Summary of the water volume and mitigation measures in Rayong
and Chonburi
Provinces for 2024
On 19th July 2024
Overview
Water situation of Bangphra, Nongkho Reservoir
Water situation of Bangphra Reservoir (by Year)
Water situation of Nongkho Reservoir (by Year)
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Water situation of Dokkrai Reservoir (by Year)
Water situation of Nongplalai Reservoir (by Year)
Water situation of Klongyai Reservoir (by Year)
Water situation of Prasae Reservoir
(MCM) 2024
1. Primary measures
1.1Water diversion via pumping from Prasae Reservoir
PS. Divert water to irrigation area during Jan to Mar 2024
1.2
1.3 Klong Saphan reverse pumping station
1.4 Divert Water from Klong Pantong - Klong Pra Ong Chaiyanuchit
Measure
2. Secondary measures
2.1 La Harn Lai
Rayong and Chonburi Provinces 2024
2.2 Wang Ta Nod
Target Line and Reservoir Simulation in Chonburi
Surveillance of water scarcity
• Divert water from Bang Pa Kong River and Pra Ong Chaiyanuchit (diversion will according to the water situation)
• Increase water diversion from Rayong (diversion will according to the water situation)
Water shortage warning
• Divert Water from Khlong Luang Ratchalothorn reservoir (diversion will according to the water situation)
• Consideration for another private pond
• Reduce water usage for various activities
Target Line and Reservoir Simulation in Rayong
On 19 Jul 2024
Water Volume 153.34 MCM or 55.71%
Increase reservoir capacity for temporary 318.13 MCM.
230 220
Normal Status All Clear) Prepare water reserve
Normal Status All Clear)
170 220
170
• Divert water from Prasae reservoir via Prasae-Klong Yai pipeline and PrasaeNong Pla Lai pipeline (diversion will according to the water situation)
Surveillance of water scarcity
Water shortage warning
Minimum storage volume 31.70 MCM.
• Divert water from Wat La Harn Rai to Nong Pla Lai reservoir (diversion will according to the water situation)
• Divert water from Prasae reservoir via Prasae-Klong Yai pipeline and Prasae-Nong Pla Lai pipeline (Full efficiency)
• Divert water from Wat La Harn Rai to Nong Pla Lai reservoir (Full efficiency)
• Reduce water consumption for all activities
Target Line and Reservoir Simulation in Prasae
Storage Volume 295.0 MCM
Normal Status All Clear)
Prepare water reserve
Surveillance of water scarcity
Water shortage warning
Normal Status All Clear)
Prepare water reserve
• Divert water from Khlong Saphan canal to Prasae reservoir (diversion will according to the water situation)
• Divert water from Wang Ta Nod canal to Prasae reservoir (diversion will according to the water situation)
• decrease divert water from Prasae reservoir (diversion will according to the water situation)