Slide complex

Page 1

Slide - complex

The Slide is a playground classic and is designed to be attached to one of our platforms in a complex. You will need 2.5� 3mm mild steel pipe, galvanised sheet and metal paint. You will also need to cement in the foundations of the slide. Make sure you have at least 1.5 metres of space around the Slide and a minimum of 2 metres in front of it. Per Slide 2.5� 3mm, mild steel pipe 2mm galvanised sheet

Amount 60ft 2ft by 8ft

How to build 1. Weld the frames to the measurements in the diagrams. 2. Make sure that there are no sharp edges. 3. Before cementing in the frame, sand and paint with undercoat the section of metal that will be going in the foundation. 4. Weld the slide to the platform and then cement in the foundation. 5. Paint.

Colour Scheme For colour scheme see complex guide 1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.