Sand Pit - complex
The Sand Pit fits around the complex and is mainly a safety element. You will need small tyres, 3” bolts and budget paint .You will not need to cement anything in. you must make sure that the pit extends at least 2 metres from the end of the slide and fireman’s pole..
Per sand pit Small tyres 3” bolts with 2 washers Sand
Amount 36-40 36-40 1 big trip
How to build 1. Once the complex is complete then you can lay the tyres around it as in the
diagram.
2. Make sure that there is at least 2 metres between the end of the slide and the tyres 3. 4. 5. 6.
as well as 2 metres from the base of the fireman’s pole and the tyres. Now drill each tyre an bolt to the two tyres next to it. Fill the middle of the tyres with earth and compact. Paint. Fill the middle of the sand pit with soft sand.
Colour Scheme Paint in the order red, orange, yellow, green, blue, purple and repeat