Post Tensioned Concrete Reinforcing SCOPE NARRATIVE This scope includes the supply and installation of all material required for a complete poured-in-place concrete post tension system, including all post-tensioning tendon materials required for cast-in-place concrete complete with stressing tendons and jacking to apply load on tendons. This scope for supply and installation includes and excludes the following items regardless of where they may appear in the tender documents unless specifically noted otherwise in this scope: TRADE DEFINITION INCLUDED 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29.

Preparation of placing drawings and friction/elongation calculations; Layout for locations when tendons penetrate formwork; Tendon anchorages; Anchorage seal caps; Couplers; Local zone burst reinforcing; Sheathing for pre-stressing tendons (bonded or un-bonded); Installation of sheathing (ducting) for bonding tendons; Pre-stressing steel (strand or thread-bars); Installation of pre-stressing steel and anchorages; Cement grout (in the case of bonded tendons); Tendon supports, spacers and applicable accessories as required; Post-tensioning specific installation equipment required to perform task; Stressing equipment required to perform task; Grouting equipment for bonded tendons required to perform task; Stressing tendons and cutting after approval; Grout, seal and cap pockets of un-bonded tendons; Grouting equipment for bonded tendons; Stripping plastic sheath of un-bonded tendon tails after concreting; Trade specific lighting to perform tasks; Trade cleanup – cleanup for work carried out by this trade; Protection of other trades’ work from damage when performing this trades scope of work; Warranty or Guaranty; Quality assurance and quality control testing of materials and procedures as detailed in the Contract Documents; Submittals and Operation and Maintenance documentation as detailed in the Contract Documents; Material handling, including unloading and hoisting; Cash allowances that apply to this trade scope when a specific dollar amount is listed in this trade’s specification section; Protection of other trades’ work from damage when performing this trade’s scope of work; Building Information Modeling (BIM) as it applies to this trade scope

Version 7.0

Page 13 of 157

March 1, 2022


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.