On 22 March 2019 26/03/62
1
OVERVIEW OF WATER SITUATION Chachoengsao Reserve Pond P2
P4 P3
P5
12
P6
Private Pond
Samnakbok Reserve Pond P7
Bang Phra res. P9
60.37
37
P-BPN P8
6.58
Nong Kho res.
P10
IN
RAYONG-CHONBURI AREA 22 MAR 2019
Chonburi P1
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
295.00
60.37
6.58
45.47
110.08
27.05
159.79
52%
31%
57%
67%
67%
54%
48.32
5.58
42.47
96.58
24.05
139.79
Inflow into reservoir (MCM) (On 21 Mar 2019)
-
-
-
0.005
0.301
Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area
-2.02
-0.02
Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM)
-
0.306 -3.19
-3.62
+0.44 -5.86
-2.04
-6.38
66.95 MCM (48.4 %)
182.60 MCM (64.46%)
Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
34
Khlong Yai res. Nong P11Pla Lai res. P12 P-NP3 45.47 P13 Dok Krai res. P14 110.08
159.79
27.05
Prasae res. P
XX
XX XX
P15
177
Raw Water Pipe Line (EW) P16
Source of data: Royal Irrigation Department
Existing Pipe Network
Constructing Pipe Network
Demand 2560 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network Constructing Pipe Network
WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR
26/03/62
3
Water situation of Bangphra Reservoir (by Year)
URC
LRC
26/03/62
4
Water situation of Nongkho Reservoir (by Year)
26/03/62
5
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Water situation of Dokkrai Reservoir (by Year)
26/03/62
7
Water situation of Nongplalai Reservoir (by Year)
Water situation of Klongyai Reservoir (by Year)
WATER SITUATION OF PRASAE RESERVOIR
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2019 Planned Water Volume (MCM) 2019
Measure JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Total
8.0
8.0
8.0
8.0
8.5
8.0
8.5
8.0
8.5
8.0
8.0
8.0
73.50 (97.50)
5.0
5.0
5.0
5.0
5.0
5.0
5.0
1. Primary measures
1.1Water diversion via pumping from Prasae Reservoir
1.2 Divert Water from Bangpakong River + Private Pond 1.3 Divert Water from Klong Pra Ong Chaiyanuchit Total
Planned PS - KY Planned PS- NPL Actual PS-KY
5.04
4.56
Actual PS-NPL
-
-
Planned
35.00
21 Mar 2019 4.48
10.76
-
-
0.71 0.84 1.08 1.52 1.66 1.31 2.08 0.68 0.70 0.90
Actual
1.04
Actual
-
Planned
9.22
1.83
11.48
21 Mar 2019 1.62
4.49
8.84 14.08 14.52 15.16 14.31 15.58 13.68 14.2
8.9
8
8
143.98
Reservoir Simulation On 22 Mar 19 Volume 182.60 MCM.
THANK YOU