CEILING

15 08-26-14

09-16-14

INTD-132

TAPE AND FINISH CEILING

15 09-17-14

10-07-14

INTD-135

CERAMIC TILE

20 10-08-14

11-04-14

CERAMIC TILE

INTD-140

PRIME PAINT

20 10-08-14

11-04-14

PRIME PAINT

INTD-145

CASEWORK

15 10-22-14

11-11-14

CASEWORK

INTD-150

CLG GRID

30 10-22-14

12-03-14

11-21-13 13:05 MAX HAYES HS Sheet 24 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

HANG DRYWALL CEILING TAPE AND FINISH CEILING

CLG GRID

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

INTD-155

PLUMBING FINISHES

40 11-05-14

01-02-15

PLUMBING FINISHES

INTD-156

FIRE PROTECTION FINISHES

40 11-05-14

01-02-15

FIRE PROTECTION FINISHES

INTD-157

LIGHT FIXTURES

40 11-05-14

01-02-15

LIGHT FIXTURES

INTD-158

DIFFUSERS

40 11-05-14

01-02-15

DIFFUSERS

INTD-160

FINISH PAINT

30 11-19-14

01-02-15

FINISH PAINT

INTD-165

SEAL CONCRETE FLOORING

15 11-27-14

12-17-14

SEAL CONCRETE FLOORING

INTD-170

DOORS & HARDWARE

25 12-04-14

01-09-15

DOORS & HARDWARE

INTD-175

CLG TILE

15 12-11-14

01-02-15

INTD-180

VCT & VINYL FLOORING

15 12-26-14

01-16-15

INTD-190

INSTALL EQUIPMENT

30 01-05-15

02-13-15

INTD-195

PUNCHLIST

15 01-30-15

02-19-15

PUNCHLIST

INTD-200

TESTING & INSPECTIONS

15 01-30-15

02-19-15

TESTING & INSPECTIONS

MILE-D205

TARGET COMPLETION MILESTONE - BUILDING D ORIGINAL *06/24/15* REVISED *03/06/15*

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING D

0

CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT

BUILDING E SHELL AND CORE

SHCE-375

FOOTINGS

SHCE-380

10 09-18-13 A

11-25-13

FOUNDATION BLOCK

5 11-26-13

12-03-13

SHCE-385

H.M. FRAMES

5 12-09-13

12-13-13

SHCE-390

BLOCK TO ROOF

30 12-09-13

01-21-14

BLOCK TO ROOF

SHCE-391

STRUCTURAL STEEL

2 01-22-14

01-23-14

STRUCTURAL STEEL

SHCE-395

ROOF JOIST & DECK

30 01-24-14

03-06-14

ROOF JOIST & DECK

SHCE-445

ROOF BLOCKING

5 03-07-14

03-13-14

ROOF BLOCKING

SHCE-450

MEP CURBS & DRAINS

5 03-07-14

03-13-14

MEP CURBS & DRAINS

SHCE-410

ROOFING

20 03-14-14

04-10-14

SHCE-405

U/G MEP

10 04-11-14

04-24-14

SHCE-420

VAPOR SYSTEM & STONE

10 04-25-14

05-08-14

SHCE-415

BRICK VENEER

15 04-28-14

05-16-14

BRICK VENEER

SHCE-440

POUR S.O.G.

10 05-09-14

05-22-14

POUR S.O.G.

SHCE-425

METAL PANELS

15 05-19-14

06-09-14

METAL PANELS

SHCE-430

WINDOWS & C.W.

15 05-19-14

06-09-14

WINDOWS & C.W.

