Watersituationandmitigation 2016 10 21 en

Page 1

Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2016 21 October 2016 Water War Room


OVERVIEW OF WATER Chachoengsao Reserve Pond P2

P4 P3

P5

17

P6

Private Pond

Samnakbok Reserve Pond P7

Bang Phra res. P9

68.25

76

P-BPN P8

9.59

Nong Kho res.

P10

P1

SITUATION IN

RAYONG-CHONBURI AREA 21 OCT2016

Chonburi

Rayong

Bangphra

Nongkho

Dokkrai

Nongplalai

Klong Yai

Prasae

117.00

21.40

79.41

163.75

40.10

248.00

68.25

9.59

46.38

82.38

38.03

234.68

58%

45%

58%

50%

95%

95%

56.20

8.59

43.38

68.88

35.03

214.68

-

-

0.64

0.93

0.74

+3.41

+0.77

Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM) Inflow into reservoir (MCM) (On 25 AUG 16) Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area

-

2.31 +8.07

+5.01

+4.19

+14.19

77.84 MCM (56.2 %)

166.794 MCM (58.88%)

+1.12 +3.60

Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir

29

234.68 Prasae res.

38.03

Khlong Yai res. 82.38 Nong P11Pla Lai res. P12 P-NP3 46.38 P13 Dok Krai res. P14

P

29

120 P7

P15

184

P16

Raw Water Pipe Line (EW)

Demand 2558 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)

Existing Pipe Network

Existing Pipe Network

Constructing Pipe Network

Constructing Pipe Network

Source of data: Royal Irrigation Department


Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces Planned Water Volume (MCM) 2016

Measure JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

8

8

0

9

9.3

9

9.3

9.3

9

9

9

9

6

6

Total

1. Primary measures 1.1Water diversion via pumping from Prasae Reservoir *Water Volume from Oct –Dec 2015 Total 10.64 MCM

Planned PS - KY Planned PS- NPL Actual PS-KY

8.6

8.2

1.32

8.92

9.02

8.15

9.17

9.21

8.78

Total

4.43

86.44

14 OCT 2016

0.14

Planned

0.90

2.80

4.50

5.50

0.14 5.50

20 OCT 2016

0.90

0.88 2.77 4.83 2.28

Actual 1.3 Divert Water from Klong Pra Ong Chaiyanuchit (start on 14 JUL 2016)

6

21 OCT 2016

Actual PS-NPL

1.2 Divert Water from Bangpakong River + Private Pond

115.9

20.11 10.03

21 OCT 2016

10.0 4.50 9.83 9.26

Planned

Planned

8

8

0

9

9.3

9

10.1

12.1

13.5

20.5

33.60

20.6

15.9

136

Remarks 1. Mar 2016 had dregdging sediment in front of Mor Mui weir which place inside Klong Nam Dang canal. So it needed to stop divert water from Prasae reservoir for a whole month and adjust the water diversion plan from 8 MCM to 9 or 9.3 MCM per month started from Apr – Sep 2016 2. On Oct – Dec 2016 Plan to divert water can be change depend on water situation 3. PS – NPL pipe system now between preparing commission test.

3


Simulation of water volume in main Rayong Reservoirs

21 OCT 2016 Water Volume : 166.79 MCM.


WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR


Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs

Source of data: Royal Irrigation Department


Water situation of Prasae Reservoir

Source of data: Royal Irrigation Department


Water situation of Dokkrai Reservoir (by Year)

Source of data: Royal Irrigation Department


Water situation of Nongplalai Reservoir (by Year)

Source of data: Royal Irrigation Department


Water situation of Klongyai Reservoir (by Year)

Source of data: Royal Irrigation Department


Water situation of Bangphra Reservoir (by Year)

Source of data: Royal Irrigation Department


Water situation of Nongkho Reservoir (by Year)

Source of data: Royal Irrigation Department


PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES

IN

RAYONG AND CHONBURI PROVINCES On 21 OCT 2016


Prasae – Nongpalai project (1) Prasae-Nongplalai Pump Station: Completed pouring concrete, lean concrete base for support pump and motor, intake channel, roof work. Now a days work are 1.1 Structure of pump station completed 1.2 Architecture work just only land scape left 1.2 Install surge valve and gate valve completed 1.3 Sub 115 kV control building completed 1.3 Construction small weir completed 1.5 SCADA System for 99.50 % Actual: 98.57 % (1) Pipe laying for 30 km section: Completed pipe jacking across Route 344 and joined the main pipe only. finished (3) Head Tank: Installing Slip Form which already 100% of work process. Completed anchorage head for posttension system 100%. The process to install stair out side tank about 100%, install Metal Bellow tools and steel pipe inside Head tank . Actual : 99.68 % (4) Electric system of Pump station: Actual 99.83%

Work progress for whole project Actual 98.98 % Delay from plan 1.02 % *Remarks: between negotiation with supplier


Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.)


Summary progress of Tabma reservoir On 15 OCT 2016 Objective For increase water supply in Rayong area not less than 47 MCM/year Project Construct pumping station nearby Rayon River and Tabma canal. For divert and keep water inside Tabma reservoir then send the water into EW pipe line system.

Budget: baht Water Volume: Construction period: contact) Due date:

Work progress (Plan) : 100 % (15 Jul 16) Actual: 77.00 % Delay : 23.00 % Remarks: The project don’t have work of process because of heavy rainfall.

2,202.7 million 47 MCM/year 60 months (extended 15 JUL 2016


Summary progress of Tabma reservoir (Cont.)  Constuction Tabma reservoir work : Actual work process 85%  Compact Soil Work : actual work process 33.66% (building contractor stop working)  HIGH LIFT PUMP STATION “Tab Ma Station” : actual work process 25.06% (building contractor stop working)  INTAKE PUMP STATION : “Tab Ma Station” : actual work process 0%  Klong Tab Ma pumping station : actual work process 60.23% (building contractor stop working)  Rayong River pumping station : actual work process 50.01% (building contractor stop working)  Pipe Laying work: actual work process 90.15% about 18,301 meters from total 20,300meters (building contractor stop working)


Summary progress of Tabma reservoir (Cont.)


Nongpalai – NongKho Route no.2 pipe laying project Objective : Increase capacity to supply water for Borwin - Pluak Daeng area about 60 MCM/ year. Component: 1.Temporary pumping station construction and install pump 2.Pipe lying size 1,200 mm. length 10.1 km. and 700 mm. length 11.2 km. 3.SCADA Work Process: on 21 OCT 2016 - Plan 97.71% - Delay from plan 2.29 % PIPE: - Pipe size 1,200 mm. finished - Pipe size 700 mm. finished PUMP STATION: work process on this section about 100%


Nongpalai – NongKho Route no.2 pipe laying project (Cont.)  Pipe laying work - Finish pipe laying - Installation Butterfly Valve is finished (Construct Butterfly Valve manhole) - Installation Air Valve is finished (Construct Air Valve manhole) - Work process 97.65 %  Pumping station (Temporary) -work process 100%



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.