2021-01-08-Water Situation Weekly Report

Page 1

On 8 Jan 2021 13/01/64

1


Overview of water situation in Rayong-Chonburi area on 8 Jan 2021 P2

P4

Chonburi

P1

P3

P5 P6

Private Pond

Reservoir capacity (MCM) Current storage volume 12 (MCM) Percentage of reservoir capacity Useable storage volume Samnakbok (excluding Dead Reserve Pond Storage) (MCM) P7

73.50 P9

P-BPN

P8

Bangphra

Nongkho

Dokkrai

Nongplalai

Klong Yai

Prasae

117.00

21.40

79.41

163.75

40.10

295.00

73.50

16.50

68.79

153.89

37.52

226.25

63%

77%

87%

94%

94%

77%

61.45

15.50

65.79

140.39

34.52

206.25

-

-

-

-

0.138

-1.98

-0.56

Inflow into reservoir (MCM) (On 7 Jan 2021)

Bang Phra res. 16.50

Nong Kho res.

P10

37

Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area

34

153.89

68.79

Rayong

-1.19

-8.44

90.00 MCM (65.0%)

260.21 MCM (91.86%)

37.52

-3.53

-1.96

226.25

Prasae res.

P

P11 P12 P-NP3 P13

P14

XX

XX XX

P15

177

-3.72

-2.54

Khlong Yai res. Nong Pla Lai res.

Dok Krai res.

-

0.138

Ref: Royal Irrigation Department

P16

Raw Water Pipe Line (EW) Existing Pipe Network Constructing Pipe Network

Demand 2564 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network Constructing Pipe Network


Water situation of Bangphra, Nongkho Reservoir

13/01/64

3


Water situation of Bangphra Reservoir (by Year)

13/01/64

4


Water situation of Nongkho Reservoir (by Year)

13/01/64

5


Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs


Water situation of Dokkrai Reservoir (by Year)

13/01/64

7


Water situation of Nongplalai Reservoir (by Year)


Water situation of Klongyai Reservoir (by Year)


Water situation of Prasae Reservoir


Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2021 Planned Water Volume (MCM) 2021

Measure

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

8.0

8.0

8.0

8.0

8.0

3.00

3.00

3.00

3.00

3.00

SEP

OCT

NOV

DEC

Total

1. Primary measures

1.1Water diversion via pumping from Prasae Reservoir PS: 1. Plans for pumping water from the Prasae reservoir will adjust according to the water situation 2. Prasae – Nong Pla Lai start divert from 5 Jan 2021. Supply water to the community along the pipe. 1.2 Divert Water from Bangpakong River + Private Pond

Planned PS - K Y Planned PS- NPL

3.00

24.00

3.00

Actual PS-KY Actual PS-NPL

Planned Private Pond

0.00

7 Jan 0.07 1.86

Planned Actual P rivate P ond

Actual

Bangpakong

Planned Actual

0.07 1.68

1.86

0.35

5.75 6.80

Bangpakong

1.3 Divert Water from Klong Pra Ong Chaiyanuchit

3.00

40.00

7 Jan 0.43

7.80

7.40

22.00

0.43


Target Line

Data is currently being updated!


Reservoir Simulation

Data is currently being updated!