HESTON DELIVERY PLAN 1.1

Page 1

129 HESTON ROAD DELIVERY PLAN DECEMBER 2020

1


OVERVIEW The Heston Road project is presently going through a management and delivery restructure to ensure the delivery of the 9 properties and the retail unit Moninstone have made the following appointments to ensure the overall project and facilitate the sale of the properties in 2021  Appointment of Contract Administrator Andrew Breathwick  Engaged the following professional team members CIBER Limited – Project Management Harrabin – Independent PQS MJ Architects – Design and Procurement

2


IMMEDIATE ACTIONS TAKEN W/E 27TH NOV Moninstone have initiated the following  Reprogrammed the project for a 2021 finish  Commenced a procurement process to accept an incoming contractor  Taken steps to secure the site, and checked the status of building control inspections so far ( favourable reports with no defects as at 27/11)  Engaged with the outgoing contractor for transitions  Retained the incumbent designer Ed Deacon to finish design under warranty  Retained the PQS for valuation  Initiated information exchanges with and Independent PQS Practice 3


DELIVERY TEAM

4


OUTLINE PROGRAMME EARLY JUNE 2021 FINISH

5


THANK YOU HESTON@CIBER.GROUP HTTP://WWW.CIBER.GROUP


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.