System Overview of Telensa
…. rolling out across the country
…. rolling out across the country
Base Sta:on Controls Range
up to 5,000 Telecells 2-‐5 Miles
Fast, easy deployment over wide area
base sta:ons gives radio coverage over several kilometres
base sta:ons gives radio coverage over several kilometres
…..avoid complexi:es of mesh (sequenced deployment)
achieve complete area coverage in a few days
….. thousands of telecells per base sta:on can then connect automa:cally
Telecells Control Switching
via Nema socket On / Off
Telecells Control Switching Dimming
via Nema socket On / Off via 1-‐10V Analogue or DALI Module
Telecells Control Switching Dimming
via 3 / 5 cores On / Off via integral module
Telecells Control Switching Dimming Antenna
via 3 / 5 cores On / Off via integral module selectable
Installa:on
mini
NEMA 2-‐part
mini
Maintenance Factors
CMS can be configured to do this compensa:ng for MF i.e. within the :meframe of the cleaning cycle, progressively increase the power and light output to compensate for the build-‐up of dirt. The CMS is capable, therefore, of making this energy saving.
Night Scou:ng With CMS most faults are detected automa:cally, so the manual scou:ng opera:on can be scaled down. With CMS it would be appropriate to reduce the opera:on by 1 person, a saving of £60k per annum.
PLANet – Public Ligh:ng Ac:ve Network -‐ user interface
a very brief taster……
show all assets over wide area at increasing zoom
show all assets over wide area at increasing zoom
show all assets over wide area at increasing zoom
show all assets over wide area at increasing zoom
show all assets over wide area at increasing zoom
show all assets over wide area at increasing zoom
…with satellite view available…
…and streetview
…..in this case showing a base sta:on on a column
filtering in the grid view ….
…. results show several “High Street”
filtering in the grid view ….
refine filter….
…. iden:fies chosen loca:on “High Street, Newport”
refine filter….
…. iden:fies chosen loca:on “High Street, Newport”
…. zoom to selected refine filter….
goes to selected columns
flexible screen layout op:ons display different fields of informa:on
flexible screen layout op:ons re-‐arrange fields sequence
flexible screen layout op:ons
context filtering -‐ search
flexible screen layout op:ons
context filtering -‐ select
context filtering -‐ checkbox
context filtering – date / :me
filter for faults… in grid and show on map
select individual column for more detail
a) b) c) d)
select individual column for more detail
detailed status latest event log latest electrical values recent daily energy consump:on
a) b) c) d)
select individual column for more detail
detailed status latest event log latest electrical values recent daily energy consump:on
a) b) c) d)
select individual column for more detail
detailed status latest event log latest electrical values recent energy daily consump:on
a) b) c) d)
select individual column for more detail
detailed status latest event log latest electrical values recent energy daily consump:on
a) b) c) d)
select individual column for more detail
detailed status latest event log latest electrical values recent energy daily consump:on
e.g. onset of fault
also perform ac:ons….
also perform ac:ons…. a) interrogate electrical values b) override switch/dim
also perform ac:ons…. a) interrogate electrical values b) override switch/dim
integra:on with leading Asset Management Systems e.g.
Integra:on with leading Asset Management Systems e.g.
CMS for the new ligh:ng landscape…
Telensa PLANet