Selected Works Edwin Huang
Edwin Huang Mobile I 0415560300 Instagram I @edwinhuang7 Email I Edwin.huang7@gmail.com Linkedin I https://www.linkedin.com/in/edwin-huang-15b180181/
Language
A recent graduate of architecture (undergraduate) and current lighting designer who is passionate about lively public spaces.
Education
Software Ability Advanced Rhino, Adobe Suite, Intermediate Revit, Grasshopper , V-Ray Basic Enscape, Autocad
Experience Lighting Designer Arup, Sydney, NSW (26/11/19 - present) Student intern John Poole Architects, Sydney, NSW (05/06/18 - 11/07/18)
English and Chinese
Secondary: Ryde Secondary College I Ryde, NSW (2010-2015) Achievements: Regional relay 4 x 100m finalist 1st in Information Technology 2014 Tertiary University of Sydney I Sydney, NSW Bachelor of Design in Architecture (2019 graduate)
A collection of works from undergraduate program and professional experience.
Contents I. Civic Sanctuary II. Urban Oasis III. Macquarie Uni Law School IV. World Square V. 25 Martin Place
I. Civic Sanctuary Civic Sanctuary embodies intimate flowing spaces that creates a theatre of dynamic threshold spaces, acting as itself a performance for it’s users and catering to public performance. The manifestation of minimalistic design maneuvers results in a monastic-like place of spiritual contemplation, a Civic Sanctuary.
NSW Land Registry Services
Hyde Park Barracks
The site is situated at the intersection of the commercial precinct and the domain. It is flanked by significant buildings of Sydney’s colonial history such as the Sydney Eye Hospital, Hyde Park Barracks and The Mint. The proposal is hence inextricably grounded in Sydney’s colonial provenance, paying homage to historically significant social groups.
Proposal
Sydney Eye Hospital
I.
Civic Sanctuary
The simulateneous opening and closing of spaces creates spatial tensions and releases, guiding the user to walk in certain directions for various views and experiences.
Upon reaching the site, users are met with a memorial wall arising out of the ground. The mass of the memorial wall is grounded and intersect’s the site’s horizontal plane, a metaphor for the telling the site’s history.
Software used: Rhino, V-Ray
II.
Urban Oasis
Courtyard render An Urban Oasis where individuals are greeted by a central courtyard, a defining of public space.
Bathing render A visual impression intending to capture the serenity of private bathing spaces, the coolness of stone walls permeating through the air and the stillness of untouched water.
Software used: Rhino, V-Ray
Architect’s render
III.
Macquarie University Law School
A new law building for Macquarie University which retains the existing concrete structure and builds on top of it using CLT beams and columns. Is defined strongly a crown moot court as a focal point with visibility to to the North-East.
E
F
G
H
I
J
K
L
M
O
N
P
Q
R
S
T
U
General Notes 1. This drawing shall be read in conjunction with all other mechanical, architectural, structural, electrical, hydraulic and other drawings, design reports, specifications and associated design documents with due allowance for the design status. Refer to Architectural reflected ceiling plans for acoustic ceiling panel locations and design intent. 2. This drawing is not for construction. 3. This drawing provides information intended to identify the scope, design intent and general installation requirements of the works. The Contractor shall be responsible for the final coordination, shall undertake site measurements and / or surveys as required and set out all works to suit actual on-site conditions. 4. Configurations, arrangements and connection details shown are generic in nature and show a level of detail consistent with Detailed Design. Activities such as coordination and costing should take this into consideration. 5. The Contractor shall ensure that structural loadings are within the designated allowance and provide all steelwork not shown on the structural drawings as well as brackets, supports,etc as required. 6. Services penetrations through external walls to be weather sealed. Through internal and external walls to be acoustically stopped. All penetrations shall be fire rated with approved materials to the approval of structural engineer and authorities. 7. Through fire rated compartments shall be fire stopped to achieve a fire rating equivalent to the fire compartment and allow for movement, construction tolerances and thermal expansion as necessary. 8. All works shall be undertaken as per Macquarie University Design Standards. 9. All electrical systems/devices are new unless noted otherwise. 10. Drawing to be printed in colour. 11. The contractor shall produce dimensioned multidisciplinary services layout drawings and sections demonstrating coordination between work shown and specified in other disciplines' drawings and documents. These drawings shall be in addition to and at an enhanced level of the design drawings specified in the preliminaries. 12. Supports and fixings are to be designed in accordance with AS1770 Structural Design Actions Part 4: Earthquake Actions in Australia. 13. Final services coordination within Moot Court ceiling and associated Moot Court structure subject to design finalisation by contractor. The services shown are to be incorporated into the final structure and architecture based on the design intent indicated on the drawings. 14. Refer to the Fire Services Specification for materials and workmanship. 15. Refer to Fire Engineering Brief / Report for detail and requirements to be incorporated in the Fire Services documentation. 16. Check all dimensions on site and coordinate with other trades prior to purchase of equipment or installation of fire services. No claims will be considered regarding items which cannot be installed due to error resulting from failure to check dimensions or coordinate with other trades on site. 17. Confirm location, sizes and depths of structural beams, ceiling void, all other services and ceiling height prior to installation. Determine exact sizes and locations of structural penetrations on site in accordance with the structural requirements. Obtain approval from structural engineer prior to drilling any core holes and penetraing structure.
