On 8 Jan 2021 13/01/64
1
Overview of water situation in Rayong-Chonburi area on 8 Jan 2021 P2
P4
Chonburi
P1
P3
P5 P6
Private Pond
Reservoir capacity (MCM) Current storage volume 12 (MCM) Percentage of reservoir capacity Useable storage volume Samnakbok (excluding Dead Reserve Pond Storage) (MCM) P7
73.50 P9
P-BPN
P8
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
295.00
73.50
16.50
68.79
153.89
37.52
226.25
63%
77%
87%
94%
94%
77%
61.45
15.50
65.79
140.39
34.52
206.25
-
-
-
-
0.138
-1.98
-0.56
Inflow into reservoir (MCM) (On 7 Jan 2021)
Bang Phra res. 16.50
Nong Kho res.
P10
37
Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area
34
153.89
68.79
Rayong
-1.19
-8.44
90.00 MCM (65.0%)
260.21 MCM (91.86%)
37.52
-3.53
-1.96
226.25
Prasae res.
P
P11 P12 P-NP3 P13
P14
XX
XX XX
P15
177
-3.72
-2.54
Khlong Yai res. Nong Pla Lai res.
Dok Krai res.
-
0.138
Ref: Royal Irrigation Department
P16
Raw Water Pipe Line (EW) Existing Pipe Network Constructing Pipe Network
Demand 2564 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network Constructing Pipe Network
Water situation of Bangphra, Nongkho Reservoir
13/01/64
3
Water situation of Bangphra Reservoir (by Year)
13/01/64
4
Water situation of Nongkho Reservoir (by Year)
13/01/64
5
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Water situation of Dokkrai Reservoir (by Year)
13/01/64
7
Water situation of Nongplalai Reservoir (by Year)
Water situation of Klongyai Reservoir (by Year)
Water situation of Prasae Reservoir
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2021 Planned Water Volume (MCM) 2021
Measure
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
8.0
8.0
8.0
8.0
8.0
3.00
3.00
3.00
3.00
3.00
SEP
OCT
NOV
DEC
Total
1. Primary measures
1.1Water diversion via pumping from Prasae Reservoir PS: 1. Plans for pumping water from the Prasae reservoir will adjust according to the water situation 2. Prasae – Nong Pla Lai start divert from 5 Jan 2021. Supply water to the community along the pipe. 1.2 Divert Water from Bangpakong River + Private Pond
Planned PS - K Y Planned PS- NPL
3.00
24.00
3.00
Actual PS-KY Actual PS-NPL
Planned Private Pond
0.00
7 Jan 0.07 1.86
Planned Actual P rivate P ond
Actual
Bangpakong
Planned Actual
0.07 1.68
1.86
0.35
5.75 6.80
Bangpakong
1.3 Divert Water from Klong Pra Ong Chaiyanuchit
3.00
40.00
7 Jan 0.43
7.80
7.40
22.00
0.43
Target Line
Data is currently being updated!
Reservoir Simulation
Data is currently being updated!