Work Samples By Daniel Zbarsky
Index 215-15 Northern Boulevard: • Page 6: Elevations • Page 7: Elevations • Page 8: Sections • Page 9: Sections
Throgs Neck Bridge Service Building: • Page 44: Existing Roof Plan • Page 45: New Roof Plan • Page 46: Typical Details • Page 47: Typical Details
No • • • •
Sgt. Dougherty Park: • Page 50: Proposed Schematic Plan • Page 52: Proposed Grading and Materials Plan • Page 53: Section A • Page 54: Comfort Station Floor Plan • Page 55: Comfort Station Roof Plan • Page 56: Comfort Station Elevation A • Page 57: Comfort Station Elevation B • Page 58: Comfort Station Elevation C • Page 59: Comfort Station Elevation D • Page 60: Comfort Station Section S1 • Page 61: Comfort Station Section S2 • Page 62: View from Main Entrance • Page 63: View from Side Entrance • Page 64: View from Skate Park • Page 65: View from Spray Shower
7 Line Station: Pages 12: Existing Plan Layout Pages 13: Option A Plan Layout Pages 14: Option A Plans Pages 15: Option A Profiles
Baltimore Harbor Tunnel Ventilation Buildings: • Page 18: Roof Demolition Plan • Page 19: Roof Plan • Page 20-23: Typical Details 456 Grand Street: • Pages 26-27: Elevations Thesis Portfolio: • Page 32: Diagrams - Legend • Page 33: Diagrams - Plans • Page 34: Organization & Unit Plans • Page 35: Site & Ground Level Plan • Page 36: 2nd & 3rd Level Plans • Page 37: Cross Section & West Elevation • Page 38: Leisure Space View • Page 39: Agriculture Space View • Page 40: Public Space View – Farmer’s Market • Page 41: Public Space View – Performance Area
144 West 139th Street: • Page 68-69: Floor Plans Murray Hill Station: • Page 72: Proposed Location Plan • Page 73: Existing Aerial • Pages 74-86: Construction Phasing • Page 87: Proposed Aerial • Page 88: Proposed Elevator Machine Room • Page 89: Proposed View from Platform
215-15 Northern Boulevard New Core & Shell Commercial Development in Bayside, Queens
Elevations, Sections
6
Elevations
Elevations
7
8
Sections
Sections
9
No. 7 Line Station
Renovation & New Connection Corridor Construction
Presentation: Plans, Sections
12
Existing Plan Layout
Option A Plan Layout
13
14
Option A Plans
Option A Profiles
15
Baltimore Harbor Tunnel Ventilation Buildings Exhaust Vent Construction and Roof Replacement
100% Submission Set: Plans, Details
18
Roof Demolition Plan
New Roof Plan
19
20
Typical Part Plan & Sections
Typ. Details
21
22
Typ. Details
Typ. Details
23
456 Grand Street
New Condo Development in Williamsburg, Brooklyn
Elevations
26
West Elevation
South-West Elevation
27
28
East Elevation
North Elevation
29
Thesis Portfolio
From Rural to Urban: Bridge Housing on the Istanbul Waterfront
Plans, Elevations, Sections, 3D Views
32
Diagrams – Legend
Diagrams – Plans
33
34
Organization & Unit Plans
Site & Ground Level Plan
35
36
2nd & 3rd Level Plans
Cross Section & Elevation
37
38
Leisure Space View
Agriculture Space View
39
40
Public Space View – Farmer’s Market
Public Space View – Performance Area
41
Throgs Neck Bridge Service Building Roof Replacement
70% Submission Set: Plans, Details
44
Existing Roof Plan
New Roof Plan
45
46
Typical Details
Typical Details
47
Sgt Dougherty Park
Renovation & Reconfiguration of Park & Comfort Station
PDC Submission: Plans, Elevations, Sections, 3D Views
Flagpole Play Equipment
Park Entrance with gate
Handball Court
Skate Park Viewing Area
Drinking Fountain
Spray Shower Area Companion Seating Comfort Station
Park Entrance with gate
Basketball Court
Skate Park
0
5
10
Park Entrance with gate
20 FT
Proposed Schematic Site Plan
51
Rubber Safety Surface Colored Seal Coat Asphalt
Precast Concrete Paver (Hanover Matrix 2156) Precast Concrete Paver (Hanover Matrix 2601) Precast Concrete Paver (Hanover Matrix 2601)
Granite Stairs & Coping (Double Grey)
Concrete Admixture (C-41 Acacia Green) Concrete Admixture (SC4272 Cool Bimini) Concrete Admixture (C-25 Sombrero Buff)
Porter Ave
Granite Pavement (Golden Harvest) Granite Pavement (Alamo Red Sand) Concrete (Standard Grey)
Anthony St 0
52
5
10
20 FT
Proposed Grading and Materials Plan
0
2.5 5
10 FT
0
5
20 FT
10
Section A
53
0
54
3
5
10 FT
Comfort Station Floor Plan
0
3
5
10 FT
Comfort Station Roof Plan
55
0
56
3
5
10 FT
Comfort Station Elevation A
0
3
5
10 FT
Comfort Station Elevation B
57
0
58
3
5
10 FT
Comfort Station Elevation C
0
3
5
10 FT
Comfort Station Elevation D
29
0
60
3
5
10 FT
Comfort Station Section S1
0
3
5
10 FT
Comfort Station Section S2
61
62
View from Main Entrance
View from Side Entrance
63
64
View from Skate Park
View from Spray Shower
65
144 West 139th Street
Renovation of Pre-war Low-rise in Harlem, Manhattan
Plans
68
Floor Plans
Floor Plans
69
Murray Hill Station New Elevators and Station Improvements
Proposal: Site Plan, 3D Views
N PROPOSED ELEVATOR
STAIR CLOSURE
PROPOSED ELEVATOR
72
TEMPORARY STAIRS
Proposed Location Plan
MONTH 0
Existing Aerial
73
MONTH 0
74
Construction Phasing
MONTH 1
Construction Phasing
75
MONTH 1
76
Construction Phasing
MONTH 2
Construction Phasing
77
MONTH 2
78
Construction Phasing
MONTH 2
Construction Phasing
79
MONTH 4
80
Construction Phasing
MONTH 6
Construction Phasing
81
MONTH 8
82
Construction Phasing
MONTH 9
Construction Phasing
83
MONTH 9
84
Construction Phasing
MONTH 12
Construction Phasing
85
MONTH 15
86
Construction Phasing
Proposed Aerial
87
88
Proposed Elevator Machine Room
Proposed View from Platform
89