Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2017 5 May 2017 Water War Room
OVERVIEW OF WATER Chachoengsao Reserve Pond P2
P4 P3
20
P5 P6
Samnakbok Reserve Pond
Private Pond
P7
Bang Phra res. P9
68.65
68
P-BPN P8
11.67
Nong Kho res.
P10
P1
SITUATION IN
RAYONG-CHONBURI AREA 5 MAY 2017
Chonburi
Rayong
Bangphra
Nongkho
Dokkrai
Nongplalai
Klong Yai
Prasae
117.00
21.40
79.41
163.75
40.10
248.00
68.65
11.67
46.63
97.80
23.96
97.34
59%
55%
59%
60%
60%
39%
56.60
10.67
43.63
84.30
20.96
77.34
-
-
0.164
-
0.092
-0.25
-1.03
Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM) Inflow into reservoir (MCM) (On 26 JAN 2017) Water volume compared to previous week (-decrease, +increase) (MCM) Total water volume in each area
-
0.256 -1.60
+0.33
+0.08 -4.41
-1.28
-1.19
92.4 MCM (66.8 %)
168.19 MCM (65.7 %)
Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir
30
97.34 Prasae res.
23.96
Khlong Yai res. 97.80 Nong P11Pla Lai res. P12 P-NP3 46.63 P13 Dok Krai res. P14
P
XX
XX XX
P15
179
Raw Water Pipe Line (EW) P16
Source of data: Royal Irrigation Department
Existing Pipe Network Constructing Pipe Network
Demand 2560 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID) Existing Pipe Network
Constructing Pipe Network
WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR
Source of data: Royal Irrigation Department
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Source of data: Royal Irrigation Department
WATER SITUATION OF PRASAE RESERVOIR
Source of data: Royal Irrigation Department
Water situation of Bangphra Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongkho Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Dokkrai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongplalai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Klongyai Reservoir (by Year)
Source of data: Royal Irrigation Department
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces 2017 Planned Water Volume (MCM) 2017
Measure
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
9
9
9
9
9
9
9
9
9
8
8
8
6
6
6
6
6
6
Total
1. Primary measures 1.1Water diversion via pumping from Prasae Reservoir
1.2 Divert Water from Bangpakong River + Private Pond
Planned PS - KY Planned PS- NPL
141.0 4 May 2017
Actual PS-KY
7.28
8.27
9.35
8.99
Actual PS-NPL
4.82
3.62
1.92
1.75
Planned
35.08
1.19 4 May 2017
12.35
0.24
1.0
3.41 5.55 5.74 5.55
21.25
Actual 1.3 Divert Water from Klong Pra Ong Chaiyanuchit Total
Planned Planned
15
16
15
15
15
15
9
12.41 14.55 13.74 13.55
8
162.25
Reservoir Simulation
5 May 17 Volume 168.19 MCM.
PROGRESS OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES
IN
RAYONG AND CHONBURI PROVINCES On 28 Feb 2017
Prasae – Nongpalai project ITEM PROCESS DETAILS PUMP STATION WORK CIVIL WORK 99.03% - Architecture work just only land scape left MECHANICAL - Start Commissioning Test On 4 OCT and stop test on 7 OCT 100.00% WORK because found crack and water leakage nearby Air Chamber - PEA delivered 115 kV. to system on 28 SEP 2016 ELECTRIC SYSTEM 99.97% - Electric pole work around the project left SCADA 99.55% - Between test the system HEAD TANK WORK CIVIL AND - Architecture work just only land scape left and laying concrete MECHANICAL 100% pipe for drainage WORK - Remaining installing lightning rod and the installation of street ELECTRIC SYSTEM 99.95% lighting inside project area. SCADA PIPE WORK PIPE LAYING WORK
97.92 %
100%
Remaining installing the transmitter Communication System -
Completed pipe laying Completed installation Cathodic Protection
Work progress for whole project • found a problem with pump, now we’re in the investigation process.
Nongpalai – NongKho Route no.2 pipe laying project Objective : Increase capacity to supply water for Borwin - Pluak Daeng area about 60 MCM/ year. Component: 1.Temporary pumping station construction and install pump 2.Pipe lying size 1,200 mm. length 10.1 km. and 700 mm. length 11.2 km. 3.SCADA
PROJECT COMPLETED