BeverwijkWijngaarden

Client Gasunie made considerable investments in the construction of the ‘Gas Hub’. An integrated gas infrastructure utilized for the production, transport, storage and transit of gas for the European market. One of the final large projects of this major operation is the construction of a new gas transport pipeline between Dutch towns Beverwijk and Wijngaarden. A.Hak Leidingbouw and A.Hak Drillcon were granted two of the three lots of this trajectory and thus became responsible for the construction of 60 kilometers of this 48" gas transport pipeline. A challenging project, partially due to soil conditions and water management requirements. In crossing the abundance of (rail)roads and waterways in a varying landscape, it was up to A.Hak Drillcon to select the ideal drilling methods for every location.

Client

N.V. Nederlandse Gasunie Main contractor

A.Hak Project

Beverwijk-Wijngaarden, Lot 1 + 2 Location

Beverwijk-Wijngaarden, the Netherlands Project term drilling

May 2013 – April 2014


The right drilling method for every crossing

HORIZONTAL DIRECTIONAL DRILLING

For the long crossings, Horizontal Directional Drillings were carried out. These HDD’s were completed with the 330 tons mega rig and the 500 tons mega rig, the latter of which being christened during this project. Due to the pressure of the groundwater, the rigs were deployed on mounds for various drillings. Special return pipelines for drilling fluid were constructed both above and under the surface. For the underground pipelines, the drilling rods were used as mud return lines, allowing for optimum usage of this substance. In addition to roads and waterways, the ‘Polderbaan’ runway of Schiphol International Airport was also crossed. This crossing was especially unique because the runway remained fully operational during the entire process. A large press delegation and even a film crew witnessed the process of the 1.269 meters long pipeline carefully being put in place. MICROTUNNELING

HDD 48"

Drilling 1 Drilling 2 Drilling 3 Drilling 4 Drilling 5 Drilling 6 Drilling 7 Drilling 8 Drilling 9 Drilling 10 Drilling 11 Drilling 12

LOCATION

North Sea Canal Zijkanaal B Zijkanaal C Highway A9 Ringvaart north Highway A5 + A9 Runway P5 Ringvaart south Railway + Highway A44 Wijde Aa + N446 Oude Rijn + N11 + Railway Westeinde

MT 48"

LOCATION

Drilling 1 Drilling 2 Drilling 3 Drilling 4 Drilling 5 Drilling 6 Drilling 7 Drilling 8 Drilling 9 Drilling 10 Drilling 11 Drilling 12 Drilling 13 Drilling 14

IJweg Nieuwe Westrandweg Nieuwe Kerkertocht Bottelierspad Zuid Tangent BRT Route Noorderweg Highway A9 & A22 Hoofdvaart Central Station Beverwijk Geniedijk Bennebroekerweg N207 Highway A44

GFB CASING TUBE DN 1500

LOCATION

Drilling 15

Hoofddorp

DP 48"

LOCATION

Drilling 1

N201 + Parking lot

LENGTH (M1)

1.255 991 1.217 991 1.012 1.173 1.269 703 1.055 920 955 932

Almost all Microtunneling operations on this route were completed with medium-carrying steel gas pipelines. Only when a railroad crossing was encountered, concrete case tubes were used. A.Hak Drillcon was challenged time and time again to find innovative solutions for managing the pressured groundwater levels. This was especially important while constructing dry and safe pits, for which underwater concrete and specially designed sleeves were applied.

LENGTH (M1)

30 144 126 252 72 147 96 305 72 144 106 72 126 131

LENGTH (M1)

75 LENGTH (M1)

583

DIRECT PIPE DRILLING

Adjacent to Highway A4 near Hoofddorp, close to Schiphol International Airport, the local N201 road and its neighboring business park were crossed using the Direct pipe method. This method was selected as the available space was limited and this drilling method allows for working with short pipeline sections. An extra benefit of this innovative technology is the possibility to retract pipelines back into the ground. On the receiving end of the drilling, the bend was welded to the pipeline above the groundwater level. Once this step was completed, the pipeline was retracted so that the welded bend was maneuvered at the correct depth, the very first time such a solution was deployed. FOR MORE FOOTAGE PLEASE VISIT: WWW.A-HAKDRILLCON.NL/NIEUWS

ADDRESS

Engelseweg 159    5705 AD Helmond A.Hak Drillcon B.V.    PO Box 715    5700 AS Helmond T +31 (0)492 345 600    F +31 (0)492 345 601    @ drillcon@a-hak.nl POSTAL ADDRESS

WWW.A-HAKDRILLCON.NL

Completing twelve Horizontal Directional Drillings, fifteen Microtunneling operations and applying the Direct Pipe method, the A.Hak sister companies constructed the entire pipeline segment and persevered through all challenges on the way!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.