COMMUNITY DEVELOPMENT 2015 One Region - One Voice
2015 Report | 2
Oakland City Old New Lake Dam received a $1.85 million CDBG grant.
COMMUNITY development The Coalition’s community development division works daily with communities and elected officials on projects that will add value to Southwest Indiana.
$7.6M
87.5%
+$73M
2014 Grant funding awarded in 2014.
Average percentage of project costs paid by grant funding.
Amount of grant funding awarded to date.
The Blight Elimination Program is currently helping Southwest Indiana communities remarket over 275 properties.
We know our stuff. Lead by Debbie Bennett-Stearsman, the community development staff is well versed in continuing education. Each person on our community development team is a certified grant manager with Bennett-Stearsman holding the designation of Master Certified Grant Administrator, only 6 in the state of Indiana. Recertification classes are held every year; and, grant workshops are held on every new state and federal grant program that must be attended.
We tackle the hard projects. The Coalition is currently participating in the newly funded Blight Elimination Program from the State of Indiana. To date over $5.8 million has been awarded to Southwest Indiana communities by the Indiana Housing and Community Development Authority (IHCDA) for the demolition of over 200 homes that have fallen to ill-repair. After demolition the properties can be redeveloped and put back on the tax rolls for the communities. More funding is expected in 2015 as additional rounds have been announced.
EPA Regional Brownfields Assessment Grant With the help of the EPA, some forgotten properties in Southwest Indiana are receiving a second chance of becoming beautiful and prosperous again.
Impeccable Reputation
The Coalition has always provided the best level of service to our county through its Community Development
The United States Environmental Protection Agency (EPA) awarded the Economic Development Coalition of Southwest Indiana a $580,000 Brownfields Assessment Grant. The funds will provide help communities to assess contamination areas in designated brownfields for future clean up and revitalization. The grant will create an inventory of Brownfield sites in the region, assess a portion of the sites and will provide funds for mitigation and remediation of selected sites. The program will help communities revitalize properties for the purposes of creating a better environment and improve the local economy by placing properties back on the tax rolls. Funds from the Brownfields Assessment Grant are divided into two program categories: $400,000 for hazardous substance and $180,000 for petroleum clean up.
Division. The return on the investment is always outstanding. - Stephen Bottoms/Gibson County Commissioners
With the help we received from the Coalition getting grant funding, an ugly abandoned silo was torn down and birthed a vision for our now beautiful riverfront. - Mayor John Tucker City of Mount Vernon
+90% Majority of the 2014 projects were funded 90% or better by grant awards.
2015 Report | 4
GIBSON COUNTY Funding Source
Type
Description
Community
Year
Grant Amount