Cabling to light fixtures in areas with exposed CLT beams and no suspended ceiling to reticulate in conduit. Final finish to be confirmed by architect (typical for all floors)
X14
X1X2
X4
X6
X7
X8
X9
X10
X11
X12
X16
D5
D5
Y16
X18
X13 D5
D5 D4
D4
D4
D4
FL1
D6
201X
M S2
D4
D4
D4
D4
D4
D4
EM1
D6
D6
D12 D12
11 m² CLG-101A D6 2700
10D6 m² CLG-101A 2700
D8
D8
D1
? ?
L9
L9
L9
M S2
M S2
L3
210
D6
D6
OFFICE 10 m²
210X
D13
EX1
STORE 5 m²
L9
D8
EM2 MS1
MS1
D12 D13
EX1 D4 MS1
L5
D5
EX1
D13
EX1
218
L5
L5
4-6p MEETING 16 m²
L5
L5
EXIT
L5 D4
L2-B EM2
MS1
D4
EX1
D4
EXIT
L5
EM1
D1
D3
D4
L5
EX3
L2.120
EXIT
MECH 0 m²
B1
B1E
260
258
HYD 0 m²
L5
D1 MS1
L11
MECH 0 m²
259
B1
219X
Lighting General Notes
COMMS 12 m²
B1E
B1
338
MECH 1 m²
L6
B1
EX3
B1
MS1
G23GG HYD 2 m²
D5
EM1
? ?
MS1
D5
B1
D12 EM1 D12 D13
D4
EM1
LCP2
D1
P1
L3 B1
CHW 0 m²
L9
MS1
D5
L3
D13
D4
EXIT FHR 1 m² G23BB
D3
MS1
EX2
D5
EM1
L2-B
EX1
P1
D8
L9
EM2
MS1
EXIT
P1
MOOT COURT 172 m²
1 LCP
D6
OFFICE 10 m²
D6
OFFICE 10 m²
MS1
MS1 MS1
EXIT
MS1
D1
L9
D1 EX2
Y10
D6 209
208
D6
L9
EXIT
EM1
D6
207 OFFICE 10 m²
12 m²
L9
MS1
217
EX1
LCP2
EXIT
D1
MS1
LCP2
G23JJ
L9
D1
206 D6 OFFICE
3100
LCP2
D6
CLG-101A 2700
D12CLG-101D EX1
FL-103 3878
Y12
D6
D12 EM1
OFFICE
OFFICE
CLG-101A 10 m² D6 2700
9 m²
205
204
OFFICE
202 CLG-101A D6 OFFICE 2700
LCP2
IT
CLG-101A 2700
LCP2
S2 M
D6
M S2
M S2
M S2
D6 203
OFFICE 9 m²
EX1
FIRE STAIR 1 29 m²
B1E
LCP2
S2 M
D6
201
MS1
FS1
D13
MS1
P2-B MS1
LCP2
LCP2
S2 M
LCP2
S2 M
D6
CLG-101DD4 3100
S2 M
S2 M
D4
LCP2
D5
MS1
D4
P2-B LCP2
D5 MS1
CLG-101D MS1 3100
MS1 CLG-101D 3100EM1
D4
D5
UTILITY EXHAUST 0 m²
LCP2
EM1 CLG-101D 3100 MS1
D4
L2.172
EX1
WORKPLACE 270 m²
CLG-101D 3100
D4
LCP2
D5
B1E
FL1 MS1
S2 M
EX1 P2-B
D4
S2 M
D4
LCP2
LCP2
EM1 D4
D5
216X STORE
D13 5 m²
OFFICE 10 m²
D6
D4 LCP2
S2 M
D4
MS1
D4
D6 216
OFFICE 10 m²
D6
D4
EM1 D4
D6 215
214 CLG-101A OFFICE 2700 10 m²
D6
CLG-101A 2700
MS1
D4
D6
213 OFFICE 10 m²
D6
M S2
D4
MS1
EM1
MS1
Y14
D6
212 OFFICE 10 m²
EXIT
D6
LCP2
D4
D4
OFFICE 10 m²
CLG-101D 3100
EXIT
D6
D6
D4 FL1
CLG-101D 3100 D4
EX
D4
211
D4
EXIT
D4 FL1
CLG-101D 3100
M S2
D4 D4
D4
MECH 0 m²
D3 D1
D3
D3
MS1
D3
FL1
D3 EM2
H1 H1
Lift car lighting by VT contractor
H1
H1 H1 H1 H1
D4
H1
221 D6 D6 OFFICE
D3
H1
D4
MS1
EM1 S2 M
10 m²
10 m² 10 m²
CLG-101A 2700
236
MS1 D4
D4
H1 H1
235
235 D6 OFFICED6 OFFICE
CLG-101D 3100
M S2
L5
D1
D3 EX1
MS1
LCP2
P1
L5
EXIT
H1
LCP2
L5 EM2
D1
H1 H1
LCP2
? ?
