Overview of water situation in Rayong-Chonburi area on 24 Apr 2020 Chachoengsao Reserve Pond P2
P4 P3
P5
12
P6
Private Pond
Samnakbok Reserve Pond P7
P9
P-BPN P8
Bang Phra res. 24.37
37
3.30
Nong Kho res.
P10
Chonburi
P1
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
295.00
24.37
3.30
9.43
22.62
3.96
33.03
21%
15%
12%
14%
10%
13%
12.32
2.30
6.43
9.12
0.96
13.03
-
-
0.075
0.056
0.133
Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM) Inflow into reservoir (MCM) (On 23 Apr 20)
0.265
-
Water volume compared -4.89 -5.64 -7.22 -2.59 +0.12 to previous week -32.53 (-decrease, +increase) -10.53 -9.69 (MCM) Total water volume in 27.67 MCM 36.01 MCM each area (20.0%) (12.71%) Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
33.03
3.96
34
Prasae res.
22.62Khlong Yai res.
9.43
Dok Krai res.
Nong Pla Lai res.
P
P11
P14
P12 P-NP3 P13
XX
XX XX
P15
177
Raw Water Pipe Line (EW) P16
Source of data: Royal Irrigation Department
Existing Pipe Network
Constructing Pipe Network
Demand 2020 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network Constructing Pipe Network
Water situation of Bangphra, Nongkho Reservoir
26/04/63
3
Water situation of Bangphra Reservoir (by Year)
26/04/63
4
Water situation of Nongkho Reservoir (by Year)
26/04/63
5
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Water situation of Dokkrai Reservoir (by Year)
26/04/63
7
Water situation of Nongplalai Reservoir (by Year)
Water situation of Klongyai Reservoir (by Year)
Water situation of Prasae Reservoir
On 24 Apr 2020 Water Volume 36.35 MCM.
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2020 Planned Water Volume (MCM) 2020
Measure JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
Total
-
8.0
8.0
8.0
8.0
8.0
-
-
-
8.0
8.0
8.0
40.00
6.2
5.80
6.20
3.08
3.6
3.6
3.6
3.6
3.6
6.2
6.2
6.2
0.03 6.80
7.72
Actual PS-NPL
6.26
6.12
23 Apr 6.45 5.41
Planned Private Pond
2.4
3.30
3.61
1. Primary measures 1.1Water diversion via pumping from Prasae Reservoir
Planned PS - KY Planned PS- NPL Actual PS-KY
1.2 Divert Water from Bangpakong River + Private Pond
23 Apr 6.32
3.77
Planned Actual Private Pond
Actual Bangpakong
1.3 Divert Water from Klong Pra Ong Chaiyanuchit
Planned Actual
0.23
0.33
-
-
24 Apr 1.09 2.09
21.28
(57.88)
20.87 24.24 3.85
2.72
20.20
0.55 0.55
Bangpakong
(64.00)
6.08
5.90
6.09
2.35
20.97
3.74
Reservoir Simulation
On 24 Apr 2020 Water Volume 36.35 MCM.