Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2016 16 September 2016 Water War Room
OVERVIEW OF WATER Chachoengsao Reserve Pond P2
P4 P3
P5
17
P6
Private Pond
Samnakbok Reserve Pond P7
Bang Phra res. P9
36.69
76
P-BPN P8
4.15
Nong Kho res.
P10
P1
Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM) Inflow into reservoir (MCM) (On 25 AUG 16) Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area
SITUATION IN
RAYONG-CHONBURI AREA 16 SEP 2016
Chonburi
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
248.00
36.69
4.15
23.01
45.65
25.75
156.08
31%
19%
29%
28%
64%
63%
24.64
3.15
20.01
32.15
22.75
136.08
-
-
0.1687
-
-
+8.08
+0.67
-
0.1687 +1.98
+0.29
+8.75
+3.64
40.84 MCM (29.5%)
94.4 MCM (33.3%)
+1.37 +5.28
Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
29
156.08
25.75
Khlong Yai res. 45.65 Nong P11Pla Lai res. P12 P-NP3 23.01 P13 Dok Krai res. P14
Prasae res.
P
29
120 P7
P15
184
P16
Raw Water Pipe Line (EW)
Demand 2558 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)
Existing Pipe Network
Existing Pipe Network
Constructing Pipe Network
Constructing Pipe Network
Source of data: Royal Irrigation Department
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces Planned water volume Measure
Actual
*Water Volume from Oct –Dec 2015 Total 10.64 MCM
Planned
1. Primary measures 1.1 Water diversion via pumping from Prasae Reservoir
2016 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Total
8
8
0
9
9.3
9
9.3
9.3
9
15
15
15
115.9
16 SEP 2016
8.6
8.2
1.32
8.92
9.02
8.15
9.17
9.21
1.2 Pump water from Rayong River back to Nongplalai Reservoir using RID’s Wat Lahanyai pump station. 1.3 Pump water from Rayong River
Total
1.0
Plan Actual
1.4 Water transfer from Bangpakong River + Private Pond
Plan
8
8
0
9
9.3
9
9.3
77.75
4.52
1.0
2.0
0.5
0.5
1.0
4.0
5.0
7.0
7.0
4.0
27.0
13.3
15
23
22.5
19.5
145.9
Remarks 1. Mar 2016 had dregging sediment in front of Mor Mui weir which place inside Klong Nam Dang canal. So it needed to stop divert water from Prasae reservoir for a whole month and adjust the water diversion plan from 8 MCM to 9 or 9.3 MCM per month started from Apr – Sep 2016 2. On Oct – Dec 2016 Plan to divert water can be change depend on water situation
3
Simulation of water volume in main Rayong Reservoirs
Assume by used rainfall as 1997 in first half year and no inflow between JUN - AUG
16 SEP 2016 Water Volume : 94.4 MCM.
WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Source of data: Royal Irrigation Department
Water situation of Prasae Reservoir
Source of data: Royal Irrigation Department
Water situation of Dokkrai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongplalai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Klongyai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Bangphra Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongkho Reservoir (by Year)
Source of data: Royal Irrigation Department
PROGRESS OF WATER SHORTAGE
PREVENTION AND MITIGATION MEASURES IN
RAYONG AND CHONBURI PROVINCES On 31 AUG 2016
Prasae – Nongpalai project (1) Prasae-Nongplalai Pump Station: Completed pouring concrete, lean concrete base for support pump and motor, intake channel, roof work. Now a days work are 1.1 Structure of pump station completed between on architecture process 1.2 Install surge valve and gate valve completed 1.3 Sub 115 kV control building completed 1.3 Construction small weir completed 1.4 Flow meter on process 90% 1.5 Construction SCADA building process for 90% Actual: 95.55 %
(1) Pipe laying for 30 km section: Completed pipe jacking across Route 344 and joined the main pipe only. finished (3) Head Tank: Installing Slip Form which already 100% of work process. Completed anchorage head for posttension system 100%. The process to install stair out side tank about 100%, install Metal Bellow tools and steel pipe inside Head tank . Actual : 99.59 % (4) Electric system of Pump station: Actual 88%
Work progress for whole project Actual 94.81% Delay from plan 5.05% *Remarks: between negotiation with supplier
Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.)
Summary progress of Tabma reservoir On 31 AUG 2016 Objective For increase water supply in Rayong area not less than 47 MCM/year Project Construct pumping station nearby Rayon River and Tabma canal. For divert and keep water inside Tabma reservoir then send the water into EW pipe line system. Budget: baht Water Volume: Construction period: contact) Due date:
Work progress (Plan) : 100 % (15 Jul 16) Actual: 77.00% Delay : 23.00% Remarks: The project don’t have work of process because of heavy rainfall.
2,202.7 million 47 MCM/year 60 months (extended 15 JUL 2016
Summary progress of Tabma reservoir (Cont.) Constuction Tabma reservoir work Constuction Rayong pump station work
Constuction Tabma pump station work
Nongpalai – NongKho Route no.2 pipe laying project Objective : Increase capacity to supply water for Borwin - Pluak Daeng area about 60 MCM/ year. Component: 1.Temporary pumping station construction and install pump 2.Pipe lying size 1,200 mm. length 10.1 km. and 700 mm. length 11.2 km. 3.SCADA Work Process: on 31 Jul 2016 - Plan 95.84 % - Delay from plan 4.16 % PIPE: - Pipe size 1,200 mm. finished - Pipe size 700 mm. finished PUMP STATION: work process on this section about 99.90% - Finished install pump and motor - Finished electric system - During system test
Nongpalai – NongKho Route no.2 pipe laying project (Cont.)
-
Pipe laying work Finish pipe laying Installation Butterfly Valve is on process 75% Installation Air Valve is on process 75% Installation Blow off Valve is on process 75%