Edwin Ng Portfolio

Page 1



Curriculum Vitae Objec ve

To work in an environment that pushes the current limits of my abili es and allows me the opportuni es to gain the respect of my peers.

Educa on

2011-present Monash University Master of Architecture Gradua ng 2012 2008-2010 Monash University Bachelor of Architecture 2002-2007 Blackburn High School (ENTER: 90.9)

Employment History

2008-present Coles Supermarkets, Delicatessen assistant - Providing excellent customer service. - Communica ng with non english speaking customers on consistent basis. -Being pa ent with di cult customers

Skills

Digital Adobe photoshop, Illustrator, Rhino, V-ray for Rhino, 3ds Max Edwin Ng date of birth: 01/11/1989 address: 7/33 medway street, Box Hill North, Victoria 3129 contact number: 0402979906 email: edwinng89@gmail.com Australian ci zen and resident

Language Cantonese-fluent Mandarin-basic

Interest/Hobbies

Basketball, photography, cooking, building plas c model kits

References Markus Jung Senior Lecturer, Department of Architecture Monash University t: +61 3 9903 4931 f: +61 3 9903 1521 e: Architecture at Monash

David Ng Delicatessen Manager Coles 0411656228


REDUCE WASTE THROUGH REUSING

REDUCE, REUSE, REVIATLISE

It has been said that the greenest buildings are the ones that we already have. Upgrading existing buildings is considered a more climate-friendly strategy than producing new energy efficient buildings.

HYBRID PUBLIC DOMAIN // CAULFIELD NORTH

NEW

NEW

There are many aging buildings throughout Melbourne that are primed for demolition and are set to be replaced by new ones, making Australia one of the leading producers of construction related waste. New construction not only contributes to over 40% of global CO2 emissions but it also uses vast amounts of natural resources.

OLD Melbourne Drill Hall -MGS architects

OLD OLD OL O L LD

REUSING INDUSTRIAL & COMMERCIAL BUILDINGS Industrial and commercial buildings are especially well suited to adaptive reuse due to their large open spaces and strucural layout. The decline of heavy industry has left a legacy of abandoned, idled, and underutilized dormant sites across Melbourne.

Caixa Forum -Herzog De Meuron

REUSING BUILDING COMPONENTS Typical life cycle of commercial building elements

This thesis is a critique and a response to the existing Monash University master plan, where high density buildings would replace existing ones. easy sub division

The thesis will focus on applying adaptive reuse practices to Caulfield Plaza, which is in need of revitalization in order to achieve its potential in a vibrant social and economic climate.

envelope 60+ years

interior 5-10 years

structure 80-100+ years

Building envelopes and interiors can be redeveloped through different combinations.

The aim is to create a precedent which can be applied to buildings throughout the world and show that careful planning and incremental change can be more effective than large towers when dealing with increasing density.

column grid structures

creating intermediary floor with light structure

refit/ refurbish

extend

selective demolition


LEARN, WORK, LIVE, PLAY

REVITALISING CAULFIELD

Thousands of students and staff attend Monash University each year, generating businesses and social activities

Total enrolments - 14,329 students

Academic staff - 1120 Total staff - 1992

40% international 5,732 students

NEED FOR COMMUNITY PROGRAM Despite having a major education institution and strong access to public transport, there are no community sporting facilities within walking distance.

Oakleigh Recreation Centre 8.1 km 15 minutes drive Caulfield Recreation Centre 4.3km 11 minute drive

Carnegie Swim Centre 3.9km 9 minute drive

REVITALISING CAULFIELD PLAZA

CAULFIELD PLAZA (existing condition)

SITE PLAN

- Opened on 04/03/1982 - Parking grid structure - A Myer shopping centre development - Floor area: 2675m2 - Floor area ratio: 1.83 PROGRAM - Pharmacy - Bakery - Grocery store - Bank - Supermarket - Travel agent - Take away food - Solicitor - Gift shop - Rooftop + underground parking (284 spots)

MONASH UNIVERSITY MASTER PLAN (by MGS architects) - Projected completion date: - 15 to 20 years - Floor area: approx. 1,2000m2 - Floor area ratio: approx. 4

PROGRAM - New student housing (800 beds) - New law building

- New master plan involves heavy demolition of existing site. - Is it economically viable to be completed in current unstable finanical conditions?


6

3

2 4

1 5

1 2

1

3

4

5

REVITALISING CAULFIELD PLAZA (phase 1)

REVITALISING CAULFIELD PLAZA (phase 2)

REVITALISING CAULFIELD PLAZA (phase 3)

REVITALISING CAULFIELD (future)

Projected completion date: - 2 to 3years - Floor area: approx. 4100m2 - Floor area ratio: approx. 2.3

Projected completion date: - 2 to 3years - Floor area: approx. 4200m2 - Floor area ratio: approx. 2.3

Projected completion date: - 1 year - Floor area: approx. 4200m2 - Floor area ratio: approx. 2.6

Projected completion date: - ??? - Floor area: approx. ??? - Floor area ratio: approx. ???

