1 minute read

July 4

Next Article
CNYstrong

CNYstrong

Kate Hill

On tuesday, July 4, crowds of community members and visitors gathered in downtown Cazenovia for the traditional Fourth of July parade. The festive event was organized by Project CAFÉ in cooperation with the Greater Cazenovia Area Chamber of Commerce and the Village of Cazenovia.

Town to improve water pollution control facility, sewer district

by kAtE Hill Staff Writer

On July 10, the Cazenovia Town Board adopted a resolution related to the proposed increase and improvements to the Town of Cazenovia Water Pollution Control Facility and the Town of Cazenovia Consolidated Sanitary Sewer District.

At the request of the town, GHD Consulting Service, Inc. has prepared a July 2023 map, plan, and report titled “Cazenovia Water Pollution Control Facility Engineering Report” relating to certain repairs and betterments to the water pollution control facility and the increase and improvements to the consolidated sanitary sewer district.

The engineering report is on file in the office of the town clerk and is available for public viewing.

According to the resolution, the proposed facilities improvement project includes the reconstruction of the influent building and equipment improvements, the construction of two new primary clarifiers and a new primary distribution box, the rehabilitation of the existing final clarifiers and the construction of one additional final clarifier, the conversion of the existing chlorine disinfection system to UV disinfection and associated improvements, structural improvements, electrical and lighting improvements, and heating and ventilation improvements.

This article is from: