Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2016 28 October 2016 Water War Room
OVERVIEW OF WATER Chachoengsao Reserve Pond P2
P4 P3
17
P5 P6
Samnakbok Reserve Pond
Private Pond
P7
Bang Phra res. P9
73.80
76
P-BPN P8
10.16
Nong Kho res.
P10
P1
SITUATION IN
RAYONG-CHONBURI AREA 28 OCT2016
Chonburi
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
248.00
73.80
10.16
50.40
88.89
36.81
235.40
63%
47%
63%
54%
92%
95%
61.75
9.16
47.40
75.39
33.81
215.40
-
-
0.318
0.611
0.37
+5.56
+0.57
Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM) Inflow into reservoir (MCM) (On 27 OCT 16) Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area
-
1.30 +4.02
+6.51
+6.13
+9.31
83.97MCM. (60.7%)
176.1MCM. (62.2%)
-1.22
+0.72
Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
29
235.40 Prasae res.
36.81
Khlong Yai res. 88.89 Nong P11Pla Lai res. P12 P-NP3 50.40 P13 Dok Krai res. P14
P
29
120 P7
P15
184
P16
Raw Water Pipe Line (EW)
Demand 2558 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)
Existing Pipe Network
Existing Pipe Network
Constructing Pipe Network
Constructing Pipe Network
Source of data: Royal Irrigation Department
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces Planned Water Volume (MCM) 2016
Measure
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
8
8
0
9
9.3
9
9.3
9.3
9
9
9
9
Total
1. Primary measures 1.1Water diversion via pumping from Prasae Reservoir *Water Volume from Oct –Dec 2015 Total 10.64 MCM
Planned PS - KY Planned PS- NPL Actual PS-KY
6 8.6
8.2
1.32
8.92
9.02
8.15
9.17
9.21
8.78
Total
6.55
88.56
14 OCT 2016
0.14
Planned
0.90
Actual 1.3 Divert Water from Klong Pra Ong Chaiyanuchit (start on 14 JUL 2016)
6
27 OCT 2016
Actual PS-NPL 1.2 Divert Water from Bangpakong River + Private Pond
6
115.9
2.80
4.50
5.50
0.14 5.50
27 OCT 2016
0.90
0.88 2.77 4.83 3.28
20.11 11.76
27 OCT 2016
Planned
Planned
10.0 4.50 9.83 13.0 8
8
0
9
9.3
9
10.1
12.1
13.5
20.5
37.33
20.6
15.9
136
Remarks 1. Mar 2016 had dregdging sediment in front of Mor Mui weir which place inside Klong Nam Dang canal. So it needed to stop divert water from Prasae reservoir for a whole month and adjust the water diversion plan from 8 MCM to 9 or 9.3 MCM per month started from Apr – Sep 2016 2. On Oct – Dec 2016 Plan to divert water can be change depend on water situation 3. PS – NPL pipe system now between preparing commission test.
3
Simulation of water volume in main Rayong Reservoirs
28 OCT 2016 Water Volume : 176.1MCM.
WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Source of data: Royal Irrigation Department
Water situation of Prasae Reservoir
Source of data: Royal Irrigation Department
Water situation of Dokkrai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongplalai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Klongyai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Bangphra Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongkho Reservoir (by Year)
Source of data: Royal Irrigation Department
PROGRESS OF WATER SHORTAGE
PREVENTION AND MITIGATION MEASURES IN
RAYONG AND CHONBURI PROVINCES On 21 OCT 2016
Prasae – Nongpalai project (1) Prasae-Nongplalai Pump Station: Completed pouring concrete, lean concrete base for support pump and motor, intake channel, roof work. Now a days work are 1.1 Structure of pump station completed 1.2 Architecture work just only land scape left 1.2 Install surge valve and gate valve completed 1.3 Sub 115 kV control building completed 1.3 Construction small weir completed 1.5 SCADA System for 99.50 % Actual: 98.57 %
(1) Pipe laying for 30 km section: Completed pipe jacking across Route 344 and joined the main pipe only. finished (3) Head Tank: Installing Slip Form which already 100% of work process. Completed anchorage head for posttension system 100%. The process to install stair out side tank about 100%, install Metal Bellow tools and steel pipe inside Head tank . Actual : 99.68 % (4) Electric system of Pump station: Actual 99.83%
Work progress for whole project Actual 98.98 % Delay from plan 1.02 % *Remarks: between negotiation with supplier
Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.)
Summary progress of Tabma reservoir On 15 OCT 2016 Objective For increase water supply in Rayong area not less than 47 MCM/year Project Construct pumping station nearby Rayon River and Tabma canal. For divert and keep water inside Tabma reservoir then send the water into EW pipe line system. Budget: baht Water Volume: Construction period: contact) Due date:
Work progress (Plan) : 100 % (15 Jul 16) Actual: 77.00 % Delay : 23.00 % Remarks: The project don’t have work of process because of heavy rainfall.
2,202.7 million 47 MCM/year 60 months (extended 15 JUL 2016
Summary progress of Tabma reservoir (Cont.) Constuction Tabma reservoir work : Actual work process 85% Compact Soil Work : actual work process 33.66% (building contractor stop working) HIGH LIFT PUMP STATION “Tab Ma Station” : actual work process 25.06% (building contractor stop working) INTAKE PUMP STATION : “Tab Ma Station” : actual work process 0% Klong Tab Ma pumping station : actual work process 60.23% (building contractor stop working) Rayong River pumping station : actual work process 50.01% (building contractor stop working) Pipe Laying work: actual work process 90.15% about 18,301 meters from total 20,300meters (building contractor stop working)
Summary progress of Tabma reservoir (Cont.)
Nongpalai – NongKho Route no.2 pipe laying project Objective : Increase capacity to supply water for Borwin - Pluak Daeng area about 60 MCM/ year. Component: 1.Temporary pumping station construction and install pump 2.Pipe lying size 1,200 mm. length 10.1 km. and 700 mm. length 11.2 km. 3.SCADA Work Process: on 21 OCT 2016 - Plan 97.71% - Delay from plan 2.29 % PIPE: - Pipe size 1,200 mm. finished - Pipe size 700 mm. finished PUMP STATION: work process on this section about 100%
Nongpalai – NongKho Route no.2 pipe laying project (Cont.) Pipe laying work - Finish pipe laying - Installation Butterfly Valve is finished (Construct Butterfly Valve manhole) - Installation Air Valve is finished (Construct Air Valve manhole) - Work process 97.65 %
Pumping station (Temporary) -work process 100%