Evy Tsolaki_Portfolio

Page 1

evy tsolaki samples of work


EVY TSOLAKI

Mpotsari’s Park _

landscape

status: project area: 4.185 m2 location: Mpotsari sqare, Thessaloniki, Greece team: Evy Tsolaki - Maria Spaniola - I. Emmanouil A.M. Papoutsopoulou - Katerina Koropouli year: 2014 - 2015 0 1 | PAGE


EVY TSOLAKI

Pocket Park_

landscape

status: project area: 940 m2 location: Plateia M. Dionysiou, Kozani, Greece team: Evy Tsolaki - Maria Spaniola - I. Emmanouil A.M. Papoutsopoulou - Katerina Koropouli year: 2014 - 2015 0 2 | PAGE


EVY TSOLAKI

Piazzale Scogli Rossi_

landscape

&

pubblic buildings

status: competition area: 940 m2 location: Piazzale ‘‘Scogli Rossi’’, Arbatax, Citta’ di Tortoli, Sardegna, Italy team: Evy Tsolaki - Giulia Marabini - Chiara Buffa Raffaele Gagliardi - Marco Solinas year: 2011 0 3 | PAGE


EVY TSOLAKI

Is Mortorius_

layers

landscape

The project aims to make visible the exceptional landscape succession, from the marine bed to the sky, from the subsoil to the phytogenic mantle of macchia mediterranea shrubland, to the territory’s sequential historic control strategies, creating an effective stratigraphy of vistas to explore. The stone modulates the affinity between the ruins and the volumes’ reconstruction in the building’s reformation project, where the existent walls,

renovated and plastered, are clearly distinguished from the stone membranes that contain the new buildings program. The new perforated granitic walls help pass through and disperse daylight and air till they get luminous and transparent to the view. They are membranes in a succession of horizontal, vertical and oblique levels that generate a mineral landscape.

&

pubblic buildings

status: competition location: Is Mortorius promontory - ex batteria militare ‘‘Carlo Faldi’’, Sardegna, Italy team: Evy Tsolaki - Giulia Marabini Chiara Buffa - Vuk Valter year: 2010

0 4 | PAGE


EVY TSOLAKI

mechanized production cut_1

post industrial landscape

The purpose of this study is to restore a post-industrial landscape with its transformation into a rich ecosystem. The idea is based on Gilles Clement΄s three concepts of: garden in motion, planetary garden and the third landscape. The industrial landscape chosen for rehabilitation is the Lignite Center of Western Macedonia (LKDM). The LKDM is the second in capacity in Europe and the sixth worldwide. In this region, more specifically in the trench developed along the axis passing through Florina - Ptolemaida - Kozani - Elassona,

the greatest amount of lignite available in Greece is concentrated. This paper proposes the conversion of a lignite center in a sustainable and autonomous ecosystem with sufficient variety of species of flora and fauna using the existing equipment, the infrastructure and the given landscape. The ecosystem supports also urban structures mainly for controlling the production of agricultural crops and to ensure its function to an optimum level.

&

pubblic buildings

location: Lignite Center of Western Macedonia, Kozani - Ptolemaida, Greece year: 2013 - 2014

thesis project, PSD, University of Thessaly, Greece tutor: Zisis Kotionis

0 5 | PAGE


EVY TSOLAKI

mechanized production cut_2

post industrial landscape

&

pubblic buildings

location: Lignite Center of Western Macedonia, Kozani - Ptolemaida, Greece year: 2013 - 2014

thesis project, PSD, University of Thessaly, Greece tutor: Zisis Kotionis 0 6 | PAGE


EVY TSOLAKI

an ideal machine for the mud’s island in the venice lagoon_1 principal stages of the island’s transformation

1. the mud’s island - Tresse - at the present

2. creation of the second island the ideal machine is in function

3. vision of the area in the future part of the mud is given back to nature

post industrial landscape

The Tresse island was created in the lagoon as a “box” for the storage of polluted mud deriving from the digging of the canals in the industrial area of “porto Marghera”. . The project suggests an invertion for a rejected area to be turned into an integral part of the landscape. Using the same mud stored for years in the old island an ideal machine is created for the temporary storage and recycling of dirty mud. The machine consists of two islands separated but complementary. They are connected and every movement in one of the two influences the other. The mud is the material for their construction and in the same time it is the reason for their existence. When the old island is being destroyed the new one is being created.

The whole process is set on a dynamic way and it depends on the capacity of the material to change. The transformation of the island is slow but complete. The circle islands are the last to remain on stage on a respond to a re-action of nature. The program includes a Research Center and an energy production area of solar panels. The building is a steel circle island that emerges from the lagoon and is exposed to the tide variations. The reticular shell gives a sense of lightness and the large hole in the center creates a wide water piazza. The height changes gradually in order to create an entrance and a passage for boats and gondolas.