CHANGES 1) Removal of ground floor and basement car parking.

CHANGES 1) Interactive landscaping.

CHANGES 1) Carparking converted to temporary housing (26 flats) New flats utilse existing parking grid structure.

Adjacent buildings will begin to implement adaptive reuse strategies to increase density as required in the future.

2) New retail. 2) Extend existing brick pavement towards train station and University, activating existing laneway. 3) New level of parking included to compensate for loss of basement car park. Car parking will be accessed via new connection adjacent parking facility.

3) Supermarket recieving bay converted to ampitheatre. 4) Supermarket moved to basement. 5) Community sporting facility

AMPITHEATRE - PERFORMANCE SPACE

AMPITHEATRE - OUTDOOR CINEMA

AMPITHEATRE - OUTDOOR CINEMA


RETAIL 3

SUPER MARKET LOADING SERVICES

RETAIL 4

RETAIL WASTE ROOM RETAIL 5 RESIDENTIAL WASTE ROOM

RESIDENTIAL BIKE STORAGE

STORAGE

RESIDENTIAL LOBBY

RETAIL 6

RETAIL 1

MULTI PURPOSE / PERFORMANCE SPACE

CAFE

MULTI PURPOSE / PERFORMANCE SPACE

OFFICE LOBBY

CAFE

FOOD COURT

MONASH UNIVERSITY

CAULFIELD TRAIN STATION (PLATFORM 4)

FIRST FLOOR PLAN (PHASE 1)


COMMUNITY LOUNGE

COMMUNITY LOUNGE

COMMUNITY CANTEEN

COMMUNITY CANTEEN

LAUNDRY

LAUNDRY

RESIDENTIAL LOBBY

RESIDENTIAL LOBBY

OFFICE

OFFICE

OFFICE

OFFICE

LEVEL 4 PLAN - 1:200

PLAYGROUND PLAYGROUND

CHILDCARE CENTRE

CHILDCARE CENTRE

OFFICE

OFFICE

SHARED COURTYARD

LEVEL 3 APARTMENT - 1:200

SHARED COURTYARD

LEVEL 5 APARTMENT - 1:200

FIRST FLOOR PLAN (PHASE 1) - 1:200 FIRST FLOOR PLAN (PHASE 3) - 1:200

ARRANGEMENT 1

ARRANGEMENT 2

ARRANGEMENT 3

TYPE 1 - 4 x studio flat

level 5

level 5

TYPE 4 - 2 x bedroom flat

TYPE 2 - 1 x bedroom flat

TYPE 6 - 5 x bedroom flat

level 5

first floor

first floor

first floor

TYPE 3 - 2 x bedroom flat

level 4

level 4

level 4

level 3

level 3

level 3

TOWER HOUSING ARRANGEMENTS- 1:200

ground floor

ground floor

ground floor

first floor

TYPE 5 - home office/ business

ground floor

ground floor

TEMPORARY HOUSING TYPES - 1:200



C!TY SPEAK - flexiCOMMUNITY

CIRCULATION SYSTEM

HOUSING // PRAHRAN flexiCOMMUNITY is a housing system located on essex street, prahran. The brief requires housing for three different demographics; seniors, students and multi generational families. Prahran has quite an active community with many lush parks and chapel street within walking distance. The main idea driving the design is to have 3 different zones for the different housing types whilst having shared community spaces that allow different age groups to interact with each other, thus creating a closer and safer community. The apartments are designed in way that allows easy expansion and subdivision if required in the future.

MALVER

CHAPEL

STREET

N ROA

D

SWIMMING POOL

PROGRAM DISTRIBUTION - Main entrance responds to the swimming pool on other side. SWIMMING POOL

- Public and Community areas are exposed to the park and swimming pool. - Rooftop landscaping and program creates interaction within the community while providing views


3 4

PUBLIC/ COMMUNITY AREAS 1. LIBRARY/ LOUNGE AREA

4. LAUNDRY

2. RECREATIONAL ROOM

5. BICYLE PARKING

3. CAFE

6. GYM

FLEXIBILE SPACES - In between the first levels of 3 bedroom flats is an open space. - These spaces are divided in half and belong to the home owner. - These outdoor spaces can be modified according to the home owners needs. - Home owners can purchase neighbouring space.

FIRST FLOOR

PUBLIC/ PRIVATE AREAS - In between the ground floor of 3 bedroom flats is a void space. - These void spaces can be used as entertainment spaces, encouraging interaction within the community.