IHCDA BEP Demo of Blighted Homes Gibson 2014 $1,440,000 EPA Assessment Regional Brownfields EDC Region 2014 TBD CDBG Construction Dams Improvement Projects Oakland City 2014 $2,074,500 CDBG Construction Water Tower Improvements Francisco 2013 $500,000.00 Various Various Stellar Projects Princeton 2013 $5,300,000.00 CDBG Construction New Library Haubstadt 2012 $400,000.00 DUKE Trails Trails in Wirth and DT Park Oakland City 2012 $20,000.00 D-2 Construction Demolition Oakland City 2012 $74,825.00 D-2 Construction White River Township FD Gibson 2012 $400,000.00 CDBG Planning White River Township FD Planning 2011 $50,000.00 D-2 Construction Hazleton Levee Improve Hazleton 2011 $1,620,900.00 CDBG Construction Water Improvements Patoka 2011 $600,000.00 CDBG Construction Windsor Marchines Gibson 2010 $450,000.00 CDBG Planning Wastewater/Storm Plan Fort Branch 2010 $40,000.00 CDBG Planning Downtown Owensville Owensville 2010 $50,000.00 CDBG Planning Downtown Princeton Princeton 2010 $50,000.00 CDBG Planning Park Plan Princeton Princeton 2010 $30,000.00 CDBG Planning Park Plan Oakland City 2010 $30,000.00 RD Construction Water Improvements Oakland City 2010 $4,669,500.00 CDBG Construction Sewer Improvements Oakland City 2010 $2,681,000.00 CDBG Planning Storm Water Plan Patoka 2010 $30,000.00 EDA Planning Whirlpool EDCSWI 2010 $57,870.50 D-2 Construction Storm Water Improvements Oakland City 2010 $975,011.00 CDBG Construction Wastewater Improvements Haubstadt 2010 $600,000.00 CDBG Construction New Community Center Oakland City 2010 $500,000.00 EDA Planning CEDS Gibson 2009 $12,500.00 CDBG Construction Special Needs Goodwill Gibson 2009 $500,000.00 CDBG Planning Storm Water Oakland City 2009 $35,000.00 D-2 Construction Water Improvements Princeton 2009 $2,430,400.00 CDBG D-1 25% Match FEMA Hazleton 2009 $7,608.36 CDBG D-1 25% Match FEMA Gibson 2009 $50,425.27 CDBG CFF Special Needs Fac (GCARC) Gibson 2008 $500,000.00 CDBG CFF Firefighting Vehicle Columbia Twp 2008 $140,000.00 CDBG CFF Firefighting Vehicle Francisco 2008 $150,000.00 CDBG CFF Community Center Project Haubstadt 2008 $465,000.00 CDBG Planning Comprehensive Master Plan Princeton 2008 $50,000.00 CDBG CEDF Toyota Boshoku - sewer Princeton 2008 $450,000.00
Funding Source
Type
Description
Community
Year
Grant Amount
CDBG CFF Wastewater Improvements Fort Branch 2007 $500,000.00 CDBG Planning Comprehensive Master Plan Owensville 2007 $48,600.00 CDBG CFF Special Needs Fac. (GCARC) Princeton 2007 $248,972.00 INDOT Planning I-69 Corridor Princeton 2007 $50,000.00 INDOT Planning I-69 Comprehensive Plan Gibson 2007 $50,000.00 INDOT Planning I-69 Comprehensive Plan Oakland City 2007 $50,000.00 CDBG QR Urgent Need - Fire Station Ft.Branch 2006 $300,000.00 CDBG Planning Comprehensive Master Plan Fort Branch 2006 $50,000.00 CDBG CFF Firefighting Vehicle Oakland City 2006 $150,000.00 CDBG CFF Special Needs Fac. (GCARC) Gibson 2005 $209,000.00 CDBG CFF Fire Station Somerville 2005 $289,500.00
Gibson County Grant Total =
$29,380,612.13
2015 Report | 6
POSEY COUNTY Funding Source
Type
Description
Community
Year
Grant Amount
INDOT Transit Feasibility Study Posey 2014 $10,000.00 IHCDA BEP Demolition of Blight Posey 2014 $617,000.00 EPA Assessment Regional Brownfields EDC Region 2014 TBD Stellar Planning Strategic Investment Plan Mt. Vernon 2014 $10,000.00 CDBG Planning Water/Wastewater Plan Cynthiana 2014 $40,000.00 CDBG Construction Storm Water Construction New Harmony 2013 $500,000.00 D-2 Construction Wabash Levee #5 Posey County 2011 $1,509,886.00 CDBG Construction Storm Water Mt. Vernon 2011 $524,287.00 CDBG Construction Purchase - Rescue Truck Poseyville 2011 $150,000.00 Ellsworth Congr. Ermrk Downtown Revitalization Mt. Vernon 2010 $49,000.00 CDBG Planning Economic Development Plan Poseyville 2010 $50,000.00 CDBG Demolition Silo Project Mt. Vernon 2010 $300,000.00 D-2 Construction Wastewater Plant Improve. Mt. Vernon 2010 $6,572,000.00 EDA Planning Whirlpool EDCSWI 2010 $57,870.50 CDBG Construction New Fire/EMS Building New Harmony 2010 $500,000.00 CDBG CFF Water System Improvements Poseyville 2009 $600,000.00 EDA Planning