MS1
LCP2
P1 252 HUB 184 m²
EM1
H1 H1
H1
D1 ? ?
MS1
S2 M
P1 P1
P1
LCP2
Y9
H1
Y8
D6 OFFICE 236 D6 10 m² OFFICE 10 m²
D3 to be suspended in areas with no drop ceiling
1. Refer to Luminaire Schedule in Electrical Specification for details of luminaire fixtures. 2. This drawing is to be read in conjunction with all relevant Architectural, Structural, Electrical, Hydraulic and Fire Services drawings. 3. Lighting to be controlled via DALI drivers. 4. Non-dimmable lights to be controlled by Dali relay. 5. Final luminaire locations are to be taken from architectural drawings. 6. All lighting to be installed in accordance with Australian Standards. 7. All lighting layouts to video conferencing rooms to be confirmed with architect prior to construction. 8. Refer to architectural information for location and specification of floor lamps. 9. Allow for lighting control panels to room with display screens. 10. Landscape / External lighting is to be issued in a subsequent tender addendum.
CLG-101A 2700
L2.116
? ?
D1
P1
MS1
222
D6
EM1
L5
D4
D4
OFFICE 9 m²
D6
D1
MS1
D4
MS1
MS1
RISER 2 m²
CLG-101D 3100
D4
D4
D10
CLG-102 D10 2400
EM1 MS1
D4
FL1
D4
D6 CLG-101A
D4 EM1
D6
D10
OFFICE 10 m²CLG-101A
D4
D4
D4
FL-103 3878 D4
LCP2
2700
LCP2
D6 CLG-101A
D6
LCP2
EXIT
LCP2
D4
LCP2
D6 CLG-101A
D4
CLG-101D 3100
D4
D4
D4
CLG-101D
D4
D4
MS1
D4
FL1
CLG-101A 2700
EM1 D4
D4
D4
MS1 3100
CLG-101D 3100
D4
D4
OFFICE
CLG-101D 3100
D4
MS1
MS1
FL1
246 2700
D4
D4
MS1
EM1 D4
D6
2700
245 OFFICE 11 m²
D4
FL1 LCP2
MS1
EX1
LCP2
244 OFFICE 11 m²
D4 D6
WORKPLACE 467 m²
D4
D6
2700
243
LCP2
238D6 OFFICE 10 m²
M S2
EXIT
CLG-101D 3100
LCP2
CLG-101D 3100
D6
D6
D6
D12 CLG-101D 3100 P2-B 221X
MS1
MS1 CLG-101D 3100
D6 226 OFFICE 10 m²
D6
LCP2
D6 242
FL1
OFFICE 10 m²
D6
11 m² D6
D4
D4
D4
D4
LCP2
D6 241 OFFICE 10 m²
D6
CLG-101A 2700
S2 M
D4 EM1
EX1
LCP2
L9 D6
227 OFFICE CLG-101A 2700 10 m²
2700
P2-B
S2 M
D10
MALE WC 28 m²
D6
S2 M
D4
D4
MS1
D4
TE 1 m²
S2 M
D11 D11 D11 D11 D11 GF.145
228 OFFICE 10 m²
D6
P2-B
M S2
D4
GF.140
RISER 1 m²
250 CLG-101A EM1 ACC. WC 2700 6 m²
MS1 EXIT
D12 CLG-101D 3100
P2-B
249
B1E
LCP2
D11 D11 D11 D11
D6
229
12 m²
D6 CLG-101A
M S2
LCP2
D6 MS1OFFICE
D12
M S2
LCP2
L9 L9
EXIT LCP2
D6
EM1 P2-B
MS1
D8
L9 L9
EX1
D12
MS1 CLG-101D 3100
M S2
D3
MS1
MS1
L9
D6
MS1
D10 D10
D7
EX2 L9
230 D6
OFFICE 11 m²
D6
MS1
FHR 1 m²
Y2 Y1
LCP2
MS1
MS1
L9
L9
231 OFFICE 9 m²
D6
D6
EX1 D3
S2 M
D7
MS1
EM2
D4
D6
232 OFFICE 9 m²
224
OFFICE 10 m²
MS1
EM2
S2 M
B1E
D6
S2 M
D10
MS1
D8
D6
OFFICE 9 m²
S2 M
ELEC 3 m²
CLG-101A 2700 233
D10
EM1 D10
GF.141 249X
L2.114
L5
M S2
MS1 D10 FEMALE WC D10 28 m²
MS1
EM1
L9 D6
234
D6
S2 M
MS1
EM2
D8 D6 OFFICE 9 m²
L2.110 CORRIDOR 20 m²
B1E
D4
MS1
L9 D11 D11 D11 D11
D10 CLG-102 251 2400
EXIT
251X CLEANERS STORE 3 m²
B1
Y4
Lift car GF.135 LIFT lighting by 6 m² VT contractor
M S2
B1
D7
M S2
CLG-102 2400 CLG-102 2400
M S2
B1E
CHW 1 m²
L2.107
CHW - C5a 0 m²
M S2
EXIT
MS1 EXIT EX2
L2.105
B1
L5
M S2
EXIT COMMS 11 m²
L5
D3
EX1
EX3 EXIT
B1 250X
L2-B LCP2
D4
237 OFFICE 10 m²
LCP2
Y6
D6
D3
247 CLG-202A 4-6p MEETING 2700 16 m²
LCP2
LCP2
L2-B
L2-B
L2-B
L5
EM2
D1
EXIT
L5
MS1
EM1 D1
