PORTFOLIO
EDUCATION AND CERTIFICATES Sep.2008-Jun.2013
School of Architecture and Civil Engineering, Xihua University Bachelor of Architecture(5-year)
Sep.2016-Dec.2018
Politecnico Di Milano Architecture master degree
May.2018
MIAW "urban renovation" workshop (“Sansiro renovation”)
PROFESSIONAL EXPERIMENCE
QU ZHENG Nationality: China
Politecnico Di Milano architecture master degree He has been pursuing his architectural ideals, going through 5 years of undergraduate education, not satisfied after 3 years of work, and 2 years of graduate experience. He created the building, and the building also shaped him.
Mar.2013-Jun.2013
Sihui architect stutio (Internships )
Jun.2013-May.2015
China Southwest Architectural Design&Research Institute Co.,Ltd (Architect assistant)
May.2015-Aug.2016
China Shanghai Architectural Design& Research Institute Co.,Ltd (Architect)
May.2018-Jul.2018
Beijing Pu Feng Shang Art Design Co, Ltd. (Internships) CAD/DRAWING
AUTOCAD FREE HAND DRAWING WACOM HANDSRIPT
In the seven years of architectural education and three years of architectural career, He slowly polished himself. Always brave and happy on the road of architecture. Recently just completed a master's degree in architecture at the Polytechnic of Milan, while at the same time refining design techniques, critical thinking, theoretical knowledge, and portfolios. He is highly motivated and hard at work. He always finds a balance between working hours and the quality of his work. He has good self-management and time management skills. He has a selfunderstanding of critical and logical thinking. +39 3663637128 1252520543@qq.com Via Giuseppe Candiani, 125, 20158 Milano
3D MODELING
FABRICATION
RHINO GRASSHOPPER SKETCHUP REVIT
LAZERCUT 3D PRINT EPS,HANDCRAFTING
CREATIVE SUITE
RENDERING
PHOTOSHOP ILLUSTRATOR INDESIGN AFTER EFFECT LIGHT ROOM
VRAY ENSCAPE KEYSHOT PRODIUM
MICROSOFT
MICROSOFT WORD MICROSOFT OFFICE POWERPOINT
LANGUAGE SKILL: CHINESE(NATIVE) ENGLISH(FLUENT)
PROFESSIONAL EXPERIMENCE (PROJECT EXPERIENCE)
PROFESSIONAL EXPERIMENCE (PROJECT EXPERIENCE)
Dianchi Lake C&Ecenterin Yunnan Province Sep.2015-Nov.2015 Responsible for the floor plan design and style design of the commercial center.
Tianquan Wetland Park Aug.2014-Sep.2014 Architectural design of in-park buildings including Cultural Center,Wetland EducationCenter,andTourist Reception Center; Participated in the overall functional layout design and construction drawing preliminary design.
Jiasheng Commercial Center in Hubei Province Jul.2015-Sep.2015 Responsibleforthefloorplandesignandstyledesignofthecommercialcenter. Mulan Hotel in Lanzhou City Jun.2015-Jul.2015 Responsibleforthegraphicdesignandmodeldesignofthehotel. Liupanshui Comprehensive Residential Areain Hubei Province Jun.2015Jul.2015 Responsible for the house layout design and style design for small high-rise and high-rise house holds. No.1 Bund Garden House in Hubei Province Jun.2015-Jul.2015 Responsible for design in gand adjusting the house layout during the first phase of the project; participated in designing the kindergarten in the residential community. Recreational Business District of Wudang Mountain in Hubei Province May.2015-Jun.2015 Partookinthearchitecturaldesignoftheclubsinthefrontalareaandthevillasinthebackarea. Future Square in Jinan City, Shandong Province Oct.2014-Mar.2015 Collected and analyzed materials; participated in the overall architectural planning andsingle-buildingstyledesign. TianfuSoftwarePark(Phase5)Sep.2014-Dec.2014 Collectedandanalyzedmaterials;participated in the layout design and single building style design. Dingyuan International Commercial Center in Lanzhou City Jul.2014-Sep.2014 Collected materials and analyzed the condition of the site; participated in the overall functional layout design and single-building preliminary design.