CEDS Poseyville 2009 $12,500.00 CDBG Planning Storm Water New Harmony 2009 $35,000.00 CDBG D-1 25% Match FEMA Posey 2009 $17,040.38 CDBG Planning Comprehensive Master Plan Mt. Vernon 2007 $48,500.00 CDBG Planning Comprehensive Master Plan Posey County 2007 $50,000.00 CDBG CFF Wastewater System Imprvnts Cynthiana 2006 $269,000.00 CDBG CFF Acquisition - CAPE Head Start Mt. Vernon 2006 $257,250.00 CDBG Planning Comprehensive Master Plan New Harmony 2006 $50,000.00 CDBG Planning Downtown Revitalization Mt. Vernon 2005 $50,000.00 CDBG CFF Community Center Project New Harmony 2005 $500,000.00
Posey County Grant Total =
$12,779,333.88
2015 Report | 8
VANDERBURGH COUNTY Funding Source
Type
Description
Community
Year
Grant Amount
CDBG Construction Bohannon Estates Vanderburgh 2012 $497,000.00 D-2 Construction GBT USA Inc. Evansville 2011 $208,000.00 CDBG Planning Downtown Revitalization Darmstadt 2010 $50,000.00 CD-2 Construction Evl-Vburg Levee Improve. Evansville 2010 $1,655,000.00 EDA Planning Whirlpool EDCSWI 2010 $57,870.50 D-2 Eco. Dev. Berry Plastics Evansville 2009 $3,000,000.00 EDA Planning CEDS Vanderburgh 2009 $12,500.00 INDOT TEA Burdette Park Vanderburgh 2008 $2,500,000.00 CDBG QR Urgent Need Fire Station Knight Twp. 2005 $500,000.00
Vanderburgh County Grant Total =
$8,480,370.50
2015 Report | 10
WARRICK COUNTY Funding Source
Type
Description
Community
Year
Grant Amount
D-2 IFA BF Partner DT Demolition Boonville 2014 $250,000.00 CDBG Planning Wastewater Plan Grant Lynnville 2014 $30,000.00 EPA Assessment Regional Brownfields EDC Region 2014 TBD D-2 Demolition Fisher Lumber Company Chandler 2014 $350,000.00 IHCDA BEP Demolition of Blight Warrick 2014 $1,142,000.00 IFA IN Brownfld Zephyr Petrolium Remed. Boonville 2014 $139,232.00 IHCDA BEP-RD2 Demolition of Blight Warrick 2014 $176,000.00 EDA Planning CEDS EDC Region 2015 TBD DOC Operational Community Corrections Warrick 2011-2013 $224,578.00 DOC Operational Community Corrections Warrick 2006-2010 $396,000.00 CDBG Construction PTRSD Warrick 2012 $500,000.00 USDARD Construction PTRSD Warrick 2012 $500,000.00 D-2 Demolition CarQuest Building Warrick 2012 $116,000.00 D-2 Demolition Boonville Fire Building Boonville 2012 $84,100.00 D-2 Construction Little Pigeon Debris Removal Warrick 2011 $785,020.00 CDBG Construction Newburgh Warrick 2011 $600,000.00 D-2 Dams/Levees Scales Lake Modify Warrick 2011 $316,155.00 CDBG Planning Master Utility Plan Elberfeld 2011 $50,000.00 CDBG Planning Downtown Plan Newburgh 2010 $50,000.00 CDBG Planning Downtown Plan Boonville 2010 $50,000.00 Energy Block Grant Lighting Retro-Fit Warrick 2010 $83,000.00 Ellsworth Congr.Earmark Stonehaven Sewer Warrick 2010 $500,000.00 D-2 Construction Wastewater System Imprvmts Boonville 2010 $4,281,687.00 D-2 Construction Water Improvments Lynnville 2010 $1,000,000.00 EDA Planning Whirlpool EDCSWI 2010 $57,870.50 D-2 Dams/Levees Scales Lake Warrick Co. 2010 $1,285,750.00 CDBG Construction Warrick Senior Center Warrick Co. 2010 $500,000.00 CDBG Construction Tennyson Water Extension Tennyson 2010 $600,000.00 CDBG Sewer Elberfeld Warrick 2009 $878,737.00 EDA Planning CEDS Warrick 2009 $12,500.00 D-2 Disaster Sewer Chandler 2009 $1,643,850.00 D-2 Disaster Water Chandler 2009 $3,834,328.00 CDBG Construction Stonehaven Sewer Warrick 2009 $600,000.00 INDOT Planning I-69 Comprehensive Plan Warrick 2008 $50,000.00 CDBG Construction Wastewater System Imprvmts Lynnville 2007 $500,000.00 CDBG Construction Firefighting Vehicle Elberfeld 2006 $130,000.00 CDBG Construction Historic Preservation Newburgh 2006 $500,000.00
Warrick County Grant Total =
$22,216,807.50
2015 Report | 12