2021-01-15-Water Situation Weekly Report

Page 1

On 15 Jan 2021 22/01/64

1


Overview of water situation in Rayong-Chonburi area on 15 Jan 2021 P2

P4

Chonburi

P1

Rayong

Bangphra

Nongkho

Dokkrai

Nongplalai

Klong Yai

Prasae

117.00

21.40

79.41

163.75

40.10

295.00

71.40

15.98

67.29

148.42

33.95

222.34

61%

75%

94%

91%

85%

75%

59.35

14.98

64.29

134.92

30.95

202.34

-

-

0.102

0.117

0.102

-2.10

-0.52

P3

P5 P6

Private Pond

Reservoir capacity (MCM) Current storage volume 12 (MCM) Percentage of reservoir capacity Useable storage volume Samnakbok (excluding Dead Reserve Pond Storage) (MCM) P7

Inflow into reservoir (MCM) (On 14 Jan 21)

71.40

Bang Phra res. P-BPN

P9

P8

15.98

Nong Kho res. P10

37

Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area

34

148.42

67.29

-1.50

-5.48 -10.55

87.38 MCM (63.1%)

249.66 MCM (90.70%)

33.95

-3.58 -3.91

-2.62

222.34

Prasae res.

Khlong Yai res. Nong Pla Lai res.

Dok Krai res.

-

0.320

P

P11 P12 P-NP3 P13

P14

XX

XX XX

P15

177 Ref: Royal Irrigation Department

Raw Water Pipe Line (EW) P16

Existing Pipe Network Constructing Pipe Network

Demand 2564 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network Constructing Pipe Network


Water situation of Bangphra, Nongkho Reservoir

22/01/64

3


Water situation of Bangphra Reservoir (by Year)

22/01/64

4


Water situation of Nongkho Reservoir (by Year)

22/01/64

5


Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs


Water situation of Dokkrai Reservoir (by Year)

22/01/64

7


Water situation of Nongplalai Reservoir (by Year)


Water situation of Klongyai Reservoir (by Year)


Water situation of Prasae Reservoir


Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2021 Planned Water Volume (MCM) 2021

Measure JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

8.0

8.0

8.0

8.0

8.0

3.00

3.00

3.00

3.00

6.00

SEP

OCT

NOV

DEC

Total

1. Primary measures

1.1Water diversion via pumping from Prasae Reservoir PS: 1. Plans for pumping water from the Prasae reservoir will adjust according to the water situation 2. Prasae – Nong Pla Lai start divert from 5 Jan 2021. Supply water to the community along the pipe. 1.2 Divert Water from Bangpakong River + Private Pond

Planned PS - KY Planned PS- NPL

3.00

30.00

6.00

Actual PS-KY Actual PS-NPL

Planned Private Pond

0.00

14 Jan 0.17 1.86

Planned Actual Private Pond

Actual Bangpakong

Planned Actual

0.17 1.68

1.86

0.35

5.75

6.80

Bangpakong

1.3 Divert Water from Klong Pra Ong Chaiyanuchit

3.00

40.00

14 Jan 0.85

7.80

7.40

22.00

0.85


Target Line and Reservoir Simulation in Chonburi

Storage Volume 138.40 MCM

155

On 15 Jan 2021 Water Volume 87.38 MCM or 63.1%

Normal Status (All Clear)

155

130 Prepare water reserve •

Surveillance of water scarcity

Water shortage warning Minimum storage volume15.05 MCM.

• •

Divert water from Bang Pa Kong River and Pra Ong Chaiyanuchit (diversion will according to the water situation) Increase water diversion from Rayong (diversion will according to the water situation)

Divert Water from Khlong Luang Ratchalothorn reservoir (diversion will according to the water situation) Consideration for another private pond Reduce water usage for various activities


Target Line and Reservoir Simulation in Rayong

On 15 Jan 2021 Water Volume 249.66 MCM or 90.7%

Storage Volume 138.40 MCM

Normal Status (All Clear)

220

170 Surveillance of water scarcity

220

Divert water from Prasae reservoir via Prasae-Klong Yai pipeline and Prasae-Nong Pla Lai pipeline (diversion will according to the water situation) Divert water from Wat La Harn Rai to Nong Pla Lai reservoir (diversion will according to the water situation)

Water shortage warning

230

• •

Divert water from Prasae reservoir via Prasae-Klong Yai pipeline and Prasae-Nong Pla Lai pipeline (Full efficiency) Divert water from Wat La Harn Rai to Nong Pla Lai reservoir (Full efficiency) Reduce water consumption for all activities

Minimum storage volume 31.70 MCM. 22/01/64

13


Target Line and Reservoir Simulation in Prasae

Storage Volume 295.0 MCM

On 15 Jan 2021 Water Volume 222.34 MCM or 75.4%

Normal Status (All Clear)

250

250

205 Prepare water reserve •

Surveillance of water scarcity

• •

Water shortage warning Minimum storage volume 20.0 MCM.

Divert water from Khlong Saphan canal to Prasae reservoir (diversion will according to the water situation) Divert water from Wang Ta Nod canal to Prasae reservoir (diversion will according to the water situation) decrease divert water from Prasae reservoir (diversion will according to the water situation)

• Reduce water consumption for all activities


THANK YOU