Vehicle Administration Officein Dongying City,Shandong Province Apr.2014Jun.2014 Participated in the overall functional design and single-building preliminary design. Resort Villa Districtin Dongying City,Shandong Province Apr.2014-Jun.2014 Collected materials and analyzed the condition of the site; participated in the overall functional layout design and single-building preliminary design. Red Wine Bonded Logistics Park in Dongying City, Shandong Province Feb.2014-Apr.2014 Participated in the single-building preliminary design and detailed design. GoweBlueValley(DeyangIndustrialPark)Nov.2013-Jan.2014 Collected materials and analyzed the condition of the site; participated in the overall functional layout design and single-building preliminary design. Mid-Lake Island Shopping Mall in Dongying City, Shandong Province Aug.2013-Nov.2013 Participated in the overal lfunctional design and single-building preliminary design. ADDITIONAL critical thinkg and problem solving ability to take initiative ability to work under pressure optimistic and motivated a team player HOBBY/INTERESTS basketball,hiking,swimming,games drawings,cooking,movie,music,singing,
ACADEMIC PROJECT 1 THE SENSENELS 2 THE URBAN SNAKE 3 “Z” CITY CULTURE CENTER
01
THE SENTINELS
The sentinels Phu Do is a village in Hanoi, Vietnam, which is famous for its tradition of noodle making. However, the village is facing the problem of pollution from noodle production activity.
Comparisions VOLUME OF POLLUTED WATER VOLUME OF POLLUTED WATER BEFORE PURIFICATION BEFORE PURIFICATION
This bio-pollutant with nitrogen and phosphorus as its components has caused the eutrophication of water body, which is invisible inside the village but evident in the outside canal receiving waste water from the drainage.
In order to solve these problems, we first need to find the most polluted canal location through research and analysis, and then set up a sentry tower in these places to determine the height of these filter towers according to different pollution levels. Total Volume: 34.0m3 Wastewater: 6.0m3 Total Volume: 67.6m3 Wastewater: 7.5m3
The aim of the project is to deal with the issue by using an environmental and sustainable approach. Mycelium, the subterranean part of mushrooms, is brought in with its symbolism on the invisible pollution and, at the same time, as a organic solution to the pollution. Aquaponic system, with its vertical mechanism of circulating waste water, is also introduced due to its high efficiency on pollutant transformation and food production. In this project, mycelia and aquaponic system are working together based on the mutualistic symbiosis of mycelium itself and the root of plants.
Location analysis
EM
ST
Y XT S NE ION E T TH ICA TO RIF PU
* 92 noodle producing households water/ m3 of pulluted 92 noodle producing households * 1,5 household 1,5 m3 of pulluted water/3 Total : 92 x 1.5 = 138 m of household wasted into=the canal Total :water 92 x 1.5 138 m3 of wasted water into the canal
VOLUME OF POLLUTED WATER VOLUME OF POLLUTED WATER AFTER PURIFICATION AFTER PURIFICATION
EM EXT SYST HE N TO T ICATION IF PUR
Total Volume: 68.9m3 Wastewater: 7.5m3
Total Volume: 171.2m3 Wastewater: 7.5m3 Total Volume: 72.4m3 Wastewater: 7.5m3
closure of drainage plug-in installation Installation/Intervention for purification Installation/Intervention for visible purification
intervention (eg: addition, expansion...) on exisiting buildings
invisible intervention (eg: underground) on exisiting buildings
SYSTEM DESIGN tem evolvement flow rate, 2 gallon per minute, which equals to 30m3 per hour, Vertical analysis ld be a proper value in non-commercial aquaponic system. 30cm grow bed is adopted, the time for filtrating water is 1~4 rs regardlessDistrubution of the area of the grow bed. Basically, there are at / MYCELIUM / Building development t 2 layers to complete NEST the process of purification. volume of water tank should be at least the water consumpSystem evolvement of the area per day which is calculated by the equation below: For flow rate, 2 gallon per minute, which equals to 30m3 per hour,
