1 minute read
Another step to connect Cliff Path
The connection of the Cliff Path in Hermanus has come another step closer with the start this week of a public participation process for the basic assessment for environmental authorisation.
What this means in layman’s terms is that the environmental consultants Ecosense have been appointed as the independent Environmental Assessment Practitioners (EAP) responsible for facilitating the basic assessment process for the proposed pedestrian path to connect the two sections of the existing Hermanus Cliff Path via Poole’s Bay.
Advertisement
According to Ecosense the applicant is the Cliff Path Action Group (CPAG), which will facilitate and implement the connection of the Cliff Path, should it be approved by the Department of Environmental Affairs and Development Planning.
The public participation document states the proposed pathway would be located in Poole’s Bay and will connect to the existing Cliff path in the West at Sea Road and in the East at Mickey Way next to Mollergren Park.
Click below to read more.