Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015 16th November 2015 Water War Room

0


OVERVIEW OF WATER Chachoengsao Reserve Pond P2

P4 P3

P5

13

P6

Private Pond

Samnakbok Reserve Pond

Bang Phra res. 46.75

82

P-BPN P8

RAYONG-CHONBURI AREA 16TH NOVEMBER 2015

Chonburi

Rayong

Bangphra

Nongkho

Dokkrai

Nongplalai

Klong Yai

Prasae

117.00

21.40

71.40

163.75

40.10

248.00

46.75

7.56

79.53

159.59

42.22

275.10

40%

35%

111%

97%

105%

111%

34.70

6.56

76.53

146.09

39.22

255.10

-

-

0.63

1.40

0.05

Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM)

Inflow into reservoir (MCM)

P7

P9

P1

SITUATION IN

7.56

Nong Kho res.

P10

28

2.08

-

Water volume compared +1.85 +0.52 +2.12 +1.10 -0.11 to previous week -2.55 (-decrease, +increase) +2.37 +3.11 (MCM) Total water volume in 54.31 MCM 281.34 MCM each area (39.2 %) (102.2%) Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir

275.10

42.22

Prasae res.

Khlong Yai res. 159.59 P11Pla Lai res. 79.53 Nong P12 P-NP3

Dok Krai res.

P14

P

P13

28

120 P7

P15

180

P16

Raw Water Pipe Line (EW)

Source of data: Royal Irrigation Department

Demand 2558 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)

Existing Pipe Network

Existing Pipe Network

Constructing Pipe Network

1 Constructing Pipe Network


SUMMARY OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN RAYONG AND CHONBURI PROVINCES Planned water volume Measure

2015 Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Total

7.5*

7.5

9.0

9.0

9.0

9.0

9.0

9.0

12.0

12.0

85.5

1. Primary measures

Planned

1.1 Water diversion via pumping from Prasae Reservoir

Actual

12 Oct 2015

6.61

8.86

8.69

8.32

1.2 Pump water from Rayong River back to Nongplalai Reservoir using RID’s Wat Lahanyai pump station. 1.3 Pump water from Rayong River 1.4 Water transfer from Bangpakong River actual Total 2.Divert water from Praongchaiyanuchitcanal (Water Volume 500,000 cmd Start pump on 16 Sep 15 to 16 Oct 15 Because of pipe has leakage)

7.5

7.5

9.0

9.0

9.0

9.22

8.75

2.66

53.11

1.0

1.0

2.0

1.0

3.0

4.5

1.71

3.86

6.23

10.0

13.0

14.5

0.5

0.5

1.0

4.5

1.5

14.5

Stop pump 10 Nov 2015

0.85 17.0

Stop pump 15 Nov 15 16 Oct 15

Actual

14.03

4.5

12.65 14.0

103.0

18.53

2


Simulation of water volume in main Rayong Reservoirs

16 Nov 15 Water Volume: 281.34 MCM.

3


WATER SITUATION

OF

NONGPLALAI, DOKKRAI

Source of data: Royal Irrigation Department

AND

KLONGYAI RESERVOIRS


WATER SITUATION

OF

BANGPHRA

Source of data: Royal Irrigation Department

AND

NONGKHO RESERVOIRS

5


WATER SITUATION

OF

PRASAE RESERVOIR

Source of data: Royal Irrigation Department

6


WATER SITUATION

OF

DOKKRAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

NONGPLALAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

KLONGYAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

BANGPHRA RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

NONGKHO RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN

RAYONG AND CHONBURI PROVINCES

12


Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16

(1)Prasae : Nongplalai Pump Station: Completed pouring concrete, lean concrete base for support pump and motor and intake channel. Install roof will be finish end of November. (2)Pipe laying for 30 km section: Completed pipe jacking across Route 344 and joined the main pipe only 1.04 km. pipe laying left. Start formwork for Butterfly valve, Air valve Blow off manhole. (3)Head Tank: Installing Slip Form which already 100% of work process. Start install Anchorage head for posttension system 80% of work process. (4)Sub_115 kv: The process of foundation and tools installation about 80%

*Remarks: between negotiation with supplier


Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.) (1)

(3)

(2)

14


Summary progress of Tabma reservoir Objective For increase water supply in Rayong area not less than 47 MCM/year Project Construct pumping station nearby Rayon River and Tabma canal. For divert and keep water inside Tabma reservoir then send the water into EW pipe line system. Budget: Water Volume: Construction period: Due date:

2,202.7 million baht 47 MCM/year 60 months 31 Dec 2015

Work progress (Plan) : Actual: Delay from plan:

91 % (20 Oct 58) 69 % 25.2 %

Remarks: The project don’t have work of process because of heavy rainfall.