could be a proper value in non-commercial aquaponic system. If a 30cm grow bed is adopted, the time for filtrating water is 1~4 ly water consumption = population in the area x 0.18m hours regardless of the area of the grow bed. Basically, there are at erage water consumption/day/person) least 2 layers to complete the process of purification. FOR PERSONS The volume of water tank2~4 should be at least the water consumption of the area perTotal day which is calculated by the equation below: Hight: 20.4m
EMENTFOR 1~2 PERSONS raw wastewater
Total Hight: 15.6m
grey water
pre-cleaned water tank
Aquaponic Unit 2.4m
For flow rate, 2 gallon per minute, which equals to
30m
2.4m
FOR ? PERSONS Total Hight: ? For ? persons Total height: ? m FOR 1~2 PERSONS
Storage Unit 2.4m
greyAquaponic water for Unit sleeping 2.4m unit
Hybrid Unit
for hybrid unit
to complete the process
Hybrid Unit (Living + Sleeping) 4.8m
30m 3
n-commercial aqua
wastewater raw raw wastewater
REPETITIVE SET
Storage Unit 2.4m Storage Unit
or filtrating water is
Aquaponic Unit 2.4m
Aquaponic Unit 2.4m
grey water for living unit
Retail Unit Aquaponic Unit
water consump e eqution below: 3 ax
0.18m
raw wastewater
Retail Unit 3.6m
2.4m grey water for retail unit coarse filter screen pre-cleaned
water tank grey water for living unit Living Unit 3.6m
grey water for retail unit coarse filter
Living Unit 3.6m
grey water for living unit
Living Unit 3.6m grey water for living unit
grey water for retail unit coarse filter screen raw wastewater
Retail Unit 3.6m
grey water for retail unit coarse filter screen grey water
Aquaponic Unit 2.4m Living Unit 3.6m
Retail Unit 3.6m grey water
pre-cleaned water tank
pre-cleaned water tank
Aquaponic Unit 2.4m
grey water for sleeping unit
FOR 3~6 PERSONS Total Hight: 23.1m
Living Unit 3.6m
Retail Unit
3.6m
grey water
grey water for retail unit coarse filter screen raw wastewater grey water pre-cleaned water tank
Sleeping Unit (triple) 8.4m
6.0m
o complete the process
Aquaponic Unit 2.4m Sleeping Unit (double) 6.0m Living Unit 3.6m
FOR ? PERSONS IS IT POSSIBLE?
FOR ? PERSONS IS IT POSSIBLE?
grey water for sleeping unit
Hybrid Unit (Living + Sleeping) Sleeping4.8m Unit (double) for hybrid unit
grey water for sleeping unit
Aquaponic Unit 2.4m
Storage Unit 2.4m
Sleeping Unit (double) 6.0m
2.4m
he grow bed.
Storage Unit 2.4m
grey water for sleeping unit
Aquaponic Unit 2.4m
grey water for sleeping unit
Sleeping Unit (triple) 8.4m
Storage Unit 2.4m
Aquaponic Unit 2.4m
Aquaponic Unit 2.4m
REPETITIVE SET
Aquaponic Unit 2.4m
Total height: 15.6m
grey water for sleeping unit
Aquaponic Unit 2.4m
FOR 2~4 PERSONS
REPETITIVE SET
Retail Unit 3.6m
pre-cleaned water tank
Total Hight: 20.4m For 2-4 persons Total height: 20.4m
grey water for sleeping unit
Aquaponic Unit Sleeping Unit (double) 2.4m 6.0m
grey water for sleeping unit grey water for living unit
grey water raw wastewater
grey water
pre-cleaned water tank
2.4m
Sleeping Unit (triple) 8.4m
Retail Unit 3.6m
Retailfor Unitretail grey water 3.6m unit grey water for retail unit coarse filter coarse filter screen screen
For 1-2 persons Total Hight: 15.6m
-
REPETITIVE SET
Total Hight: 20.4m
Aquaponic Unit 2.4m
grey water
1~2 PERSONS Total height:FOR 20.4m
Aquaponic Unit 2.4m
Sleeping Unit (triple) 8.4m Aquaponic Unit
Aquaponic Unit 2.4m Sleeping Unit (double) 6.0m Living Unit 3.6m
grey water for sleeping unit grey water for living unit
Aquaponic Unit 2.4m
FINAL VERSION FOR 2~4 PERSONS Total Hight: 20.4m For 2-4 persons
Sleeping Unit (double) 6.0m grey water for sleeping unit
Storage Unit 2.4m
Storage Unit 2.4m
Retail Unit 3.6m grey water for retail unit The volume of water tank should be at least the water consump coarse filter tionscreen of the area per day which is calculated by the eqution below: grey water 3 daily water consumption = population in the area x 0.18m pre-cleaned (average water consumption/day/person) water tank
2.4m
FOR ? PERSONS Aquaponic Unit Total Hight: ? Sleeping UnitFor (double) 2.4m ? persons 6.0m Total height: ? m
-
Sleeping) 30cm grow bed is adopted, the(Living time for+ filtrating water is 4.8m for hybrid unit 1~4 hours regardless of the area of the grow bed.