GROUND FLOOR

FIRST FLOOR

GROUND FLOOR

Option 1 -outdoor space Option 2 - home office -outdoor space

FIRST FLOOR

PUBLIC

PRIVATE

GROUND FLOOR Option 3 -bedroom -living space

Option 4 -bedroom -balcony -study room

GROUND FLOOR


CREMORNE 2025 (www.cremorne2025.org) STRATEGIC GROWTH PLAN // CREMORNE (group project)

Cremorne2025 is an urban design studio which is part of the Department of Architecture (Faculty of Art, Design and Architecture) at Monash University, Melbourne, Australia. In this studio, students are asked to collaboratively envision Cremorne in 2025 as a new, lively, mixed-use, dense and sustainable inner suburb of Melbourne. As part of their overall design vision, the students pursue the activation and occupation of urban space as a central strategy. This approach promotes new ideas for Cremorne and also an understanding of the future of Melbourne in a wider sense. At present, we truly live in the first urban decade. According to the UN, in 2008 the rural/urban tipping point was reached and now more than half of the world’s population live in cities - for the first time in human history! The population of Melbourne’s Metropolitan Area is predicted to grow by 1.8 M by the year 2036. This figure of growth reflects Melbourne’s dynamism and attractiveness as a City with a future. At the same time, it highlights the great challenge of how and where the city will host these new citizens.

To handle the pressure of population growth, cities like Melbourne as well as others in the Americas and Europe commonly pushed their limits outwards by expanding into their rural areas. The often uncontrolled sprawl created manifold problems: detached low-rise settlements with poor and inefficient infrastructure, social segregation, ever-increasing land consumption and rising costs for expanding infrastructure networks.


CIRCULATION CONCEPT PEDESTRIAN VEHICLE

CREMORNE 2025 (www.cremorne2025.org) TOURIST & BUSINESS HUB // CREMORNE

Cremorne is a suburb that is located within walking distance to Melbourne Park, home to Melbourne's major sporting and entertainment venues. Each year, venues such as Rod Laver Arena, the MCG and AAMI park attract millions of visitors with famous international events such as the Australian Open (tennis) and national events such as AFL, A-League Soccer and Rugby. As the population continues to increase, the popularity of the events held at these venues will inevitably increase, potentially attracting more international visitors as well as people from around Australia. In order to allow visitors to fully experience Melbourne culture, a new Hotel and convention centre will be developed within Cremorne. Not only will this project bring a steady cash flow into Cremorne, but it will also provide locals with jobs that are close to home.

SITE PLAN

LEGEND 1. CONFERENCE/ FUNCTION ROOM 2. OFFICES 3. EXHIBITION/ CONVENTION SPACE 4. STAFF AREA 5. HOTEL LOBBY 6. LOUNGE 7.RESTAURANT 8. HOTEL ROOM 9. LAUNDRY 10. KITCHEN 11. BAR 12. GYM 13. SHOP 14. CAFE 15. SHARED BALCONY

11

The project consists of two high rise buildings (one hotel and one office) that are tied together by a podium that connects to Richmond station as well as a landscape bridge that leads to Melbourne Park.

15

8

Deciduous plants have been incorporated into the facade of the building in order to protect inhabitatants from direct western sun during harsh summers, while letting light through during winter. 5

7

11

6 4

SECTION A

10 9

RETAIL

HOUSING

SECTION B


FISHING RETREAT CABIN HOUSING // THURSDAY ISLAND This cabin is designed to open the interior towards the sea. Due to the constant high temperatures of the region, this cabin aims to create a more comfortable environment by maximising ventilation and reducing exposure towards direct sunlight. This cabin is designed as a light weight timber structure which ensures that no heat is stored within the building throughout the day.

west sun

east sun Narrow floor plan to limit the expoxure towards eastern and western sun

-Wind scoops take advantage of the south eastern/ north western winds to further ventilate the building. -The wind scoops act as buffer spaces that reduce the heat from eastern/western sunlight -Wind scoops can be closed off during cyclone seasons

-Higher ceiling allows hot air to rise and be released. -Building on stilts provides further ventilation underneath the building

N


230x120mm beam

50x100mm purlin

corrugated steel

glue laminated timber beam external cladding, 900mm: 20mm vertical boarding, horizontal 10 mm battens.