SHCE-435

ROOFING TRIM

5 05-19-14

05-23-14

FOOTINGS FOUNDATION BLOCK H.M. FRAMES

ROOFING U/G MEP VAPOR SYSTEM & STONE

ROOFING TRIM

INTERIOR BUILDOUT

INTE-105

NON BEARING MASONRY WALLS

10 05-23-14

06-06-14

INTE-115

OVERHEAD DUCTWORK

40 06-09-14

08-04-14

11-21-13 13:05 MAX HAYES HS Sheet 25 of 26

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

NON BEARING MASONRY WALLS OVERHEAD DUCTWORK

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

ORIGINAL *06/24/15*

REV


Activity ID

Activity Name

Original Start Duration

Finish

2013

2014

2015

2016

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

INTE-116

OVERHEAD HVAC PIPING

40 06-09-14

08-04-14

OVERHEAD HVAC PIPING

INTE-117

OVERHEAD ELECTRICAL

40 06-09-14

08-04-14

OVERHEAD ELECTRICAL

INTE-118

OVERHEAD PLUMBING

40 06-09-14

08-04-14

OVERHEAD PLUMBING

INTE-119

OVERHEAD FIRE PROTECTION

40 06-09-14

08-04-14

OVERHEAD FIRE PROTECTION

INTE-125

ELECTRICAL ROUGH-INS

35 07-08-14

08-25-14

ELECTRICAL ROUGH-INS

INTE-126

PLUMBING ROUGH-INS

35 07-08-14

08-25-14

PLUMBING ROUGH-INS

INTE-130

FRAME DRYWALL CEILING

15 08-05-14

08-25-14

FRAME DRYWALL CEILING

INTE-131

HANG DRYWALL CEILING

15 08-26-14

09-16-14

INTE-132

TAPE AND FINISH CEILING

15 09-17-14

10-07-14

INTE-135

CERAMIC TILE

20 10-08-14

11-04-14

CERAMIC TILE

INTE-140

PRIME PAINT

20 10-08-14

11-04-14

PRIME PAINT

INTE-150

CLG GRID

30 10-22-14

12-03-14

INTE-155

PLUMBING FINISHES

40 11-05-14

01-02-15

PLUMBING FINISHES

INTE-156

FIRE PROTECTION FINISHES

40 11-05-14

01-02-15

FIRE PROTECTION FINISHES

INTE-157

LIGHT FIXTURES

40 11-05-14

01-02-15

LIGHT FIXTURES

INTE-158

DIFFUSERS

40 11-05-14

01-02-15

DIFFUSERS

INTE-145

CASEWORK

15 11-12-14

12-03-14

INTE-160

FINISH PAINT

30 11-19-14

01-02-15

INTE-165

SEAL CONCRETE FLOOR

15 11-27-14

12-17-14

INTE-170

DOORS & HARDWARE

25 12-04-14

01-09-15

INTE-175

CLG TILE

15 12-11-14

01-02-15

INTE-180

VCT & VINYL FLOORING

20 12-18-14

01-16-15

INTE-190

INSTALL EQUIPMENT

30 01-05-15

02-13-15

INTE-195

PUNCHLIST

15 01-30-15

02-19-15

PUNCHLIST

INTE-200

TESTING & INSPECTIONS

15 01-30-15

02-19-15

TESTING & INSPECTIONS

MILE-E305

TARGET COMPLETION MILESTONE - BUILDING E *07/01/15* REVISED *03/06/15*

02-19-15*

TARGET COMPLETION MILESTONE - BUILDING E

ORIGINAL

0

HANG DRYWALL CEILING TAPE AND FINISH CEILING

CLG GRID

CASEWORK FINISH PAINT SEAL CONCRETE FLOOR DOORS & HARDWARE CLG TILE VCT & VINYL FLOORING INSTALL EQUIPMENT

ORIGINAL *07/01/15*

REVISE

PROJECT COMPLETION PROJECT COMPLETION GENERAL

COMP-495

PROJECT COMPLETION ACTIVITIES

COMP-505

CONSTRUCTION COMPLETION

COMP-500

OWNER CLOSEOUT / COMMISSIONING / LEED

COMP-510

CERTIFICATE OF OCCUPANCY

11-21-13 13:05 MAX HAYES HS Sheet 26 of 26

*7/1/15*

*7/1/15*

43 01-06-15 0 65 07-01-15

03-05-15

PROJECT COMPLETION ACTIVITIES

03-05-15*

CONSTRUCTION COMPLETION

09-30-15

*7/1/15*

OWNER CLOSEOUT / COMMISSIONING / LEED

0 07-01-15*

CERTIFICATE OF OCCUPANCY

MAX HAYES CAREER AND TECHNICAL HIGH SCHOOL SCHEDULE UPDATE 11-19-13

*7/1/15*