2 layers
Aquaponic Unit Section 2.4m drawings
/ MYCELIUM NESTStorage / Building development Unit
Aquaponic Unit FOR 2~4 PERSONS 2.4m
Total Hight: 15.6m
If a
Basicly, there are at least of purification
grey water for sleeping unit
Daily water consumption = population in the area x 0.18m (Average water consumption/day/person)
3
in non-commercial aqua per hour , could be a proper value Storage Unit
ponic system.
stewater
to
coarse filter screen
FOR ? PERSONS Sleeping Unit (double) Total Hight: 6.0m ?
raw wastewater
3.6m FOR 3~6 grey water for retail PERSONS unit coarse filterHight: 23.1m Total screen grey water
FOR 2~4pre-cleaned PERSONS water tank grey water for living Total Hight: 15.0m unit
Retail Unit 3.6m
320
grey water for retail unit
grey water for living unit
Aquaponic Unit 2.4m raw wastewater
Living Unit 3.6m
Retail Unit 3.6m
grey water for retail unit coarse filter screen
Aquaponic Unit 2.4m
?
Living Unit 3.6m
Retail Unit 3.6m grey water
?
pre-cleaned water tank
Building section 321
GENERATION ANALYSIS
/ MYCELIUM NEST / Facade design facade generation
Floors lines generation try to find the efficient line of different floors to get the maxmum natural lightings.
1
1
facade drawings 5
5
1
P(-1)
2
P0
P1
P(-1)
structure
plan
P1
P(-1)
02 Create a path from bottom to top: Each intersection points at the bottom is regarded as a seed, when moving upwards,it only reach the point [-1,1] as illustrated.
3
3
P(-2) P(-1)
P0
seed
P0
seed
P(-2) P(-1) P1 P2
P0
3
P1
P2P(-2) P(-1)
seed
6
6
P1
2
seed
sunlight
P0
4
4
6
seed
06 Create continuous differentiation according to the growth of mycelium
P0
P1
P2
7
7
7
seed
03 Create openings for the ground floor: In this case the seed can reach point [-2,2] of grid line 1.
4
5
05 Add connection: Where there is no enough substrate for mycelium to grow
01 Unfold the cylinder Divide the surface into
2
/ MYCELIUM NEST / Facade design
07 Smoothen the joint to simulate the form of mycelium when is growing together.
8
8
04 Create openings on the facade: In this case the seed can reach point [-2,2] of the nearest grid line.
8
08 Adjust the shape on the ground floor: for better bearing load External view and digital model 326
327
/ MYCELIUM NEST / Building design SUNLIGHT
STRUCTURE
PLAN
View from top
/ MYCELIUM NEST / Building Design
Plans drawings
TF ƀQQT RNCP TF ƀQQT RNCP
TQQH RNCP TQQH RNCP
PLAN PLAN PLAN PLAN 1:200 1:200 1:200 1:200
PF ƀQQT RNCP PF ƀQQT RNCP
VJ ƀQQT RNCP VJ ƀQQT RNCP
TF ƀQQT RNCP TF ƀQQT RNCP
TQQH RNCP
3rd floor plan
Roof plan
UV ƀQQT RNCP UV ƀQQT RNCP
TF ƀQQT RNCP VJ ƀQQT RNCP TF ƀQQT RNCP VJ ƀQQT RNCP TF ƀQQT RNCP TF ƀQQT RNCP
TQQH RNCP TQQH RNCP
ITQWPF ƀQQT RNCP
PF ƀQQT RNCP VJ ƀQQT RNCP PF ƀQQT RNCP VJ ƀQQT RNCP PF ƀQQT RNCP PF ƀQQT RNCP
VJ ƀQQT RNCP VJ ƀQQT RNCP
ITQWPF ƀQQT RNCP Ground floor plan
2nd floor plan
PF ƀQQT RNCP PF ƀQQT RNCP
Sunlight
Structure 324
Plan
TQQH RNCP
DCUGOGPV ƀQQT RNCP DCUGOGPV ƀQQT RNCP
Basement floor plan
TQQH RNCP TQQH RNCP
VJ ƀQQT RNCP VJ ƀQQT RNCP
6th floor plan
VJ ƀQQT RNCP VJ ƀQQT RNCP
UV ƀQQT RNCP UV ƀQQT RNCP
1st floor plan
UV ƀQQT RNCP UV ƀQQT RNCP
325
VJ ƀQQT RNCP VJ ƀQQT RNCP
5th floor plan
VJ ƀQQT RNCP VJ ƀQQT RNCP
02
THE URBAN SNAKE
CULTURE CENTER This is a renovation of an old building The function of the old building itself is the vegetable market, where people come and go to buy food every day. The building is in the inner city of Xi'an, close to the city wall. The entire area of the building is very old. In the central area of such a big city, the function of the building and the quality of the building are far behind the development of the modern. The building is too old, and the surrounding humanities are chaotic, and the market lacks management. The traffic lanes are too narrow, the market stalls are old, and the market streamlines are chaotic. But the old market buildings in the region also have its unique style of China's rapid urbanization in the 1970s: the faรงade, the main network, and the simple functional-first design principle, also to meet the huge construction needs of the time. After analysis, we feel that we retain the original building, transform it, and optimize the surrounding environment, transforming it into a combination of market and cultural center.