100x100mm beam

timber louvre system fly screen

bi-fold door

primary structure connections

primary structure

22mm timber decking

50x100mm joist timber beam

exterior secondary structure concrete footing

detail section 1:20


1

2

3

4

5

6

1. public outdoor space / entrance 2. kitchen / dining 3. living 4. bathroom 5. bed room 6. private outdoor space


SOLUTION WITHOUT POLUTTION GHOST GHO HOST S TO TOWNS OWNS W

Abonded Ghost Towns

REUSE WASTE

TAR SANDS MINING TAILING PONDS

DEFORESTATION

MINED SAND AND EARTH

MASSIVE WASTE PRODUCTS CREATED

CONSTRUCTION

GROWTH

CAPCITY

Pipelines Pipelines

Pipelines

Mining expansion

Mining expansion

Mining expansion

Reuse of Ghost Towns Exporting processed materials

1:5,000,000 (1cm:5km)

1:5,000,000

1:5,000,000

(1cm:5km)

(1cm:5km)

Factory 1600m2

Transport Terminal 300m2

Health 500m2

Factory 1600m2

Workshop 800m2

Storage 2000m2

Recreation 1500m2

Commercial/Retail m2

Entertainment 500m2

Education 750m2

Hospitality 750m2

Transport Terminal 300m2

Health 500m2

Workshop 800m2

Storage 2000m2

Commercial/Retail m2

Entertainment 500m2

Education 750m2

Hospitality 750m2

Temporary accomodation + services

Individual Components 50m2

Transport Terminal 300m2

Health 500m2

Workshop 800m2

Storage 2000m2

Individual Components 50m2

Recreation 1500m2

Commercial/Retail m2

Entertainment 500m2

Education 750m2

Hospitality 750m2

Produce green house 750m2 live stock 300m2

Produce green house 750m2 live stock 300m2

Temporary accomodation + services

Factory 1600m2

Recreation 1500m2

Produce green house 750m2 live stock 300m2

Temporary accomodation + services

Individual Components 50m2

Timber frame -Made with CLT (cross laminated timber)

Housing Modules

Additional modules can be added on

Housing modules can be removed from frame

Reuseable timber

Old mining Machines

Recycled Steel

Waste Sand from Mining

Processed Sand Blocks & Walls


WARNING MAY CONTAIN TRACES OF WASTE Edmonton

CONSTRUCTION, MATERIALS PROCESSING FACTORY

GROWTH, SELF MANUFACTURNING FROM WASTE PRODUCTS

CAPACITY REACHED, THE TOWN CONSISTS OF A BIODEGRADABLE TOWN CENTRE AND MODULAR PRE FABRICATED INDIVIDUAL COMPONENTS

Fort Mc Murray

DECAY, WHEN MINING STOPS OR MOVE THE INDIVIDUAL COMPONETS ARE EXPORTED OUT OF THE TOWN TO NEW SITES AND THE TOWN CENTRE BIODEGRADES

DECAY

Pipelines Mining expansion Reuse of Ghost Towns Exporting processed materials

1:5,000,000 (1cm:5km)

Factory 1600m2

Transport Terminal 300m2

egg room

Workshop 800m2

Storage 2000m2

Recreation 1500m2

Commercial/Retail m2

Entertainment 500m2

Education 750m2

Hospitality 750m2

feed room

Health 500m2 produce

Produce green house 750m2 live stock 300m2

washing, ing, pro processing, processing storage

compost ompost heating heatin

Temporary accomodation + services

compost ost heating

nesting

ventilation

ventilation

Greenhouse plan | scale 1:200

Greenhouse section | scale 1:50

Individual Components 50m2


COBURG Parking Public Space

Public Transport

BELL S T.

Proposal- Transport Interchange SYDN

BELL ST. BELL S T.

E Y R D.

E Y R D.

SYDN

SYDN

+ Public transport

+

+ Recreation

E Y R D.

BELL S T.

Convenience

-Accomodate a new type of urban life around infrastructural elements. VICTO VICTO

VICTORIA

R I A S T. T

RD.

St.

SYDNEY

LOUISA

MURNO

S T.

E Y R D.

VICTO

R I A S T.

MURNO ST.

Train Station

Busy

-Coburg has three public spaces; Victoria Street mall, a park behind the leisure centre and behind the train line. -Only Victoria Street mall is busy, because of its distance to Sydney road.

Built Form

open carpark

-Open carparks make up almost half of coburg and are vital for retail shops. -However, these carparks will be removed in the future to make way for high density buildings.

MURNO

S T.

E Y R D.

Coburg has trams buses and trains, however, the stops are scattered throughout the site.

- Boost in activity will increase safety around public transport areas. Empty

SYDN

Tram Stop

E Y R D.

Bus Stop

S T.

- Create public domain where people from different demographics will be brougtht together. - Provide more free leisure activites.

SYDN

SYDN

MURNO

ST.

R I A S T.


2 1

3

1. TRAIN STATION 2. SKATE PARK 3. BASKETBALL COURT 4. BOCCE COURT 5. RETAIL 6. COMMUTER LOUNGE 7. INFORMATION/ STAFF OFFICE

5

5

5

7

6

5

4 GROUND FLOOR - TRANSPORT INTERCHANGE


Landscaping

-Landscaping forms stairs that lead to the train station -Creates seating that allows people to watch nearby activities

- Forms a row of seating that can be used by people waiting in line for the bus or for spectators watching sports


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.