P2-B
LCP2
D1
D1
? ?
MS1
D1
S2 M
248
4-6p MEETING 16 m²
D1
FL1
D4
Y7 EX1
D4
D4 FL1
CLG-101D 3100
S2 M
D6
D3
D4 EM1
M S2
MS1
P1 MS1
D6
D3 L5
L11
P1
LCP2
FHR 1 m²
D1 L6 340 HYD 2 m²
LCP2
L5 ARE LINEAR STRIPS TO WASH TIMBER BEAMS
LCP2
LCP2
D6 240 OFFICE 10 m²
D6
MS1
D4
F E C B
D4
D6 239 OFFICE 10 m²
D6
CLG-101D 3100
D4
D4
23.09.21 15.09.21 20.08.21 28.07.21
Issue
Tender Issue Tender Issue Draft Tender Issue Preliminary Issue
Date
EX1
Barrack Place Level 5 151 Clarence Street Sydney NSW 2000 Australia +61 (0) 2 9320 9320 www.arup.com
Client
Macquarie University
Project Title
Macquarie Law School Macquarie University Macquarie Park NSW 2109 Drawing Title
Electrical ICT & Security Services Level 02 Lighting & Emergency Lighting Layout Scale at A0 Role Status
1 : 100
By / Chkd / Appd
KB/BS/NP
Electrical Services For Tender
Arup Job No
Rev
278946
F
ID
E23-1020 © Arup
Scope of works was to provide lighting design services to the design development stage to Macquarie University Law School. Work involves setting up and running workshops with architects, coordinating with the internal Engineering and BIM teams and producing revit documentation of lighting reflected ceiling plans.
Software used: Revit, Unify
24/09/2021 5:00:01 PM
D
EXIT
C
EXIT
B
Architect’s render
IV.
World Square
The installation of a new floatng ‘veil’ is proposed to the World Square Central Plaza. The structure is to become an iconic architectural and artistic feature, whilst also providing protection from falling overhead objects from apartments.
Existing
Proposed
June 21st 9am
June 21st 12pm
June 21st 2pm
The analysis of daylight access considered how the ‘veil’ is expected to impact daylight access by comparing existing and proposed conditions. The above image shows an excerpt of the broader daylight calculation study in which findings discover when assuming an overcast sky, approximatley a 25% reduction in lux levels under the areas beneath the proposed ‘veil’.
Software used: Grasshopper, Honeybee, Ladybug
Architect’s render
IV.
World Square
Electrical lighting was also developed for this project in which the use of spotlights, catenary lighting and downlights to corridors have been calculated and specified in accordance to the relevant lighting standards for public activity spaces.
Luminance readings of the existing site had been done to better understand the light levels of the space and to undertake research into Arup’s “Safety at night” initiative.
Software used: Python
V.
25 Martin Place
The external private domain consists of a glass ‘ribbon’ facade with internal lighting in tuneable white light along the building perimeter to highlight the architectural geometry and palette. The image above shows a lighting render to illustrate lighting effects, types and overal appearance.
Software used: Photoshop
Obtrusive light study has been done to understand adverse lighting effects of the scheme onto surrounding buildings. The areas of calculation includes luminance on vertical plane, luminous intensity, threshold increment and up-ward light spill.
Software used: Agi 32