Comparision (before and after)
Masterplan & Ground floor
CONCEPT Retaining the structural form of the original building, introducing the "snake" linear form of the building into the building, connecting the entire building streamline, from the bottom layer to the top layer, making the original rigid building vision live, at the same time, the interior The communication between people and people becomes diverse, not at the same level, but for different levels of activity communication, making people's activities in the building dynamic and fluid. The serpentine building has different small components attached to it, providing a space for rest and viewing. In the series of serpentine structures, the “moving” and “quiet” connections make the building vibrant.
Plans & Visual analysis
Original structure & removed structure
Inserting the snake
COMPONENTS The renovation of the project has little impact on the original building structure, and the two pillars and some secondary beams are removed, in order to use the space more flexibly. Then the serpentine structure is inserted into it. The position and shape of different serpentine structures correspond to different functions, but most of these functions are related to urban cultural cities, public activities, urban leisure, and the functions of the original market.
MAIN SECTION
03
"Z" CITY CENTER
CONCEPT
CULTURAL CENTER
A cultural city in Chengdu is also a tourist city, but in this park, the old residential area interrupted the flow of the entire park, so we removed the residential area, established a cultural center, and secondly connected the entrances of the surrounding cities. The role of this cultural center is to connect such a link between the entire park and the city, while the cultural center remains part of the city park.
The project is located in Chengdu, China. The venue is located in a park in the center of the city. The project site used to be a dilapidated residential area. Now we transform it into a cultural center of the city to meet the urban public space and public activities in Chengdu. demand
site
park
The integrity of the park was affected
The walk pathes of the park are blocked
The entire park area is kind of separate from the city
THE GROUND FLOOR The ground floor functions mostly with commercial, public activities and leisure: exhibitions, conferences, shops, bars, restaurants, book areas, tea rooms This series of functions enriched the public areas, completed the matching of urban parks, and improved the connectivity of the city.
“Z” BUILDING CONSTRUCTION DETAILS
TOWER CONSTRUCTION
PARAMETRIC PROJECT EXERCISES 1 "ANTS TOWER" 2 "NET SPACE" 3 WOODEN "LOOP"
"ANTS TOWER"
TYPICAL FORMS AND CUBES from point ---bounding box---voronoi3d---typical cubes---different holes Generate different cubes, to different body blocks, and controllable holes
"ANTS TOWER"
NEST SPACE Exploring in the general space of the bird's nest is different from the feeling of the space in our daily life. This is a different experience.
FACADE AND SECTIONS
LOOP OF NEST
Such high and low variety in the mesh nest, can be the functions of rest, entertainment, display, etc.
The mesh nest, connected into a whole loop
"NEST SPACE"
WOODEN LOOP This is a temporary display space, formed by wood, with empty space in the middle, with a downward entrance into this space.
WOODEN LOOP box --twist(Moebius but half of it)---flow---two surface(up and down)---the wood and the structure
"WOODEN LOOP"
QU ZHENG