&

pubblic buildings

location: island of Tresse, Venice lagoon, Italy date: 2006 - 2007

thesis project Diploma, University IUAV of Venice, Italy tutors: Margherita Vanore Imma Jansana Roberto Zancan

0 7 | PAGE


EVY TSOLAKI

an ideal machine for the mud’s island in the venice lagoon_2 sequence of the different stages of the the island’s transformation and of mud filling of the basins

creation and destruction:

post industrial landscape

pubblic buildings

location: island of Tresse, Venice lagoon, Italy date: 2006 - 2007

Notes: scene 00: Current situation. The old island is maximum 12 m high. scene 01: Beginning of the exportation of mud from the old island and construction of the new island with the same mud. scene 09: Construction of the first basin in the new island and beginning of filling in. Continuation of the digging & exporta tion of the mud in the old island. scene 19: Basins and roads are complete. The machine is now in full function.

&

scene 20: Beginning of the destruction. Emergency situation is finished. The basins are not necessary any more. scene 28: The backbone of the machine. The roads connecting the circle-islands are essential for the creation of the green area. scene 29: In the future. What is given back to nature.

thesis project Diploma, University IUAV of Venice, Italy tutors: Margherita Vanore Imma Jansana Roberto Zancan

0 8 | PAGE


EVY TSOLAKI

Greenpoint_

public building

A Green Point is a place that includes the appropriate equipment and the facilities to recycle, reuse and repair / upcycle items, in order to inform, to reinforce environmental awareness and participation of citizens in waste prevention programs. The main concept relies on a prototype system of metallic beams, joints and panels, which form the volumes and the urban furniture. A grid of 80 cm step is used horizontally and vertically for ergonomic reasons, providing flexibility and ensuring the economy of the structure.

The whole project is formed by four small spatial structures, each one of which is indicated by a different color, corresponding to a different use, and thus facilitating both the orientation and the visual communication. The individual parts are unified by a planted perforated roof. Extensive planting flows around the space giving emphasis to the GP’s ecological character, composing an urban garden.

status: competition - 1st prize area: 500 m2 location: indicative plot, Kozani, Greece client: DIADYMA S.A. (Waste Management of Western Macedonia), Greece team: Evy Tsolaki, Giotis Kladopoulos, Maria Spaniola year: 2015

0 9 | PAGE


EVY TSOLAKI

Reuse Center _

pubblic building

Developement of Concept and Developed Design for two buildings and a covered storage area, with a logistics center for reused and recycled items, an information center and a repair / upcycling lab, as well as Preliminary Landscape Design for the adjacent area

&

landscape

building area: 570 m2 | landscape area: 1436 m2 location: Kozani, Greece client: DIADYMA S.A. (Waste Management of Western Macedonia), Greece team: E. Tsolaki, M. Spaniola, G. Kladopoulos year: 2016

1 0 | PAGE


EVY TSOLAKI

Proskynitari_

section

plan public building

Developed project from concept up to Planning Permits Documentation and Building permit submition. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site.

status: ongoing program: small chapel area: 6.80 m2 location: Lefkopighi, Kozani, Greece client: Church of Kozani, IMSK _cost: 5,500â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2014 1 1 | PAGE


EVY TSOLAKI

Linear House_

schemes of the volumes

plan level 3

plan level 2

plan level 1

p r i vat e r e s i d e n c e

Developed project up to Planning Permits Documentation. Prepared proposals and presentations for client.

status: project area: 470 m2 location: Lefkanti, Island of Euvoea, Greece client: private team: Evy Tsolaki year: 2011 1 2 | PAGE


EVY TSOLAKI

Pafylis beauty shop_

plan

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen.

|

interior design

status: realized area: 93 m2 location: Kozani, Greece client: private _ cost: 55,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2016 1 3 | PAGE


EVY TSOLAKI

Pafylis beauty shop_

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen.

|

interior design

status: realized area: 93 m2 location: Kozani, Greece client: private _ cost: 55,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2016 1 4 | PAGE


EVY TSOLAKI

Siampanopoulos Retail shop_

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen. Designed all furniture and central lighting.

|

interior design

status: realized area: 160 m2 location: Kozani, Greece client: private _cost: 60,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2014 1 5 | PAGE


EVY TSOLAKI

Siampanopoulos Retail shop_

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen. Designed all furniture and central lighting.

|

interior design

status: realized area: 160 m2 location: Kozani, Greece client: private _cost: 60,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2014 1 6 | PAGE


EVY TSOLAKI

Blue Deer Bar_

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen.

|

interior design

status: realized area: 96 m2 location: Kozani, Greece client: private _cost: 47,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2015 1 7 | PAGE


EVY TSOLAKI

Latino Ristorante italiano_

railings detail

table detail plan second floor

plan first floor refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen.

|

interior design

status: realized area: 110 m2 location: Kozani, Greece client: private _ cost: 52,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2013 1 8 | PAGE


EVY TSOLAKI

T26 Bar_

refurbishment

Developed project from concept up to construction drawings and details. Managed the whole project from the design phase up to final construction. Handled the supervision of the construction and the problems encountered on site. Responsable for products research, suppliers offers and assignments to craftsmen.

|

interior design

status: realized area: 97 m2 location: Kozani, Greece client: private _ cost: 65,000â‚Ź team: Evy Tsolaki, Maria Spaniola year: 2013 1 9 | PAGE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.